Method, device, computer device, readable storage medium and program product for processing violation deduction information
By identifying and generating the time conditions for violation point deduction information and using computer technology to generate notifications, the problem of scattered violation information is solved, unified management and efficient processing are achieved, and the safety of power operations is improved.
Patent Information
- Application Number
- CN202411598240.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-11
- Publication Date
- 2025-10-14
- Estimated Expiration
- 2044-11-11
AI Technical Summary
During power operations, the standards for deducting points for violations are not unified among various units, resulting in the dispersion and inability to share violation information, low processing efficiency, and affecting the safe operation of the power system.
By obtaining initial violation point deduction information, identifying time information, and generating a violation point deduction notice based on preset conditions, a unified violation management standard is achieved, and computer technology is used to assist in processing violation point deduction information.
It improves the processing efficiency of violation point deduction information and the safety of power operations, and realizes global management and analysis based on universal violation management standards.
Smart Images

Figure CN119516795B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of computer, in particular to a processing method and device of violation deduction information, computer equipment, computer readable storage medium and computer program product. BACKGROUND
[0002] In the process of electric power operation or power grid operation, a major violation accident will directly cause great harm to the safety of the operating personnel and the safe operation of the power system. In order to prevent the violation accident, corresponding violation management regulations need to be established to meet the safety requirements of the power system.
[0003] However, under the background of separate construction of violation management applications in various units, there is a problem that the same violation has different violation codes and deduction values in different units due to the non-uniform violation deduction standard of personnel, and since the violation information is scattered in different units and cannot be shared, it is not conducive to global analysis of the violation information, resulting in a problem of low processing efficiency of violation deduction information. SUMMARY
[0004] Therefore, it is necessary to provide a processing method and device of violation deduction information, computer equipment, computer readable storage medium and computer program product aiming at the above technical problems.
[0005] In a first aspect, the present application provides a processing method of violation deduction information, comprising:
[0006] obtaining initial violation deduction information to be processed, determining a current state of the initial violation deduction information, and obtaining first violation deduction information and second violation deduction information according to the current state;
[0007] identifying first time information contained in the first violation deduction information, and identifying second time information contained in the second violation deduction information;
[0008] According to a first time condition, the first time information is identified to obtain third violation deduction information that does not satisfy the first time condition;
[0009] According to a second time condition, the second time information is identified to obtain fourth violation deduction information that does not satisfy the second time condition;
[0010] The first violation deduction information, the second violation deduction information, the third violation deduction information and the fourth violation deduction information are respectively generated into corresponding violation deduction notification forms according to a preset violation deduction notification form template.
[0011] In one of the embodiments, the identification of the first time information contained in the first violation deduction information comprises:
[0012] If the first traffic violation deduction information belongs to the target traffic violation deduction type, the attribute information in the remarks column contained in the first traffic violation deduction information is extracted, and the first time information is obtained based on the attribute information in the remarks column; if the first traffic violation deduction information does not belong to the target traffic violation deduction type, the briefing record information contained in the first traffic violation deduction information is extracted, and the first time information is obtained based on the briefing record information.
[0013] In one embodiment, before identifying the second time information included in the second traffic violation point deduction information, the method further includes:
[0014] Determining the violation point deduction type of the second violation point deduction information; and selecting corresponding time information identification methods according to the violation point deduction type;
[0015] The identifying the second time information included in the second traffic violation point deduction information includes:
[0016] According to the time information identification method, the second time information contained in the second traffic violation point deduction information of each traffic violation point deduction type is identified respectively.
[0017] In one embodiment, the first time information includes construction time, briefing time, and work ticket filling time; the first time information is identified according to the first time condition to obtain the third violation point deduction information that does not meet the first time condition, including:
[0018] The construction time, the briefing time and the work ticket filling time are sorted according to the time sequence to obtain a time sequence corresponding to the first time information; in the time sequence, a target time sequence that does not meet the first time condition is identified; and the third violation deduction information is determined based on the target time sequence.
[0019] In one embodiment, the second time information includes a receiving time and a planned start time; and identifying the second time information according to the second time condition to obtain fourth violation point deduction information that does not meet the second time condition includes:
[0020] According to the receiving time and the planned start time, a time difference corresponding to the receiving time and the planned start time is obtained; among the time differences, a target time difference that does not meet any sub-condition included in the second time condition is identified; according to the target time difference, the fourth violation penalty information is determined.
[0021] In one of the embodiments, after the corresponding violation deduction notice is generated according to the preset violation deduction notice template, the method further comprises:
[0022] determining the violation types corresponding to the first violation deduction information, the second violation deduction information, the third violation deduction information and the fourth violation deduction information respectively; according to the violation types, matching target information entries in a violation deduction information database respectively, and inputting the violation deduction notice into the target information entries in the violation deduction information database.
[0023] In a second aspect, the application further provides a violation deduction information processing device, comprising:
[0024] a state determining module, configured to acquire initial violation deduction information to be processed, determine a current state of the initial violation deduction information, and obtain first violation deduction information and second violation deduction information according to the current state;
[0025] a time identifying module, configured to identify first time information contained in the first violation deduction information, and identify second time information contained in the second violation deduction information;
[0026] a first identifying module, configured to identify the first time information according to a first time condition, and obtain third violation deduction information which does not satisfy the first time condition;
[0027] a second identifying module, configured to identify the second time information according to a second time condition, and obtain fourth violation deduction information which does not satisfy the second time condition;
[0028] a notice generating module, configured to generate corresponding violation deduction notices according to a preset violation deduction notice template, respectively for the first violation deduction information, the second violation deduction information, the third violation deduction information and the fourth violation deduction information.
[0029] In a third aspect, the application further provides a computer device, comprising a memory and a processor, the memory stores a computer program, and the processor implements the following steps when executing the computer program:
[0030] The initial violation deduction information to be processed is acquired, the current state of the initial violation deduction information is determined, and first violation deduction information and second violation deduction information are obtained according to the current state; first time information contained in the first violation deduction information is identified, and second time information contained in the second violation deduction information is identified; the first time information is identified according to a first time condition, and third violation deduction information that does not satisfy the first time condition is obtained; the second time information is identified according to a second time condition, and fourth violation deduction information that does not satisfy the second time condition is obtained; and the first violation deduction information, the second violation deduction information, the third violation deduction information, and the fourth violation deduction information are respectively generated into corresponding violation deduction notification forms according to a preset violation deduction notification form template.
[0031] In a fourth aspect, the present application further provides a computer readable storage medium, having a computer program stored thereon, the computer program being executed by a processor to implement the following steps:
[0032] The initial violation deduction information to be processed is acquired, the current state of the initial violation deduction information is determined, and first violation deduction information and second violation deduction information are obtained according to the current state; first time information contained in the first violation deduction information is identified, and second time information contained in the second violation deduction information is identified; the first time information is identified according to a first time condition, and third violation deduction information that does not satisfy the first time condition is obtained; the second time information is identified according to a second time condition, and fourth violation deduction information that does not satisfy the second time condition is obtained; and the first violation deduction information, the second violation deduction information, the third violation deduction information, and the fourth violation deduction information are respectively generated into corresponding violation deduction notification forms according to a preset violation deduction notification form template.
[0033] In a fifth aspect, the present application further provides a computer program product, comprising a computer program, the computer program being executed by a processor to implement the following steps:
[0034] The initial violation deduction information to be processed is acquired, the current state of the initial violation deduction information is determined, and first violation deduction information and second violation deduction information are obtained according to the current state; first time information contained in the first violation deduction information is identified, and second time information contained in the second violation deduction information is identified; the first time information is identified according to a first time condition, and third violation deduction information that does not satisfy the first time condition is obtained; the second time information is identified according to a second time condition, and fourth violation deduction information that does not satisfy the second time condition is obtained; and the first violation deduction information, the second violation deduction information, the third violation deduction information, and the fourth violation deduction information are respectively generated into corresponding violation deduction notification forms according to a preset violation deduction notification form template.
[0035] The violation deduction information processing method, device, computer equipment, computer readable storage medium, and computer program product described above determine the current state of initial violation deduction information, and obtain first violation deduction information and second violation deduction information according to the current state; identify first time information contained in the first violation deduction information, and identify second time information contained in the second violation deduction information; identify the first time information according to a first time condition, and obtain third violation deduction information that does not satisfy the first time condition; identify the second time information according to a second time condition, and obtain fourth violation deduction information that does not satisfy the second time condition; and generate the first violation deduction information, the second violation deduction information, the third violation deduction information, and the fourth violation deduction information into corresponding violation deduction notification forms according to a preset violation deduction notification form template. The entire violation deduction information processing process described above does not require a large amount of manual participation, and the processing of violation deduction information is assisted by computer technology, and work management is performed according to unified violation deduction standards, which realizes global management and analysis of violation information based on a general violation management standard, thereby improving the processing efficiency of violation deduction information and the overall violation management efficiency of a company, and also facilitates the safety of power work. BRIEF DESCRIPTION OF DRAWINGS
[0036] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the related art, the drawings needed to be used in the description of the embodiments of the present application or the related art will be briefly introduced. Obviously, the drawings in the following description are only some embodiments of the present application, and other related drawings can be obtained by those skilled in the art without creative labor.
[0037] Figure 1 An application environment diagram of the violation deduction information processing method in an embodiment;
[0038]
[0038] Figure 2 a flowchart of a processing method of violation deduction information in an embodiment;
[0039] Figure 3 a flowchart of a processing method of violation deduction information in an embodiment;
[0040] Figure 4 a flowchart of a processing method of violation deduction information in an embodiment;
[0041] Figure 5 a flowchart of a processing method of violation deduction information in an embodiment;
[0042] Figure 6 a structural block diagram of a processing device of violation deduction information in an embodiment;
[0043] Figure 7 an internal structure diagram of a computer device in an embodiment. DETAILED DESCRIPTION
[0044] In order to make the objects, technical solutions and advantages of the present application clearer, the present application will be further described in detail below with reference to the drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present application and should not be used to limit the present application.
[0045] The processing method of violation deduction information provided by the embodiments of the present application can be applied in an application environment as shown in the figure. Figure 1 In the application environment, a terminal communicates with a server through a network. A data storage system can store data required to be processed by the server. The data storage system can be integrated on the server, or placed on a cloud or other network server.
[0046] Specifically, the processing method of violation deduction information provided by the embodiments of the present application can be executed by the server.
[0047] For example, the server obtains initial violation deduction information to be processed, determines a current state of the initial violation deduction information, and obtains first violation deduction information and second violation deduction information according to the current state; the server identifies first time information contained in the first violation deduction information, and identifies second time information contained in the second violation deduction information; the server identifies the first time information according to a first time condition, and obtains third violation deduction information that does not satisfy the first time condition; the server identifies the second time information according to a second time condition, and obtains fourth violation deduction information that does not satisfy the second time condition; and the server generates corresponding violation deduction notices according to a preset violation deduction notice template, respectively, for the first violation deduction information, the second violation deduction information, the third violation deduction information and the fourth violation deduction information.
[0048] In the application environment as Figure 1 shown, the terminal can be, but is not limited to, various personal computers, notebook computers, smart phones and tablet computers. The server can be implemented by an independent server or a server cluster composed of multiple servers.
[0049] In one embodiment, as Figure 2 shown, a processing method of violation deduction information is provided, which is described by taking the server in Figure 1 as an example and includes the following steps.
[0050] Step S201, obtaining initial violation deduction information to be processed, determining the current state of the initial violation deduction information, and obtaining first violation deduction information and second violation deduction information according to the current state.
[0051] Among them, the initial violation deduction information can include personal violation deduction red-green light statistics, personal violation deduction red-green light statistics export, personal violation deduction detail list, personal violation deduction detail list export, personal violation deduction details, contractor violation deduction statistics, contractor violation deduction statistics export, contractor personal deduction detail list, contractor personal deduction detail list export, and contractor personal deduction details and other information.
[0052] Among them, the current state can represent the current process state of the initial violation deduction information, for example: to be filled in, to be issued, to be received, to be permitted, and to be executed.
[0053] Among them, the current state corresponding to the first violation deduction information can be to be filled in and to be issued, and the current state corresponding to the second violation deduction information can be to be received, to be permitted, and to be executed.
[0054] Specifically, the server obtains the initial violation deduction information to be processed under the specified path, determines the current state of the initial violation deduction information, and divides the initial violation deduction information into first violation deduction information and second violation deduction information according to the current state.
[0055] For example, the server can obtain the initial violation deduction information to be processed from the path of "power grid management platform->safety production application->production operation management->violation deduction management".
[0056] Step S202, identifying first time information contained in the first violation deduction information, and identifying second time information contained in the second violation deduction information.
[0057] Among them, the first time information can include construction time, briefing time and filling in work order time, and the second time information can include receiving time and planned start time.
[0058] Specifically, the server determines a corresponding time information identification manner according to the work order type to which the first and second violation deduction information belongs, respectively, and identifies the first time information contained in the first violation deduction information and the second time information contained in the second violation deduction information according to the corresponding time information identification manner.
[0059] In step S203, the first time information is identified according to a first time condition, and third violation deduction information that does not satisfy the first time condition is obtained.
[0060] The first time condition can be survey time < disclosure time < work order filling time.
[0061] Specifically, the server sorts the survey time, the disclosure time and the work order filling time according to the time sequence, and obtains a time sequence corresponding to the first time information; in the time sequence, a target time sequence that does not satisfy the first time condition is identified; and the third violation deduction information that does not satisfy the first time condition is determined according to the target time sequence.
[0062] In step S204, the second time information is identified according to a second time condition, and fourth violation deduction information that does not satisfy the second time condition is obtained.
[0063] The second time condition can include two sub-conditions: a. the "receiving time" needs to be earlier than the "planned start time" by 6 hours or more; b. the "receiving time" needs to be earlier than 6 o'clock the day before the "planned start time", otherwise it is considered that the work order has a violation phenomenon.
[0064] Specifically, the server obtains a time difference value corresponding to the receiving time and the planned start time according to the receiving time and the planned start time; in the time difference value, a target time difference value that does not satisfy any sub-condition contained in the second time condition is identified; and the fourth violation deduction information that does not satisfy the second time condition is determined according to the target time difference value.
[0065] In step S205, the first violation deduction information, the second violation deduction information, the third violation deduction information and the fourth violation deduction information are respectively generated into corresponding violation deduction notification forms according to a preset violation deduction notification form template.
[0066] The violation deduction notification form is a formal document issued by the electric power safety production supervision department when handling work violations, which is used to notify the work personnel that he has committed a violation behavior in the construction process and has been deducted corresponding points.
[0067] Specifically, the server identifies the third and fourth violation deduction information as the violation deduction information with the record of the violation operation, and stores the third and fourth violation deduction information in a classified manner.
[0068] In the method, the current state of the initial violation deduction information is determined, and the first and second violation deduction information is obtained according to the current state; the first time information included in the first violation deduction information is identified, and the second time information included in the second violation deduction information is identified; then, the first time information is identified according to the first time condition, and the third violation deduction information that does not satisfy the first time condition is obtained, and the second time information is identified according to the second time condition, and the fourth violation deduction information that does not satisfy the second time condition is obtained; finally, the first, second, third and fourth violation deduction information is respectively generated into the corresponding violation deduction notice according to the preset violation deduction notice template. The entire processing of the violation deduction information does not require a large amount of manual participation, and the processing of the violation deduction information is assisted by computer technology, and the operation management is performed according to the unified violation deduction standard, the global management and analysis of the violation information based on the general violation management standard are realized, the processing efficiency of the violation deduction information and the overall violation management efficiency of the company are improved, and the safety of the power operation is also improved.
[0069] In one of the embodiments, in the step S202, the first time information included in the first violation deduction information is identified, and the identification specifically includes the following steps.
[0070] If the first violation deduction information belongs to the target violation deduction type, the note attribute information included in the first violation deduction information is extracted, and the first time information is obtained according to the note attribute information; if the first violation deduction information does not belong to the target violation deduction type, the disclosure record information included in the first violation deduction information is extracted, and the first time information is obtained according to the disclosure record information.
[0071] Specifically, the server determines whether the first violation deduction information belongs to the target violation deduction type, if the first violation deduction information belongs to the target violation deduction type, the note attribute information included in the first violation deduction information is extracted, and the first time information is obtained according to the note attribute information; if the first violation deduction information does not belong to the target violation deduction type, the disclosure record information included in the first violation deduction information is extracted, and the first time information is obtained according to the disclosure record information.
[0072] In the embodiment, the first time information contained in the first violation deduction information is identified efficiently and accurately by judging whether the first violation deduction information belongs to a target violation deduction type first, and then using a corresponding time information extraction mode.
[0073] In one of the embodiments, before the second time information contained in the second violation deduction information is identified, the method further includes the following steps:
[0074] determining a violation deduction type of the second violation deduction information, and selecting a corresponding time information identification mode according to the violation deduction type;
[0075] In the step S202, the second time information contained in the second violation deduction information is identified, including the following steps:
[0076] The second time information contained in the second violation deduction information of each violation deduction type is identified according to the time information identification mode.
[0077] The violation deduction type of the second violation deduction information includes, but is not limited to, improper operation, improper safety measures, and high-risk operation.
[0078] Specifically, the server determines the violation deduction type of the second violation deduction information, selects a corresponding time information identification mode according to the violation deduction type, and identifies the second time information contained in the second violation deduction information of each violation deduction type according to the time information identification mode.
[0079] In the embodiment, the second time information contained in the second violation deduction information is identified efficiently and accurately by determining the violation deduction type of the second violation deduction information first, and then using a corresponding time information extraction mode according to the violation deduction type.
[0080] In one of the embodiments, as shown in Figure 3 In the case where the first time information includes construction time, briefing time and filling operation ticket time, in the step S203, the first time information is identified according to the first time condition to obtain third violation deduction information that does not satisfy the first time condition, including the following steps:
[0081] In step S301, the construction time, the briefing time and the filling operation ticket time are sorted according to the time sequence to obtain a time sequence corresponding to the first time information.
[0082] In step S302, the target time sequence that does not satisfy the first time condition is identified in the time sequence.
[0083] Step S303: Determine the third traffic violation point deduction information according to the target time series.
[0084] Among them, the first time condition can be construction time < briefing time < time to fill in the work ticket.
[0085] Specifically, the server sorts the construction time, briefing time and work ticket filling time according to the time sequence to obtain the time series corresponding to the first time information; in the time series, the server identifies the target time series that does not meet the first time condition; finally, based on the target time series, the server determines the third violation deduction information that does not meet the first time condition.
[0086] In this embodiment, by sorting the construction time, briefing time and work ticket filling time according to the time sequence, and specifically filtering out the target time sequence in the obtained time sequence, the third violation point deduction information that does not meet the first time condition can be quickly and accurately identified, while improving the processing efficiency of the violation point deduction information.
[0087] In one embodiment, Figure 4 As shown, in the case where the second time information includes the receiving time and the planned start time, in the above step S204, the second time information is identified according to the second time condition to obtain the fourth traffic violation point deduction information that does not meet the second time condition, which specifically includes the following steps:
[0088] Step S401: Obtain the time difference between the receiving time and the planned start time according to the receiving time and the planned start time.
[0089] Step S402: Among the time differences, identify a target time difference that does not satisfy any sub-condition included in the second time condition.
[0090] Step S403: Determine fourth traffic violation point deduction information based on the target time difference.
[0091] Specifically, the server obtains the time difference corresponding to the receiving time and the planned start time based on the receiving time and the planned start time; in the time difference, identifies the target time difference that does not meet any sub-condition included in the second time condition; finally, based on the target time difference, determines the fourth violation deduction information that does not meet the second time condition.
[0092] In this embodiment, by screening out the target time difference that does not meet any sub-condition included in the second time condition from the time difference, and then based on the target time difference, quickly and accurately identifying the fourth violation point deduction information that does not meet the second time condition, the processing efficiency of the violation point deduction information is improved.
[0093] In one of the embodiments, after the corresponding violation deduction notices are respectively generated according to the preset violation deduction notice templates, the method further includes the following steps:
[0094] The first violation deduction information, the second violation deduction information, the third violation deduction information and the fourth violation deduction information are determined to correspond to respective violation types; according to the violation types, target information entries in the violation deduction information library are respectively matched, and the violation deduction notice is recorded into the target information entries in the violation deduction information library.
[0095] The information entry generally refers to a short information unit arranged according to certain rules in a book, a document, a database or an encyclopedia, similar to a title or a section.
[0096] Specifically, the server determines the violation types corresponding to the first violation deduction information, the second violation deduction information, the third violation deduction information and the fourth violation deduction information according to the preset violation type classification standard; then, according to the violation types, the target information entries in the violation deduction information library are respectively matched; finally, the violation deduction notice is recorded into the target information entries in the violation deduction information library.
[0097] In the embodiment, the violation types corresponding to the first violation deduction information, the second violation deduction information, the third violation deduction information and the fourth violation deduction information are determined according to the preset violation type classification standard, so that the violation deduction notice is recorded into the violation deduction information library in a rule-based and orderly manner according to the violation type as the classification standard, which is beneficial to efficient storage and subsequent review of the violation deduction notice.
[0098] In one of the embodiments, as shown in Figure 5 a processing method of violation deduction information in a specific embodiment is provided, which specifically includes the following steps:
[0099] In step S501, the initial violation deduction information to be processed is obtained, the current state of the initial violation deduction information is determined, and the first violation deduction information and the second violation deduction information are obtained according to the current state.
[0100] In step S502, if the first violation deduction information belongs to the target violation deduction type, the note column attribute information contained in the first violation deduction information is extracted, and the first time information is obtained according to the note column attribute information; if the first violation deduction information does not belong to the target violation deduction type, the disclosure record information contained in the first violation deduction information is extracted, and the first time information is obtained according to the disclosure record information.
[0101] In step S503, the type of the second violation deduction information is determined; according to the type of the violation deduction, a corresponding time information identification mode is selected; and according to the time information identification mode, the second time information contained in the second violation deduction information of each type of violation deduction is identified.
[0102] In step S504, the construction time, the briefing time and the time for filling in the work order are sorted according to the time sequence to obtain the time sequence corresponding to the first time information; in the time sequence, the target time sequence that does not meet the first time condition is identified; and according to the target time sequence, the third violation deduction information is determined.
[0103] In step S505, the time difference corresponding to the receiving time and the planned start time is obtained according to the receiving time and the planned start time; in the time difference, the target time difference that does not meet any sub-condition contained in the second time condition is identified; and according to the target time difference, the fourth violation deduction information is determined.
[0104] In step S506, the first violation deduction information, the second violation deduction information, the third violation deduction information and the fourth violation deduction information are respectively generated into corresponding violation deduction notices according to the preset violation deduction notice template.
[0105] In step S507, the types of the first violation deduction information, the second violation deduction information, the third violation deduction information and the fourth violation deduction information are determined; according to the types of the violations, the target information entries in the violation deduction information library are matched respectively, and the violation deduction notices are recorded into the target information entries in the violation deduction information library.
[0106] The beneficial effects brought by the above embodiments are as follows:
[0107] The scheme of the present application assists the processing of the violation deduction information by using computer technology, and manages the work according to the unified violation deduction standard, realizes the global management and analysis of the violation information based on the general violation management standard, thereby improving the processing efficiency of the violation deduction information and the overall violation management efficiency of the company, and is also beneficial to improving the safety of the power work.
[0108] It should be understood that although the steps in the flowcharts involved in the embodiments described above are shown in sequence according to the arrows, the steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified herein, the execution of the steps is not strictly limited in sequence, and the steps can be executed in other sequences. Moreover, at least some of the steps in the flowcharts involved in the embodiments described above can include multiple steps or multiple stages, which are not necessarily executed at the same time, but can be executed at different times, and the execution sequence of the steps or stages is not necessarily sequential, but can be executed alternately or alternately with at least part of other steps or steps or stages in other steps.
[0109] Based on the same inventive concept, the embodiments of the present application also provide a device for processing violation deduction information, which is used to implement the processing method of violation deduction information described above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme described in the above method, so the specific limitations in one or more device embodiments for processing violation deduction information provided below can refer to the limitations of the processing method of violation deduction information described above, which will not be repeated here.
[0110] In an exemplary embodiment, as shown in Figure 6 a device for processing violation deduction information is provided, comprising:
[0111] The state determination module 601 is configured to obtain initial violation deduction information to be processed, determine the current state of the initial violation deduction information, and obtain first violation deduction information and second violation deduction information according to the current state.
[0112] The time identification module 602 is configured to identify first time information contained in the first violation deduction information, and identify second time information contained in the second violation deduction information.
[0113] The first identification module 603 is configured to identify the first time information according to a first time condition, and obtain third violation deduction information that does not satisfy the first time condition.
[0114] The second identification module 604 is configured to identify the second time information according to a second time condition, and obtain fourth violation deduction information that does not satisfy the second time condition.
[0115] The notification form generation module 605 is configured to generate corresponding violation deduction notification forms for the first violation deduction information, the second violation deduction information, the third violation deduction information, and the fourth violation deduction information according to a preset violation deduction notification form template.
[0116] In an embodiment, the time identifying module 602 is further configured to: if the first violation deduction information belongs to the target violation deduction type, extract attribute information in a note column included in the first violation deduction information, and obtain the first time information according to the attribute information in the note column; if the first violation deduction information does not belong to the target violation deduction type, extract disclosure record information included in the first violation deduction information, and obtain the first time information according to the disclosure record information.
[0117] In an embodiment, the processing apparatus of the violation deduction information further includes a mode selecting module configured to determine a violation deduction type of the second violation deduction information; select a corresponding time information identifying mode according to the violation deduction type; and the time identifying module 602 is further configured to identify the second time information included in the second violation deduction information of each violation deduction type according to the time information identifying mode.
[0118] In an embodiment, the first time information includes construction time, disclosure time and job card filling time; the first identifying module 603 is further configured to sort the construction time, the disclosure time and the job card filling time according to a time sequence to obtain a time sequence corresponding to the first time information; identify a target time sequence that does not satisfy the first time condition in the time sequence; and determine the third violation deduction information according to the target time sequence.
[0119] In an embodiment, the second time information includes receiving time and planned start time; the second identifying module 604 is further configured to obtain a time difference value corresponding to the receiving time and the planned start time according to the receiving time and the planned start time; identify a target time difference value that does not satisfy any sub-condition included in the second time condition in the time difference value; and determine the fourth violation deduction information according to the target time difference value.
[0120] In an embodiment, the processing apparatus of the violation deduction information further includes a data inputting module configured to determine a violation type corresponding to the first violation deduction information, the second violation deduction information, the third violation deduction information and the fourth violation deduction information respectively; match a target information item in a violation deduction information database according to the violation type; and input a violation deduction notice sheet into the target information item in the violation deduction information database.
[0121] Each module in the above processing apparatus of the violation deduction information can be realized by software, hardware and a combination thereof in whole or in part. Each module can be embedded in or independent of a processor in a computer device in a hardware form, or stored in a memory in a computer device in a software form, so as to be called and executed by a processor to perform operations corresponding to each module.
[0122] In an example embodiment, a computer device, which can be a server, is provided, and an internal structure diagram of the computer device can be as shown in FIG. 1. Figure 7 The computer device includes a processor, a memory, an input / output interface, and a communication interface. The processor, the memory, and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. The processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The internal memory provides an environment for running the operating system and the computer program in the non-volatile storage medium. The database of the computer device is configured to store violation deduction notice data. The input / output interface of the computer device is configured to exchange information between the processor and external devices. The communication interface of the computer device is configured to communicate with terminals outside through a network connection. The computer program is executed by the processor to implement a violation deduction information processing method.
[0123] Those skilled in the art can understand that Figure 7 The structure shown in the above embodiment is only a block diagram of part of the structure related to the scheme of the present application, and does not constitute a limitation on the computer device to which the scheme of the present application is applied. The specific computer device can include more or fewer components than those shown in the diagram, or combine certain components, or have a different arrangement of components.
[0124] In an example embodiment, a computer device is provided, which includes a memory and a processor. The memory stores a computer program, and the processor executes the computer program to implement the steps in the above method embodiments.
[0125] In an example embodiment, a computer readable storage medium is provided, which stores a computer program. The computer program is executed by a processor to implement the steps in the above method embodiments.
[0126] In an example embodiment, a computer program product is provided, which includes a computer program. The computer program is executed by a processor to implement the steps in the above method embodiments.
[0127] It should be noted that the user information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data for analysis, stored data, displayed data, etc.) involved in the present application are all information and data authorized by the user or authorized by all parties, and the collection, use, and processing of the related data need to comply with relevant regulations.
[0128] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a non-volatile computer readable storage medium, and when executed, can include the processes of the above-mentioned embodiment methods. Any reference to memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile memory and volatile memory. The non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical storage, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. The volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration but not limitation, the RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM), etc. The database involved in the embodiments provided in the present application can include at least one of a relational database and a non-relational database. The non-relational database can include a distributed database based on a block chain, etc., without being limited thereto. The processor involved in the embodiments provided in the present application can be a general-purpose processor, a central processing unit, a graphics processing unit, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, an artificial intelligence (AI) processor, etc., without being limited thereto.
[0129] The technical features of the above embodiments can be combined in any manner. To make the description concise, all possible combinations of the technical features in the above embodiments are not described, but as long as the combinations of the technical features do not exist contradictions, they should be considered as the scope of the present application.
[0130] The above-described embodiments are merely illustrative of several embodiments of the present application, and the description is relatively specific and detailed, but should not be understood as a limitation on the scope of the patent. It should be noted that for those skilled in the art, without departing from the concept of the present application, a number of modifications and improvements can be made, which are all within the scope of the present application. Therefore, the scope of protection of the present application should be subject to the appended claims.
Claims
1. A method for processing traffic violation penalty information, characterized in that: The method comprises: Obtaining initial violation point deduction information to be processed in the power operation scenario, determining a current status of the initial violation point deduction information, and obtaining first violation point deduction information and second violation point deduction information based on the current status; the current status includes to be filled in, to be issued, to be received, to be approved, and in progress; the current status corresponding to the first violation point deduction information is to be filled in or to be issued, and the current status corresponding to the second violation point deduction information is to be received, to be approved, or in progress; Identifying first time information included in the first traffic violation point deduction information, and identifying second time information included in the second traffic violation point deduction information; the first time information includes the survey time, the briefing time, and the work ticket filling time, and the second time information includes the receipt time and the planned start time; Identifying the first time information according to the first time condition to obtain third traffic violation point deduction information that does not meet the first time condition; Identifying the second time information according to the second time condition to obtain fourth traffic violation point deduction information that does not meet the second time condition; The first violation point deduction information, the second violation point deduction information, the third violation point deduction information and the fourth violation point deduction information are respectively used to generate corresponding violation point deduction notification forms according to a preset violation point deduction notification form template.
2. The method according to claim 1, characterized in that The identifying the first time information included in the first traffic violation point deduction information includes: If the first traffic violation point deduction information belongs to the target traffic violation point deduction type, extracting the attribute information in the remarks column contained in the first traffic violation point deduction information, and obtaining the first time information according to the attribute information in the remarks column; If the first traffic violation point deduction information does not belong to the target traffic violation point deduction type, extracting the briefing record information contained in the first traffic violation point deduction information, and obtaining the first time information based on the briefing record information.
3. The method according to claim 1, characterized in that Before identifying the second time information included in the second traffic violation point deduction information, the method further includes: Determining the violation point deduction type of the second violation point deduction information; According to the violation point deduction type, select the corresponding time information identification method; The identifying the second time information included in the second traffic violation point deduction information includes: According to the time information identification method, the second time information contained in the second traffic violation point deduction information of each traffic violation point deduction type is identified respectively.
4. The method according to claim 1, wherein The first time information includes construction time, briefing time, and work ticket filling time; the first time information is identified according to the first time condition to obtain third violation point deduction information that does not meet the first time condition, including: Sorting the construction time, the briefing time, and the work ticket filling time according to a time sequence relationship to obtain a time sequence corresponding to the first time information; In the time series, identifying a target time series that does not meet the first time condition; The third traffic violation point deduction information is determined according to the target time series.
5. The method according to claim 1, wherein The second time information includes a receiving time and a planned start time; and the identifying the second time information according to the second time condition to obtain fourth violation point deduction information that does not meet the second time condition includes: Obtain a time difference between the receiving time and the planned start time according to the receiving time; Among the time differences, identifying a target time difference that does not satisfy any sub-condition included in the second time condition; The fourth traffic violation point deduction information is determined according to the target time difference.
6. The method according to any one of claims 1 to 5, characterized in that After generating the corresponding traffic violation point deduction notices according to the preset traffic violation point deduction notice template, the method further includes: Determining the violation types corresponding to the first violation point deduction information, the second violation point deduction information, the third violation point deduction information, and the fourth violation point deduction information respectively; According to the violation type, target information entries in the violation point deduction information database are matched respectively, and the violation point deduction notice is entered into the target information entry in the violation point deduction information database.
7. A device for processing traffic violation penalty information, characterized in that: The device comprises: a status determination module, configured to obtain initial violation point deduction information to be processed in an electric power operation scenario, determine a current status of the initial violation point deduction information, and obtain first violation point deduction information and second violation point deduction information based on the current status; the current status includes to be filled in, to be issued, to be received, to be approved, and in progress; the current status corresponding to the first violation point deduction information is to be filled in or to be issued, and the current status corresponding to the second violation point deduction information is to be received, to be approved, or in progress; a time identification module, configured to identify first time information contained in the first traffic violation point deduction information, and to identify second time information contained in the second traffic violation point deduction information; the first time information includes an inspection time, a briefing time, and a work ticket filling time; and the second time information includes a receipt time and a planned start time; a first identification module, configured to identify the first time information according to a first time condition, and obtain third traffic violation point deduction information that does not meet the first time condition; a second identification module, configured to identify the second time information according to a second time condition, and obtain fourth traffic violation point deduction information that does not meet the second time condition; The notification form generation module is used to generate corresponding violation point deduction notification forms for the first violation point deduction information, the second violation point deduction information, the third violation point deduction information and the fourth violation point deduction information according to a preset violation point deduction notification form template.
8. A computer device comprising a memory and a processor, wherein the memory stores a computer program, wherein: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 6 are implemented.
9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
10. A computer program product comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.
Citation Information
Patent Citations
Violation data query method and system and storage medium
CN110909231A
One-stop safety supervision method for electric power operation site
CN114971261A