Soft rock tunnel excavation method, device, equipment, system and medium
By combining milling equipment and scanning equipment, the construction profile of soft rock tunnels is adjusted in real time, and the problems of over-excavation or under-excavation in soft rock tunnel construction are solved, and construction efficiency and molding quality are improved.
Patent Information
- Application Number
- CN202411741684.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-29
- Publication Date
- 2025-03-04
AI Technical Summary
During the construction of soft rock tunnels, due to the weak properties of soft rock properties, there are often over-excavation or under-excavation, which affects the construction efficiency and forming quality of the tunnel.
A soft rock tunnel excavation method is adopted to scan the tunnel profile of the construction area in real time through the combination of preset milling equipment and scanning equipment to determine whether it coincides with the preset profile. If it does not overlap, the current profile is adjusted through steps such as interception processing and secondary milling to make it coincide with the preset profile.
It effectively avoids over-excavation or under-excavation, improves the efficiency and forming quality of tunnel construction, and achieves efficient excavation of soft rock tunnels.
Smart Images

Figure CN119554037A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel construction, and in particular to a soft rock tunnel excavation method, device, equipment, system and medium. Background Art
[0002] Soft rock tunnel refers to a tunnel structure formed in a soft rock geological body. When tunnel excavation and tunneling construction are carried out in a soft rock geological body, over-excavation may occur. Over-excavation will increase the amount of slag discharge, increase the thickness of the initial shotcrete, delay the construction period and increase the construction cost. If the over-excavation is not properly controlled, cavities and unstable surrounding rock will easily form behind the initial support. In order to reduce the amount of over-excavation, the external insertion angle of the drill hole is generally reduced while the opening position is converged to reduce over-excavation. There will be under-excavation near the supported steel frame section, and the under-excavation treatment takes a long time, affecting the progress and quality of the project.
[0003] In the prior art, when excavating soft rock tunnels, controlled blasting and milling are usually used for excavation. However, due to the weak characteristics of soft rock, over-excavation or under-excavation occurs during the actual construction process, which affects the construction efficiency and forming quality of the tunnel. Summary of the invention
[0004] The main purpose of the present application is to provide a soft rock tunnel excavation method, device, equipment, system and medium, aiming to solve the technical problem that in the related technology, when excavating soft rock tunnels, controlled blasting and milling are usually used for excavation construction. However, due to the weak characteristics of soft rock lithology, over-excavation or under-excavation occurs in the actual construction process, affecting the construction efficiency and forming quality of the tunnel.
[0005] To achieve the above objectives, the present application proposes a soft rock tunnel excavation method, comprising the following steps:
[0006] When the preset milling equipment is used to perform milling operations on the soft rock in the target construction area, the preset scanning equipment is used to perform scanning operations on the target construction area to obtain the current tunnel profile formed in the target construction area;
[0007] Determining whether the current tunnel profile coincides with a preset tunnel profile;
[0008] When they overlap, the process returns to the step of using a preset milling device to perform milling operations on the soft rock in the target construction area, and then using a preset scanning device to scan the target construction area to obtain the current tunnel contour formed in the target construction area until the tunnel is formed.
[0009] In one embodiment, after the step of determining whether the current tunnel profile coincides with the preset tunnel profile, the method further includes:
[0010] When they do not overlap, the non-overlapping area of the current tunnel outline and the preset tunnel outline is intercepted to form the current outline;
[0011] Determine the reason for the non-overlap between the current profile and the preset tunnel profile according to the coordinate position relationship between the current profile and the preset tunnel profile; wherein the non-overlap reason includes an over-break operation reason and an under-break operation reason;
[0012] According to the obtained non-overlapping reason, a treatment plan for the current contour is established; wherein the treatment plan includes: when the non-overlapping reason is the over-excavation operation, the treatment plan is to fill the area where the current contour is located; when the non-overlapping reason is the under-excavation operation, the treatment plan is to perform a secondary milling operation on the current contour;
[0013] The current contour is processed using the processing scheme until the current contour is eliminated and the current tunnel contour is made to coincide with the preset tunnel contour.
[0014] In one embodiment, before the step of using a preset scanning device to scan the target construction area when the preset milling device is used to perform milling operation on the soft rock in the target construction area to obtain the current tunnel profile formed in the target construction area, the step further includes:
[0015] Determining a preset center position of the soft rock tunnel according to preset construction data;
[0016] When the tunnel contours do not overlap, the step of intercepting the non-overlapping areas between the current tunnel contour and the preset tunnel contour to form the current contour comprises:
[0017] When they do not overlap, the preset center position is projected onto the current tunnel outline and the preset tunnel outline respectively to form a corresponding virtual positioning point;
[0018] The two virtual positioning points are overlapped, and the non-overlapping areas between the current tunnel outline and the preset tunnel outline are intercepted to form the current outline.
[0019] In one embodiment, after the step of overlapping the two virtual positioning points and intercepting the non-overlapping area between the current tunnel contour and the preset tunnel contour to form the current contour, the method further includes:
[0020] The non-overlapping reason corresponding to the current contour is output to perform an alarm operation.
[0021] In one embodiment, before the step of using a preset scanning device to scan the target construction area when the preset milling device is used to perform milling operation on the soft rock in the target construction area to obtain the current tunnel profile formed in the target construction area, the step further includes:
[0022] Using the preset scanning device to calibrate the preset tunnel profile in the target construction area;
[0023] The preset milling equipment is controlled to perform milling operations in the target construction area according to the preset tunnel profile.
[0024] Based on the same technical concept, in a second aspect, the present invention also proposes a soft rock tunnel excavation device, comprising:
[0025] A profile generating module is used to scan the target construction area using a preset scanning device when performing a milling operation on the soft rock in the target construction area using a preset milling device, so as to obtain a current tunnel profile formed in the target construction area;
[0026] A judging module, used to judge whether the current tunnel profile coincides with a preset tunnel profile;
[0027] The result output module is used to return to the step of using a preset scanning device to scan the target construction area when the preset milling equipment is used to perform milling operations on the soft rock in the target construction area to obtain the current tunnel contour formed in the target construction area, until the tunnel is formed.
[0028] Based on the same technical concept, in the third aspect, the present invention also proposes a soft rock tunnel excavation device, which includes a processor and a memory, and a cable-stayed bridge cable force test program is stored in the memory. When the cable-stayed bridge cable force test program is executed by the processor, the soft rock tunnel excavation method described in the first aspect is implemented.
[0029] Based on the same technical concept, in a fourth aspect, the present invention further proposes a soft rock tunnel excavation system, comprising:
[0030] Milling equipment;
[0031] a scanning device, the scanning device being mounted on the milling device; and,
[0032] The soft rock tunnel excavation equipment described in the third aspect is respectively communicatively connected with the milling equipment and the scanning equipment, and the soft rock tunnel excavation equipment can respectively generate a first control instruction to control the milling equipment and a second control instruction to control the scanning equipment.
[0033] In one embodiment, the scanning device comprises:
[0034] A positioning mechanism, wherein the positioning mechanism comprises a first connecting member, one end of which is connected to the milling device, and the other end of which extends toward the target construction area and forms a mounting hole, wherein a first laser transceiver is installed in the mounting hole, the first laser transceiver is communicatively connected to the soft rock tunnel excavation device, and the first laser transceiver can emit a positioning beam to the preset center position;
[0035] A rotating mechanism, the rotating mechanism comprising a driving member, the driving member is mounted on the first connecting member, a driving gear is mounted on the output end of the first connecting member, the driving gear is meshed with a gear ring sleeved on the outer periphery of the first connecting member, and a guide member is provided on the first connecting member to slide with the side surface of the gear ring, and a mounting position is formed on the side wall of the gear ring away from the first connecting member; and,
[0036] A scanning mechanism, the scanning mechanism includes a first telescopic driving member and a second telescopic driving member, the first telescopic driving member and the second telescopic driving member are spaced apart at the installation position along the extension direction of the first connecting member, the first telescopic member and the second telescopic member are both hinged to the installation position, and the telescopic ends of the first telescopic member and the second telescopic member are both connected to a second connecting member, the second connecting member extends along the extension direction of the first connecting member, and an installation groove is formed at one end of the second connecting member facing the target construction area, a scanner is installed in the installation groove, the first telescopic member and / or the second telescopic member can drive the second connecting member to approach or move away from the first connecting member to adjust the scanning direction of the scanner.
[0037] Based on the same technical concept, in the fifth aspect, the present invention also proposes a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by one or more processors, the soft rock tunnel excavation method described in the first aspect is implemented.
[0038] One or more technical solutions proposed in this application have at least the following technical effects:
[0039] The technical solution of the present application uses a preset scanning device to scan the target construction area when using a preset milling device to perform milling operations on the soft rock in the target construction area, so as to obtain the current tunnel contour formed in the target construction area, and determines whether the current tunnel contour coincides with the preset tunnel contour. If so, the technical solution returns to the step of scanning the target construction area using a preset scanning device to obtain the current tunnel contour formed in the target construction area when using the preset milling device to perform milling operations on the soft rock in the target construction area, until a tunnel is formed. When in use, it is determined whether to continue excavating the soft rock tunnel according to the degree of coincidence between the current tunnel contour obtained by scanning the target construction area during the milling operation and the preset tunnel contour. The present invention can avoid the defects of poor forming quality and the influence of tunnel construction efficiency due to over-excavation or under-excavation caused by the surrounding rock characteristics of the soft surrounding rock tunnel, thereby achieving the purpose of efficient excavation of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.
[0041] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0042] Figure 1 A flow chart of a soft rock tunnel excavation method exemplified in this application;
[0043] Figure 2 Flowcharts of some specific embodiments of the present application;
[0044] Figure 3 for Figure 2 Flow chart of step S400 in the example;
[0045] Figure 4 Flow charts of some further specific embodiments of the present application;
[0046] Figure 5 A schematic diagram of the structure of a scanning mechanism according to an example of the present invention;
[0047] Figure 6 for Figure 5 A structural schematic diagram of the scanning mechanism of the example in another perspective;
[0048] Figure 7 for Figure 6 A schematic diagram of the structure of the enlarged portion A of the example;
[0049] Figure 8 A schematic diagram of the side structure of a scanning structure according to an example of the present invention;
[0050] Fig. 9 This is a schematic diagram of the structure of the soft rock tunnel excavation equipment used as an example in this application.
[0051] Reference numerals:
[0052] 100, positioning mechanism; 110, first connecting member; 120, first laser transceiver; 200, rotating mechanism; 210, driving member; 220, driving gear; 230, ring gear; 240, guide member; 250, mounting position; 300, scanning mechanism; 310, first telescopic driving member; 320, second telescopic driving member; 330, second connecting member; 340, scanner; 350, slide groove; 360, sliding ear.
[0053] The purpose, features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0054] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.
[0055] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.
[0056] See also Figures 1 to 9 The present application proposes a first embodiment of a soft rock tunnel excavation method, comprising the following steps:
[0057] S100, when using a preset milling device to perform a milling operation on the soft rock in the target construction area, using a preset scanning device to perform a scanning operation on the target construction area to obtain a current tunnel profile formed in the target construction area;
[0058] In this embodiment, when implemented specifically, the preset scanning device of the example includes the following structure:
[0059] The positioning mechanism 100 includes a first connecting member 110, one end of which is connected to the milling device, and the other end of the first connecting member 110 extends toward the target construction area and forms a mounting hole, in which a first laser transceiver 120 is installed, and the first laser transceiver 120 is communicatively connected to the soft rock tunnel excavation device, and the first laser transceiver 120 can emit a positioning beam to a preset center position;
[0060] The rotating mechanism 200 includes a driving member 210, which is mounted on the first connecting member 110. A driving gear 220 is mounted on the output end of the first connecting member 110. The driving gear 220 is meshed with a gear ring 230 sleeved on the outer periphery of the first connecting member 110. A guide member 240 is provided on the first connecting member 110 to slide with the side of the gear ring 230. A mounting position 250 is formed on the side wall of the gear ring 230 away from the first connecting member 110; and,
[0061] The scanning mechanism 300 includes a first telescopic driving member 310210 and a second telescopic driving member 320210. The first telescopic driving member 310210 and the second telescopic driving member 320210 are spaced apart at the mounting position 250 along the extension direction of the first connecting member 110. The first telescopic member and the second telescopic member are both hinged to the mounting position 250, and the telescopic ends of the first telescopic member and the second telescopic member are both connected to a second connecting member 330. The second connecting member 330 extends along the extension direction of the first connecting member 110, and an installation groove is formed at one end of the second connecting member 330 toward the target construction area. A scanner 340 is installed in the installation groove. The first telescopic member and / or the second telescopic member can drive the second connecting member 330 to approach or move away from the first connecting member 110 to adjust the scanning direction of the scanner 340.
[0062] In this embodiment, by setting a positioning mechanism 100, a rotating mechanism 200 and a scanning mechanism 300, when in use, the ring gear 230 in the rotating mechanism 200 is sleeved on the outer periphery of the first connecting member 110, and the driving member 210 installed on the outer periphery of the first connecting member 110 drives the ring gear 230 to rotate through the driving gear 220, thereby realizing the function of adjusting the scanning direction of the scanning mechanism 300. At the same time, the second connecting member 330 is driven by the cooperation of the first telescopic member and / or the second telescopic member, thereby realizing the function of adjusting the scanning angle of the scanner 340. Finally, the present invention can use the scanner 340 to realize the function of real-time scanning of different working positions in different target working areas during actual operation.
[0063] It needs to be further explained that, in this embodiment, during the specific implementation, the scanner 340 can also follow the milling equipment to perform the following operation, thereby enabling the present invention to instantly follow and complete the scanning operation when the milling equipment is milling, so that during the actual operation, the present invention can instantly generate the quality of the current tunnel profile formed by the milling equipment operation.
[0064] It should be particularly and clearly stated that, in this embodiment, the exemplified laser transceiver and scanner 340 use existing technologies, and this application does not make any improved designs therefor, so their structures and working principles will not be described in detail here.
[0065] S200, determining whether the current tunnel profile coincides with a preset tunnel profile;
[0066] In this embodiment, when determining whether the current tunnel profile coincides with the preset tunnel profile, positioning can be performed based on the preset center position that has been set, and then the preset center position is simultaneously projected to the current tunnel profile and the preset tunnel profile, so that the same positioning point exists between the current tunnel profile and the preset tunnel profile, and finally the present invention can accurately determine whether the current tunnel profile coincides with the preset tunnel profile. Of course, in order to more clearly determine whether the current tunnel profile coincides with the preset tunnel profile, in specific implementation, at least two auxiliary positioning positions can also be set in the target construction area. During the scanning operation, at least two auxiliary positioning positions and the preset center position are projected to the current tunnel profile and the preset tunnel profile, so as to achieve the purpose of comparing whether the current tunnel profile coincides with the preset tunnel profile.
[0067] S300. When there is overlap, the process returns to the step of using a preset scanning device to scan the target construction area while using a preset milling device to perform milling operations on the soft rock in the target construction area to obtain a current tunnel profile formed in the target construction area until the tunnel is formed.
[0068] In this embodiment, when using a preset milling device to perform milling operations on the soft rock in the target construction area, a preset scanning device is used to perform a scanning operation on the target construction area to obtain a current tunnel contour formed in the target construction area, and it is determined whether the current tunnel contour coincides with the preset tunnel contour. If so, the process returns to executing the step of scanning the target construction area using a preset scanning device to perform milling operations on the soft rock in the target construction area to obtain a current tunnel contour formed in the target construction area until a tunnel is formed. When in use, when performing a milling operation, it is determined whether to continue excavating the soft rock tunnel according to the degree of overlap between the current tunnel contour obtained by scanning the target construction area and the preset tunnel contour. This allows the present invention to avoid the defects of poor forming quality and the impact on tunnel construction efficiency due to over-excavation or under-excavation caused by the surrounding rock characteristics of the soft surrounding rock tunnel, thereby achieving the purpose of efficient tunnel excavation.
[0069] In one embodiment, after step S200, the method further includes:
[0070] S400, when there is no overlap, intercepting the non-overlapping area between the current tunnel outline and the preset tunnel outline to form a current outline;
[0071] S500, determining the reason for the non-overlap between the current profile and the preset tunnel profile according to the coordinate position relationship between the current profile and the preset tunnel profile; wherein the non-overlap reason includes an over-break operation reason and an under-break operation reason;
[0072] In this embodiment, when determining the cause of the non-overlap, a judgment can be made based on the projection result of the current tunnel contour on the preset tunnel contour. When the current tunnel contour is projected on the preset tunnel contour and part of it is located outside the preset tunnel contour, it indicates that the area outside the preset tunnel contour is an over-excavation area, that is, the non-overlap in this area is caused by over-excavation; when the current tunnel contour is within the preset tunnel contour, it indicates that the area is an under-excavation area, that is, the non-overlap in this area is caused by under-excavation.
[0073] S600, establishing a treatment plan for the current contour according to the acquired non-overlapping reason; wherein the treatment plan includes: when the non-overlapping reason is the over-excavation operation, the treatment plan is to perform a filling operation on the area where the current contour is located; when the non-overlapping reason is the under-excavation operation, the treatment plan is to perform a secondary milling operation on the current contour;
[0074] S700: Perform a treatment operation on the current contour using the treatment plan until the current contour is eliminated and the current tunnel contour is made to coincide with the preset tunnel contour.
[0075] In this embodiment, by processing non-overlapping areas in real time, the present invention can timely process existing over-break or under-break areas during tunnel construction, thereby avoiding the impact of over-break or under-break on the tunnel line shape.
[0076] In one embodiment, before step S300, the method further includes:
[0077] S800, determining a preset center position of the soft rock tunnel according to preset construction data;
[0078] Step S400 includes:
[0079] S410: When they do not overlap, projecting the preset center position onto the current tunnel outline and the preset tunnel outline respectively to form a corresponding virtual positioning point;
[0080] S420: Overlap the two virtual positioning points, and intercept the non-overlapping areas between the current tunnel outline and the preset tunnel outline to form a current outline.
[0081] In one embodiment, after step S420, the method further includes:
[0082] S430: Output the non-overlapping reason corresponding to the current contour and perform an alarm operation.
[0083] In one embodiment, before step S100, the method further includes:
[0084] S10, using the preset scanning device to calibrate the preset tunnel profile in the target construction area;
[0085] S20, controlling the preset milling equipment to perform milling operations in the target construction area according to the preset tunnel profile.
[0086] Based on the same technical concept, in a second aspect, the present invention also proposes a soft rock tunnel excavation device, comprising:
[0087] A profile generating module is used to scan the target construction area using a preset scanning device when performing a milling operation on the soft rock in the target construction area using a preset milling device, so as to obtain a current tunnel profile formed in the target construction area;
[0088] A judging module, used to judge whether the current tunnel profile coincides with a preset tunnel profile;
[0089] The result output module is used to return to the step of using a preset scanning device to scan the target construction area when the preset milling equipment is used to perform milling operations on the soft rock in the target construction area to obtain the current tunnel contour formed in the target construction area, until the tunnel is formed.
[0090] The soft rock tunnel excavation device provided in the present application adopts the soft rock tunnel excavation method in the above embodiment, which can solve the technical problem that when excavating soft rock tunnels, controlled blasting and milling are usually used for excavation construction. However, due to the weak characteristics of soft rock lithology, over-excavation or under-excavation occurs in the actual construction process, affecting the construction efficiency and forming quality of the tunnel. Compared with the prior art, the beneficial effects of the soft rock tunnel excavation device provided in the present application are the same as the beneficial effects of the soft rock tunnel excavation method provided in the above embodiment, and the other technical features of the soft rock tunnel excavation device are the same as the features disclosed in the method of the previous embodiment, which will not be repeated here.
[0091] Based on the same technical concept, in the third aspect, the present invention also proposes a soft rock tunnel excavation device, which includes a processor and a memory, and a cable-stayed bridge cable force test program is stored in the memory. When the cable-stayed bridge cable force test program is executed by the processor, the soft rock tunnel excavation method described in the first aspect is implemented.
[0092] Reference below Fig. 9, which shows a schematic diagram of the structure of a soft rock tunnel excavation device suitable for implementing the embodiment of the present application. The soft rock tunnel excavation device in the embodiment of the present application may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Descriptions), PMPs (Portable Media Players), vehicle-mounted terminals (such as vehicle-mounted control terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Fig. 9 The soft rock tunnel excavation equipment shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0093] like Fig. 9 As shown, the soft rock tunnel excavation equipment may include a processing device 1001 (such as a central processing unit, a graphics processor, etc.), which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 1002 or a program loaded from a storage device 1003 to a random access memory (RAM) 1004. Various programs and data required for the operation of the soft rock tunnel excavation equipment are also stored in the RAM 1004. The processing device 1001, the ROM 1002, and the RAM 1004 are connected to each other via a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Typically, the following systems may be connected to the I / O interface 1006: input devices 1007 including, for example, a touch screen, a touchpad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; output devices 1008 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 1003 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 1009. The communication device 1009 may allow the soft rock tunnel excavation equipment to communicate wirelessly or wired with other equipment to exchange data. Although the figure shows a soft rock tunnel excavation equipment with various systems, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems may be implemented or have instead.
[0094] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.
[0095] The soft rock tunnel excavation equipment provided by the present application adopts the soft rock tunnel excavation method in the above embodiment, which can solve the technical problem that when excavating soft rock tunnels, controlled blasting and milling are usually used for excavation construction. However, due to the weak characteristics of soft rock lithology, over-excavation or under-excavation occurs in the actual construction process, affecting the construction efficiency and forming quality of the tunnel. Compared with the prior art, the beneficial effects of the soft rock tunnel excavation equipment provided by the present application are the same as the beneficial effects of the soft rock tunnel excavation method provided by the above embodiment, and the other technical features of the soft rock tunnel excavation equipment are the same as the features disclosed in the method of the previous embodiment, which will not be repeated here.
[0096] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.
[0097] Based on the same technical concept, in a fourth aspect, the present invention further proposes a soft rock tunnel excavation system, comprising:
[0098] Milling equipment;
[0099] a scanning device, the scanning device being mounted on the milling device; and,
[0100] The soft rock tunnel excavation equipment described in the third aspect is respectively communicatively connected with the milling equipment and the scanning equipment, and the soft rock tunnel excavation equipment can respectively generate a first control instruction to control the milling equipment and a second control instruction to control the scanning equipment.
[0101] In addition, the soft rock tunnel excavation system provided in the embodiment of the present application can solve the technical problem that when excavating soft rock tunnels, controlled blasting and milling are usually used for excavation construction. However, due to the weak characteristics of soft rock lithology, over-excavation or under-excavation occurs in the actual construction process, affecting the construction efficiency and molding quality of the tunnel. Compared with the prior art, the beneficial effects of the soft rock tunnel excavation system provided in the embodiment of the present application are the same as the beneficial effects of the soft rock tunnel excavation method provided in the above embodiment, and other technical features of the soft rock tunnel excavation system are the same as the features disclosed in the above embodiment method, which will not be repeated here.
[0102] In one embodiment, the scanning device comprises:
[0103] A positioning mechanism 100, wherein the positioning mechanism 100 comprises a first connecting member 110, wherein one end of the first connecting member 110 is connected to the milling device, and the other end of the first connecting member 110 extends toward the target construction area and forms a mounting hole, wherein a first laser transceiver 120 is installed in the mounting hole, wherein the first laser transceiver 120 is communicatively connected to the soft rock tunnel excavation device, and the first laser transceiver 120 can emit a positioning beam to the preset center position;
[0104] A rotating mechanism 200, the rotating mechanism 200 includes a driving member 210, the driving member 210 is installed on the first connecting member 110, a driving gear 220 is installed at the output end of the first connecting member 110, the driving gear 220 is meshed with a ring gear 230 sleeved on the outer periphery of the first connecting member 110, and a guide member 240 is provided on the first connecting member 110 to slide with the side of the ring gear 230, and a mounting position 250 is formed on the side wall of the ring gear 230 away from the first connecting member 110; and,
[0105] The scanning mechanism 300 includes a first telescopic driving member 310210 and a second telescopic driving member 320210. The first telescopic driving member 310210 and the second telescopic driving member 320210 are spaced apart at the mounting position 250 along the extension direction of the first connecting member 110. The first telescopic member and the second telescopic member are both hinged to the mounting position 250, and the telescopic ends of the first telescopic member and the second telescopic member are both connected to a second connecting member 330. The second connecting member 330 extends along the extension direction of the first connecting member 110, and an installation groove is formed at one end of the second connecting member 330 toward the target construction area. A scanner 340 is installed in the installation groove. The first telescopic member and / or the second telescopic member can drive the second connecting member 330 to approach or move away from the first connecting member 110 to adjust the scanning direction of the scanner 340.
[0106] In this embodiment, by setting a positioning mechanism 100, a rotating mechanism 200 and a scanning mechanism 300, when in use, the ring gear 230 in the rotating mechanism 200 is sleeved on the outer periphery of the first connecting member 110, and the driving member 210 installed on the outer periphery of the first connecting member 110 drives the ring gear 230 to rotate through the driving gear 220, thereby realizing the function of adjusting the scanning direction of the scanning mechanism 300. At the same time, the second connecting member 330 is driven by the cooperation of the first telescopic member and / or the second telescopic member, thereby realizing the function of adjusting the scanning angle of the scanner 340. Finally, the present invention can use the scanner 340 to realize the function of real-time scanning of different working positions in different target working areas during actual operation.
[0107] It needs to be further explained that, in this embodiment, during the specific implementation, the scanner 340 can also follow the milling equipment to perform the following operation, thereby enabling the present invention to instantly follow and complete the scanning operation when the milling equipment is milling, so that during the actual operation, the present invention can instantly generate the quality of the current tunnel profile formed by the milling equipment operation.
[0108] Of course, in order to enable the present invention to better adjust the scanning angle of the second connecting member 330 and the scanner 340 installed on the second connecting member 330 during its specific implementation, the present invention may be provided with a slide groove 350 on the second connecting member 330 during its specific implementation, and two sliding ears 360 spaced apart are slidably provided in the slide groove 350, and the first telescopic member and the second telescopic member are respectively hinged with a sliding ear 360, thereby enabling the present invention to better adjust the scanning angle of the second connecting member 330 and the scanner 340 installed on the second connecting member 330 during its use.
[0109] Based on the same technical concept, in the fifth aspect, the present invention also proposes a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by one or more processors, the soft rock tunnel excavation method described in the first aspect is implemented.
[0110] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency), etc., or any suitable combination of the above.
[0111] The computer-readable storage medium may be included in the soft rock tunnel excavation equipment; or may exist independently without being assembled into the soft rock tunnel excavation equipment.
[0112] The computer-readable storage medium carries one or more programs. When the one or more programs are executed by the soft rock tunnel excavation equipment, the soft rock tunnel excavation equipment can implement the soft rock tunnel excavation method described above.
[0113] Computer program code for performing the operations of the present application may be written in one or more programming languages or a combination thereof, including object-oriented programming languages such as Java, Smalltalk, C++, and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).
[0114] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0115] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.
[0116] The readable storage medium provided in the present application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned soft rock tunnel excavation method, and can solve the technical problem that when excavating soft rock tunnels, controlled blasting and milling are usually used for excavation construction, but due to the weak characteristics of soft rock lithology, over-excavation or under-excavation occurs in the actual construction process, affecting the construction efficiency and molding quality of the tunnel. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided in the present application are the same as the beneficial effects of the soft rock tunnel excavation method provided in the above-mentioned embodiment, which will not be repeated here.
[0117] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.
Claims
1. A soft rock tunnel excavation method, characterized in that: The steps include: When the preset milling equipment is used to perform milling operations on the soft rock in the target construction area, the preset scanning equipment is used to perform scanning operations on the target construction area to obtain the current tunnel profile formed in the target construction area; Determining whether the current tunnel profile coincides with a preset tunnel profile; When they overlap, the process returns to the step of using a preset milling device to perform milling operations on the soft rock in the target construction area, and then using a preset scanning device to scan the target construction area to obtain the current tunnel contour formed in the target construction area until the tunnel is formed.
2. The soft rock tunnel excavation method according to claim 1, characterized in that: After the step of determining whether the current tunnel profile coincides with the preset tunnel profile, the method further includes: When they do not overlap, the non-overlapping area of the current tunnel outline and the preset tunnel outline is intercepted to form the current outline; Determine the reason for the non-overlap between the current profile and the preset tunnel profile according to the coordinate position relationship between the current profile and the preset tunnel profile; wherein the non-overlap reason includes an over-break operation reason and an under-break operation reason; According to the obtained non-overlapping reason, a treatment plan for the current contour is established; wherein the treatment plan includes: when the non-overlapping reason is the over-excavation operation, the treatment plan is to fill the area where the current contour is located; when the non-overlapping reason is the under-excavation operation, the treatment plan is to perform a secondary milling operation on the current contour; The current contour is processed using the processing scheme until the current contour is eliminated and the current tunnel contour is made to coincide with the preset tunnel contour.
3. The soft rock tunnel excavation method according to claim 2, characterized in that: Before the step of using a preset scanning device to scan the target construction area when the preset milling device is used to perform milling operation on the soft rock in the target construction area to obtain the current tunnel profile formed in the target construction area, the method further includes: Determining a preset center position of the soft rock tunnel according to preset construction data; When the tunnel contours do not overlap, the step of intercepting the non-overlapping areas between the current tunnel contour and the preset tunnel contour to form the current contour comprises: When they do not overlap, the preset center position is projected onto the current tunnel outline and the preset tunnel outline respectively to form a corresponding virtual positioning point; The two virtual positioning points are overlapped, and the non-overlapping areas between the current tunnel outline and the preset tunnel outline are intercepted to form the current outline.
4. The soft rock tunnel excavation method according to claim 3, characterized in that: After the step of overlapping the two virtual positioning points and intercepting the non-overlapping area between the current tunnel outline and the preset tunnel outline to form the current outline, the method further includes: The non-overlapping reason corresponding to the current contour is output to perform an alarm operation.
5. The soft rock tunnel excavation method according to any one of claims 1 to 4, characterized in that: Before the step of using a preset scanning device to scan the target construction area when the preset milling device is used to perform milling operation on the soft rock in the target construction area to obtain the current tunnel profile formed in the target construction area, the method further includes: Using the preset scanning device to calibrate the preset tunnel profile in the target construction area; The preset milling equipment is controlled to perform milling operations in the target construction area according to the preset tunnel profile.
6. A soft rock tunnel excavation device, characterized in that: include: A profile generating module is used to scan the target construction area using a preset scanning device when performing a milling operation on the soft rock in the target construction area using a preset milling device, so as to obtain a current tunnel profile formed in the target construction area; A judging module, used to judge whether the current tunnel profile coincides with a preset tunnel profile; The result output module is used to return to the step of using a preset scanning device to scan the target construction area when the preset milling equipment is used to perform milling operations on the soft rock in the target construction area to obtain the current tunnel contour formed in the target construction area, until the tunnel is formed.
7. A soft rock tunnel excavation equipment, characterized in that: The soft rock tunnel excavation equipment includes a processor and a memory, wherein a cable-stayed bridge cable force test program is stored in the memory, and when the cable-stayed bridge cable force test program is executed by the processor, the soft rock tunnel excavation method according to any one of claims 1 to 5 is implemented.
8. A soft rock tunnel excavation system, characterized in that: include: Milling equipment; A scanning device, the scanning device being mounted on the milling device; as well as, The soft rock tunnel excavation equipment as described in claim 7, wherein the soft rock tunnel excavation equipment is communicatively connected to the milling equipment and the scanning equipment, respectively, and the soft rock tunnel excavation equipment can respectively generate a first control instruction for controlling the milling equipment and a second control instruction for controlling the scanning equipment.
9. The soft rock tunnel excavation system according to claim 8, characterized in that: The scanning device comprises: A positioning mechanism, wherein the positioning mechanism comprises a first connecting member, one end of which is connected to the milling device, and the other end of which extends toward the target construction area and forms a mounting hole, wherein a first laser transceiver is installed in the mounting hole, the first laser transceiver is communicatively connected to the soft rock tunnel excavation device, and the first laser transceiver can emit a positioning beam to the preset center position; A rotating mechanism, the rotating mechanism comprising a driving member, the driving member is mounted on the first connecting member, a driving gear is mounted on the output end of the first connecting member, the driving gear is meshed with a gear ring sleeved on the outer periphery of the first connecting member, and a guide member is provided on the first connecting member to slide with the side surface of the gear ring, and a mounting position is formed on the side wall of the gear ring away from the first connecting member; and, A scanning mechanism, the scanning mechanism includes a first telescopic driving member and a second telescopic driving member, the first telescopic driving member and the second telescopic driving member are spaced apart at the installation position along the extension direction of the first connecting member, the first telescopic member and the second telescopic member are both hinged to the installation position, and the telescopic ends of the first telescopic member and the second telescopic member are both connected to a second connecting member, the second connecting member extends along the extension direction of the first connecting member, and an installation groove is formed at one end of the second connecting member facing the target construction area, a scanner is installed in the installation groove, the first telescopic member and / or the second telescopic member can drive the second connecting member to approach or move away from the first connecting member to adjust the scanning direction of the scanner.
10. A computer-readable storage medium, characterized in that: The storage medium stores a computer program, and when the computer program is executed by one or more processors, the soft rock tunnel excavation method according to any one of claims 1 to 6 is implemented.