Train fault processing method and system
Through the automatic train monitoring system to identify the fault type and generate a solution, the cumbersome problem of fault handling in the rail transit system is solved, and the fault handling efficiency and the work efficiency of dispatchers are improved.
Patent Information
- Application Number
- CN202411799984.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-09
- Publication Date
- 2025-03-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
When handling train failures, the existing rail transit system is cumbersome, which increases the working pressure of dispatchers and reduces the efficiency of driving command.
The fault type is identified through the automatic train monitoring system (ATS system), combined with factors around the vehicle, a specific processing plan is generated based on the preset processing category, and an execution order is issued, including rescue, nearby passenger cleaning, driver taking over, running to the terminal station cleaning, and running to the end of today's service.
By identifying the fault code bits, the processing plan is calculated, the efficiency of dispatching to deal with vehicle failures is improved, the working pressure of dispatchers is reduced, and the processing process is simplified by issuing intelligent commands with one click.
Smart Images

Figure CN119590471A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of rail transportation, and in particular to a train fault processing method and system. Background Art
[0002] Urban rail transit is a public transportation tool that carries passengers on a large scale. It is also a very complex system that integrates and monitors numerous subsystems and equipment, including traction, braking, auxiliary machinery, running gear, air conditioning, fire alarms, pantograph detection, batteries, door control, etc. There are many parts. As the equipment ages, various faults will occur, resulting in train delays, cancellations, etc., affecting the normal operation of the subway and reducing the passenger service capacity.
[0003] At present, the handling of faults mainly relies on the coordination of the driver (man-driven) or vehicle dispatcher (unmanned), as well as the train dispatcher and station staff of the control center. The driver or vehicle dispatcher determines the current state of the train based on the prompts of the vehicle monitoring system, whether it is in a condition to continue driving or needs rescue, and notifies the dispatcher of the center that the vehicle has a fault and needs emergency treatment. The dispatcher determines the scope of the impact on the operation based on the feedback of the driver or vehicle dispatcher. For those who need rescue, they arrange for passenger removal and rescue. For those vehicles that are in a condition to continue driving, they arrange for the faulty vehicle to be cleared of passengers in time, withdraw from operation, and arrange for a spare vehicle to be put online to replace it. The operation of vehicle faults is very cumbersome, which increases the work pressure of dispatchers and reduces the efficiency of driving command. Summary of the invention
[0004] In order to improve the operating efficiency of rail transit, the present invention proposes a train fault processing method. The processing method comprises the following steps:
[0005] S1. Determine the corresponding processing category according to the fault type;
[0006] S2, transmit the fault to the automatic train monitoring system (ATS system) through the vehicle's signal interface;
[0007] S3, the train automatic monitoring system generates a specific processing plan based on the real-time incoming vehicle faults, combined with the factors around the vehicle and the vehicle fault line calculation according to the preset processing category;
[0008] S4. Issue an execution command according to the generated processing solution.
[0009] Furthermore, the processing categories include at least one of rescue, clearing passengers nearby, driver taking over, running to the current terminal to clear passengers, and running until the end of today's service.
[0010] Furthermore, for vehicle failures with a processing category of rescue, the following processing procedures are included: determining the location of the faulty vehicle, finding the nearest stop line, determining the corresponding passenger clearance platform, as well as the rescue train and the passenger clearance platform of the rescue train, and forming a passenger clearance and rescue order.
[0011] Furthermore, for vehicle failures with the processing category of nearby passenger clearance, the following processing procedures are included: determining the location of the faulty vehicle, finding the nearest passenger clearance platform, finding a spare vehicle, determining the planned train number for the spare vehicle to replace it, and generating commands to take the faulty vehicle offline and replace it with the spare vehicle.
[0012] Furthermore, for vehicle failures that require driver takeover, the following processing procedures are included: the faulty vehicle is automatically detained at a station where the driver can board, the central dispatching personnel are proactively notified of the failure and the scope of impact of the operating vehicle, and the dispatching personnel are prompted to arrange for the driver to board in a timely manner.
[0013] Furthermore, for the vehicle failure processing category of running to the current terminal, the following processing process is included: determining the location of the faulty vehicle and the terminal of this run, finding a spare vehicle, determining the planned train number for the spare vehicle to replace it, and generating commands to take the faulty vehicle offline and the spare vehicle to replace it.
[0014] Furthermore, for vehicle failures whose processing category is running until the end of the day's service, the following processing process is included: actively reminding the central dispatching personnel of the failure and the scope of impact of the operating vehicle, and the dispatching personnel handle it as needed.
[0015] Furthermore, the spare vehicle is a spare vehicle at a terminal station serving the faulty vehicle.
[0016] Furthermore, step S1 also includes establishing a mapping table corresponding to fault types and processing categories.
[0017] Furthermore, step S2 also includes the vehicle sending a status code to the train automatic monitoring system in real time, and step S3 determines the train fault condition according to the status code.
[0018] In addition, the present invention also provides a train fault processing system for executing the processing method, comprising:
[0019] A train having a signal interface, wherein the train sends a fault code bit through the signal interface;
[0020] A train automatic monitoring system, which is in communication with the train via the signal interface, and is used to receive fault code bits and generate corresponding execution commands;
[0021] The dispatching center is connected to the automatic train monitoring system for receiving execution commands.
[0022] The present invention has the following beneficial effects:
[0023] 1. Map a wide variety of faults to several categories related to operational adjustments, and establish a corresponding relationship between faults and processing categories. By identifying the fault code, the processing plan can be calculated, which can guide dispatchers to promptly understand the impact of equipment failures on operations, greatly improving the efficiency of dispatchers in handling vehicle failures;
[0024] 2. Added multiple intelligent commands for one-click delivery and disposal. Through automatic calculation and recommendation, a composite intelligent command is generated to replace the multiple commands that the original dispatcher needed to execute at different time points in the processing stage, which greatly improved the disposal efficiency and reduced the work pressure of dispatchers. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 The figure is a flow chart of the fault handling method of the present invention. DETAILED DESCRIPTION
[0026] The following is a further detailed description of a train fault handling method and system proposed by the present invention in conjunction with the accompanying drawings and specific embodiments. According to the following description, the advantages and features of the present invention will be clearer. It should be noted that the accompanying drawings are in a very simplified form and use non-precise proportions, which are only used to conveniently and clearly assist in explaining the purpose of the embodiments of the present invention. In order to make the purposes, features and advantages of the present invention more obvious and easy to understand, please refer to the accompanying drawings. It should be noted that the structures, proportions, sizes, etc. illustrated in the accompanying drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no technical substantive significance. Any structural modification, change in proportional relationship or adjustment of size, without affecting the effects that the present invention can produce and the purposes that can be achieved, should still fall within the scope of the technical content disclosed by the present invention.
[0027] The invention provides a train fault processing method, aiming to improve fault processing efficiency and reduce the pressure of operators.
[0028] The processing prevention comprises the following steps:
[0029] S1. According to the characteristics of the current route and vehicle, pre-sort the possible vehicle failures, and determine the corresponding processing category according to the failure type; the processing category includes at least one of rescue, nearby passenger clearance, driver takeover, running to the current terminal to clear passengers, and running to the end of the day's service. Among them, the processing category should be able to be configured, updated and adjusted according to the needs of specific projects. In some embodiments, S1 can establish a mapping table corresponding to the failure type and the processing category, and find the corresponding relationship between the failure type and the processing category from the table.
[0030] S2. The vehicle status is transmitted to the automatic train monitoring system through the vehicle's signal interface. In this embodiment, the vehicle sends the status code position to the automatic train monitoring system in real time, and the automatic train monitoring system continuously monitors the collected vehicle status code positions.
[0031] S3. The train automatic monitoring system identifies the fault type based on the real-time vehicle status, combines the factors around the vehicle and the fault type, and generates a specific processing plan based on the preset processing category; specifically, when the vehicle status code changes and a fault code is generated, the train fault condition is determined based on the fault code, and the major plan that requires operational adjustment is determined based on the established mapping table.
[0032] S4. Issue an execution command according to the generated processing solution.
[0033] Furthermore, in step S3, for vehicle faults with the rescue category, such as total air undervoltage faults, the following processing procedures are included: determine the location of the faulty vehicle, and find the nearest stop line according to the rules, such as preferentially searching in the forward running mode, but in special areas, such as the line terminal, it can be determined according to special configuration rules. Determine the corresponding clearing platform, and determine the clearing platform of the rescue train and the rescue train, and form a clearing rescue command.
[0034] Furthermore, in step S3, for vehicle failures with the processing category of clearing passengers nearby, such as failures of two or more traction inverters, the following processing procedures are included: determining the location of the faulty vehicle, finding the nearest platform for clearing passengers, if the vehicle happens to be parked at the platform, clearing passengers at the platform, finding a spare vehicle, giving priority to spare vehicles at the terminal served by the faulty vehicle, determining the planned train number for the spare vehicle to replace it, and generating commands for taking the faulty vehicle offline and for the spare vehicle to replace it.
[0035] Furthermore, in step S3, for vehicle failures with the processing category of driver takeover, such as communication interruption between the on-board CC (on-board controller) and the vehicle TCMS (train control and management system), the following processing procedures are included: the faulty vehicle is automatically detained at a station where the driver can board, which can be the next station, and the central dispatching personnel are actively informed of the failure and the scope of impact of the operating vehicle, and the dispatching personnel are prompted to arrange for the driver to board in time.
[0036] Furthermore, in step S3, for the vehicle failure processing category of running to this terminal, the following processing process is included: determining the location of the faulty vehicle and the terminal of this run, looking for a spare vehicle, which can be a spare vehicle for the terminal station served by the faulty vehicle, determining the planned train number for the spare vehicle to replace it, and finally generating a command to take the faulty vehicle offline and replace it with the spare vehicle.
[0037] In step S3, for the vehicle failure that is handled until the end of the day's service, the following processing process is included: actively remind the central dispatcher of the failure and the scope of impact of the operating vehicle, and the dispatcher handles it as needed.
[0038] In addition, the present invention also proposes a train fault processing system for executing the processing method, the processing system comprising:
[0039] A train having a signal interface, wherein the train sends a fault code bit through the signal interface;
[0040] A train automatic monitoring system, which is in communication connection with the train via the signal interface, and is used to receive fault code bits and generate corresponding execution commands, which can be generated and issued by triggering corresponding buttons;
[0041] The dispatching center is connected to the automatic train monitoring system for receiving execution commands.
[0042] The present invention maps a wide variety of faults to several categories related to operational adjustments, and establishes a corresponding relationship between faults and processing categories. The processing plan can be calculated by identifying the fault code position, which can guide dispatchers to promptly understand the impact of equipment failures on operations, greatly improving the dispatch efficiency in handling vehicle failures; multiple new intelligent commands for one-click handling are added, which automatically calculate and recommend to generate a composite intelligent command to replace the multiple commands that the original dispatch needed to execute at different time points in the processing stage, greatly improving the handling efficiency and reducing the work pressure of dispatchers.
[0043] Although the content of the present invention has been described in detail through the above preferred embodiments, it should be appreciated that the above description should not be considered as a limitation of the present invention. After reading the above content, it will be apparent to those skilled in the art that various modifications and substitutions of the present invention will occur. Therefore, the protection scope of the present invention should be limited by the appended claims.
Claims
1. A train fault handling method, characterized in that: The following steps are involved: S1. Pre-sort possible vehicle failures according to the current route and vehicle characteristics, and determine the corresponding processing category according to the failure type; S2, passing the vehicle status to the automatic train monitoring system through the vehicle's signal interface; S3, the train automatic monitoring system identifies the fault type according to the real-time vehicle status, combines the factors around the vehicle and the fault type, and generates a specific processing plan according to the preset processing category; S4. Issue an execution command according to the generated processing solution.
2. The train fault handling method according to claim 1, characterized in that: The processing categories include at least one of rescue, nearby passenger clearance, driver takeover, running to the current terminal to clear passengers, and running until the end of the day's service.
3. The train fault handling method according to claim 2, characterized in that: For vehicle failures with the rescue category, the following processing procedures are included: determining the location of the faulty vehicle, finding the nearest stop line, determining the corresponding passenger clearance platform, and determining the rescue train and the passenger clearance platform of the rescue train, and forming an order for passenger clearance and rescue.
4. The train fault handling method according to claim 2, characterized in that: The vehicle failure processing category is to clear passengers nearby, including the following processing procedures: determine the location of the faulty vehicle, find the nearest platform for clearing passengers, find a spare vehicle, determine the planned train number for the spare vehicle to replace it, and generate commands to take the faulty vehicle offline and replace it with a spare vehicle.
5. The train fault handling method according to claim 2, characterized in that: The following processing procedures are included for vehicle failures that require driver takeover: the faulty vehicle is automatically detained at a station where the driver can board, the central dispatching personnel are proactively notified of the failure and the scope of impact of the operating vehicle, and the dispatching personnel are prompted to arrange for the driver to board in a timely manner.
6. The train fault handling method according to claim 2, characterized in that: The processing category for vehicle failures that are running to the current terminal station includes the following processing procedures: determining the location of the faulty vehicle and the terminal point of this run, finding a spare vehicle, determining the planned train number for the spare vehicle to replace it, and generating commands to take the faulty vehicle offline and the spare vehicle to replace it.
7. The train fault handling method according to claim 2, characterized in that: For vehicle failures that are handled until the end of the day's service, the following processing procedures are included: proactively inform the center dispatcher of the failure and the scope of impact of the operating vehicle, and the dispatcher handles it as needed.
8. The train fault handling method according to claim 4 or 6, characterized in that: The spare vehicle is a spare vehicle for the terminal station that serves the broken-down vehicle.
9. The train fault handling method according to claim 1, characterized in that: Step S1 also includes establishing a mapping table corresponding to fault types and processing categories.
10. The train fault handling method according to claim 1, characterized in that: Step S2 also includes: the vehicle sends a status code to the train automatic monitoring system in real time, and step S3 determines the train fault status according to the status code.
11. A train fault processing system, used to execute the processing method according to any one of claims 1 to 10, characterized in that: include: A train having a signal interface, wherein the train sends a fault code bit through the signal interface; A train automatic monitoring system, which is in communication with the train via the signal interface, and is used to receive fault code bits and generate corresponding execution commands; The dispatching center is connected to the automatic train monitoring system for receiving execution commands.
Citation Information
Patent Citations
Urban rail transit intelligent scheduling system and method
CN113222409A
Urban rail transit vehicle operation adjustment decision analysis method and device
CN113911175A
Train operation emergency processing method, device, system and equipment and storage medium
CN116001868A
Scheduling emergency fault processing method and device and electronic equipment
CN117217456A
Intelligent driving dispatching system and method
WO2024193091A1