Reclaimed water recycling integrated system in construction and use stages of gymnasium

By designing the integrated system for recycled water recycling and utilization in the construction and use of the gymnasium, the problems of integration of recycled water recycling and utilization systems and sustainable use of equipment during the construction phase are solved, and the goals of efficient utilization of resources and green environmental protection are achieved.

CN119593423APending Publication Date: 2025-03-11GUANGDONG UNIV OF TECH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311176135.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-09-11
Publication Date
2025-03-11

AI Technical Summary

Technical Problem

The integration of water recycling and utilization systems during construction stage, the sustainable use of recycling and purification equipment, and the three-dimensional display of recycling system results.

Method used

A reclaimed water recycling integrated system for the construction and use of the gymnasium was designed, including analyzing the on-site construction site, establishing a water stop curtain, wastewater drainage ditches and collection wells, reclaimed water purification and treatment system, rainwater recovery pipeline direction and reclaimed water utilization pipeline direction. The results of the recycling system are displayed using BIM technology, which clearly shows the pipeline direction, the three-dimensional effect of the integrated system and the water flow direction.

Benefits of technology

It has achieved efficient recycling and purification of water during the construction stage, and equipment and pipelines can be used until the project operation and maintenance stage, saving resources and conforming to the development theme of green and environmental protection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure HSA0000297356530000011
    Figure HSA0000297356530000011
  • Figure HSA0000297356530000012
    Figure HSA0000297356530000012
  • Figure HSA0000297356530000021
    Figure HSA0000297356530000021
Patent Text Reader

Abstract

The invention relates to an integrated system for recycling reclaimed water in construction and use stages of a gymnasium. In order to solve the technical problems that in the prior art, construction water recycling equipment on a construction site cannot play a role to the greatest extent, construction water is not fully utilized, water resources are seriously wasted, and the environment-friendly development theme is not met, the invention provides a water recycling integrated system in construction and use stages. The construction water is recycled, the cleanliness of the treated reclaimed water is high, the treated reclaimed water can be directly reused in site construction of a construction site, and underground water which needs to be discharged originally and is pumped out is re-purified and then applied to spraying equipment for controlling dust raising in the construction stage. And waste of water resources is effectively avoided. Meanwhile, the designed and constructed equipment continues to be used in the project operation and maintenance stage, resources are saved to a greater extent, and the development theme of green and environmental protection is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of green building engineering construction, especially a method of dust control during the construction phase combined with closed precipitation, and the design of water collection and recycling facilities is used in the project operation and maintenance phase to achieve non-disposable use of resource equipment, which can become fixed equipment after the project is completed. Background Art

[0002] With the development of society, in addition to comprehensively considering economic, cost, safety, construction period and other factors, green buildings must also be considered in construction. At present, the use of wellpoint dewatering combined with water-stop curtains is an effective way to solve the groundwater problem. The utilization of groundwater extraction is a full recycling of natural resources. The extracted groundwater that originally needs to be discharged is re-purified and applied to the spray equipment for dust control during the construction phase. In addition to recycling the construction water, this application also recycles the treated reclaimed water to a higher degree of cleanliness and can be directly reused in on-site construction, effectively avoiding the waste of water resources. At the same time, the equipment designed and constructed is used until the project operation and maintenance stage, saving resources to a greater extent and meeting the requirements of resource reuse, which is used to meet the development theme of green environmental protection. Summary of the invention

[0003] The present invention belongs to the field of green building engineering construction, especially a method of dust control during the construction phase combined with closed precipitation, and the design of water collection and recycling facilities is used in the project operation and maintenance phase to achieve non-disposable use of resource equipment, which can become fixed equipment after the project is completed.

[0004] In order to achieve the above objectives, the present invention needs to solve three technical problems:

[0005] 1. Integration of water recycling system during the construction phase;

[0006] 2. The recycling and purification equipment used in the construction phase can be used to recycle and utilize rainwater during the project operation and maintenance phase;

[0007] 3. Use BIM technology to display the results of the recycling system, clearly showing the direction of the pipeline, the three-dimensional effect of the integrated system and the direction of water flow.

[0008] In order to solve the three technical problems, the following technical solutions are provided:

[0009] 1. An integrated system for recycling water during the construction and use phases of a gymnasium, characterized in that it comprises the following steps:

[0010] S1. Analyze the construction site and establish a water-stop curtain

[0011] S2. Build wastewater drainage ditches and water collection wells

[0012] S3. Establish a water purification system

[0013] S4. Design the route of rainwater recycling pipes

[0014] S5. Design of water utilization pipeline direction

[0015] 2. According to claim 1, step S1 includes analyzing the on-site construction site and establishing a water-stop curtain. It is characterized in that the site is arranged using BIM technology, and the water-stop curtain is arranged on the site to block the groundwater on the side wall and the bottom of the foundation pit from flowing into the foundation pit.

[0016] 3. According to claim 1, step S2 includes establishing a wastewater drainage ditch and a water collection well. The characteristic is that for the Qionghai Stadium project, underground continuous wall groundwater sealing measures are adopted; open ditch plus water collection well precipitation method is adopted to centrally store the water pumped by precipitation, and reuse it during construction after purification.

[0017] 4. According to claim 1, step S3 includes establishing a reclaimed water purification system. Characteristically, the system includes a reclaimed water recovery module, a sedimentation module, a deep treatment module and a reclaimed water reservoir. The reclaimed water recovery module includes a water collecting pipe, one end of which is connected to the wastewater output end, the sedimentation module includes a plurality of sedimentation tanks connected in series, and the other end of the water pipe is connected to the sedimentation tank. The wastewater treated by the sedimentation module is discharged into the municipal system or input into the deep treatment sub-module. The deep treatment module performs deep adsorption purification treatment on the water that can be further purified after being treated by the sedimentation module, and then flows to the reservoir for storage and reuse.

[0018] 5. According to claim 1, step S4 includes designing the direction of the rainwater recycling pipeline. It is characterized in that the rainwater recycling passes through the rainwater recycling pipeline and directly enters the sedimentation module, and after sedimentation, it undergoes the same treatment steps as the recycled water recovered by the water-stop curtain.

[0019] 6. According to claim 1, step S5 includes designing the direction of the pipeline for the utilization of reclaimed water. It is characterized in that after the rainwater is purified, it can be directly used for flushing toilets, washing cars at the construction site, and sprinkling water on site to control dust through pipeline design. The water body that has been treated or has reached the required water quality can be used for greening, water for structural maintenance, and water for concrete test block maintenance. The reclaimed water recovery includes a water collection pipe, one end of which is connected to the wastewater output end. The recycled reclaimed water includes foundation pit precipitation using a green precipitation curtain and rainwater recovery at the construction site. The main direction of reclaimed water utilization: for foundation pit precipitation, it uses the drainage ditch to flow to the water collection well and then enters the purification system, while the rainwater directly enters the sedimentation module and then undergoes a further purification; finally, the water body pumped by precipitation and the rainwater in the construction stage are purified and stored in the same reservoir, and then used through pipelines to include greening, water for concrete test blocks and structural maintenance, fire water, flushing toilets, washing cars at the construction site, and sprinkling water on site to control dust.

[0020] The water recycling and water treatment system and rainwater collection pipelines of the construction site during the construction phase can be directly used in the project operation and maintenance phase. The precipitation of the water collection well of the water-stop curtain during the original construction phase can be transformed into a spray nozzle for the maintenance of the lawn and green plants in the gymnasium. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0022] Figure 1 This is a flow chart of the steps of the integrated system for recycling grey water during the construction and use phases of a gymnasium as described in an embodiment of the present invention.

[0023] Figure 2 This is a schematic diagram of the effect of the integrated system for recycling and utilizing grey water in the construction and use phases of the gymnasium according to the embodiment of the present invention. Among them, 1-dust suppression device 2-construction fence 3-water reservoir 4-deep treatment module 5-sedimentation module 6-water collection well 7-grey water recovery module 8-drainage ditch 9-rainwater recovery pipeline 10-grey water utilization pipeline in the construction phase 11-grey water utilization pipeline in the operation and maintenance phase 12-water stop curtain 13-fire water pipeline 14-wastewater output end 15-spray nozzle

[0024] Figure 3 Step 1 of the BIM modeling of the integrated system for recycling and utilizing reclaimed water in the gymnasium construction and use phases described in the embodiment of the present invention is to analyze the on-site construction site and establish a schematic diagram of the water-stop curtain.

[0025] Figure 4 Step 2 of the BIM modeling of the integrated system for recycling and utilizing reclaimed water during the construction and use phases of the gymnasium described in the embodiment of the present invention is to establish a schematic diagram of the reclaimed water drainage ditch and the water collection well.

[0026] Figure 5 Step 3 of the BIM modeling of the integrated system for recycling and utilizing reclaimed water during the construction and use phases of the gymnasium according to the embodiment of the present invention is to establish a schematic diagram of the reclaimed water purification system.

[0027] Figure 6 Step 4 of the BIM modeling of the integrated system for recycling and utilizing reclaimed water during the construction and use phases of the gymnasium according to the embodiment of the present invention is to design a schematic diagram of the rainwater recycling pipeline.

[0028] Figure 7Step 5 of the BIM modeling of the integrated system for recycling and utilizing reclaimed water during the construction and use phases of a gymnasium according to an embodiment of the present invention, a schematic diagram of a fire-fighting water pipeline designed in the design of the reclaimed water pipeline direction

[0029] Figure 8 This is step 6 of the BIM modeling of the integrated system for recycling and utilizing reclaimed water in the gymnasium construction and use phases according to the embodiment of the present invention, and the schematic diagram of the reclaimed water utilization pipeline in the construction phase is designed.

[0030] Fig. 9 Step 7 of the BIM modeling of the integrated system for recycling and utilizing reclaimed water in the gymnasium construction and use phases according to the embodiment of the present invention, a schematic diagram of the reclaimed water pipeline in the establishment and operation phase of the reclaimed water pipeline direction is designed

[0031] Fig.10 The final result diagram of the integrated system for recycling and utilizing reclaimed water during the construction and use phases of a gymnasium according to an embodiment of the present invention DETAILED DESCRIPTION

[0033] In order to make the purpose, features and advantages of the present invention more obvious and easy to understand, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the embodiments described below are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0034] The present invention belongs to the field of green building engineering construction, especially a method of dust control during the construction phase combined with closed precipitation, and the design of water collection and recycling facilities is used in the project operation and maintenance phase to achieve non-disposable use of resource equipment, which can become fixed equipment after the project is completed.

[0035] according to Figure 2Schematic diagram of the effect of the integrated system for recycling and utilizing grey water during the construction and use phases of the gymnasium. During the construction phase, the underground continuous wall groundwater sealing measures and the open ditch plus water collection well dewatering method are adopted for the water stop curtain. The grey water recovered by the 12-water stop curtain flows to the 6-water collection well through the 8-drainage ditch and enters the water recycling and utilization integrated system. The water recycling and water treatment system of the gymnasium construction site includes 7-water recovery module, 5-sedimentation module, 4-depth module and 3-water reuse (reservoir) module. Among them, the 7-water recovery module is connected to the 6-water collection well to collect the grey water discharged by the water stop curtain. The grey water flowing into 6-is first filtered out by preliminary filtration of larger waste residues and wastes, and then flows into the 5-sedimentation module for the next purification treatment. The other end is connected to the 14-wastewater output end and flows into the municipal pipe network. After preliminary treatment, the water source flowing into the 5-sedimentation module is left to settle in the sedimentation module, and then enters the 4-depth module. After the activated carbon adsorbs the suspended matter in the water, it becomes a usable clean water source, and flows through the pipeline to the 3-recovery water reuse (water tank) module for storage and use according to on-site needs.

[0036] At the same time, during the construction phase, rainwater can also enter the system for purification and recycling. The recycled rainwater passes through the 9-rainwater recycling pipeline and directly enters the 5-sedimentation module. After sedimentation, it undergoes the same treatment steps as the recycled water recycled by the water-stop curtain. The above is the process of recycling recycled water, purifying it into usable clean water and storing it.

[0037] The purified clean water is stored in 3-reservoir. The clean water utilization path in the construction stage is ① through 10-recycled water utilization pipeline in the construction stage, where the rainwater is purified and passed through the pipeline design, and the recycled water can be directly used for flushing toilets, washing cars at the construction site, and sprinkling water on site to control dust. The water that has been treated or meets the water quality requirements can be used for greening, structural maintenance water, and concrete test block maintenance water, etc. Utilization path ② through 13-fire water pipeline, it can be used for fire water in the construction stage.

[0038] The construction site water treatment system, rainwater recycling pipeline and fire water pipeline in the construction phase can be directly applied to the project operation and maintenance phase. Clean water utilization methods in the operation and maintenance phase ① The precipitation of the water collection well of the water-stop curtain in the original construction phase can be transformed into 15-spray nozzles, and used for the maintenance of the lawn and green plants in the gymnasium through the 11-water utilization pipeline in the operation and maintenance phase. Clean water utilization method ② Through the 13-fire water pipeline, it can be used for fire water in the operation and maintenance phase.

[0039] The innovations of this invention are: ① Integration of groundwater and rainwater recovery and utilization during the construction phase; ② Recovery and purification equipment and some pipelines during the construction phase can be used for rainwater recovery and utilization during the project operation and maintenance phase; ③ Use BIM technology to display the results of the recovery system, clearly showing the direction of the pipeline, the three-dimensional effect of the integrated system, and the direction of the water flow.

[0040] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

Claims

1. An integrated system for recycling and utilizing reclaimed water during the construction and use phases of a gymnasium, characterized in that: The following steps are involved: S1. Analyze the construction site and establish a water-stop curtain S2. Build wastewater drainage ditches and water collection wells S3. Establish a water purification system S4. Design the route of rainwater recycling pipes S5. Design the direction of water utilization pipelines.

2. According to claim 1, step S1 includes analyzing the on-site construction site and establishing a water-stop curtain. It is characterized in that BIM technology is used for site layout, and a water-stop curtain is arranged on the site to prevent groundwater from the side walls and bottom of the foundation pit from flowing into the foundation pit.

3. According to claim 1, step S2 includes building a wastewater drainage ditch and a water collection well. For the Qionghai Stadium project, underground continuous walls are used to seal groundwater. Open ditches and collection wells are used to dewater the water, which is then centrally stored and reused during construction after purification.

4. According to claim 1, step S3 includes establishing a reclaimed water purification system. Characterized in that: The system includes a water recovery module, a sedimentation module, a deep treatment module and a water storage tank. The water recovery module includes a water collection pipe, one end of which is connected to the wastewater output end. The sedimentation module includes several sedimentation tanks connected in series, and the other end of the water pipe is connected to the sedimentation tank. The wastewater treated by the sedimentation module is discharged into the municipal system or input into the deep treatment module. The deep treatment module deeply adsorbs and purifies the water that can be further purified after being treated by the sedimentation module, and then flows to the water storage tank for storage and reuse.

5. According to claim 1, step S4 includes designing the direction of the rainwater recycling pipeline. It is characterized in that: Rainwater is recovered through the rainwater recovery pipe and directly enters the sedimentation module. After sedimentation, it undergoes the same treatment steps as the recycled water recovered by the water-stop curtain.

6. According to claim 1, step S5 includes designing the direction of the water utilization pipeline. Characterized in that: After rainwater purification, it can be directly used for flushing toilets, washing cars at construction sites, and sprinkling water on site to control dust through pipeline design. Water bodies that have been treated or meet the water quality requirements can be used for greening, structural maintenance water, and concrete test block maintenance water. The recycling of recycled water includes a water collection pipe, one end of which is connected to the wastewater output end. The recycled water includes foundation pit precipitation using a green precipitation curtain and rainwater recycling at the construction site. The main direction of the use of recycled water: For foundation pit precipitation, it flows to the water collection well through the drainage ditch and then enters the purification system, while rainwater directly enters the sedimentation module for further purification; finally, the water pumped by precipitation and the rainwater in the construction stage are purified and stored in the same reservoir, and then used through pipelines to include greening, concrete test blocks and structural maintenance water, fire water, flushing toilets, washing cars at construction sites, and sprinkling water on site to control dust. The water recycling and water treatment system and rainwater collection pipelines of the construction site during the construction phase can be directly used in the project operation and maintenance phase. The precipitation of the water collection well of the water-stop curtain during the original construction phase can be transformed into a spray nozzle for the maintenance of the lawn and green plants in the gymnasium.