Quick plastering screeding and ground mortar leveling screeding control device
By designing a quick plastering and floor mortar leveling and bending control device, the problems of complex plastering and leveling operations and poor thickness accuracy in the existing technology are solved, and the precise control of plastering thickness and verticality is achieved, reducing costs and labor fatigue of workers.
Patent Information
- Application Number
- CN202411898578.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-03-11
AI Technical Summary
The prior art has complicated operations, poor thickness accuracy and increased early labor investment in the process of plastering and floor mortar leveling.
A rapid plastering and floor mortar leveling plastering control device is designed, including a fixed frame, guide rail, thickness adjustment device, verticality adjustment device and rib strip layout device. Through the combination of these devices, precise adjustment and control of plastering thickness and verticality are achieved.
It realizes convenient, scale and accurate control of plaster thickness and verticality, reduces material use and labor fatigue, reduces costs, and improves the quality of on-site plastering molding.
Smart Images

Figure CN119593563A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of plastering and ground mortar leveling, and in particular to a quick plastering rib punching and ground mortar leveling rib punching control device. Background Art
[0002] In various civil construction projects, especially housing construction projects, plastering needs to be carried out according to the specific requirements of the wall, and secondary ground leveling is required before the ground decoration construction. At present, plastering on construction sites uses infrared laser to make gray cakes to level the vertical surface of the wall. Ground leveling is also done by making gray cakes after infrared laser leveling. The use of gray cakes and ribs to control the thickness of plastering or leveling is poor in accuracy, the operation is relatively complicated, and the target is easily lost due to mortar coverage in the later construction. However, the use of gray cakes and ribs increases the intensity of workers' early marking and increases the initial labor input.
[0003] Therefore, it is necessary to develop a rapid plastering reinforcement and ground mortar leveling reinforcement control device to solve the above problems. Summary of the invention
[0004] The purpose of the present invention is to design a quick plastering reinforcement and ground mortar leveling reinforcement control device in order to solve the above problems.
[0005] The present invention achieves the above-mentioned purpose through the following technical solutions: Rapid plastering reinforcement and ground mortar leveling reinforcement control device, including: The fixed frame includes two side plates, two partition plates, and a top plate. The two sides of the long side of the top plate are respectively connected to one side of the long side of the two side plates, and one side of the long side of the two partition plates is connected to the top plate. The two side plates and the two partition plates are arranged parallel to each other, and the two side plates and the two partition plates are perpendicular to the top plate. A first mounting groove is formed between the two partition plates. The guide rail is placed in the first mounting groove, and the guide rail includes two mounting plates, and the inner sides of the two mounting plates are provided with tracks along the length direction thereof, and the two tracks have the same height; A thickness adjustment device for adjusting the height of the guide rail; the thickness adjustment device is mounted on the fixed frame and connected to the guide rail; A rib strip laying device; the rib strip laying device can be slidably placed above the two tracks; A verticality adjusting device is used to adjust the verticality of the guide rail; the verticality adjusting device is installed on the fixed frame and connected to the guide rail.
[0006] Specifically, the thickness adjustment device includes two thickness controllers, two guide rail connecting shafts, two first threaded rods, and two first rotating handles. A notch is formed in the middle of the two side plates and the two partitions, and a second mounting groove is formed between the side plates and the partitions. A first threaded hole is provided at the bottom of the center of the two second mounting grooves, and a scale is provided on the side of the notch on the side plate. The two thickness controllers are respectively placed in the two second mounting grooves and located at the notch. The first end of the first threaded rod is connected to the rotating handle, the first threaded rod is threadedly engaged with the first threaded hole, and the second end of the first threaded rod is inseparable from the thickness controller and can be rotatably engaged; an axial hole is provided on the inner side wall of each thickness controller, the first end of the guide rail connecting shaft is interference fit with the axial hole, the second end of the guide rail connecting shaft is connected to the mounting plate, and the lower end of the thickness controller is used to indicate the scale.
[0007] Furthermore, a first mounting hole and a second mounting hole are provided on the top of the thickness controller, the first mounting hole and the second mounting hole are connected, the second mounting hole is placed below the first mounting hole, a disc is provided at the second end of the first threaded rod, the disc is installed in the second mounting hole, the first threaded rod is passed through the first mounting hole, the diameter of the disc is smaller than the diameter of the second mounting hole, and the diameter of the first threaded rod is smaller than the diameter of the first mounting hole.
[0008] Specifically, the verticality adjustment device includes a second threaded rod and a second rotating handle. A second threaded hole is provided in the middle of one end of the top plate. A connecting plate is horizontally installed between two mounting plates below the second threaded hole. The first end of the second threaded rod is connected to the second rotating handle, and the second threaded rod is threadedly engaged with the second threaded hole. The second end of the second threaded rod is not detached from the connecting plate and can be rotatably engaged.
[0009] Furthermore, the verticality adjustment device also includes a vertical indicator, a vertical indicator pointer, and a guide rail shaft pointer. The vertical indicator is installed on the outer wall of the thickness controller, and the guide rail shaft pointer is installed at the end of the guide rail connecting shaft penetrating the thickness controller. The vertical indicator pointer of the vertical indicator and the guide rail shaft pointer have the same rotation center axis.
[0010] Specifically, the rib strip laying device includes a slider, a U-shaped device, and a grouting pipe. The slider can be slidably placed on the track. A U-shaped slot is provided on the slider. A grouting hole is provided on the slider in the middle of the U-shaped slot. The first end of the grouting pipe is connected to the grouting hole, and the second end of the grouting pipe is connected to the grouting equipment. The open end of the U-shaped device faces the length direction of the slider, and the U-shaped device is vertically inserted into the U-shaped slot.
[0011] Furthermore, the rib arrangement device also includes two cross bars, and third mounting holes are correspondingly arranged on two opposite sides of the upper portion of the U-shaped device, and two ends of a cross bar are respectively installed in the third mounting holes arranged oppositely on both sides of the U-shaped device.
[0012] Furthermore, the rib arrangement device also includes at least two springs, the lower part of the U-shaped device is formed as a support plate extending horizontally to both sides, and the at least two springs are divided into two groups and are respectively placed between the two support plates and the slider.
[0013] Preferably, the rib arrangement device further comprises at least four spring clamping columns, the spring ends are sleeved in the spring clamping columns, and the spring clamping columns are installed at the support plate and the bottom of the slider.
[0014] Preferably, the grouting equipment is a glass glue gun, two grouting device support blocks are provided on the sliding block, and the grouting equipment is installed between the two grouting device support blocks.
[0015] The beneficial effects of the present invention are: The present application adjusts the designed plaster thickness through a fixed frame and a thickness adjustment device; the verticality adjustment of the plaster is achieved through the cooperation of a fixed frame and a verticality adjustment device; mortar is poured while the rib strip laying device is running in the track, and the mortar enters the U-shaped groove to form strip-shaped rib strips, and through the slow downward movement of the rib strip laying device, a whole rib strip can eventually be formed; through the present application, the rib strips can be laid out conveniently, on a large scale, and accurately, making the plaster thickness design and verticality control more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 is a bottom view of the fixed frame of the present invention; Figure 2 is a side view of the present invention; Figure 3 It is a schematic diagram of the structure of the scale in the present invention; Figure 4 is a bottom view of the present invention; Figure 5 It is a structural schematic diagram of the guide rail in the present invention; Figure 6 It is a schematic diagram of the structure of the thickness controller in the present invention; Figure 7 It is a structural schematic diagram of the circular hole in the present invention; Figure 8 is a top view of the slider in the present invention; Fig. 9 is an axial view of the slider in the present invention; Fig.10 It is a schematic diagram of the installation structure of the glass glue gun in the present invention; Fig.11 It is a structural schematic diagram of the U-shaped device in the present invention; Fig.12 It is a schematic diagram of the installation structure of the U-shaped device in the present invention; Fig.13 It is a schematic diagram of the installation structure of the glass glue gun pressure plate in the present invention.
[0017] In the figure: 1, side plate; 2, partition plate; 3, first threaded hole; 4, top plate; 5, scale; 6, notch; 7, thickness controller; 8, vertical indicator; 9, shaft hole; 10, vertical indicator pointer; 11, guide rail shaft pointer; 12, first threaded rod; 13, guide rail connecting shaft; 14, slider; 15, U-shaped slot; 16, grouting hole; 17, grouting device support block; 18, spring clamp column; 19, spring; 20, cross bar ; 21. Grouting pipe; 22. Sealing gasket; 23. Grouting device storage barrel; 24. Glass glue gun pressure plate; 25. Thickened push piece; 25-2. Glue gun handle; 26. Push rod release pressure piece; 27. First horizontal tube; 28. Second horizontal tube; 29. Track; 30. First rotating handle; 31. First mounting hole, 32. Guide rail; 33. Second threaded rod; 34. U-shaped device; 35. Second threaded hole; 36. Connecting plate. DETAILED DESCRIPTION
[0018] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.
[0019] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.
[0021] In the description of the present invention, it should be understood that the terms "upper", "lower", "inside", "outside", "left", "right", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the product of the invention is usually placed when in use, or are directions or positional relationships commonly understood by those skilled in the art. These directions or positional relationships are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.
[0022] Furthermore, the terms “first”, “second”, etc. are merely used for distinguishing descriptions and should not be understood as indicating or implying relative importance.
[0023] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms such as "setting" and "connection" should be understood in a broad sense. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0024] The specific implementation modes of the present invention are described in detail below in conjunction with the accompanying drawings.
[0025] like Figure 1-13 As shown, the rapid plastering reinforcement and ground mortar leveling reinforcement control device includes: Fixed frame; The fixed frame includes two side panels 1, two partition panels 2, and a top panel 4, the two sides of the long side of the top panel 4 are respectively connected to one side of the long side of the two side panels 1, and one side of the long side of the two partition panels 2 is connected to the top panel 4, the two side panels 1 and the two partition panels 2 are arranged parallel to each other, and the two side panels 1 and the two partition panels 2 are perpendicular to the top panel 4; a first mounting groove is formed between the two partition panels 2; The guide rail 32 is placed in the first mounting groove, and the guide rail 32 includes two mounting plates, and the inner sides of the two mounting plates are provided with rails 29 along the length direction thereof, and the two rails 29 have the same height; A thickness adjustment device for adjusting the height of the guide rail 32; the thickness adjustment device is mounted on the fixed frame and connected to the guide rail 32; The rib strip laying device is slidably placed above the two tracks 29; A verticality adjusting device is used to adjust the verticality of the guide rail 32 ; the verticality adjusting device is installed on the fixed frame and connected to the guide rail 32 .
[0026] like Figure 2 and 3As shown in FIG. 8 , the thickness adjustment device includes two thickness controllers 7, two guide rail connecting shafts 13, two first threaded rods 12, and two first rotating handles 30. A notch 6 is formed in the middle of the two side plates 1 and the two partitions 2. A second mounting groove is formed between the side plate 1 and the partition 2. A first threaded hole 3 is provided at the bottom of the center of the two second mounting grooves. A scale 5 is provided on one side of the notch 6 on the side plate 1. The two thickness controllers 7 are respectively placed in the two second mounting grooves and located at the notch 6. The first end of the first threaded rod 12 is connected to the rotating handle, the first threaded rod 12 is threadedly matched with the first threaded hole 3, and the second end of the first threaded rod 12 is not separated from the thickness controller 7 and can be rotatably matched; an axial hole 9 is provided on the inner side wall of each thickness controller 7, the first end of the guide rail connecting shaft 13 is interference-fitted with the axial hole 9, the second end of the guide rail connecting shaft 13 is connected to the mounting plate, and the lower end of the thickness controller 7 is used to indicate the scale 5. The matching arrangement of the scale 5 and the thickness controller 7 can intuitively control the plastering or leveling thickness.
[0027] like Figure 6 As shown, a first mounting hole 31 and a second mounting hole are provided on the top of the thickness controller 7, the first mounting hole 31 and the second mounting hole are connected, the second mounting hole is placed below the first mounting hole, a disc is provided at the second end of the first threaded rod 12, the disc is installed in the second mounting hole, the first threaded rod 12 is arranged through the first mounting hole, the diameter of the disc is smaller than the diameter of the second mounting hole, and the diameter of the first threaded rod 12 is smaller than the diameter of the first mounting hole 31.
[0028] like Figure 1 and 2 As shown in 13, the verticality adjustment device includes a second threaded rod 33 and a second rotating handle. A second threaded hole 35 is provided in the middle of one end of the top plate 4. A connecting plate 36 is horizontally installed between two mounting plates below the second threaded hole 35. The first end of the second threaded rod 33 is connected to the second rotating handle, and the second threaded rod 33 is threadedly engaged with the second threaded hole 35. The second end of the second threaded rod 33 is not disengaged from the connecting plate 36 and can be rotatably engaged (the engaging structure here is the same as the connecting structure between the second end of the first threaded rod 12 and the thickness controller 7).
[0029] like Figure 6 As shown, the verticality adjustment device also includes a vertical indicator 8, a vertical indicator pointer 10, and a guide rail shaft pointer 11. The vertical indicator 8 is installed on the outer wall of the thickness controller 7, and the guide rail shaft pointer 11 is installed at the end of the guide rail connecting shaft 13 penetrating the thickness controller 7. The vertical indicator pointer 10 of the vertical indicator 8 and the guide rail shaft pointer 11 have the same rotation center axis.
[0030] like Figure 8-12As shown, the rib arrangement device includes a slider 14, a U-shaped device 34, and a grouting pipe 21. The slider 14 can be slidably placed on the track 29. A U-shaped slot 15 is provided on the slider 14. A grouting hole 16 is provided on the slider 14 in the middle of the U-shaped slot 15. The first end of the grouting pipe 21 is connected to the grouting hole 16, and the second end of the grouting pipe 21 is connected to the grouting equipment. The open end of the U-shaped device 34 faces the length direction of the slider 14, and the U-shaped device 34 is correspondingly vertically inserted into the U-shaped slot 15.
[0031] like Fig.10 As shown, the rib arrangement device further includes two cross bars 20, and third mounting holes are correspondingly provided on two opposite sides of the upper portion of the U-shaped device 34, and the two ends of one cross bar 20 are respectively installed in the third mounting holes provided oppositely on both sides of the U-shaped device 34. The purpose of providing the two cross bars 20 is to avoid limiting the downward position of the U-shaped device 34 and to prevent the U-shaped device 34 from detaching from the slider 14.
[0032] like Figure 10-11 As shown, the rib arrangement device also includes at least two springs 19. The lower part of the U-shaped device 34 is formed as a support plate extending horizontally to both sides. The at least two springs 19 are divided into two groups and are respectively placed between the two support plates and the slider 14. The springs 19 are in a compressed state when the bottom of the U-shaped device 34 is pressed against the wall or the ground.
[0033] like Figure 10-11 As shown, the rib arrangement device further includes at least four spring clamping columns 18 , the ends of the springs 19 are sleeved in the spring clamping columns 18 , and the spring clamping columns 18 are installed at the bottom of the support plate and the slider 14 .
[0034] like Figure 8-10 As shown, the grouting device is a glass glue gun, two grouting device support blocks 17 are provided on the slider 14, and the grouting device is installed between the two grouting device support blocks 17.
[0035] In some embodiments, Figure 5 As shown, a first horizontal tube 27 is provided at the front end of the guide rail 32, and a second horizontal tube 28 is provided in the middle of the guide rail 32. The top surface of the horizontal tube is flush with the upper surface of the guide rail 32, and the setting of the horizontal tube does not affect the passage of the rib arrangement device; observation windows are provided on the top plate 4 at the top of the first horizontal tube 27 and the second horizontal tube 28 for observing the first horizontal tube 27 and the second horizontal tube 28.
[0036] When the present application is working, the two first rotating handles 30 are rotated at the same time to drive the two thickness controllers 7 to move up and down at the same time (when the first rotating handles 30 are rotated, the first threaded rod 12 rotates and moves up / down relative to the top plate 4, pushing the thickness controller 7 to move up / down), thereby realizing the preliminary control of the plastering thickness. When the thickness controller 7 moves up and down, the scale 5 indicated by the outer lower edge is the thickness of the plastering layer in the middle part. By rotating the second rotating handle, the second threaded rod 33 moves up / down relative to the top plate 4, pushing the connecting plate 36 at one end of the guide rail 32 to move up / down, and the guide rail 32 rotates along the guide rail connecting shaft 13, and finally the verticality adjustment of the entire guide rail 32 is realized. When the guide rail connecting shaft 13 rotates, the guide rail shaft pointer 11 rotates synchronously. When the wall is punched, the device is vertically attached to the wall. At this time, the vertical indicator pointer 10 deflects the angle according to the verticality of the wall. After adjusting the thickness controller 7 to the designed plastering thickness, the second threaded rod 33 is rotated to drive the guide rail 32 and the guide rail connecting shaft 13 to rotate a certain angle. The guide rail shaft pointer 11 will indicate the rotation angle. When the guide rail shaft pointer 11 and the vertical indicator pointer 10 indicate the same angle (the guide rail shaft pointer 11 overlaps with the vertical indicator pointer 10), the vertical surface formed at the bottom of the guide rail 32 is the plastering vertical surface.
[0037] When grouting and ribs are needed, the whole device is pressed against the wall or the ground, and the U-shaped device 34 is pressed against the wall due to the elastic force of the spring 19. The left, right and lower parts of the U-shaped device 34 and the slider 14 form a five-sided closed space with the wall. The mortar forms a rib strip pattern in the U-shaped device 34. During grouting, the mortar enters the U-shaped device 34 through the grouting hole 16 to form a rib strip, and the rib strip is firmly bonded to the wall.
[0038] When the grouting device is a glass glue gun, it includes a grouting device storage barrel 23, a glass glue gun pressure plate 24, a thickened push piece 25, a push rod release pressure piece 26, and a sealing gasket 22; the grouting pipe 21 is welded to the slider 14, and a sealing gasket 22 is added to the joint of the grouting pipe 21 to prevent leakage. The mortar is stored in the grouting device storage barrel 23. When grouting is required, the glue gun handle 25-2 is pressed by the right hand to press the mortar into the U-shaped device 34 to form a rib strip. During the pressing process, slowly pull down the slider 14 to extend the rib strip. After completing the entire rib strip, stop grouting the vertical wall and remove the rectification device. Repeat the construction of the next rib.
[0039] Embodiment 2: When the ground is leveled and ribbed, the device is level with the ground and the first rotating handle 30 is rotated to drive the thickness controller 7 to move up and down to achieve preliminary control of the plaster thickness. The thickness controllers 7 on the left and right sides must move up and down synchronously. When the thickness controller 7 moves up and down, the scale 5 indicated by the outer lower edge is the thickness of the leveling layer in the middle part. Observe the first horizontal tube 27, and the bubble is centered to ensure that the left and right sides are in the same horizontal position. Rotate the second threaded rod 33 to drive the guide rail 32 and the guide rail connecting shaft 13 to rotate, and observe the second horizontal tube 28. When the bubble is centered, the guide rail 32 is in a horizontal plane. At this time, the bottom surface of the guide rail 32 is the ground leveling level surface. The subsequent operation steps are the same as the wall rib.
[0040] This application can be used in wall plastering and rib punching, floor plastering and leveling work scenarios, which can effectively reduce materials, reduce workers' fatigue, reduce costs, reduce dimensional deviation problems, and improve on-site plastering molding quality.
[0041] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. Rapid plastering reinforcement and ground mortar leveling reinforcement control device, characterized in that: include: The fixed frame includes two side plates, two partition plates, and a top plate. The two sides of the long side of the top plate are respectively connected to one side of the long side of the two side plates, and one side of the long side of the two partition plates is connected to the top plate. The two side plates and the two partition plates are arranged parallel to each other, and the two side plates and the two partition plates are perpendicular to the top plate. A first mounting groove is formed between the two partition plates. The guide rail is placed in the first mounting groove, and the guide rail includes two mounting plates, and the inner sides of the two mounting plates are provided with tracks along the length direction thereof, and the two tracks have the same height; A thickness adjustment device for adjusting the height of the guide rail; the thickness adjustment device is mounted on the fixed frame and connected to the guide rail; A rib strip laying device; the rib strip laying device can be slidably placed above the two tracks; A verticality adjusting device is used to adjust the verticality of the guide rail; the verticality adjusting device is installed on the fixed frame and connected to the guide rail.
2. The rapid plastering reinforcement and floor mortar leveling reinforcement control device according to claim 1 is characterized in that: The thickness adjustment device includes two thickness controllers, two guide rail connecting shafts, two first threaded rods, and two first rotating handles. A notch is formed in the middle of the two side plates and the two partitions, and a second mounting groove is formed between the side plates and the partitions. A first threaded hole is provided at the bottom of the center of the two second mounting grooves, and a scale is provided on the side of the notch on the side plate. The two thickness controllers are respectively placed in the two second mounting grooves and located at the notch. The first end of the first threaded rod is connected to the rotating handle, and the first threaded rod is threadedly matched with the first threaded hole. The second end of the first threaded rod is inseparable from the thickness controller and can be rotatably matched; an axial hole is provided on the inner side wall of each thickness controller, the first end of the guide rail connecting shaft is interference fit with the axial hole, the second end of the guide rail connecting shaft is connected to the mounting plate, and the lower end of the thickness controller is used to indicate the scale.
3. The rapid plastering reinforcement and floor mortar leveling reinforcement control device according to claim 2 is characterized in that: A first mounting hole and a second mounting hole are provided on the top of the thickness controller, the first mounting hole and the second mounting hole are connected, the second mounting hole is placed below the first mounting hole, a disc is provided on the second end of the first threaded rod, the disc is installed in the second mounting hole, the first threaded rod is passed through the first mounting hole, the diameter of the disc is smaller than the diameter of the second mounting hole, and the diameter of the first threaded rod is smaller than the diameter of the first mounting hole.
4. The rapid plastering reinforcement and floor mortar leveling reinforcement control device according to claim 2 is characterized in that: The verticality adjustment device includes a second threaded rod and a second rotating handle. A second threaded hole is provided in the middle of one end of the top plate. A connecting plate is horizontally installed between two mounting plates below the second threaded hole. The first end of the second threaded rod is connected to the second rotating handle. The second threaded rod is threadedly engaged with the second threaded hole. The second end of the second threaded rod is not separated from the connecting plate and can be rotatably engaged.
5. The rapid plastering reinforcement and floor mortar leveling reinforcement control device according to claim 4 is characterized in that: The verticality adjustment device also includes a vertical indicator, a vertical indicator pointer, and a guide rail shaft pointer. The vertical indicator is installed on the outer wall of the thickness controller, and the guide rail shaft pointer is installed at the end of the guide rail connecting shaft penetrating the thickness controller. The vertical indicator pointer of the vertical indicator and the guide rail shaft pointer have the same rotation center axis.
6. The rapid plastering reinforcement and floor mortar leveling reinforcement control device according to claim 1 is characterized in that: The rib strip laying device includes a slider, a U-shaped device, and a grouting pipe. The slider can be slidably placed on the track. A U-shaped slot is arranged on the slider. A grouting hole is arranged on the slider in the middle of the U-shaped slot. The first end of the grouting pipe is connected to the grouting hole, and the second end of the grouting pipe is connected to the grouting equipment. The opening end of the U-shaped device faces the length direction of the slider, and the U-shaped device is vertically inserted into the U-shaped slot.
7. The rapid plastering reinforcement and floor mortar leveling reinforcement control device according to claim 6 is characterized in that: The rib arrangement device also includes two cross bars, and third mounting holes are correspondingly arranged on two opposite sides of the upper part of the U-shaped device. The two ends of one cross bar are respectively installed in the third mounting holes arranged oppositely on both sides of the U-shaped device.
8. The rapid plastering reinforcement and floor mortar leveling reinforcement control device according to claim 6 is characterized in that: The rib arrangement device also includes at least two springs. The lower part of the U-shaped device is formed as a support plate extending horizontally to both sides. The at least two springs are divided into two groups and are respectively placed between the two support plates and the slider.
9. The rapid plastering reinforcement and floor mortar leveling reinforcement control device according to claim 8, characterized in that: The rib strip arrangement device also includes at least four spring clamping columns, the spring ends are sleeved in the spring clamping columns, and the spring clamping columns are installed at the support plate and the bottom of the slider.
10. The rapid plastering reinforcement and floor mortar leveling reinforcement control device according to claim 8, characterized in that: The grouting equipment is a glass glue gun. Two grouting device support blocks are arranged on the sliding block, and the grouting equipment is installed between the two grouting device support blocks.