Personnel scheduling information generation method and device, equipment, medium and program product

By generating and updating personnel scheduling information, the problem of inaccurate production and resettlement population planning schemes in the prior art is solved, and the accuracy of the scheme and satisfaction of personnel placement are improved.

CN119623906APending Publication Date: 2025-03-14SHANGHAI INVESTIGATION DESIGN & RES INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411467748.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-21
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

When generating a production resettlement population planning scheme, few influencing factors are considered in the prior art, resulting in inaccurate plans and incomplete compliance with the actual situation in the alpine canyon area.

Method used

By receiving the target area description information, population description information and land acquisition information input by the user, the target area information, proportion information and personnel resettlement information are generated, the personnel resettlement coefficient is calculated, and the personnel dispatch information is updated based on the coefficients to more accurately reflect the impact of the construction of land acquisition on the target area.

Benefits of technology

The accuracy of the production resettlement population planning scheme is improved, making it more in line with the actual situation in the alpine canyon area, and ensuring the rationality and satisfaction of personnel resettlement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119623906A_ABST
    Figure CN119623906A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of computers, and discloses a personnel scheduling information generation method and device, equipment, a medium and a program product, and the personnel scheduling information generation method comprises the steps: receiving first target region description information, first population description information and second target region description information; generating target region area information and first proportion information by using the first target region description information and the first population description information; generating second proportion information by using the second target area description information; generating first personnel placement information according to the second target region description information and the target region area information; processing the first proportion information and the second proportion information to obtain a personnel placement coefficient; judging whether the personnel placement coefficient is greater than a preset value; and if yes, updating the first personnel placement information as personnel scheduling information through a personnel placement coefficient. According to the method, the area proportion of the garden plot collected by the target area is considered, and the obtained personnel scheduling information is more accurate.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of computer technology, and in particular to a method, device, equipment, medium and program product for generating personnel scheduling information. Background Art

[0002] In the process of hydropower development advancing to high mountain and canyon areas, it is necessary to carry out construction and land acquisition in high mountain and canyon areas. In the process of construction and land acquisition and resettlement of immigrants, the commonly used production and resettlement population planning methods include: inputting existing data such as the expropriated cultivated land data and the average per capita cultivated land data of the expropriated units before the land acquisition into the computer equipment, and using the pre-configured personnel scheduling algorithm in the computer equipment to generate a production and resettlement population planning scheme. This method considers fewer influencing factors, resulting in inaccurate production and resettlement population planning schemes that do not conform to the actual situation. It is urgent to improve or optimize the conventional personnel scheduling algorithm. Summary of the invention

[0003] In view of this, the present invention provides a method, device, equipment, medium and program product for generating personnel scheduling information to solve the problem of errors between production and resettlement population planning schemes and actual conditions.

[0004] In a first aspect, the present invention provides a method for generating personnel dispatch information, including: receiving first target area description information, first population description information and second target area description information input by a user; wherein the first target area description information is used to characterize the overall land information of the target area, the first population description information is used to characterize the overall population information of the target area, and the second target area description information is used to characterize the land information expropriated in the target area; using the first target area description information and the first population description information, generating target area area information and first proportion information; wherein the target area information is used to characterize the per capita land area information of the target area, and the first proportion information is used to characterize the land area of ​​the target area. The overall cultivated land proportion information of the target area is obtained; using the second target area description information, the second proportion information is generated; the second proportion information is used to characterize the cultivated land proportion information collected in the target area; according to the second target area description information and the target area area information, the first personnel placement information is generated; the first personnel placement information is used to characterize the preliminary production placement population information of the target area; the first proportion information and the second proportion information are processed to obtain the personnel placement coefficient; the personnel placement coefficient is used to characterize the proportion of the cultivated land area collected in the target area; it is determined whether the personnel placement coefficient is greater than a preset value; if the personnel placement coefficient is greater than the preset value, the first personnel placement information is updated to the personnel scheduling information through the personnel placement coefficient.

[0005] The present invention uses the first target area description information and the first population description information to generate target area area information for characterizing the per capita land area of ​​the target area and the first proportion information for characterizing the overall cultivated land proportion of the target area, uses the second target area description information characterizing the land information expropriated in the target area to generate the second proportion information for characterizing the proportion of cultivated land expropriated in the target area, and generates the first personnel placement information according to the second target area description information and the target area information, wherein the expropriated land area parameter is considered in the first personnel placement information, which is more in line with the actual situation of construction land expropriation. The present invention uses a new personnel scheduling algorithm to generate a production resettlement population planning scheme, and during the execution of the algorithm, the first proportion information and the second proportion information are specifically processed to obtain a personnel placement coefficient for characterizing the proportion of the cultivated land area expropriated in the target area, and judges whether the personnel placement coefficient is greater than a preset value. If the personnel placement coefficient is greater than the preset value, it indicates that the proportion of the cultivated land area expropriated in the target area is large, that is, the construction land expropriation has a large impact on the target area, and therefore, the first personnel placement information is updated to the personnel scheduling information through the personnel placement coefficient. The present invention adjusts the first personnel placement information through the personnel placement coefficient, takes into account the land area requisitioned for construction, and comprehensively considers the impact of construction land requisition on the proportion of cultivated land. The obtained personnel scheduling information is more accurate and more in line with the actual situation, ensuring the rationality of the scheduling of personnel placement according to the personnel scheduling information and improving the satisfaction with the personnel placement.

[0006] In an optional implementation, the method for generating personnel scheduling information further includes: if the personnel placement coefficient is less than or equal to a preset value, determining the first personnel placement information as the personnel scheduling information.

[0007] In the present invention, when the personnel placement coefficient is less than or equal to the preset value, it means that the proportion of cultivated land area expropriated in the target area is small, that is, the impact of construction land expropriation on the target area is small. The first personnel placement information can be used as personnel scheduling information to simplify the determination process of personnel scheduling information, analyze it according to different situations, and improve the efficiency of generating personnel scheduling information.

[0008] In an optional implementation, the first proportion information and the second proportion information are processed to obtain a personnel placement coefficient, including: determining the personnel placement coefficient according to a ratio of the second proportion information to the first proportion information.

[0009] In an optional implementation, updating the first personnel placement information into personnel scheduling information by using the personnel placement coefficient includes: updating the first personnel placement information into personnel scheduling information according to the product of the first personnel placement information and the personnel placement coefficient.

[0010] In an optional embodiment, the first target area description information includes the total land area parameter and the total cultivated land area parameter of the target area; the first target area description information and the first population description information are used to generate the target area area information and the first proportion information, including: generating the target area information according to the ratio of the total land area parameter to the first population description information; generating the first proportion information according to the ratio of the total cultivated land area parameter to the total land area parameter.

[0011] In an optional implementation, the second target area description information includes expropriation land area parameters and expropriation cultivated land area parameters; the second target area description information is used to generate the second proportion information, including: generating the second proportion information based on the ratio of the expropriation cultivated land area parameters to the expropriation land area parameters.

[0012] In an optional implementation, generating first personnel placement information according to the second target area description information and the target area area information includes: generating the first personnel placement information according to the ratio of the expropriated land area parameter to the target area information.

[0013] In a second aspect, the present invention provides a device for generating personnel scheduling information, including: a description information receiving module, used to receive first target area description information, first population description information and second target area description information input by a user; wherein the first target area description information is used to characterize the overall land information of the target area, the first population description information is used to characterize the overall population information of the target area, and the second target area description information is used to characterize the land information expropriated in the target area; a first proportion information generating module, used to generate target area area information and first proportion information using the first target area description information and the first population description information; the target area area information is used to characterize the per capita land area information of the target area, and the first proportion information is used to characterize the overall cultivated land proportion information of the target area; the second proportion information generating module A block is used to generate second proportion information by using the second target area description information; the second proportion information is used to characterize the proportion information of cultivated land collected in the target area; a first personnel placement information generation module is used to generate first personnel placement information according to the second target area description information and the target area area information; the first personnel placement information is used to characterize the preliminary production placement population information of the target area; a personnel placement coefficient determination module is used to process the first proportion information and the second proportion information to obtain a personnel placement coefficient; the personnel placement coefficient is used to characterize the proportion of the cultivated land area collected in the target area; a judgment module is used to judge whether the personnel placement coefficient is greater than a preset value; a personnel scheduling information generation module is used to update the first personnel placement information to the personnel scheduling information through the personnel placement coefficient according to the personnel placement coefficient being greater than the preset value.

[0014] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the method for generating personnel scheduling information of the above-mentioned first aspect or any corresponding embodiment thereof by executing the computer instructions.

[0015] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to enable a computer to execute the method for generating personnel scheduling information of the above-mentioned first aspect or any corresponding embodiment thereof.

[0016] In a fifth aspect, the present invention provides a computer program product, including computer instructions, and the computer instructions are used to enable a computer to execute the method for generating personnel scheduling information of the above-mentioned first aspect or any corresponding embodiment thereof. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the related technologies, the drawings required for use in the specific embodiments or the related technical descriptions will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0018] Figure 1 is a flow chart of a method for generating personnel scheduling information according to an embodiment of the present invention;

[0019] Figure 2 is a flow chart of another method for generating personnel scheduling information according to an embodiment of the present invention;

[0020] Figure 3 is a structural block diagram of a device for generating personnel scheduling information according to an embodiment of the present invention;

[0021] Figure 4 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0023] With the acceleration of hydropower development, hydropower development will be promoted to the high mountain and canyon areas in the upper reaches of major rivers. The high mountain and canyon areas have high altitudes, abundant water and less soil, poor land, mountains and canyons connected, complex and diverse natural geographical environment, rich water resources, and are concentrated areas for hydropower development. From the perspective of social environment, the level of industrialization in the high mountain and canyon areas is low, the industrial structure mainly relies on farming, and the production mode is mainly based on the combination of animal husbandry and agriculture and animal husbandry. The main living materials in the high mountain and canyon areas are composed of wheat, corn, potatoes, barley and other grains. Therefore, the dependence on agricultural production, especially arable land resources, is high.

[0024] There is little arable land suitable for crop production in mountainous valleys, most of which are concentrated in a few large river valleys, which are usually also areas for hydropower construction. The construction of power stations will make the already scarce arable land resources even more scarce. In addition, the local ecological environment is fragile, the land is relatively poor, and the mountains and rivers are parallel, making reclamation difficult. In addition to arable land that is convenient for agricultural cultivation, other land such as forest land and pasture is also an important source of livelihood in the region, including the cultivation of high-altitude Chinese herbal medicines, the picking of forest resources, and grazing on pastures.

[0025] In the process of hydropower development advancing to the high mountain and canyon areas in the upper reaches of major rivers, land acquisition for construction is necessary. Land acquisition for construction refers to the act of converting collectively owned land of farmers into state-owned land in accordance with the prescribed procedures and powers for the needs of public interests. In the process of land acquisition for construction, a production resettlement population planning scheme needs to be determined. If the traditional production resettlement population planning scheme is followed, the natural geography and socio-economic characteristics of the high mountain and canyon areas are not fully considered. For example, when applied to high mountain and canyon areas, the geographical factors and socio-economic factors of the high mountain and canyon areas are not fully considered, which reduces the accuracy of the production resettlement population planning scheme, resulting in errors between the production resettlement population planning scheme and the actual situation, leading to errors in the planning of the production resettlement population. The corresponding production resettlement population planning scheme will not be recognized by the immigrants, resulting in difficulties in the production resettlement of immigrants, and directly affecting the resettlement willingness of immigrants and the progress of project construction.

[0026] The embodiment of the present invention provides a method for generating personnel scheduling information, which achieves the effect of accurately determining personnel scheduling information by considering the proportion of the requisitioned cultivated land area and the requisitioned cultivated land area in the target area.

[0027] According to an embodiment of the present invention, an embodiment of a method for generating personnel scheduling information is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0028] In this embodiment, a method for generating personnel scheduling information is provided, which can be used in a computer device. Figure 1 is a flow chart of a method for generating personnel scheduling information according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:

[0029] Step S101, receiving first target area description information, first population description information and second target area description information input by a user; wherein the first target area description information is used to characterize the overall land information of the target area, the first population description information is used to characterize the overall population information of the target area, and the second target area description information is used to characterize the land information expropriated in the target area.

[0030] The target area represents an area for construction and land requisition. The embodiment of the present invention obtains first target area description information and first population description information based on data collection and investigation of the target area, and obtains second target area description information through investigation and data collection of the target area.

[0031] Step S102, using the first target area description information and the first population description information, generate target area area information and first proportion information; wherein the target area information is used to characterize the per capita land area information of the target area, and the first proportion information is used to characterize the overall cultivated land proportion information of the target area.

[0032] Among them, cultivated land refers to land where crops and perennial crops are grown.

[0033] In some optional embodiments, the first target area description information includes the total land area parameter and the total cultivated land area parameter of the target area; the target area area information and the first proportion information are generated using the first target area description information and the first population description information, including: generating the target area information according to the ratio of the total land area parameter to the first population description information; generating the first proportion information according to the ratio of the total cultivated land area parameter to the total land area parameter.

[0034] Exemplarily, the target area area information may be the per capita land area of ​​the target area, the total land area parameter may be the total land area of ​​the target area, the total cultivated land area parameter may be the total cultivated land area of ​​the target area, and the first population description information includes the total population of the target area.

[0035] Step S103, using the second target area description information to generate second proportion information; the second proportion information is used to represent the proportion information of cultivated land collected in the target area.

[0036] In some optional embodiments, the second target area description information includes expropriation land area parameters and expropriation cultivated land area parameters; the second target area description information is used to generate the second proportion information, including: generating the second proportion information based on the ratio of the expropriation cultivated land area parameters to the expropriation land area parameters.

[0037] Exemplarily, the land area parameter for expropriation may be the land area required for expropriation for construction, and the cultivated land area parameter for expropriation may be the cultivated land area required for expropriation for construction.

[0038] Step S104, generating first personnel placement information according to the second target area description information and the target area area information; the first personnel placement information is used to characterize the preliminary production placement population information of the target area.

[0039] In some optional implementations, generating first personnel placement information based on the second target area description information and the target area area information includes: generating the first personnel placement information based on a ratio of the expropriated land area parameter to the target area information.

[0040] Exemplarily, the land area parameter for expropriation can be the land area required for construction expropriation, the target area area information can be the per capita land area of ​​the target area, and the first personnel resettlement information can be the first personnel resettlement population. Based on the ratio of the land area required for construction expropriation to the per capita land area, the first personnel resettlement population after construction expropriation can be obtained.

[0041] Step S105, processing the first proportion information and the second proportion information to obtain a personnel placement coefficient; the personnel placement coefficient is used to represent the proportion of the cultivated land area collected in the target area.

[0042] In some optional implementations, the first proportion information and the second proportion information are processed to obtain a personnel placement coefficient, including: determining the personnel placement coefficient according to a ratio of the second proportion information to the first proportion information.

[0043] Among them, the first proportion information can be the proportion of the total cultivated land in the target area; the second proportion information can be the proportion of cultivated land requisitioned in the target area; the personnel placement coefficient obtained according to the ratio of the proportion of cultivated land requisitioned in the target area to the proportion of the total cultivated land is used to characterize the proportion of the cultivated land area requisitioned in the target area.

[0044] Step S106, determining whether the personnel placement coefficient is greater than a preset value.

[0045] Among them, the preset value can be 1. If the personnel resettlement coefficient is greater than 1, it means that the proportion of cultivated land area expropriated in the target area is large, that is, the impact of construction land expropriation on the target area is large. If the personnel resettlement coefficient is less than or equal to 1, it means that the proportion of cultivated land area expropriated in the target area is small, that is, the impact of construction land expropriation on the target area is small.

[0046] Step S107: If the personnel placement coefficient is greater than a preset value, the first personnel placement information is updated to personnel scheduling information by using the personnel placement coefficient.

[0047] In some optional implementations, updating the first personnel placement information to the personnel scheduling information by using the personnel placement coefficient includes: updating the first personnel placement information to the personnel scheduling information according to the product of the first personnel placement information and the personnel placement coefficient.

[0048] Exemplarily, the first personnel placement information may be a first personnel placement population, and the personnel scheduling information may be a target personnel placement population. The first personnel placement population is multiplied by a personnel placement coefficient to obtain the personnel scheduling information.

[0049] In some optional implementations, if the personnel placement coefficient is less than or equal to a preset value, the first personnel placement information is determined as personnel scheduling information.

[0050] In some optional implementations, personnel placement is scheduled based on the personnel scheduling information.

[0051] In the embodiment of the present invention, when the personnel placement coefficient is less than or equal to the preset value, it means that the proportion of cultivated land area expropriated in the target area is small, that is, the impact of land expropriation for construction on the target area is small. The first personnel placement information can be used as personnel scheduling information to simplify the process of determining the personnel scheduling information, analyze it according to different situations, and improve the efficiency of determining the personnel scheduling information.

[0052] The method for generating personnel scheduling information provided in this embodiment uses the first target area description information and the first population description information to generate target area area information for characterizing the per capita land area of ​​the target area and the first proportion information for characterizing the overall cultivated land proportion of the target area, uses the second target area description information for characterizing the land information collected in the target area, generates the second proportion information for characterizing the proportion of cultivated land collected in the target area, and generates the first personnel placement information according to the second target area description information and the target area information. The first personnel placement information takes into account the land area parameter collected, which is more in line with the actual situation of land acquisition for construction. The present invention uses a new personnel scheduling algorithm to generate a production resettlement population planning scheme. During the execution of the algorithm, the first proportion information and the second proportion information are specifically processed to obtain a personnel placement coefficient for characterizing the proportion of cultivated land area collected in the target area, and judges whether the personnel placement coefficient is greater than a preset value. If the personnel placement coefficient is greater than the preset value, it indicates that the proportion of cultivated land area collected in the target area is large, that is, the construction land acquisition has a large impact on the target area. Therefore, the first personnel placement information is updated to the personnel scheduling information through the personnel placement coefficient. The present invention adjusts the first personnel placement information through the personnel placement coefficient, takes into account the land area requisitioned for construction, and comprehensively considers the impact of construction land requisition on the proportion of cultivated land. The obtained personnel scheduling information is more accurate and more in line with the actual situation, ensuring the rationality of the scheduling of personnel placement according to the personnel scheduling information and improving the satisfaction with the personnel placement.

[0053] In this embodiment, a method for generating personnel scheduling information is provided, which can be used in a computer device. Figure 2 is a flow chart of another method for generating personnel scheduling information according to an embodiment of the present invention. Figure 2 As shown, the process includes the following steps:

[0054] Step S201, based on the data collection and investigation of the construction and requisition area, the total land area, total cultivated land area and total population of each rural collective economic organization in the construction and requisition area are obtained.

[0055] Among them, the unit of the total land area and the total cultivated land area is mu, and the unit of the total population is person. The total land area and the total cultivated land area constitute the first target area description information, and the total population constitutes the first population description information.

[0056] Step S202, based on the total land area, the total cultivated land area and the total population, calculate the per capita land area and the proportion of cultivated land in the rural collective economic organization.

[0057] Among them, the per capita land area is the ratio of the total land area to the total population; the proportion of cultivated land is the ratio of the total cultivated land area to the total land area, the per capita land area is the area information of the target area, and the proportion of cultivated land is the first proportion information.

[0058] Step S203, through physical survey of the construction land acquisition area, obtain the land area that needs to be acquired for construction land acquisition and the cultivated land area that needs to be acquired.

[0059] Among them, the unit of the land area that needs to be expropriated and the cultivated land area that needs to be expropriated is mu, and the land area that needs to be expropriated and the cultivated land area that needs to be expropriated constitute the second target area description information.

[0060] Step S204, based on the land area to be expropriated and the area of ​​cultivated land to be expropriated, calculate the proportion of cultivated land to be expropriated for construction.

[0061] In some optional implementations, the proportion of cultivated land that needs to be requisitioned is the ratio of the area of ​​cultivated land that needs to be requisitioned to the area of ​​land that needs to be requisitioned, and the proportion of cultivated land that needs to be requisitioned is the second proportion information.

[0062] Step S205, calculate the production resettlement population calculation coefficient of each rural collective economic organization based on the proportion of cultivated land and the proportion of cultivated land to be expropriated.

[0063] Among them, the calculation coefficient of the production resettlement population is the ratio of the proportion of cultivated land that needs to be expropriated to the proportion of cultivated land, and the production resettlement population coefficient is the personnel resettlement coefficient.

[0064] Step S206, calculate the initial production resettlement population based on the land area to be expropriated and the per capita land area.

[0065] Among them, the initial production resettlement population is the ratio of the land area that needs to be expropriated to the per capita land area, and the initial production resettlement population is the first personnel resettlement information.

[0066] Step S207, determining whether the production resettlement population calculation coefficient is greater than one.

[0067] Step S208: If the production resettlement population calculation coefficient is greater than one, the final production resettlement population is calculated based on the production resettlement population calculation coefficient and the preliminary production resettlement population.

[0068] Among them, the final production resettlement population is the product of the production resettlement population calculation coefficient and the preliminary production resettlement population, and the final production resettlement population is the personnel scheduling information.

[0069] Step S209, if the production resettlement population calculation coefficient is less than or equal to one, the preliminary production resettlement population is used as the final production resettlement population.

[0070] The method for generating personnel scheduling information provided in this embodiment can take into account the differentiated current situations in mountainous and canyon areas, scientifically and reasonably calculate the production resettlement population, provide a basis for formulating practical and feasible immigration resettlement plans, and improve the satisfaction of immigration resettlement.

[0071] In the present embodiment, a device for generating personnel scheduling information is also provided, and the device is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions thereof will not be repeated. As used below, the term "module" may implement a combination of software and / or hardware of a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and contemplated.

[0072] This embodiment provides a device for generating personnel scheduling information, such as Figure 3 As shown, including:

[0073] The description information receiving module 301 is used to receive the first target area description information, the first population description information and the second target area description information input by the user; wherein the first target area description information is used to characterize the overall land information of the target area, the first population description information is used to characterize the overall population information of the target area, and the second target area description information is used to characterize the land information expropriated in the target area.

[0074] The first proportion information generating module 302 is used to generate the target area area information and the first proportion information by using the first target area description information and the first population description information; wherein the target area area information is used to characterize the per capita land area information of the target area; and the first proportion information is used to characterize the overall cultivated land proportion information of the target area.

[0075] The second proportion information generating module 303 is used to generate second proportion information using the second target area description information; the second proportion information is used to represent the proportion information of cultivated land collected in the target area.

[0076] The first personnel placement information generating module 304 is used to generate first personnel placement information according to the second target area description information and the target area area information; the first personnel placement information is used to characterize the preliminary production placement population information of the target area.

[0077] The personnel placement coefficient determination module 305 is used to process the first proportion information and the second proportion information to obtain the personnel placement coefficient; the personnel placement coefficient is used to represent the proportion of the cultivated land area collected in the target area.

[0078] The judgment module 306 is used to judge whether the personnel placement coefficient is greater than a preset value.

[0079] The personnel scheduling information generating module 307 is used to update the first personnel placement information into the personnel scheduling information according to the personnel placement coefficient being greater than a preset value.

[0080] In some optional implementations, the personnel placement scheduling module 307 is further configured to determine the first personnel placement information as the personnel scheduling information according to the personnel placement coefficient being less than or equal to a preset value.

[0081] In some optional implementations, the first target area description information includes a total land area parameter and a total cultivated land area parameter of the target area; the first proportion information generation module 302 includes:

[0082] The target region area information generating unit is used to generate the target region area information according to the ratio of the total land area parameter to the first population description information.

[0083] The first proportion information generating unit is used to generate the first proportion information according to the ratio of the total area parameter of cultivated land to the total area parameter of land.

[0084] In some optional implementations, the second target area description information includes the land area parameter and the cultivated land area parameter; the second proportion information generation module 303 includes:

[0085] The second ratio information generating unit is used to generate the second ratio information according to the ratio of the cultivated land area parameter to be collected and the land area parameter to be collected.

[0086] In some optional implementations, the first personnel placement information generating module 304 includes:

[0087] The first personnel placement information generating unit is used to generate the first personnel placement information according to the ratio of the expropriated land area parameter to the target area area information.

[0088] In some optional implementations, the personnel placement coefficient determination module 305 includes:

[0089] The personnel placement coefficient determination unit is used to determine the personnel placement coefficient according to the ratio of the second proportion information to the first proportion information.

[0090] In some optional implementations, the personnel placement scheduling module 307 includes:

[0091] The personnel placement scheduling unit is used to update the first personnel placement information into personnel scheduling information according to the product of the first personnel placement information and the personnel placement coefficient.

[0092] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.

[0093] The personnel scheduling information generation device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.

[0094] The embodiment of the present invention also provides a computer device having the above Figure 3 The device for generating personnel scheduling information is shown.

[0095] See also Figure 4 , Figure 4 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 4 As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 4 A processor 10 is taken as an example.

[0096] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.

[0097] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.

[0098] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0099] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.

[0100] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.

[0101] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.

[0102] A part of the present invention may be applied as a computer program product, such as a computer program instruction, which, when executed by a computer, can call or provide the method and / or technical solution according to the present invention through the operation of the computer. Those skilled in the art should understand that the existence of the computer program instruction in a computer-readable medium includes, but is not limited to, a source file, an executable file, an installation package file, etc., and accordingly, the way in which the computer program instruction is executed by the computer includes, but is not limited to: the computer directly executes the instruction, or the computer compiles the instruction and then executes the corresponding compiled program, or the computer reads and executes the instruction, or the computer reads and installs the instruction and then executes the corresponding installed program. Here, the computer-readable medium may be any available computer-readable storage medium or communication medium accessible to the computer.

[0103] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A method for generating personnel scheduling information, characterized in that: Applied to computer equipment, the generating method comprises: Receive first target area description information, first population description information, and second target area description information input by a user; wherein the first target area description information is used to characterize the overall land information of the target area, the first population description information is used to characterize the overall population information of the target area, and the second target area description information is used to characterize the expropriated land information of the target area; Using the first target area description information and the first population description information, target area area information and first proportion information are generated; wherein the target area information is used to represent the per capita land area information of the target area, and the first proportion information is used to represent the overall cultivated land proportion information of the target area; Using the second target area description information, second proportion information is generated; the second proportion information is used to represent the proportion information of cultivated land collected in the target area; Generate first personnel placement information according to the second target area description information and the target area area information; the first personnel placement information is used to characterize the preliminary production placement population information of the target area; The first proportion information and the second proportion information are processed to obtain a personnel placement coefficient; the personnel placement coefficient is used to represent the proportion of the cultivated land area collected in the target area; Determining whether the personnel placement coefficient is greater than a preset value; If the personnel placement coefficient is greater than the preset value, the first personnel placement information is updated to personnel scheduling information according to the personnel placement coefficient.

2. The method according to claim 1, characterized in that: The method further comprises: If the personnel placement coefficient is less than or equal to the preset value, the first personnel placement information is determined as the personnel scheduling information.

3. The method according to claim 1 or 2, characterized in that: The processing of the first proportion information and the second proportion information to obtain a personnel placement coefficient includes: The personnel placement coefficient is determined according to a ratio of the second proportion information to the first proportion information.

4. The method according to claim 1 or 2, characterized in that: The updating of the first personnel placement information into personnel scheduling information by using the personnel placement coefficient includes: The first personnel placement information is updated to the personnel scheduling information according to the product of the first personnel placement information and the personnel placement coefficient.

5. The method according to claim 1 or 2, characterized in that: The first target area description information includes a total land area parameter and a total cultivated land area parameter of the target area; the use of the first target area description information and the first population description information to generate the target area area information and the first proportion information includes: generating the target area information according to the ratio of the total land area parameter to the first population description information; The first proportion information is generated according to the ratio of the total cultivated land area parameter to the total land area parameter.

6. The method according to claim 1 or 2, characterized in that: The second target area description information includes a land area parameter and a cultivated land area parameter; the second target area description information is used to generate the second proportion information, including: The second proportion information is generated according to the ratio of the requisitioned cultivated land area parameter to the requisitioned land area parameter.

7. The method according to claim 6, characterized in that The step of generating first personnel placement information according to the second target area description information and the target area area information includes: The first personnel placement information is generated according to the ratio of the expropriated land area parameter to the target area area information.

8. A device for generating personnel scheduling information, characterized in that: The device comprises: A description information receiving module, used to receive first target area description information, first population description information and second target area description information input by a user; wherein the first target area description information is used to characterize the overall land information of the target area, the first population description information is used to characterize the overall population information of the target area, and the second target area description information is used to characterize the land information expropriated in the target area; A first proportion information generating module is used to generate target area area information and first proportion information by using the first target area description information and the first population description information; wherein the target area information is used to represent the per capita land area information of the target area, and the first proportion information is used to represent the overall cultivated land proportion information of the target area; A second proportion information generating module is used to generate second proportion information using the second target area description information; the second proportion information is used to represent the proportion information of cultivated land collected in the target area; A first personnel placement information generating module is used to generate first personnel placement information according to the second target area description information and the target area area information; the first personnel placement information is used to characterize the preliminary production placement population information of the target area; A personnel placement coefficient determination module is used to process the first proportion information and the second proportion information to obtain a personnel placement coefficient; the personnel placement coefficient is used to represent the proportion of the cultivated land area collected in the target area; A judgment module, used to judge whether the personnel placement coefficient is greater than a preset value; The personnel scheduling information generating module is used to update the first personnel placement information into personnel scheduling information by using the personnel placement coefficient according to the fact that the personnel placement coefficient is greater than the preset value.

9. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the method for generating personnel scheduling information according to any one of claims 1 to 7 by executing the computer instructions.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the method for generating personnel scheduling information according to any one of claims 1 to 7.

11. A computer program product, characterized in that The method comprises computer instructions, wherein the computer instructions are used to enable a computer to execute the method for generating personnel scheduling information according to any one of claims 1 to 7.