Task management method and system based on time axis

By adopting a timeline-based task management method in emergency management, real-time task monitoring and update functions are provided, the efficiency of task scheduling and monitoring in emergency response is solved, and the overall efficiency of emergency response is improved.

CN119624404AActive Publication Date: 2025-03-14GUANGDONG VISION INFORMATION TECH CO LTD

Patent Information

Application Number
CN202411751623.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-02
Publication Date
2025-03-14
Estimated Expiration
2044-12-02

AI Technical Summary

Technical Problem

Emergency management departments lack effective visualization tools in task scheduling and execution monitoring after emergencies, which makes it difficult to track the task execution progress in real time, affecting the overall efficiency of emergency response.

Method used

The timeline-based task management method is adopted to realize real-time monitoring of the issuance and completion of task instructions in each time period during the emergency response process through a visual timeline interface. The method includes receiving emergency event information, obtaining emergency display views, receiving task process information feedback from the action side, and updating the display model in real time.

Benefits of technology

The full monitoring of task scheduling and execution during the emergency response process is realized, the emergency response efficiency is improved, and the timely completion of tasks and the effective allocation of resources is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119624404A_ABST
    Figure CN119624404A_ABST
Patent Text Reader

Abstract

The embodiment of the invention relates to the technical field of task management, and discloses a task management method based on a time axis, which comprises the following steps: receiving emergency information and event time information, and determining corresponding event handling information according to the emergency information; acquiring an emergency display view associated with the event handling information according to the event handling information, wherein the emergency display view comprises time axis information and task axis information; receiving task process information fed back by the action end to perform data updating on time axis information and task axis information in the emergency display view; and carrying out real-time graphic display on the updated display model at the command end. Through the scheme of the invention, a user can clearly see the time point at which each task is issued and the current state. And as time goes on, the abscissa is automatically updated, and the change of the task state can be reflected on the time axis in real time, so that the whole-process monitoring of the task scheduling and execution condition in the emergency response process is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of emergency management, and in particular to a timeline-based task management method and system. Background Art

[0002] At present, emergency management departments at all levels have a high degree of informatization in emergency communications, information reporting, duty, consultation and judgment, emergency materials and resource dispatch, etc., but they are still insufficient in the construction of response mechanisms after emergencies. Especially in task scheduling and execution monitoring, the lack of effective visualization tools makes it difficult to track the progress of task execution in real time, affecting the overall efficiency of emergency response. Therefore, designing a solution that can perform efficient event management has become a technical problem that needs to be solved urgently by technicians in this field. Summary of the invention

[0003] In response to the above-mentioned defects, an embodiment of the present invention discloses a timeline-based task management method, which realizes real-time monitoring of the issuance and completion status of task instructions in each time period during the emergency response process through a visual timeline interface, thereby improving the efficiency of emergency response.

[0004] A first aspect of an embodiment of the present invention discloses a timeline-based task management method, including:

[0005] Receiving emergency event information and event time information, and determining corresponding event handling information according to the emergency event information;

[0006] Acquire an emergency display view associated with the event handling information according to the event handling information, wherein the emergency display view includes time axis information and task axis information; wherein different emergency display views correspond to different task axis information;

[0007] The task progress information fed back by the action end is received to update the time axis information and task axis information in the emergency display view; and the updated display model is displayed in real time on the command end.

[0008] As an optional implementation manner, in the first aspect of the embodiment of the present invention, the task management method further includes:

[0009] The corresponding task processing instructions are sent to the corresponding action end through the task instruction issuing module, the corresponding task marking information is generated according to the task processing instructions, and the task marking information is updated and displayed on the emergency display view, wherein the task marking information is the marking information corresponding to the task axis in the emergency display view.

[0010] As an optional implementation, in the first aspect of the embodiment of the present invention, the receiving task progress information fed back by the action end to update the time axis information and task axis information in the emergency display view includes:

[0011] Acquire task axis information in the emergency display view, and determine the position of each task on the task axis according to the task axis information;

[0012] Acquire current time information; and match the current time information with the time axis to generate a current timeline;

[0013] The task progress information fed back by each action terminal is received in real time, and the time axis information and task axis information in the emergency display view are updated according to the task progress information and the current timeline.

[0014] As an optional implementation manner, in the first aspect of the embodiment of the present invention, after the task progress information fed back by each action terminal is received in real time, the method further includes:

[0015] Determine the association relationship information between the tasks in the task axis information, and if the association relationship information is a preset association relationship, generate a first association line to connect two tasks with the preset association relationship;

[0016] If the association relationship information is a potential association relationship, a second association line is generated to connect two tasks with a potential association relationship; data association is performed on all connected tasks to display them as a whole;

[0017] If the association relationship information indicates that the two are not associated, no association operation is performed on the two.

[0018] As an optional implementation manner, in the first aspect of the embodiment of the present invention, after the task progress information fed back by each action terminal is received in real time, the method further includes:

[0019] When it is detected that a display task overlaps with other task connections, the position of the corresponding task on the task axis is adjusted to achieve a display distinction operation.

[0020] As an optional implementation manner, in the first aspect of the embodiment of the present invention, the emergency event information includes the time, location, type and content of the event, and after receiving the emergency event information, the method further includes:

[0021] According to the time, location, type and content of the emergency, the public opinion data related to the emergency on the Internet is obtained and sent to the command end. The public opinion data includes one or more of text, picture and video information, which are obtained from the Internet through a python crawler.

[0022] As an optional implementation manner, in the first aspect of the embodiment of the present invention, after the task progress information fed back by each action terminal is received in real time, the method further includes:

[0023] The task process information fed back by each action end is matched with the event processing model to determine the process evaluation result of each task process. If the process evaluation result does not meet the set requirements, an alarm message is generated and displayed at the emergency display view according to the alarm message.

[0024] A second aspect of an embodiment of the present invention discloses a timeline-based task management system, including:

[0025] Receiving module: used to receive emergency event information and event time information, and determine corresponding event handling information according to the emergency event information;

[0026] A display determination module: used to obtain an emergency display view associated with the event handling information according to the event handling information, wherein the emergency display view includes time axis information and task axis information; wherein different emergency display views correspond to different task axis information;

[0027] Update module: used to receive task progress information fed back by the action end to update the time axis information and task axis information in the emergency display view; and to display the updated display model in real time on the command end.

[0028] The third aspect of an embodiment of the present invention discloses an electronic device, comprising: a memory storing executable program code; a processor coupled to the memory; the processor calls the executable program code stored in the memory to execute the timeline-based task management method disclosed in the first aspect of the embodiment of the present invention.

[0029] A fourth aspect of an embodiment of the present invention discloses a computer-readable storage medium storing a computer program, wherein the computer program enables a computer to execute the timeline-based task management method disclosed in the first aspect of an embodiment of the present invention.

[0030] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:

[0031] In the embodiment of the present invention, through the horizontal axis (time scale) and vertical axis (task list) on the timeline interface, the user can clearly see at which time each task was issued and the current status. As time goes by, the horizontal axis is automatically updated, and the changes in the task status will also be reflected in real time on the timeline, thereby realizing the full monitoring of task scheduling and execution during the emergency response process. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0033] Figure 1 It is a flowchart of a timeline-based task management method disclosed in an embodiment of the present invention;

[0034] Figure 2 It is a schematic diagram of the process of updating the emergency display view disclosed in the embodiment of the present invention;

[0035] Figure 3 It is a schematic diagram of the process of determining the association relationship disclosed in the embodiment of the present invention;

[0036] Figure 4 is a display schematic diagram of an emergency display view disclosed in an embodiment of the present invention;

[0037] Figure 5 is another display schematic diagram of the emergency display view disclosed in the embodiment of the present invention;

[0038] Figure 6 is another display schematic diagram of the emergency display view disclosed in the embodiment of the present invention;

[0039] Figure 7 It is a structural diagram of a timeline-based task management system provided by an embodiment of the present invention;

[0040] Figure 8 It is a structural schematic diagram of an electronic device provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0041] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0042] It should be noted that the terms "first", "second", "third", "fourth", etc. in the specification and claims of the present invention are used to distinguish different objects rather than to describe a specific order. The terms "including" and "having" in the embodiments of the present invention and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device including a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0043] At present, emergency management departments at all levels have a high degree of informatization in emergency communications, information reporting, on-duty, consultation and judgment, emergency materials and resource scheduling, etc., but they are still insufficient in the construction of response mechanisms after emergencies. Especially in terms of task scheduling and execution monitoring, there is a lack of effective visualization tools, which makes it difficult to track the progress of task execution in real time, affecting the overall efficiency of emergency response. The embodiment of the present invention discloses a timeline-based task management method, system, electronic device and storage medium, which can clearly see at which time each task is issued and its current status through the horizontal coordinate (time scale) and vertical coordinate (task list) on the timeline interface. As time goes by, the horizontal coordinate is automatically updated, and changes in task status will also be reflected in real time on the timeline, thereby realizing full monitoring of task scheduling and execution during the emergency response process.

[0044] Embodiment 1

[0045] See also Figure 1 , Figure 1 It is a flowchart of the timeline-based task management method disclosed in the embodiment of the present invention. Among them, the execution subject of the method described in the embodiment of the present invention is an execution subject composed of software and / or hardware, and the execution subject can receive relevant information by wired or / and wireless means, and can send certain instructions. Of course, it can also have certain processing functions and storage functions. The execution subject can control multiple devices, such as a remote physical server or cloud server and related software, or it can be a local host or server and related software that performs related operations on a device placed somewhere. In some scenarios, multiple storage devices can also be controlled, and the storage devices can be placed in the same place or different places as the devices. For example Figure 1-Figure 6 As shown, the timeline-based task management method includes the following steps:

[0046] S101: receiving emergency event information and event time information, and determining corresponding event handling information according to the emergency event information;

[0047] S102: acquiring an emergency display view associated with the event handling information according to the event handling information, wherein the emergency display view includes time axis information and task axis information; wherein different emergency display views correspond to different task axis information;

[0048] S103: Receive task progress information fed back by the action end to update the time axis information and task axis information in the emergency display view; and display the updated display model in real time on the command end.

[0049] The solution of the embodiment of the present invention can quickly determine the corresponding event handling information by receiving the emergency event information and event time information, which helps to make decisions quickly in emergency situations, reduce response time, and improve response efficiency.

[0050] The associated emergency display view is obtained based on the event handling information. The view includes timeline information and task axis information, making task management more intuitive. The timeline helps users understand the progress of the event and the time nodes of each stage, while the task axis clearly displays the various tasks and their relationship, helping managers to better grasp the overall situation.

[0051] After receiving the task progress information fed back by the action end, the method can update the timeline information and task axis information in the emergency display view in real time. This dynamic update mechanism ensures the accuracy and timeliness of the information, allowing the command end to keep abreast of the latest task progress at any time. The real-time graphic display function further enhances the readability of the information, allowing managers to understand the task status more intuitively and make more informed decisions. Different emergency display views correspond to different task axis information, which means that the method supports flexible adjustment of task allocation according to specific events and needs. This helps to optimize resource allocation and improve task execution efficiency. Through a unified emergency display view and real-time update mechanism, the method promotes communication and collaboration among team members. Each member can clearly understand their role and responsibilities in the task, as well as the overall progress of the task, so as to work better together.

[0052] More preferably, the task management method further includes:

[0053] The corresponding task processing instructions are sent to the corresponding action end through the task instruction issuing module, the corresponding task marking information is generated according to the task processing instructions, and the task marking information is updated and displayed on the emergency display view, wherein the task marking information is the marking information corresponding to the task axis in the emergency display view.

[0054] The embodiment of the present invention can ensure that the task processing instructions are accurately sent to the corresponding action end through the task instruction issuing module. This avoids misunderstanding or omission of information during the transmission process and improves the accuracy and efficiency of task execution. The task marking information generated according to the task processing instruction can be updated and displayed in real time on the emergency display view. This enables managers to keep abreast of the latest progress of the task, discover and solve potential problems in a timely manner, and ensure that the task is smoothly advanced as planned. The updated display of the task marking information on the emergency display view realizes the visualization and transparency of task management. This helps to improve the efficiency and trust of teamwork, because each member can clearly see the allocation, progress and completion of the task. Since the task marking information can be updated in real time, managers can flexibly adjust the task allocation and priority according to the actual situation. This helps to deal with the uncertainty in emergencies and ensure that the task can be completed in the most effective way. The task marking information updated in real time provides valuable decision-making support for managers. Through real-time monitoring and analysis of task progress, managers can make decisions faster and adjust strategies to cope with possible challenges and changes.

[0055] More preferably, the step of receiving the task progress information fed back by the action terminal to update the time axis information and the task axis information in the emergency display view includes:

[0056] S1031: Acquire task axis information in the emergency display view, and determine the position of each task on the task axis according to the task axis information;

[0057] S1032: Acquire current time information; and match the current time information with the time axis to generate a current timeline;

[0058] S1033: Receive task progress information fed back by each action terminal in real time, and update the timeline information and task axis information in the emergency display view according to the task progress information and the current timeline.

[0059] By receiving task progress information fed back by each action terminal in real time, the system can instantly understand the latest status of each task. This real-time performance ensures that the data in the emergency display view is always up-to-date, providing timely and accurate information support for decision makers. The current time information is obtained and matched with the timeline to generate the current timeline, so that the system can clearly display the position of the current time point on the task timeline. This helps decision makers quickly locate the progress of the current task and grasp the time rhythm.

[0060] like Figure 4As shown, the horizontal axis represents time and the vertical axis represents the task list; if it indicates a fire situation, point A represents the dispatch of the fire truck, point B represents the dispatch of firefighters, and point C represents the arrival at the set location for flushing operations; D represents the arrival of the drone at the scene, and E represents the drone spraying operations.

[0061] Specifically, the current time information is obtained; and the current time information is matched with the timeline to generate the current timeline; when performing specific display, the display modes of the current timeline include: centered display, centered left display and centered right display. The display mode of the current timeline is set according to the task execution status on the current page. When the task density before the current timeline is higher, the centered right display is set; and when the task density after the current timeline is higher, the centered left display is set; and during the task execution process, the image is updated once every preset time, and during the image update process, the corresponding task status is also updated.

[0062] More preferably, after receiving the task progress information fed back by each action terminal in real time, the method further includes:

[0063] S103a: determining association relationship information between tasks in the task axis information, and if the association relationship information is a preset association relationship, generating a first association line to connect two tasks with the preset association relationship;

[0064] S103b: if the association relationship information is a potential association relationship, a second association line is generated to connect two tasks with a potential association relationship; data association is performed on all connected tasks to display them as a whole;

[0065] S103c: If the association relationship information indicates that the two are not associated, no association operation is performed on the two.

[0066] The solution of the embodiment of the present invention determines the association relationship information between each task in the task axis information. If there is a preset association relationship (such as process sequence, dependency, etc.), a first association line is generated for connection operation. This makes the logical relationship between tasks more intuitive and clear, which helps decision makers quickly understand the sequence and dependency between tasks. If there is a potential association relationship (such as possible impact, potential collaboration opportunities, etc.), a second association line is generated for connection operation. This helps decision makers discover the hidden connections that may exist between tasks, so as to more comprehensively consider the overall layout and scheduling of tasks.

[0067] Data is associated for all connected tasks and displayed as a whole. This allows decision makers to view the relationship between tasks from a higher perspective and better grasp the overall progress and trend of tasks. By displaying the tasks as a whole, decision makers can more easily identify synergies and potential conflicts between tasks. This helps decision makers make more comprehensive and systematic decisions and improve the efficiency and accuracy of emergency response.

[0068] The solution of the embodiment of the present invention provides richer and more comprehensive information support in the emergency display view by clarifying the task association relationship and enhancing the overall perception. This enables decision makers to make decisions based on a more complete set of information, reducing decision errors caused by insufficient or inaccurate information. Rich information and clear logical relationships help decision makers make decisions quickly, reducing hesitation and repetition in the decision-making process. At the same time, the enhancement of overall perception also enables decision makers to more accurately assess the progress and potential risks of tasks, thereby formulating more effective emergency response strategies.

[0069] More preferably, after receiving the task progress information fed back by each action terminal in real time, the method further includes:

[0070] When it is detected that a display task overlaps with other task connections, the position of the corresponding task on the task axis is adjusted to achieve a display distinction operation.

[0071] The solution of the embodiment of the present invention can avoid information overlap: when it is detected that a displayed task overlaps with other task lines, the system can automatically adjust the position of the corresponding task on the task axis. This adjustment avoids overlap and intersection between task lines, so that the progress and association relationship of each task can be clearly displayed.

[0072] In one embodiment of the present invention, when a task is detected to overlap with other tasks, the task is placed below the task axis and when there is a time overlap conflict, one task can be displayed on the positive coordinate axis and the other on the negative coordinate axis, that is, one above and one below; in this way, the tasks can be better distinguished. In addition to the above method, the user can also actively adjust the display of the above tasks during the specific implementation.

[0073] Enhanced readability: By adjusting the task positions, the system ensures that the information in the emergency display view has good readability. Decision makers can easily identify the status, progress, and relationship between each task and other tasks, so as to make more accurate decisions.

[0074] Reduce visual distractions: Overlapping of task lines may cause visual distractions to decision makers, affecting their understanding and judgment of task progress. By adjusting the positions of tasks to avoid overlap, the system reduces this visual distraction, allowing decision makers to focus more on the task itself.

[0075] Improve operational convenience: The system automatically adjusts the task position without manual intervention by decision makers. This not only saves decision makers' time and energy, but also improves the efficiency and accuracy of emergency response; Adapt to different task layouts: The system can automatically adjust the task position according to actual conditions to adapt to different task layouts and associations. This flexibility enables the system to cope with various complex emergency scenarios and ensure accurate transmission and effective display of information.

[0076] Support dynamic updates: When the task progress is constantly updated, the system can continuously monitor the overlap of task lines and automatically adjust them. This ensures that the emergency display view can always accurately reflect the actual status and relationship of the task, providing continuous and effective information support for decision makers.

[0077] More preferably, the emergency event information includes the time, location, type and content of the event, and after receiving the emergency event information, the method further includes:

[0078] According to the time, location, type and content of the emergency, the public opinion data related to the emergency on the Internet is obtained and sent to the command end. The public opinion data includes one or more of text, picture and video information, which are obtained from the Internet through a python crawler.

[0079] The solution of the embodiment of the present invention collects and analyzes public opinion data on the Internet in real time, and the system can promptly discover sensitive information and abnormal fluctuations related to emergencies. This provides early warning for relevant agencies, helping them to take measures in advance to prevent the situation from further deteriorating.

[0080] By analyzing and mining historical public opinion data, the system is able to establish a public opinion trend prediction model. This enables the system to predict the public's reaction and attitude changes to emergencies in the future, providing decision makers with more forward-looking decision support. The system can send the collected public opinion data to the command end in a timely manner, facilitating information sharing between different departments. This helps break down departmental barriers, promote cross-departmental collaboration, and improve the overall efficiency of emergency response. When collecting and processing public opinion data, the system takes security measures such as data desensitization and encryption. This ensures the security and privacy of the data and prevents data leakage and abuse.

[0081] More preferably, after receiving the task progress information fed back by each action terminal in real time, the method further includes:

[0082] The task process information fed back by each action end is matched with the event processing model to determine the process evaluation result of each task process. If the process evaluation result does not meet the set requirements, an alarm message is generated and displayed at the emergency display view according to the alarm message.

[0083] The system of the embodiment of the present invention can receive task progress information fed back by each action end in real time, and match it with the event processing model. Through this matching, the system can accurately evaluate the completion of each task process and generate a process evaluation result. This provides decision makers with a real-time task progress monitoring and evaluation method, which helps them to understand the task execution status in a timely manner. If the process evaluation result does not meet the set requirements, the system can automatically generate an alarm message. These alarm messages will be displayed in the emergency display view to remind decision makers to pay attention and take corresponding measures. This helps decision makers to promptly discover and correct problems in task execution and ensure that the task can proceed smoothly according to the predetermined plan.

[0084] The solution of the embodiment of the present invention is to facilitate the viewing by the commanding personnel.

[0085] When implementing the system, 1. The upstream system sends a plan xml file from time to time, which contains a set of <type: task>; after receiving the file, the upstream system needs to return a receipt. The upstream system here refers to the command end system; 2. Send status report commands from time to time to inquire about the execution of the plan. The monitoring system is similar to the broker in the message queue, which maintains the task queue, receives the plan issued by the upstream system, and dispatches the task to the downstream system for execution. The monitoring module here is a built-in monitoring module used to monitor the system operation of the command end; 3. The monitoring program maintains a set of task queues, and updates the corresponding task status according to the task status information sent by the downstream system. If the downstream system is idle, assign a new task to it. The downstream system here refers to the action end; 4. After the monitoring program is restarted, it can read the saved task information to rebuild the <type: task queue>, and rebuild the <downstream system: current task> association through the status information reported by the downstream system. 5. When the task status changes, the status information needs to be reported to the upstream system. Each downstream system handles a specific type of task, and multiple tasks of the same type can be assigned to multiple downstream systems for execution. The downstream system sends the current task status (heartbeat protocol) at regular intervals.

[0086] The system of the present invention includes but is not limited to the following components: Timeline interface: The vertical axis of the interface represents the task list, and the horizontal axis is the time scale. As time goes by, the horizontal axis automatically moves forward.

[0087] Task instruction issuing module: When a task instruction needs to be issued during a certain period of time, this module will generate a task mark on the corresponding timeline and associate it with specific task details. Task status monitoring module: Updates and displays the execution status of tasks in real time, such as "pending", "processing", "completed", etc., and displays them intuitively on the timeline. Data analysis module: Statistical analysis of task execution is performed, and corresponding reports are generated to help decision makers better evaluate the effectiveness of emergency response.

[0088] Working principle: When the system is running, through the horizontal axis (time scale) and vertical axis (task list) on the timeline interface, users can clearly see at which point in time each task was issued and its current status. As time goes by, the horizontal axis is automatically updated, and changes in task status will be reflected in real time on the timeline, thereby achieving full monitoring of task scheduling and execution during the emergency response process.

[0089] Beneficial effects: Improve response efficiency: Ensure timely completion of tasks by real-time monitoring of task execution status. Enhance visibility: Display task progress in the form of a timeline, allowing managers to quickly understand the overall situation. Assist decision-making: Provide detailed task execution data analysis to provide a basis for subsequent improvements.

[0090] Gantt Chart, Task Duration: Gantt charts are mainly used to show the duration of tasks. The length of the bar represents the time span from the start to the end of the task. Task Dependencies: Gantt charts show the dependencies between tasks, such as when one task must be completed before another task can start. Milestones: Gantt charts usually mark important milestones and key nodes. Static Display: Gantt charts are mainly used for project planning and schedule management, and are usually updated less frequently. Resource Allocation: Gantt charts can also show resource allocation, such as the use of personnel and equipment.

[0091] The timeline task scheduling and monitoring system of the embodiment of the present invention, real-time monitoring: The timeline task scheduling and monitoring system is mainly used to monitor the issuance and completion of tasks in real time, emphasizing the instant update of the current status. Task status: The system focuses on the current status of the task (such as pending, processing, completed), rather than the duration of the task. Automated update: The system will automatically update the timeline as actual time passes to display the latest task status. Dynamic display: The system is mainly used in emergency response scenarios, which require frequent updates of task status. Emergency response: The system is suitable for rapid response and task scheduling of emergencies, such as emergency management and emergency handling.

[0092] Gantt chart: displays the duration and dependencies of tasks, suitable for long-term project management and resource allocation. Timeline task scheduling and monitoring system: monitors task status in real time, suitable for emergency response and scenarios where task status needs to be updated frequently.

[0093] In the embodiment of the present invention, through the horizontal axis (time scale) and vertical axis (task list) on the timeline interface, the user can clearly see at which time each task was issued and the current status. As time goes by, the horizontal axis is automatically updated, and the changes in the task status will also be reflected in real time on the timeline, thereby realizing the full monitoring of task scheduling and execution during the emergency response process.

[0094] Embodiment 2

[0095] See also Figure 7 , Figure 7 Schematic diagram of the structure of the timeline-based task management system disclosed in the embodiment of the present invention. Figure 7 As shown, the timeline-based task management system may include:

[0096] Receiving module 21: used to receive emergency event information and event time information, and determine corresponding event handling information according to the emergency event information;

[0097] Display determination module 22: used to obtain an emergency display view associated with the event handling information according to the event handling information, wherein the emergency display view includes time axis information and task axis information; wherein different emergency display views correspond to different task axis information;

[0098] Update module 23: used for receiving task progress information fed back by the action end to update the time axis information and task axis information in the emergency display view; and performing real-time graphic display of the updated display model on the command end.

[0099] In the embodiment of the present invention, through the horizontal axis (time scale) and vertical axis (task list) on the timeline interface, the user can clearly see at which time each task was issued and the current status. As time goes by, the horizontal axis is automatically updated, and the changes in the task status will also be reflected in real time on the timeline, thereby realizing the full monitoring of task scheduling and execution during the emergency response process.

[0100] Embodiment 3

[0101] See also Figure 8 , Figure 8Schematic diagram of the structure of an electronic device disclosed in an embodiment of the present invention. The electronic device may be a computer, a server, etc. Of course, in certain circumstances, it may also be a smart device such as a mobile phone, a tablet computer, a monitoring terminal, and an image acquisition device with processing functions. Figure 8 As shown, the electronic device may include:

[0102] A memory 510 storing executable program codes;

[0103] a processor 520 coupled to the memory 510;

[0104] The processor 520 calls the executable program code stored in the memory 510 to execute part or all of the steps in the timeline-based task management method in the first embodiment.

[0105] An embodiment of the present invention discloses a computer-readable storage medium storing a computer program, wherein the computer program enables a computer to execute part or all of the steps in the timeline-based task management method in the first embodiment.

[0106] The embodiment of the present invention further discloses a computer program product, wherein when the computer program product is executed on a computer, the computer is enabled to execute part or all of the steps in the timeline-based task management method in the first embodiment.

[0107] An embodiment of the present invention further discloses an application publishing platform, wherein the application publishing platform is used to publish a computer program product, wherein when the computer program product runs on a computer, the computer executes part or all of the steps in the timeline-based task management method in embodiment one.

[0108] In various embodiments of the present invention, it should be understood that the size of the serial numbers of the processes does not necessarily mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.

[0109] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, i.e., they may be located in one place or distributed over multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.

[0110] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0111] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-accessible memory. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution, can be embodied in the form of a software product, which is stored in a memory and includes several requests for a computer device (which can be a personal computer, a server or a network device, etc., specifically a processor in a computer device) to perform some or all of the steps of the method described in each embodiment of the present invention.

[0112] In the embodiments provided by the present invention, it should be understood that "B corresponding to A" means that B is associated with A, and B can be determined according to A. However, it should also be understood that determining B according to A does not mean determining B only according to A, and B can also be determined according to A and / or other information.

[0113] Those skilled in the art can understand that some or all of the steps in the various methods of the embodiments can be completed by instructing related hardware through a program, and the program can be stored in a computer-readable storage medium, and the storage medium includes a read-only memory (ROM), a random access memory (RAM), a programmable read-only memory (PROM), an erasable programmable read-only memory (EPROM), a one-time programmable read-only memory (OTPROM), an electronically erasable programmable read-only memory (EEPROM), a compact disc read-only memory (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.

[0114] The above is a detailed introduction to the timeline-based task management method, system, electronic device and storage medium disclosed in the embodiments of the present invention. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea; at the same time, for general technical personnel in this field, according to the idea of ​​the present invention, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.

Claims

1. A timeline-based task management method, characterized in that: include: Receiving emergency event information and event time information, and determining corresponding event handling information according to the emergency event information; Acquire an emergency display view associated with the event handling information according to the event handling information, wherein the emergency display view includes time axis information and task axis information; wherein different emergency display views correspond to different task axis information; The task progress information fed back by the action end is received to update the time axis information and task axis information in the emergency display view; and the updated display model is displayed in real time on the command end.

2. The timeline-based task management method according to claim 1, characterized in that: The task management method further includes: The corresponding task processing instructions are sent to the corresponding action end through the task instruction issuing module, the corresponding task marking information is generated according to the task processing instructions, and the task marking information is updated and displayed on the emergency display view, wherein the task marking information is the marking information corresponding to the task axis in the emergency display view.

3. The timeline-based task management method according to claim 1, characterized in that: The receiving task progress information fed back by the action end to update the time axis information and task axis information in the emergency display view includes: Acquire task axis information in the emergency display view, and determine the position of each task on the task axis according to the task axis information; Acquire current time information; and match the current time information with the time axis to generate a current timeline; The task progress information fed back by each action terminal is received in real time, and the time axis information and task axis information in the emergency display view are updated according to the task progress information and the current timeline.

4. The timeline-based task management method according to claim 3, characterized in that: After receiving the task progress information fed back by each action terminal in real time, the method further includes: Determine the association relationship information between the tasks in the task axis information, and if the association relationship information is a preset association relationship, generate a first association line to connect two tasks with the preset association relationship; If the association relationship information is a potential association relationship, a second association line is generated to connect two tasks with a potential association relationship; data association is performed on all connected tasks to display them as a whole; If the association relationship information indicates that the two are not associated, no association operation is performed on the two.

5. The timeline-based task management method according to claim 3, characterized in that: After receiving the task progress information fed back by each action terminal in real time, the method further includes: When it is detected that a display task overlaps with other task lines, the position of the corresponding task on the task axis is adjusted to achieve a display distinction operation.

6. The timeline-based task management method according to claim 1, characterized in that: The emergency event information includes the time, location, type and content of the event. After receiving the emergency event information, the method further includes: According to the time, location, type and content of the emergency, the public opinion data related to the emergency on the Internet is obtained and sent to the command end. The public opinion data includes one or more of text, picture and video information, which are obtained from the Internet through a python crawler.

7. The timeline-based task management method according to claim 1, characterized in that: After receiving the task progress information fed back by each action terminal in real time, the method further includes: The task process information fed back by each action end is matched with the event processing model to determine the process evaluation result of each task process. If the process evaluation result does not meet the set requirements, an alarm message is generated and displayed at the emergency display view according to the alarm message.

8. A timeline-based task management system, characterized in that: include: Receiving module: used to receive emergency event information and event time information, and determine corresponding event handling information according to the emergency event information; A display determination module: used to obtain an emergency display view associated with the event handling information according to the event handling information, wherein the emergency display view includes time axis information and task axis information; wherein different emergency display views correspond to different task axis information; Update module: used to receive task progress information fed back by the action end to update the time axis information and task axis information in the emergency display view; and to display the updated display model in real time on the command end.

9. An electronic device, characterized in that: include: A memory storing executable program code; a processor coupled to the memory; The processor calls the executable program code stored in the memory to execute the timeline-based task management method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, wherein the computer program enables a computer to execute the timeline-based task management method according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Method and system for automatically generating flight emergency plan

    CN113570292A

  • Emergency task display method and device

    CN115774595A

  • Emergency management method and system, storage medium and processor

    CN117391462A

  • Emergency direct report and fast response system, method and program product

    CN118297281A

  • Task processing method and device, electronic equipment and storage medium

    CN118672785A

Cited By

  • Method and system for distributing emergency broadcast information through digital television

    CN121239907A