Air duct moving and hanging tackle assembly and application
By using a combination of a single-rail lifting beam and a wind splitter hanger during the fixing and moving of the downhole air barrel of the coal mine, the problems of unstable fixing and high labor intensity of the air barrel are solved, and efficient, stable hanging and rapid movement of the air barrel are achieved.
Patent Information
- Application Number
- CN202411981180.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-31
- Publication Date
- 2025-03-18
AI Technical Summary
The prior art has problems of instability and labor intensity in the fixing and moving downstream air ducts of coal mines, especially in the process of efficient and rapid excavation.
A single-rail lifting beam is used as the hanging beam of the first section of the air tube, the air divider and the rear section of the air tube. The air divider hanger moves along the length direction of the single-rail lifting beam through the air divider. When the external force drives the air divider to move, the first section of the air tube and the rear section of the air tube also move together to achieve stable hanging and rapid movement of the air tube.
It greatly reduces the labor intensity of on-site employees, improves the efficiency and stability of the air duct, and simplifies the disassembly and assembly and fixing process of the air duct.
Smart Images

Figure CN119641436A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a wind tube moving hanging pulley assembly and application thereof, belonging to the technical field of wind tube installation. Background Art
[0002] The underground ventilation system of coal mines mainly consists of two parts: the main air supply system, which brings a large amount of air into the mine and distributes it to various mining sites; the auxiliary ventilation system, which distributes the air supplied by the main air supply system to various working faces and discharges the polluted gas from each work to the return air system. A good air supply system should be able to supply enough high-quality air underground to ensure the quality of the air at the working face, thereby ensuring the health of the workers, safety and normal production.
[0003] The patent document with patent number CN202222204538.7 is searched, and a suspension fixing device for a coal mine ventilation duct is disclosed, including: a top plate, two groups of suspension components distributed left and right are arranged at the bottom of the top plate, and the suspension components are used to fix the coal mine ventilation duct, and the two groups of suspension components include a first clamping plate and a second clamping plate for fixing the coal mine ventilation duct, the first clamping plate is arranged at the front side of the second clamping plate, and two storage cavities distributed up and down are provided inside the two first clamping plates. The present invention drives the two threaded blocks on the threaded rod to move by shaking the handle, and drives the first clamping plate and the second clamping plate to move to fix the coal mine ventilation duct, and then pulls the two mounting plates, and uses bolts to fix the mounting plate to the second clamping plate, and the mounting plate pulls the elastic band to loosen from the rotating shaft, and uses the first clamping plate, the second clamping plate and the two elastic bands to play a limiting role in the front and back, up and down of the coal mine ventilation duct, so as to improve the stability of the coal mine ventilation duct when in use.
[0004] However, the current technical considerations are not comprehensive and have the following disadvantages: 1. Mine shaft ventilation adopts local fan push-in ventilation, with wind ducts as the air supply path. The power of local fans is getting bigger and bigger, and the air supply distance is getting longer and longer. This requires the wind duct to be fixed, but the current wind duct fixing device is simply hung up with iron wire, which is easy to open at the connection of the wind duct, and the fixing effect of the wind duct is not good.
[0005] 2. With the promotion of efficient and rapid excavation, moving the wind duct has become a simple but tedious task. It is not compliant for the wind duct to exceed the prescribed distance from the head, so the wind duct will be moved frequently, which brings a lot of workload to the staff. In the past, the wind duct was hung on the side of the tunnel, which was easy to cause damage.
[0006] In order to solve one of the above problems, it is necessary to innovate and improve a wind tube moving hanging pulley assembly and its application. Summary of the invention
[0007] In view of the above deficiencies in the prior art, the technical problem to be solved by the present invention is: how to achieve that when the air splitter is driven by external force to move along the monorail hanging beam, the first section of the air duct and the rear section of the air duct can also cooperate with the air splitter to move in the same direction. For this purpose, a wind duct moving hanging pulley assembly and application are provided to facilitate the movement of the wind duct, greatly reduce the labor intensity of on-site employees, and improve work efficiency.
[0008] The wind duct moving hanging pulley assembly described in the present invention comprises a monorail hanging beam, a first-section wind duct, an air separator and a rear-section wind duct, the monorail hanging beam being installed in a coal mine tunnel, and is characterized in that: a plurality of groups of wind duct hangers A are installed along the length direction of the monorail hanging beam, the first-section wind duct is hung on the monorail hanging beam through the wind duct hanger A, and the wind duct hanger A can move along the length direction of the monorail hanging beam, a plurality of groups of wind duct hangers B are installed along the length direction of the rear-section wind duct, the rear-section wind duct is hung on the monorail hanging beam through the wind duct hanger B, and the wind duct hanger B can move along the length direction of the monorail hanging beam, the air separator is hung on the monorail hanging beam through the air separator hanger, and the air separator hanger can move along the length direction of the monorail hanging beam, and an air separator fixer for limiting the movement of the air separator relative to the monorail hanging beam is also installed on the air separator hanger.
[0009] A monorail hanging beam is used as the hanging beam for the first section of the air duct, the air splitter and the rear section of the air duct. The air splitter is hung on the monorail hanging beam by an air splitter hanger, and the air splitter hanger can move along the length direction of the monorail hanging beam. When an external force drives the air splitter to move along the monorail hanging beam, the first section of the air duct and the rear section of the air duct can also move in the same direction with the air splitter, which facilitates the movement of the air duct, greatly reduces the labor intensity of on-site employees and improves work efficiency.
[0010] Preferably, the wind duct hanger A comprises a symmetrically arranged left mounting frame and a right mounting frame, the middle parts of the left mounting frame and the right mounting frame are both recessed inward and connected together by a middle fixing bolt, a preset gap is provided between the upper parts of the left mounting frame and the right mounting frame, a left track wheel A and a right track wheel B are respectively installed on the inner walls of the upper parts of the left mounting frame and the right mounting frame, a preset gap is provided between the lower parts of the left mounting frame and the right mounting frame, and a preset gap is provided between the left mounting frame and the right mounting frame. A lower horizontal support pin is installed between the lower part of the frame, and also includes a vertical plug rod that penetrates the lower horizontal support pin. An upper pressure plate is installed on the top of the vertical plug rod. A compression spring A that can push the upper pressure plate upward is sleeved on the vertical plug rod between the upper pressure plate and the lower horizontal support pin. A lower guard is provided in the middle of the vertical plug rod. When the lower guard is in contact with the lower horizontal support pin, the upper pressure plate can be restricted from continuing to move upward. The bottom end of the vertical plug rod is bent to form an upper horizontal support pin, and the upper horizontal support pin is matched with the hanging hole on the first section of the duct. It can make the ventilation duct more stable, and the ventilation duct is very quick to disassemble and assemble, with a stable structure and easy operation, which is convenient for the rapid suspension and fixation of the ventilation duct in the coal mine shaft.
[0011] Preferably, a middle auxiliary wheel is rotatably mounted between the left mounting frame and the right mounting frame through an upper horizontal support pin, and the middle auxiliary wheel is located below the left rail wheel A and the right rail wheel B. The left rail wheel A, the right rail wheel B and the middle auxiliary wheel cooperate with each other to stably run along the monorail hanging beam.
[0012] Preferably, the structure of the wind duct hanger B is the same as that of the wind duct hanger A.
[0013] Preferably, the air splitter hanger comprises two groups of air splitter hanger monomers arranged at intervals, the two groups of air splitter hanger monomers are respectively installed at the front and rear ends of the air splitter, and two groups of air splitter fixers are symmetrically installed on each group of air splitter hanger monomers.
[0014] Preferably, the air splitter hanger monomer includes a channel steel located below the monorail hanging beam, the channel steel opening is arranged upward, one end of the channel steel is detachably mounted with a left-side running wheel group and a left-side air splitter fixture, the other end of the channel steel is detachably mounted with a right-side running wheel group and a right-side air splitter fixture, the left-side running wheel group includes a first plug plate and a second plug plate which are vertically and spaced apart, one end of the channel steel is provided with a plurality of left-side slots which are plugged and matched with the first plug plate and the second plug plate, and the first plug plate and the second plug plate are connected with each other. A horizontal positioning plate A, the lower surface of which is connected with a first screw rod, which passes through the bottom plate of the channel steel and is threadedly connected with the bottom nut A, two groups of left shaft sleeves are arranged at intervals on the top of the first plug plate and the second plug plate, one end of the left wheel axle is inserted into the left shaft sleeve, and the other end of the left wheel axle is rotatably installed with a left rail wheel B, which can move along the length direction of the monorail hanging beam, the first plug plate and the second plug plate are both larger than the width of the channel steel, and the lower surface of the channel steel has a sling for hanging an air divider.
[0015] By using the plug plate to cooperate with the corresponding slot, and the horizontal positioning plate A is connected to the channel steel through the first screw rod and the bottom nut A, it can ensure the quick installation of the left track wheel B and the stability of its structure.
[0016] Preferably, the right walking wheel group includes a third plug plate and a fourth plug plate which are vertically and spaced apart. The other end of the channel steel is provided with a plurality of right slots which are plugged into and matched with the third plug plate and the fourth plug plate. A horizontal positioning plate B is connected between the third plug plate and the fourth plug plate. A second screw is connected to the lower surface of the horizontal positioning plate B. The second screw passes through the bottom plate of the channel steel and is threadedly connected to the bottom nut B. Two groups of right shaft sleeves are spaced apart on the top of the third plug plate and the fourth plug plate. One end of the right wheel axle is inserted into the air divider. The other end of the right wheel axle is rotatably installed with a right rail wheel B, and the right rail wheel B can travel along the length direction of the monorail beam.
[0017] Preferably, the left-side air divider fixer includes a fifth plug plate, and the channel steel is provided with a group of left-side slots that are plugged into the channel steel. The upper end of the channel steel is bent to form an upper pressure plate, and a vertical third screw is provided in the middle of the upper pressure plate. The other end of the third screw passes through the bottom plate of the channel steel and is threadedly connected with the bottom nut C. A compression spring B is sleeved on the third screw between the upper pressure plate and the channel steel, and the compression spring B provides a thrust to push the upper pressure plate upward. The end of the upper pressure plate away from the fifth plug plate is a crimping end. When the upper pressure plate is in the lower position, the upper pressure plate is crimped on the monorail hanger beam, and at this time the left-side rail wheel B is detached from the monorail hanger beam.
[0018] The air divider can be locked and unlocked by operating the left air divider holder and the right air divider holder simultaneously. The operation process of the left air divider holder is as follows: When the bottom nut C is tightened, the upper pressure plate overcomes the thrust of the compression spring B and moves downward relative to the channel steel, so that the fifth plug plate is deeply inserted into the corresponding left slot, thereby raising the height of the channel steel. The channel steel fits the monorail hanging beam, so that the lower bottom plate of the monorail hanging beam is clamped between the upper pressure plate and the channel steel, limiting the movement of the channel steel relative to the monorail hanging beam, thereby achieving the fixation of the position of the air distributor; When the bottom nut C is loosened, the channel steel moves downward relative to the monorail beam under its own weight, and the depth of the fifth plug plate inserted into the left slot becomes smaller, thereby lowering the height of the channel steel, so that a gap is generated between the monorail beam and the channel steel, until the left rail wheel B can contact the monorail beam and the upper pressure plate is separated from the monorail beam, thereby releasing the lock on the air splitter, and the air splitter can move along the monorail beam with the air splitter hanger.
[0019] Preferably, the right air splitter fixer has the same structure as the left air splitter fixer, and the left track wheel B is a bearing.
[0020] A wind tube moving hanging pulley assembly is used in the field of wind tube moving.
[0021] Compared with the prior art, the present invention has the following beneficial effects: The wind duct relocation hanging pulley assembly and application described in the present invention adopts a monorail hanging beam as the hanging beam for the first section of the wind duct, the air splitter and the rear section of the wind duct. The air splitter is hung on the monorail hanging beam by an air splitter hanger, and the air splitter hanger can move along the length direction of the monorail hanging beam. When an external force drives the air splitter to move along the monorail hanging beam, the first section of the wind duct and the rear section of the wind duct can also move in the same direction with the air splitter, which is convenient for the relocation of the wind duct, greatly reduces the labor intensity of on-site employees, and improves work efficiency.
[0022] The wind tube moving hanging pulley assembly of the present invention synchronously operates the left air splitter fixer and the right air splitter fixer to achieve locking and unlocking of the air splitter, and the operation is convenient.
[0023] The wind tube moving hanging pulley assembly described in the present invention utilizes a plug plate to cooperate with a corresponding slot, and the horizontal positioning plate A is connected to the channel steel through a first screw rod and a bottom nut A, which can ensure the quick installation of the left track wheel B and the stability of its structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.
[0025] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 Schematic diagram of the external structure of the air duct hanger A of the present invention; Figure 3 The structure of the air distributor hanger unit Figure 1 (locked state); Figure 4 The structure of the air distributor hanger unit Figure 2 (locked state); Figure 5 for Figure 3 Top view of the .
[0026] In the figure: 1, monorail hanging beam 2, first section air duct 3, air distributor 4, rear section air duct 5, left installation frame 6, right installation frame 7, middle fixing bolt 8, left track wheel A 9, right track wheel B 10, lower horizontal support pin 11, vertical plug rod 12, compression spring A 13, upper pressure plate 14, lower protective support 15, upper horizontal support pin 16, middle auxiliary wheel 17, channel steel 18, left slot 19, first plug plate 20, second plug plate 21, left shaft sleeve 22, left wheel axle 23, left track wheel B 24, horizontal positioning plate A 25, first screw rod 26, bottom nut A 27, sling 28, right slot 29, third plug plate 30, fourth plug plate 31, right shaft sleeve 32, right wheel axle 33, right track wheel B 34, horizontal positioning plate B 35, second screw rod 36, bottom nut B 37, fifth plug plate 38, upper pressure plate 39, third screw rod 40, bottom nut C 41, compression spring B42, air duct hanger A 43, air distributor hanger. DETAILED DESCRIPTION
[0027] The present invention is further described below in conjunction with the accompanying drawings: The present invention is further illustrated below through specific embodiments, but the present invention is not limited thereto. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
[0028] Embodiment 1, as Figure 1As shown, the wind tube moving hanging pulley assembly comprises a monorail hanging beam 1, a first section wind tube 2, an air separator 3 and a rear section wind tube 4, the monorail hanging beam 1 is installed in a coal mine tunnel, and a plurality of wind tube hangers A are installed along the length direction of the monorail hanging beam 1, the first section wind tube 2 is hung on the monorail hanging beam 1 through the wind tube hanger A, and the wind tube hanger A42 can move along the length direction of the monorail hanging beam 1, a plurality of wind tube hangers B are installed along the length direction of the rear section wind tube 4, the rear section wind tube 4 is hung on the monorail hanging beam 1 through the wind tube hanger B, and the wind tube hanger B can move along the length direction of the monorail hanging beam 1, the air separator 3 is hung on the monorail hanging beam 1 through the air separator hanger 43, and the air separator hanger can move along the length direction of the monorail hanging beam 1, and an air separator fixer for limiting the movement of the air separator 3 relative to the monorail hanging beam 1 is also installed on the air separator hanger.
[0029] A monorail hanging beam 1 is used as a hanging beam for the first section of the air duct 2, the air splitter 3 and the rear section of the air duct 4. The air splitter 3 is hung on the monorail hanging beam 1 by an air splitter hanger 43, and the air splitter hanger can move along the length direction of the monorail hanging beam 1. When an external force drives the air splitter to move along the monorail hanging beam 1, the first section of the air duct 2 and the rear section of the air duct 4 can also move in the same direction with the air splitter 3, which is convenient for the movement of the air duct, greatly reduces the labor intensity of on-site employees, and improves work efficiency.
[0030] Embodiment 2, as Figure 1-2 As shown, the wind tube moving hanging pulley assembly comprises a monorail hanging beam 1, a first section wind tube 2, an air separator 3 and a rear section wind tube 4, the monorail hanging beam 1 is installed in a coal mine tunnel, and a plurality of wind tube hangers A are installed along the length direction of the monorail hanging beam 1, the first section wind tube 2 is hung on the monorail hanging beam 1 through the wind tube hanger A, and the wind tube hanger A42 can move along the length direction of the monorail hanging beam 1, a plurality of wind tube hangers B are installed along the length direction of the rear section wind tube 4, the rear section wind tube 4 is hung on the monorail hanging beam 1 through the wind tube hanger B, and the wind tube hanger B can move along the length direction of the monorail hanging beam 1, the air separator 3 is hung on the monorail hanging beam 1 through the air separator hanger 43, and the air separator hanger can move along the length direction of the monorail hanging beam 1, and an air separator fixer for limiting the movement of the air separator 3 relative to the monorail hanging beam 1 is also installed on the air separator hanger.
[0031] Further, refer to Figure 2The wind tube hanger A comprises a symmetrically arranged left side mounting frame 5 and a right side mounting frame 6, the middle parts of the left side mounting frame 5 and the right side mounting frame 6 are both recessed inward and connected together by a middle fixing bolt 7, a preset gap is provided between the upper parts of the left side mounting frame 5 and the right side mounting frame 6, a left side track wheel A8 and a right side track wheel B33 are respectively installed on the inner walls of the upper parts of the left side mounting frame 5 and the right side mounting frame 6, a preset gap is provided between the lower parts of the left side mounting frame 5 and the right side mounting frame 6, and a lower water tank is installed between the lower parts of the left side mounting frame 5 and the right side mounting frame 6. The flat support pin 10 also includes a vertical plug rod 11 that penetrates the lower horizontal support pin 10. An upper pressure plate 13 is installed at the top of the vertical plug rod 11. A compression spring A12 that can push the upper pressure plate 13 upward is sleeved on the vertical plug rod 11 between the upper pressure plate 13 and the lower horizontal support pin 10. A lower protective support 14 is provided in the middle of the vertical plug rod 11. When the lower protective support 14 abuts against the lower horizontal support pin 10, the upper pressure plate 13 can be restricted from continuing to move upward. The bottom end of the vertical plug rod 11 is bent to form an upper horizontal support pin 15, and the upper horizontal support pin 15 is matched with the hanging hole on the first section of the wind tube 2. It can make the ventilation duct more stable, and the ventilation duct can be disassembled and assembled very quickly, with a stable structure and easy operation, which is convenient for the rapid suspension and fixing of the ventilation duct in the coal mine shaft.
[0032] Furthermore, a middle auxiliary wheel 16 is rotatably mounted between the left mounting frame 5 and the right mounting frame 6 through the upper horizontal support pin 15, and the middle auxiliary wheel 16 is located below the left rail wheel A8 and the right rail wheel B33. The left rail wheel A8, the right rail wheel B9 and the middle auxiliary wheel 16 cooperate with each other to stably run along the monorail hanging beam 1.
[0033] Furthermore, the structure of the wind duct hanger B is the same as that of the wind duct hanger A.
[0034] Furthermore, the air splitter hanger comprises two groups of air splitter hanger monomers arranged at intervals, the two groups of air splitter hanger monomers are respectively installed at the front and rear ends of the air splitter 3, and two groups of air splitter fixers are symmetrically installed on each group of air splitter hanger monomers.
[0035] Further, refer to Figure 3 , Figure 4The air splitter hanger monomer includes a channel steel 17 located below the monorail hanging beam 1, and the opening of the channel steel 17 is arranged upward. One end of the channel steel 17 is detachably mounted with a left-side running wheel group and a left-side air splitter fixture, and the other end of the channel steel 17 is detachably mounted with a right-side running wheel group and a right-side air splitter fixture. The left-side running wheel group includes a first plug plate 19 and a second plug plate 20 that are vertically and spaced apart. One end of the channel steel 17 is provided with a plurality of left-side slots 18 that are plugged and matched with the first plug plate 19 and the second plug plate 20. A horizontal positioning plate A24 is connected between the first plug plate 19 and the second plug plate 20. The lower surface of the horizontal positioning plate A24 is connected with a first screw rod 25, which passes through the bottom plate of the channel steel 17 and is threadedly connected with a bottom nut A26. Two groups of left shaft sleeves 21 are arranged at intervals on the tops of the first plug plate 19 and the second plug plate 20. One end of the left wheel axle 22 is inserted into the left shaft sleeve 21, and the other end of the left wheel axle 22 is rotatably installed with a left rail wheel B23, which can move along the length direction of the monorail hanging beam 1. The first plug plate 19 and the second plug plate 20 are both larger than the width of the channel steel 17, and the lower surface of the channel steel 17 has a sling 27 for hanging the air divider 3.
[0036] By using the plug plate to cooperate with the corresponding slot, and the horizontal positioning plate A24 being connected to the channel steel 17 through the first screw rod 25 and the bottom nut A26, it can ensure the quick installation of the left rail wheel B23 and the stability of its structure.
[0037] Furthermore, the right walking wheel group includes a third plug plate 29 and a fourth plug plate 30 which are vertically and spaced apart. The other end of the channel steel 17 is provided with a plurality of right slots 28 which are plugged into and matched with the third plug plate 29 and the fourth plug plate 30. A horizontal positioning plate B34 is connected between the third plug plate 29 and the fourth plug plate 30. A second screw 35 is connected to the lower surface of the horizontal positioning plate B34. The second screw 35 passes through the bottom plate of the channel steel 17 and is threadedly connected to the bottom nut B36. Two groups of right shaft sleeves 31 are spaced apart at the top of the third plug plate 29 and the fourth plug plate 30. One end of the right wheel axle 32 is inserted into the air divider 3. The other end of the right wheel axle 32 is rotatably mounted with a right rail wheel B33, and the right rail wheel B33 can travel along the length direction of the monorail beam 1.
[0038] Reference Figure 3 and Figure 4Furthermore, the left air divider fixer includes a fifth plug plate 37, a group of left slots 18 that are plugged into the channel steel 17 are provided on the channel steel 17, the upper end of the channel steel 17 is bent to form an upper laminate 38, and a vertical third screw 39 is provided in the middle of the upper laminate 38, the other end of the third screw 39 passes through the bottom plate of the channel steel 17 and is threadedly connected with the bottom nut C40, and a compression spring B41 is sleeved on the third screw 39 between the upper laminate 38 and the channel steel 17, and the compression spring B41 provides a thrust to push the upper laminate 38 upward, and the end of the upper laminate 38 away from the fifth plug plate 37 is a crimping end, and when the upper laminate 38 is in the lower position, the upper laminate 38 is crimped on the monorail hanger beam 1, and at this time the left rail wheel B23 is detached from the monorail hanger beam 1.
[0039] Furthermore, the two groups of left-side track wheels B23 and the upper laminate plate 38 are arranged alternately.
[0040] The air divider 3 can be locked and unlocked by operating the left air divider holder and the right air divider holder synchronously. The operation process of the left air divider holder is as follows: When the bottom nut C40 is tightened, the upper pressure plate 38 overcomes the thrust of the compression spring B41 and moves downward relative to the channel steel 17, so that the fifth plug plate 37 is deeply inserted into the corresponding left slot 18, thereby raising the height of the channel steel 17, and the channel steel 17 is fitted with the monorail hanging beam 1, so that the lower bottom plate of the monorail hanging beam 1 is clamped between the upper pressure plate 38 and the channel steel 17, limiting the movement of the channel steel 17 relative to the monorail hanging beam 1, thereby achieving the fixation of the position of the air distributor 3; When the bottom nut C40 is loosened, the channel steel 17 moves downward relative to the monorail beam 1 under its own weight, and the depth of the fifth plug plate 37 inserted into the left slot 18 becomes smaller, thereby lowering the height of the channel steel 17, so that a gap is generated between the monorail beam 1 and the channel steel 17, until the left rail wheel B23 can contact the monorail beam 1, and the upper pressure plate 38 is separated from the monorail beam 1, thereby releasing the lock on the air divider 3, and the air divider 3 can move along the monorail beam 1 along with the air divider hanger.
[0041] Furthermore, the right air splitter fixer has the same structure as the left air splitter fixer, and the left rail wheel B23 is a bearing.
[0042] Embodiment 3, the application of the wind tube relocation hanging pulley assembly in the field of wind tube relocation. A monorail hanging beam is used as the hanging beam for the first section of the wind tube, the air splitter and the rear section of the wind tube. The air splitter is hung on the monorail hanging beam through the air splitter hanger, and the air splitter hanger can move along the length direction of the monorail hanging beam. When the air splitter is driven by an external force to move along the monorail hanging beam, the first section of the wind tube and the rear section of the wind tube can also move in the same direction with the air splitter, which is convenient for the relocation of the wind tube, greatly reducing the labor intensity of on-site employees and improving work efficiency.
[0043] The wind tube moving hanging pulley assembly of the present invention synchronously operates the left air splitter fixer and the right air splitter fixer to achieve locking and unlocking of the air splitter, and the operation is convenient.
[0044] The wind tube moving hanging pulley assembly described in the present invention utilizes a plug plate to cooperate with a corresponding slot, and the horizontal positioning plate A is connected to the channel steel through a first screw rod and a bottom nut A, which can ensure the quick installation of the left track wheel B and the stability of its structure.
[0045] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
[0046] The matters not described in detail in the present invention are all known technologies to those skilled in the art.
Claims
1. A wind tube moving hanging pulley assembly, comprising a monorail hanging beam, a first section wind tube, an air distributor and a rear section wind tube, wherein the monorail hanging beam is installed in a coal mine tunnel, and is characterized in that: A plurality of sets of wind duct hangers A are installed along the length direction of the monorail hanging beam, the first section of the wind duct is hung on the monorail hanging beam through the wind duct hanger A, and the wind duct hanger A can move along the length direction of the monorail hanging beam, a plurality of sets of wind duct hangers B are installed along the length direction of the rear section of the wind duct, the rear section of the wind duct is hung on the monorail hanging beam through the wind duct hanger B, and the wind duct hanger B can move along the length direction of the monorail hanging beam, the air splitter is hung on the monorail hanging beam through the air splitter hanger, and the air splitter hanger can move along the length direction of the monorail hanging beam, and an air splitter fixer for limiting the movement of the air splitter relative to the monorail hanging beam is also installed on the air splitter hanger.
2. The wind tube moving hanging pulley assembly according to claim 1 is characterized in that: The wind duct hanger A comprises a symmetrically arranged left mounting frame and a right mounting frame, the middle parts of the left mounting frame and the right mounting frame are both recessed inward and connected together by a middle fixing bolt, a preset gap is provided between the upper parts of the left mounting frame and the right mounting frame, a left track wheel A and a right track wheel B are respectively installed on the inner walls of the upper parts of the left mounting frame and the right mounting frame, a preset gap is provided between the lower parts of the left mounting frame and the right mounting frame, and a lower horizontal support pin is installed between the lower parts of the left mounting frame and the right mounting frame, and also comprises a vertical plug rod penetrating the lower horizontal support pin, an upper pressure plate is installed at the top end of the vertical plug rod, a compression spring A capable of pushing the upper pressure plate upward is sleeved on the vertical plug rod between the upper pressure plate and the lower horizontal support pin, a lower guard is provided in the middle part of the vertical plug rod, and the upper pressure plate can be restricted from continuing to move upward after the lower guard is abutted against the lower horizontal support pin, and the bottom end of the vertical plug rod is bent to form an upper horizontal support pin, and the upper horizontal support pin is matched with the hanging hole on the first section of the wind duct. The ventilation duct can be made more stable, and the ventilation duct can be quickly assembled and disassembled, has a stable structure, is easy to operate, and is convenient for rapid suspension and fixing of the ventilation duct in a coal mine shaft.
3. The wind tube moving hanging pulley assembly according to claim 2 is characterized in that: A mid-position auxiliary wheel is rotatably mounted between the left mounting frame and the right mounting frame via an upper horizontal support pin, and the mid-position auxiliary wheel is located below the left track wheel A and the right track wheel B.
4. The wind tube moving hanging pulley assembly according to claim 3 is characterized in that: The structure of the air duct hanger B is the same as that of the air duct hanger A.
5. The wind tube moving hanging pulley assembly according to claim 4 is characterized in that: The air splitter hanger comprises two groups of air splitter hanger monomers which are spaced apart from each other. The two groups of air splitter hanger monomers are respectively installed at the front and rear ends of the air splitter. Two groups of air splitter fixers are symmetrically installed on each group of air splitter hanger monomers.
6. The wind tube moving hanging pulley assembly according to claim 5, characterized in that: The air splitter hanger monomer includes a channel steel located below the monorail hanging beam, the channel steel opening is arranged upward, one end of the channel steel is detachably mounted with a left walking wheel group and a left air splitter fixer, the other end of the channel steel is detachably mounted with a right walking wheel group and a right air splitter fixer, the left walking wheel group includes a first plug plate and a second plug plate which are arranged vertically and at intervals, one end of the channel steel is provided with a plurality of left slots which are plugged and matched with the first plug plate and the second plug plate, a horizontal positioning plate A is connected between the first plug plate and the second plug plate, the lower surface of the horizontal positioning plate A is connected with a first screw rod, the first screw rod penetrates the bottom plate of the channel steel and is threadedly connected with the bottom nut A, two groups of left shaft sleeves are arranged at intervals on the top of the first plug plate and the second plug plate, one end of the left wheel axle is inserted into the left shaft sleeve, the other end of the left wheel axle is rotatably mounted with a left rail wheel B, the left rail wheel B can travel along the length direction of the monorail hanging beam, the first plug plate and the second plug plate are both larger than the width of the channel steel, and the lower surface of the channel steel has a sling for hanging the air splitter.
7. The wind tube moving hanging pulley assembly according to claim 6, characterized in that: The right walking wheel group includes a third plug plate and a fourth plug plate which are vertically and spaced apart. The other end of the channel steel is provided with a plurality of right slots which are plugged into and matched with the third plug plate and the fourth plug plate. A horizontal positioning plate B is connected between the third plug plate and the fourth plug plate. A second screw is connected to the lower surface of the horizontal positioning plate B. The second screw passes through the bottom plate of the channel steel and is threadedly connected to the bottom nut B. Two groups of right shaft sleeves are spaced apart on the top of the third plug plate and the fourth plug plate. One end of the right wheel axle is inserted into the air divider. The other end of the right wheel axle is rotatably installed with a right rail wheel B, and the right rail wheel B can travel along the length direction of the monorail beam.
8. The wind tube moving hanging pulley assembly according to claim 7, characterized in that: The left rail wheel B is a bearing.
9. A wind tube moving hanging pulley assembly, which is used in the field of wind tube moving.