Efficient energy-saving centralized adjusting system for bathing hot water

By monitoring and controlling the liquid level and temperature in the bath hot water regulation system in real time, optimizing the working status of the air source heat pump and hot water circulation pump, solving the shortcomings of the existing system in water shortage, water peaks and energy waste, and achieving efficient and energy-saving hot water supply.

CN119642416APending Publication Date: 2025-03-18QINGDAO FORESIGHT SMART ENERGY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411889713.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-20
Publication Date
2025-03-18

AI Technical Summary

Technical Problem

The existing bath hot water regulation system has shortcomings in water shortage, peak water use and energy waste, resulting in equipment damage, unstable water temperature and excessive energy consumption.

Method used

A high-efficiency and energy-saving centralized regulation system is designed to control the working status of the air source heat pump unit and the hot water circulation pump unit through real-time monitoring of liquid level and temperature sensors, optimize the water replenishment and heating process, and ensure that the water temperature in the water tank is stable and energy consumption is reduced.

Benefits of technology

It realizes the stable and efficient output of bath hot water, reduces energy consumption, improves heating efficiency and working stability, and is suitable for peak and valley electricity price projects to save energy and reduce fees.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119642416A_ABST
    Figure CN119642416A_ABST
Patent Text Reader

Abstract

The invention discloses an efficient energy-saving centralized adjusting system for bathing hot water, which comprises a water tank, an air source heat pump unit, a hot water circulating pump unit, a water supplementing pipeline, a water supplementing electromagnetic valve, a booster water pump, a liquid level sensor, a temperature sensor and a controller. When the liquid level height is too low, the shutdown actions of the air source heat pump unit and the hot water circulating pump unit are optimally controlled, so that the working stability of the energy-saving centralized regulating system under extreme working conditions is ensured; according to the efficient and energy-saving centralized adjusting system, the water level and the water temperature in the water tank are monitored in real time through the liquid level sensor and the temperature sensor, all parts are accurately adjusted and controlled through the controller according to different time periods, the water level and the water temperature, and therefore efficient and energy-saving supply of bathing hot water is achieved; the off-peak electricity period is used for heating water, so that energy is saved and cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of hot water regulation and control systems, and in particular to a high-efficiency and energy-saving centralized regulation system for hot water for bathing. Background Art

[0002] At present, the hot water regulation system for bathing in hotels, residences or schools usually uses air source heat pumps and hot water circulation pumps. The air source heat pumps and hot water circulation pumps are used to heat the water contained in the water tank. When the water level is low, the water tank is replenished with water through the water replenishment system and heated again to realize the storage or supply of hot water. At present, the hot water heating regulation system has the following main shortcomings or defects: (1) The hot water tank is short of water due to water outage and other reasons, and the hot water circulation pump, air source heat pump and booster pump are still working, resulting in equipment damage; (2) Because ordinary water replenishment only uses a float valve to replenish water as needed, the water consumption during peak water consumption is high. If more cold water is replenished, the water tank temperature is too low (below 38 degrees), resulting in a low water flow temperature at the output end, affecting the use of hot water; (3) Because the peak water consumption is in the evening and morning, if water is replenished and heated at the same time when water is used, the ambient temperature is low at this time, and the air source heat pump is inefficient, wasting energy. In actual operation, the current heating system has the problem of excessive heating energy consumption and is unable to coordinate and cooperate with each unit included in the heating system to improve heating efficiency and heating operation stability. Summary of the invention

[0003] In an exemplary embodiment of the present application, a high-efficiency and energy-saving centralized regulation system for hot water for bathing is provided. By adjusting the operation of the air source heat pump unit and the hot water circulation pump unit in the heating process and the coordinated control between the various units when the water level is too low, it ensures that the hot water for bathing can be output stably and efficiently while effectively reducing energy consumption.

[0004] The present application provides a highly efficient and energy-saving centralized regulation system for bathing hot water, comprising: a water tank, an air source heat pump unit, a hot water circulation pump unit, a water supply pipeline, a water supply solenoid valve, a booster water pump, a liquid level sensor, a temperature sensor and a controller;

[0005] The water tank comprises a water replenishment port, an output port, a liquid inlet port and a liquid outlet port;

[0006] The water replenishment port is connected to the water replenishment pipeline, and the water replenishment solenoid valve is arranged on the water replenishment pipeline;

[0007] The liquid outlet port is connected to the hot water circulation pump unit through a pipeline, the hot water circulation pump unit is connected to the air source heat pump unit through a pipeline, the air source heat pump unit is connected to the liquid inlet port, and the liquid in the water tank flows into the water tank through the liquid inlet port after being heated by the hot water circulation pump unit and the air source heat pump unit;

[0008] The output port is connected to the bathing terminal device;

[0009] The liquid level sensor and the temperature sensor are respectively arranged in the water tank, the liquid level sensor is used to detect the height of the liquid flow currently contained in the water tank and determine it as the current water level value, and the temperature sensor is used to detect the temperature of the liquid flow currently contained in the water tank and determine it as the current temperature value;

[0010] The controller is connected to the air source heat pump unit, the hot water circulation pump unit, the water replenishment solenoid valve and the booster water pump, and the controller is also connected to the liquid level sensor and the temperature sensor;

[0011] Wherein, the controller is configured as follows in the efficient water replenishment stage:

[0012] S1: When entering the high-efficiency time period, the water supply solenoid valve is driven to start working to supply water into the water tank. The high-efficiency time period is 10:00-17:00;

[0013] S2: During the water replenishment process, if the current water temperature in the water tank is lower than the target set temperature, the air source heat pump unit and the hot water circulation pump are driven to start working, and the target set temperature is 41°C;

[0014] S3: During the continuous water replenishment process, if the current water temperature in the water tank reaches or is lower than the water tank water replenishment low temperature, the water replenishment solenoid valve is driven to close, and the air source heat pump unit and the hot water circulation pump are driven to continue working, and the water tank water replenishment low temperature is 40°C;

[0015] S4: When driving the air source heat pump unit and the hot water circulation pump to continue working, if the current water temperature in the water tank reaches or exceeds the water tank water replenishment high temperature, the water replenishment solenoid valve is driven to start working, and the air source heat pump unit and the hot water circulation pump are driven to continue working until the water level in the water tank reaches the high water level during the high efficiency period, otherwise repeat step S3, wherein the water tank water replenishment high temperature is 41°C, and the high water level during the high efficiency period is 2.1 meters;

[0016] S5: When the water level in the water tank reaches the high water level in the high-efficiency period, the water replenishment solenoid valve is driven to close, and the air source heat pump unit and the hot water circulation pump are driven to continue working. When the current water temperature in the water tank reaches the water tank water replenishment high temperature, the air source heat pump unit is driven to stop working and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working.

[0017] S6: If, during the high-efficiency time period, the water level in the water tank drops to the low water level during the high-efficiency time period, and the low water level during the high-efficiency time period is 2.00 meters, repeat the above steps S2-S5;

[0018] S7: If in the non-efficient time period outside the efficient time period, if the water level in the water tank is higher than the low water level in the non-efficient time period, the water replenishment solenoid valve is driven to remain closed, and if the current water temperature in the water tank is lower than the low working temperature of the water tank, the air source heat pump unit and the hot water circulation pump are driven to start working until the current water temperature in the water tank reaches the high working temperature of the water tank, the air source heat pump unit is driven to stop working and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working, wherein the low water level in the non-efficient time period is 0.7 meters, the high working temperature of the water tank is 42°C, and the low working temperature of the water tank is 41°C;

[0019] S8: During the non-efficient time period, if the water level in the water tank is lower than the low water level during the non-efficient time period, the water supply solenoid valve is driven to start working, and steps S2-S4 are repeated. When the water level in the water tank reaches the high water level during the non-efficient time period, the water supply solenoid valve is driven to stop working, and the air source heat pump unit and the hot water circulation pump are driven to work. When the current water temperature in the water tank reaches the target set temperature, the air source heat pump unit is driven to stop working, and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working.

[0020] If the water level in the water tank reaches the high water level during the non-efficient period, the water replenishment solenoid valve is driven to stop working, and the air source heat pump unit and the hot water circulation pump are driven to work. When the current water temperature in the water tank reaches the target set temperature, the air source heat pump unit is driven to stop working, and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working;

[0021] If the water level in the water tank drops to the low water level during the non-efficient period, step S8 is repeated, wherein the high water level during the non-efficient period is 0.8 meters.

[0022] Furthermore, the controller is also configured to: drive the booster water pump to operate during the water supply time period, and drive the booster water pump to stop working during the non-water supply time period, the water supply time period is 6:00-24:00, and the non-water supply time period is 0:00-6:00.

[0023] Furthermore, the controller is also configured to: if the water level of the water tank drops to the equipment safety low water level, drive the air source heat pump unit to stop working and drive the hot water circulation pump to stop working after a delay of 2 minutes after the hot water circulation pump stops working, and drive the booster water pump to stop running during the water supply time period, drive the water replenishment solenoid valve to operate, and when the water level of the water tank rises to the equipment safety high water level, drive the air source heat pump unit, the hot water circulation pump and the booster water pump to operate, wherein the equipment safety high water level is 0.5 meters, and the equipment safety low water level is 0.4 meters.

[0024] Furthermore, the controller is also configured to: when the water level of the water tank is less than or equal to the equipment safety low water level, output system water shortage information; when the water level of the water tank is greater than the maximum water level of the float valve water replenishment, output solenoid valve fault information, wherein the equipment safety low water level is 0.4 meters, and the maximum water level of the float valve water replenishment is 2.15 meters.

[0025] Furthermore, the controller is also configured to: when the current water temperature of the water tank is less than or equal to the low temperature alarm temperature of the water tank, output a signal that the water temperature is too low; when the current water temperature of the water tank is greater than the high temperature alarm temperature of the water tank, output a signal that the water temperature is too high, wherein the low temperature alarm temperature of the water tank is 37°C, and the high temperature alarm temperature of the water tank is 47°C.

[0026] Furthermore, the booster water pump is arranged on a pipeline between the output port and the bathing terminal equipment.

[0027] The embodiments of the present application have the following beneficial effects: after the air source heat pump unit and the hot water circulation pump unit complete heating the hot water, the working stability of the bathing hot water regulation system can be effectively guaranteed by controlling the timing of the air source heat pump unit and the hot water circulation pump unit after they stop working, and at the same time reduce the energy consumption required for the heating system, fully improve the heating performance, and optimize the shutdown action of the air source heat pump unit and the hot water circulation pump unit when the liquid level is too low, thereby ensuring the working stability of the energy-saving centralized regulation system under extreme working conditions. The system can also be used for peak and valley electricity price projects, using the valley electricity period to produce hot water, so as to save energy and reduce costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0029] Figure 1 A system schematic diagram of a high-efficiency and energy-saving centralized regulation system for bathing hot water provided by an embodiment of the present application is exemplarily shown;

[0030] Figure 2 The control logic diagram of a high-efficiency and energy-saving centralized regulation system for bathing hot water provided by an embodiment of the present application is exemplarily shown;

[0031] Figure 3 The system connection diagram of a high-efficiency and energy-saving centralized regulation system for bathing hot water provided by an embodiment of the present application is exemplarily shown;

[0032] Figure 4 The schematic diagram exemplarily shows a flow chart executed by a system of a high-efficiency and energy-saving centralized regulation system for bathing hot water provided in an embodiment of the present application. DETAILED DESCRIPTION

[0033] In order to make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application.

[0034] To further illustrate the technical solution provided by the embodiment of the present application, this is described in detail below in conjunction with the accompanying drawings and specific implementation methods. Although the embodiment of the present application provides the method operation steps shown in the following embodiments or drawings, more or fewer operation steps may be included in the method based on routine or no creative labor. In the steps where there is no necessary causal relationship logically, the execution order of these steps is not limited to the execution order provided in the embodiment of the present application.

[0035] refer to Figure 1-4 As shown, the present application provides a high-efficiency and energy-saving centralized regulation system for bathing hot water, including: a water tank 11, an air source heat pump unit 21, a hot water circulation pump unit 22, a water supply pipeline 12, a water supply solenoid valve 23, a booster water pump 24, a liquid level sensor 31, a temperature sensor 32 and a controller 30.

[0036] The water tank 11 comprises a water replenishment port, an output port, a liquid inlet port and a liquid outlet port. The water replenishment port, the output port, the liquid inlet port and the liquid outlet port are respectively used to realize the delivery and output of the liquid flow.

[0037] The water replenishment port is connected to the water replenishment pipeline 12, and a water replenishment solenoid valve 23 is arranged on the water replenishment pipeline 12. The controller 30 is connected to the water replenishment solenoid valve 23. The connection, transmission or shutoff of the liquid flow on the water replenishment pipeline 12 is controlled by the operating state of the water replenishment solenoid valve 23, thereby realizing the replenishment of water in the water tank 11. When the water level in the water tank 11 is low or lower than the preset height requirement, the introduction and transmission of the liquid flow can be realized by controlling the start-up operation of the water replenishment solenoid valve 23.

[0038] The liquid outlet port is connected to the hot water circulation pump unit 22 through a pipeline, the hot water circulation pump unit 22 is connected to the air source heat pump unit 21 through a pipeline, the air source heat pump unit 21 is connected to the liquid inlet port, and the liquid in the water tank 11 is heated by the hot water circulation pump unit 22 and the air source heat pump unit 21 and then flows into the water tank 11 through the liquid inlet port.

[0039] The liquid flow circulated from the water tank 11 is first heated by the hot water circulation pump unit 22, and then heated by the air source heat pump unit 21, and then circulated from the liquid outlet port to the water tank 11, thereby completing the heating treatment of the liquid flow in the water tank 11.

[0040] Among them, the hot water circulation pump unit 22 is mainly a mechanical device that provides stable pressure and flow rate for the circulating heat carrier. It drives the impeller to rotate through the motor, so that water forms a circulation flow in the pipeline system. Specifically, the rotational energy of the motor is transmitted to the impeller, and the impeller drives the water to flow, thereby transporting hot water from the heat source (such as a water heater, boiler, etc.) to the water point, and heating the low-temperature water flow at the end before sending it out.

[0041] The air source heat pump unit 21 uses the reverse Carnot cycle principle to drive the compressor with a small amount of electric energy, so that the refrigerant absorbs low-level heat energy in the air in the evaporator and becomes a low-temperature and low-pressure gaseous refrigerant, which is then compressed into a high-temperature and high-pressure gaseous refrigerant by the compressor and enters the condenser to release heat and heat the water. After releasing the heat, the refrigerant becomes a low-temperature and high-pressure liquid, and returns to the evaporator after being throttled by the expansion valve, and continues to absorb heat from the air. This cycle repeats, continuously transferring the heat energy in the air to the water, thereby achieving the purpose of producing hot water.

[0042] The output port is connected to the bathing terminal device 13, and the booster water pump 24 is arranged on the pipeline between the output port and the bathing terminal device 13. The booster water pump 24 boosts the liquid flow output from the output port of the water tank 11 and then transports it to the bathing terminal device 13 through the corresponding pipeline to realize the effective supply of hot water for bathing.

[0043] The liquid level sensor 31 and the temperature sensor 32 are respectively arranged in the water tank 11. The liquid level sensor 31 is used to detect the height of the liquid flow currently contained in the water tank 11 and determine it as the current water level value, and the temperature sensor 32 is used to detect the temperature of the liquid flow currently contained in the water tank 11 and determine it as the current temperature value. Specifically, the temperature sensor 32 can also be arranged on the pipeline connected to the output port, so as to detect the temperature of the liquid flow contained in the water tank 11, so as to evaluate the temperature of the liquid flow delivered by the water tank 11 to the bathing terminal device 13.

[0044] The controller 30 is connected to the air source heat pump unit 21 , the hot water circulation pump unit 22 , the water replenishment solenoid valve 23 and the booster water pump 24 . The controller 30 is also connected to the liquid level sensor 31 and the temperature sensor 32 .

[0045] The controller 30 is configured as follows during the high-efficiency water replenishment stage:

[0046] S1: When entering the high-efficiency time period, the water replenishment solenoid valve is driven to start working to replenish water into the water tank. The high-efficiency time period is 10:00-17:00.

[0047] S2: During the water replenishment process, if the current water temperature in the water tank is lower than the target set temperature, the air source heat pump unit and the hot water circulation pump are driven to start working, and the target set temperature is 41°C.

[0048] S3: During the continuous water replenishment process, if the current water temperature in the water tank reaches or is lower than the water tank replenishment low temperature, the water replenishment solenoid valve is driven to close, and the air source heat pump unit and the hot water circulation pump are driven to continue working. The water tank replenishment low temperature is 40°C.

[0049] S4: When driving the air source heat pump unit and the hot water circulation pump to continue working, if the current water temperature in the water tank reaches or exceeds the high temperature of the water tank water replenishment, the water replenishment solenoid valve is driven to start working, and the air source heat pump unit and the hot water circulation pump are driven to continue working until the water level in the water tank reaches the high water level during the high-efficiency period, otherwise repeat step S3, wherein the high temperature of the water tank water replenishment is 41°C, and the high water level during the high-efficiency period is 2.1 meters.

[0050] S5: When the water level in the water tank reaches the high water level during the high-efficiency period, the water supply solenoid valve is driven to close, and the air source heat pump unit and the hot water circulation pump are driven to continue working. When the current water temperature in the water tank reaches the water tank supply high temperature, the air source heat pump unit is driven to stop working and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working.

[0051] S6: If during the high-efficiency time period, the water level in the water tank drops to the low water level during the high-efficiency time period, which is 2.00 meters, repeat the above steps S2-S5.

[0052] S7: If in the non-efficient time period outside the efficient time period, if the water level in the water tank is higher than the low water level in the non-efficient time period, the water supply solenoid valve is driven to remain closed. If the current water temperature in the water tank is lower than the low working temperature of the water tank, the air source heat pump unit and the hot water circulation pump are driven to start working until the current water temperature in the water tank reaches the high working temperature of the water tank. The air source heat pump unit is driven to stop working and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working. Among them, the low water level in the non-efficient time period is 0.7 meters, the high working temperature of the water tank is 42°C, and the low working temperature of the water tank is 41°C.

[0053] S8: During the non-efficient time period, if the water level in the water tank is lower than the low water level during the non-efficient period, the water supply solenoid valve is driven to start working, and steps S2-S4 are repeated. When the water level in the water tank reaches the high water level during the non-efficient period, the water supply solenoid valve is driven to stop working, and the air source heat pump unit and the hot water circulation pump are driven to work. When the current water temperature in the water tank reaches the target set temperature, the air source heat pump unit is driven to stop working, and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working.

[0054] If the water level in the water tank reaches the high water level during the non-efficient period, the water supply solenoid valve is driven to stop working, and the air source heat pump unit and the hot water circulation pump are driven to work. When the current water temperature in the water tank reaches the target set temperature, the air source heat pump unit is driven to stop working and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working.

[0055] If the water level in the water tank drops to the low water level during the non-efficient period, step S8 is repeated, wherein the high water level during the non-efficient period is 0.8 meters.

[0056] High-efficiency hydration stage (10:00-17:00)

[0057] Start water replenishment: When entering the high-efficiency time period, the controller drives the water replenishment solenoid valve to start working and begins to replenish water into the water tank.

[0058] Start the heating equipment according to the water temperature: During the water replenishment process, if the current water temperature in the water tank is lower than the target set temperature (41°C), the controller drives the air source heat pump unit and the hot water circulation pump to start working.

[0059] Conditions for closing the water replenishment solenoid valve: During the continuous water replenishment process, if the current water temperature in the water tank reaches or is lower than the water tank replenishment low temperature (40°C), the water replenishment solenoid valve will be driven to close, but the air source heat pump unit and hot water circulation pump will continue to work.

[0060] Open the water supply solenoid valve again and subsequent operations: When the air source heat pump unit and the hot water circulation pump are driven to continue working, if the current water temperature in the water tank reaches or exceeds the high water supply temperature of the water tank (41°C), the water supply solenoid valve is driven to start working and continue to work until the water level in the water tank reaches the high water level during the high-efficiency period (2.1 meters); if not reached, repeat the above steps on water temperature and closing the water supply solenoid valve.

[0061] Complete the operation of the high-efficiency water replenishment stage: when the water level in the water tank reaches the high water level during the high-efficiency period, the water replenishment solenoid valve is driven to close, and the air source heat pump unit and the hot water circulation pump continue to work. When the current water temperature in the water tank reaches the water tank replenishment high temperature, the air source heat pump unit is driven to stop working first, and then the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working.

[0062] Water level drop processing: If the water level in the water tank drops to the low water level (2.00 meters) during the high-efficiency time period, repeat the above steps (S2-S5) from starting the heating equipment according to the water temperature to completing the high-efficiency water replenishment stage operation.

[0063] The water level is higher than the low water level during the non-efficient period: If the water level in the water tank is higher than the low water level during the non-efficient period (0.7 meters) during the non-efficient period, the water supply solenoid valve is driven to remain closed; if the current water temperature in the water tank is lower than the low working temperature of the water tank (41°C), the air source heat pump unit and the hot water circulation pump are driven to start working until the current water temperature in the water tank reaches the high working temperature of the water tank (42°C), and then the air source heat pump unit is driven to stop working first, and then the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working.

[0064] The water level is lower than the low water level during the non-efficient period: if the water level in the water tank is lower than the low water level during the non-efficient period, the water replenishment solenoid valve is driven to start working, and the above steps (S2-S4) from starting the heating equipment according to the water temperature in the efficient water replenishment stage to controlling the operation of each device according to the water temperature and water level are repeated; when the water level in the water tank reaches the high water level during the non-efficient period (0.8 meters), the water replenishment solenoid valve is driven to stop working, and the air source heat pump unit and the hot water circulation pump are driven to work. When the current water temperature in the water tank reaches the target set temperature (41°C), the air source heat pump unit is driven to stop working first, and then the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working; if the water level in the water tank drops to the low water level during the non-efficient period, the above operation steps (S8) when the water level is lower than the low water level during the non-efficient period are repeated.

[0065] Furthermore, the controller is also configured to: drive the booster water pump to operate during the water supply time period, and drive the booster water pump to stop working during the non-water supply time period. The water supply time period is 6:00-24:00, and the non-water supply time period is 0:00-6:00.

[0066] Furthermore, the controller is also configured to: if the water level of the water tank drops to the equipment safety low water level, the air source heat pump unit is driven to stop working and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working, and the booster water pump is driven to stop running during the water supply time period, and the water supply solenoid valve is driven to operate; when the water level of the water tank rises to the equipment safety high water level, the air source heat pump unit, the hot water circulation pump and the booster water pump are driven to operate, wherein the equipment safety high water level is 0.5 meters, and the equipment safety low water level is 0.4 meters.

[0067] Furthermore, the controller is also configured to: when the water level of the water tank is less than or equal to the equipment's safe low water level, output system water shortage information; when the water level of the water tank is greater than the float valve's maximum water level for replenishing water, output solenoid valve fault information, wherein the equipment's safe low water level is 0.4 meters, and the float valve's maximum water level for replenishing water is 2.15 meters.

[0068] Furthermore, the controller is also configured to: when the current water temperature of the water tank is less than or equal to the low temperature alarm temperature of the water tank, output a signal that the water temperature is too low; when the current water temperature of the water tank is greater than the high temperature alarm temperature of the water tank, output a signal that the water temperature is too high, wherein the low temperature alarm temperature of the water tank is 37°C and the high temperature alarm temperature of the water tank is 47°C.

[0069] Furthermore, a booster water pump is arranged on a pipeline between the output port and the bathing terminal equipment.

[0070] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0071] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0072] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0073] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0074] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. A highly efficient and energy-saving centralized regulation system for hot water for bathing, characterized in that: include: Water tank, air source heat pump unit, hot water circulation pump unit, water supply pipeline, water supply solenoid valve, booster water pump, liquid level sensor, temperature sensor and controller; The water tank comprises a water replenishment port, an output port, a liquid inlet port and a liquid outlet port; The water replenishment port is connected to the water replenishment pipeline, and the water replenishment solenoid valve is arranged on the water replenishment pipeline; The liquid outlet port is connected to the hot water circulation pump unit through a pipeline, the hot water circulation pump unit is connected to the air source heat pump unit through a pipeline, the air source heat pump unit is connected to the liquid inlet port, and the liquid in the water tank flows into the water tank through the liquid inlet port after being heated by the hot water circulation pump unit and the air source heat pump unit; The output port is connected to the bathing terminal device; The liquid level sensor and the temperature sensor are respectively arranged in the water tank, the liquid level sensor is used to detect the height of the liquid flow currently contained in the water tank and determine it as the current water level value, and the temperature sensor is used to detect the temperature of the liquid flow currently contained in the water tank and determine it as the current temperature value; The controller is connected to the air source heat pump unit, the hot water circulation pump unit, the water replenishment solenoid valve and the booster water pump, and the controller is also connected to the liquid level sensor and the temperature sensor; Wherein, the controller is configured as follows in the efficient water replenishment stage: S1: When entering the high-efficiency time period, the water supply solenoid valve is driven to start working to supply water into the water tank. The high-efficiency time period is 10:00-17:00; S2: During the water replenishment process, if the current water temperature in the water tank is lower than the target set temperature, the air source heat pump unit and the hot water circulation pump are driven to start working, and the target set temperature is 41°C; S3: During the continuous water replenishment process, if the current water temperature in the water tank reaches or is lower than the water tank water replenishment low temperature, the water replenishment solenoid valve is driven to close, and the air source heat pump unit and the hot water circulation pump are driven to continue working, and the water tank water replenishment low temperature is 40°C; S4: When driving the air source heat pump unit and the hot water circulation pump to continue working, if the current water temperature in the water tank reaches or exceeds the water tank water replenishment high temperature, the water replenishment solenoid valve is driven to start working, and the air source heat pump unit and the hot water circulation pump are driven to continue working until the water level in the water tank reaches the high water level during the high efficiency period, otherwise repeat step S3, wherein the water tank water replenishment high temperature is 41°C, and the high water level during the high efficiency period is 2.1 meters; S5: When the water level in the water tank reaches the high water level in the high-efficiency period, the water replenishment solenoid valve is driven to close, and the air source heat pump unit and the hot water circulation pump are driven to continue working. When the current water temperature in the water tank reaches the water tank water replenishment high temperature, the air source heat pump unit is driven to stop working and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working. S6: If, during the high-efficiency time period, the water level in the water tank drops to the low water level during the high-efficiency time period, and the low water level during the high-efficiency time period is 2.00 meters, repeat the above steps S2-S5; S7: If in the non-efficient time period outside the efficient time period, if the water level in the water tank is higher than the low water level in the non-efficient time period, the water replenishment solenoid valve is driven to remain closed, and if the current water temperature in the water tank is lower than the low working temperature of the water tank, the air source heat pump unit and the hot water circulation pump are driven to start working until the current water temperature in the water tank reaches the high working temperature of the water tank, the air source heat pump unit is driven to stop working and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working, wherein the low water level in the non-efficient time period is 0.7 meters, the high working temperature of the water tank is 42°C, and the low working temperature of the water tank is 41°C; S8: During the non-efficient time period, if the water level in the water tank is lower than the low water level during the non-efficient time period, the water supply solenoid valve is driven to start working, and steps S2-S4 are repeated. When the water level in the water tank reaches the high water level during the non-efficient time period, the water supply solenoid valve is driven to stop working, and the air source heat pump unit and the hot water circulation pump are driven to work. When the current water temperature in the water tank reaches the target set temperature, the air source heat pump unit is driven to stop working, and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working. If the water level in the water tank reaches the high water level during the non-efficient period, the water replenishment solenoid valve is driven to stop working, and the air source heat pump unit and the hot water circulation pump are driven to work. When the current water temperature in the water tank reaches the target set temperature, the air source heat pump unit is driven to stop working, and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working; If the water level in the water tank drops to the low water level during the non-efficient period, step S8 is repeated, wherein the high water level during the non-efficient period is 0.8 meters.

2. The high-efficiency and energy-saving centralized regulation system for bathing hot water according to claim 1, characterized in that: The controller is also configured to: The booster water pump is driven to operate during the water supply time period, and is driven to stop operating during the non-water supply time period. The water supply time period is 6:00-24:00, and the non-water supply time period is 0:00-6:

00.

3. The high-efficiency and energy-saving centralized regulation system for bathing hot water according to claim 2 is characterized in that: The controller is also configured to: If the water level of the water tank drops to the equipment safety low water level, the air source heat pump unit is driven to stop working and the hot water circulation pump is driven to stop working after a delay of 2 minutes after the hot water circulation pump stops working, and the booster water pump is driven to stop running during the water supply time period, and the water replenishment solenoid valve is driven to operate. When the water level of the water tank rises to the equipment safety high water level, the air source heat pump unit, the hot water circulation pump and the booster water pump are driven to operate, wherein the equipment safety high water level is 0.5 meters, and the equipment safety low water level is 0.4 meters.

4. The high-efficiency and energy-saving centralized regulation system for bathing hot water according to claim 3 is characterized in that: The controller is also configured to: When the water level of the water tank is less than or equal to the equipment's safe low water level, the system water shortage information is output; when the water level of the water tank is greater than the float valve's maximum water level for replenishing water, the solenoid valve fault information is output; wherein, the equipment's safe low water level is 0.4 meters, and the float valve's maximum water level for replenishing water is 2.15 meters.

5. The high-efficiency and energy-saving centralized regulation system for bathing hot water according to claim 4, characterized in that: The controller is also configured to: When the current water temperature of the water tank is less than or equal to the low temperature alarm temperature of the water tank, a signal indicating that the water temperature is too low is output; when the current water temperature of the water tank is greater than the high temperature alarm temperature of the water tank, a signal indicating that the water temperature is too high is output, wherein the low temperature alarm temperature of the water tank is 37°C, and the high temperature alarm temperature of the water tank is 47°C.

6. The high-efficiency and energy-saving centralized regulation system for bathing hot water according to claim 5, characterized in that: The booster water pump is arranged on the pipeline between the output port and the bathing terminal equipment.