Consumed resource allocation method applied to project and related equipment
By calculating the resource consumption of each service in the project and the allocation ratio of each user, the problem of unreasonable resource allocation in the existing technology is solved, and the rational allocation of resources and scientific project management are realized.
Patent Information
- Application Number
- CN202411682950.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-03-18
AI Technical Summary
When determining the resource consumption of multiple users participating in the project, existing project management methods usually adopt an equal distribution method, resulting in unreasonable resource allocation.
By obtaining multiple influencing factors of each service in the project and each user's planned investment resources, calculate the consumption resources of each service and the allocation ratio of each user, and determine the actual investment resources of each user.
The rationality and accuracy of resource allocation are achieved, ensuring that the resources invested by each user can be consumed evenly, and supporting the scientific and effective management of the project.
Smart Images

Figure CN119647841A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of data processing technology, and in particular to a method for allocating consumable resources applied to a project and related equipment. Background Art
[0002] In the current era of knowledge explosion, scientific and technological innovation has become the key driving force for corporate competition and determines the height of its future development. Projects are one of the main ways to enhance corporate innovation capabilities. Effective project management can ensure the effective realization of project goals and promote the rational allocation of scientific and technological resources. At present, many project management still adopts traditional methods, such as "heavy at both ends and light in the middle", over-emphasizing project establishment and completion while ignoring project process management. This situation leads to the use of an average distribution method when determining the consumption resources of projects with multiple users. However, the above method makes it unreasonable to determine the consumption resources of the project. Summary of the invention
[0003] In view of this, the purpose of this application is to propose a method for allocating consumable resources applied to a project and related equipment to overcome all or part of the deficiencies in the prior art.
[0004] Based on the above-mentioned purpose, the present application provides a method for allocating consumable resources applied to a project, including: obtaining multiple influencing factors corresponding to each service in the project, and respectively obtaining the planned investment resources of each user among multiple users for the project; for each service, based on the multiple influencing factors, calculating the consumable resources corresponding to the service; for each user, based on all the planned investment resources corresponding to the multiple users, calculating the allocation ratio corresponding to the user; based on the consumable resources corresponding to all services and the allocation ratio corresponding to each user, determining the actual investment resources of each user for the project.
[0005] Optionally, the multiple influencing factors include a first scheduled daily consumption resource corresponding to a full-time employee, a first consumption day corresponding to the full-time employee, a first scheduled additional consumption resource corresponding to the full-time employee, the total number of full-time employees, a first scheduled additional consumption resource corresponding to a temporary employee, a second consumption day corresponding to the temporary employee, a second scheduled additional consumption resource corresponding to the temporary employee, and the total number of temporary employees, and the service includes a human service; the calculation of the consumption resources corresponding to the service based on the multiple influencing factors includes: calculating the consumption resources corresponding to the human service based on the first scheduled daily consumption resource corresponding to the full-time employee, the first consumption day corresponding to the full-time employee, the first scheduled additional consumption resource corresponding to the full-time employee, the total number of full-time employees, the first scheduled additional consumption resource corresponding to the temporary employee, the second consumption day corresponding to the temporary employee, the second scheduled additional consumption resource corresponding to the temporary employee, and the total number of temporary employees: Wherein, p is the consumption resource corresponding to the human service, The first scheduled consumption day resources corresponding to full-time employee i1, is the first consumption day corresponding to full-time employee i1, is the first scheduled additional consumption resource corresponding to full-time employee i1, n1 represents the total number of full-time employees, The second scheduled consumption day resources corresponding to temporary employee j1, is the second number of days consumed by temporary employee j1, is the second predetermined additional consumed resource corresponding to the temporary employee j1, and n2 represents the total number of temporary employees.
[0006] Optionally, the multiple influencing factors include resources consumed by directly acquiring new equipment, resources consumed by manufacturing new equipment, resources consumed by acquiring software, resources used by old equipment, and resources consumed by using the site, and the service includes material service; the calculation of the consumed resources corresponding to the service based on the multiple influencing factors includes: based on the resources consumed by directly acquiring new equipment, the resources consumed by manufacturing new equipment, the resources consumed by acquiring software, the resources used by old equipment, and the resources consumed by using the site, calculating the consumed resources corresponding to the material service: S=S1+S2+S3+S4+S5, wherein S is the consumed resources corresponding to the material service, S1 represents the resources consumed by directly acquiring new equipment, S2 represents the resources consumed by manufacturing new equipment, S3 represents the resources consumed by acquiring software, S4 represents the resources used by old equipment, and S5 represents the resources consumed by using the site.
[0007] Optionally, the multiple influencing factors include application resources corresponding to the intellectual property rights, additional resources corresponding to the intellectual property rights, priority claim resources corresponding to the intellectual property rights, printing resources corresponding to the intellectual property rights, layout resources corresponding to the intellectual property rights, trial resources corresponding to the intellectual property rights, agency resources corresponding to the intellectual property rights, annual maintenance resources corresponding to the intellectual property rights, and maintenance years resources corresponding to the intellectual property rights; the service includes intellectual property services; and calculating the consumed resources corresponding to the service based on the multiple influencing factors includes: calculating the consumed resources corresponding to the intellectual property service based on the application resources corresponding to the intellectual property rights, the additional resources corresponding to the intellectual property rights, the priority claim resources corresponding to the intellectual property rights, the printing resources corresponding to the intellectual property rights, the layout resources corresponding to the intellectual property rights, the trial resources corresponding to the intellectual property rights, the agency resources corresponding to the intellectual property rights, the annual maintenance resources corresponding to the intellectual property rights, and the maintenance years resources corresponding to the intellectual property rights: Wherein, K is the consumption resource corresponding to the intellectual property service, The application resource corresponding to the intellectual property of type i2. Additional resources corresponding to intellectual property of type i2, The priority claim resource corresponding to the intellectual property of type i2, The printed resource corresponding to the intellectual property of type i2, The layout resource corresponding to the intellectual property of type i2. The trial resource corresponding to the intellectual property of type i2. The proxy resource corresponding to the intellectual property of type i2. The annual maintenance resources corresponding to the intellectual property of type i2, The maintenance years resource corresponding to the intellectual property of type i2.
[0008] Optionally, calculating the allocation ratio corresponding to the user based on all planned investment resources corresponding to the multiple users includes: calculating the sum of all planned investment resources, dividing the planned investment resources corresponding to the user by the sum, and obtaining the allocation ratio corresponding to the user.
[0009] Optionally, after determining the actual investment resources of each user for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, the method further includes: sending the actual investment resources to a receiver of the user corresponding to the user.
[0010] Optionally, after determining the actual investment resources of each user for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, the method further includes: generating an analysis report based on the actual investment resources corresponding to each user.
[0011] Based on the same inventive concept, the present application also provides a consumption resource allocation device applied to a project, including: an acquisition module, configured to obtain multiple influencing factors corresponding to each service in the project, and respectively obtain the planned investment resources of each user among multiple users for the project; a first calculation module, configured to calculate the consumption resources corresponding to the service for each service based on the multiple influencing factors; a second calculation module, configured to calculate the allocation ratio corresponding to each user based on all the planned investment resources corresponding to the multiple users; a determination module, configured to determine the actual investment resources of each user for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user.
[0012] Optionally, the multiple influencing factors include a first scheduled daily consumption resource corresponding to full-time employees, a first consumption day corresponding to full-time employees, a first scheduled additional consumption resource corresponding to full-time employees, the total number of full-time employees, a first scheduled additional consumption resource corresponding to temporary employees, a second consumption day corresponding to temporary employees, a second scheduled additional consumption resource corresponding to temporary employees, and the total number of temporary employees; the service includes human service; the first calculation module is further configured to: calculate the consumption resource corresponding to the human service based on the first scheduled daily consumption resource corresponding to the full-time employees, the first consumption day corresponding to the full-time employees, the first scheduled additional consumption resource corresponding to the full-time employees, the total number of full-time employees, the first scheduled additional consumption resource corresponding to the temporary employees, the second consumption day corresponding to the temporary employees, the second scheduled additional consumption resource corresponding to the temporary employees, and the total number of temporary employees: Wherein, p is the consumption resource corresponding to the human service, The first scheduled consumption day resources corresponding to full-time employee i1, is the first consumption day corresponding to full-time employee i1, is the first scheduled additional consumption resource corresponding to full-time employee i1, n1 represents the total number of full-time employees, The second scheduled consumption day resources corresponding to temporary employee j1, is the second number of days consumed by temporary employee j1, is the second predetermined additional consumed resource corresponding to the temporary employee j1, and n2 represents the total number of temporary employees.
[0013] Optionally, the multiple influencing factors include resources consumed by directly acquiring new equipment, resources consumed by manufacturing new equipment, resources consumed by acquiring software, resources used by old equipment, and resources consumed by using the site, and the service includes material service; the first calculation module is also configured to: based on the resources consumed by directly acquiring new equipment, the resources consumed by manufacturing new equipment, the resources consumed by acquiring software, resources used by old equipment, and resources consumed by using the site, calculate the consumed resources corresponding to the material service: S=S1+S2+S3+S4+S5, wherein S is the consumed resources corresponding to the material service, S1 represents the resources consumed by directly acquiring new equipment, S2 represents the resources consumed by manufacturing new equipment, S3 represents the resources consumed by acquiring software, S4 represents the resources used by old equipment, and S5 represents the resources consumed by using the site.
[0014] Optionally, the multiple influencing factors include application resources corresponding to the intellectual property rights, additional resources corresponding to the intellectual property rights, priority claim resources corresponding to the intellectual property rights, printing resources corresponding to the intellectual property rights, layout resources corresponding to the intellectual property rights, trial resources corresponding to the intellectual property rights, agency resources corresponding to the intellectual property rights, annual maintenance resources corresponding to the intellectual property rights, and maintenance years resources corresponding to the intellectual property rights; the service includes intellectual property services; and the first calculation module is further configured to: calculate the consumption resources corresponding to the intellectual property services based on the application resources corresponding to the intellectual property rights, the additional resources corresponding to the intellectual property rights, the priority claim resources corresponding to the intellectual property rights, the printing resources corresponding to the intellectual property rights, the layout resources corresponding to the intellectual property rights, the trial resources corresponding to the intellectual property rights, the agency resources corresponding to the intellectual property rights, the annual maintenance resources corresponding to the intellectual property rights, and the maintenance years resources corresponding to the intellectual property rights: Wherein, K is the consumption resource corresponding to the intellectual property service, The application resource corresponding to the intellectual property of type i2. Additional resources corresponding to intellectual property of type i2, The priority claim resource corresponding to the intellectual property of type i2, The printed resource corresponding to the intellectual property of type i2, The layout resource corresponding to the intellectual property of type i2. The trial resource corresponding to the intellectual property of type i2. The proxy resource corresponding to the intellectual property of type i2. The annual maintenance resources corresponding to the intellectual property of type i2, The maintenance years resource corresponding to the intellectual property of type i2.
[0015] Optionally, the second calculation module is further configured to: calculate the sum of all planned investment resources, divide the planned investment resources corresponding to the user by the sum, and obtain the allocation ratio corresponding to the user.
[0016] Optionally, after determining the actual investment resources of each user for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, it also includes a sending module, which is configured to send the actual investment resources to the receiver of the user corresponding to it.
[0017] Optionally, after determining the actual investment resources of each user for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, it also includes a generation module, which is configured to generate an analysis report based on the actual investment resources corresponding to each user.
[0018] Based on the same inventive concept, the present application also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable by the processor, wherein the processor implements the method as described above when executing the computer program.
[0019] Based on the same inventive concept, the present application also provides a non-transitory computer-readable storage medium, which stores computer instructions, and the computer instructions are used to enable a computer to execute the method as described above.
[0020] As can be seen from the above, the consumption resource allocation method and related equipment provided by the present application for a project include obtaining multiple influencing factors corresponding to each service in the project, and respectively obtaining the planned investment resources of each user among multiple users for the project. For each service, based on the multiple influencing factors, the consumption resources corresponding to the service are calculated, so that the calculated consumption resources are accurate. For each user, based on all the planned investment resources corresponding to the multiple users, the allocation ratio corresponding to the user is calculated, ensuring that the planned investment resources of each user can be consumed evenly. Based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, the actual investment resources of each user for the project are determined, ensuring the rationality of determining the actual investment resources of each user for the project. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the technical solutions in the present application or related technologies, the drawings required for use in the embodiments or related technical descriptions are briefly introduced below. Obviously, the drawings described below are only embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0022] Figure 1 A flowchart of a method for allocating consumable resources applied to a project according to an embodiment of the present application;
[0023] Figure 2 A flowchart of a method for allocating consumable resources applied to a project according to another embodiment of the present application;
[0024] Figure 3 A flowchart of a method for allocating consumable resources applied to a project according to another embodiment of the present application;
[0025] Figure 4 This is a structural diagram of a consumable resource allocation device applied to a project according to an embodiment of the present application;
[0026] Figure 5 This is a schematic diagram of the hardware structure of an electronic device according to an embodiment of the present application. DETAILED DESCRIPTION
[0027] In order to make the objectives, technical solutions and advantages of the present application more clearly understood, the present application is further described in detail below in combination with specific embodiments and with reference to the accompanying drawings.
[0028] It should be noted that, unless otherwise defined, the technical terms or scientific terms used in the embodiments of the present application should be the usual meanings understood by people with ordinary skills in the field to which the present application belongs. The "first", "second" and similar words used in the embodiments of the present application do not represent any order, quantity or importance, but are only used to distinguish different components. "Including" or "comprising" and similar words mean that the elements or objects appearing in front of the word cover the elements or objects listed after the word and their equivalents, without excluding other elements or objects. "Connect" or "connected" and similar words are not limited to physical or mechanical connections, but can include electrical connections, whether direct or indirect. "Up", "down", "left", "right" and the like are only used to indicate relative positional relationships. When the absolute position of the described object changes, the relative positional relationship may also change accordingly.
[0029] As mentioned in the background technology section, in the current era of knowledge explosion, scientific and technological innovation has become the key driving force for corporate competition and determines the height of its future development. Projects are one of the main ways to enhance the innovation capabilities of enterprises. Effective project management can ensure the effective realization of project goals and promote the rational allocation of scientific and technological resources. This management method can enable scientific research activities to develop in the direction of rational resource allocation, maximization of effects, and continuous improvement of comprehensive benefits. The scientificity and effectiveness of the project can not only enhance the sense of responsibility of project researchers and management departments, promote more benefits from the project, but also discover new growth points and research areas with development potential. These measures provide a scientific basis for project decision-making, making it more in line with development needs.
[0030] At present, many project management still adopts traditional methods, such as "heavy at both ends and light in the middle", over-emphasizing project establishment and completion while ignoring project process management. This situation leads to problems such as heavy management tasks, inadequate business process management, scattered data storage, and insufficient results transformation capabilities. For example, when determining the consumption resources of a project with multiple users, the average distribution method is usually adopted. However, different users often plan to invest different resources. The above method makes it unreasonable to determine the consumption resources of the project. The irrationality in the project management process has significantly hindered the development of enterprise scientific and technological innovation.
[0031] In view of this, the present application embodiment proposes a method for allocating consumption resources applied to a project, referring to Figure 1 , including the following steps:
[0032] Step 101 : obtaining a plurality of influencing factors corresponding to each service in the project, and respectively obtaining planned investment resources of each user among a plurality of users for the project.
[0033] In this step, the development of the enterprise cannot be separated from the support of the project, and the successful completion of the project requires the support of multiple services. First, obtain multiple influencing factors corresponding to each service in the project, where the influencing factors are factors related to determining the consumption resources of the corresponding services. Projects are usually completed by multiple users in cooperation. At the beginning of the project, each user makes a plan to invest resources for the project so that the project can be implemented smoothly. Secondly, obtain the planned investment resources for the project from each of the multiple users, where the planned investment resources corresponding to each user are different.
[0034] It should be noted that when carrying out a project, a database table corresponding to the project can be established in advance. For example, the database table includes: scientific and technological project information (project number, project name, project description, project start and end dates, project nature, project technology category, subject setting, assessment indicators, etc.); project participating unit information (unit name, unit profile, contact information of the person in charge, etc.); human resource input of each unit (personnel name, personnel position and title, education, working time invested, division of labor in the project, etc.); material input (name, quantity, specifications, investment time, site use, etc. of input materials or equipment); intellectual property distribution (type and ranking of relevant intellectual property (such as papers, patents, copyrights), distribution ratio or ownership, relevant time nodes for acquisition of intellectual property, etc.); date and time (recording the date and timestamp of data input for traceability and auditing).
[0035] Step 102: For each service, based on the multiple influencing factors, calculate the consumed resources corresponding to the service.
[0036] In this step, each service consumes resources. To accurately determine the consumed resources corresponding to each service, it is necessary to comprehensively consider the multiple influencing factors corresponding to each service. Therefore, based on multiple influencing factors, the consumed resources corresponding to the service are calculated. This application comprehensively considers multiple influencing factors, so that the calculated consumed resources are accurate.
[0037] Step 103: For each user, based on all planned investment resources corresponding to the multiple users, calculate the allocation ratio corresponding to the user.
[0038] In this step, each user has different planned investment resources for the project. In order to ensure that each user's planned investment resources can be consumed evenly, the user's allocation ratio needs to be calculated based on all the planned investment resources corresponding to multiple users. In this way, according to the user's allocation ratio, each user's planned investment resources can be consumed proportionally in the future. By calculating the user's allocation ratio, it is ensured that each user's planned investment resources can be consumed evenly.
[0039] Step 104 : determining actual input resources of each user for the project based on the consumed resources corresponding to all services and the allocation ratio corresponding to each user.
[0040] In this step, the consumable resources corresponding to the service reflect the current consumable resources of the project. In order to support the smooth operation of the project, multiple users of the project need to invest actual investment resources for the current consumable resources of the project. The consumable resources corresponding to all services are multiplied by the allocation ratio of the user to obtain the actual investment resources corresponding to the user, ensuring the rationality of determining the actual investment resources of each user for the project. It should be noted that the actual investment resources of the user are less than or equal to the planned investment resources of the user. During the entire process of the project, the user can determine the actual investment resources in real time.
[0041] Through the above scheme, multiple influencing factors corresponding to each service in the project are obtained, and the planned investment resources of each user in the multiple users for the project are obtained respectively. For each service, the consumption resources corresponding to the service are calculated based on the multiple influencing factors, so that the calculated consumption resources are accurate. For each user, the allocation ratio corresponding to the user is calculated based on all the planned investment resources corresponding to the multiple users, ensuring that the planned investment resources of each user can be consumed evenly. Based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, the actual investment resources of each user for the project are determined, ensuring the rationality of determining the actual investment resources of each user for the project.
[0042] In some embodiments, the multiple influencing factors include a first scheduled daily consumption resource corresponding to a full-time employee, a first consumption day corresponding to the full-time employee, a first scheduled additional consumption resource corresponding to the full-time employee, the total number of full-time employees, a first scheduled additional consumption resource corresponding to a temporary employee, a second consumption day corresponding to the temporary employee, a second scheduled additional consumption resource corresponding to the temporary employee, and the total number of temporary employees, and the service includes a human service; the calculation of the consumption resources corresponding to the service based on the multiple influencing factors includes: calculating the consumption resources corresponding to the human service based on the first scheduled daily consumption resource corresponding to the full-time employee, the first consumption day corresponding to the full-time employee, the first scheduled additional consumption resource corresponding to the full-time employee, the total number of full-time employees, the first scheduled additional consumption resource corresponding to the temporary employee, the second consumption day corresponding to the temporary employee, the second scheduled additional consumption resource corresponding to the temporary employee, and the total number of temporary employees: Wherein, p is the consumption resource corresponding to the human service, The first scheduled consumption day resources corresponding to full-time employee i1, is the first consumption day corresponding to full-time employee i1, is the first scheduled additional consumption resource corresponding to full-time employee i1, n1 represents the total number of full-time employees, The second scheduled consumption day resources corresponding to temporary employee j1, is the second number of days consumed by temporary employee j1, is the second predetermined additional consumed resource corresponding to the temporary employee j1, and n2 represents the total number of temporary employees.
[0043] In this embodiment, the completion of the project is inseparable from human work, so the service includes human services. Human services include the services of full-time employees and temporary employees. The resources consumed by the above two types of employees are inconsistent. Therefore, the consumed resources of the above two types of employees are calculated separately. In addition, the work of each employee is also divided into scheduled work and temporary work. The resources required for human services are fully considered to ensure the accuracy of calculating the consumed resources corresponding to human services. It should be noted that the multiple parameters involved in calculating the consumed resources corresponding to human services are multiple influencing parameters corresponding to human services.
[0044] Before obtaining multiple impact parameters corresponding to human services, it is necessary to calculate the impact parameters that cannot be directly obtained. Employees working within a fixed time will consume scheduled daily resources. The scheduled daily resources multiplied by the number of consumption days can be obtained to obtain the scheduled total consumption resources of the employee. Employees working in extra time will consume scheduled additional consumption resources. The first scheduled additional consumption resources of full-time employees are calculated by the following formula:
[0045]
[0046] in, The first scheduled additional consumption resource corresponding to full-time employee i1, 21.75 is the scheduled number of days in the month, The monthly resource consumption corresponding to full-time employee i1, The first additional days consumed by full-time employee i1, The multiple standard for the additional resource consumption planned for full-time employee i1.
[0047] The additional consumption resources for the second booking of temporary employees are calculated by the following formula:
[0048]
[0049] in, The second scheduled additional consumption resource corresponding to temporary employee j1, 21.75 is the scheduled number of days in the month, Monthly resource consumption corresponding to temporary employee v1, The second additional days consumed by temporary employee j1, The multiple standard for the additional resource consumption of temporary employee j1.
[0050] In some embodiments, the multiple influencing factors include resources consumed by directly acquiring new equipment, resources consumed by manufacturing new equipment, resources consumed by acquiring software, resources used by old equipment, and resources consumed by using the site, and the service includes material service; the calculation of the consumed resources corresponding to the service based on the multiple influencing factors includes: based on the resources consumed by directly acquiring new equipment, the resources consumed by manufacturing new equipment, the resources consumed by acquiring software, the resources used by old equipment, and the resources consumed by using the site, calculating the consumed resources corresponding to the material service: S=S1+S2+S3+S4+S5, wherein S is the consumed resources corresponding to the material service, S1 represents the resources consumed by directly acquiring new equipment, S2 represents the resources consumed by manufacturing new equipment, S3 represents the resources consumed by acquiring software, S4 represents the resources used by old equipment, and S5 represents the resources consumed by using the site.
[0051] In this embodiment, the successful completion of the project is inseparable from the support of materials, so the service includes material services. In the calculation process of material services, there is a possibility of incomplete consideration, and this embodiment comprehensively considers the various resources consumed by material resources, ensuring the accuracy of calculating the consumed resources corresponding to the material services. It should be noted that the multiple parameters involved in calculating the consumed resources corresponding to the material services are the multiple influencing parameters corresponding to the material services. Before obtaining the multiple influencing parameters corresponding to the material services, it is also necessary to calculate the influencing parameters that cannot be directly obtained.
[0052] The resources consumed by directly acquiring new devices are calculated using the following formula:
[0053]
[0054] Where S is the resource consumed by the material service, The scheduled consumption resources corresponding to the domestic equipment i3, It is the first transportation resource corresponding to the domestic equipment i3. The first installation resource corresponding to the domestic device i3 is required, and n3 represents the total number of domestic devices. The resources consumed onshore for the foreign equipment j2. The slave consumption resources corresponding to the foreign device j2, It is the second transportation resource corresponding to the foreign equipment i2. are the resources required for the second installation corresponding to the foreign device i2, and n4 represents the total number of foreign devices.
[0055] Furthermore, the above-mentioned landed consumption resources are calculated by the following method:
[0056] Resources consumed on shore = offshore resources + international transportation resources + transportation insurance resources.
[0057] Furthermore, the above-mentioned subordinate consumption resources are calculated by the following method:
[0058] Dependent consumption resources = bank resources + foreign trade procedure resources + scheduled payment resources + consumption resources + import link value-added resources.
[0059] Furthermore, the second transportation resource is calculated in the following manner:
[0060] The second transportation resource = foreign equipment offshore resources × scheduled exchange resources × domestic transportation resources.
[0061] The resources consumed to manufacture new equipment are calculated using the following formula:
[0062]
[0063] Among them, i4 is a different type of equipment.
[0064] The resources consumed by acquiring the software are calculated using the following formula:
[0065]
[0066] Among them, i5 represents different types of software.
[0067] The used resources of old equipment are calculated by the following formula:
[0068]
[0069] Among them, i6 is the type of different old devices.
[0070] The resources consumed by using the site are calculated using the following formula:
[0071]
[0072] Among them, i7 is a different venue.
[0073] In some embodiments, the multiple influencing factors include application resources corresponding to the intellectual property, additional resources corresponding to the intellectual property, priority claim resources corresponding to the intellectual property, printing resources corresponding to the intellectual property, layout resources corresponding to the intellectual property, trial resources corresponding to the intellectual property, agency resources corresponding to the intellectual property, annual maintenance resources corresponding to the intellectual property, and maintenance years resources corresponding to the intellectual property, and the service includes intellectual property services; the calculating the consumed resources corresponding to the service based on the multiple influencing factors includes: calculating the consumed resources corresponding to the intellectual property service based on the application resources corresponding to the intellectual property, the additional resources corresponding to the intellectual property, priority claim resources corresponding to the intellectual property, printing resources corresponding to the intellectual property, layout resources corresponding to the intellectual property, trial resources corresponding to the intellectual property, agency resources corresponding to the intellectual property, annual maintenance resources corresponding to the intellectual property, and maintenance years resources corresponding to the intellectual property: Wherein, K is the consumption resource corresponding to the intellectual property service, The application resource corresponding to the intellectual property of type i2. Additional resources corresponding to intellectual property of type i2, The priority claim resource corresponding to the intellectual property of type i2, The printed resource corresponding to the intellectual property of type i2, The layout resource corresponding to the intellectual property of type i2. The trial resource corresponding to the intellectual property of type i2. The proxy resource corresponding to the intellectual property of type i2. The annual maintenance resources corresponding to the intellectual property of type i2, The maintenance years resource corresponding to the intellectual property of type i2.
[0074] In this embodiment, the implementation of the project is often accompanied by technological innovation. Therefore, the consumed resources of the intellectual property service should also be considered in the resources consumed by the project. The consumed resources involved in the intellectual property service include multiple aspects. This embodiment comprehensively considers the various consumed resources corresponding to the intellectual property service, ensuring the accuracy of the consumed resources corresponding to the intellectual property service. It should be noted that the multiple parameters involved in calculating the consumed resources corresponding to the intellectual property service are the multiple influencing parameters corresponding to the intellectual property service.
[0075] In some embodiments, the calculation of the allocation ratio corresponding to the user based on all planned investment resources corresponding to the multiple users includes: calculating the sum of all planned investment resources, dividing the planned investment resources corresponding to the user by the sum, and obtaining the allocation ratio corresponding to the user.
[0076] In this embodiment, in order to ensure that the planned investment resources of all users are consumed evenly, the planned investment resources of the users should be consumed in proportion. Therefore, the sum of all planned investment resources is calculated, and the planned investment resources corresponding to the user are divided by the sum to obtain the allocation ratio corresponding to the user. According to all the planned investment resources corresponding to multiple users, the allocation ratio corresponding to each user is accurately obtained through numerical calculation.
[0077] In some embodiments, after determining each user's actual investment resources for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, the method further includes: sending the actual investment resources to a receiver of the user corresponding to the user.
[0078] In this embodiment, different users need to share different actual input resources. The actual input resources are sent to the receivers of the corresponding users so that the users can know the actual input resources consumed in time, which is conducive to user supervision. It is also necessary to record and track the flow of resources, and update or summarize the resource flow information in real time so that the management and relevant departments can understand the current resource usage.
[0079] In some embodiments, after determining each user's actual investment resources for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, the method further includes: generating an analysis report based on the actual investment resources corresponding to each user.
[0080] In this embodiment, the actual input resources sent to the receiver of the user are regularly checked, and can be compared and analyzed with the budget resources, and an analysis report is generated according to a preset time interval or event trigger. Generate a detailed resource inflow and outflow analysis report, including historical data and trend analysis. These reports and analyses can provide decision support for the management and help optimize resource utilization strategies and budget resource allocation. Send analysis reports to relevant departments or management so that the relevant departments or management resources can be informed of resource usage and budget resource execution, so as to adjust the allocation strategy of budget resources or planned input resources in a timely manner. In addition, according to the set budget and plan, the use of resources is monitored and compared in real time. The system can set early warning rules, and when resource flow is abnormal or exceeds the set range, an alarm is issued in time or the relevant responsible personnel are notified. Support compliance checks on resource flows. Ensure that the use of resources complies with the requirements of internal corporate policies and laws and regulations to avoid violations. It is also possible to design a monitoring interface or report to display real-time data and historical records of resource flows. Collect and organize relevant data information on the allocation of human resources, material resources and intellectual property rights in scientific and technological projects, and store them in tables; the tables in the above data collection and organization module include: project team member table; human resource demand plan table; personnel schedule table; personnel resource settlement table; acquisition of material list table; material inventory management table; material consumption and expenditure record table; intellectual property registration form; intellectual property rights ownership table; intellectual property protection and management record table; acquisition of intellectual property expenditure record table. Develop a monitoring interface or data visualization tool for resource inflow and outflow to ensure that resource usage can be displayed in a timely and accurate manner. Implement data access and processing procedures to ensure the accuracy and timeliness of monitoring data.
[0081] In another embodiment provided in the present application, Figure 2 As shown, a database table is established to record the estimated input resources and intellectual property allocation of each user; all the estimated input resources of the associated project are used to calculate the allocation ratio and actual input resources using the allocation formula, such as Figure 3As shown, the actual input resources are determined by the resources included in the human service, material service and intellectual property service; manage the resource flow of each user, dynamically monitor the resource resource usage; generate a resource usage analysis report. This application designs a set of resource allocation algorithms, which realizes the accurate calculation of resource allocation based on the allocation of human, material input and intellectual property in scientific and technological projects. The present invention also realizes the real-time monitoring and management of the scientific and technological research and development investment and resource allocation of each participating unit, ensuring the clarity of the resource-using unit and the accuracy of the allocated resources. Through this application, the problems in traditional scientific and technological project management are solved, such as cumbersome management tasks, insufficient standardization of business process management, scattered data storage and insufficient ability to transform results. This application realizes regular review of resource usage, and compares and analyzes it with the budget, generates detailed financial and management reports, and provides a scientific basis for management's decision-making.
[0082] It should be noted that the method of the embodiment of the present application can be performed by a single device, such as a computer or server. The method of this embodiment can also be applied to a distributed scenario and completed by multiple devices cooperating with each other. In the case of such a distributed scenario, one of the multiple devices can only perform one or more steps in the method of the embodiment of the present application, and the multiple devices will interact with each other to complete the described method.
[0083] It should be noted that the above describes some embodiments of the present application. Other embodiments are within the scope of the appended claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the above embodiments and still achieve the desired results. In addition, the processes depicted in the accompanying drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.
[0084] Based on the same inventive concept, corresponding to any of the above-mentioned embodiments and methods, the present application also provides a consumable resource allocation device applied to a project.
[0085] refer to Figure 4 , the consumable resource allocation device applied to the project comprises:
[0086] The acquisition module 10 is configured to acquire multiple influencing factors corresponding to each service in the project, and respectively acquire planned investment resources of each user among multiple users for the project.
[0087] The first calculation module 20 is configured to calculate, for each service, the consumed resources corresponding to the service based on the multiple influencing factors.
[0088] The second calculation module 30 is configured to calculate, for each user, an allocation ratio corresponding to the user based on all planned investment resources corresponding to the multiple users.
[0089] The determination module 40 is configured to determine actual investment resources of each user for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user.
[0090] Through the above device, multiple influencing factors corresponding to each service in the project are obtained, and the planned investment resources of each user in the project are obtained respectively. For each service, the consumption resources corresponding to the service are calculated based on the multiple influencing factors, so that the calculated consumption resources are accurate. For each user, the allocation ratio corresponding to the user is calculated based on all the planned investment resources corresponding to the multiple users, ensuring that the planned investment resources of each user can be consumed evenly. Based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, the actual investment resources of each user for the project are determined, ensuring the rationality of determining the actual investment resources of each user for the project.
[0091] In some embodiments, the first calculation module 20 is further configured to: the multiple influencing factors include a first scheduled daily consumption resource corresponding to a full-time employee, a first consumption day corresponding to the full-time employee, a first scheduled additional consumption resource corresponding to the full-time employee, the total number of full-time employees, a first scheduled additional consumption resource corresponding to a temporary employee, a second consumption day corresponding to the temporary employee, a second scheduled additional consumption resource corresponding to the temporary employee, and the total number of temporary employees; the service includes a human service; based on the first scheduled daily consumption resource corresponding to the full-time employee, the first consumption day corresponding to the full-time employee, the first scheduled additional consumption resource corresponding to the full-time employee, the total number of full-time employees, the first scheduled additional consumption resource corresponding to the temporary employee, the second consumption day corresponding to the temporary employee, the second scheduled additional consumption resource corresponding to the temporary employee, and the total number of temporary employees, calculate the consumption resource corresponding to the human service: Wherein, p is the consumption resource corresponding to the human service, The first scheduled consumption day resources corresponding to full-time employee i1, is the first consumption day corresponding to full-time employee i1, is the first scheduled additional consumption resource corresponding to full-time employee i1, n1 represents the total number of full-time employees, The second scheduled consumption day resources corresponding to temporary employee j1, is the second number of days consumed by temporary employee j1, is the second predetermined additional consumed resource corresponding to the temporary employee j1, and n2 represents the total number of temporary employees.
[0092] In some embodiments, the first computing module 20 is further configured that the multiple influencing factors include resources consumed by directly acquiring new equipment, resources consumed by manufacturing new equipment, resources consumed by acquiring software, resources used by old equipment, and resources consumed by using the site, and the service includes material services; based on the resources consumed by directly acquiring new equipment, the resources consumed by manufacturing new equipment, the resources consumed by acquiring software, resources used by old equipment, and resources consumed by using the site, the consumed resources corresponding to the material service are calculated: S=S1+S2+S3+S4+S5, wherein S is the consumed resources corresponding to the material service, S1 represents the resources consumed by directly acquiring new equipment, S2 represents the resources consumed by manufacturing new equipment, S3 represents the resources consumed by acquiring software, S4 represents the resources used by old equipment, and S5 represents the resources consumed by using the site.
[0093] In some embodiments, the first calculation module 20 is further configured to: the plurality of influencing factors include application resources corresponding to the intellectual property rights, additional resources corresponding to the intellectual property rights, priority claim resources corresponding to the intellectual property rights, printing resources corresponding to the intellectual property rights, layout resources corresponding to the intellectual property rights, trial resources corresponding to the intellectual property rights, agency resources corresponding to the intellectual property rights, annual maintenance resources corresponding to the intellectual property rights, and maintenance years resources corresponding to the intellectual property rights; the service includes intellectual property services; based on the application resources corresponding to the intellectual property rights, the additional resources corresponding to the intellectual property rights, priority claim resources corresponding to the intellectual property rights, printing resources corresponding to the intellectual property rights, layout resources corresponding to the intellectual property rights, trial resources corresponding to the intellectual property rights, agency resources corresponding to the intellectual property rights, annual maintenance resources corresponding to the intellectual property rights, and maintenance years resources corresponding to the intellectual property rights, calculate the consumption resources corresponding to the intellectual property services: Wherein, k is the consumption resource corresponding to the intellectual property service, The application resource corresponding to the intellectual property of type i2. Additional resources corresponding to intellectual property of type i2, The priority claim resource corresponding to the intellectual property of type i2, The printed resource corresponding to the intellectual property of type i2, The layout resource corresponding to the intellectual property of type i2. The trial resource corresponding to the intellectual property of type i2. The proxy resource corresponding to the intellectual property of type i2. The annual maintenance resources corresponding to the intellectual property of type i2, The maintenance years resource corresponding to the intellectual property of type i2.
[0094] In some embodiments, the second calculation module 30 is further configured to calculate the sum of all planned investment resources, divide the planned investment resources corresponding to the user by the sum, and obtain the allocation ratio corresponding to the user.
[0095] In some embodiments, a sending module is also included, which is configured to send the actual invested resources to the receiver of the user corresponding to the user after determining the actual invested resources of each user for the project based on the consumed resources corresponding to all services and the allocation ratio corresponding to each user.
[0096] In some embodiments, a generation module is also included, which is configured to generate an analysis report based on the actual investment resources corresponding to each user after determining the actual investment resources of each user for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user.
[0097] For the convenience of description, the above device is described in terms of functions divided into various modules. Of course, when implementing the present application, the functions of each module can be implemented in the same or multiple software and / or hardware.
[0098] The device of the above embodiment is used to implement the corresponding method for allocating consumed resources applied to a project in any of the above embodiments, and has the beneficial effects of the corresponding method embodiment, which will not be described in detail here.
[0099] Based on the same inventive concept, corresponding to any of the above-mentioned embodiments and methods, the present application also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the program, the method for allocating consumable resources applied to a project as described in any of the above embodiments is implemented.
[0100] Figure 5 A more specific schematic diagram of the hardware structure of an electronic device provided in this embodiment is shown, and the device may include: a processor 1010, a memory 1020, an input / output interface 1030, a communication interface 1040, and a bus 1050. The processor 1010, the memory 1020, the input / output interface 1030, and the communication interface 1040 are connected to each other through the bus 1050 in the device.
[0101] The processor 1010 can be implemented by a general-purpose CPU (Central Processing Unit), a microprocessor, an application-specific integrated circuit (ASIC), or one or more integrated circuits, and is used to execute relevant programs to implement the technical solutions provided in the embodiments of this specification.
[0102] The memory 1020 may be implemented in the form of ROM (Read Only Memory), RAM (Random Access Memory), static storage device, dynamic storage device, etc. The memory 1020 may store an operating system and other application programs. When the technical solutions provided in the embodiments of this specification are implemented by software or firmware, the relevant program codes are stored in the memory 1020 and are called and executed by the processor 1010.
[0103] The input / output interface 1030 is used to connect the input / output module to realize information input and output. The input / output module can be configured in the device as a component (not shown in the figure), or it can be externally connected to the device to provide corresponding functions. The input device may include a keyboard, a mouse, a touch screen, a microphone, various sensors, etc., and the output device may include a display, a speaker, a vibrator, an indicator light, etc.
[0104] The communication interface 1040 is used to connect a communication module (not shown) to realize communication interaction between the device and other devices. The communication module can realize communication through a wired mode (such as USB, network cable, etc.) or a wireless mode (such as mobile network, WIFI, Bluetooth, etc.).
[0105] The bus 1050 includes a path that transmits information between the various components of the device (eg, the processor 1010, the memory 1020, the input / output interface 1030, and the communication interface 1040).
[0106] It should be noted that, although the above device only shows the processor 1010, the memory 1020, the input / output interface 1030, the communication interface 1040 and the bus 1050, in the specific implementation process, the device may also include other components necessary for normal operation. In addition, it can be understood by those skilled in the art that the above device may also only include the components necessary for implementing the embodiments of the present specification, and does not necessarily include all the components shown in the figure.
[0107] The electronic device of the above embodiment is used to implement the corresponding method for allocating consumed resources applied to a project in any of the above embodiments, and has the beneficial effects of the corresponding method embodiment, which will not be described in detail here.
[0108] Based on the same inventive concept, corresponding to any of the above-mentioned embodiment methods, the present application also provides a non-transitory computer-readable storage medium, wherein the non-transitory computer-readable storage medium stores computer instructions, and the computer instructions are used to enable the computer to execute the consumable resource allocation method applied to the project as described in any of the above embodiments.
[0109] The computer-readable medium of this embodiment includes permanent and non-permanent, removable and non-removable media, and information storage can be implemented by any method or technology. Information can be computer-readable instructions, data structures, modules of programs, or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, read-only compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device.
[0110] The computer instructions stored in the storage medium of the above embodiment are used to enable the computer to execute the method for allocating consumable resources applied to a project as described in any of the above embodiments, and have the beneficial effects of the corresponding method embodiments, which will not be repeated here.
[0111] Based on the same concept, corresponding to any of the above-mentioned embodiment methods, the present application also provides a computer program product, including computer program instructions. When the computer program instructions are run on a computer, the computer executes the method for allocating consumable resources applied to a project as described in any of the above embodiments, which has the beneficial effects of the corresponding method embodiments and will not be repeated here.
[0112] It should be noted that the embodiments of the present application can be further described in the following manner:
[0113] It is understandable that before using the technical solutions of each embodiment of the present disclosure, the type, scope of use, usage scenarios, etc. of the personal information involved will be informed to the user in an appropriate manner, and the user's authorization will be obtained.
[0114] For example, in response to receiving an active request from a user, a prompt message is sent to the user to clearly remind the user that the operation requested to be performed will require obtaining and using the user's personal information. Thus, the user can independently choose whether to provide personal information to software or hardware such as an electronic device, application, server, or storage medium that performs the operation of the technical solution of the present disclosure according to the prompt message.
[0115] As an optional but non-limiting implementation, in response to receiving the user's active request, the prompt information may be sent to the user in the form of a pop-up window, in which the prompt information may be presented in text form. In addition, the pop-up window may also carry a selection control for the user to choose "agree" or "disagree" to provide personal information to the electronic device.
[0116] It is understandable that the above notification and the process of obtaining user authorization are merely illustrative and do not constitute a limitation on the implementation of the present disclosure. Other methods that meet relevant laws and regulations may also be applied to the implementation of the present disclosure.
[0117] A person skilled in the art should understand that the discussion of any of the above embodiments is merely illustrative and is not intended to imply that the scope of the present application is limited to these examples. In line with the concept of the present application, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of the different aspects of the embodiments of the present application as described above, which are not provided in detail for the sake of simplicity.
[0118] In addition, to simplify the description and discussion, and in order not to make the embodiments of the present application difficult to understand, the known power supply / ground connection with the integrated circuit (IC) chip and other components may or may not be shown in the provided drawings. In addition, the device can be shown in the form of a block diagram to avoid making the embodiments of the present application difficult to understand, and this also takes into account the fact that the details of the implementation of these block diagram devices are highly dependent on the platform to be implemented in the embodiments of the present application (that is, these details should be fully within the scope of understanding of those skilled in the art). In the case of elaborating specific details (e.g., circuits) to describe exemplary embodiments of the present application, it is obvious to those skilled in the art that the embodiments of the present application can be implemented without these specific details or when these specific details are changed. Therefore, these descriptions should be considered to be illustrative rather than restrictive.
[0119] Although the present application has been described in conjunction with specific embodiments of the present application, many replacements, modifications and variations of these embodiments will be apparent to those skilled in the art from the foregoing description. For example, other memory architectures (e.g., dynamic RAM (DRAM)) may use the embodiments discussed.
[0120] The embodiments of the present application are intended to cover all such substitutions, modifications and variations that fall within the broad scope of the present application. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the embodiments of the present application should be included in the protection scope of the present application.
Claims
1. A method for allocating consumable resources applied to a project, characterized in that: The method comprises: Acquire multiple influencing factors corresponding to each service in the project, and respectively acquire planned investment resources of each user among multiple users for the project; For each service, based on the multiple influencing factors, calculate the consumption resources corresponding to the service; For each user, based on all planned investment resources corresponding to the multiple users, calculate the allocation ratio corresponding to the user; Based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, the actual investment resources of each user for the project are determined.
2. The method according to claim 1, characterized in that The multiple influencing factors include a first scheduled daily consumption resource corresponding to a full-time employee, a first consumption day corresponding to a full-time employee, a first scheduled additional consumption resource corresponding to a full-time employee, a total number of full-time employees, a first scheduled additional consumption resource corresponding to a temporary employee, a second consumption day corresponding to a temporary employee, a second scheduled additional consumption resource corresponding to a temporary employee, and a total number of temporary employees, and the service includes a human service; The calculating the consumed resources corresponding to the service based on the multiple influencing factors includes: Based on the first scheduled daily consumption resources corresponding to the full-time employee, the first number of consumption days corresponding to the full-time employee, the first scheduled additional consumption resources corresponding to the full-time employee, the total number of full-time employees, the first scheduled additional consumption resources corresponding to the temporary employee, the second number of consumption days corresponding to the temporary employee, the second scheduled additional consumption resources corresponding to the temporary employee and the total number of temporary employees, the consumption resources corresponding to the human service are calculated: Wherein, p is the consumption resource corresponding to the human service, The first scheduled consumption day resources corresponding to full-time employee i1, is the first consumption day corresponding to full-time employee i1, is the first scheduled additional consumption resource corresponding to full-time employee i1, n1 represents the total number of full-time employees, The second scheduled consumption day resources corresponding to temporary employee j1, is the second number of days consumed by temporary employee j1, is the second predetermined additional consumed resource corresponding to the temporary employee j1, and n2 represents the total number of temporary employees.
3. The method according to claim 1, characterized in that The multiple influencing factors include resources consumed by directly acquiring new equipment, resources consumed by manufacturing new equipment, resources consumed by acquiring software, resources consumed by using old equipment, and resources consumed by using a site, and the services include material services; The calculating the consumed resources corresponding to the service based on the multiple influencing factors includes: Based on the resources consumed by directly acquiring the new equipment, the resources consumed by manufacturing the new equipment, the resources consumed by acquiring the software, the resources consumed by using the old equipment, and the resources consumed by using the site, the consumed resources corresponding to the material service are calculated: S=S1+S2+S3+S4+S5, Among them, S is the consumable resources corresponding to the material service, S1 represents the resources consumed by directly acquiring new equipment, S2 represents the resources consumed by manufacturing new equipment, S3 represents the resources consumed by acquiring software, S4 represents the resources used by old equipment, and S5 represents the resources consumed by using the venue.
4. The method according to claim 1, characterized in that: The multiple influencing factors include application resources corresponding to the intellectual property rights, additional resources corresponding to the intellectual property rights, priority claim resources corresponding to the intellectual property rights, printing resources corresponding to the intellectual property rights, layout resources corresponding to the intellectual property rights, trial resources corresponding to the intellectual property rights, agency resources corresponding to the intellectual property rights, annual maintenance resources corresponding to the intellectual property rights, and maintenance years resources corresponding to the intellectual property rights, and the services include intellectual property services; The calculating the consumed resources corresponding to the service based on the multiple influencing factors includes: Based on the application resources corresponding to the intellectual property, the additional resources corresponding to the intellectual property, the priority claim resources corresponding to the intellectual property, the printing resources corresponding to the intellectual property, the layout resources corresponding to the intellectual property, the trial resources corresponding to the intellectual property, the agency resources corresponding to the intellectual property, the annual maintenance resources corresponding to the intellectual property and the maintenance years resources corresponding to the intellectual property, the consumption resources corresponding to the intellectual property service are calculated: Wherein, K is the consumption resource corresponding to the intellectual property service, The application resource corresponding to the intellectual property of type i2. Additional resources corresponding to intellectual property of type i2, The priority claim resource corresponding to the intellectual property of type i2, The printed resource corresponding to the intellectual property of type i2, The layout resource corresponding to the intellectual property of type i2. The trial resource corresponding to the intellectual property of type i2. The proxy resource corresponding to the intellectual property of type i2. The annual maintenance resources corresponding to the intellectual property of type i2, The maintenance years resource corresponding to the intellectual property of type i2.
5. The method according to claim 1, characterized in that The calculating the allocation ratios corresponding to the users based on all planned investment resources corresponding to the multiple users includes: The sum of all planned investment resources is calculated, and the planned investment resources corresponding to the user are divided by the sum to obtain the allocation ratio corresponding to the user.
6. The method according to claim 1, characterized in that After determining actual input resources of each user for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, the method further includes: The actual invested resources are sent to a receiver of a corresponding user.
7. The method according to claim 1, characterized in that After determining actual input resources of each user for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, the method further includes: Generate an analysis report based on the actual investment resources corresponding to each user.
8. A consumable resource allocation device applied to a project, characterized in that: include: An acquisition module is configured to acquire a plurality of influencing factors corresponding to each service in the project, and to respectively acquire planned investment resources of each user among a plurality of users for the project; A first calculation module is configured to calculate, for each service, the consumption resources corresponding to the service based on the multiple influencing factors; A second calculation module is configured to calculate, for each user, an allocation ratio corresponding to the user based on all planned investment resources corresponding to the multiple users; The determination module is configured to determine actual investment resources of each user for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user.
9. The device according to claim 8, characterized in that The multiple influencing factors include a first scheduled daily consumption resource corresponding to a full-time employee, a first consumption day corresponding to a full-time employee, a first scheduled additional consumption resource corresponding to a full-time employee, a total number of full-time employees, a first scheduled additional consumption resource corresponding to a temporary employee, a second consumption day corresponding to a temporary employee, a second scheduled additional consumption resource corresponding to a temporary employee, and a total number of temporary employees, and the service includes a human service; The first computing module is further configured to: Based on the first scheduled daily consumption resources corresponding to the full-time employee, the first number of consumption days corresponding to the full-time employee, the first scheduled additional consumption resources corresponding to the full-time employee, the total number of full-time employees, the first scheduled additional consumption resources corresponding to the temporary employee, the second number of consumption days corresponding to the temporary employee, the second scheduled additional consumption resources corresponding to the temporary employee and the total number of temporary employees, the consumption resources corresponding to the human service are calculated: Wherein, p is the consumption resource corresponding to the human service, The first scheduled consumption day resources corresponding to full-time employee i1, is the first consumption day corresponding to full-time employee i1, is the first scheduled additional consumption resource corresponding to full-time employee i1, n1 represents the total number of full-time employees, The second scheduled consumption day resources corresponding to temporary employee j1, is the second number of days consumed by temporary employee j1, is the second predetermined additional consumed resource corresponding to the temporary employee j1, and n2 represents the total number of temporary employees.
10. The device according to claim 8, characterized in that The multiple influencing factors include resources consumed by directly acquiring new equipment, resources consumed by manufacturing new equipment, resources consumed by acquiring software, resources consumed by using old equipment, and resources consumed by using a site, and the services include material services; The first computing module is further configured to: Based on the resources consumed by directly acquiring the new equipment, the resources consumed by manufacturing the new equipment, the resources consumed by acquiring the software, the resources consumed by using the old equipment, and the resources consumed by using the site, the consumed resources corresponding to the material service are calculated: S=S1+S2+S3+S4+S5, Among them, S is the consumable resources corresponding to the material service, S1 represents the resources consumed by directly acquiring new equipment, S2 represents the resources consumed by manufacturing new equipment, S3 represents the resources consumed by acquiring software, S4 represents the resources used by old equipment, and S5 represents the resources consumed by using the venue.
11. The device according to claim 8, characterized in that The multiple influencing factors include application resources corresponding to the intellectual property rights, additional resources corresponding to the intellectual property rights, priority claim resources corresponding to the intellectual property rights, printing resources corresponding to the intellectual property rights, layout resources corresponding to the intellectual property rights, trial resources corresponding to the intellectual property rights, agency resources corresponding to the intellectual property rights, annual maintenance resources corresponding to the intellectual property rights, and maintenance years resources corresponding to the intellectual property rights, and the services include intellectual property services; The first computing module is further configured to: Based on the application resources corresponding to the intellectual property, the additional resources corresponding to the intellectual property, the priority claim resources corresponding to the intellectual property, the printing resources corresponding to the intellectual property, the layout resources corresponding to the intellectual property, the trial resources corresponding to the intellectual property, the agency resources corresponding to the intellectual property, the annual maintenance resources corresponding to the intellectual property and the maintenance years resources corresponding to the intellectual property, the consumption resources corresponding to the intellectual property service are calculated: Wherein, K is the consumption resource corresponding to the intellectual property service, The application resource corresponding to the intellectual property of type i2. Additional resources corresponding to intellectual property of type i2, The priority claim resource corresponding to the intellectual property of type i2, The printed resource corresponding to the intellectual property of type i2, The layout resource corresponding to the intellectual property of type i2. The trial resource corresponding to the intellectual property of type i2. The proxy resource corresponding to the intellectual property of type i2. The annual maintenance resources corresponding to the intellectual property of type i2, The maintenance years resource corresponding to the intellectual property of type i2.
12. The device according to claim 8, characterized in that The second computing module is further configured to: The sum of all planned investment resources is calculated, and the planned investment resources corresponding to the user are divided by the sum to obtain the allocation ratio corresponding to the user.
13. The device according to claim 8, characterized in that After determining the actual input resources of each user for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, a sending module is further included, wherein the sending module is configured to: The actual invested resources are sent to a receiver of a corresponding user.
14. The device according to claim 8, characterized in that After determining the actual input resources of each user for the project based on the consumption resources corresponding to all services and the allocation ratio corresponding to each user, a generation module is also included, and the generation module is configured to: Generate an analysis report based on the actual investment resources corresponding to each user.
15. An electronic device comprising a memory, a processor, and a computer program stored in the memory and running on the processor, characterized in that: When the processor executes the program, the method according to any one of claims 1 to 7 is implemented.
16. A non-transitory computer-readable storage medium storing computer instructions, characterized in that: The computer instructions are used to enable a computer to execute the method according to any one of claims 1 to 7.