Power failure risk assessment method and device for main and distribution cooperation, medium and electronic equipment

By constructing and analyzing the power grid topology, identifying the risks of power outage equipment and power supply, and generating new wiring methods and load control strategies, the problem of inaccurate assessment of power outage risks in the main distribution network is solved, and more accurate risk assessment and timely response strategies are achieved, reducing power outage losses.

CN119647940APending Publication Date: 2025-03-18STATE GRID ZHEJIANG ELECTRIC POWER CO LTD JINHUA POWER SUPPLY CO +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411601721.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-11
Publication Date
2025-03-18

AI Technical Summary

Technical Problem

The existing main distribution network power outage risk assessment is not accurate enough, and it is difficult to reflect the actual operating conditions of the power grid, resulting in large workloads in power grid equipment maintenance and inability to provide response strategies in a timely manner, resulting in huge losses.

Method used

By building a power grid topology, searching for power outage equipment and scope, identifying power supply risk equipment, generating new wiring methods and supply transfer strategies, combining the main distribution network scheduling model to generate load control strategies, forming a new power grid topology, and generating current grid risk warning information.

Benefits of technology

It improves the accuracy of the risk assessment of power outages in the main distribution network, provides timely and effective response strategies, and reduces the losses caused by power outages.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119647940A_ABST
    Figure CN119647940A_ABST
Patent Text Reader

Abstract

The invention provides a power failure risk assessment method and device for main and distribution cooperation, a medium and electronic equipment, and relates to the technical field of power systems. Constructing a power grid topological structure; searching the topological structure of the power grid, and determining power failure equipment and a power failure range in the main power distribution network; carrying out topology identification according to the power grid topology structure, and obtaining equipment with a power supply risk; generating a corresponding new wiring mode according to the power failure equipment; determining an influence load corresponding to the power failure equipment according to the power failure equipment and the power failure range, and generating a transfer strategy for the influence load; generating a load control strategy according to the main distribution network dispatching model and the new wiring mode; generating a new power grid topological structure according to the new wiring mode, the transfer strategy and the load control strategy; and generating current power grid risk early warning information according to the new power grid topological structure and the equipment with the power supply risk. The accuracy of power failure risk assessment of the main distribution network is improved, and a timely and effective coping strategy is provided.
Need to check novelty before this filing date? Find Prior Art

Description

Background Art

[0002] Faced with the explosive growth of distributed renewable energy, a new type of grid main-distribution and micro-coordinated control operation platform has been proposed in the new power system to achieve main-distribution and micro-coordinated control of regional power grids, resource aggregators, distributed photovoltaics, energy storage, charging stations and micro-energy networks.

[0003] When a power outage occurs in the main distribution network, each emergency power outage will bring risks and cause losses to the power grid. In order to avoid the risk of large-scale power outages caused by faults in the main distribution network, accurate risk assessment is required for the operating main distribution network to reduce the losses caused by power outages, and at the same time, the accuracy of fault detection needs to be improved.

[0004] The existing main distribution network power outage risk assessment is not accurate enough and cannot reflect the actual operating conditions of the power grid. It will greatly increase the workload of power grid equipment maintenance and cause huge losses due to power outages. It is also impossible to provide timely and effective response strategies when a power outage occurs in the main distribution network.

[0005] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present disclosure, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field. Summary of the invention

[0006] The purpose of the present disclosure is to provide a method, device, medium and electronic equipment for main and distribution coordinated power outage risk assessment, which at least to a certain extent overcomes the problem that related technologies cannot promptly assess and respond to power outages in the main distribution network.

[0007] Other features and advantages of the present disclosure will become apparent from the following detailed description, or may be learned in part by the practice of the present disclosure.

[0008] According to one aspect of the present disclosure, a method for assessing power outage risk in a coordinated manner between a power source and a power distribution system is provided, comprising:

[0009] Constructing the grid topology;

[0010] Searching the power grid topology structure to determine the power outage equipment and power outage range in the main distribution network;

[0011] Performing topology identification based on the power grid topology structure to obtain devices with power supply risks;

[0012] Generate a corresponding new wiring mode according to the power outage equipment;

[0013] Determine the affected load corresponding to the power outage equipment according to the power outage equipment and the power outage range, and generate a power transfer strategy for the affected load;

[0014] Generate a load control strategy according to the main distribution network dispatching model and the new wiring mode;

[0015] Generate a new power grid topology according to the new wiring mode, the power transfer strategy and the load control strategy; and

[0016] Current power grid risk warning information is generated based on the new power grid topology and the equipment with power supply risks.

[0017] In one embodiment of the present disclosure, the calculating and generating a new wiring mode according to the main distribution network operation data includes:

[0018] Pre-calculating the preset wiring mode of the main distribution network for the anticipated equipment disconnection;

[0019] When a power outage occurs, determining the power outage equipment;

[0020] The corresponding new wiring mode is calculated for the power-off device based on the preset wiring mode.

[0021] In one embodiment of the present disclosure, it also includes:

[0022] Analyze the maintenance method according to the main distribution network dispatching model and the power grid section;

[0023] Evaluate the risk information of the power grid after maintenance according to the maintenance method;

[0024] The power grid risk information is pushed to the user end.

[0025] In one embodiment of the present disclosure, it also includes:

[0026] Determine the power outage situation of the user according to the power outage equipment of the main distribution network and the power outage scope;

[0027] A target user is determined according to the power outage situation of the user, and a power outage reminder is generated for the target user.

[0028] In one embodiment of the present disclosure, the step of constructing a power grid topology structure includes:

[0029] Obtaining the connection mode between internal elements and nodes in the main distribution network;

[0030] A power grid topology structure is constructed according to the connection mode between the internal elements and the nodes, wherein the connection mode is a wiring mode.

[0031] In one embodiment of the present disclosure, the power outage scope includes power plants, transformers, lines, line sections and users.

[0032] In one embodiment of the present disclosure, the power transfer strategy includes a power transfer path and a power transfer capacity.

[0033] According to another aspect of the present disclosure, a main power distribution coordinated power outage risk assessment device is provided, comprising:

[0034] Building blocks for building power grid topology;

[0035] A search module, used to search the power grid topology structure to determine the power outage equipment and power outage range in the main distribution network;

[0036] An identification module, used to perform topology identification according to the power grid topology structure and obtain devices with power supply risks;

[0037] A wiring generation module, used to generate a corresponding new wiring mode according to the power outage equipment;

[0038] A first strategy generating module is used to determine the affected load corresponding to the power outage equipment according to the power outage equipment and the power outage range, and generate a power transfer strategy for the affected load;

[0039] A second strategy generation module is used to generate a load control strategy according to the main distribution network dispatching model and the new wiring mode;

[0040] a structure generation module, configured to generate a new power grid topology according to the new wiring mode, the power transfer strategy and the load control strategy; and

[0041] The warning generation module is used to generate current power grid risk warning information based on the new power grid topology and the equipment with power supply risks.

[0042] According to another aspect of the present disclosure, there is provided an electronic device, characterized in that it includes:

[0043] Processor; and

[0044] A memory, configured to store executable instructions of the processor;

[0045] Wherein, the processor is configured to execute any one of the above-mentioned main-distribution coordinated power outage risk assessment methods by executing the executable instructions.

[0046] According to another aspect of the present disclosure, a computer-readable storage medium is provided, on which a computer program is stored, characterized in that when the computer program is executed by a processor, any one of the above-mentioned methods for assessing power outage risks in coordination between the main and distribution systems is implemented.

[0047] The embodiment of the present disclosure provides a method for assessing power outage risk of main distribution network collaboration, including: constructing a power grid topology structure; searching the power grid topology structure to determine the power outage equipment and the power outage range in the main distribution network; performing topological identification according to the power grid topology structure to obtain equipment with power supply risk; generating a corresponding new wiring mode according to the power outage equipment; determining the impact load corresponding to the power outage equipment according to the power outage equipment and the power outage range, and generating a transfer strategy for the impact load; generating a load control strategy according to the main distribution network dispatching model and the new wiring mode; generating a new power grid topology structure according to the new wiring mode, the transfer strategy and the load control strategy; generating current power grid risk warning information according to the new power grid topology structure and the equipment with power supply risk. Based on the topological structure of the power grid, analyze the equipment with power supply risk in the power grid caused by the power outage, then calculate the new wiring mode, and make corresponding load transfer strategy and load control strategy, and analyze and evaluate the new power grid topology structure generated by the above-mentioned new adjustment strategy to generate the final current power grid risk warning information. Improve the accuracy of the main distribution network power outage risk assessment, and provide timely and effective response strategies when a power outage occurs in the main distribution network to avoid huge losses caused by power outages.

[0048] It is to be understood that the foregoing general description and the following detailed description are exemplary and explanatory only and are not restrictive of the present disclosure. BRIEF DESCRIPTION OF THE DRAWINGS

[0049] The accompanying drawings herein are incorporated into the specification and constitute a part of the specification, illustrate embodiments consistent with the present disclosure, and together with the specification are used to explain the principles of the present disclosure. Obviously, the accompanying drawings described below are only some embodiments of the present disclosure, and for ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without creative work.

[0050] Figure 1 A schematic diagram of a method for assessing power outage risk in a main-distribution coordinated manner according to an embodiment of the present disclosure is shown;

[0051] Figure 2 A schematic diagram of another method for assessing power outage risk in coordination between a main power source and a power distribution source in an embodiment of the present disclosure is shown;

[0052] Figure 3 A schematic diagram of a power outage risk assessment device for main and distribution coordination in an embodiment of the present disclosure is shown; and

[0053] Figure 4 A structural block diagram of a computer device in an embodiment of the present disclosure is shown. DETAILED DESCRIPTION

[0054] Example embodiments will now be described more fully with reference to the accompanying drawings. However, example embodiments can be implemented in a variety of forms and should not be construed as limited to the examples set forth herein; rather, these embodiments are provided so that the disclosure will be more comprehensive and complete and to fully convey the concepts of the example embodiments to those skilled in the art. The described features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.

[0055] In addition, the accompanying drawings are only schematic illustrations of the present disclosure and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and their repeated description will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities and do not necessarily correspond to physically or logically independent entities. These functional entities can be implemented in software form, or implemented in one or more hardware modules or integrated circuits, or implemented in different networks and / or processor devices and / or microcontroller devices.

[0056] Reference Figure 1 As shown, in one embodiment of the present disclosure, a method for assessing power outage risk of a main power distribution system is provided, comprising:

[0057] S101, constructing a power grid topology structure;

[0058] The grid topology is constructed in advance for the main distribution network. The generated grid topology can be used to identify the topology of the power system, that is, to identify the connection relationship between the nodes in the power system and establish a topological structure model of the power system. The network structure of the power system can be accurately understood, including the substations, feeders, distribution lines and other components on the high-voltage and low-voltage sides, thereby providing basic data for the automated operation and management of the power system.

[0059] In a specific example, step S101 includes:

[0060] Obtaining the connection mode between internal elements and nodes in the main distribution network;

[0061] Among them, the internal components and node connection methods can belong to the distribution network or the main grid.

[0062] A power grid topology structure is constructed according to the connection mode between the internal elements and the nodes, wherein the connection mode is a wiring mode.

[0063] Specifically, the constructed power grid topology structure can be used to make timely judgments when a power outage risk occurs.

[0064] S102, searching the power grid topology structure to determine the power outage equipment and power outage range in the main distribution network;

[0065] Specifically, the power outage scope includes power plants, transformers, lines, line sections and users, etc. This allows statistics on the loss of load when a power outage occurs, and can also be used for power outage scope inspection before operation, maintenance planning and after a fault occurs.

[0066] S103, performing topology identification according to the power grid topology structure to obtain devices with power supply risks;

[0067] Specifically, the generated power grid topology structure can be used to identify the topology of the power system, that is, to identify the connection relationship between each node in the power system and establish a topological structure model of the power system. The network structure of the power system can be accurately understood, including various components such as substations, feeders, and distribution lines on the high-voltage and low-voltage sides, thereby providing basic data for the automated operation and management of the power system. According to the real-time topology of the power grid, the special operation mode of the power grid, including the main network and distribution network equipment, is identified, and the plants and equipment with power supply risks are automatically analyzed and checked to realize the operation risk monitoring of the main distribution network.

[0068] S104, generating a corresponding new wiring mode according to the power outage device;

[0069] Reference Figure 2 As shown, in a specific example, S201, pre-calculate the preset wiring mode of the main distribution network when the expected device is disconnected;

[0070] The calculation method for the main distribution network wiring method under the expected equipment disconnection can be determined in advance.

[0071] S202, when a power outage occurs, determining the power outage device;

[0072] After a power outage occurs, the wiring method of the power grid can be automatically triggered and calculated to generate a new wiring method reminder after the power outage device is identified.

[0073] S203: Calculate the corresponding new wiring mode for the power-off device based on the preset wiring mode.

[0074] After the automatic calculation equipment is powered off, the wiring mode of the power grid can automatically trigger the calculation. Among them, the new wiring mode can also include a weak wiring mode. Optionally, the calculation of the weak wiring mode of the main distribution network under the expected equipment disconnection can be automatically calculated. After the equipment is powered off, the wiring mode of the power grid can automatically trigger the calculation and generate a new weak wiring mode reminder.

[0075] S105, determining the affected load corresponding to the power outage equipment according to the power outage equipment and the power outage range, and generating a power transfer strategy for the affected load;

[0076] Among them, the transfer strategy includes the transfer path, transfer capacity, etc. When a power outage occurs in the main and distribution networks, the affected loads are analyzed according to the target equipment, and the affected loads are safely transferred to the new power source. A load transfer operation plan including the transfer path and transfer capacity is proposed to reduce the impact on the power outage area and users.

[0077] S106, generating a load control strategy according to the main distribution network dispatching model and the new wiring mode;

[0078] Among them, the main distribution network dispatching model can be determined according to the grid topology corresponding to the main network and the distribution network. Combined with the main distribution network dispatching model, when a power outage occurs in the power grid, multiple load supply area adjustment strategies will be generated according to the new wiring method, provided to the dispatcher process for selection, and the optimal path can be finally determined to reduce the impact of the power outage area and users, and help the power grid restore power supply.

[0079] S107, generating a new power grid topology according to the new wiring mode, the power transfer strategy and the load control strategy; and

[0080] Specifically, when a power outage occurs in the power grid, a corresponding new power grid topology is generated based on the new adjustment strategy. The system will automatically calculate the execution risk of the existing maintenance method under the new connection method based on the new equipment topology connection method, and remind the dispatcher to take precautions.

[0081] S108, generating current power grid risk warning information according to the new power grid topology and the equipment with power supply risk.

[0082] Specifically, the connection relationship between the current nodes can be evaluated according to the current new power grid topology, and early warning reminders of the current power grid risk warning information can be generated for devices with power supply risks, so as to promptly remind users and managers.

[0083] In this embodiment, the devices in the power grid that are at risk of power supply due to the power outage are analyzed based on the topological structure of the power grid, and then a new wiring mode is calculated, and corresponding load transfer strategy and load control strategy are made to help restore power supply faster. The new power grid topology generated by the new adjustment strategy is analyzed and evaluated to generate the final current power grid risk warning information.

[0084] In a specific example, it also includes:

[0085] Analyze the maintenance method according to the main distribution network dispatching model and the power grid section;

[0086] Evaluate the risk information of the power grid after maintenance according to the maintenance method;

[0087] Specifically, the grid risk after the maintenance operation is performed is evaluated, and grid risk information is obtained, such as automatically publishing or pushing analysis result information such as power outage users, power outage operations, risky equipment, and risk warning notices.

[0088] The power grid risk information is pushed to the user end.

[0089] The maintenance assessment structure can then be pushed to the user end in a timely manner. For temporary maintenance, it supports the control personnel to manually set the maintenance equipment, automatically analyze the post-maintenance method to adjust the suggestions and evaluate the grid risk level and risk prevention measures, so as to realize automatic adjustment and evaluation of the maintenance method.

[0090] In a specific example, it also includes:

[0091] Determine the power outage situation of the user according to the power outage equipment of the main distribution network and the power outage scope;

[0092] After obtaining the power outage equipment and power outage range of the main distribution network, the calculation of power outage for important users under the expected equipment disconnection of the main distribution network can automatically trigger the possibility of power outage for important users after the equipment is powered off, that is, the power outage situation of the above-mentioned users.

[0093] A target user is determined according to the power outage situation of the user, and a power outage reminder is generated for the target user.

[0094] Specifically, when an important user in the main distribution network is at risk of power outage, an alarm can be generated to remind the user in a variety of ways, such as text messages, phone calls, etc., to avoid losses caused by power outages.

[0095] Reference Figure 3 As shown, in another embodiment of the present disclosure, a main-distribution coordinated power outage risk assessment device is provided, comprising:

[0096] A construction module 301 is used to construct a power grid topology structure;

[0097] A search module 302 is used to search the power grid topology structure to determine the power outage equipment and power outage range in the main distribution network;

[0098] An identification module 303 is used to perform topology identification according to the power grid topology structure and obtain devices with power supply risks;

[0099] A wiring generation module 304 is used to generate a corresponding new wiring mode according to the power outage equipment;

[0100] A first strategy generating module 305 is used to determine the affected load corresponding to the power outage device according to the power outage device and the power outage range, and generate a power transfer strategy for the affected load;

[0101] A second strategy generating module 306, configured to generate a load control strategy according to the main distribution network dispatching model and the new wiring mode;

[0102] A structure generation module 307, configured to generate a new power grid topology according to the new wiring mode, the power transfer strategy and the load control strategy; and

[0103] The warning generation module 308 is used to generate current power grid risk warning information according to the new power grid topology and the equipment with power supply risk.

[0104] The main and distribution coordinated power outage risk assessment device in this embodiment analyzes the equipment with power supply risks in the power grid caused by the power outage based on the topological structure of the power grid, and then calculates the new wiring mode, and makes corresponding load transfer strategy and load control strategy. It also analyzes and evaluates the new power grid topology structure generated by the above-mentioned new adjustment strategy, and generates the final current power grid risk warning information.

[0105] In yet another embodiment of the present disclosure, an electronic device is provided, comprising:

[0106] Processor; and

[0107] A memory, configured to store executable instructions of the processor;

[0108] Wherein, the processor is configured to execute any one of the above-mentioned main-distribution coordinated power outage risk assessment methods by executing the executable instructions.

[0109] It will be appreciated by those skilled in the art that various aspects of the present invention may be implemented as a system, method or program product. Therefore, various aspects of the present invention may be specifically implemented in the following forms, namely: a complete hardware implementation, a complete software implementation (including firmware, microcode, etc.), or a combination of hardware and software, which may be collectively referred to herein as a "circuit", "module" or "system".

[0110] Refer to the following Figure 4 An electronic device 400 according to this embodiment of the present invention will be described. Figure 4 The electronic device 400 shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present invention.

[0111] like Figure 4 As shown, the electronic device 400 is in the form of a general computing device. The components of the electronic device 400 may include but are not limited to: at least one processing unit 410, at least one storage unit 420, and a bus 430 connecting different system components (including the storage unit 420 and the processing unit 410).

[0112] The storage unit stores program codes, which can be executed by the processing unit 410, so that the processing unit 410 performs the steps according to various exemplary embodiments of the present invention described in the above “Exemplary Method” section of this specification. For example, the processing unit 410 can perform the following steps: Figure 1 The power outage risk assessment method for main and distribution coordination shown in .

[0113] The storage unit 420 may include a readable medium in the form of a volatile storage unit, such as a random access storage unit (RAM) 4201 and / or a cache storage unit 4202 , and may further include a read-only storage unit (ROM) 4203 .

[0114] The storage unit 420 may also include a program / utility 4204 having a set (at least one) of program modules 4205, such program modules 4205 including but not limited to: an operating system, one or more application programs, other program modules, and program data, each of which or some combination may include an implementation of a network environment.

[0115] Bus 430 may represent one or more of several types of bus structures, including a memory unit bus or memory unit controller, a peripheral bus, an accelerated graphics port, a processing unit, or a local bus using any of a variety of bus architectures.

[0116] The electronic device 400 may also communicate with one or more external devices 700 (e.g., keyboards, pointing devices, Bluetooth devices, etc.), may also communicate with one or more devices that enable a user to interact with the electronic device 400, and / or communicate with any device that enables the electronic device 400 to communicate with one or more other computing devices (e.g., routers, modems, etc.). Such communication may be performed via an input / output (I / O) interface 450. Furthermore, the electronic device 400 may also communicate with one or more networks (e.g., local area networks (LANs), wide area networks (WANs), and / or public networks, such as the Internet) via a network adapter 460. As shown, the network adapter 460 communicates with other modules of the electronic device 400 via a bus 430. It should be understood that, although not shown in the figure, other hardware and / or software modules may be used in conjunction with the electronic device 400, including but not limited to: microcode, device drivers, redundant processing units, external disk drive arrays, RAID systems, tape drives, and data backup storage systems, etc.

[0117] Through the description of the above implementation, it is easy for those skilled in the art to understand that the example implementation described here can be implemented by software, or by software combined with necessary hardware. Therefore, the technical solution according to the implementation of the present disclosure can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, including several instructions to enable a computing device (which can be a personal computer, a server, a terminal device, or a network device, etc.) to execute the method according to the implementation of the present disclosure.

[0118] In another embodiment of the present disclosure, a computer-readable storage medium is provided, on which a computer program is stored, characterized in that when the computer program is executed by a processor, any one of the above-mentioned main-distribution coordinated power outage risk assessment methods is implemented.

[0119] In an exemplary embodiment of the present disclosure, a computer-readable storage medium is also provided, on which a program product capable of implementing the above method of the present specification is stored. In some possible implementations, various aspects of the present invention can also be implemented in the form of a program product, which includes a program code, and when the program product is run on a terminal device, the program code is used to enable the terminal device to execute the steps according to various exemplary embodiments of the present invention described in the above "Exemplary Method" section of the present specification.

[0120] A program product for implementing the above method according to an embodiment of the present invention is described, which can adopt a portable compact disk read-only memory (CD-ROM) and include program code, and can be run on a terminal device, such as a personal computer. However, the program product of the present invention is not limited thereto, and in this document, a readable storage medium can be any tangible medium containing or storing a program, which can be used by or in combination with an instruction execution system, an apparatus or a device.

[0121] The program product may use any combination of one or more readable media. The readable medium may be a readable signal medium or a readable storage medium. The readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples (non-exhaustive list) of readable storage media include: an electrical connection with one or more wires, a portable disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above.

[0122] Computer readable signal media may include data signals propagated in baseband or as part of a carrier wave, in which readable program code is carried. Such propagated data signals may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. Readable signal media may also be any readable medium other than a readable storage medium, which may send, propagate, or transmit a program for use by or in conjunction with an instruction execution system, apparatus, or device.

[0123] The program code embodied on the readable medium may be transmitted using any appropriate medium, including but not limited to wireless, wired, optical cable, RF, etc., or any suitable combination of the foregoing.

[0124] Program code for performing the operations of the present invention may be written in any combination of one or more programming languages, including object-oriented programming languages ​​such as Java, C++, etc., and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user computing device, partially on the user device, as a separate software package, partially on the user computing device and partially on a remote computing device, or entirely on a remote computing device or server. In cases involving a remote computing device, the remote computing device may be connected to the user computing device through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computing device (e.g., through the Internet using an Internet service provider).

[0125] It should be noted that, although several modules or units of the device for action execution are mentioned in the above detailed description, this division is not mandatory. In fact, according to the embodiments of the present disclosure, the features and functions of two or more modules or units described above can be embodied in one module or unit. On the contrary, the features and functions of one module or unit described above can be further divided into multiple modules or units to be embodied.

[0126] In addition, although the steps of the method in the present disclosure are described in a specific order in the drawings, this does not require or imply that the steps must be performed in this specific order, or that all the steps shown must be performed to achieve the desired results. Additionally or alternatively, some steps may be omitted, multiple steps may be combined into one step, and / or one step may be decomposed into multiple steps, etc.

[0127] Through the description of the above implementation, it is easy for those skilled in the art to understand that the example implementation described here can be implemented by software, or by software combined with necessary hardware. Therefore, the technical solution according to the implementation of the present disclosure can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a USB flash drive, a mobile hard disk, etc.) or on a network, including several instructions to enable a computing device (which can be a personal computer, a server, a mobile terminal, or a network device, etc.) to execute the method according to the implementation of the present disclosure.

[0128] Those skilled in the art will readily appreciate other embodiments of the present disclosure after considering the specification and practicing the invention disclosed herein. This application is intended to cover any modification, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary techniques in the art that are not disclosed in the present disclosure. The specification and examples are intended to be exemplary only, and the true scope and spirit of the present disclosure are indicated by the appended claims.

Claims

1. A method for assessing power outage risk in a coordinated manner between main and distribution power sources, characterized in that: include: Constructing the grid topology; Searching the power grid topology structure to determine the power outage equipment and power outage range in the main distribution network; Performing topology identification based on the power grid topology structure to obtain devices with power supply risks; Generate a corresponding new wiring mode according to the power outage equipment; Determine the affected load corresponding to the power outage equipment according to the power outage equipment and the power outage range, and generate a power transfer strategy for the affected load; Generate a load control strategy according to the main distribution network dispatching model and the new wiring mode; Generate a new power grid topology according to the new wiring mode, the power transfer strategy and the load control strategy; as well as Current power grid risk warning information is generated based on the new power grid topology and the equipment with power supply risks.

2. The method for assessing power outage risk of main and distribution coordination according to claim 1 is characterized in that: The calculating and generating a new wiring mode according to the main distribution network operation data comprises: Pre-calculating the preset wiring mode of the main distribution network for the anticipated equipment disconnection; When a power outage occurs, determining the power outage equipment; The corresponding new wiring mode is calculated for the power-off device based on the preset wiring mode.

3. The method for assessing power outage risk of main and distribution coordination according to claim 1 is characterized in that: Also includes: Analyze the maintenance method according to the main distribution network dispatching model and the power grid section; Evaluate the risk information of the power grid after maintenance according to the maintenance method; The power grid risk information is pushed to the user end.

4. The method for assessing power outage risk of main and distribution coordination according to claim 1 is characterized in that: Also includes: Determine the power outage situation of the user according to the power outage equipment of the main distribution network and the power outage scope; A target user is determined according to the power outage situation of the user, and a power outage reminder is generated for the target user.

5. The method for assessing power outage risk of main and distribution coordination according to claim 1 is characterized in that: The step of constructing a power grid topology structure includes: Obtaining the connection mode between internal elements and nodes in the main distribution network; A power grid topology structure is constructed according to the connection mode between the internal elements and the nodes, wherein the connection mode is a wiring mode.

6. The method for assessing power outage risk of main and distribution coordination according to claim 1 is characterized in that: The power outage scope includes power plants, transformers, lines, line sections and users.

7. The method for assessing power outage risk of main and distribution coordination according to claim 1 is characterized in that: The power transfer strategy includes a power transfer path and a power transfer capacity.

8. A power outage risk assessment device for main and distribution coordination, characterized in that: include: Building blocks for building power grid topology; A search module, used to search the power grid topology structure to determine the power outage equipment and power outage range in the main distribution network; An identification module, used to perform topology identification according to the power grid topology structure and obtain devices with power supply risks; A wiring generation module, used to generate a corresponding new wiring mode according to the power outage equipment; A first strategy generating module is used to determine the affected load corresponding to the power outage equipment according to the power outage equipment and the power outage range, and generate a power transfer strategy for the affected load; A second strategy generation module is used to generate a load control strategy according to the main distribution network dispatching model and the new wiring mode; A structure generation module, used to generate a new power grid topology according to the new wiring mode, the power transfer strategy and the load control strategy; as well as The warning generation module is used to generate current power grid risk warning information based on the new power grid topology and the equipment with power supply risks.

9. An electronic device, characterized in that: include: processor; as well as A memory, configured to store executable instructions of the processor; Wherein, the processor is configured to execute the main-distribution coordinated power outage risk assessment method as described in any one of claims 1 to 7 by executing the executable instructions.

10. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the method for assessing power outage risk of the main power distribution coordination as described in any one of claims 1 to 7 is implemented.