Double-column structure based on prefabricated cup foundation and construction method of double-column structure
By setting partitions in the prefabricated cup mouth foundation and using temporary support and distance adjustment pads, the problem that prefabricated columns in ultra-long prefabricated buildings cannot effectively match the prefabricated cup mouth foundation is solved, and the controllability of the spacing between the double prefabricated columns and the optimization of building functions is achieved.
Patent Information
- Application Number
- CN202510201202.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-24
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2045-02-24
AI Technical Summary
In ultra-long prefabricated buildings, prefabricated columns cannot effectively match the prefabricated cup mouth foundation at the structural joints, resulting in too large spacing between the double prefabricated columns, affecting the building function.
A double column structure based on prefabricated cup mouth foundation is designed. By providing a partition in the prefabricated cup mouth foundation, the channel is divided into a first channel and a second channel, the verticality and spacing of the prefabricated column are adjusted using temporary support and the spacing pad, and the prefabricated column is fixed by high-strength grouting material.
The double prefabricated columns share a prefabricated cup mouth foundation, ensuring the controllability of the spacing between the double prefabricated columns, suitable for ultra-long buildings, and solving the problem of excessive spacing during the installation of prefabricated columns.