Simulation structure and simulation manufacturing method for road void disease
By breaking the target evacuation area in the road structure and laying the evacuation fill layer and control joints, and using solvent to dissolve the filling layer to simulate the road evacuation disease, the problem of unreliable simulation results in the prior art is solved, and a more accurate and efficient evacuation disease simulation and road bearing capacity evaluation are achieved.
Patent Information
- Application Number
- CN202411662739.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-20
- Publication Date
- 2025-03-21
- Estimated Expiration
- 2044-11-20
AI Technical Summary
In the prior art, the simulation method for road de-empty diseases has the problem of unreliable simulation results, and it is difficult to truly reduce physical and mechanical parameters and initial stress fields in numerical simulations. The scale reduction model test has the problem of dynamic similarity criteria and large measurement errors.
By laying the lower structure layer, the middle structure layer and the upper structure layer, and laying the evacuation filling layer and the control joint after the target evacuation area is broken, the control joint is connected to the water supply pipe, and the solvent is introduced into the evacuation filling layer and dissolve its material, thereby forming a evacuation disease in the target evacuation area, simulating the evacuation disease phenomenon of the actual road.
It realizes more accurate simulation of air-removing diseases, shortens the air-removing molding time, can put pressure on air-removing diseases of varying degrees, evaluates road load-bearing capacity, improves road load-bearing capacity evaluation system, optimizes maintenance resources and fund allocation, improves maintenance efficiency and quality, and extends road life.