Novel precast concrete frame column and mounting method thereof
By designing an adjustable support mechanism and a vibrator shake mechanism in the precast concrete frame column, the problem of the inability to adjust the support structure in the prior art is solved, and construction safety and concrete quality are improved.
Patent Information
- Application Number
- CN202510192905.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-21
- Publication Date
- 2025-03-25
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing precast concrete frame columns lack flexible adjustments in the pouring process, resulting in low construction efficiency and poor safety, especially in high-rise buildings or special structure construction.
A new type of precast concrete frame column and its installation method are designed, using a support mechanism including connecting components, fixing components and shrinking components. It can be adjusted accurately according to different heights of the frame column, and the concrete is vibrated by the vibrating rod in the shaking mechanism to eliminate air bubbles.
Through the design of the support mechanism, the stability of the frame columns during the pouring process is ensured, and the construction safety and efficiency are improved; the shaking mechanism effectively improves the density and uniformity of the concrete and optimizes the quality of the concrete.
Smart Images

Figure CN119686491A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of prefabricated assembled concrete structures, and in particular to a novel prefabricated concrete frame column and an installation method thereof. Background Art
[0002] With the advancement of the construction industrialization process, prefabricated construction technology has gradually emerged and has been widely used. Prefabricated buildings are produced in a standardized manner in factories and transported to the construction site for assembly, which greatly improves construction efficiency and quality controllability.
[0003] After searching, the Chinese patent number CN212271212U discloses that the utility model discloses a precast concrete frame column, which belongs to the technical field of precast assembled concrete structures. The frame column includes an upper frame column and a lower frame column of the same structure, and a beam and a floor slab are arranged at the top of the lower frame column. The upper frame column is provided with embedded longitudinal steel bars inside, and at least one supporting leg is embedded at the bottom of the upper frame column, and a gasket is arranged between the supporting leg and the lower frame column. The longitudinal steel bars of the upper frame column and the longitudinal steel bars of the lower frame column are connected by an extrusion sleeve, and a post-cast section is reserved between the upper frame column and the lower frame column, and dense steel bars are arranged inside the post-cast section. The utility model adopts the precast concrete frame column of the above structure, which can solve the problems of laborious installation, high cost and difficult detection of the existing precast concrete frame column structure.
[0004] However, in the existing prefabricated and assembled concrete structure, when concrete is injected into the frame columns, it is necessary to effectively support the frame columns to ensure their stability and safety during the pouring process. The above-mentioned support method adopts a simple fixed bracket or a temporary support structure. These support methods are not only cumbersome and time-consuming to install, but also difficult to flexibly adjust according to the actual height of the frame columns, thereby affecting the construction efficiency and support effect. Especially in the construction of high-rise buildings or special structures, the height and shape of the frame columns often vary, and the requirements for the support structure are also more stringent. Traditional fixed brackets or temporary support structures are often difficult to meet these diverse needs, which can easily lead to safety problems such as tilting, deformation and even collapse of the frame columns during the pouring process. Based on this, the present invention designs a new prefabricated concrete frame column and an installation method thereof to solve the above problems. Summary of the invention
[0005] 1. Technical issues to be resolved In view of the above-mentioned shortcomings and deficiencies of the prior art, the present invention provides a novel precast concrete frame column and an installation method thereof, which solves the technical problem that the supporting structure cannot be adjusted.
[0006] (II) Technical solution In order to achieve the above object, the main technical solutions adopted by the present invention include: A new type of prefabricated concrete frame column, comprising: The frame column as a whole, wherein longitudinal steel bars are installed inside the frame column as a whole, and dense steel bars are installed on the outer ring of the longitudinal steel bars.
[0007] A supporting mechanism, wherein the supporting mechanism is located outside the overall frame column and supports the overall frame column, and the supporting mechanism includes a connecting component, a fixing component and a contraction component. The connecting component is located outside the overall frame column and supports the overall frame column, the fixing component is located outside the overall frame column and is used to connect the connecting component to the overall frame column, and the contraction component is located inside the connecting component and can adjust the length of the connecting component and support the overall frame column at different heights.
[0008] The shaking mechanism is located at the top of the frame column as a whole and shakes the concrete inside the frame column as a whole and reduces the bubbles inside the concrete.
[0009] Preferably, the connecting assembly includes a support plate installed on the outer side of the frame column as a whole, an adjusting rod is hinged on one side of the support plate, a fixing rod is installed on the outer ring of the adjusting rod, a fixing plate is installed on the bottom of the fixing rod, the support plates are arranged in four groups and distributed in a circular array, and the adjusting rods and the fixing rods are both arranged in four groups and distributed in a circular array.
[0010] Preferably, the fixing assembly includes a connecting strip plate installed on the outer side of the frame column as a whole, and connecting screw holes are provided in the inner cavities of the connecting strip plate and the support plate, and connecting screws are threadedly connected in the inner cavities of the connecting screw holes, and connecting nuts are installed on the outer rings of the connecting screws. The connecting screw holes are provided in multiple groups and are distributed linearly, and fixing screw holes are provided in the inner cavity of the fixing plate, and fixing screws are threadedly connected in the inner cavities of the fixing screw holes.
[0011] Preferably, the contraction assembly includes contraction screw holes in the inner cavities of the adjusting rod and the fixing rod, a contraction screw is threadedly connected in the inner cavity of the contraction screw hole, a contraction nut is threadedly connected to the outer ring of the contraction screw, and the contraction screw holes are arranged in multiple groups and are horizontally distributed.
[0012] Preferably, the shaking mechanism includes a vibrating rod installed between the longitudinal steel bars, a connecting plate is installed on the top of the vibrating rod, a working plate is installed on the top of the connecting plate, working screw holes are opened in the inner cavities of the working plate and the connecting plate, a working screw is threadedly connected in the inner cavity of the working screw hole, and a support column is installed at the bottom of the working plate.
[0013] Preferably, a mounting plate is installed at the bottom of the frame column as a whole, a mounting screw hole is opened in the inner cavity of the mounting plate, a mounting screw rod is threadedly connected in the inner cavity of the mounting screw hole, and the mounting screw hole and the mounting screw rod are arranged in four groups and distributed in a rectangular array.
[0014] Preferably, a novel method for installing a precast concrete frame column is provided, the method comprising the following steps: Step S1, prefabricate the frame column as a whole, ensure that its size, strength and reinforcement arrangement meet the design requirements, determine the installation position of the frame column according to the design drawings at the construction site, and pre-embed the foundation embedded parts.
[0015] Step S2, assemble the support mechanism, adjust the retractable assembly according to the height of the frame column, ensure that the support plate fits tightly against the outer side of the frame column, and use the fixing assembly to firmly connect the support mechanism and the frame column as a whole to ensure stable support.
[0016] Step S3, use lifting equipment to hoist the frame column as a whole to the predetermined position, slowly lower it to the foundation embedded parts, adjust the verticality and horizontality of the frame column, and after meeting the design requirements, use the mounting plate and mounting screws to firmly connect the frame column to the foundation structure.
[0017] Step S4, start the vibrating rod in the shaking mechanism to vibrate and compact the concrete inside the frame column until the bubbles inside the concrete are basically eliminated. After the concrete reaches the designed strength, remove the supporting mechanism and complete the installation of the frame column.
[0018] Preferably, the step S2 further comprises the following steps: Step S2.1, support mechanism assembly: Assemble the support plate, adjustment rod, fixing rod and fixing plate components according to the design drawings to ensure that the connection between the components is firm and reliable.
[0019] Step S2.2, height adjustment: According to the actual height of the frame column as a whole, adjust the shrinkage screw and shrinkage nut in the shrinkage assembly to make the support plate fit tightly against the outer side of the frame column as a whole. During the adjustment process, ensure the stability and balance of the support mechanism.
[0020] Step S2.3, fixed connection: Use the connecting screws and connecting nuts in the fixing assembly to firmly connect the support mechanism and the frame column as a whole. During the connection process, the matching accuracy of the connecting screw holes and the connecting screws should be ensured to avoid looseness or misalignment.
[0021] The step S3 further comprises the following steps: Step S3.1, preparation for lifting: Select appropriate lifting equipment to ensure that the lifting capacity meets the overall weight requirements of the frame column, and prepare wire ropes, lifting equipment and safety protection measures for lifting.
[0022] Step S3.2, lifting operation: connect the hook of the lifting equipment to the lifting point on the top of the frame column, and slowly lift the frame column to a predetermined height. During the lifting process, ensure the stability and safety of the lifting equipment to avoid tilting or collision of the frame column.
[0023] Step S3.3, position adjustment: slowly lower the frame column as a whole onto the foundation embedded parts, and use a level and plumb meter to adjust the verticality and horizontality of the frame column as a whole. During the adjustment process, ensure that the frame column as a whole fits tightly with the foundation embedded parts to avoid gaps or misalignment.
[0024] Step S3.4, fixed connection: Use the mounting plate and mounting screws to firmly connect the frame column as a whole to the foundation structure. During the connection process, ensure the matching accuracy of the mounting screw holes and the mounting screws to avoid looseness or misalignment. At the same time, check the tightness and stability of the connection parts.
[0025] Preferably, the frame column is made entirely of high-strength, low-shrinkage C60 precast concrete with a compressive strength of not less than 60 MPa to meet the bearing capacity requirements of high-rise buildings and special structures. The longitudinal steel bars are made of HRB400 hot-rolled ribbed steel bars to ensure the longitudinal bearing capacity of the frame column. The dense steel bars are made of HRB400 hot-rolled ribbed steel bars, which are tightly wound around the outer ring of the longitudinal steel bars in a spiral shape to improve the shear resistance and seismic resistance of the frame column.
[0026] Preferably, the vibrating rod adopts a high-frequency vibrator with a frequency of 50 Hz and a power of 1.5 kW to ensure the effective removal of bubbles inside the concrete, and the connecting plate and the working plate are both made of Q235B steel plates to provide sufficient strength and stability.
[0027] (III) Beneficial effects 1. The present invention ensures the stability of the entire frame column during the pouring process through the design of the support mechanism, effectively preventing problems such as loosening of the support or tilting and deformation of the frame column caused by the concrete pouring pressure. In addition, by accurately adjusting the shrinkage component, it can ensure that the height of the support point matches the actual requirements of the entire frame column, thereby improving the safety of the overall structure.
[0028] 2. The present invention effectively removes bubbles inside the concrete through high-frequency vibration of the vibrating rod in the shaking mechanism, improves the density and uniformity of the concrete, and thus optimizes the quality of the concrete. The vibration energy of the vibrating rod has strong penetrating power, which can ensure the uniform density of various parts inside the concrete and avoid the reduction of concrete strength and durability due to bubbles.
[0029] 3. The present invention reduces the amount of wet work on site and reduces construction costs by adopting prefabricated concrete frame columns and modular support mechanisms. At the same time, the flexibility and adaptability of the support mechanism allow it to be reused in multiple projects, further reducing costs and improving economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 It is a schematic diagram of the overall structure of the novel precast concrete frame column of the present invention; Figure 2 It is an overall front view of the novel precast concrete frame column of the present invention; Figure 3 for Figure 2 A magnified image of point A; Figure 4 The overall top view of the new prefabricated concrete frame column of the present invention Figure 5 for Figure 4 A magnified view of point B; Figure 6 It is a schematic diagram of the overall structure of the frame column of the present invention; Figure 7 It is a front view of the structure of the whole frame column of the present invention; Figure 8 The present invention is a flow chart of a novel precast concrete frame column and an installation method thereof.
[0031] [Description of Reference Numerals] 1. Frame column as a whole; 2. Longitudinal reinforcement; 3. Densified reinforcement; 4. Support plate; 5. Adjustment rod; 6. Fixing rod; 7. Fixing plate; 8. Connecting strip; 9. Connecting screw hole; 10. Connecting screw; 11. Connecting nut; 12. Fixing screw hole; 13. Fixing screw; 14. Contraction screw hole; 15. Contraction screw; 16. Contraction nut; 17. Vibrating rod; 18. Connecting plate; 19. Working plate; 20. Working screw hole; 21. Working screw; 22. Support column; 23. Mounting plate; 24. Mounting screw hole; 25. Mounting screw. DETAILED DESCRIPTION
[0032] In order to better explain the present invention and facilitate understanding, the present invention is described in detail below in conjunction with the accompanying drawings through specific embodiments. Figure 1 The orientation is used as a reference.
[0033] The technical problem of the inability to adjust the supporting structure proposed in the embodiment of the present invention is solved by designing the supporting mechanism to ensure the stability of the frame column as a whole 1 during the pouring process, and effectively prevent problems such as loosening of the support or tilting and deformation of the frame column due to the pressure of concrete pouring. In addition, by accurately adjusting the shrinkage component, it can be ensured that the height of the support point matches the actual requirements of the frame column as a whole 1, thereby improving the safety of the overall structure.
[0034] In order to better understand the above technical solution, exemplary embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present invention are shown in the accompanying drawings, it should be understood that the present invention can be implemented in various forms and should not be limited by the embodiments described herein. On the contrary, these embodiments are provided to enable a clearer and more thorough understanding of the present invention and to fully convey the scope of the present invention to those skilled in the art.
[0035] Embodiment 1; See also Figure 1-Figure 8 In an embodiment of the present invention, a novel precast concrete frame column includes: a frame column as a whole 1, a longitudinal steel bar 2 is installed inside the frame column as a whole 1, and a dense steel bar 3 is installed on the outer ring of the longitudinal steel bar 2; a supporting mechanism, the supporting mechanism is located outside the frame column as a whole 1 and supports the frame column as a whole 1, the supporting mechanism includes a connecting component, a fixing component and a shrinking component, the connecting component is located outside the frame column as a whole 1 and supports the frame column as a whole 1, the fixing component is located outside the frame column as a whole 1 and is used to connect the connecting component to the frame column as a whole 1, the shrinking component is located inside the connecting component and can adjust the length of the connecting component and support the frame column as a whole 1 at different heights; a shaking mechanism, the shaking mechanism is located at the top of the frame column as a whole 1 and shakes the concrete inside the frame column as a whole 1 and reduces bubbles inside the concrete.
[0036] The connection assembly includes a support plate 4 installed on the outside of the frame column 1 as a whole, an adjustment rod 5 is hinged on one side of the support plate 4, a fixing rod 6 is installed on the outer ring of the adjustment rod 5, a fixing plate 7 is installed on the bottom of the fixing rod 6, the support plate 4 is provided with four groups and distributed in a circumferential array, and the adjustment rod 5 and the fixing rod 6 are both provided with four groups and distributed in a circumferential array. The fixing assembly includes a connecting strip plate 8 installed on the outside of the frame column 1 as a whole, the inner cavities of the connecting strip plate 8 and the support plate 4 are both provided with connecting screw holes 9, the inner cavities of the connecting screw holes 9 are threadedly connected with connecting screws 10, the outer rings of the connecting screws 10 are installed with connecting nuts 11, the connecting screw holes 9 are provided with multiple groups and are linearly distributed, the inner cavity of the fixing plate 7 is provided with fixing screw holes 12, and the inner cavities of the fixing screw holes 12 are threadedly connected with fixing screws 13. The contraction assembly includes a contraction screw hole 14 provided in the inner cavity of the adjusting rod 5 and the fixing rod 6, a contraction screw rod 15 is threadedly connected in the inner cavity of the contraction screw hole 14, and a contraction nut 16 is threadedly connected to the outer ring of the contraction screw 15. There are multiple groups of contraction screw holes 14 and they are horizontally distributed.
[0037] The working principle of the embodiment of the present invention is as follows: first, the support plate 4 is installed to the outside of the frame column 1 through the connection assembly, and the support plate 4 is distributed in a circumferential array to ensure uniform support of the frame column 1. The connection screw holes 9 on the connecting strip 8 and the corresponding connection screw holes 9 in the inner cavity of the support plate 4 are connected by using the connection screw rod 10 and the connection nut 11 for fastening connection. This design is not only convenient for installation and adjustment, but also enhances the stability of the connection.
[0038] Next, according to the height requirement of the frame column 1, the shrinkage assembly is used for precise adjustment. The shrinkage screw hole 14 is opened inside the adjustment rod 5 and the fixed rod 6. By rotating the shrinkage screw 15 and tightening the shrinkage nut 16, the effective length of the adjustment rod 5 relative to the fixed rod 6 can be changed, thereby adjusting the height of the support point. At the same time, the horizontal distribution design of multiple groups of shrinkage screw holes 14 enables reliable support at different height positions.
[0039] After adjusting to the required height, the fixing plate 7 matches the threaded hole on the preset fixing point on the outer side of the frame column 1 through the fixing screw hole 12 in the inner cavity of the fixing plate 7, and is locked using the fixing screw 13. This process ensures the stability of the support mechanism during the pouring process and prevents the support from loosening due to the pressure of concrete pouring.
[0040] Embodiment 2; See also Figure 1-Figure 8In the embodiment of the present invention, the shaking mechanism includes a vibrating rod 17 installed between the longitudinal steel bars 2, a connecting plate 18 is installed on the top of the vibrating rod 17, a working plate 19 is installed on the top of the connecting plate 18, working screw holes 20 are provided in the inner cavities of the working plate 19 and the connecting plate 18, a working screw 21 is threadedly connected in the inner cavity of the working screw hole 20, and a support column 22 is installed at the bottom of the working plate 19. A mounting plate 23 is installed at the bottom of the frame column 1, a mounting screw hole 24 is provided in the inner cavity of the mounting plate 23, a mounting screw 25 is threadedly connected in the inner cavity of the mounting screw hole 24, and four groups of mounting screw holes 24 and mounting screws 25 are arranged and distributed in a rectangular array. The vibrating rod 17 adopts a high-frequency vibrator with a frequency of 50Hz and a power of 1.5kW to ensure the effective removal of bubbles inside the concrete. The connecting plate 18 and the working plate 19 are made of Q235B steel plates to provide sufficient strength and stability.
[0041] The bottom of the frame column 1 is installed with a mounting plate 23, and the inner cavity of the mounting plate 23 is provided with a mounting screw hole 24, and the inner cavity of the mounting screw hole 24 is threadedly connected with a mounting screw rod 25, and the mounting screw hole 24 and the mounting screw rod 25 are provided with four groups and distributed in a rectangular array. The frame column 1 is made of high-strength, low-shrinkage C60 precast concrete, and its compressive strength is not less than 60MPa to meet the bearing capacity requirements of high-rise buildings and special structures. The longitudinal steel bars 2 are made of HRB400 grade hot-rolled ribbed steel bars to ensure the longitudinal bearing capacity of the frame column, and the dense steel bars 3 are made of HRB400 grade hot-rolled ribbed steel bars, which are tightly wound around the outer ring of the longitudinal steel bars 2 in a spiral shape to improve the shear resistance and seismic resistance of the frame column.
[0042] The working principle of the embodiment of the present invention is: after the concrete pouring is completed, the shaking mechanism begins to play its key role. The vibrating rod 17, as the core component of the shaking mechanism, is designed as a high-frequency vibrator with a vibration frequency of 50Hz and a power of 1.5kW. This design ensures that the vibrating rod 17 can generate sufficient vibration energy, effectively penetrate the concrete layer, and promote the rapid removal of bubbles inside the concrete, thereby improving the density and uniformity of the concrete. The vibrating rod 17 is tightly connected to the working plate 19 through the connecting plate 18. Both parts are made of Q235B steel plate. This material not only has excellent strength and toughness, but also can effectively resist the vibration stress generated during the vibration process, ensuring the stability and durability of the shaking mechanism.
[0043] After pouring is completed, the shaking mechanism is started, and the high-frequency vibration of the vibrating rod 17 is transmitted to the interior of the concrete through the connecting plate 18 and the working plate 19, thereby effectively removing bubbles; the rectangular array distribution design of the mounting screw holes 24 and the mounting screws 25 on the mounting plate 23 not only provides a stable support point, but also facilitates on-site installation and adjustment. By rotating the mounting screws 25, the horizontal and vertical positions of the frame column as a whole 1 can be accurately controlled to ensure its close connection with the foundation structure and overall stability.
[0044] Embodiment 3; See also Figure 1-Figure 8 In an embodiment of the present invention, a novel method for installing precast concrete frame columns is provided, and the method comprises the following steps: Step S1, precasting the frame column as a whole 1, ensuring that its size, strength and steel bar arrangement meet the design requirements, determining the installation position of the frame column according to the design drawings at the construction site, and pre-burying the foundation embedded parts; Step S2, assembling the support mechanism, adjusting the shrinkage assembly according to the height of the frame column, ensuring that the support plate 4 is tightly fitted with the outer side of the frame column as a whole 1, and firmly connecting the support mechanism with the frame column as a whole 1 by using the fixing assembly to ensure the stability of the support; Step S3, using the lifting equipment to hoist the frame column as a whole 1 to a predetermined position, slowly lowering it to the foundation embedded parts, adjusting the verticality and horizontality of the frame column, and after meeting the design requirements, firmly connecting the frame column with the foundation structure by using the mounting plate 23 and the mounting screw 25; Step S4, starting the vibrating rod 17 in the shaking mechanism, vibrating and compacting the concrete inside the frame column until the bubbles inside the concrete are basically eliminated, and after the concrete reaches the design strength, removing the support mechanism to complete the installation of the frame column.
[0045] Step S2 also includes the following steps: Step S2.1, support mechanism assembly: assemble the support plate 4, adjustment rod 5, fixing rod 6 and fixing plate 7 and other components according to the design drawings to ensure that the connection between the components is firm and reliable; Step S2.2, height adjustment: according to the actual height of the frame column as a whole 1, adjust the shrinkage screw 15 and the shrinkage nut 16 in the shrinkage assembly to make the support plate 4 fit tightly with the outer side of the frame column as a whole 1. During the adjustment process, the stability and balance of the support mechanism should be ensured; Step S2.3, fixed connection: use the connecting screw 10 and the connecting nut 11 in the fixing assembly to firmly connect the support mechanism to the frame column as a whole 1. During the connection process, the matching accuracy of the connecting screw hole 9 and the connecting screw 10 should be ensured to avoid loosening or misalignment.
[0046] Step S3 also includes the following steps: Step S3.1, hoisting preparation: select appropriate lifting equipment to ensure that the lifting capacity meets the weight requirement of the frame column 1 as a whole, and prepare the wire rope, lifting equipment and safety protection measures for hoisting; Step S3.2, hoisting operation: connect the hook of the lifting equipment to the hoisting point on the top of the frame column 1 as a whole, and slowly lift the frame column 1 as a whole to a predetermined height. During the hoisting process, the stability and safety of the lifting equipment should be ensured to avoid tilting or collision of the frame column 1 as a whole; Step S3.3, position adjustment: Slowly lower the frame column as a whole 1 onto the foundation embedded parts, and use the level and plumb meter to adjust the verticality and horizontality of the frame column as a whole 1. During the adjustment process, ensure that the frame column as a whole 1 fits tightly with the foundation embedded parts to avoid gaps or misalignment; Step S3.4, fixed connection: Use the mounting plate 23 and the mounting screw 25 to firmly connect the frame column as a whole 1 to the foundation structure. During the connection process, ensure the matching accuracy of the mounting screw hole 24 and the mounting screw 25 to avoid looseness or misalignment. At the same time, check the tightness and stability of the connection parts.
[0047] The working principle of the embodiment of the present invention is: in the prefabrication stage, the frame column as a whole 1 is produced strictly according to the design drawings to ensure that its size, strength and steel bar arrangement meet the engineering requirements. At the construction site, the installation position of the frame column is accurately located according to the design drawings, and the foundation embedded parts are pre-buried. The embedding of the foundation embedded parts must ensure accurate position and firm fixation, laying the foundation for the subsequent accurate installation of the frame column. The support mechanism is composed of components such as a support plate 4, an adjustment rod 5, a fixing rod 6 and a fixing plate 7. During assembly, the connection between the components must be ensured to be firm and reliable, and high-strength bolts or welding are used to ensure the overall stability of the support mechanism. In the height adjustment stage, the support plate 4 is closely fitted to the outer side of the frame column as a whole 1 by accurately rotating the contraction screw 15 and the contraction nut 16. In this process, the stability and balance of the support mechanism need to be monitored in real time to avoid tilting or shaking. When fixedly connected, the connecting screw 10 and the connecting nut 11 are used to ensure the firm connection between the support mechanism and the frame column as a whole 1. The connection screw hole 9 and the connection screw rod 10 must be matched with high precision to avoid looseness or misalignment, thereby ensuring the stability of the support mechanism during hoisting and vibration compaction.
[0048] Before lifting, it is necessary to select appropriate lifting equipment to ensure that its lifting capacity meets the weight requirements of the frame column as a whole 1. At the same time, prepare the wire rope, lifting equipment and safety protection measures for lifting to ensure the safety and stability of the lifting process. During the lifting operation, the hook of the lifting equipment is firmly connected to the lifting point at the top of the frame column as a whole 1, and the frame column is slowly lifted to the predetermined height. During the lifting process, it is necessary to monitor the stability and safety of the lifting equipment in real time to avoid tilting or collision of the frame column. After the frame column is lowered onto the foundation embedded parts, use the level and plumb meter to make precise adjustments to ensure that the verticality and horizontality of the frame column meet the design requirements. During the adjustment process, it is necessary to ensure that the frame column fits tightly with the foundation embedded parts to avoid gaps or misalignment, thereby ensuring the overall stability and bearing capacity of the frame column.
[0049] After the overall positioning of the frame column 1 is completed, the vibrating rod 17 in the shaking mechanism is started to vibrate and compact the concrete inside the frame column. The high-frequency vibration energy of the vibrating rod 17 penetrates the concrete layer, effectively removes the bubbles inside the concrete, and improves the density and uniformity of the concrete. During the vibration compaction process, the state of the concrete needs to be monitored in real time to ensure that the bubbles are basically eliminated. After the concrete reaches the designed strength, the support mechanism is removed.
[0050] In the description of the present invention, it should be understood that the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0051] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0052] In the present invention, unless otherwise clearly specified and limited, when a first feature is “on” or “below” a second feature, it may be that the first and second features are in direct contact, or that the first and second features are in indirect contact through an intermediate medium. Moreover, when a first feature is “above”, “above” or “above” a second feature, it may be that the first feature is directly above or obliquely above the second feature, or it may simply mean that the first feature is higher in level than the second feature. When a first feature is “below”, “below” or “below” a second feature, it may be that the first feature is directly below or obliquely below the second feature, or it may simply mean that the first feature is lower in level than the second feature.
[0053] In the description of this specification, the description of the terms "one embodiment", "some embodiments", "embodiment", "example", "specific example" or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, unless they are contradictory.
[0054] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may alter, modify, replace and modify the above embodiments within the scope of the present invention.
Claims
1. A new type of precast concrete frame column, characterized in that: include: A frame column as a whole (1), wherein longitudinal steel bars (2) are installed inside the frame column as a whole (1), and dense steel bars (3) are installed around the outer ring of the longitudinal steel bars (2); A support mechanism, the support mechanism is located outside the frame column as a whole (1) and supports the frame column as a whole (1), the support mechanism comprises a connecting component, a fixing component and a shrinking component, the connecting component is located outside the frame column as a whole (1) and supports the frame column as a whole (1), the fixing component is located outside the frame column as a whole (1) and is used to connect the connecting component to the frame column as a whole (1), and the shrinking component is located inside the connecting component and can adjust the length of the connecting component and support the frame column as a whole (1) at different heights; A shaking mechanism is located at the top of the frame column as a whole (1) and shakes the concrete inside the frame column as a whole (1) and reduces bubbles inside the concrete.
2. A novel precast concrete frame column according to claim 1, characterized in that: The connection assembly comprises a support plate (4) mounted on the outside of the frame column (1); an adjustment rod (5) is hingedly connected to one side of the support plate (4); a fixing rod (6) is mounted on the outer ring of the adjustment rod (5); a fixing plate (7) is mounted on the bottom of the fixing rod (6); the support plate (4) is provided in four groups and distributed in a circular array; and the adjustment rods (5) and the fixing rods (6) are both provided in four groups and distributed in a circular array.
3. A novel precast concrete frame column according to claim 2, characterized in that: The fixing assembly comprises a connecting strip plate (8) installed on the outside of the frame column (1), the connecting strip plate (8) and the inner cavity of the support plate (4) are both provided with connecting screw holes (9), the inner cavity of the connecting screw hole (9) is threadedly connected with a connecting screw rod (10), the outer ring of the connecting screw rod (10) is installed with a connecting nut (11), the connecting screw holes (9) are provided with multiple groups and are linearly distributed, the inner cavity of the fixing plate (7) is provided with fixing screw holes (12), and the inner cavity of the fixing screw hole (12) is threadedly connected with a fixing screw rod (13).
4. A novel precast concrete frame column according to claim 2, characterized in that: The shrinkage assembly comprises shrinkage screw holes (14) provided in the inner cavities of the adjustment rod (5) and the fixing rod (6); a shrinkage screw rod (15) is threadedly connected in the inner cavity of the shrinkage screw hole (14); a shrinkage nut (16) is threadedly connected to the outer ring of the shrinkage screw rod (15); and the shrinkage screw holes (14) are provided in a plurality of groups and are horizontally distributed.
5. The novel precast concrete frame column according to claim 1 is characterized in that: The shaking mechanism comprises a vibrating rod (17) installed between the longitudinal steel bars (2), a connecting plate (18) is installed on the top of the vibrating rod (17), a working plate (19) is installed on the top of the connecting plate (18), working screw holes (20) are provided in the inner cavities of the working plate (19) and the connecting plate (18), a working screw rod (21) is threadedly connected in the inner cavity of the working screw hole (20), and a support column (22) is installed at the bottom of the working plate (19).
6. The novel precast concrete frame column according to claim 1 is characterized in that: A mounting plate (23) is installed at the bottom of the frame column as a whole (1), a mounting screw hole (24) is provided in the inner cavity of the mounting plate (23), a mounting screw rod (25) is threadedly connected in the inner cavity of the mounting screw hole (24), and the mounting screw hole (24) and the mounting screw rod (25) are both provided in four groups and distributed in a rectangular array.
7. A novel precast concrete frame column according to any one of claims 1 to 6, characterized in that: A novel method for installing a prefabricated concrete frame column is provided, the method comprising the following steps: Step S1, prefabricate the frame column as a whole (1), ensure that its size, strength and reinforcement arrangement meet the design requirements, determine the installation position of the frame column according to the design drawings at the construction site, and pre-embed the foundation embedded parts; Step S2, assembling the support mechanism, adjusting the retracting assembly according to the height of the frame column, ensuring that the support plate (4) is tightly fitted to the outer side of the frame column (1), and using the fixing assembly to firmly connect the support mechanism to the frame column (1) to ensure stable support; Step S3, using a lifting device to hoist the frame column (1) as a whole to a predetermined position, slowly lowering it onto the foundation embedded parts, adjusting the verticality and horizontality of the frame column, and after meeting the design requirements, using a mounting plate (23) and mounting screws (25) to firmly connect the frame column to the foundation structure; Step S4, start the vibrating rod (17) in the shaking mechanism to vibrate and compact the concrete inside the frame column until the bubbles inside the concrete are basically eliminated. After the concrete reaches the designed strength, remove the supporting mechanism and complete the installation of the frame column.
8. The method for installing a novel precast concrete frame column according to claim 1 is characterized in that: The step S2 further comprises the following steps: Step S2.1, assembling the support mechanism: assembling the support plate (4), the adjustment rod (5), the fixing rod (6) and the fixing plate (7) according to the design drawings, ensuring that the connection between the components is firm and reliable; Step S2.2, height adjustment: according to the actual height of the frame column as a whole (1), the shrinking screw (15) and the shrinking nut (16) in the shrinking assembly are adjusted so that the support plate (4) is closely fitted to the outer side of the frame column as a whole (1). During the adjustment process, the stability and balance of the support mechanism should be ensured; Step S2.3, fixed connection: using the connecting screw (10) and the connecting nut (11) in the fixing assembly, the support mechanism is firmly connected to the frame column as a whole (1). During the connection process, the matching accuracy of the connecting screw hole (9) and the connecting screw (10) should be ensured to avoid looseness or misalignment; The step S3 further comprises the following steps: Step S3.1, preparation for lifting: Select appropriate lifting equipment to ensure that the lifting capacity meets the weight requirement of the frame column as a whole (1), and prepare the wire rope, lifting equipment and safety protection measures for lifting; Step S3.2, hoisting operation: connect the hook of the lifting equipment to the hoisting point on the top of the frame column (1), and slowly lift the frame column (1) to a predetermined height. During the hoisting process, ensure the stability and safety of the lifting equipment to avoid tilting or collision of the frame column (1); Step S3.3, position adjustment: slowly lower the frame column as a whole (1) onto the foundation embedded parts, and use a level and a plumb line to adjust the verticality and horizontality of the frame column as a whole (1). During the adjustment process, ensure that the frame column as a whole (1) fits tightly with the foundation embedded parts to avoid gaps or misalignment; Step S3.4, fixed connection: Use the mounting plate (23) and the mounting screw (25) to firmly connect the frame column as a whole (1) to the base structure. During the connection process, the matching accuracy of the mounting screw hole (24) and the mounting screw (25) should be ensured to avoid looseness or misalignment. At the same time, the tightness and stability of the connection parts should be checked.
9. The novel precast concrete frame column according to claim 1 is characterized in that: The frame column (1) is made of high-strength, low-shrinkage C60 precast concrete, and its compressive strength is not less than 60 MPa, so as to meet the bearing capacity requirements of high-rise buildings and special structures. The longitudinal reinforcement (2) is made of HRB400 hot-rolled ribbed steel bars to ensure the longitudinal bearing capacity of the frame column. The dense reinforcement (3) is made of HRB400 hot-rolled ribbed steel bars, which are tightly wound around the outer ring of the longitudinal reinforcement (2) in a spiral shape, so as to improve the shear resistance and seismic resistance of the frame column.
10. The novel precast concrete frame column according to claim 5 is characterized in that: The vibrating rod (17) is a high-frequency vibrator with a frequency of 50 Hz and a power of 1.5 kW to ensure effective removal of bubbles inside the concrete. The connecting plate (18) and the working plate (19) are both made of Q235B steel plates to provide sufficient strength and stability.
Citation Information
Patent Citations
Novel vertical prefabricated part joint connecting method
CN107090908A
Concrete frame column roll welding spiral stirrup reinforcement cage and preparation method thereof
CN112814281A
Steel formwork supporting device
CN114922465A
Pouring process for non-orthogonal frame fan-shaped plane bare concrete structure
CN118065495A
Precast concrete frame column
CN212271212U