Operation strategy for new energy commercial vehicle battery swap station
By adopting battery operation model and charging operation model in new energy commercial vehicle battery swap stations, combined with data interoperability between cloud platform and station control system, the problem of how the battery swap station can effectively manage battery swap demand and charging period, and achieve the effect of reducing operating costs and improving economic benefits.
Patent Information
- Application Number
- CN202411878575.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-19
- Publication Date
- 2025-03-25
AI Technical Summary
How to improve operational efficiency, reduce operating costs, and improve economic benefits in new energy commercial vehicle battery swap stations, especially how to effectively manage the demand and charging period of battery swap batteries after the scale is expanded.
An operation strategy is adopted, including a battery operation model and a charging operation model. Through the data interoperability of the cloud operation platform, station control system and charging system, the battery swap cycle time interval is determined and divided into multiple stages. The charging is carried out in the flat and valley periods based on real-time electricity price information to ensure full battery demand in continuous stages.
It effectively reduces the battery reserves and operating costs of the battery swap station, reduces electricity bills during peak periods, increases customer stickiness and battery swap frequency, and reduces the pressure on municipal power supply.
Smart Images

Figure CN119692717A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of battery replacement for electric vehicles, and in particular relates to an operation strategy for battery replacement stations for new energy commercial vehicles. Background Art
[0002] As a new type of fast energy replenishment method for new energy vehicles, new energy vehicle battery swap stations are widely adopted by new energy commercial vehicle operators. With the increasing scale of new energy commercial vehicles and the large-scale deployment of new energy commercial vehicle battery swap stations, how to improve operational efficiency while minimizing operating costs and improving economic benefits has become a major problem for commercial vehicle operators.
[0003] Based on this problem, this application proposes a new battery swap station operation strategy suitable for various new energy battery swap sites. Summary of the invention
[0004] The purpose of the present invention is to provide an operation strategy for a new energy commercial vehicle battery swap station to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above-mentioned purpose, a technical solution adopted by the present invention is: an operation strategy for a new energy commercial vehicle battery swap station, the battery swap station includes a cloud operation platform, a station control system and a charging system, the charging system includes a plurality of charging positions, and the charging system communicates data with the cloud operation platform through the station control system;
[0006] The operation strategy includes a battery operation model and a charging operation model;
[0007] The battery operation model includes the following establishment steps:
[0008] A1: Determine the battery swap cycle time interval and divide it into several stages;
[0009] A2: The cloud operation platform counts the number of batteries replaced at each stage within a certain battery replacement cycle time interval;
[0010] A3: Calculate and determine the range of the number of batteries to be replaced at each stage within a single battery replacement cycle time interval, and determine the number of batteries required at each stage;
[0011] A4: Taking the current battery replacement cycle time stage as the starting point, ensure that the number of fully charged batteries in at least X consecutive stages meets the number of batteries required in the stage, where X is an integer greater than 1;
[0012] A5: When the battery at any stage in step A4 is replaced, prepare for charging the fully charged battery required for the next stage after the continuous X stages starting from this stage;
[0013] The charging operation model includes the following establishment steps:
[0014] B1: The cloud operation platform is connected to the power grid and obtains the real-time electricity price information of the power grid;
[0015] B2: Determine the peak, flat and valley period information of electricity prices in each stage of the battery operation model based on electricity price information;
[0016] B3: In step A5, during the flat and / or valley time intervals of the phase in which the battery is replaced, the battery is charged so that it meets the number of fully charged batteries in a phase after the continuous X phases.
[0017] Preferably, the operation strategy further includes a battery replacement cost calculation model;
[0018] The battery replacement cost calculation model adopts the following calculation method:
[0019] C1: Estimate the time required to fully charge the vehicle's replacement battery;
[0020] C2: Determine the electricity price period for full charging based on the battery replacement time;
[0021] C3: The cost of battery replacement is determined by the sum of the electricity charges in each electricity price period multiplied by the charging time in that period.
[0022] Preferably, the operation strategy further includes a battery replacement cost calculation model;
[0023] D1: Each stage described in step A1 only includes any one of the stages of sharp, peak, flat, and valley;
[0024] D2: Based on the battery replacement time, the battery replacement cost is determined by calculating the electricity fee period described in the battery replacement time and the total time required to fully charge.
[0025] Preferably, in step B3, if the first stage of the non-battery replacement cycle time interval in step A4 is the first battery replacement stage in the cycle time stage, the number of fully charged batteries in the stage before the replaced stage is settled into the subsequent stage of the replaced stage, and it is determined whether the subsequent stage meets the conditions of step A4. If not, the battery is charged in the flat section and / or valley section of the replaced stage to ensure that the conditions of step A4 are met.
[0026] Preferably, in step B3, during the stage of charging the battery, if the number of fully charged batteries in the flat segment and valley segment of this stage cannot meet the conditions in step A4, or there is no flat segment and valley segment in this stage, the battery is charged in the peak segment and / or peak segment of this stage.
[0027] Preferably, the battery replacement fee also includes service fees, and the fees paid by the customer include service fees and battery replacement costs. The calculation formula for the total battery replacement fee is as follows:
[0028] The total cost of battery replacement = k*service fee + battery replacement cost; k is the service coefficient, k is less than 1 when the electricity price is in the flat or off-peak period, and k is greater than 1 when the electricity price is in the peak or high period.
[0029] Preferably, each charging position corresponds to an extension meter, and data between the extension meter and the cloud operation platform is communicated to further accurately confirm the actual charging power.
[0030] Preferably, the cloud operation platform calculates the battery replacement cost by using the actual charging power consumption determined by the extension meter.
[0031] Beneficial effects of the present invention: This solution determines the battery swap cycle time interval and divides it into several stages, realizes the control of the number of batteries required in each stage according to the data obtained / determined in daily operations, determines the approximate peak value of the battery quantity demand according to the battery operation model, thereby reducing the investment cost of the battery swap station according to the applicable demand (such as the basic number of batteries that each battery swap station should purchase and the size of the battery swap site, etc.), and at the same time, according to the electricity fee period, charging is carried out when the electricity fee is low during the flat and valley periods, thereby effectively realizing cost control;
[0032] Among them, by setting the service coefficient, when the electricity price is at the peak period, the operating cost of the operator can be effectively reduced, and when the electricity price is at the off-peak period, the consumption cost of the consumer can be effectively reduced. Under this operating model, customer stickiness can be enhanced, especially the frequency of battery replacement by customers during off-peak periods can be increased, which reduces the pressure of municipal power supply during peak periods to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 is a flow chart for establishing a battery operation model in the present invention;
[0034] Figure 2 It is a flow chart of the charging operation model in the present invention;
[0035] Figure 3 This is the calculation process of the total cost of battery replacement in the present invention. DETAILED DESCRIPTION
[0036] The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings so that the advantages and features of the present invention can be more easily understood by those skilled in the art, thereby making a clearer and more definite definition of the protection scope of the present invention.
[0037] Example:
[0038] See also Figure 1, an operation strategy for a new energy commercial vehicle battery swap station, the battery swap station includes a cloud operation platform, a station control system and a charging system, the charging system includes a plurality of charging positions, and the charging system communicates data with the cloud operation platform through the station control system;
[0039] The operation strategy includes a battery operation model and a charging operation model;
[0040] The battery operation model includes the following establishment steps:
[0041] A1: Determine the battery swap cycle time interval and divide it into several stages;
[0042] A2: The cloud operation platform counts the number of battery replacements at each stage within a number of battery replacement cycle time intervals. The battery replacement cycle time intervals in step A1 can be divided into equal time periods in units of days. In this battery replacement cycle time interval, regular working days (Monday to Friday) and weekends can be determined separately, effectively ensuring the battery demand under different conditions.
[0043] A3: Calculate and determine the range of the number of battery replacements at each stage within a single battery replacement cycle time interval, and determine the number of batteries required at each stage. When doing this, the actual battery replacement situation every day of the week can be determined based on business data, such as two to three weeks of business data, and the number required at each stage can be determined by using the average value method. If the difference between weekdays and Sundays is not considered when dividing the battery replacement cycle time interval, the daily data can be counted and the number of batteries required for each stage can be determined by the normal distribution calculation method. The standard deviation value under this calculation method is formulated according to the actual situation;
[0044] A4: Taking the current battery swap cycle time stage as the starting point, ensure that the number of fully charged batteries in at least X consecutive stages meets the number of batteries required in the stage, where X is an integer greater than 1, preferably 2, which can effectively reduce the battery reserve of the battery swap station;
[0045] A5: When the battery at any stage in step A4 is replaced, prepare for charging the fully charged battery required for the next stage after the continuous X stages starting from this stage;
[0046] The charging operation model includes the following establishment steps:
[0047] B1: The cloud operation platform is connected to the power grid and obtains the real-time electricity price information of the power grid;
[0048] B2: Determine the peak, flat and valley period information of electricity prices in each stage of the battery operation model based on electricity price information;
[0049] B3: In step A5, during the flat and / or valley time intervals of the phase in which the battery is replaced, the battery is charged so that it meets the number of fully charged batteries in a phase after the continuous X phases.
[0050] Wherein, the operation strategy also includes a battery replacement cost calculation model;
[0051] The battery replacement cost calculation model adopts the following calculation method:
[0052] C1: Estimate the time required to fully charge the vehicle's replacement battery;
[0053] C2: Determine the electricity price period for full charging based on the battery replacement time;
[0054] C3: Determine the battery replacement cost based on the sum of the electricity charges in each electricity price period multiplied by the charging time in that period;
[0055] Among them, in other embodiments, the battery replacement cost calculation model may also adopt the following method;
[0056] D1: Each stage described in step A1 only includes any one of the stages of sharp, peak, flat, and valley;
[0057] D2: Based on the battery replacement time, the battery replacement cost is determined by calculating the electricity fee period described in the battery replacement time and the total time required to fully charge.
[0058] Among them, in step B3, if the first stage of the non-battery replacement cycle time interval in step A4 is the first battery replacement stage in the cycle time stage, the number of fully charged batteries in the stage before the replaced stage is settled into the subsequent stage of the replaced stage, and it is determined whether the subsequent stage meets the conditions of step A4. If not, the battery is charged in the flat section and / or valley section of the replaced stage to ensure that the conditions of step A4 are met.
[0059] Among them, in step B3, during the stage of charging the battery, if the number of fully charged batteries in the flat segment and valley segment of this stage cannot meet the conditions in step A4, or there is no flat segment and valley segment in this stage, the battery is charged in the peak segment and / or peak segment of this stage.
[0060] Among them, the battery replacement fee also includes service fees. The fees paid by customers include service fees and battery replacement costs. The calculation formula for the total battery replacement fee is as follows:
[0061] The total cost of battery replacement = k*service fee + battery replacement cost; k is the service coefficient, when the electricity price is in the flat and off-peak period, k is less than 1, when the electricity price is in the peak and peak period, k is greater than 1. For example, in the flat and off-peak period, k can be 0.9, in the peak and peak period, k can be 1.15.
[0062] Among them, each charging position corresponds to an extension meter, and data between the extension meter and the cloud operation platform is exchanged to further accurately confirm the actual charging power.
[0063] Among them, the cloud operation platform calculates the cost of battery replacement through the actual charging power consumption determined by the extension meter. Under this condition, you can use apps and other methods to pay or settle the last battery replacement fee when replacing the battery to further ensure the benefits of your station.
[0064] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structural transformations made using the contents of the present invention's specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. An operation strategy for a new energy commercial vehicle battery swap station, characterized in that: The battery swap station includes a cloud operation platform, a station control system and a charging system. The charging system includes a plurality of charging positions. The charging system communicates data with the cloud operation platform through the station control system. The operation strategy includes a battery operation model and a charging operation model; The battery operation model includes the following establishment steps: A1: Determine the battery swap cycle time interval and divide it into several stages; A2: The cloud operation platform counts the number of batteries replaced at each stage within a certain battery replacement cycle time interval; A3: Calculate and determine the range of the number of batteries to be replaced at each stage within a single battery replacement cycle time interval, and determine the number of batteries required at each stage; A4: Taking the current battery replacement cycle time stage as the starting point, ensure that the number of fully charged batteries in at least X consecutive stages meets the number of batteries required in the stage, where X is an integer greater than 1; A5: When the battery at any stage in step A4 is replaced, prepare for charging the fully charged battery required for the next stage after the continuous X stages starting from this stage; The charging operation model includes the following establishment steps: B1: The cloud operation platform is connected to the power grid and obtains the real-time electricity price information of the power grid; B2: Determine the peak, flat and valley period information of electricity prices in each stage of the battery operation model based on electricity price information; B3: In step A5, during the flat and / or valley time intervals of the phase in which the battery is replaced, the battery is charged so that it meets the number of fully charged batteries in a phase after the continuous X phases.
2. The operation strategy for a new energy commercial vehicle battery swap station according to claim 1 is characterized in that: The operation strategy also includes a battery replacement cost calculation model; The battery replacement cost calculation model adopts the following calculation method: C1: Estimate the time required to fully charge the vehicle's replacement battery; C2: Determine the electricity price period for full charging based on the battery replacement time; C3: The cost of battery replacement is determined by the sum of the electricity charges in each electricity price period multiplied by the charging time in that period.
3. The operation strategy for a new energy commercial vehicle battery swap station according to claim 1 is characterized in that: The operation strategy also includes a battery replacement cost calculation model; D1: Each stage described in step A1 only includes any one of the stages of sharp, peak, flat, and valley; D2: Based on the battery replacement time, the battery replacement cost is determined by calculating the electricity fee period during the battery replacement time and the total time required to fully charge the battery.
4. The operation strategy for a new energy commercial vehicle battery swap station according to claim 1 is characterized in that: In step B3, if the first stage of the non-battery replacement cycle time interval in step A4 is the first battery replacement stage in the cycle time stage, the number of fully charged batteries in the stage before the replaced stage is settled into the subsequent stage of the replaced stage, and it is determined whether the subsequent stage meets the conditions of step A4. If not, the battery is charged in the flat section and / or valley section of the replaced stage to ensure that the conditions of step A4 are met.
5. The operation strategy for a new energy commercial vehicle battery swap station according to claim 4 is characterized in that: In step B3, during the battery charging stage, if the number of fully charged batteries in the flat and valley segments of this stage cannot meet the conditions in step A4, or there are no flat and valley segments in this stage, the battery is charged in the peak and / or peak segments of this stage.
6. An operation strategy for a new energy commercial vehicle battery swap station according to claim 2 or 3, characterized in that: The battery replacement fee also includes service fees. The fees paid by customers include service fees and battery replacement costs. The calculation formula for the total battery replacement fee is as follows: Total battery replacement cost = k*service fee + battery replacement cost; Among them, k is the service coefficient. When the electricity price is in the flat or valley period, k is less than 1, and when the electricity price is in the peak or peak period, k is greater than 1.
7. The operation strategy for a new energy commercial vehicle battery swap station according to claim 6 is characterized in that: Each charging station corresponds to an extension meter, and data between the extension meter and the cloud operation platform is exchanged to further accurately confirm the actual charging power.
8. The operation strategy for a new energy commercial vehicle battery swap station according to claim 7 is characterized in that: The cloud operation platform calculates the battery replacement cost through the actual charging power consumption determined by the extension meter.