Electricity market generation subject electricity business license information tracking reminding method and device
By automatically monitoring the consistency between electricity business license registration data and electricity business license data, the problem of low efficiency in manual tracking and verification has been solved, ensuring the accuracy and timeliness of power generation entity data, and improving the efficiency of normal participation and management in electricity trading.
Patent Information
- Application Number
- CN202411769231.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-04
- Publication Date
- 2025-11-04
- Estimated Expiration
- 2044-12-04
AI Technical Summary
In existing technologies, the manual tracking and verification of power business license registration data by power generation companies in the power trading system is inefficient, untimely, and prone to omissions. This results in power generation entities being unable to continuously meet the registration requirements, affecting their normal participation in power trading and posing regulatory risks.
A method and device for tracking and reminding power business license information of power generation entities in the power market are provided. By obtaining project information of power generation entities, the consistency between power business license registration data and power business license data is automatically monitored, triggering business reminders or linkage control to ensure data accuracy and timeliness.
It enables automatic tracking and verification of electricity business license registration data, improves the authenticity and availability of data and management efficiency, ensures that power generation entities can participate normally in electricity trading, saves labor costs, and avoids market risks.
Smart Images

Figure CN119692940B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the field of information technology, in particular to a power market generation subject power business license information tracking and reminding method and device. BACKGROUND
[0002] When a power generation enterprise registers in a power transaction system, the power market operating agency should check whether the registered power business license related data meets the power business license supervision requirements. If it does not meet the relevant requirements, the check will not pass. If the check passes when registering, the power business license change of the generation subject will be continuously monitored during the participation in the power market, and business reminders or business linkage controls will be made according to the monitoring results.
[0003] At present, the registration data of the power business license is usually tracked and verified manually. However, with the large-scale batch production of new energy projects, the manual tracking and verification method will have the problems of large amount of checking work, low efficiency, untimely tracking, easy omission, and the problem that the generation subject cannot continuously meet the registration conditions, which may affect the normal participation of the generation subject in the power transaction, and there is also the risk of triggering the relevant supervision requirements. SUMMARY
[0004] Therefore, the present application provides a power market generation subject power business license information tracking and reminding method and device, which can improve the timeliness and accuracy of the registration data of the power business license of the generation subject in the power market, so as to ensure that the generation subject continuously meets the basic registration conditions, normally participates in the power transaction, avoids market risks, and meets the relevant supervision requirements of the power market.
[0005] According to a first aspect of the present application, a power market generation subject power business license information tracking and reminding method is provided, which comprises:
[0006] obtaining project information of a generation subject;
[0007] if it is determined according to the project information that the generation subject has obtained a power business license, obtaining power business license data of the generation subject, and determining power business license registration data of the generation subject according to the project information;
[0008] conducting consistency monitoring on the power business license registration data and the power business license data, and triggering business reminders or conducting business linkage controls according to the monitoring results;
[0009] if it is determined according to the project information that the generation subject has not obtained the power business license, conducting expected reminders according to the processing time of the power business license, and if the processing is not completed by the due date, conducting business linkage controls.
[0010] According to a second aspect of the present application, a device for tracking and reminding power business license information of a power market generation body is provided, and the device comprises:
[0011] an acquisition unit configured to acquire project information of the generation body;
[0012] a determination unit configured to, if it is determined according to the project information that the generation body has obtained a power business license, acquire power business license data of the generation body, and determine power business license registration data of the generation body according to the project information;
[0013] a monitoring unit configured to monitor consistency of the power business license registration data and the power business license data, and trigger business reminding or perform business linkage control according to a monitoring result;
[0014] a reminding unit configured to, if it is determined according to the project information that the generation body has not obtained the power business license, perform expected reminding according to a stipulated handling time of the power business license, and perform business linkage control if the generation body fails to handle the power business license by the stipulated handling time.
[0015] According to a third aspect of the present application, a storage medium having a computer program stored thereon is provided, and the program is executed by a processor to implement the power market generation body power business license information tracking and reminding method.
[0016] According to a fourth aspect of the present application, an electronic device is provided, which comprises a storage medium, a processor, and a computer program stored in the storage medium and executable on the processor, and the processor implements the power market generation body power business license information tracking and reminding method when executing the program.
[0017] By the technical scheme, the power market generation subject power business license information tracking reminding method and device can realize automatic tracking and verification of the power business license registration data, thereby improving the real usability of the power market generation subject power business license registration data, avoiding omission of manual tracking, and guaranteeing that the power business license registration data meets the power business license supervision and management regulations, the generation subject continuously meets the basic registration conditions, effectively ensures that the power market generation subject can normally participate in power trading, and saves the labor cost of the generation subject and the power market operation institution for power business license management, and improves the reliability and management efficiency of the generation subject data. Meanwhile, the application can also provide expected reminding in the case that the generation subject does not obtain the power business license, guide the generation subject to perform the subject responsibility, and actively pay attention to the power market registration data, thereby providing support for the generation subject to smoothly participate in the power market.
[0018] The above description is only a summary of the technical scheme of the application. In order to more clearly understand the technical means of the application, the application can be implemented according to the content of the specification, and in order to make the above and other purposes, characteristics and advantages of the application more obvious and easy to understand, the following specific embodiments of the application are described. BRIEF DESCRIPTION OF DRAWINGS
[0019] The drawings described herein are used to provide further understanding of the application, and form a part of the application. The schematic embodiments of the application and the description thereof are used to explain the application, and do not constitute an improper limitation on the application. In the drawings:
[0020] Figure 1 A flowchart of a power market generation subject power business license information tracking reminding method provided by the embodiment of the application is shown;
[0021] Figure 2 A flowchart of consistency monitoring provided by the embodiment of the application is shown;
[0022] Figure 3 A structural diagram of a power market generation subject power business license information tracking reminding device provided by the embodiment of the application is shown;
[0023] Figure 4 A structural diagram of another power market generation subject power business license information tracking reminding device provided by the embodiment of the application is shown. DETAILED DESCRIPTION
[0024] Hereinafter, the present application will be described in detail with reference to the accompanying drawings and in conjunction with embodiments. It should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other without conflict.
[0025] The way of manually tracking and verifying the power business license registration data of the power generation subject has problems of low efficiency, untimely tracking and easy omission, thereby causing the power generation subject to be unable to continuously meet the registration basic conditions, affecting the normal participation of the power generation subject in the power transaction, and also causing the risk of violating the relevant regulatory requirements.
[0026] Based on this, the embodiment of the present application provides a power market power generation subject power business license information tracking reminding method, as shown in the figure, the method comprises the following steps: Figure 1
[0027] Step 10, obtaining project information of the power generation subject.
[0028] The power generation subject is divided according to the power source type, including thermal power generation subject, photovoltaic power generation subject, wind power generation subject and hydroelectric power generation subject, etc. The project information includes project responsible subject name, operation time, power source type, installed capacity, power business license information, etc. The power source type specifically includes thermal power, photovoltaic power, wind power and hydroelectric power, etc.
[0029] For the embodiment of the present application, when the power generation subject adds the power market asset, the power generation subject information is filled in the power transaction system, which includes the project responsible subject name, operation time, power source type, installed capacity, power business license information, etc. The power business license information specifically refers to whether the power business license is obtained, and two options of "yes" and "no" are set. If "yes" is selected, the power business license subject name, license time, license capacity, license unit capacity, license project name and license operation time need to be filled in and the power business license copy scanning is submitted; if "no" is selected, the operation time of the power generation subject needs to be filled in and the power business license commitment is submitted. After the power transaction system obtains the above data, it is stored as the initial value of the power business license information of the power generation subject in the power market customer file information.
[0030] Step 20, if it is determined according to the project information that the power generation subject has obtained the power business license, obtaining the power business license data of the power generation subject, and determining the power business license registration data of the power generation subject according to the project information.
[0031] For the embodiment of the present application, when determining the power business license registration data of the power generation subject, the project responsible subject name, the commissioning time, the unit capacity, the power business license time, the license number, the registered capacity and the project name registered in the project information are determined to be the power business license registration data of the power generation subject. At the same time, when obtaining the power business license data of the power generation subject, the power business license subject name, the license number, the license time, the license capacity, the license unit capacity, the license project name and the license commissioning time filled in step 10 are obtained first, and then the power business license data is determined according to the power business license subject name, the license number, the license time, the license capacity, the license unit capacity, the license project name and the license commissioning time.
[0032] Specifically, the power business license registration data can be obtained through the power market data interface of the power transaction system, and specifically includes the project responsible subject name, the commissioning time, the unit capacity, the power business license time, the license number, the registered capacity and the project name. The power business license data can be obtained through the power business license data interface of the power transaction system, and specifically includes the power business license subject name, the license number, the license time, the license capacity, the license unit capacity, the license project name and the license commissioning time.
[0033] Step 30, consistency monitoring is performed on the power business license registration data and the power business license data, and according to the monitoring result, business reminding or business linkage control is triggered.
[0034] For the embodiment of the present application, after obtaining the power business license registration data and the power business license data, consistency monitoring is required, that is, it is required to ensure that the power business data registered by the power generation subject when participating in the power market is consistent with the power business license data. For this process, as shown in the figure, Figure 2 , it includes:
[0035] Step 31, comparing the power business license registration data with the corresponding field contents in the power business license data to obtain a monitoring result.
[0036] For the embodiment of the present application, the project responsible subject name, the commissioning time, the unit capacity, the power business license time, the license number, the registered capacity and the project name in the power business license registration data are compared with the power business license subject name, the license commissioning time, the license unit capacity, the license time, the license number, the license capacity and the license project name in the power business license data, so as to realize consistency monitoring.
[0037] Step 32, if the field content is inconsistent or the validity period of the power business license is about to expire according to the monitoring result, a business reminder is triggered.
[0038] For example, the project responsibility subject name in the power business license registration data is inconsistent with the power business license subject name in the power business license data, or the registration capacity in the power business license registration data is inconsistent with the permitted capacity, a business reminder is triggered.
[0039] For another example, by comparing the power business license time in the power business license registration data and the license time in the power business license data, it is determined that the validity period of the power business license is about to expire in 3 months or 1 month, a business reminder is triggered.
[0040] For the embodiment of the application, after triggering the business reminder, the power transaction system generates a business reminder information and sends it to the power market operation agency staff and the power plant subject enterprise administrator. For the generation process of the business reminder information, the method comprises: according to the transaction name of the power plant subject, the time when the power business license is about to expire or the inconsistent field content, a preset information template is used to generate and send the business reminder information.
[0041] Among them, the business reminder information can be sent to the power market operation agency staff and the power plant subject enterprise administrator through short message, email, voice and the like.
[0042] For example, the project responsibility subject name in the power business license registration data is inconsistent with the power business license subject name in the power business license data, or the registration capacity in the power business license registration data is inconsistent with the permitted capacity, a business reminder is triggered.
[0043] For another example, by comparing the power business license time in the power business license registration data and the license time in the power business license data, it is determined that the validity period of the power business license is about to expire in 3 months or 1 month, a business reminder is triggered.
[0044] Step 33, if the validity period of the power business license has expired according to the monitoring result, a business linkage control is performed, an informing information is sent to the subject, and a transaction permission suspension instruction is sent to the transaction system.
[0045] For the embodiment of the present application, by comparing the power business license time in the power business license registration data and the license time in the power business license data, it is determined that the validity period of the power business license has expired, and the power transaction system sends a transaction suspension permission instruction and sends a notification to the power market operation agency staff and the power generation subject enterprise administrator.
[0046] Step 40, if it is determined according to the project information that the power generation subject has not obtained the power business license, then according to the stipulated handling time of the power business license, an expected reminder is performed.
[0047] For the embodiment of the present application, if the power generation subject has not obtained the power business license, an expected reminder is performed for the power generation subject to supervise the power generation subject to complete the power business license handling as soon as possible. For this process, the method comprises: determining the stipulated handling time of the power business license according to the project power source type of the power generation subject; performing an expected reminder according to the stipulated handling time of the power business license and the commissioning time in the project information, and if it is not handled by the expiration date, performing a business linkage control.
[0048] Among them, the exemption period of different power source types of power generation subjects is different, and the exemption period determines the stipulated handling time of the power business license. For example, according to the current rules, wind power generation subjects and photovoltaic power generation subjects should handle the power business license within 6 months after grid connection; other power generation subjects should handle the power business license within 3 months after completing the start-up trial operation. If there is a change in national regulations, it will be adjusted accordingly.
[0049] Specifically, after determining the stipulated handling time of the power business license according to the project power source type of the power generation subject, the time limit for the power generation subject to handle the power business license is determined according to the commissioning time of the power generation subject, so as to remind the power generation subject. If the power generation subject has not handled and submitted the power business license until the stipulated handling time node, a business linkage control is performed, the power transaction system sends a transaction suspension permission instruction and sends a notification to the power market operation agency staff and the power generation subject enterprise administrator. For this process, the method comprises: if it is determined according to the commissioning time that the power generation subject will reach the stipulated handling time of the power business license, a time period expected reminder is performed; if it is determined according to the commissioning time that the power generation subject has reached the stipulated handling time of the power business license, a business linkage control is performed, a transaction suspension permission instruction and a notification are sent.
[0050] Among them, the expected reminder and the notification of the transaction suspension permission can be sent to the market operation agency responsible person and the power generation subject through short message, email, voice, etc.
[0051] In the expected reminder, the reminder information is generated, for example, {{powerPlantTransactionName}} (transaction number: {{businessNumber}}) has not submitted the power business license in the power trading system, please submit within 1 month after receiving the information. If not submitted on time, the power trading center will suspend the power plant trading qualification according to the "Power Business License Supervision and Management Method". If it has been submitted or in the exemption period, please ignore the SMS.
[0052] For example, {{powerPlantTransactionName}} (transaction number: {{businessNumber}}) has not submitted the power business license in the power trading system, please submit within 5 days after receiving the information. If not submitted on time, the power trading center will suspend the power plant trading qualification according to the "Power Business License Supervision and Management Method". If it has been submitted or in the exemption period, please ignore the SMS.
[0053] In the embodiment of the present application, if the power generation subject does not obtain the power business license, the power trading system will continue to generate the expected reminder information to remind the power generation subject to handle and submit the power business license as soon as possible. If the power generation subject does not obtain the power business license and submit valid power business license data until the specified handling time, the trading right of the power generation subject is suspended, and the power generation subject is automatically sent the information of the suspension of the trading right. After the power generation subject obtains the power business license and submits valid power business license data, the trading right of the power generation subject is restored.
[0054] After the power generation subject obtains the power business license and submits valid power business license data, the power trading system will perform step 30, that is, the consistency monitoring of the power business license registration data and the power business license data.
[0055] The power market power generation subject power business license information tracking reminding method provided by the embodiment of the present application can realize automatic tracking verification of power business license registration data, thereby improving the authenticity and availability of power business license registration data of the power market power generation subject, avoiding omissions in manual tracking, and further ensuring that the power business license registration data meets the power business license supervision and management regulations, normalizing automatic verification of the system to ensure that the power generation project continuously meets the registration conditions, effectively ensuring that the power market power generation subject can normally participate in power trading, while saving the labor cost of power business license management of the power generation subject and the power market operation institution, and improving the reliability and management efficiency of the power generation subject data. Meanwhile, the embodiment of the present application can also provide expected reminding in the case that the power generation subject has not obtained the power business license, thereby providing support for the smooth participation of the power generation subject in the power market.
[0056] Further, as a specific implementation of the method shown in the above embodiment, the embodiment provides a power market power generation subject power business license information tracking reminding device, as shown in the above embodiment, the device comprises an acquisition unit 101, a determination unit 102, a monitoring unit 103 and a reminding unit 104. Figure 1 Figure 3 The acquisition unit 101 can be used to acquire the project information of the power generation subject.
[0057] The determination unit 102 can be used to acquire the power business license data of the power generation subject if it is determined according to the project information that the power generation subject has obtained the power business license, and determine the power business license registration data of the power generation subject according to the project information.
[0058] The monitoring unit 103 can be used to monitor the consistency of the power business license registration data and the power business license data, and trigger business reminding or business linkage control according to the monitoring result.
[0059] The reminding unit 104 can be used to provide expected reminding according to the handling time of the power business license if it is determined according to the project information that the power generation subject has not obtained the power business license, and perform business linkage control if the power business license is not handled by the due date.
[0060] The reminding unit 104 can be used to provide expected reminding according to the handling time of the power business license if it is determined according to the project information that the power generation subject has not obtained the power business license, and perform business linkage control if the power business license is not handled by the due date.
[0061] In some embodiments, the determining unit 102 can be specifically configured to acquire the power business license subject name, license number, license time, license capacity, license unit capacity, license project name and license commissioning time of the power generation subject, and determine the power business license data according to the power business license subject name, the license number, the license time, the license capacity, the license unit capacity, the license project name and the license commissioning time.
[0062] In some embodiments, the determining unit 102 can be specifically configured to determine the power business license registration data of the power generation subject according to the registered project responsibility subject name, commissioning time, unit capacity, power business license time, license number, registered capacity and project name in the project information.
[0063] In some embodiments, the monitoring unit 103, as shown in the figure, includes a comparison module 1031, a triggering module 1032 and a linkage module 1033. Figure 4
[0064] The comparison module 1031 can be configured to compare the power business license registration data with the corresponding field content in the power business license data to obtain a monitoring result.
[0065] The triggering module 1032 can be configured to trigger a business reminder if it is determined according to the monitoring result that the field content is inconsistent or the validity period of the power business license is about to expire.
[0066] The linkage module 1033 can be configured to perform business linkage control and send informing information to the subject and send a suspension of transaction authority instruction to the transaction system if it is determined according to the monitoring result that the validity period of the power business license has expired.
[0067] In some embodiments, the triggering module 1032 can be specifically configured to generate and send a business reminder information by using a preset information template according to the transaction name of the power generation subject, the time when the power business license is about to expire or the inconsistent field content.
[0068] In some embodiments, the reminding unit 104 includes a determining module 1041 and a reminding module 1042.
[0069] The determining module 1041 can be configured to determine the prescribed handling time of the power business license according to the project power source type of the power generation subject.
[0070] The reminding module 1042 can be used to make an expected reminding according to the handling time of the power business license and the commissioning time in the project information, and make a business linkage control if the handling is not made at the due time.
[0071] In some embodiments, the reminding module 1042 can be specifically used to make a time period expected reminding if it is determined according to the commissioning time that the power generation subject is about to reach the handling time of the power business license, and make a business linkage control to send a transaction permission suspension instruction and an informing information if it is determined according to the commissioning time that the power generation subject has reached the handling time of the power business license.
[0072] It should be noted that other corresponding descriptions of the functions of the power market power generation subject power business license information tracking reminding device provided in the embodiments of the present application can be referred to the corresponding descriptions in Figure 1 and Figure 2 , which will not be repeated here.
[0073] Based on the above methods shown in Figure 1 and Figure 2 , correspondingly, the embodiments also provide a storage medium having a computer program stored thereon, and the program is executed by a processor to implement the power business license information tracking reminding method shown in Figure 1 and Figure 2 .
[0074] Based on such understanding, the technical solutions of the present application can be embodied in the form of a software product, which can be stored in a non-volatile storage medium (which can be a CD-ROM, a U disk, a mobile hard disk, etc.), and includes a plurality of instructions to make an electronic device (which can be a personal computer, a server, or a network device, etc.) execute the methods of various implementation scenarios of the present application.
[0075] Based on the above methods shown in Figure 1 and Figure 2 , and the virtual device embodiments shown in Figure 3 and Figure 4 , in order to achieve the above purpose, the embodiments of the present application also provide an electronic device, which can be specifically a personal computer, a tablet computer, a server, or other network devices, etc. The device includes a storage medium and a processor; the storage medium is used to store a computer program; the processor is used to execute the computer program to implement the power business license information tracking reminding method shown in Figure 1 and Figure 2 .
[0076] Optionally, the above-mentioned entity device can further include a user interface, a network interface, a camera, a radio frequency (RF) circuit, a sensor, an audio circuit, a WI-FI module, and the like. The user interface can include a display screen, an input unit such as a keyboard, and the like. Optionally, the user interface can further include a USB interface, a card reader interface, and the like. The network interface can optionally include a standard wired interface, a wireless interface (such as a WI-FI interface), and the like.
[0077] Those skilled in the art can understand that the above-mentioned entity device structure provided by the embodiment does not constitute a limitation on the entity device, and can include more or fewer components, or combine certain components, or different component arrangements.
[0078] The storage medium can further include an operating system and a network communication module. The operating system is a program for managing hardware and software resources of the above-mentioned entity device, and supports the running of information processing programs and other software and / or programs. The network communication module is used to realize communication between components inside the storage medium, and communication with other hardware and software in the information processing entity device.
[0079] From the above description of the embodiments, those skilled in the art can clearly understand that the present application can be implemented by means of software with a necessary general hardware platform, or by hardware.
[0080] In the case where the power generation main body has obtained a power business license, the embodiment of the present application can realize automatic tracking and verification of the power business license registration data by monitoring the consistency of the power business license registration data and the power business license data, and triggering business reminders or business linkage control according to the monitoring results, so as to improve the authenticity and availability of the power business license registration data of the power market power generation main body, avoid omissions in manual tracking, and further ensure that the power business license registration data meets the power business license supervision and management regulations, effectively guaranteeing that the power market power generation main body can normally participate in power trading, while saving the human cost of power business license management of the power market operation institution and improving the reliability and management efficiency of the power generation main body data. At the same time, the embodiment of the present application can also provide an expected reminder in the case where the power generation main body has not obtained a power business license, so as to provide support for its smooth participation in the power market.
[0081] Those skilled in the art can understand that the modules or flows in the drawings are not necessarily required for implementing the present application. Those skilled in the art can understand that the modules in the devices in the implementation scenarios can be distributed in the devices in the implementation scenarios according to the description of the implementation scenarios, or can be changed to be located in one or more devices different from the implementation scenarios. The modules in the above implementation scenarios can be combined into one module, or can be further split into multiple sub-modules.
[0082] The above application numbers are only for description, and do not represent the advantages and disadvantages of the implementation scenarios. The above disclosure is only some specific implementation scenarios of the present application, but the present application is not limited thereto, and any variations that can be thought of by those skilled in the art should fall within the protection scope of the present application.
Claims
1. A method for tracking and reminding power business license information of power generation entities in the power market, characterized in that, include: Obtain project information from the power generation entity; If it is determined from the project information that the power generation entity has obtained a power business license, then the power business license data of the power generation entity is obtained, and the power business license registration data of the power generation entity is determined from the project information. The consistency of the power business license registration data and the power business license data is monitored, and based on the monitoring results, a business reminder or business linkage control is triggered. If it is determined from the project information that the power generation entity has not obtained the power business license, then an expected reminder will be issued according to the processing time stipulated in the power business license. If the license is not processed by the deadline, business linkage control will be implemented. The step of issuing timely reminders based on the processing time stipulated in the power business license, and implementing business linkage control if the processing is not completed by the deadline, includes: The processing time for the power business license is determined based on the power source type of the power generation entity. Specifically, when the power generation entity is a wind power generation entity or a photovoltaic power generation entity, the processing time for the power business license is within a first preset time period after the wind power generation entity or the photovoltaic power generation entity is connected to the grid; when the power generation entity is another type of power generation entity, the processing time for the power business license is within a second preset time period after the completion of the start-up and trial operation. Based on the processing time stipulated in the power business license and the commissioning time in the project information, an expected reminder will be issued. If the application is not processed by the deadline, business linkage control will be implemented. The system provides advance reminders based on the processing time stipulated in the power business license and the commissioning time in the project information. If the application is not processed by the deadline, business linkage control is implemented, including: If the commissioning time determines that the power generation entity is about to reach the stipulated processing time for the power business license, then time-segmented anticipatory reminders will be issued. If it is determined from the commissioning time that the power generation entity has reached the time stipulated for processing the power business license, then business linkage control will be implemented, and a suspension of transaction authority instruction and notification information will be sent.
2. The method according to claim 1, characterized in that, The acquisition of the power business license data of the power generation entity includes: Obtain the name of the power business license holder, license number, license period, license capacity, license unit capacity, license project name, and license commissioning time of the power generation entity; The power business license data is determined based on the name of the licensee, the license number, the license time, the license capacity, the licensed unit capacity, the licensed project name, and the licensed commissioning time.
3. The method according to claim 1, characterized in that, The step of determining the power business license registration data of the power generation entity based on the project information includes: Based on the registered project responsible entity name, commissioning time, unit capacity, power business license time, license number, registered capacity, and project name in the project information, determine the power business license registration data of the power generation entity.
4. The method according to claim 1, characterized in that, The process of monitoring the consistency between the power business license registration data and the power business license data, and triggering business alerts or implementing business linkage control based on the monitoring results, includes: The monitoring results are obtained by comparing the power business license registration data with the corresponding field content in the power business license data; If the monitoring results determine that the field content is inconsistent or that the validity period of the power business license is about to expire, a business reminder will be triggered. If the monitoring results determine that the validity period of the power business license has expired, business linkage control will be implemented, a notification message will be sent to the main entity, and a command to suspend trading permissions will be sent to the trading system.
5. The method according to claim 4, characterized in that, The triggered service reminder includes: Based on the transaction name of the power generation entity, the expiration date of the power business license, or inconsistent field content, a business reminder message is generated and sent using a preset information template.
6. A device for tracking and reminding users of electricity business license information for power generation entities in the electricity market, characterized in that, include: The acquisition unit is used to acquire project information from the power generation entity. The determining unit is configured to, if it is determined from the project information that the power generation entity has obtained a power business license, acquire the power business license data of the power generation entity and determine the power business license registration data of the power generation entity based on the project information; The monitoring unit is used to monitor the consistency between the power business license registration data and the power business license data, and to trigger business reminders or perform business linkage control based on the monitoring results. The reminder unit is used to remind the power generation entity that it has not obtained the power business license according to the project information, based on the stipulated processing time of the power business license; if the license is not processed by the deadline, business linkage control is performed. The reminder unit includes: a determination module and a reminder module. The determining module is used to determine the prescribed processing time for the power business license based on the power source type of the power generation entity. Specifically, when the power generation entity is a wind power generation entity or a photovoltaic power generation entity, the prescribed processing time for the power business license is within a first preset time period after the wind power generation entity or the photovoltaic power generation entity is connected to the grid; when the power generation entity is another type of power generation entity, the prescribed processing time for the power business license is within a second preset time period after the completion of the start-up and trial operation. The reminder module is used to provide expected reminders based on the processing time stipulated in the power business license and the commissioning time in the project information. If the application is not processed by the due date, business linkage control will be implemented. The reminder module is specifically used to provide time-segmented anticipatory reminders if it is determined based on the commissioning time that the power generation entity is about to reach the prescribed processing time for the power business license; and to perform business linkage control, sending a suspension of transaction permission instruction and notification information if it is determined based on the commissioning time that the power generation entity has already reached the prescribed processing time for the power business license.
7. A storage medium having a computer program stored thereon, characterized in that, When the computer program is executed by a processor, it implements the method of any one of claims 1 to 5.
8. An electronic device comprising a storage medium, a processor, and a computer program stored on the storage medium and executable on the processor, characterized in that, When the processor executes the computer program, it implements the method of any one of claims 1 to 5.
Citation Information
Patent Citations
User unified identity model construction method and system for novel power system
CN115760157A
Service license data processing method and device, equipment and storage medium
CN118761831A