Equipment management method and device, computer equipment and storage medium
Through the method of creating project solutions, determining points and binding device relationships in IoT device management, the problem of low installation and management of smart devices is solved, and more efficient and accurate device management and debugging is achieved.
Patent Information
- Application Number
- CN202411774584.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-02
- Publication Date
- 2025-03-25
AI Technical Summary
Against the background of the rapid development of Internet of Things technology, the installation and management efficiency of smart devices is low, resulting in irregular equipment installation, inconvenient management, and inconsistent debugging effects, which brings management problems to equipment maintenance, maintenance, scheduling, etc.
By creating a project plan, determining the points to be created, obtaining point information, determining the points to be bound, and establishing a binding relationship between the target device and the points to be bound to realize the management and debugging of the device.
This method improves the efficiency and accuracy of equipment installation and management, reduces the workload of manually configuring equipment information and information collection on-site, so that all devices bound to it can be viewed, configured and debugged through points only.
Smart Images

Figure CN119692941A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of equipment management, and in particular to an equipment management method, apparatus, computer equipment and storage medium. Background Art
[0002] With the rapid development of Internet of Things technology, the application of smart devices in various fields is becoming more and more extensive. More and more companies have more and more equipment, especially in scenes where a large number of electronic devices need to be installed, such as access control management, parking lot management, and parking spaces. Usually, installers are required to manually install equipment according to the on-site conditions, perform on-site parameter configuration and debugging, etc. However, due to the low efficiency of on-site manual processing and the uneven quality of manual labor, problems such as non-standard equipment installation, inconvenient management, and inconsistent equipment debugging effects are becoming increasingly prominent, which brings certain management difficulties to equipment maintenance, repair, and scheduling. Summary of the invention
[0003] Based on this, it is necessary to provide a device management method, apparatus, computer equipment and storage medium to address the above technical issues, so as to solve at least one of the above problems.
[0004] In a first aspect, an embodiment of the present application provides a device management method, the method comprising the following steps:
[0005] Creating a project plan, and determining the points to be created based on the project plan;
[0006] Acquire information of a point to be created, and determine a point to be bound based on the information of the point to be created;
[0007] A binding relationship is established between the target device and the point to be bound, so as to manage the target device through the point to be bound.
[0008] In one embodiment, determining the points to be created based on the project plan includes:
[0009] Based on the project plan, collecting project information, the project information including project location information and environmental information;
[0010] Based on the project location information and environmental information, divide and create point location areas;
[0011] Determine a point to be created corresponding to each point belonging area, wherein each point belonging area includes at least one point to be created.
[0012] In one embodiment, after determining the point to be bound, the method further includes:
[0013] Enter at least one of the device type corresponding to the point to be bound, the belonging area corresponding to the point to be bound, and the network configuration parameter information corresponding to the point to be bound.
[0014] In one embodiment, the step of establishing a binding relationship between the target device and the point to be bound includes:
[0015] Obtain the target device information by scanning the identification code or manually entering it, so as to establish a binding relationship between the target device and the point to be bound based on the target device information; or
[0016] Acquiring communication information of the target device;
[0017] Based on the communication information, establishing a communication connection with the target device to obtain the target device information;
[0018] Based on the target device information, a binding relationship between the target device and the point to be bound is established.
[0019] In one embodiment, after the binding relationship between the target device and the point to be bound is established, the following steps are included:
[0020] A communication connection is established with the target device, and the target device is redirected to a device configuration interface of the target device to perform device debugging on the target device in the device configuration interface.
[0021] In one embodiment, after the binding relationship between the target device and the point to be bound is established, the following steps are included:
[0022] Obtaining device status information reported by the target device;
[0023] Based on the binding relationship, the device status information is associated with the point to be bound;
[0024] Based on the point to be bound, the device status information of the target device is checked to adjust the target device parameters based on the device status information.
[0025] In one embodiment, after the binding relationship between the target device and the point to be bound is established, the following steps are included:
[0026] Release the binding relationship between the target device and the point to be bound, and remove the device binding record of the target device;
[0027] Identify new target devices;
[0028] A binding relationship is established between the new target device and the point to be bound.
[0029] In a second aspect, a device management apparatus is provided, comprising:
[0030] A project plan creation unit, used to create a project plan and determine the points to be created based on the project plan;
[0031] A point creation unit, used for acquiring information of a point to be created, and creating a corresponding point based on the information of the point to be created, wherein the point is used to represent the installation position of the device;
[0032] A point determination unit, used to determine the points to be bound among the created points;
[0033] The binding unit is used to establish a binding relationship between the target device and the point to be bound, so as to manage the target device through the point to be bound.
[0034] In a third aspect, a computer device is provided, comprising a memory, a processor, and computer-readable instructions stored in the memory and running on the processor, wherein the processor implements the device management method as described above when executing the computer-readable instructions.
[0035] In a fourth aspect, a readable storage medium is provided, on which computer-readable instructions are stored, and when the computer-readable instructions are executed by a processor, the device management method as described above is implemented.
[0036] The above-mentioned equipment management method, apparatus, computer equipment and storage medium, and its method implementation include: creating a project plan, determining the points to be created based on the project plan; obtaining the information of the points to be created, and determining the points to be bound based on the information of the points to be created; establishing a binding relationship between the target device and the points to be bound, so as to manage the target device through the points to be bound. In the embodiment of the present application, by creating a project plan, points are created in advance based on the project plan, and the equipment and configuration information corresponding to each point to be bound are configured in advance, so that all the bound devices can be viewed, configured and debugged only through the points, reducing the workload of manual on-site configuration of equipment information and equipment information collection, and improving the efficiency and accuracy of equipment installation and management. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the description of the embodiments of the present application will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0038] Figure 1 This is a schematic diagram of an application environment of a device management method in an embodiment of the present application;
[0039] Figure 2 This is a schematic diagram of a process of a device management method in an embodiment of the present application. Figure 1 ;
[0040] Figure 3 It is a schematic diagram of the interface of the point creation method in one embodiment of the present application;
[0041] Figure 4 This is a schematic diagram of an interface for batch importing or exporting points in an embodiment of the present application;
[0042] Figure 5 This is a schematic diagram of an interface of a point-associated device in an embodiment of the present application;
[0043] Figure 6 It is a schematic diagram of the interface of the device association points in one embodiment of the present application;
[0044] Figure 7 This is a schematic diagram of a process of a device management method in an embodiment of the present application. Figure 2 ;
[0045] Figure 8 This is a schematic diagram of a process of a device management method in an embodiment of the present application. Figure 3 ;
[0046] Fig. 9 This is a schematic diagram of a process of a device management method in an embodiment of the present application. Figure 4 ;
[0047] Fig.10 This is a schematic diagram of a process of a device management method in an embodiment of the present application. Figure 5 ;
[0048] Fig.11 is a structural diagram of a device management device in one embodiment of the present application;
[0049] Fig.12 It is a schematic diagram of a computer device in one embodiment of the present application. DETAILED DESCRIPTION
[0050] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0051] The device management method provided in this embodiment can be applied in Figure 1In the application environment, an application is installed in the client, based on which project plans can be created, points can be created, and points can be bound to equipment. It can communicate with the operation and maintenance platform to send point information and binding information to the operation and maintenance platform. The client can also communicate with the local platform and the cloud platform to send point information and binding information to the local platform and the cloud platform, or the point information and binding information can be directly updated to the local platform and / or the cloud platform through the operation and maintenance platform to achieve rapid synchronization and update of information. The platform can issue relevant credentials such as user permissions, parameter configuration instructions, remote control instructions, etc. according to the points, so as to perform parameter configuration, debugging, remote control and other operations on the equipment based on the point and binding relationship. The equipment can report binding records or current operating status information in real time, so that operation and maintenance personnel or managers can view equipment information based on the store to achieve maintenance and management of the equipment.
[0052] The client includes but is not limited to various personal computers, laptops, smart phones, tablet computers and portable wearable devices. The operation and maintenance platform, the local platform and the cloud platform can all be implemented using an independent server or a server cluster consisting of multiple servers.
[0053] In one embodiment, if Figure 2 As shown, a device management method is provided, which is applied in Figure 1 The client in the example is used to illustrate the process, including the following steps:
[0054] In step S110, a project plan is created, and points to be created are determined based on the project plan;
[0055] In the embodiments of the present application, a project plan can be created according to actual needs, and the project plan types may specifically include parking lot management, parking space management, access control management, etc. For example, if a project plan is created for Building A, if the project plan type is access control management, then all channel equipment, access control equipment, and pedestrian gate equipment in Building A can be subjected to information collection, information binding, and other operations. If a project plan is created for a parking lot, the project plan type may be parking lot management, which includes gate equipment, video equipment, lighting equipment, parking space management equipment, and charging equipment. If a project plan is created for urban roadside parking, the project plan type may be parking space management, which includes high-position video equipment, parking space management equipment, parking space sensing equipment, and charging pile equipment. It can be understood that as long as the scenarios that require the system to install electronic equipment are in the project plan of this application, they all fall within the scope of protection of this application.
[0056] Optionally, a project plan can be created through an application, a public account, a mini-program, etc. Information collection and project information management can be performed on the specific implementation location of the project plan, the associated project number, the project category, the project host computer platform, etc. for subsequent use.
[0057] In step S120, the point information to be created is obtained, and the corresponding point is created based on the point information to be created;
[0058] See also Figure 3 , provides a schematic diagram of the interface for adding points. Points refer to the location information of specific installed equipment. For example, taking the above-mentioned Building A as an example, the point can be the meeting room 2201, 2202, etc. on the 22nd floor. It can be the name of a specific location, or it can be coordinate information based on longitude and latitude. You can obtain information such as the point name, type such as channel, access control, elevator control, area to which it belongs, and network configuration parameters to create points in the configuration interface. It should be noted that the point affiliation area can be divided according to the project. For example, each floor of Building A can be used as a point affiliation area. For example, all areas on the 22nd floor can be used as a store affiliation area. New points can be displayed on the right.
[0059] It can be understood that a project plan may include at least one point-attribution area, and a point-attribution area may include at least one point.
[0060] See also Figure 4 After creating a point, you can create multiple points at the same time, and then realize batch import / export of multiple points. You can choose to import points or export data to realize the import and export of point data. For example, Figure 4 In the example, the generated points may include conference room 504, conference room 505, conference room 602, conference room 605 and conference room 603. All points may be imported in batches, or the information of all points may be imported, such as name, type, default area, etc.
[0061] Optionally, after creating the corresponding point, at least one of the device type corresponding to the point, the region corresponding to the point, and the network configuration parameter information corresponding to the point can also be entered. The above information can be stored as point information, which supports batch import and export, and the point can also represent the device installation location.
[0062] After creating the point, enter the device type corresponding to the point, and verify the device when installing the device later to avoid the problem of abnormalities caused by the actual installed device type not matching the designed device type. At the same time, after creating the point, you can also enter the corresponding belonging area and network configuration parameter information of the point. By planning the belonging area and configuring the network configuration parameter information in advance, the device can be automatically networked and connected to the network according to the belonging area information and network configuration information when it is installed for the first time, reducing the workload of workers in configuring the network and belonging area on site, and reducing the probability of errors.
[0063] It should be noted that points can be moved to different areas. For example, when creating a point, point 1 is in point belonging area A. If the creation is wrong and point 1 should belong to point belonging area B, you can directly move point 1 to belonging area B and delete the record of point 1 in point belonging area A without creating point 1 again.
[0064] In step S130, the points to be bound are determined from the created points;
[0065] As an implementation method, the creation of points and the points to be bound can be executed together, that is, the points to be bound are determined when the creation points are determined, or the creation of points and the points to be bound can be executed separately, that is, the points are created first, and then the points to be bound are determined from the created points.
[0066] As an implementation method, after creating a point, a point list can be generated, and the point list can include all created points. At this time, you can arbitrarily select a created point in the point list as a point to be bound. Or you can directly use it as a point to be bound after creating it.
[0067] As an implementation method, a point map may be generated based on the project plan, and identifications of created points, such as names, IDs, etc., may be displayed in the point map. Based on the point map, corresponding points may be selected as points to be bound.
[0068] In step S140, a binding relationship is established between the target device and the point to be bound, so as to manage the target device through the point to be bound.
[0069] In the embodiment of the present application, the target device may be a device that can be installed at a point, such as an access control device, a gate device, a card swiping device, etc. For example, if the point is a parking lot entrance, the target device may be an entrance gate. If the point is a conference room, the target device may be a card swiping device, an attendance device, etc. One point may correspond to at least one target device.
[0070] After creating the point, you can select the point to be bound, and establish a communication connection with the target device through Bluetooth, WiFi, etc. to obtain the device information of the target device, such as the device identification code, device ID and other information, and add it to the device binding interface of the point to be bound, so as to establish a binding relationship between the target device and the point to be bound. Alternatively, you can display a paper identification code in the target device or directly paste it on or near the target device, such as a QR code or a motherboard private print code, and obtain the device information of the target device by scanning the code, such as the device identification code, device ID and other information, and add it to the device binding interface of the point to be bound, so as to establish a binding relationship between the target device and the point to be bound. Alternatively, you can directly obtain the manually entered device information through manual entry to establish a binding relationship between the target device and the point to be bound.
[0071] It should be noted that the binding relationship can be uploaded to the operation and maintenance platform, local platform and / or cloud platform for updating or storage, so that subsequent operation and maintenance personnel and management personnel can directly query the target device information through the point according to the binding relationship, and perform parameter configuration, debugging and remote control of the target device.
[0072] Alternatively, see Figure 5 , you can associate the device with the point to be bound, just click the location of the point to be bound in the point map, then enter the interface for adding devices, select the adding method, such as scanning code, Bluetooth or manual entry, enter the device information, such as device model, device identification code, etc., then you can automatically enter the point information, such as point name, point type, point ownership, etc., without manual entry, so as to bind with the point. Or you can also associate the point to be bound with the device, that is, Figure 6 As shown, you can directly enter the interface for adding devices, select the adding method, such as scanning code, Bluetooth or manual entry, enter the device information, such as device model, device identification code, etc., and then select the point information to establish a binding relationship.
[0073] The embodiment of the present application provides a device management method, including: creating a project plan, determining the point to be created based on the project plan; obtaining the information of the point to be created, and creating the corresponding point based on the information of the point to be created, wherein the point is used to characterize the installation position of the device; determining the point to be bound in the created points; establishing a binding relationship between the target device and the point to be bound, so as to manage the target device through the point to be bound. In the embodiment of the present application, by creating a project plan, creating multiple points based on the project plan, and binding the equipment corresponding to each point, and synchronizing it to the operation and maintenance platform, the rapid synchronization and update of information can be improved, and the binding relationship between the equipment and the point can be clearly displayed in the configuration interface based on the point, so that all the equipment bound to it can be viewed, configured and debugged only through the point, without the need to manually collect equipment information, reducing labor costs and the cumbersomeness of equipment information, and improving the efficiency and accuracy of equipment management.
[0074] See also Figure 7 In one embodiment of the present application, establishing a binding relationship between a target device and a point to be bound includes:
[0075] In step 210, the target device information is obtained by scanning the identification code or manually entering the information, so as to establish a binding relationship between the target device and the point to be bound based on the target device information; or
[0076] In step S220, communication information of the target device is obtained;
[0077] In step S230, a communication connection is established with the target device based on the communication information to obtain the target device information;
[0078] In step S240, a binding relationship between the target device and the point to be bound is established based on the target device information.
[0079] Optionally, if the target device is in a powered-on state, the communication information of the target device can be obtained, for example, the Bluetooth signal within a preset range nearby can be searched, and a Bluetooth pairing connection can be established based on the Bluetooth information to obtain the target device information, such as obtaining the identification code of the target device and combining it with the point name, ID, etc. of the point to establish a binding relationship between the target device and the point. Alternatively, the QR code, the motherboard private print code, etc. can be displayed on the display screen of the target device, and the code can be scanned to obtain the target device information, and then establish a binding relationship between the target device and the point. Alternatively, if the target device is not powered on, the surrounding paper identification codes, such as QR codes, motherboard private print codes, etc., can be obtained by pre-pasting them on the target device to obtain device information, and then establish a binding relationship between the target device and the point. Alternatively, when the target device is not powered on, the target device information can also be obtained by manual entry, such as entering the device information in the device adding interface of the point to establish a binding relationship between the target device and the point.
[0080] In an embodiment of the present application, after establishing the binding relationship between the target device and the point to be bound, the following steps are included:
[0081] A communication connection is established with the target device, and the target device is redirected to a device configuration interface of the target device to perform device debugging on the target device in the device configuration interface.
[0082] Optionally, after the binding relationship between the point and the target device is established, the target device can be installed, and after the device is installed, the installation status can be checked, and the device can be powered on. After the device is started, the device can be debugged based on the point to determine whether the device can operate normally. Exemplarily, the identification code that can be scanned through the display screen of the target device, or the identification code that is pasted on the target device or around it, such as a QR code, a motherboard private print code, etc., can be jumped to the device configuration interface to configure the device parameters for device debugging. Alternatively, Bluetooth debugging can be performed, such as searching for a Bluetooth list within a preset range, and clicking the Bluetooth name or identification code of the target device in the Bluetooth list to jump to the corresponding device configuration interface to configure the device parameters for device debugging.
[0083] Among them, the equipment debugging content includes network debugging, management software switching, web page configuration, network testing, lighting testing, finding device ringing, etc. The network debugging can specifically include the debugging of network parameters such as wired network, WiFi network, 4G, 5G network, etc.
[0084] It should be noted that the device debugging parameters can be uploaded to the operation and maintenance platform, synchronized to the local platform and / or cloud platform through the operation and maintenance platform, or directly uploaded to the local platform and / or cloud platform.
[0085] It should be noted that after creating the corresponding point and determining the point to be bound, at least one of the device type corresponding to the point, the belonging area corresponding to the point, and the network configuration parameter information corresponding to the point can also be entered. The above information can be stored as point information, which supports batch import and export, and the point can also represent the device installation location.
[0086] See also Figure 8 In one embodiment of the present application, determining the points to be created based on the project plan includes:
[0087] In step S310, based on the project plan, project information is collected, and the project information includes project location information and environment information;
[0088] In step S320, based on the project location information and environmental information, point attribution areas are divided and created;
[0089] In step S330, the point to be created corresponding to each point belonging area is determined, wherein each point belonging area includes at least one point to be created.
[0090] Optionally, the project plan may include a project plan name, a project number, and a project plan type, and the plan type may include parking lots, access control, parking spaces, etc. Based on the created project plan, project information can be collected, such as the type of host computer, human-travel software, and vehicle-travel software, and positioning software, such as a navigation map, can be used to determine the implementation location information and environmental information of the project plan. Based on the location information and environmental information, at least one point attribution area can be divided. For example, in an industrial park, each office building can be divided into a point attribution area, or in a parking lot, each lane can be divided into a point attribution area. Each point attribution area may include at least one point. For example, taking lane a as an example, each parking space in lane a can be used as a point, and the parking lock, monitoring equipment, and charging equipment set on each parking space can be used as target devices bound to the point.
[0091] See also Fig. 9 In one embodiment of the present application, after establishing the binding relationship between the target device and the point to be bound, the following steps are included:
[0092] In step S410, the binding position corresponding to the target device when the binding relationship is established is obtained;
[0093] In step S420, it is determined whether the current location of the target device is consistent with the binding location;
[0094] In step S430, if not, determining the target point corresponding to the current position of the target device;
[0095] In step S440, the binding relationship between the target device and the point to be bound is released, and based on the device information of the target device when establishing the binding relationship, a binding relationship between the target device and the target point is established.
[0096] Optionally, after the target device establishes a binding relationship with the point, the current location information can be obtained through the positioning system as the binding location information of the target device and stored. When the location of the target device changes, for example, the target device is removed from point 1 and installed in point 2, the current location of the target device can be obtained, and it can be determined whether the current location is consistent with the binding location, for example, whether the distance between the current location and the binding location is within a preset range. If not, the location of the nearest point nearby can be queried through the current location. If the distance between it and the location of the point is less than the preset distance range, the point can be used as the target point, and the original binding relationship of the target device can be released, and the binding relationship between the target device and the target point can be established. When binding, the device information obtained during the original binding can be directly called, without the need to collect the device information again, which can improve the efficiency of device management.
[0097] As an implementation method, when the point belonging area changes, is re-divided, the point name changes, etc., the point can also be transferred. For example, point 1 is changed to point 2. Point 1 is located in point belonging area A, and point 2 is located in point belonging area B. Then point 1 can be directly moved to point belonging area B without creating point 1 in point belonging area B again.
[0098] In an embodiment of the present application, after establishing the binding relationship between the target device and the point to be bound, the following steps are included:
[0099] Get the device status information reported by the target device;
[0100] Based on the binding relationship, the device status information is associated with the point to be bound;
[0101] Based on the point to be bound, check the device status information of the target device to adjust the target device parameters based on the device status information.
[0102] Optionally, the device can report the device operating status information and add the operating status information to the point bound to the device, and can simultaneously report it to the operation and maintenance platform. The operation and maintenance personnel or management personnel can view the operating status of the device bound to it through the point. If there are abnormalities, failures, etc., maintenance can be carried out in time, and the parameters of the device, such as network parameters, lights, ringing, etc., can be adjusted based on the operating status.
[0103] See also Fig.10 In one embodiment of the present application, after establishing the binding relationship between the target device and the point to be bound, the steps include:
[0104] In step S510, the binding relationship between the target device and the point to be bound is released, and the device binding record of the target device is removed;
[0105] In step S520, a new target device is determined;
[0106] In step S530, a binding relationship between the new target device and the point to be bound is established.
[0107] Optionally, when the target device is removed and needs to be installed at another location, the original binding relationship of the target device can be released, the binding record can be deleted, and the device information can be deleted from the bound location. When other new target devices are installed at the location, a new binding relationship between the target device and the location can be established, and the binding relationship can be synchronously updated to the operation and maintenance platform.
[0108] In an embodiment of the present application, a project plan is created, multiple points are created based on the project plan, and the equipment corresponding to each point is bound and synchronized to the operation and maintenance platform, which can improve the rapid synchronization and update of information, and the binding relationship between the equipment and the point can be clearly displayed in the configuration interface based on the point, so that all the bound devices can be viewed, configured and debugged only through the point, without the need for manual collection of equipment information, reducing labor costs and the cumbersomeness of equipment information, and improving the efficiency and accuracy of equipment management.
[0109] It should be understood that the size of the serial numbers of the steps in the above embodiments does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0110] In one embodiment, a device management apparatus is provided, which corresponds one-to-one to the device management method in the above embodiment. Fig.11 As shown, the equipment management device includes a project solution creation unit 10, a point creation unit 20, a point determination unit 30 and a binding unit 40. Each functional module is described in detail as follows:
[0111] A project plan creation unit 10 is used to create a project plan and determine the points to be created based on the project plan;
[0112] The point creation unit 20 is used to obtain information of the point to be created, and create a corresponding point based on the information of the point to be created;
[0113] A point determination unit 30, used to determine the points to be bound among the created points;
[0114] The binding unit 40 is used to establish a binding relationship between the target device and the point to be bound, so as to manage the target device through the point to be bound.
[0115] In one embodiment of the present application, the binding unit 40 is further configured to:
[0116] Obtain the target device information by scanning the identification code or manually entering it, so as to establish a binding relationship between the target device and the point to be bound based on the target device information; or
[0117] Obtain communication information of the target device;
[0118] Based on the communication information, a communication connection is established with the target device to obtain the target device information;
[0119] Based on the target device information, a binding relationship is established between the target device and the point to be bound.
[0120] In one embodiment of the present application, the apparatus further includes: a device debugging unit, configured to:
[0121] A communication connection is established with the target device, and the target device is redirected to a device configuration interface of the target device to perform device debugging on the target device in the device configuration interface.
[0122] In one embodiment of the present application, the point determination unit 30 is further configured to:
[0123] Based on the project plan, collect project information, including project location information and environmental information;
[0124] Divide and create point-to-point areas based on project location information and environmental information;
[0125] Determine the point to be created corresponding to each point belonging area, wherein each point belonging area includes at least one point to be created.
[0126] In an embodiment of the present application, the device further includes a point information input 30, which is used to:
[0127] Enter at least one of the device type corresponding to the point, the belonging area corresponding to the point, and the network configuration parameter information corresponding to the point.
[0128] In an embodiment of the present application, the device further includes: a binding relationship reconstruction unit, configured to:
[0129] Get the binding position corresponding to the target device when establishing the binding relationship;
[0130] Determine whether the current location of the target device is consistent with the binding location;
[0131] If not, determine the target point corresponding to the current position of the target device;
[0132] The binding relationship between the target device and the point to be bound is released, and based on the device information of the target device when the binding relationship is established, a binding relationship between the target device and the target point is established.
[0133] In an embodiment of the present application, the apparatus further includes: a device status viewing unit, configured to:
[0134] Get the device status information reported by the target device;
[0135] Based on the binding relationship, the device status information is associated with the point to be bound;
[0136] Based on the point to be bound, check the device status information of the target device to adjust the target device parameters based on the device status information.
[0137] In an embodiment of the present application, the device further includes: a binding relationship updating unit, configured to:
[0138] Release the binding relationship between the target device and the point to be bound, and remove the device binding record of the target device;
[0139] Identify new target devices;
[0140] Establish a binding relationship between the new target device and the point to be bound.
[0141] In an embodiment of the present application, a project plan is created, multiple points are created based on the project plan, and the equipment corresponding to each point is bound and synchronized to the operation and maintenance platform, which can improve the rapid synchronization and update of information, and the binding relationship between the equipment and the point can be clearly displayed in the configuration interface based on the point, so that all the bound devices can be viewed, configured and debugged only through the point, without the need for manual collection of equipment information, reducing labor costs and the cumbersomeness of equipment information, and improving the efficiency and accuracy of equipment management.
[0142] For the specific definition of the device management device, please refer to the definition of the device management method above, which will not be repeated here. Each module in the above-mentioned device management device can be implemented in whole or in part by software, hardware and a combination thereof. The above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0143] In one embodiment, a computer device is provided. The computer device may be a terminal device, and its internal structure diagram may be as follows: Fig.12 As shown. The computer device includes a processor, a memory, and a network interface connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a readable storage medium. The readable storage medium stores computer-readable instructions. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer-readable instructions are executed by the processor, a device management method is implemented. The readable storage medium provided in this embodiment includes a non-volatile readable storage medium and a volatile readable storage medium.
[0144] In an embodiment of the present application, a computer device is provided, including a memory, a processor, and computer-readable instructions stored in the memory and executable on the processor. When the processor executes the computer-readable instructions, the steps of the above-mentioned device management method are implemented.
[0145] In an embodiment of the application, a readable storage medium is provided, which stores computer-readable instructions. When the computer-readable instructions are executed by a processor, the steps of the above-mentioned device management method are implemented.
[0146] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing related hardware through computer-readable instructions, and the computer-readable instructions can be stored in a non-volatile readable storage medium or a volatile readable storage medium. When the computer-readable instructions are executed, they may include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM), etc.
[0147] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.
[0148] The above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A device management method, characterized in that: The method comprises: Creating a project plan, and determining the points to be created based on the project plan; Acquire information of a point to be created, and determine a point to be bound based on the information of the point to be created; A binding relationship is established between the target device and the point to be bound, so as to manage the target device through the point to be bound.
2. The device management method according to claim 1, characterized in that: The determining of the points to be created based on the project plan includes: Based on the project plan, collecting project information, the project information including project location information and environmental information; Based on the project location information and environmental information, divide and create point location areas; Determine a point to be created corresponding to each point belonging area, wherein each point belonging area includes at least one point to be created.
3. The device management method according to claim 2, characterized in that: After determining the point to be bound, the method further includes: Enter at least one of the device type corresponding to the point to be bound, the belonging area corresponding to the point to be bound, and the network configuration parameter information corresponding to the point to be bound.
4. The device management method according to claim 1, characterized in that: The step of establishing a binding relationship between the target device and the point to be bound includes: Obtain the target device information by scanning the identification code or manually entering it, so as to establish a binding relationship between the target device and the point to be bound based on the target device information; or Acquiring communication information of the target device; Based on the communication information, establishing a communication connection with the target device to obtain the target device information; Based on the target device information, a binding relationship between the target device and the point to be bound is established.
5. The device management method according to any one of claims 1 to 4, characterized in that: After the binding relationship between the target device and the point to be bound is established, the following steps are included: A communication connection is established with the target device, and the target device is redirected to a device configuration interface of the target device to perform device debugging on the target device in the device configuration interface.
6. The device management method according to any one of claims 1 to 4, characterized in that: After the binding relationship between the target device and the point to be bound is established, the following steps are included: Obtaining a binding position corresponding to the target device when establishing the binding relationship; Determining whether the current location of the target device is consistent with the binding location; If not, determining the target point corresponding to the current position of the target device; The binding relationship between the target device and the point to be bound is released, and based on the device information of the target device when the binding relationship is established, a binding relationship between the target device and the target point is established.
7. The device management method according to any one of claims 1 to 4, characterized in that: After the binding relationship between the target device and the point to be bound is established, the following steps are included: Obtaining device status information reported by the target device; Based on the binding relationship, the device status information is associated with the point to be bound; Based on the point to be bound, the device status information of the target device is checked to adjust the target device parameters based on the device status information.
8. A device management device, characterized in that: The device comprises: A project plan creation unit, used to create a project plan and determine the points to be created based on the project plan; A point creation unit, used for acquiring information of a point to be created, and creating a corresponding point based on the information of the point to be created; A point determination unit, used to determine the points to be bound among the created points; The binding unit is used to establish a binding relationship between the target device and the point to be bound, so as to manage the target device through the point to be bound.
9. A computer device comprising a memory, a processor, and computer-readable instructions stored in the memory and executed on the processor, characterized in that: When the processor executes the computer-readable instructions, the device management method according to any one of claims 1 to 7 is implemented.
10. A readable storage medium having computer readable instructions stored thereon, characterized in that: When the computer-readable instructions are executed by a processor, the device management method according to any one of claims 1 to 7 is implemented.