Engineering geological survey water pressure test device

By designing an engineering geological survey water pressure test device integrating trolleys, water supply mechanisms and adjustment mechanisms, the shortcomings in the existing devices in terms of adjustment range and stability are solved, and higher practicality and convenience are achieved.

CN119715312AInactive Publication Date: 2025-03-28山东省地质矿产勘查开发局第七地质大队
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411913310.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-24
Publication Date
2025-03-28
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing engineering geological survey water pressure test equipment is relatively single in terms of adjustment range and function, and the equipment is insufficient instability when used in the laboratory, resulting in inconvenient use.

Method used

An engineering geological survey water pressure test device including a trolley, water supply mechanism, slide rail, slider, frame and adjustment mechanism is designed. Through the integrated installation of spiral blades and water supply pipes, combined with electric push rods and adjustment mechanisms, the stability of the equipment and the adjustment range are improved.

Benefits of technology

This device enhances the practicality and convenience of the equipment by improving the adjustment range and stability, and solves the instability problem of existing devices when used in the laboratory.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119715312A_ABST
    Figure CN119715312A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of water pressure tests, and discloses an engineering geological survey water pressure test device which comprises a cart, a water supply mechanism is arranged at the top of the cart, a sliding rail is fixedly connected to the top of the cart, a sliding block is slidably connected to the sliding rail, and a frame body is fixedly connected to the top of the sliding block. When the positions of the frame bodies are changed, the moving wheels are separated from the ground during drilling or water injection in the mode that the rod bodies push the push plates and the positioning rods through the ball bodies, on the contrary, after the moving wheels make contact with the ground and the mounting plate slides to the highest point, the frame bodies are pushed, and the moving wheels are driven to move to the ground. When the adjusting mechanism is not lifted to the highest position, the frame body is pushed, and the plate body is in contact with the first check block, due to the existence of the second spring, the plate body ascends, the height of the first check block is not changed, and the check block can still play a role in limiting the sliding block.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of water pressure testing, in particular to an engineering geological survey water pressure testing device. Background Art

[0002] The water pressure test is a permeability test conducted in a borehole. It uses a plug to isolate a certain length of the borehole, then presses water into the borehole at a certain pressure, and measures the pressure flow rate under the corresponding pressure. The pressure flow rate per unit test section length under a certain force is used to characterize the permeability of the rock in the borehole section. It is a common method for evaluating the permeability of rock mass. In engineering geological surveys, it is necessary not only to test the soil and vegetation of the area, but also the water in the area. It is not only necessary to test the water quality and water flow, but also to conduct a water pressure test. Therefore, a water pressure test device for engineering geological surveys is required.

[0003] At present, the engineering geological survey water pressure test equipment on the market is all carried out outdoors, so the water pressure test equipment needs to be easy to move. In the related technology, the separate components of the water pressure test equipment are integrated and installed on a mobile mechanism, so as to facilitate the transfer of the geological survey water pressure test equipment. However, in actual use, its adjustment range is small, and the function is relatively single. In addition, in the water pressure laboratory, the overall stability of the equipment cannot be guaranteed, which makes it inconvenient to use and brings inconvenience to the water pressure test work. Summary of the invention

[0004] 1. Technical issues to be solved

[0005] In view of the shortcomings of the prior art, the present invention provides an engineering geological survey water pressure test device, which has the advantages of facilitating water pressure tests and improving stability in the laboratory, thereby solving the problem that the existing engineering geological survey water pressure test device does not have a good adjustment function.

[0006] (II) Technical solution

[0007] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: an engineering geological survey water pressure test device, comprising: a cart, a water supply mechanism is arranged on the top of which, a slide rail is fixedly connected to the top of the cart, a slider is slidably connected to the slide rail, a frame is fixedly connected to the top of the slider, at least two of the slide rails, the sliders and the frames are arranged, and adjustment mechanisms are arranged on both of the two frames, a mounting plate is slidably connected to the inside of the frame, the adjustment mechanism is used to adjust the height of the mounting plate, a water supply pipe is arranged on one of the mounting plates, and a motor is fixedly connected to the other mounting plate, and the motor The output end of the machine is fixedly connected with a spiral blade, the water supply pipe is connected to the water supply mechanism through a water pipe, a moving wheel is arranged at the bottom of the cart, an electric push rod is fixedly connected inside the cart, a push plate is slidably connected inside the cart, the output end of the electric push rod is tightly attached to the push plate, a positioning rod is fixedly connected to the bottom of the push plate, a slide groove 1 is provided on the slide rail, a rod body is slidably connected in the slide groove 1, one end of the rod body is inserted into the cart, a spring 1 is sleeved on the outside of the rod body, two ends of the spring 1 are respectively fixedly connected to the cart and the rod body, and a ball is fixedly connected to the top of the rod body.

[0008] In some embodiments, the water supply mechanism is composed of a water tank, a water pump, a water pipe, a pressure gauge and a flow meter.

[0009] In some embodiments, a groove is formed on the sliding block, and the ball is embedded in the groove.

[0010] In some embodiments, the adjustment mechanism is composed of a servo motor and a threaded rod, the servo motor is fixed on the top of the frame, the threaded rod is rotatably connected in the frame, and the mounting plate is threadedly connected to the threaded rod.

[0011] In some embodiments, a plurality of positioning rods are provided.

[0012] In some embodiments, a second slide groove is provided in the cart, a stopper one is slidably connected in the second slide groove, a second spring is provided in the second slide groove, and two ends of the second spring are respectively fixedly connected to the stopper one and the cart.

[0013] In some embodiments, a plate body is slidably connected to the frame body, a slide groove three is provided in the frame body, a stopper two is slidably connected in the slide groove three, both the stopper two and the bottom of the plate body are chamfered, a spring three is provided in the slide groove three, and the two ends of the spring three are fixedly connected to the stopper two and the frame body respectively.

[0014] In some embodiments, the distance from the bottom of the second stopper to the top of the slide rail is equal to the height of the plate.

[0015] (III) Beneficial effects

[0016] Compared with the prior art, the present invention provides an engineering geological survey water pressure test device, which has the following beneficial effects:

[0017] 1. The engineering geological survey water pressure test device integrates the spiral blades and the water delivery pipe on the cart, which is convenient for overall transportation. At the same time, the adjustment range of the equipment is increased by setting the adjustment mechanism to improve practicality;

[0018] 2. The engineering geological survey water pressure test device turns on the electric push rod to adjust the height of the push plate and the positioning rod, so as to achieve the contact between the positioning rod and the ground or the contact between the moving wheel and the ground, thereby improving stability;

[0019] 3. The engineering geological survey water pressure test device changes the position of the frame, and at the same time, the ball pushes the rod body, so that the rod body pushes the push plate and the positioning rod, so that when drilling or water injection, the moving wheel is separated from the ground, and vice versa, the moving wheel is in contact with the ground, thereby improving practicality;

[0020] 4. The engineering geological survey water pressure test device pushes the frame body by pressing the stopper downward to disengage the slider from the slide rail, thereby realizing the disassembly of the slider and the structure thereon. Conversely, the stopper acts as a limit to the slider to prevent it from disengaging from the slide rail.

[0021] 5. When the engineering geological survey water pressure test device is using the adjustment mechanism, after the mounting plate slides to the highest point, the plate body is pressed against the slide rail, so that when the frame is pushed, the plate body directly pushes the block 1, and the limit on the slide block is cancelled, which is convenient for disassembly. If the adjustment mechanism is not lifted to the highest point, when the frame is pushed, when the plate body contacts the block 1, the plate body rises due to the presence of the spring 2, and the height of the block 1 remains unchanged, so that the block can still limit the slide block, thereby improving practicality. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a structural schematic diagram of the present invention;

[0023] Figure 2 It is a schematic diagram of the internal structure of the cart in the present invention when viewed from above;

[0024] Figure 3 It is a schematic diagram of the installation position structure of the plate body in the present invention;

[0025] Figure 4 It is a schematic diagram of the opening position structure of the second chute in the present invention.

[0026] In the figure:

[0027] 10. Trolley; 11. Water supply mechanism; 12. Slide rail; 13. Slider; 14. Frame;

[0028] 20. Adjustment mechanism; 21. Mounting plate; 22. Water supply pipe; 23. Motor; 24. Spiral blade;

[0029] 30. Moving wheels;

[0030] 40. Electric push rod; 41. Push plate; 42. Positioning rod;

[0031] 50. Slide groove 1; 51. Rod body; 52. Spring 1; 53. Ball;

[0032] 60. Slide groove 2; 61. Stopper 1; 62. Spring 2;

[0033] 70. Plate body; 71. Slide slot three; 72. Stop block two; 73. Spring three. DETAILED DESCRIPTION

[0034] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0035] It should be noted that all directional indications in the embodiments of the present application are only used to explain the relative position relationship, movement status, etc. between the components in a certain specific posture. If the specific posture changes, the directional indication will also change accordingly.

[0036] In this application, unless otherwise clearly specified and limited, the terms "connection", "fixation", etc. should be understood in a broad sense. For example, "fixation" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0037] In addition, in this application, descriptions such as "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in this field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0038] At present, the engineering geological survey water pressure test devices on the market are all carried out outdoors. After drilling holes in the ground, water is injected while measuring relevant data based on flow meters and water pressure gauges to achieve water pressure tests.

[0039] In the related art, the separate components of the water pressure test device are integrated and installed on a mobile mechanism, so as to facilitate the transfer of the geological survey water pressure test device. However, in actual use, its adjustment range is small and its function is relatively simple. In addition, in the water pressure laboratory, the overall stability of the equipment cannot be guaranteed, which makes it inconvenient to use and brings inconvenience to the water pressure test work.

[0040] In order to solve the problems in the related technology to a certain extent, the embodiment of the present application provides an engineering geological survey water pressure test device. When it is needed, the cart 10 only needs to move the equipment to the specified position, and the height of the spiral blade 24 and the water supply pipe 22 is adjusted in turn by the adjustment mechanism 20, and then the water supply mechanism 11 is cooperated to realize the water injection operation, and then the relevant data is measured by the flow meter and pressure gauge, which is more convenient and quick, and improves the convenience of the device.

[0041] The present application is described below with reference to the accompanying drawings and specific embodiments:

[0042] Combination Figure 1-Figure 4 The embodiment of the present application provides an engineering geological survey water pressure test device, including: a cart 10, a water supply mechanism 11 is arranged on the top of the cart 10, a slide rail 12 is fixedly connected to the top of the cart 10, a slider 13 is slidably connected to the slide rail 12, a frame 14 is fixedly connected to the top of the slider 13, at least two of the slide rails 12, the slider 13 and the frame 14 are provided, and an adjustment mechanism 20 is arranged on both of the two frames 14, a mounting plate 21 is slidably connected to the inner side of the frame 14, and the adjustment mechanism 20 is used to adjust the height of the mounting plate 21, a water supply pipe 22 is arranged on one of the mounting plates 21, and a motor 23 is fixedly connected to the other mounting plate 21, and the output end of the motor 23 is fixedly connected to The spiral blade 24, the water supply pipe 22 is connected to the water supply mechanism 11 through a water pipe, a moving wheel 30 is arranged at the bottom of the cart 10, an electric push rod 40 is fixedly connected inside the cart 10, a push plate 41 is slidably connected inside the cart 10, the output end of the electric push rod 40 is tightly attached to the push plate 41, a positioning rod 42 is fixedly connected to the bottom of the push plate 41, a slide groove 50 is opened on the slide rail 12, a rod body 51 is slidably connected in the slide groove 50, one end of the rod body 51 is inserted into the cart 10, a spring 52 is sleeved on the outside of the rod body 51, two ends of the spring 52 are respectively fixedly connected to the cart 10 and the rod body 51, and a ball 53 is fixedly connected to the top of the rod body 51.

[0043] If a water pressure test is required, the cart 10 is directly pushed to move the cart 10 through the moving wheels 30 at the bottom until the cart 10 is moved to the specified position, and then a frame 14 is manually pushed to drive the mounting plate 21, the motor 23 and the spiral blade 24 thereon to move. Then, the height of the mounting plate 21 and the structure on the mounting plate 21 are adjusted through the adjustment mechanism 20, and the motor 23 is turned on at the same time to rotate the spiral blade 24. Then, the spiral blade 24 is made to penetrate the ground to achieve the punching operation, and finally, the adjustment mechanism 20 is used to adjust the height of the mounting plate 21 and the structure on the mounting plate 21. The height of the mounting plate 21 and the structure thereon is adjusted again until it is reset, the frame 14 is manually pulled to reset the frame 14, and then another frame 14 is pulled to make the frame 14 drive another mounting plate 21 and the water supply pipe 22 to move, and finally the water supply mechanism 11 is docked with the water supply pipe 22, and the adjustment mechanism 20 is opened to adjust the height of the water supply pipe 22 so that it penetrates into the opened hole, and then the water supply mechanism 11 is opened to make the water supply mechanism 11 deliver water to the hole, and relevant data are measured by the flow meter and the water pressure gauge to realize the water pressure test;

[0044] When the frame 14 is pushed, the frame 14 slides on the slide rail 12 through the slider 13 until the slider 13 contacts the ball 53, pushes the ball 53 and the rod 51 into the slide groove 50, and squeezes the spring 52, and at the same time, the rod 51 pushes the push plate 41 and the positioning rod 42 to slide out from the bottom of the cart 10, and then the positioning rod 42 contacts the ground to support the entire cart 10, so that the moving wheel 30 is separated from the ground, the stability is improved, and the position of the equipment is prevented from shifting during the subsequent water injection process, affecting normal use. When the electric push rod 40 is actively turned on, the output end of the electric push rod 40 pushes the push plate 41 and the positioning rod 42, so as to realize the active adjustment of the height of the positioning rod 42 and improve practicality.

[0045] Specifically, during the test, a water stop plug is installed in the borehole to isolate the test section from the surrounding rock mass. Then, a certain head pressure is applied by a water pump to press water into the test section. The water will penetrate into the surrounding rock mass through the cracks in the borehole wall. Within a certain period of time (usually about 10 minutes), the amount of water pressed in and the amount of pressure applied are recorded. By measuring the change in water volume during this period, the unit water absorption (ω) of the rock mass can be calculated. The formula is: ω=Q / (s·L), where Q is the amount of seepage water, s is the pressure head height, and L is the length of the test section.

[0046] In some embodiments, the water supply mechanism 11 is composed of a water tank, a water pump, a water pipe, a pressure gauge and a flow meter. When supplying water, the water pump is turned on to pump out the water in the water tank and transport it to the water delivery pipe 22 through the water pipe to realize the water supply operation. The water tank and the water pump are fixedly connected to the cart 10, and the water inlet of the water pump is connected to the water tank. The water pipe is installed at the water outlet of the water pump and fixed on the water tank. The pressure gauge and the flow meter are installed on the water pipe to monitor the pressure and flow in the water pipe.

[0047] In some embodiments, a groove is provided on the slider 13, and the ball 53 is embedded in the groove. After the position of the frame 14 is adjusted to align the groove on the slider 13 with the ball 53, the ball 53 is embedded in the groove through the rebound force of the spring 52, thereby limiting the slider 13 and the frame 14.

[0048] In some embodiments, the adjustment mechanism 20 is composed of a servo motor and a threaded rod, the servo motor is fixed on the top of the frame 14, the threaded rod is rotatably connected in the frame 14, and the mounting plate 21 is threadedly connected to the threaded rod.

[0049] The servo motor in the adjustment mechanism 20 is turned on to drive the threaded rod to rotate, and the height of the mounting plate 21 is adjusted through the threaded connection between the threaded rod and the mounting plate 21 .

[0050] In some embodiments, a plurality of positioning rods 42 are provided, so that the plurality of positioning rods 42 are in contact with the ground at the same time, thereby increasing the contact area and improving stability.

[0051] In some embodiments, a second slide groove 60 is opened in the cart 10, a stopper 61 is slidably connected in the second slide groove 60, a second spring 62 is arranged in the second slide groove 60, and both ends of the second spring 62 are fixedly connected to the stopper 61 and the cart 10 respectively.

[0052] When it is necessary to remove the slider 13, push the block 61 downward to make the block 61 slide in the slide groove 60, squeeze the spring 62, make the block 61 lower than the slide rail 12, and then directly push the frame 14 to make the frame 14 drive the slider 13 to slide out from the slide rail 12, thereby realizing the removal of the slider 13 and the structure thereon, and vice versa to realize the installation. After the installation is completed, the block 61 has a limiting and anti-slip effect on the slider 13.

[0053] In some embodiments, a plate body 70 is slidably connected to the frame body 14, a sliding groove 3 71 is provided in the frame body 14, a stopper 2 72 is slidably connected in the sliding groove 3 71, chamfers are provided at the bottom of the stopper 2 72 and the plate body 70, a spring 3 73 is provided in the sliding groove 3 71, and two ends of the spring 3 73 are respectively fixedly connected to the stopper 2 72 and the frame body 14.

[0054] The cam 72 is then moved back into position after the locking cam 73 is unlocked, and the locking cam 73 is unlocked when the locking cam 73 is unlocked, thereby locking the cam 72 in the unlocked position.

[0055] In some embodiments, the distance from the bottom of the second stopper 72 to the top of the slide rail 12 is equal to the height of the plate 70, so that after the second stopper 72 slides out, the plate 70 can be tightly attached to the top of the slide rail 12, thereby facilitating subsequent disassembly.

[0056] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", "some examples", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present application. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification.

[0057] In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the fact that they can be implemented by ordinary technicians in this field. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0058] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. An engineering geological survey water pressure test device, characterized in that: include: A cart (10) is provided with a water supply mechanism (11) on its top, a slide rail (12) is fixedly connected to the top of the cart (10), a slider (13) is slidably connected to the slide rail (12), a frame (14) is fixedly connected to the top of the slider (13), at least two of the slide rail (12), the slider (13) and the frame (14) are provided, and an adjustment mechanism (20) is provided on both of the two frames (14), a mounting plate (21) is slidably connected to the inner side of the frame (14), and the adjustment mechanism (20) is used to adjust the height of the mounting plate (21), a water supply pipe (22) is provided on one of the mounting plates (21), and a motor (23) is fixedly connected to the other mounting plate (21), a spiral blade (24) is fixedly connected to the output end of the motor (23), and the water supply pipe (22) The trolley (10) is connected to the water supply mechanism (11) through a water pipe. A moving wheel (30) is arranged at the bottom of the trolley (10). An electric push rod (40) is fixedly connected inside the trolley (10). A push plate (41) is slidably connected inside the trolley (10). The output end of the electric push rod (40) is tightly attached to the push plate (41). A positioning rod (42) is fixedly connected to the bottom of the push plate (41). A slide groove (50) is provided on the slide rail (12). A rod body (51) is slidably connected in the slide groove (50). One end of the rod body (51) is inserted into the trolley (10). A spring (52) is sleeved on the outer side of the rod body (51). The two ends of the spring (52) are respectively fixedly connected to the trolley (10) and the rod body (51). A ball (53) is fixedly connected to the top of the rod body (51).

2. The engineering geological survey water pressure test device according to claim 1, characterized in that: The water supply mechanism (11) is composed of a water tank, a water pump, a water pipe, a pressure gauge and a flow meter.

3. The engineering geological survey water pressure test device according to claim 1, characterized in that: The sliding block (13) is provided with a groove, and the ball (53) is embedded in the groove.

4. The engineering geological survey water pressure test device according to claim 1, characterized in that: The adjustment mechanism (20) is composed of a servo motor and a threaded rod, wherein the servo motor is fixed on the top of the frame (14), the threaded rod is rotatably connected inside the frame (14), and the mounting plate (21) is threadedly connected to the threaded rod.

5. The engineering geological survey water pressure test device according to claim 1, characterized in that: A plurality of positioning rods (42) are provided.

6. The engineering geological survey water pressure test device according to claim 1, characterized in that: A second slide groove (60) is provided in the cart (10), a stopper (61) is slidably connected in the second slide groove (60), a second spring (62) is provided in the second slide groove (60), and two ends of the second spring (62) are respectively fixedly connected to the stopper (61) and the cart (10).

7. The engineering geological survey water pressure test device according to claim 6, characterized in that: The frame (14) is slidably connected with a plate (70), a sliding groove (71) is provided in the frame (14), a stopper (72) is slidably connected in the sliding groove (71), the stopper (72) and the bottom of the plate (70) are both chamfered, a spring (73) is provided in the sliding groove (71), and the two ends of the spring (73) are respectively fixedly connected to the stopper (72) and the frame (14).

8. The engineering geological survey water pressure test device according to claim 7, characterized in that: The distance from the bottom of the second stopper (72) to the top of the slide rail (12) is equal to the height of the plate body (70).