By determining the installation range of the energy storage node at the output point of the weak station area in the mountainous area, the problem of poor power supply stability in the weak station area in the mountainous area is solved, and the effect of improving the stability of the power supply network is achieved.
Patent Information
- Application Number
- CN202411769130.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-04
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2044-12-04
AI Technical Summary
The power supply stability of weak station areas in mountainous areas is poor, affecting user life.
By obtaining the output points of the distribution transformer and power lines in the station area, determining the monitoring points, and using instruments installed at the output points and monitoring points to obtain the line data, performing two-dimensional processing, spatial and temporal anomaly analysis, and determining the installation range of the energy storage nodes to improve power supply stability.
By arranging additional energy storage nodes at unstable output points, the stability of the entire power supply network is improved and the power supply for users' lives is more reliable.
Smart Images

Figure CN119727113A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of distribution network management, and in particular to a microgrid configuration method and system for weak substations in mountainous areas. Background Art
[0002] "Substation" is a term in the power system, which refers to an area powered by power transformers. Specifically, a substation refers to a power supply range defined in the power distribution network and powered by one or more distribution transformers. Each substation usually serves a certain number of users, and the users in the substation share the power supply of one or more transformers.
[0003] In mountainous areas, the power transmission process will be affected by the environment. Some power supply processes will be very unstable and the substations are relatively weak, affecting the lives of users. How to improve the power supply stability of weak substations in mountainous areas is the technical problem that the technical solution of the present invention aims to solve. Summary of the invention
[0004] The purpose of the present invention is to provide a microgrid configuration method and system for weak substations in mountainous areas to solve the problems raised in the above-mentioned background technology.
[0005] To achieve the above object, the present invention provides the following technical solutions:
[0006] A microgrid configuration method and system for weak station areas in mountainous areas, the method comprising:
[0007] Obtain the distribution transformer of the substation area and the power line based on the distribution transformer, obtain the output point of the power line, and determine the monitoring point in the power line according to the output point;
[0008] Acquire line data based on the instruments installed at the output points and the instruments installed at the monitoring points, and perform two-dimensional processing on the line data;
[0009] Identify the line data after two-dimensional processing and determine the spatial abnormality of each output point;
[0010] Identify the line data of each output point and determine the time anomaly of each output point;
[0011] The spatial and temporal anomalies of all output points are counted to determine the energy storage nodes.
[0012] As a further solution of the present invention: the steps of obtaining the distribution transformer of the substation and the power line based on the distribution transformer, obtaining the output point of the power line, and determining the monitoring point in the power line according to the output point include:
[0013] Get the distribution transformers installed in the substation area, and use the distribution transformers as line nodes to query the power lines in the substation area;
[0014] Obtain output points on the power line, and calculate the detection density at each position in the power line according to the output points;
[0015] Select monitoring points based on detection density and update detection density simultaneously;
[0016] The loop is executed until a preset loop exit condition is met; the loop exit condition includes that the detection density of all positions reaches a preset density value and the number of monitoring points reaches a preset number threshold.
[0017] As a further solution of the present invention: the calculation process of the detection density includes:
[0018] Where ρ(x) is the detection density at position x on the power line, α is the preset correction coefficient, and d i (x) is the distance between the ith point and the x position, and N is the total number of points; the points include output points and monitoring points.
[0019] As a further solution of the present invention: the step of acquiring line data according to the instrument installed at the output point and the instrument installed at the monitoring point, and performing two-dimensional processing on the line data comprises:
[0020] Establish a connection channel with the instrument installed at the output point, and establish a connection channel with the instrument installed at the monitoring point;
[0021] Acquire route data containing location tags based on the established connection channel;
[0022] Perform time domain registration on line data and normalize line data with location tags at the same time;
[0023] Arrange the normalized data based on the position labels.
[0024] As a further solution of the present invention: the process of the normalization processing includes:
[0025] In the formula, y ′ is the data after normalization, y is the data before normalization, and y max is the maximum value of the line data, y min It is the minimum value of line data.
[0026] As a further solution of the present invention: the step of identifying the two-dimensionally processed line data and determining the spatial abnormality of each output point includes:
[0027] Perform two-dimensional Fourier transform on the line data after two-dimensional processing to extract the spectrum diagram and phase diagram;
[0028] Perform high-pass filtering of different sizes on the spectrum graph, and perform inverse transformation on the spectrum graph after high-pass filtering based on the phase graph;
[0029] In the result obtained by the inverse transformation, query the location of the retained data;
[0030] Determine the spatial abnormality of the location of the retained data according to the size of the high-pass filter;
[0031] Among them, the high-pass filtering scheme adopts a circular filtering scheme based on the origin, and the size adopts the radius of the circle; the spatial anomaly degree is proportional to the maximum radius corresponding to each position.
[0032] As a further solution of the present invention: the step of identifying the line data of each output point and determining the time anomaly degree of each output point includes:
[0033] Count the line data of each output point and obtain the data difference of the line data;
[0034] Taking the current time as the starting point, query the data difference within the preset backtracking time;
[0035] Perform a preset ratio of de-extreme value processing on the data differences within the retrospective time, and calculate the standard deviation of the data differences after de-extreme value processing;
[0036] The temporal anomaly degree of the output point is determined according to the direct proportion of the standard deviation.
[0037] As a further solution of the present invention: the step of counting the spatial abnormality and temporal abnormality of all output points and determining the energy storage node comprises:
[0038] Count the spatial anomaly and temporal anomaly of all output points and calculate the comprehensive anomaly;
[0039] Determine a predicted energy storage area according to the comprehensive abnormality; the predicted energy storage area is a circular area, the radius of the circular area is inversely proportional to the comprehensive abnormality, and the predicted energy storage area is used to characterize the installation range of the energy storage node that supplies power to the output point;
[0040] Calculate the intersection of all predicted energy storage areas, and sort the intersections in descending order according to the number of predicted energy storage areas corresponding to each intersection;
[0041] The energy storage nodes are installed in the intersection in sequence until the number of energy storage nodes reaches a preset threshold.
[0042] As a further solution of the present invention: in the process of installing energy storage nodes, each time an energy storage node is installed, the predicted energy storage area corresponding to the energy storage node is eliminated once in the process of calculating the intersection of all predicted energy storage areas.
[0043] The technical solution of the present invention also provides a microgrid configuration system for weak substations in mountainous areas, the system comprising:
[0044] A monitoring point determination module is used to obtain the distribution transformer of the substation area and the power line based on the distribution transformer, obtain the output point of the power line, and determine the monitoring point in the power line according to the output point;
[0045] A two-dimensional processing module, used for acquiring line data according to the instrument installed at the output point and the instrument installed at the monitoring point, and performing two-dimensional processing on the line data;
[0046] The spatial analysis module is used to identify the line data after two-dimensional processing and determine the spatial abnormality of each output point;
[0047] The time analysis module is used to identify the line data of each output point and determine the time anomaly of each output point;
[0048] The energy storage node setting module is used to count the spatial anomaly and temporal anomaly of all output points and determine the energy storage nodes.
[0049] As a further solution of the present invention: the monitoring point determination module includes:
[0050] A data query unit is used to obtain the distribution transformers installed in the substation area, and query the power lines in the substation area with the distribution transformers as line nodes;
[0051] A detection density calculation unit, used to obtain output points on the power line, and calculate the detection density at each position in the power line according to the output points;
[0052] A detection density updating unit, used to select monitoring points based on the detection density and synchronously update the detection density;
[0053] The loop execution unit is used for loop execution until a preset loop exit condition is met; the loop exit condition includes that the detection density of all positions reaches a preset density value and the number of monitoring points reaches a preset number threshold.
[0054] As a further solution of the present invention: the two-dimensional processing module includes:
[0055] A channel establishing unit, used to establish a connection channel with an instrument installed at an output point, and to establish a connection channel with an instrument installed at a monitoring point;
[0056] A channel application unit, used for acquiring line data containing location tags based on the established connection channel;
[0057] A normalization processing unit is used to perform time domain registration on the line data and normalize the line data with location tags at the same time;
[0058] The data arrangement unit is used to arrange the normalized data based on the position labels.
[0059] As a further solution of the present invention: the spatial analysis module includes:
[0060] A two-dimensional data processing unit, used for performing a two-dimensional Fourier transform on the line data after two-dimensional processing, and extracting a spectrum diagram and a phase diagram;
[0061] An inverse transformation unit, used for performing high-pass filtering of different sizes on the spectrum graph, and performing inverse transformation on the spectrum graph after high-pass filtering based on the phase graph;
[0062] A position query unit, used for querying the position of the retained data in the result obtained by the inverse transformation;
[0063] an abnormality calculation unit, used to determine the spatial abnormality of the position of the retained data according to the size of the high-pass filter;
[0064] Among them, the high-pass filtering scheme adopts a circular filtering scheme based on the origin, and the size adopts the radius of the circle; the spatial anomaly degree is proportional to the maximum radius corresponding to each position.
[0065] As a further solution of the present invention: the time analysis module includes:
[0066] A data difference obtaining unit is used to count the line data of each output point and obtain the data difference of the line data;
[0067] A data difference query unit, used to query the data difference within a preset backtracking time with the current time as the starting point;
[0068] A mean calculation unit, used to perform a de-extreme value process on the data differences within the retrospective time at a preset ratio, and calculate the standard deviation of the data differences after the de-extreme value process;
[0069] The execution unit is used to determine the time anomaly degree of the output point according to the direct proportion of the standard deviation.
[0070] As a further solution of the present invention: the energy storage node setting module includes:
[0071] The data statistics unit is used to count the spatial anomaly and temporal anomaly of all output points and calculate the comprehensive anomaly;
[0072] A prediction unit, used to determine a predicted energy storage area according to the comprehensive abnormality; the predicted energy storage area is a circular area, the radius of the circular area is inversely proportional to the comprehensive abnormality, and the predicted energy storage area is used to characterize the installation range of the energy storage node that supplies power to the output point;
[0073] A descending order arrangement unit is used to calculate the intersection of all predicted energy storage areas and arrange the intersections in descending order according to the number of predicted energy storage areas corresponding to each intersection;
[0074] The installation application unit is used to install energy storage nodes in the intersection in sequence until the number of energy storage nodes reaches a preset number threshold.
[0075] Compared with the prior art, the present invention has the following beneficial effects:
[0076] The present invention performs spatiotemporal analysis on the data of all output points, selects some unstable output points, and additionally arranges some energy storage nodes based on these output points to supply energy to these output points, thereby improving the stability of the entire power supply network. BRIEF DESCRIPTION OF THE DRAWINGS
[0077] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention.
[0078] Figure 1 The overall flow chart of the microgrid configuration method for weak substations in mountainous areas is shown.
[0079] Figure 2 The structural diagram of the microgrid configuration system for weak substations in mountainous areas is shown. DETAILED DESCRIPTION
[0080] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0081] Embodiment 1:
[0082] Figure 1 The present invention provides a general flow chart of a microgrid configuration method and system for weak station areas in mountainous areas. In an embodiment of the present invention, a microgrid configuration method for weak station areas in mountainous areas includes:
[0083] Step S100: obtaining a distribution transformer in the substation area and a power line based on the distribution transformer, obtaining an output point of the power line, and determining a monitoring point in the power line according to the output point;
[0084] Step S200: acquiring line data according to the instrument installed at the output point and the instrument installed at the monitoring point, and performing two-dimensional processing on the line data;
[0085] Step S300: Identify the line data after two-dimensional processing and determine the spatial abnormality of each output point;
[0086] Step S400: Identify the line data of each output point and determine the time anomaly of each output point;
[0087] Step S500: Count the spatial anomaly and temporal anomaly of all output points to determine the energy storage nodes.
[0088] "Substation" is a term in the power system, which refers to an area powered by power transformers. Specifically, a substation refers to a power supply range defined in the power distribution network and powered by one or more distribution transformers. Each substation usually serves a certain number of users, and the users in the substation share the power supply of one or more transformers.
[0089] The distribution transformers in each substation and the power lines based on the distribution transformers already have data, which can be read directly. On this basis, it is necessary to obtain which power users the power lines are connected to, which are called output points. There must be an electric meter at the output point. On this basis, based on the distribution of output points, some monitoring points are added to the power lines to make the line data acquisition process more comprehensive.
[0090] Line data is obtained based on the instruments installed at the output points and the instruments installed at the monitoring points. Each line data is the data at a monitoring point or an output point. Its position is recorded, and the line data is sorted according to the position, and then the line data is two-dimensionally processed; after the two-dimensional processing, the two-dimensionally processed data is identified, and some relatively abnormal positions can be located, which is called spatial anomaly degree; the spatial anomaly degree represents the difference between the data of any position at the current moment and the data of the adjacent position at the current moment; generally, if there is a branch between adjacent positions, the difference between their line data will be relatively large.
[0091] For each location where the meter is installed, the acquired line data is arranged in chronological order, and the fluctuation of the line data is analyzed to obtain the time anomaly degree; the time anomaly degree indicates the fluctuation of the line data within a period of time.
[0092] Finally, some output points are selected according to the spatial anomaly and temporal anomaly, and some energy storage nodes are set based on the output points to compensate for their electric energy and improve the stability of their use process.
[0093] The actual function of the technical solution of the present invention is to select some unstable output points from multiple output points, and additionally arrange some energy storage nodes based on these output points to supply energy to these output points, thereby improving the stability of the entire power supply network.
[0094] Embodiment 2:
[0095] Regarding step S100, the steps of obtaining the distribution transformer of the substation and the power line based on the distribution transformer, obtaining the output point of the power line, and determining the monitoring point in the power line according to the output point include:
[0096] Get the distribution transformers installed in the substation area, and use the distribution transformers as line nodes to query the power lines in the substation area;
[0097] Obtain output points on the power line, and calculate the detection density at each position in the power line according to the output points;
[0098] Select monitoring points based on detection density and update detection density simultaneously;
[0099] The loop is executed until a preset loop exit condition is met; the loop exit condition includes that the detection density of all positions reaches a preset density value and the number of monitoring points reaches a preset number threshold.
[0100] The above content specifically limits the selection process of monitoring points. The ultimate target to be analyzed in this application is the output point, and instruments are installed at the output point, and its electricity consumption data is known. If the monitoring point is not installed, it is feasible to directly analyze the output point, but the comprehensiveness of the data will be slightly reduced; therefore, the present application also provides a monitoring point selection scheme, which aims to improve the comprehensiveness of the data acquisition process.
[0101] Get the distribution transformers installed in the substation, and use the distribution transformers as line nodes to query the power lines in the substation. The distribution transformers are devices that output electricity. The power lines are connected to the electricity users. Get the output points on the power lines, and calculate the detection density at each location in the power lines based on the output points. The detection density indicates how many detection resources there are at a certain location.
[0102] Compare the detection density at each position, install a monitoring point at the lowest detection density, then the detection density of all positions is updated accordingly, and then install another monitoring point at the lowest detection density, and execute the cycle until the detection density of all positions reaches the preset density value or the number of monitoring points reaches the preset threshold value.
[0103] Furthermore, the calculation process of the detection density includes:
[0104] Where ρ(x) is the detection density at position x on the power line, α is the preset correction coefficient, and d i (x) is the distance between the ith point and the x position, and N is the total number of points; the points include output points and monitoring points.
[0105] The x position in the calculation process of the detection density needs to be explained. This application considers that the line is one-dimensional. Therefore, it is necessary to simplify the line into a line in advance according to the preset order. After selecting an origin on the line, all positions can be represented by the parameter x; each point with an instrument will affect the density at the x position. The farther the distance, the smaller the impact. For any position, the final detection density can be obtained by superimposing the influence of all points with instruments at that position.
[0106] Embodiment three:
[0107] Step S200, the step of acquiring line data according to the instrument installed at the output point and the instrument installed at the monitoring point, and performing two-dimensional processing on the line data includes:
[0108] Establish a connection channel with the instrument installed at the output point, and establish a connection channel with the instrument installed at the monitoring point;
[0109] Acquire route data containing location tags based on the established connection channel;
[0110] Perform time domain registration on line data and normalize line data with location tags at the same time;
[0111] Arrange the normalized data based on the position labels.
[0112] All existing instruments have data transmission functions. A connection channel with the instrument is established, and line data containing location tags are obtained based on the established connection channel. In the technical solution of the present invention, the data acquisition frequency of all instruments is the same. However, since the transmission process itself takes time, the line data obtained from different instruments will be offset in time. In this case, the line data with a sufficiently small time difference needs to be regarded as data at the same time, that is, time domain alignment. For the line data at the same time, they are arranged according to the position of the instrument to obtain two-dimensional data; generally, from north to south corresponds to from top to bottom, and from west to east corresponds to from left to right.
[0113] In addition, for ease of processing, the present application will also perform normalization processing on the line data in the process of arranging the normalized data based on the position labels, that is, perform dimensionless processing on the line data.
[0114] Furthermore, the process of the normalization includes:
[0115] In the formula, y ′ is the data after normalization, y is the data before normalization, and y max is the maximum value of the line data, y min It is the minimum value of line data.
[0116] The normalization process itself is very simple. It is worth mentioning that the data after normalization will fall into the range of 0 to 255, which is actually the range of grayscale values. This makes the two-dimensional data compatible with most image processing algorithms for calculating spatial anomaly.
[0117] Embodiment 4:
[0118] Regarding step S300, the step of identifying the two-dimensionally processed line data and determining the spatial abnormality of each output point includes:
[0119] Perform two-dimensional Fourier transform on the line data after two-dimensional processing to extract the spectrum diagram and phase diagram;
[0120] Perform high-pass filtering of different sizes on the spectrum graph, and perform inverse transformation on the spectrum graph after high-pass filtering based on the phase graph;
[0121] In the result obtained by the inverse transformation, query the location of the retained data;
[0122] Determine the spatial abnormality of the location of the retained data according to the size of the high-pass filter;
[0123] Among them, the high-pass filtering scheme adopts a circular filtering scheme based on the origin, and the size adopts the radius of the circle; the spatial anomaly degree is proportional to the maximum radius corresponding to each position.
[0124] The above content specifically limits the calculation process of spatial anomaly. The line data after two-dimensional processing can be compared to an image. A two-dimensional Fourier transform is performed on the line data after two-dimensional processing to obtain a spectrum diagram and a phase diagram. The spectrum diagram reflects the changes of each data after two-dimensional processing. The high-frequency part corresponds to the part with drastic changes. The spectrum diagram is high-pass filtered, that is, the low-frequency part (around the origin in the frequency domain diagram) is removed, and the position with more drastic changes can be retained.
[0125] Among them, in the process of removing the low-frequency part, the size of the removed area is the size of the above content. The larger the size, the more drastic the change of the retained position, and accordingly, the higher the spatial anomaly. Since the same position may be retained in the removal process of multiple sizes, the maximum size is selected, and the spatial anomaly is determined in direct proportion to the maximum size. The proportionally selected function can be a composite function based on an exponential function, a composite function based on a logarithmic function, or a composite function based on a power function. The specific parameters are determined by the staff according to the situation.
[0126] Embodiment five:
[0127] Regarding step S400, the step of identifying the line data of each output point and determining the time anomaly of each output point includes:
[0128] Count the line data of each output point and obtain the data difference of the line data;
[0129] Taking the current time as the starting point, query the data difference within the preset backtracking time;
[0130] Perform a preset ratio of de-extreme value processing on the data differences within the retrospective time, and calculate the standard deviation of the data differences after de-extreme value processing;
[0131] The temporal anomaly degree of the output point is determined according to the direct proportion of the standard deviation.
[0132] In an example of the technical solution of the present invention, the calculation process of the time anomaly degree is described. The calculation process of the time anomaly degree is actually a fluctuation identification process. The line data of each output point is counted, and the data difference of the line data is obtained. The data difference is the derivative of discrete data and reflects the change. Taking the current time as the starting point, the data difference within the preset backtracking time is queried. The backtracking time is generally one day; the data difference within the backtracking time is subjected to a preset proportion of de-extreme value processing, and the standard deviation of the data difference after de-extreme value processing is calculated. The popular description of the de-extreme value processing is to remove a certain number of maximum values and a certain number of minimum values. The purpose of the de-extreme value processing is to prevent misjudgment (due to the violent fluctuation caused by noise); the data difference after the de-extreme value processing is analyzed to calculate the standard deviation. The time anomaly degree of the output point can be determined according to the direct proportion of the standard deviation, that is, the larger the standard deviation, the greater the fluctuation, and the greater the time anomaly degree.
[0133] Furthermore, the step of counting the spatial anomaly and temporal anomaly of all output points to determine the energy storage node includes:
[0134] Count the spatial anomaly and temporal anomaly of all output points and calculate the comprehensive anomaly;
[0135] Determine a predicted energy storage area according to the comprehensive abnormality; the predicted energy storage area is a circular area, the radius of the circular area is inversely proportional to the comprehensive abnormality, and the predicted energy storage area is used to characterize the installation range of the energy storage node that supplies power to the output point;
[0136] Calculate the intersection of all predicted energy storage areas, and sort the intersections in descending order according to the number of predicted energy storage areas corresponding to each intersection;
[0137] The energy storage nodes are installed in the intersection in sequence until the number of energy storage nodes reaches a preset threshold.
[0138] In an example of the technical solution of the present invention, the spatial and temporal anomalies of all output points are counted, the comprehensive anomaly is calculated (they can be summed according to preset weights), a radius is determined according to the comprehensive anomaly, and a circular area with the output point as the center is created, which is called the predicted energy storage area. The larger the comprehensive anomaly, the smaller the radius, which indicates the range within which the energy supply point needs to be set when auxiliary energy is supplied to the output point.
[0139] After determining the predicted energy storage areas of all output points, calculate the intersection of all predicted energy storage areas. Each intersection corresponds to a different number of predicted energy storage areas. The more corresponding ones there are, the more meaningful it is to set up an energy storage node at the intersection. Arrange the intersections in descending order according to the number of predicted energy storage areas corresponding to each intersection, then select the intersections one by one and install the energy storage node in the intersection.
[0140] It should be noted that the predicted energy storage area itself is a spatial range, and the intersection is actually also a range. Energy storage nodes are set within the intersection, and a random setting method can be adopted as long as the energy storage nodes are ensured to be within the intersection.
[0141] Embodiment six:
[0142] In the process of installing energy storage nodes, each time an energy storage node is installed, the predicted energy storage area corresponding to the energy storage node is eliminated once in the process of calculating the intersection of all predicted energy storage areas.
[0143] The above content adds a simplified solution. Every time a storage node is set up, the corresponding predicted storage area is deleted, indicating that the corresponding output node already has auxiliary energy supply equipment. This can prevent the storage nodes from being too concentrated, that is, one output node can be powered by multiple storage nodes.
[0144] In fact, both solutions provided in this application are feasible. What is affected is the number of energy storage nodes to be set up and the cost issue.
[0145] Embodiment seven:
[0146] Figure 2The structure diagram of the microgrid configuration system for weak stations in mountainous areas is shown. In a preferred embodiment of the technical solution of the present invention, a microgrid configuration system for weak stations in mountainous areas is also provided. The system 10 includes:
[0147] The monitoring point determination module 11 is used to obtain the distribution transformer of the substation area and the power line based on the distribution transformer, obtain the output point of the power line, and determine the monitoring point in the power line according to the output point;
[0148] A two-dimensional processing module 12 is used to obtain line data according to the instrument installed at the output point and the instrument installed at the monitoring point, and perform two-dimensional processing on the line data;
[0149] The spatial analysis module 13 is used to identify the line data after two-dimensional processing and determine the spatial abnormality of each output point;
[0150] The time analysis module 14 is used to identify the line data of each output point and determine the time anomaly degree of each output point;
[0151] The energy storage node setting module 15 is used to count the spatial anomaly and temporal anomaly of all output points and determine the energy storage nodes.
[0152] Furthermore, the monitoring point determination module 11 includes:
[0153] A data query unit is used to obtain the distribution transformers installed in the substation area, and query the power lines in the substation area with the distribution transformers as line nodes;
[0154] A detection density calculation unit, used to obtain output points on the power line, and calculate the detection density at each position in the power line according to the output points;
[0155] A detection density updating unit, used to select monitoring points based on the detection density and synchronously update the detection density;
[0156] The loop execution unit is used for loop execution until a preset loop exit condition is met; the loop exit condition includes that the detection density of all positions reaches a preset density value and the number of monitoring points reaches a preset number threshold.
[0157] Specifically, the two-dimensional processing module 12 includes:
[0158] A channel establishing unit, used to establish a connection channel with an instrument installed at an output point, and to establish a connection channel with an instrument installed at a monitoring point;
[0159] A channel application unit, used for acquiring line data containing location tags based on the established connection channel;
[0160] A normalization processing unit is used to perform time domain registration on the line data and normalize the line data with location tags at the same time;
[0161] The data arrangement unit is used to arrange the normalized data based on the position labels.
[0162] In addition, the spatial analysis module 13 includes:
[0163] A two-dimensional data processing unit, used for performing a two-dimensional Fourier transform on the line data after two-dimensional processing, and extracting a spectrum diagram and a phase diagram;
[0164] An inverse transformation unit, used for performing high-pass filtering of different sizes on the spectrum graph, and performing inverse transformation on the spectrum graph after high-pass filtering based on the phase graph;
[0165] A position query unit, used for querying the position of the retained data in the result obtained by the inverse transformation;
[0166] an abnormality calculation unit, used to determine the spatial abnormality of the position of the retained data according to the size of the high-pass filter;
[0167] Among them, the high-pass filtering scheme adopts a circular filtering scheme based on the origin, and the size adopts the radius of the circle; the spatial anomaly degree is proportional to the maximum radius corresponding to each position.
[0168] Furthermore, the time analysis module 14 includes:
[0169] A data difference obtaining unit is used to count the line data of each output point and obtain the data difference of the line data;
[0170] A data difference query unit, used to query the data difference within a preset backtracking time with the current time as the starting point;
[0171] A mean calculation unit, used to perform a de-extreme value process on the data differences within the retrospective time at a preset ratio, and calculate the standard deviation of the data differences after the de-extreme value process;
[0172] The execution unit is used to determine the time anomaly degree of the output point according to the direct proportion of the standard deviation.
[0173] In addition, the energy storage node setting module 15 includes:
[0174] The data statistics unit is used to count the spatial anomaly and temporal anomaly of all output points and calculate the comprehensive anomaly;
[0175] A prediction unit, used to determine a predicted energy storage area according to the comprehensive abnormality; the predicted energy storage area is a circular area, the radius of the circular area is inversely proportional to the comprehensive abnormality, and the predicted energy storage area is used to characterize the installation range of the energy storage node that supplies power to the output point;
[0176] A descending order arrangement unit is used to calculate the intersection of all predicted energy storage areas and arrange the intersections in descending order according to the number of predicted energy storage areas corresponding to each intersection;
[0177] The installation application unit is used to install energy storage nodes in the intersection in sequence until the number of energy storage nodes reaches a preset number threshold.
[0178] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A microgrid configuration method for weak station areas in mountainous areas, characterized in that: The method comprises: Obtain the distribution transformer of the substation area and the power line based on the distribution transformer, obtain the output point of the power line, and determine the monitoring point in the power line according to the output point; Acquire line data based on the instruments installed at the output points and the instruments installed at the monitoring points, and perform two-dimensional processing on the line data; Identify the line data after two-dimensional processing and determine the spatial abnormality of each output point; Identify the line data of each output point and determine the time anomaly of each output point; The spatial and temporal anomalies of all output points are counted to determine the energy storage nodes.
2. The microgrid configuration method for weak station areas in mountainous areas according to claim 1 is characterized in that: The steps of obtaining the distribution transformer of the substation area and the power line based on the distribution transformer, obtaining the output point of the power line, and determining the monitoring point in the power line according to the output point include: Get the distribution transformers installed in the substation area, and use the distribution transformers as line nodes to query the power lines in the substation area; Obtain output points on the power line, and calculate the detection density at each position in the power line according to the output points; Select monitoring points based on detection density and update detection density simultaneously; The loop is executed until a preset loop exit condition is met; the loop exit condition includes that the detection density of all positions reaches a preset density value and the number of monitoring points reaches a preset number threshold.
3. The microgrid configuration method for weak station areas in mountainous areas according to claim 2 is characterized in that: The calculation process of the detection density includes: Where ρ(x) is the detection density at position x on the power line, α is the preset correction coefficient, and d i (x) is the distance between the ith point and the x position, and N is the total number of points; the points include output points and monitoring points.
4. The microgrid configuration method for weak station areas in mountainous areas according to claim 3 is characterized in that: The step of acquiring line data according to the instrument installed at the output point and the instrument installed at the monitoring point, and performing two-dimensional processing on the line data comprises: Establish a connection channel with the instrument installed at the output point, and establish a connection channel with the instrument installed at the monitoring point; Acquire route data containing location tags based on the established connection channel; Perform time domain registration on line data and normalize line data with location tags at the same time; Arrange the normalized data based on the position labels.
5. The microgrid configuration method for weak substations in mountainous areas according to claim 4 is characterized in that: The process of normalization includes: In the formula, y ′ is the data after normalization, y is the data before normalization, and y max is the maximum value of the line data, y min It is the minimum value of line data.
6. The microgrid configuration method for weak station areas in mountainous areas according to claim 1 is characterized in that: The step of identifying the line data after two-dimensional processing and determining the spatial abnormality of each output point includes: Perform two-dimensional Fourier transform on the line data after two-dimensional processing to extract the spectrum diagram and phase diagram; Perform high-pass filtering of different sizes on the spectrum graph, and perform inverse transformation on the spectrum graph after high-pass filtering based on the phase graph; In the result obtained by the inverse transformation, query the location of the retained data; Determine the spatial abnormality of the location of the retained data according to the size of the high-pass filter; Among them, the high-pass filtering scheme adopts a circular filtering scheme based on the origin, and the size adopts the radius of the circle; the spatial anomaly degree is proportional to the maximum radius corresponding to each position.
7. The microgrid configuration method for weak substations in mountainous areas according to claim 1 is characterized in that: The step of identifying the line data of each output point and determining the time anomaly of each output point includes: Count the line data of each output point and obtain the data difference of the line data; Taking the current time as the starting point, query the data difference within the preset backtracking time; Perform a preset ratio of de-extreme value processing on the data differences within the retrospective time, and calculate the standard deviation of the data differences after de-extreme value processing; The temporal anomaly degree of the output point is determined according to the direct proportion of the standard deviation.
8. The microgrid configuration method for weak substations in mountainous areas according to claim 1 is characterized in that: The step of counting the spatial anomaly and temporal anomaly of all output points to determine the energy storage node comprises: Count the spatial anomaly and temporal anomaly of all output points and calculate the comprehensive anomaly; Determine a predicted energy storage area according to the comprehensive abnormality; the predicted energy storage area is a circular area, the radius of the circular area is inversely proportional to the comprehensive abnormality, and the predicted energy storage area is used to characterize the installation range of the energy storage node that supplies power to the output point; Calculate the intersection of all predicted energy storage areas, and sort the intersections in descending order according to the number of predicted energy storage areas corresponding to each intersection; The energy storage nodes are installed in the intersection in sequence until the number of energy storage nodes reaches a preset threshold.
9. The microgrid configuration method for weak station areas in mountainous areas according to claim 8 is characterized in that: In the process of installing energy storage nodes, each time an energy storage node is installed, the predicted energy storage area corresponding to the energy storage node is eliminated once in the process of calculating the intersection of all predicted energy storage areas.
10. A microgrid configuration system for weak substations in mountainous areas, characterized in that: The system comprises: A monitoring point determination module is used to obtain the distribution transformer of the substation area and the power line based on the distribution transformer, obtain the output point of the power line, and determine the monitoring point in the power line according to the output point; A two-dimensional processing module, used for acquiring line data according to the instrument installed at the output point and the instrument installed at the monitoring point, and performing two-dimensional processing on the line data; The spatial analysis module is used to identify the line data after two-dimensional processing and determine the spatial abnormality of each output point; The time analysis module is used to identify the line data of each output point and determine the time anomaly of each output point; The energy storage node setting module is used to count the spatial anomaly and temporal anomaly of all output points and determine the energy storage nodes.
11. The microgrid configuration system for weak substations in mountainous areas according to claim 10 is characterized in that: The monitoring point determination module includes: A data query unit is used to obtain the distribution transformers installed in the substation area, and query the power lines in the substation area with the distribution transformers as line nodes; A detection density calculation unit, used to obtain output points on the power line, and calculate the detection density at each position in the power line according to the output points; A detection density updating unit, used to select monitoring points based on the detection density and synchronously update the detection density; The loop execution unit is used for loop execution until a preset loop exit condition is met; the loop exit condition includes that the detection density of all positions reaches a preset density value and the number of monitoring points reaches a preset number threshold.
12. The microgrid configuration system for weak substations in mountainous areas according to claim 10, characterized in that: The two-dimensional processing module comprises: A channel establishing unit, used to establish a connection channel with an instrument installed at an output point, and to establish a connection channel with an instrument installed at a monitoring point; A channel application unit, used for acquiring line data containing location tags based on the established connection channel; A normalization processing unit is used to perform time domain registration on the line data and normalize the line data with location tags at the same time; The data arrangement unit is used to arrange the normalized data based on the position labels.
13. The microgrid configuration system for weak substations in mountainous areas according to claim 10, characterized in that: The spatial analysis module includes: A two-dimensional data processing unit, used for performing a two-dimensional Fourier transform on the line data after two-dimensional processing, and extracting a spectrum diagram and a phase diagram; An inverse transformation unit, used for performing high-pass filtering of different sizes on the spectrum graph, and performing inverse transformation on the spectrum graph after high-pass filtering based on the phase graph; A position query unit, used for querying the position of the retained data in the result obtained by the inverse transformation; an abnormality calculation unit, used to determine the spatial abnormality of the position of the retained data according to the size of the high-pass filter; Among them, the high-pass filtering scheme adopts a circular filtering scheme based on the origin, and the size adopts the radius of the circle; the spatial anomaly degree is proportional to the maximum radius corresponding to each position.
14. The microgrid configuration system for weak substations in mountainous areas according to claim 10, characterized in that: The time analysis module includes: A data difference obtaining unit is used to count the line data of each output point and obtain the data difference of the line data; A data difference query unit, used to query the data difference within a preset backtracking time with the current time as the starting point; A mean calculation unit, used to perform a de-extreme value process on the data differences within the retrospective time at a preset ratio, and calculate the standard deviation of the data differences after the de-extreme value process; The execution unit is used to determine the time anomaly degree of the output point according to the direct proportion of the standard deviation.
15. The microgrid configuration system for weak substations in mountainous areas according to claim 10, characterized in that: The energy storage node setting module includes: The data statistics unit is used to count the spatial anomaly and temporal anomaly of all output points and calculate the comprehensive anomaly; A prediction unit, used to determine a predicted energy storage area according to the comprehensive abnormality; the predicted energy storage area is a circular area, the radius of the circular area is inversely proportional to the comprehensive abnormality, and the predicted energy storage area is used to characterize the installation range of the energy storage node that supplies power to the output point; A descending order arrangement unit is used to calculate the intersection of all predicted energy storage areas and arrange the intersections in descending order according to the number of predicted energy storage areas corresponding to each intersection; The installation application unit is used to install energy storage nodes in the intersection in sequence until the number of energy storage nodes reaches a preset number threshold.
Citation Information
Patent Citations
Intelligent power distribution network exception handling method and system
CN112787398A
Power distribution network toughness planning method considering distributed energy storage emergency power supply capability
CN115809836A
Intelligent power utilization real-time monitoring method and system
CN115982577A
Light storage energy dynamic adjustment method and system based on weather prediction
CN117318111A
Transformer fault state supervision method and system based on Internet of Things data
CN117630543A
Cited By
Source network hydrogen storage integrated coordination control method and system of off-network system
CN120341970A
Source-grid-hydrogen-storage integrated coordinated control method and system for off-grid systems
CN120341970B