A building machine integrated platform
By introducing an integrated platform of steel platform system, support system and hanging system into the building construction machine, and using structures such as connecting blocks and positioning components, the problem of low installation efficiency of existing building construction machines has been solved, achieving precise positioning and rapid connection, thereby improving construction efficiency and structural stability.
Patent Information
- Application Number
- CN202411731207.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-29
- Publication Date
- 2025-12-12
- Estimated Expiration
- 2044-11-29
AI Technical Summary
The existing steel platforms and support systems for building construction have low installation efficiency and are difficult to align precisely, resulting in extended construction time and insufficient structural stability.
The building construction machine integrated platform, which includes a steel platform system, a support system, and a hanging frame system, utilizes connecting blocks, positioning components, and adjusting screws to achieve precise positioning and rapid connection of the steel platform.
This improved the convenience and accuracy of steel platform installation, shortened construction time, and enhanced the overall structural stability of the building construction machine.
Smart Images

Figure CN119737060B_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The present application relates to the technical field of building machine, and particularly relates to a building machine integrated platform. BACKGROUND
[0002] In modern building construction, the building machine as an efficient and fast construction equipment is widely used in the construction of high-rise and super high-rise buildings. The building machine generally comprises a steel platform system, a support system and a hanging frame system, the construction equipment is installed in the steel platform system, the support system is used for supporting and lifting the steel platform system and the hanging frame system as a whole, and the hanging frame system is arranged below the steel platform for workers to work. The steel platform and the support system of the existing building machine mostly adopt traditional connection modes such as bolt fastening, buckle locking or direct welding. Although these connection modes meet the connection requirements to some extent, the overall installation efficiency is not high. In the installation process, due to the lack of pre-fixing and adjusting mechanism, the steel platform and the support system are often difficult to realize accurate alignment, which leads to the gradual accumulation of errors, and further increases the complexity and difficulty of installation. This not only leads to the extension of construction time and the lag of engineering progress, but also may affect the overall structural strength and stability of the building machine due to the unfirm connection, and further adversely affects the construction quality. SUMMARY
[0003] The technical problem to be solved by the present application is to provide a building machine integrated platform, which can improve the convenience and accuracy of steel platform installation, improve the installation efficiency and shorten the construction time.
[0004] In order to solve the above technical problems, the present application provides a building machine integrated platform, comprising a steel platform system, a support system supporting the steel platform and a hanging frame system connected with the steel platform, the steel platform system comprises a top plate assembly, the top plate assembly comprises a plurality of first walkway plates, the support system comprises an upper support assembly and a lower support assembly, the upper support assembly comprises an upper support disc and an upper support frame, the lower support assembly comprises a lower support disc and a lower support frame, the upper support disc is connected with the upper support frame, the upper support frame is connected with the lower support disc, the lower support disc is connected with the lower support frame, and the hanging frame system comprises a connecting frame and a plurality of second walkway plates arranged on the connecting frame in layers.
[0005] The steel platform system further comprises a positioning assembly for positioning the top plate assembly and a plurality of connecting rod assemblies for fixing the top plate assembly, a plurality of the first walkway plates are connected with each other and arranged on the connecting rod assemblies, the connecting rod assembly comprises a first connecting rod and a second connecting rod, a connecting block is further arranged between the first connecting rod and the second connecting rod, positioning columns are arranged on both sides of the connecting block, and the positioning columns on both sides of the connecting block can be connected with the first connecting rod and the second connecting rod respectively;
[0006] The connecting block comprises a first folded edge flush with upper surfaces of the first connecting rod and the second connecting rod, and a connecting hole is arranged on the first folded edge; the positioning assembly comprises a fixing plate and a positioning block, the positioning block is capable of sliding on the fixing plate in a direction perpendicular to the length of the first walkway plate, the fixing plate is provided with a fixing hole capable of being fixed in the connecting hole, and a side of the positioning block is capable of abutting against a side edge of the first walkway plate and sliding along the length direction of the first walkway plate to form installation positioning of the first walkway plate.
[0007] The hanger system further comprises a connecting assembly, the connecting assembly comprises a connecting steel strip, a top of the connecting steel strip is connected to the bottom of the steel platform system, and a bottom of the connecting steel strip is connected with the connecting frame.
[0008] As an improvement of the above-mentioned scheme, the connecting block further comprises a second folded edge and an intermediate folded edge, the first folded edge and the second folded edge are arranged in parallel, the intermediate folded edge is arranged vertically and located between the first folded edge and the second folded edge, the second folded edge is flush with lower surfaces of the first connecting rod and the second connecting rod, the same side of the first folded edge and the second folded edge abuts against the first connecting rod, and the other side of the first folded edge and the second folded edge abuts against the second connecting rod; one side of the intermediate folded edge abuts against the first connecting rod, and the other side of the intermediate folded edge abuts against the second connecting rod.
[0009] As an improvement of the above-mentioned scheme, the positioning assembly further comprises an adjusting table and an adjusting screw, the adjusting table is fixed to a side of the fixing plate away from the walkway plate, an end of the adjusting screw passes through the adjusting table and is rotationally connected with the positioning block, an outer thread of the adjusting screw is capable of being engaged with an inner thread of the adjusting table, and the adjusting screw is capable of moving relative to the adjusting table and driving the positioning block to move when the adjusting screw rotates.
[0010] As an improvement of the above-mentioned scheme, the fixing plate comprises an upper plate, a vertical plate and a lower plate, the upper plate, the vertical plate and the lower plate enclose a groove, a side of the first connecting rod or the second connecting rod is capable of being inserted into the groove, the positioning block is arranged on the upper plate, the upper plate is provided with a sliding groove, a sliding table is arranged at a bottom of the positioning block, the sliding table is capable of being inserted into the sliding groove and sliding in the sliding groove, and a scale bar is further arranged on a side of the sliding groove.
[0011] As an improvement of the above-mentioned scheme, the lower support disc is provided with a pre-positioning mechanism, the pre-positioning mechanism comprises a positioning strip arranged on the lower support disc, the positioning strip is arranged on a side of a connecting position of the upper support frame and the lower support disc, and the upper support frame is capable of abutting against the positioning strip when the upper support frame is connected with the lower support disc.
[0012] As an improvement of the above-mentioned solution, the lower supporting disc is provided with a through hole, the bottom of the upper supporting frame is provided with a connecting table capable of being connected to the through hole, the positioning strip is arranged on the side of the through hole, the positioning strip protrudes from the surface of the lower supporting disc, and the side of the connecting table is capable of abutting against the side of the positioning strip.
[0013] As an improvement of the above-mentioned solution, the lower supporting disc is further provided with a positioning groove, the positioning groove is surrounded by two or more positioning strips, and the connecting table is capable of being inserted into the positioning groove.
[0014] As an improvement of the above-mentioned solution, the connecting assembly comprises a first connecting buckle and a second connecting buckle, the second connecting buckle is fixed to the bottom of the first connecting buckle, the two sides of the first connecting buckle are respectively provided with first buckling arms, the first buckling arms protrude towards the inner side of the first connecting buckle and are capable of being buckled to the two sides of the connecting rod assembly, the two sides of the second connecting buckle are respectively provided with second buckling arms, the second buckling arms protrude towards the inner side of the second connecting buckle and are capable of being buckled to the two sides of the connecting steel bar.
[0015] As an improvement of the above-mentioned solution, the connecting frame comprises a frame body supporting rod and a frame body connecting buckle, the frame body connecting buckle is fixed to the top of the frame body supporting rod, the two sides of the frame body connecting buckle are respectively provided with third buckling arms, the third buckling arms protrude towards the inner side of the frame body connecting buckle and are capable of being buckled to the two sides of the connecting steel bar.
[0016] As an improvement of the above-mentioned solution, the frame body supporting rod is vertically arranged, the second walkway plate is divided into multiple layers and is horizontally fixed to the connecting frame, and the multiple layers of the second walkway plate are arranged at intervals.
[0017] The present application has the following beneficial effects:
[0018] The building machine integrated platform of the application is provided with a steel platform system, a support system and a hanging rack system, wherein the steel platform system comprises a top plate assembly, a positioning assembly and a connecting rod assembly, the top plate assembly comprises a plurality of first walkway plates, the plurality of first walkway plates are connected with each other and arranged on the connecting rod assembly, the connecting rod assembly comprises first connecting rods and second connecting rods, and is used for combining and connecting to form stronger support, in order to facilitate the connection of the first connecting rods and the second connecting rods, a connecting block is further arranged between the first connecting rods and the second connecting rods, positioning columns are arranged on the two sides of the connecting block respectively, the positioning columns on the two sides of the connecting block can be connected with the first connecting rods and the second connecting rods respectively, the first connecting rods and the second connecting rods can be connected in advance by using the connecting block, the first connecting rods and the second connecting rods are facilitated to be welded subsequently, and the welding precision is high. The connecting block comprises a first folded edge, a connecting hole is arranged on the first folded edge, a fixing hole is arranged on a fixing plate of the positioning assembly, the fixing hole can be fixed in the connecting hole, a side portion of a positioning block of the positioning assembly can abut against a side edge of the first walkway plate and can slide along the length direction of the first walkway plate, and the positioning block can slide on the fixing plate in a direction perpendicular to the length of the first walkway plate, the edge position of the first walkway plate can be limited by sliding the positioning block, so that the first walkway plate is positioned, and the connection with the connecting rod assembly is facilitated subsequently. Therefore, the building machine integrated platform of the application can improve the convenience and accuracy of steel platform installation, improve the installation efficiency and shorten the construction time. BRIEF DESCRIPTION OF DRAWINGS
[0019] Figure 1 is a structural schematic view of the building machine integrated platform of the application;
[0020] Figure 2 is a structural schematic view of the steel platform of the application;
[0021] Figure 3 is a structural schematic view of the positioning assembly and the connecting rod assembly of the application;
[0022] Figure 4 is a structural schematic view of the connecting rod assembly of the application;
[0023] Figure 5 is a structural schematic view of the positioning assembly of the application;
[0024] Figure 6 is a structural schematic view of the support system of the application;
[0025] Figure 7 is a structural schematic view of the lower support disc of the application;
[0026] Figure 8 is a structural schematic view of the hanging rack system of the application. DETAILED DESCRIPTION
[0027] In order to make the objects, technical solutions and advantages of the present application clearer, the present application will be further described in detail below with reference to the drawings. It should be noted that the terms "upper", "lower", "left", "right", "front", "back", "inner", "outer" and the like appearing in the present application, are based on the drawings of the present application and are not specific limitations on the present application.
[0028] Reference Figures 1-5 The embodiment of the present application discloses a building machine integrated platform, which comprises a steel platform system 100, a support system 200 supporting the steel platform, and a hanger system 300 connected with the steel platform. The steel platform system 100 is used for supporting construction personnel, construction equipment and materials and the like. The support system 200 can support the steel platform, and the oil cylinder system can lift the steel platform system 100 and the hanger system 300. The steel platform system 100 comprises a top plate assembly 1, which comprises a plurality of first walkway plates 11. The first walkway plates 11 can place construction equipment, materials and the like, and can also be used for construction personnel to walk. The support system 200 comprises an upper support assembly 4 and a lower support assembly 5. The upper support assembly 4 comprises an upper support disc 41 and an upper support frame 42. The lower support assembly 5 comprises a lower support disc 51 and a lower support frame 52. The upper support disc 41 is connected with the upper support frame 42. The upper support frame 42 is connected with the lower support disc 51. The lower support disc 51 is connected with the lower support frame 52. During installation, the upper support assembly 4 is first connected to the bottom of the steel platform system 100, and then the lower support assembly 5 is connected with the upper support assembly 4. Specifically, the upper support frame 42 is connected to the lower support disc 51. The hanger system 300 comprises a connecting frame 7 and a plurality of second walkway plates 9 arranged in layers on the connecting frame 7. The second walkway plates 9 are hung below the steel platform and are arranged in multiple layers, corresponding to different building layers, to allow construction workers to work on different building layers.
[0029] The steel platform system 100 further comprises a positioning assembly 2 for positioning the top plate assembly 1 and a plurality of connecting rod assemblies 3 for fixing the top plate assembly 1. The positioning assembly 2 can pre-position the top plate assembly 1, thereby improving the subsequent welding efficiency and accuracy. A plurality of first walkway plates 11 are connected with each other and arranged on the connecting rod assemblies 3, forming a continuous construction space. The connecting rod assemblies 3 comprise first connecting rods 31 and second connecting rods 32. The length direction of the first walkway plates 11 is parallel to the length direction of the first connecting rods 31 and the second connecting rods 32. The first connecting rods 31 and the second connecting rods 32 can support the first walkway plates 11 after being connected.
[0030] See Figure 4 To facilitate the connection between the first connecting rod 31 and the second connecting rod 32, a connecting block 33 is provided between them. The connecting block 33 is welded between the first connecting rod 31 and the second connecting rod 32, forming a single unit. For ease of positioning and welding, positioning posts 3312 are provided on both sides of the connecting block 33. These positioning posts 3312 can be connected to the first connecting rod 31 and the second connecting rod 32 respectively. Before welding, the positioning posts 3312 are pre-positioned by connecting them to the first connecting rod 31 and the second connecting rod 32, thus reducing the probability of the connecting block 33 shifting and improving welding accuracy and quality.
[0031] See Figure 4 The connecting block 33 further includes a first folded edge 331, which is flush with the upper surfaces of the first connecting rod 31 and the second connecting rod 32, thus avoiding interference with the installation of the walkway slab during installation. The first folded edge 331 has a connecting hole 3311. The positioning component 2 includes a fixing plate 21 and a positioning block 22. The fixing plate 21 is fixed in the connecting hole 3311 for fixation. The positioning block 22 can slide on the fixing plate 21 along a direction perpendicular to the length of the first walkway slab 11. In use, the fixing plate 21 is first fixed in the connecting hole 3311, and then the positioning block 22 is slid to a preset position. The side of the positioning block 22 can abut against the side edge of the walkway slab and slide along the length of the first walkway slab 11, thus limiting the installation position of the walkway slab and forming a pre-position, thereby positioning the walkway slab for installation and preventing errors or offsets in subsequent installation.
[0032] The hanging system 300 also includes a connecting component 8, which includes a connecting steel bar 83. The top of the connecting steel bar 83 is connected to the bottom of the steel platform system 100, and the bottom of the connecting steel bar 83 is connected to the connecting frame 7. The connecting steel bar 83 enables the connecting frame 7 to be connected to the steel platform system 100, thereby enabling the second walkway panels 9 of each layer to hang below the steel platform.
[0033] The beneficial effects of the embodiments of the present invention are as follows:
[0034] The building machine integrated platform of the embodiment of the present application is provided with a steel platform system 100, a support system 200 and a hanger system 300, wherein the steel platform system 100 comprises a top plate assembly 1, a positioning assembly 2 and a connecting rod assembly 3, the top plate assembly 1 comprises a plurality of first walkway plates 11, the plurality of first walkway plates 11 are connected with each other and arranged on the connecting rod assembly 3, the connecting rod assembly 3 comprises a first connecting rod 31 and a second connecting rod 32, and is used for being combined and connected to form stronger support, in order to facilitate the connection of the first connecting rod 31 and the second connecting rod 32, a connecting block 33 is further arranged between the first connecting rod 31 and the second connecting rod 32, positioning columns 3312 are arranged on both sides of the connecting block 33 respectively, the positioning columns 3312 on both sides of the connecting block 33 can be connected with the first connecting rod 31 and the second connecting rod 32 respectively, by using the connecting block 33, the first connecting rod 31 and the second connecting rod 32 can be connected in advance, the first connecting rod 31 and the second connecting rod 32 are facilitated to be welded subsequently, and the welding precision is high. The connecting block 33 comprises a first folded edge 331, a connecting hole 3311 is arranged on the first folded edge 331, a fixed hole 211 is arranged on a fixed plate 21 of the positioning assembly 2, the fixed hole 211 can be fixed in the connecting hole 3311, a side portion of a positioning block 22 of the positioning assembly 2 can abut against a side edge of the first walkway plate 11 and can slide along the length direction of the first walkway plate 11, and the positioning block 22 can slide on the fixed plate 21 along a direction perpendicular to the length of the first walkway plate 11, by sliding the positioning block 22, the edge position of the first walkway plate 11 can be limited, so that the first walkway plate 11 is positioned, and the connection with the connecting rod assembly 3 is facilitated subsequently. Therefore, the building machine integrated platform of the present application can improve the convenience and accuracy of the installation of the steel platform, improve the installation efficiency, and shorten the construction time.
[0035] Specifically, referring to Figure 4The connecting block 33 further comprises a second folded edge 332 and an intermediate folded edge 333, the first folded edge 331 and the second folded edge 332 are arranged in parallel, and the intermediate folded edge 333 is arranged vertically between the first folded edge 331 and the second folded edge 332. When positioning, after the positioning column 3312 is connected, the first folded edge 331 is flush with the upper surface of the first connecting rod 31 and the second connecting rod 32, and the second folded edge 332 is flush with the lower surface of the first connecting rod 31 and the second connecting rod 32. By controlling the flush effect of the upper and lower surfaces, the quality of positioning can be controlled, and the first folded edge 331 and the second folded edge 332 can be prevented from deviating, thereby ensuring the welding quality. Wherein, one side of the first folded edge 331 and the second folded edge 332 abuts against the first connecting rod 31, and the other side of the first folded edge 331 and the second folded edge 332 abuts against the second connecting rod 32, so as to achieve the positioning effect.
[0036] The intermediate folded edge 333 is arranged vertically, and the first folded edge 331 and the second folded edge 332 are arranged at the upper and lower ends of the intermediate folded edge 333, respectively. One side of the intermediate folded edge 333 abuts against the first connecting rod 31, and the other side abuts against the second connecting rod 32. The intermediate folded edge 333 not only improves the connection strength of the first folded edge 331 and the second folded edge 332, but also connects the first folded edge 331 and the second folded edge 332 into a whole, which facilitates the placement of the connecting block 33 between the first connecting rod 31 and the second connecting rod 32, saves the placement step, and facilitates the overall pre-positioning and improves the positioning effect. Moreover, compared with a single connecting piece, the connecting block 33 has an increased volume, which is conducive to installation and welding, and is not easy to deviate after pre-positioning. The arrangement of the intermediate folded edge 333 also facilitates the arrangement of the positioning column 3312. The first folded edge 331 and the second folded edge 332 are located at the upper and lower parts of the first connecting rod 31 and the second connecting rod 32. The first connecting rod 31 and the second connecting rod 32 are usually channel steels, and the upper and lower parts have wing plates, so it is not easy to arrange positioning holes on the wing plates. After the intermediate folded edge 333 is arranged, the positioning column 3312 can be arranged on the intermediate folded edge 333.
[0037] The positioning column 3312 is arranged on both sides of the intermediate folded edge 333. The positioning columns 3312 on both sides of the intermediate folded edge 333 protrude towards the side where the first connecting rod 31 and the second connecting rod 32 are located. The first connecting rod 31 and the second connecting rod 32 are each provided with a positioning hole, which is arranged at the middle position of the first connecting rod 31 and the second connecting rod 32, avoiding the position of the wing plate. The positioning column 3312 can be inserted into the positioning hole to form a pre-positioning.
[0038] See Figure 5 To accommodate various sizes of the first walkway slab 11 and adjust its pre-positioning location, the positioning assembly 2 further includes an adjusting platform 23 and an adjusting screw 24. The adjusting platform 23 is fixed to the side of the fixing plate 21 away from the first walkway slab 11, and protrudes upwards from the surface of the fixing plate 21. The adjusting screw 24 can be a common screw, with threads on its shaft. The adjusting platform 23 also has meshing threads. The end of the adjusting screw 24 passes through the adjusting platform 23 and engages with the positioning block 22. The adjusting platform 23 is fixed to the fixed plate 21 and can remain stationary relative to the fixed plate 21, while the positioning block 22 can slide relative to the fixed plate 21. The external thread of the adjusting screw 24 can engage with the internal thread of the adjusting platform 23, and the end of the adjusting screw 24 is rotatably connected to the positioning block 22. When the adjusting screw 24 rotates, it can only rotate relative to the positioning block 22 and will not separate from the positioning block 22. When the adjusting screw 24 rotates, it can move relative to the adjusting platform 23 and drive the positioning block 22 to move. During adjustment, by rotating the adjusting screw 24, the positioning block 22 can be pushed to move on the fixed plate 21, thereby adjusting the position of the side of the first walkway 11, achieving the effect of adjusting the pre-positioned position, and it can also be applied to first walkway 11 of different specifications.
[0039] Furthermore, in order to fix the fixing plate 21 to the connecting rod assembly 3, the fixing plate 21 includes an upper plate 212, a vertical plate 213, and a lower plate 214. The upper plate 212, the vertical plate 213, and the lower plate 214 form a groove 215, into which the side of the first connecting rod 31 or the second connecting rod 32 can be inserted. The upper plate 212, the vertical plate 213, and the lower plate 214 form a limiting position, which, combined with the fixing of the connecting hole 3311, can play a firm fixing role. The positioning block 22 is disposed on the upper plate 212, the upper plate 212 is provided with a sliding groove 2121, and the bottom of the positioning block 22 is provided with a sliding table 221. The sliding table 221 can be inserted into the sliding groove 2121 and slide within the sliding groove 2121. The sliding groove 2121 defines the moving direction of the positioning block 22. Furthermore, the side of the sliding groove 2121 is also provided with a scale bar 216. The adjustment distance can be determined by the scale bar 216, and the position can be adjusted according to the scale bar 216.
[0040] See Figure 6, in order to facilitate the connection of the upper support assembly 4 and the lower support assembly 5, the lower support disc 51 is provided with a positioning mechanism 6, the positioning mechanism 6 comprises a positioning strip 61 provided on the lower support disc 51, the positioning strip 61 is provided on the side of the connection between the upper support frame 42 and the lower support disc 51, and the upper support frame 42 can abut on the positioning strip 61 when the upper support frame 42 is connected with the lower support disc 51, the positioning strip 61 has a pre-positioning effect on the upper support frame 42, so as to facilitate the centering of the hole position between the upper support frame 42 and the lower support frame 52, and then facilitate the installation and connection.
[0041] Specifically, referring to Figure 6 and Figure 7 , the lower support disc 51 is provided with a through hole 511, and the bottom of the upper support frame 42 is provided with a connecting table 421, which can be connected in the through hole 511 by using bolts and other fasteners, and the positioning strip 61 is arranged on the side of the through hole 511. During installation, the positioning strip 61 on the side of the through hole 511 can be used for pre-positioning, so that the through hole 511 can be aligned with the connecting position of the connecting table 421.
[0042] The positioning strip 61 protrudes from the surface of the lower support disc 51, and the side of the connecting table 421 can abut on the side of the positioning strip 61.
[0043] In order to further improve the pre-positioning effect, the lower support disc 51 is further provided with a positioning groove 512, the positioning groove 512 is surrounded by two or more positioning strips 61, the two or more positioning strips 61 form a groove shape to form the positioning groove 512, and the groove opening of the positioning groove 512 faces upward or the side, so that the connecting table 421 can be inserted into the positioning groove 512 during installation. The pre-positioning directions of the positioning groove 512 and the positioning strip 61 are different, and the connecting table 421 can be better limited from multiple directions.
[0044] Referring to Figure 8In order to connect the connecting rod assembly 3 and the connecting steel strip 83, the connecting assembly 8 further comprises a first connecting buckle 81 and a second connecting buckle 82, the second connecting buckle 82 is fixed to the bottom of the first connecting buckle 81, the first connecting buckle 81 and the second connecting buckle 82 are opposite to each other, wherein the two sides of the first connecting buckle 81 are respectively provided with first buckling arms 811, the first buckling arms 811 are shaped as "7" and extend towards the inside of the first connecting buckle 81 and can be buckled to the two sides of the connecting rod assembly 3, so as to connect the first connecting buckle 81 with the connecting rod assembly 3, the two sides of the second connecting buckle 82 are respectively provided with second buckling arms 821, the second buckling arms 821 are shaped as "7" and extend towards the inside of the second connecting buckle 82 and can be buckled to the two sides of the connecting steel strip 83, so as to connect the second connecting buckle 82 with the connecting steel strip 83.
[0045] In addition, the connecting frame 7 comprises a frame support rod 71 and a frame connecting buckle 72, the frame connecting buckle 72 is fixed to the top of the frame support rod 71, the two sides of the frame connecting buckle 72 are respectively provided with third buckling arms 721, the third buckling arms 721 are shaped as "7" and extend towards the inside of the frame connecting buckle 72 and can be buckled to the two sides of the connecting steel strip 83, so as to connect the frame connecting buckle 72 with the connecting steel strip 83.
[0046] The frame support rod 71 is vertically arranged, the second walkway plate 9 is divided into multiple layers and is horizontally fixed to the connecting frame 7, the multiple layers of the second walkway plate 9 are arranged at intervals, each layer of the second walkway plate 9 corresponds to a different building layer, so as to facilitate workers to work on different building layers.
[0047] The above is the preferred embodiment of the present application, it should be noted that, for those skilled in the art, without departing from the principles of the present application, can make several improvements and refinements, these improvements and refinements are also considered to be within the scope of the present application.
Claims
1. A building construction machine integrated platform, characterized in that, The system includes a steel platform system, a support system supporting the steel platform, and a hanging system connected to the steel platform. The steel platform system includes a top plate assembly, which includes multiple first walkway plates. The support system includes an upper support assembly and a lower support assembly. The upper support assembly includes an upper support plate and an upper support frame. The lower support assembly includes a lower support plate and a lower support frame. The upper support plate is connected to the upper support frame, and the upper support frame is connected to the lower support plate. The lower support plate is connected to the lower support frame. The hanging system includes a connecting frame and multiple second walkway plates arranged in layers on the connecting frame. The steel platform system also includes a positioning component for positioning the top plate assembly and multiple connecting rod assemblies for fixing the top plate assembly. Multiple first walkway plates are interconnected and disposed on the connecting rod assembly. The connecting rod assembly includes a first connecting rod and a second connecting rod. A connecting block is also provided between the first connecting rod and the second connecting rod. Positioning posts are provided on both sides of the connecting block. The positioning posts on both sides of the connecting block can be connected to the first connecting rod and the second connecting rod, respectively. The connecting block includes a first folded edge, which is flush with the upper surfaces of the first connecting rod and the second connecting rod. The first folded edge has a connecting hole. The positioning assembly includes a fixing plate and a positioning block. The positioning block can slide on the fixing plate along a direction perpendicular to the length of the first walkway plate. The fixing plate has a fixing hole that can be fixed in the connecting hole. The side of the positioning block can abut against the side edge of the first walkway plate and slide along the length of the first walkway plate to form an installation positioning for the first walkway plate. The rack system also includes a connecting component, which includes a connecting steel bar. The top of the connecting steel bar is connected to the bottom of the steel platform system, and the bottom of the connecting steel bar is connected to the connecting frame. The connecting block further includes a second folded edge and a middle folded edge. The first folded edge and the second folded edge are arranged in parallel. The middle folded edge is arranged vertically and located between the first folded edge and the second folded edge. The second folded edge is flush with the lower surface of the first connecting rod and the second connecting rod. The same side of the first folded edge and the second folded edge abuts against the first connecting rod, and the other side of the first folded edge abuts against the second connecting rod. One side of the middle folded edge abuts against the first connecting rod, and the other side abuts against the second connecting rod. The positioning assembly further includes an adjustment platform and an adjustment screw. The adjustment platform is fixed in the fixed plate on the side away from the first walkway plate. The end of the adjustment screw passes through the adjustment platform and is rotatably connected to the positioning block. The external thread of the adjustment screw can mesh with the internal thread of the adjustment platform. When the adjustment screw rotates, it can move relative to the adjustment platform and drive the positioning block to move.
2. The building construction machine integrated platform according to claim 1, characterized in that, The fixing plate includes an upper plate, a vertical plate, and a lower plate. The upper plate, the vertical plate, and the lower plate form a groove. The side of the first connecting rod or the second connecting rod can be inserted into the groove. The positioning block is disposed on the upper plate. The upper plate is provided with a sliding groove. The bottom of the positioning block is provided with a sliding platform. The sliding platform can be inserted into the sliding groove and slide in the sliding groove. The side of the sliding groove is also provided with a scale strip.
3. The building construction machine integrated platform according to claim 1, characterized in that, The lower support plate is provided with a pre-positioning mechanism, which includes a positioning strip on the lower support plate. The positioning strip is located on the side of the connection between the upper support frame and the lower support plate. When the upper support frame is connected to the lower support plate, the upper support frame can abut against the positioning strip.
4. The building construction machine integrated platform according to claim 3, characterized in that, The lower support plate has a through hole, and the bottom of the upper support frame has a connecting platform that can be connected to the through hole. The positioning strip is located on the side of the through hole and protrudes from the surface of the lower support plate. The side of the connecting platform can abut against the side of the positioning strip.
5. The building construction machine integrated platform according to claim 4, characterized in that, The lower support plate is also provided with a positioning groove, which is formed by a plurality of positioning strips, and the connecting platform can be inserted into the positioning groove.
6. The building construction machine integrated platform according to claim 1, characterized in that, The connecting assembly includes a first connecting buckle and a second connecting buckle. The second connecting buckle is fixed to the bottom of the first connecting buckle. The first connecting buckle has a first fastening arm on each side. The first fastening arm extends toward the inside of the first connecting buckle and can fasten to both sides of the connecting rod assembly. The second connecting buckle has a second fastening arm on each side. The second fastening arm extends toward the inside of the second connecting buckle and can fasten to both sides of the connecting steel bar.
7. The building construction machine integrated platform according to claim 1, characterized in that, The connecting frame includes a frame support rod and a frame connecting buckle. The frame connecting buckle is fixed to the top of the frame support rod. A third fastening arm is provided on each side of the frame connecting buckle. The third fastening arm extends toward the inside of the frame connecting buckle and can fasten to both sides of the connecting steel bar.
8. The building construction machine integrated platform according to claim 7, characterized in that, The frame support rod is set vertically, and the second walkway slab is divided into multiple layers and is fixed horizontally on the connecting frame. The multiple layers of the second walkway slab are spaced apart.
Citation Information
Patent Citations
Steel platform for building system
CN119641103A