A method and system for managing equipment for zero-emission energy saving in industrial and mining enterprises

By obtaining and analyzing the workshop information and equipment basic information of industrial and mining enterprises, determining the equipment layout plan and calculating cost-effectiveness, the problem of industrial and mining enterprises not being able to effectively absorb energy during the production process is solved, and the goal of reducing equipment management costs and zero emission energy saving is achieved.

CN119740845AInactive Publication Date: 2025-04-01BEIJING BAILINGTIANDI ENVIRONMENTAL PROTECTION TECH
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202510255654.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-05
Publication Date
2025-04-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The energy generated by industrial and mining enterprises during the production process cannot be effectively absorbed, resulting in increased emissions and high equipment management costs.

Method used

By obtaining enterprise workshop information data and equipment basic information data, multiple workshop equipment layout plans are determined, the equipment layout cost and functional value are calculated, and the recommended information is output based on cost-effectiveness to optimize equipment layout.

Benefits of technology

It reduces the equipment management costs of enterprises and achieves the goal of zero emission and energy saving in industrial and mining enterprises.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119740845A_ABST
    Figure CN119740845A_ABST
Patent Text Reader

Abstract

The present application provides an equipment management method and system for zero-emission energy saving in industrial and mining enterprises, belonging to the technical field of zero-emission energy saving in enterprises; wherein, an equipment management method for zero-emission energy saving in industrial and mining enterprises comprises: obtaining enterprise workshop information data and equipment basic information data; determining multiple workshop equipment layout plans according to the enterprise workshop information data and the equipment basic information data; calculating equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculating the solution cost performance data of each workshop equipment layout plan according to the equipment layout cost data and the equipment function value data; outputting solution recommendation information based on the solution cost performance data; adopting this solution, the equipment management cost of the enterprise is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of enterprise zero-emission energy-saving technology, and in particular to an equipment management method and system for zero-emission energy-saving in industrial and mining enterprises. Background Art

[0002] Generally, industrial and mining enterprises will set up multiple workshops for processing products. In the process of processing products on the production line in the enterprise's workshop, additional energy will be generated. This energy will dissipate, making the enterprise's emissions more serious. Therefore, in order to reduce enterprise emissions and achieve zero-emission energy-saving effects, some related equipment with energy absorption functions can be arranged in the workshop. In order to reduce the company's equipment management costs, it is necessary to reasonably arrange a corresponding number of equipment in the workshop. Summary of the invention

[0003] The present application provides a method and system for zero-emission energy-saving equipment management in industrial and mining enterprises, which can reduce the equipment management costs of the enterprises.

[0004] In a first aspect, the present application provides an equipment management method for zero-emission energy saving in industrial and mining enterprises. The method comprises: Acquire enterprise workshop information data and equipment basic information data; the enterprise workshop information data includes workshop device type, workshop device location and workshop device preset importance data; the equipment basic information data includes equipment type, equipment cost and equipment performance; Determine multiple workshop equipment layout plans according to the enterprise workshop information data and the equipment basic information data; the workshop equipment layout plans include the number of workshop equipment, workshop equipment location and workshop equipment type of each enterprise workshop; Calculating equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculating the solution cost performance data of each workshop equipment layout plan based on the equipment layout cost data and the equipment function value data; Output scheme recommendation information based on the scheme cost performance data; the scheme recommendation information includes the workshop equipment layout scheme with the highest scheme cost performance data.

[0005] Further, the calculating of equipment layout cost data and equipment function value data of each workshop equipment layout scheme, and calculating the scheme cost performance data of each workshop equipment layout scheme according to the equipment layout cost data and the equipment function value data includes: Calculate first equipment cost data according to the equipment cost, the number of workshop equipment and the type of workshop equipment; Determine the equipment coverage workshop device importance and value data according to the workshop device preset importance data, the workshop equipment location and equipment performance; Calculating installation cost data of each device according to the equipment coverage workshop device importance and value data and preset unit importance cost data, and calculating second equipment cost data based on the installation cost data of each device; The equipment layout cost data of each workshop equipment layout plan is calculated according to the first equipment cost data and the second equipment cost data.

[0006] Furthermore, the calculation method of the equipment layout cost data includes: Assume that any workshop equipment layout has n equipment, then the equipment cost of the i-th equipment is ; Assume that there are m workshop devices covered by the i-th equipment, then the preset importance data of the j-th workshop device covered by the i-th equipment is ; ; In the formula, Arrange cost data for equipment; It is the preset unit importance cost data; are respectively a preset first weight and a preset second weight; wherein, .

[0007] Further, the calculating of equipment layout cost data and equipment function value data of each workshop equipment layout scheme, and calculating the scheme cost performance data of each workshop equipment layout scheme according to the equipment layout cost data and the equipment function value data includes: Based on the importance and value data of the equipment in the equipment-covered workshop and the preset importance value comparison table, the equipment performance value data of each equipment is obtained; Based on the device performance value data and the preset value data, a first device set and a second device set are selected; the first device set includes a plurality of first devices; the first device is a device whose device performance value data is not less than the preset value data; the second device is a device whose device performance value data is less than the preset value data; Make sure that the equipment is arranged with spare equipment of the same type; If the device belongs to the first device set, calculating the additional value data of the first device; If the device belongs to the second device set, calculating the second device additional value data; The device function value data is calculated based on the device performance value data, the first device additional value data, and the second device additional value data.

[0008] Furthermore, the calculation method of the equipment function value data includes: Assume that any workshop equipment layout plan has q equipment, then the equipment performance value data of the pth equipment is ; ; ; ; ; In the formula, It is the equipment function value data; is a natural constant; They are judgment functions respectively.

[0009] In the second aspect, the present application provides an equipment management system for zero-emission energy saving in industrial and mining enterprises. The system includes: An acquisition module, used to acquire enterprise workshop information data and equipment basic information data; the enterprise workshop information data includes workshop device type, workshop device location and workshop device preset importance data; the equipment basic information data includes equipment type, equipment cost and equipment performance; A determination module, used to determine a plurality of workshop equipment layout plans according to the enterprise workshop information data and the equipment basic information data; the workshop equipment layout plan includes the number of workshop equipment, workshop equipment location and workshop equipment type of each enterprise workshop; A calculation module, used to calculate the equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculate the solution cost performance data of each workshop equipment layout plan based on the equipment layout cost data and the equipment function value data; An output module is used to output solution recommendation information based on the solution cost performance data; the solution recommendation information includes a workshop equipment layout solution with the highest solution cost performance data.

[0010] Furthermore, the calculation module is further configured to calculate the equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculate the solution cost performance data of each workshop equipment layout plan according to the equipment layout cost data and the equipment function value data, including: Calculate first equipment cost data according to the equipment cost, the number of workshop equipment and the type of workshop equipment; Determine the equipment coverage workshop device importance and value data according to the workshop device preset importance data, the workshop equipment location and equipment performance; Calculating installation cost data of each device according to the equipment coverage workshop device importance and value data and preset unit importance cost data, and calculating second equipment cost data based on the installation cost data of each device; The equipment layout cost data of each workshop equipment layout plan is calculated according to the first equipment cost data and the second equipment cost data.

[0011] Furthermore, the calculation module is further configured such that the calculation method of the equipment layout cost data includes: Assume that any workshop equipment layout has n equipment, then the equipment cost of the i-th equipment is ; Assume that there are m workshop devices covered by the i-th equipment, then the preset importance data of the j-th workshop device covered by the i-th equipment is ; ; In the formula, Arrange cost data for equipment; It is the preset unit importance cost data; are respectively a preset first weight and a preset second weight; wherein, .

[0012] Furthermore, the calculation module is further configured to calculate the equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculate the solution cost performance data of each workshop equipment layout plan according to the equipment layout cost data and the equipment function value data, including: Based on the importance and value data of the equipment in the equipment-covered workshop and the preset importance value comparison table, the equipment performance value data of each equipment is obtained; Based on the device performance value data and the preset value data, a first device set and a second device set are selected; the first device set includes a plurality of first devices; the first device is a device whose device performance value data is not less than the preset value data; the second device is a device whose device performance value data is less than the preset value data; Make sure that the equipment is arranged with spare equipment of the same type; If the device belongs to the first device set, calculating the additional value data of the first device; If the device belongs to the second device set, calculating the second device additional value data; The device function value data is calculated based on the device performance value data, the first device additional value data, and the second device additional value data.

[0013] Furthermore, the calculation module is further configured such that the calculation method of the equipment function value data includes: Assume that any workshop equipment layout plan has q equipment, then the equipment performance value data of the pth equipment is ; ; ; ; ; In the formula, It is the equipment function value data; is a natural constant; They are judgment functions respectively.

[0014] It should be understood that the contents described in the Summary of the Invention are not intended to limit the key or important features of the embodiments of the present application, nor are they intended to limit the scope of the present application. Other features of the present application will become easily understood through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] The above and other features, advantages and aspects of the embodiments of the present application will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. In the accompanying drawings, the same or similar reference numerals represent the same or similar elements, wherein: Figure 1 A flowchart of a method for managing equipment for zero-emission energy saving in industrial and mining enterprises in an embodiment of the present application is shown; Figure 2 A block diagram of an equipment management system for zero-emission energy saving in industrial and mining enterprises in an embodiment of the present application is shown. DETAILED DESCRIPTION

[0016] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0017] In addition, the term "and / or" in this article is only a description of the association relationship between the associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0018] The present application provides a method and system for zero-emission energy-saving equipment management in industrial and mining enterprises, which can reduce the equipment management costs of the enterprises.

[0019] In a first aspect, the present application provides a method for managing equipment for zero-emission energy saving in industrial and mining enterprises. Figure 1 The specific steps included in the method are as follows.

[0020] Step S110: Acquire enterprise workshop information data and equipment basic information data; the enterprise workshop information data includes workshop device type, workshop device location and workshop device preset importance data; the equipment basic information data includes equipment type, equipment cost and equipment performance.

[0021] It can be understood that in this solution, the equipment with energy absorption function can be a heat pump, and the specific application scenario is to arrange a heat pump in the company's workshop and use the heat pump to absorb the heat emitted by the equipment in the workshop; specifically, the heat pump has two working modes; the summer working mode is that the heat pump switches to cooling mode, and the heat dissipation of the recovery equipment is used for workshop cooling, and the condensation heat is stored for use in other processes; the winter working mode is the heat pump heating mode, using waste heat for heating.

[0022] It should be noted that the preset importance data of the workshop devices here is determined based on the working frequency of the workshop devices. Multiple historical time periods of the same length are selected to determine the working frequency of each workshop device in each historical time period. The working frequency is obtained by dividing the number of device startups by the length of the historical time period; then the sum of the working frequencies of the devices corresponding to each historical time period is calculated, and then the sum is divided by the number of historical time periods to obtain the average working frequency; the preset importance data of each device is obtained based on the average working frequency and the preset frequency comparison table; the preset frequency comparison table here includes the correspondence between the average working frequency and the preset importance data.

[0023] It can be understood that the equipment performance here refers to the number of devices that the heat pump can connect to. When the heat pump is arranged in each enterprise workshop, based on the heat pump function, the purpose of using the heat pump is to recover the heat emitted by the workshop equipment and achieve the purpose of waste heat recovery. Therefore, the heat pump needs to be arranged near the workshop equipment so that the heat pump can cover the connected equipment and be close to the equipment, which can improve the waste heat recovery efficiency of the heat pump.

[0024] Step S120: determining a plurality of workshop equipment layout plans according to the enterprise workshop information data and the equipment basic information data; the workshop equipment layout plans include the number of workshop equipment, workshop equipment location and workshop equipment type of each enterprise workshop.

[0025] In an embodiment of the present application, heat pumps of corresponding types and quantities are arranged based on the enterprise workshop information data; specifically, each workshop device can be equipped with a dedicated heat pump device, or several workshop devices can be equipped with a centralized heat pump device; and, based on the stability of the heat pump, a backup heat pump can also be arranged; therefore, for the enterprise workshop, after the number, type, and location information of the devices in the enterprise workshop is known, the heat pump can be freely installed based on the conventional method, and the number, type, and location of the heat pump can be freely set; therefore, based on the above method, multiple workshop equipment layout plans can be obtained; since the plan construction method is a conventional method, it will not be repeated here.

[0026] Step S130: Calculate the equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculate the solution cost performance data of each workshop equipment layout plan based on the equipment layout cost data and the equipment function value data.

[0027] In an embodiment of the present application, calculating the equipment layout cost data and equipment function value data of each workshop equipment layout plan specifically includes: calculating the first equipment cost data according to the equipment cost, the number of workshop equipment and the type of workshop equipment; determining the equipment coverage workshop device importance and value data according to the preset importance data of the workshop device, the location of the workshop equipment and the equipment performance; calculating the installation cost data of each device according to the equipment coverage workshop device importance and value data and the preset unit importance cost data, and calculating the second equipment cost data based on the installation cost data of each device; calculating the equipment layout cost data of each workshop equipment layout plan according to the first equipment cost data and the second equipment cost data; and calculating the second equipment cost data based on the equipment coverage workshop device importance and value data and the preset unit importance cost data. The device performance value data of each device is obtained by comparing the importance value data with the preset importance value table; the first device set and the second device set are screened based on the device performance value data and the preset value data; the first device set includes multiple first devices; the first device is a device whose device performance value data is not less than the preset value data; the second device is a device whose device performance value data is less than the preset value data; it is determined that the device is arranged with the same type of spare devices; if the device belongs to the first device set, the first device additional value data is calculated; if the device belongs to the second device set, the second device additional value data is calculated; the device function value data is calculated based on the device performance value data, the first device additional value data and the second device additional value data.

[0028] The calculation method of the equipment layout cost data includes: Assume that any workshop equipment layout has n equipment, then the equipment cost of the i-th equipment is ; Assume that there are m workshop devices covered by the i-th equipment, then the preset importance data of the j-th workshop device covered by the i-th equipment is ; ; In the formula, Arrange cost data for equipment; It is the preset unit importance cost data; are respectively a preset first weight and a preset second weight; wherein, .

[0029] The calculation method of the equipment function value data includes: Assume that any workshop equipment layout plan has q equipment, then the equipment performance value data of the pth equipment is ; ; ; ; ; In the formula, It is the equipment function value data; is a natural constant; They are judgment functions respectively.

[0030] Furthermore, the cost performance data of the solution is calculated as follows: cost performance data of the solution = equipment function value data / equipment layout cost data.

[0031] Step S140: outputting scheme recommendation information based on the scheme cost performance data; the scheme recommendation information includes a workshop equipment layout scheme having the highest scheme cost performance data.

[0032] It can be understood that in this solution, in addition to the workshop equipment layout plan with the highest cost-performance data, the solution recommendation information may also include the workshop equipment layout plan with the lowest equipment layout cost data and the workshop equipment layout plan with the highest equipment function value data.

[0033] By adopting the above method, the heat pump equipment in the enterprise workshop is arranged, which reduces the equipment management cost of the enterprise.

[0034] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity of description, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the embodiments of the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required by the present application.

[0035] In the second aspect, the present application provides an equipment management system for zero-emission energy saving in industrial and mining enterprises. Figure 2 As shown, the system includes, an acquisition module 210, which is used to acquire enterprise workshop information data and equipment basic information data; the enterprise workshop information data includes workshop device type, workshop device location and workshop device preset importance data; the equipment basic information data includes equipment type, equipment cost and equipment performance; a determination module 220, which is used to determine multiple workshop equipment layout plans based on the enterprise workshop information data and the equipment basic information data; the workshop equipment layout plan includes the number of workshop equipment, workshop equipment location and workshop equipment type of each enterprise workshop; a calculation module 230, which is used to calculate the equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculate the plan cost performance data of each workshop equipment layout plan based on the equipment layout cost data and the equipment function value data; an output module 240, which is used to output plan recommendation information based on the plan cost performance data; the plan recommendation information includes the workshop equipment layout plan with the highest plan cost performance data.

[0036] Furthermore, the calculation module 230 is further configured to calculate the equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculate the solution cost performance data of each workshop equipment layout plan according to the equipment layout cost data and the equipment function value data, including: Calculate first equipment cost data according to the equipment cost, the number of workshop equipment and the type of workshop equipment; Determine the equipment coverage workshop device importance and value data according to the workshop device preset importance data, the workshop equipment location and equipment performance; Calculating installation cost data of each device according to the equipment coverage workshop device importance and value data and preset unit importance cost data, and calculating second equipment cost data based on the installation cost data of each device; The equipment layout cost data of each workshop equipment layout plan is calculated according to the first equipment cost data and the second equipment cost data.

[0037] Furthermore, the calculation module 230 is further configured to calculate the equipment layout cost data in the following manner: Assume that any workshop equipment layout has n equipment, then the equipment cost of the i-th equipment is ; Assume that there are m workshop devices covered by the i-th equipment, then the preset importance data of the j-th workshop device covered by the i-th equipment is ; ; In the formula, Arrange cost data for equipment; It is the preset unit importance cost data; are respectively a preset first weight and a preset second weight; wherein, .

[0038] Furthermore, the calculation module 230 is further configured to calculate the equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculate the solution cost performance data of each workshop equipment layout plan according to the equipment layout cost data and the equipment function value data, including: Based on the importance and value data of the equipment in the equipment-covered workshop and the preset importance value comparison table, the equipment performance value data of each equipment is obtained; Based on the device performance value data and the preset value data, a first device set and a second device set are selected; the first device set includes a plurality of first devices; the first device is a device whose device performance value data is not less than the preset value data; the second device is a device whose device performance value data is less than the preset value data; Make sure that the equipment is arranged with spare equipment of the same type; If the device belongs to the first device set, calculating the additional value data of the first device; If the device belongs to the second device set, calculating the second device additional value data; The device function value data is calculated based on the device performance value data, the first device additional value data, and the second device additional value data.

[0039] Furthermore, the calculation module 230 is further configured to calculate the device function value data in the following manner: Assume that any workshop equipment layout plan has q equipment, then the equipment performance value data of the pth equipment is ; ; ; ; ; In the formula, It is the equipment function value data; is a natural constant; They are judgment functions respectively.

[0040] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the described device can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.

[0041] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of disclosure involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the aforementioned disclosed concept. For example, the above features are replaced with the technical features with similar functions disclosed in this application (but not limited to) by each other to form a technical solution.

Claims

1. A method for managing equipment for zero-emission energy saving in industrial and mining enterprises, characterized in that: include: Acquire enterprise workshop information data and equipment basic information data; the enterprise workshop information data includes workshop device type, workshop device location and workshop device preset importance data; The basic equipment information data includes equipment type, equipment cost and equipment performance; Determine a plurality of workshop equipment layout plans according to the enterprise workshop information data and the equipment basic information data; the workshop equipment layout plans include the number of workshop equipment, workshop equipment location and workshop equipment type of each enterprise workshop; Calculating equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculating the solution cost performance data of each workshop equipment layout plan based on the equipment layout cost data and the equipment function value data; Outputting solution recommendation information based on the solution cost performance data; The solution recommendation information includes a workshop equipment layout solution with the highest cost-performance ratio data.

2. The method according to claim 1, characterized in that The calculating of the equipment layout cost data and the equipment function value data of each workshop equipment layout plan, and calculating the solution cost performance data of each workshop equipment layout plan according to the equipment layout cost data and the equipment function value data includes: Calculate first equipment cost data according to the equipment cost, the number of workshop equipment and the type of workshop equipment; Determine the equipment coverage workshop device importance and value data according to the workshop device preset importance data, the workshop equipment location and equipment performance; Calculating installation cost data of each device according to the equipment coverage workshop device importance and value data and preset unit importance cost data, and calculating second equipment cost data based on the installation cost data of each device; The equipment layout cost data of each workshop equipment layout plan is calculated according to the first equipment cost data and the second equipment cost data.

3. The method according to claim 2, characterized in that The calculation method of the equipment layout cost data includes: Assume that any workshop equipment layout has n equipment, then the equipment cost of the i-th equipment is ; Assume that there are m workshop devices covered by the i-th equipment, then the preset importance data of the j-th workshop device covered by the i-th equipment is ; ; In the formula, Arrange cost data for equipment; It is the preset unit importance cost data; are respectively a preset first weight and a preset second weight; wherein, .

4. The method according to claim 3, characterized in that The calculating of the equipment layout cost data and the equipment function value data of each workshop equipment layout plan, and calculating the solution cost performance data of each workshop equipment layout plan according to the equipment layout cost data and the equipment function value data includes: Based on the importance and value data of the equipment in the equipment-covered workshop and the preset importance value comparison table, the equipment performance value data of each equipment is obtained; Based on the device performance value data and the preset value data, a first device set and a second device set are selected; the first device set includes a plurality of first devices; the first device is a device whose device performance value data is not less than the preset value data; the second device is a device whose device performance value data is less than the preset value data; Make sure the equipment is arranged with spare equipment of the same type; If the device belongs to the first device set, calculating the additional value data of the first device; If the device belongs to the second device set, calculating the second device additional value data; The device function value data is calculated based on the device performance value data, the first device additional value data, and the second device additional value data.

5. The method according to claim 4, characterized in that The calculation method of the equipment function value data includes: Assume that any workshop equipment layout plan has q equipment, then the equipment performance value data of the pth equipment is ; ; ; ; ; In the formula, It is the equipment function value data; is a natural constant; They are judgment functions respectively.

6. An equipment management system for zero-emission energy saving in industrial and mining enterprises, characterized in that: include: An acquisition module (210) is used to acquire enterprise workshop information data and equipment basic information data; The enterprise workshop information data includes workshop device type, workshop device location and workshop device preset importance data; the equipment basic information data includes equipment type, equipment cost and equipment performance; A determination module (220) is used to determine a plurality of workshop equipment layout plans according to the enterprise workshop information data and the equipment basic information data; the workshop equipment layout plans include the number of workshop equipment, workshop equipment location and workshop equipment type of each enterprise workshop; A calculation module (230), used to calculate equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculate the solution cost performance data of each workshop equipment layout plan based on the equipment layout cost data and the equipment function value data; An output module (240), configured to output solution recommendation information based on the solution cost performance data; The solution recommendation information includes a workshop equipment layout solution with the highest cost-performance ratio data.

7. The system according to claim 6, characterized in that The calculation module (230) is further configured to calculate the equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculate the solution cost performance data of each workshop equipment layout plan based on the equipment layout cost data and the equipment function value data, including: Calculate first equipment cost data according to the equipment cost, the number of workshop equipment and the type of workshop equipment; Determine the equipment coverage workshop device importance and value data according to the workshop device preset importance data, the workshop equipment location and equipment performance; Calculating installation cost data of each device according to the equipment coverage workshop device importance and value data and preset unit importance cost data, and calculating second equipment cost data based on the installation cost data of each device; The equipment layout cost data of each workshop equipment layout plan is calculated according to the first equipment cost data and the second equipment cost data.

8. The system according to claim 7, characterized in that The calculation module (230) is further configured such that the calculation method of the equipment layout cost data includes: Assume that any workshop equipment layout has n equipment, then the equipment cost of the i-th equipment is ; Assume that there are m workshop devices covered by the i-th equipment, then the preset importance data of the j-th workshop device covered by the i-th equipment is ; ; In the formula, Arrange cost data for equipment; It is the preset unit importance cost data; are respectively a preset first weight and a preset second weight; wherein, .

9. The system according to claim 8, characterized in that The calculation module (230) is further configured to calculate the equipment layout cost data and equipment function value data of each workshop equipment layout plan, and calculate the solution cost performance data of each workshop equipment layout plan based on the equipment layout cost data and the equipment function value data, including: Based on the importance and value data of the equipment in the equipment-covered workshop and the preset importance value comparison table, the equipment performance value data of each equipment is obtained; Based on the device performance value data and the preset value data, a first device set and a second device set are selected; the first device set includes a plurality of first devices; the first device is a device whose device performance value data is not less than the preset value data; the second device is a device whose device performance value data is less than the preset value data; Make sure the equipment is arranged with spare equipment of the same type; If the device belongs to the first device set, calculating the additional value data of the first device; If the device belongs to the second device set, calculating the second device additional value data; The device function value data is calculated based on the device performance value data, the first device additional value data, and the second device additional value data.

10. The system according to claim 9, characterized in that The calculation module (230) is further configured such that the calculation method of the equipment function value data includes: Assume that any workshop equipment layout plan has q equipment, then the equipment performance value data of the pth equipment is ; ; ; ; ; In the formula, It is the equipment function value data; is a natural constant; They are judgment functions respectively.

Citation Information

Patent Citations

  • Equipment model selection method for energy interconnection system

    WO2023134254A1