A work plan management method and system

By obtaining and processing bank employees' work plan information in real time and generating and adjusting work plans, the problem of lack of uniformity and standardization of work plan management in the existing technology has been solved, and work efficiency has been improved.

CN119761789AInactive Publication Date: 2025-04-04JIANGXI BANK CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202510275585.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-10
Publication Date
2025-04-04
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing technology, bank employees' work plans lack unified management and standards, which leads to a long time when the leaders review and process each employee's work plans, which reduces work efficiency.

Method used

By obtaining the annual development plan and employee information of the target company in real time, generating an initial work plan corresponding to the employee, and allowing employees to modify it. The system determines in real time whether the employee has modified the initial work plan, adaptively adjusts according to the modified content, generates a target work plan and transmits it to the leadership terminal.

Benefits of technology

It realizes unified management of work plans, improves work efficiency, and reduces the leaders' review and processing time.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119761789A_ABST
    Figure CN119761789A_ABST
Patent Text Reader

Abstract

The present invention provides a work plan management method and system, the method comprising: obtaining the annual development plan of a target enterprise in real time, and receiving the employee information inputted by the employees in the target enterprise in real time; generating an initial work plan corresponding to the employee according to the annual development plan in real time based on the employee information, and sending the initial work plan to the employee terminal corresponding to the employee; when the employee receives the initial work plan through the employee terminal, judging in real time whether the employee modifies the initial work plan through the employee terminal; if it is judged in real time that the employee modifies the initial work plan through the employee terminal, obtaining the corresponding modification content in real time, and adaptively adjusting the initial work plan according to the modification content to generate a corresponding target work plan, and transmitting the target work plan to the leader terminal corresponding to the employee. The present invention can complete the unified management of the work plan, and correspondingly improve the work efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of data processing, and in particular to a work plan management method and system. Background Art

[0002] With the advancement of science and technology and the rapid development of productivity, the Internet and computer technology have become increasingly mature and have been popularized in people's daily lives, greatly facilitating people's work and life.

[0003] Among them, in order to improve work efficiency, most of the existing banks will adopt an online office working mode. Specifically, most of the existing bank employees will formulate corresponding work plans in the course of their daily work, and will further report the formulated work plans to the corresponding leaders for corresponding approval.

[0004] Furthermore, since most of the existing employees edit their work plans according to their own customary formats, there is a lack of unified standards and a lack of unified management processes, which results in leaders having to spend a long time reviewing each employee's work plan and taking corresponding actions, which in turn reduces work efficiency. Summary of the invention

[0005] Based on this, the purpose of the present invention is to provide a work plan management method and system to solve the problem that the existing technology lacks unified management and formulation standards for each employee's work plan, resulting in leaders needing to spend a long time to review and process each employee's work plan.

[0006] The first aspect of the embodiment of the present invention proposes: A work plan management method, wherein the method comprises: Obtain the annual development plan of the target enterprise in real time, and receive the corresponding employee information input by the employees of the target enterprise in real time; Based on the employee information, an initial work plan corresponding to the employee is generated in real time according to the annual development plan, and the initial work plan is sent to the employee terminal corresponding to the employee; When the employee receives the initial work plan through the employee terminal, determining in real time whether the employee modifies the initial work plan through the employee terminal; If it is determined in real time that the employee has modified the initial work plan through the employee terminal, the corresponding modification content is obtained in real time, and the initial work plan is adaptively adjusted according to the modification content to generate a corresponding target work plan, and the target work plan is transmitted to the leader terminal corresponding to the employee.

[0007] The beneficial effect of the present invention is that by acquiring the employee information of employees in real time, the initial work plan adapted to the current employee can be acquired accordingly. Among them, there may be situations where the employee has made modifications. Based on this, if it is determined in real time that the current employee has modified his / her initial work plan, it is necessary to further make corresponding adaptive adjustments to the current initial work plan, and finally obtain the required target work plan, which can be transmitted to the corresponding leadership terminal, thereby completing the unified management of the work plan and correspondingly improving work efficiency.

[0008] Furthermore, the step of generating an initial work plan corresponding to the employee in real time according to the annual development plan based on the employee information includes: When the employee information is acquired in real time, a target position and a target department corresponding to the employee are determined in real time according to the employee information; Detect all work departments included in the target enterprise in real time, and construct a mapping relationship between all work departments and the annual development plan in real time; Based on the mapping relationship, the initial work plan is generated in real time according to the target position and the target department.

[0009] Furthermore, the step of generating the initial work plan in real time according to the target position and the target department based on the mapping relationship includes: When the target position and the target department are respectively obtained, a first workload corresponding to the target position in the current year and a second workload corresponding to the target department in the current year are determined in real time; Performing a division process on the first workload and the second workload to calculate a corresponding first ratio in real time, wherein the first ratio is between 0 and 1; The initial work plan is generated according to the first ratio and the mapping relationship.

[0010] Furthermore, the step of generating the initial work plan according to the first ratio and the mapping relationship includes: When the first ratio is obtained in real time, the total work functions corresponding to all the work departments are determined in real time, and the total workload corresponding to the annual development plan is mapped in real time according to the total work functions through the mapping relationship; Calculate in real time a second ratio between the second workload and the total workload, and calculate in real time a target ratio suitable for the employee based on the first ratio and the second ratio; The target workload adapted to the employee is calculated in real time according to the target ratio and the total workload, and the initial work plan is generated in real time according to the target workload.

[0011] Furthermore, the step of adaptively adjusting the initial work plan according to the modified content to generate a corresponding target work plan includes: When the modified content is acquired in real time, the initial work plan is parsed to detect the title column and the plan column respectively included in the initial work plan in real time; Performing a full scan on the plan column to detect the target content contained in the plan column; The target content is adaptively adjusted according to the modified content to generate the target work plan accordingly.

[0012] Furthermore, the step of adaptively adjusting the target content according to the modified content to correspondingly generate the target work plan includes: When the target content is acquired in real time, a full scan is performed on the target content to detect the corresponding first character string in real time; Performing a second full scan on the modified content to detect the corresponding second character string in real time; The first character string and the second character string are proofread to generate the target work plan accordingly.

[0013] Furthermore, the step of proofreading the first character string and the second character string to generate the target work plan accordingly includes: When the second character string is acquired in real time, a number of keywords included in the second character string are detected in real time; Matching target sentences corresponding to the plurality of keywords in the first string in real time, and detecting target strings corresponding to the target sentences in real time; The target character string is correspondingly replaced with the second character string to correspondingly complete the modification of the target content and correspondingly generate the target work plan.

[0014] The second aspect of the embodiment of the present invention proposes: A work plan management system, wherein the system comprises: A receiving module, used to obtain the annual development plan of the target enterprise in real time, and receive the corresponding employee information input by the employees of the target enterprise in real time; A processing module, configured to generate an initial work plan corresponding to the employee in real time according to the annual development plan based on the employee information, and send the initial work plan to an employee terminal corresponding to the employee; A judgment module, configured to judge in real time whether the employee modifies the initial work plan through the employee terminal when the employee receives the initial work plan through the employee terminal; The output module is used to obtain the corresponding modification content in real time if it is determined in real time that the employee has modified the initial work plan through the employee terminal, and adaptively adjust the initial work plan according to the modification content to generate a corresponding target work plan, and transmit the target work plan to the leader terminal corresponding to the employee.

[0015] Furthermore, the processing module is specifically used for: When the employee information is acquired in real time, a target position and a target department corresponding to the employee are determined in real time according to the employee information; Detect all work departments included in the target enterprise in real time, and construct a mapping relationship between all work departments and the annual development plan in real time; Based on the mapping relationship, the initial work plan is generated in real time according to the target position and the target department.

[0016] Furthermore, the processing module is specifically used for: When the target position and the target department are respectively obtained, a first workload corresponding to the target position in the current year and a second workload corresponding to the target department in the current year are determined in real time; Performing a division process on the first workload and the second workload to calculate a corresponding first ratio in real time, wherein the first ratio is between 0 and 1; The initial work plan is generated according to the first ratio and the mapping relationship.

[0017] Furthermore, the processing module is specifically used for: When the first ratio is obtained in real time, the total work functions corresponding to all the work departments are determined in real time, and the total workload corresponding to the annual development plan is mapped in real time according to the total work functions through the mapping relationship; Calculate in real time a second ratio between the second workload and the total workload, and calculate in real time a target ratio suitable for the employee based on the first ratio and the second ratio; The target workload adapted to the employee is calculated in real time according to the target ratio and the total workload, and the initial work plan is generated in real time according to the target workload.

[0018] Furthermore, the output module is specifically used for: When the modified content is acquired in real time, the initial work plan is parsed to detect the title column and the plan column respectively included in the initial work plan in real time; Performing a full scan on the plan column to detect the target content contained in the plan column; The target content is adaptively adjusted according to the modified content to generate the target work plan accordingly.

[0019] Furthermore, the output module is specifically used for: When the target content is acquired in real time, a full scan is performed on the target content to detect the corresponding first character string in real time; Performing a second full scan on the modified content to detect the corresponding second character string in real time; The first character string and the second character string are proofread to generate the target work plan accordingly.

[0020] Furthermore, the output module is specifically used for: When the second character string is acquired in real time, a number of keywords included in the second character string are detected in real time; Matching target sentences corresponding to the plurality of keywords in the first string in real time, and detecting target strings corresponding to the target sentences in real time; The target character string is correspondingly replaced with the second character string to correspondingly complete the modification of the target content and correspondingly generate the target work plan.

[0021] The third aspect of the embodiment of the present invention proposes: A computer comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the work plan management method as described above when executing the computer program.

[0022] The fourth aspect of the embodiments of the present invention proposes: A readable storage medium stores a computer program, wherein the program, when executed by a processor, implements the work plan management method as described above.

[0023] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1 A flowchart of a work plan management method provided by a first embodiment of the present invention; Figure 2This is a structural block diagram of a work plan management system provided in the third embodiment of the present invention.

[0025] The following specific implementation manner will further illustrate the present invention in conjunction with the above-mentioned drawings. DETAILED DESCRIPTION

[0026] In order to facilitate the understanding of the present invention, the present invention will be described more fully below with reference to the relevant drawings. Several embodiments of the present invention are given in the drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the present invention more thorough and comprehensive.

[0027] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used herein are for illustrative purposes only.

[0028] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which the present invention belongs. The terms used herein in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention. The term "and / or" used herein includes any and all combinations of one or more of the related listed items.

[0029] See also Figure 1 , shown is the work plan management method provided by the first embodiment of the present invention. The work plan management method provided by this embodiment can complete the unified management of the work plan, thereby correspondingly improving the work efficiency.

[0030] Specifically, this embodiment provides: A work plan management method specifically comprises the following steps: Step S10, obtaining the annual development plan of the target enterprise in real time, and receiving the corresponding employee information input by the employees of the target enterprise in real time; Step S20, generating an initial work plan corresponding to the employee in real time according to the annual development plan based on the employee information, and sending the initial work plan to the employee terminal corresponding to the employee; Step S30, when the employee receives the initial work plan through the employee terminal, determining in real time whether the employee modifies the initial work plan through the employee terminal; Step S40, if it is determined in real time that the employee has modified the initial work plan through the employee terminal, the corresponding modification content is obtained in real time, and the initial work plan is adaptively adjusted according to the modification content to generate a corresponding target work plan, and the target work plan is transmitted to the leader terminal corresponding to the employee.

[0031] Specifically, in this embodiment, it should be noted that, in order to objectively and effectively complete the unified management of each employee's work plan, it is necessary to obtain the corresponding information of the enterprise and the employee information corresponding to each employee in the current enterprise. It should be pointed out that the work plan management method provided by this application is specifically implemented for each bank, and the work plan of each employee in the existing bank is closely related to the development plan of the bank, that is, the development plan of the bank determines the work plan of each employee. Based on this, in order to effectively manage the work plan of each employee, specifically, the present invention will first obtain the annual development plan of the target enterprise, that is, the development needs of the enterprise, through the server set in the background. At the same time, it is necessary to synchronously receive the employee information input by each employee in the current enterprise. Based on this, the present invention can be based on the employee information of each current employee, and further generate the initial work plan corresponding to each employee in real time according to the above-mentioned annual development plan, that is, the preliminary work plan, based on this, and further send the current initial work plan to the employee terminal of each employee.

[0032] Furthermore, after confirming in real time that the employees have received the initial work plans corresponding to them, each employee will conduct a corresponding review. During this process, an employee may modify the initial work plan corresponding to him. Based on this, the present invention needs to determine in real time whether there is a situation where an employee actually modifies the initial work plan corresponding to him through the employee terminal. Specifically, if not, it can be explained that no employee has modified the initial work plan corresponding to him. Then, each current initial employee plan can be directly set as the actual work plan of each employee. Correspondingly, if yes, it can be detected that an employee has modified the initial work plan corresponding to him. Based on this, the present invention needs to first obtain the corresponding modification content. At the same time, the initial work plan that needs to be modified is adaptively adjusted immediately according to the current modification content, that is, adaptively modified, so that a target work plan adapted to the current employee can be further generated, and the current target work plan needs to be further transmitted to the leader terminal corresponding to the current employee, so that the leader of the current employee can perform corresponding approval, so that the management of the work plans of each employee can be unified, which improves work efficiency accordingly.

[0033] Second embodiment Furthermore, the step of generating an initial work plan corresponding to the employee in real time according to the annual development plan based on the employee information includes: When the employee information is acquired in real time, a target position and a target department corresponding to the employee are determined in real time according to the employee information; Detect all work departments included in the target enterprise in real time, and construct a mapping relationship between all work departments and the annual development plan in real time; Based on the mapping relationship, the initial work plan is generated in real time according to the target position and the target department.

[0034] Furthermore, the step of generating the initial work plan in real time according to the target position and the target department based on the mapping relationship includes: When the target position and the target department are respectively obtained, a first workload corresponding to the target position in the current year and a second workload corresponding to the target department in the current year are determined in real time; Performing a division process on the first workload and the second workload to calculate a corresponding first ratio in real time, wherein the first ratio is between 0 and 1; The initial work plan is generated according to the first ratio and the mapping relationship.

[0035] Furthermore, the step of generating the initial work plan according to the first ratio and the mapping relationship includes: When the first ratio is obtained in real time, the total work functions corresponding to all the work departments are determined in real time, and the total workload corresponding to the annual development plan is mapped in real time according to the total work functions through the mapping relationship; Calculate in real time a second ratio between the second workload and the total workload, and calculate in real time a target ratio suitable for the employee based on the first ratio and the second ratio; The target workload adapted to the employee is calculated in real time according to the target ratio and the total workload, and the initial work plan is generated in real time according to the target workload.

[0036] Furthermore, the step of adaptively adjusting the initial work plan according to the modified content to generate a corresponding target work plan includes: When the modified content is acquired in real time, the initial work plan is parsed to detect the title column and the plan column respectively included in the initial work plan in real time; Performing a full scan on the plan column to detect the target content contained in the plan column; The target content is adaptively adjusted according to the modified content to generate the target work plan accordingly.

[0037] Furthermore, the step of adaptively adjusting the target content according to the modified content to correspondingly generate the target work plan includes: When the target content is acquired in real time, a full scan is performed on the target content to detect the corresponding first character string in real time; Performing a second full scan on the modified content to detect the corresponding second character string in real time; The first character string and the second character string are proofread to generate the target work plan accordingly.

[0038] Furthermore, the step of proofreading the first character string and the second character string to generate the target work plan accordingly includes: When the second character string is acquired in real time, a number of keywords included in the second character string are detected in real time; Matching target sentences corresponding to the plurality of keywords in the first string in real time, and detecting target strings corresponding to the target sentences in real time; The target character string is correspondingly replaced with the second character string to correspondingly complete the modification of the target content and correspondingly generate the target work plan.

[0039] In addition, in this embodiment, it is also necessary to explain that after the employee information corresponding to the employee is obtained in real time through the above steps, in order to be able to objectively and accurately generate the initial work plan corresponding to each employee, preferably, the present invention will first further determine the target position and target department corresponding to the current employee based on the employee information of the current employee, based on which, the importance of the current employee in the current enterprise can be obtained accordingly. At the same time, in order to accurately process the current enterprise, the present invention will further detect all the work departments corresponding to the internal of the current target enterprise, preferably, the present invention will further construct a mapping relationship between all the current work departments and the above annual development plan, that is, the work plan required for each work department is determined accordingly. Based on this, after the required target position and target department are obtained respectively through the above steps, the present invention can further determine the first workload required to be completed by the current target position in the current year, and the second workload required to be completed by the current target department in the current year. Preferably, the present invention will further divide the current first workload by the current second workload, and can calculate the required first ratio accordingly. Specifically, the first ratio can accurately reflect the importance of the current employee in the current department. Based on this, in order to accurately calculate the workload suitable for the current employees, the present invention will further determine the total work functions corresponding to all work departments in the current enterprise, and can further convert the current total work functions into the corresponding total workload in real time according to the above-mentioned mapping relationship. Based on this, it is also necessary to further divide the above-mentioned second workload by the current total workload, and can further calculate the corresponding second ratio. Furthermore, the current first ratio and the second ratio are immediately multiplied, and the required second ratio can be further calculated. Specifically, the second ratio can accurately reflect the importance of the current employee in the current enterprise. Based on this, the target workload suitable for the current employee can be finally calculated according to the current second ratio and the above-mentioned total workload, and an initial work plan suitable for the current employee can be generated according to the target workload to facilitate subsequent processing.

[0040] Furthermore, after the above steps detect in real time that an employee has modified the initial work plan corresponding to the employee, in order to objectively and accurately complete the adaptive adjustment of the current initial work plan, preferably, the present invention will first obtain the modified content corresponding to the current employee, and at the same time, parse and process the current initial work plan synchronously, and can detect the title bar and plan bar contained therein accordingly. It should be pointed out that since the work plan only exists in the plan bar, based on this, only the current plan bar needs to be further processed. Specifically, the present invention will first detect the target content corresponding to the current plan bar, and at the same time, perform a full scan of the current target content, and can scan The present invention can detect the corresponding first character string. Similarly, the present invention can perform a second full scan on the modified content and can scan the corresponding second character string. Based on this, the present invention can further detect the corresponding keywords contained in the current second character string, so that the corresponding target sentence can be further matched in real time in the first character string based on the current keywords. Similarly, the present invention can further detect the target character string contained in the current target sentence. On this basis, it only needs to replace the current target character string with the second character string to automatically complete the adaptive modification of the current target content and finally generate the required target work plan for subsequent processing.

[0041] See also Figure 2 , the third embodiment of the present invention provides: A work plan management system, wherein the system comprises: A receiving module, used to obtain the annual development plan of the target enterprise in real time, and receive the corresponding employee information input by the employees of the target enterprise in real time; A processing module, configured to generate an initial work plan corresponding to the employee in real time according to the annual development plan based on the employee information, and send the initial work plan to an employee terminal corresponding to the employee; A judgment module, configured to judge in real time whether the employee modifies the initial work plan through the employee terminal when the employee receives the initial work plan through the employee terminal; The output module is used to obtain the corresponding modification content in real time if it is determined in real time that the employee has modified the initial work plan through the employee terminal, and adaptively adjust the initial work plan according to the modification content to generate a corresponding target work plan, and transmit the target work plan to the leader terminal corresponding to the employee.

[0042] Furthermore, the processing module is specifically used for: When the employee information is acquired in real time, a target position and a target department corresponding to the employee are determined in real time according to the employee information; Detect all work departments included in the target enterprise in real time, and construct a mapping relationship between all work departments and the annual development plan in real time; Based on the mapping relationship, the initial work plan is generated in real time according to the target position and the target department.

[0043] Furthermore, the processing module is specifically used for: When the target position and the target department are respectively obtained, a first workload corresponding to the target position in the current year and a second workload corresponding to the target department in the current year are determined in real time; Performing a division process on the first workload and the second workload to calculate a corresponding first ratio in real time, wherein the first ratio is between 0 and 1; The initial work plan is generated according to the first ratio and the mapping relationship.

[0044] Furthermore, the processing module is specifically used for: When the first ratio is obtained in real time, the total work functions corresponding to all the work departments are determined in real time, and the total workload corresponding to the annual development plan is mapped in real time according to the total work functions through the mapping relationship; Calculate in real time a second ratio between the second workload and the total workload, and calculate in real time a target ratio suitable for the employee based on the first ratio and the second ratio; The target workload adapted to the employee is calculated in real time according to the target ratio and the total workload, and the initial work plan is generated in real time according to the target workload.

[0045] Furthermore, the output module is specifically used for: When the modified content is acquired in real time, the initial work plan is parsed to detect the title column and the plan column respectively included in the initial work plan in real time; Performing a full scan on the plan column to detect the target content contained in the plan column; The target content is adaptively adjusted according to the modified content to generate the target work plan accordingly.

[0046] Furthermore, the output module is specifically used for: When the target content is acquired in real time, a full scan is performed on the target content to detect the corresponding first character string in real time; Performing a second full scan on the modified content to detect the corresponding second character string in real time; The first character string and the second character string are proofread to generate the target work plan accordingly.

[0047] Furthermore, the output module is specifically used for: When the second character string is acquired in real time, a number of keywords included in the second character string are detected in real time; Matching target sentences corresponding to the plurality of keywords in the first string in real time, and detecting target strings corresponding to the target sentences in real time; The target character string is correspondingly replaced with the second character string to correspondingly complete the modification of the target content and correspondingly generate the target work plan.

[0048] A fourth embodiment of the present invention provides a computer, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the work plan management method described above when executing the computer program.

[0049] A fifth embodiment of the present invention provides a readable storage medium having a computer program stored thereon, wherein the program, when executed by a processor, implements the work plan management method as described above.

[0050] In summary, the work plan management method and system provided by the above embodiments of the present invention can complete the unified management of work plans, thereby correspondingly improving work efficiency.

[0051] It should be noted that the above modules can be functional modules or program modules, and can be implemented by software or hardware. For modules implemented by hardware, the above modules can be located in the same processor; or the above modules can be located in different processors in any combination.

[0052] The logic and / or steps represented in the flowchart or otherwise described herein, for example, can be considered as an ordered list of executable instructions for implementing logical functions, and can be embodied in any computer-readable medium for use by an instruction execution system, device or apparatus (such as a computer-based system, a system including a processor, or other system that can fetch instructions from an instruction execution system, device or apparatus and execute instructions), or in conjunction with such instruction execution systems, devices or apparatuses. For the purposes of this specification, "computer-readable medium" can be any device that can contain, store, communicate, propagate or transmit a program for use by an instruction execution system, device or apparatus, or in conjunction with such instruction execution systems, devices or apparatuses.

[0053] More specific examples of computer-readable media (a non-exhaustive list) include the following: an electrical connection with one or more wires (electronic device), a portable computer disk case (magnetic device), a random access memory (RAM), a read-only memory (ROM), an erasable and programmable read-only memory (EPROM or flash memory), an optical fiber device, and a portable compact disk read-only memory (CDROM). In addition, the computer-readable medium may even be a paper or other suitable medium on which the program is printed, since the program may be obtained electronically, for example, by optically scanning the paper or other medium, followed by editing, deciphering or, if necessary, processing in another suitable manner, and then stored in a computer memory.

[0054] It should be understood that the various parts of the present invention can be implemented by hardware, software, firmware or a combination thereof. In the above-mentioned embodiments, multiple steps or methods can be implemented by software or firmware stored in a memory and executed by a suitable instruction execution system. For example, if implemented by hardware, as in another embodiment, it can be implemented by any one of the following technologies known in the art or their combination: a discrete logic circuit having a logic gate circuit for implementing a logic function for a data signal, a dedicated integrated circuit having a suitable combination of logic gate circuits, a programmable gate array (PGA), a field programmable gate array (FPGA), etc.

[0055] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0056] The above-described embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the present invention. It should be pointed out that, for a person of ordinary skill in the art, several modifications and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the attached claims.

Claims

1. A work plan management method, characterized in that: The method comprises: Obtain the annual development plan of the target enterprise in real time, and receive the corresponding employee information input by the employees of the target enterprise in real time; Based on the employee information, an initial work plan corresponding to the employee is generated in real time according to the annual development plan, and the initial work plan is sent to the employee terminal corresponding to the employee; When the employee receives the initial work plan through the employee terminal, determining in real time whether the employee modifies the initial work plan through the employee terminal; If it is determined in real time that the employee has modified the initial work plan through the employee terminal, the corresponding modification content is obtained in real time, and the initial work plan is adaptively adjusted according to the modification content to generate a corresponding target work plan, and the target work plan is transmitted to the leader terminal corresponding to the employee.

2. The work plan management method according to claim 1, characterized in that: The step of generating an initial work plan corresponding to the employee in real time according to the annual development plan based on the employee information comprises: When the employee information is acquired in real time, a target position and a target department corresponding to the employee are determined in real time according to the employee information; Detect all work departments included in the target enterprise in real time, and construct a mapping relationship between all work departments and the annual development plan in real time; Based on the mapping relationship, the initial work plan is generated in real time according to the target position and the target department.

3. The work plan management method according to claim 2, characterized in that: The step of generating the initial work plan in real time according to the target position and the target department based on the mapping relationship comprises: When the target position and the target department are respectively obtained, a first workload corresponding to the target position in the current year and a second workload corresponding to the target department in the current year are determined in real time; Performing a division process on the first workload and the second workload to calculate a corresponding first ratio in real time, wherein the first ratio is between 0 and 1; The initial work plan is generated according to the first ratio and the mapping relationship.

4. The work plan management method according to claim 3, characterized in that: The step of generating the initial work plan according to the first ratio and the mapping relationship includes: When the first ratio is obtained in real time, the total work functions corresponding to all the work departments are determined in real time, and the total workload corresponding to the annual development plan is mapped in real time according to the total work functions through the mapping relationship; Calculate in real time a second ratio between the second workload and the total workload, and calculate in real time a target ratio suitable for the employee based on the first ratio and the second ratio; The target workload adapted to the employee is calculated in real time according to the target ratio and the total workload, and the initial work plan is generated in real time according to the target workload.

5. The work plan management method according to claim 1, characterized in that: The step of adaptively adjusting the initial work plan according to the modified content to generate a corresponding target work plan includes: When the modified content is acquired in real time, the initial work plan is parsed to detect the title column and the plan column respectively included in the initial work plan in real time; Performing a full scan on the plan column to detect the target content contained in the plan column; The target content is adaptively adjusted according to the modified content to generate the target work plan accordingly.

6. The work plan management method according to claim 5, characterized in that: The step of adaptively adjusting the target content according to the modified content to correspondingly generate the target work plan includes: When the target content is acquired in real time, a full scan is performed on the target content to detect the corresponding first character string in real time; Performing a second full scan on the modified content to detect the corresponding second character string in real time; The first character string and the second character string are proofread to generate the target work plan accordingly.

7. The work plan management method according to claim 6, characterized in that: The step of proofreading the first character string and the second character string to generate the target work plan accordingly includes: When the second character string is acquired in real time, a number of keywords included in the second character string are detected in real time; Matching target sentences corresponding to the plurality of keywords in the first string in real time, and detecting target strings corresponding to the target sentences in real time; The target character string is correspondingly replaced with the second character string to correspondingly complete the modification of the target content and correspondingly generate the target work plan.

8. A work plan management system, characterized in that: The system comprises: A receiving module, used to obtain the annual development plan of the target enterprise in real time, and receive the corresponding employee information input by the employees of the target enterprise in real time; A processing module, configured to generate an initial work plan corresponding to the employee in real time according to the annual development plan based on the employee information, and send the initial work plan to an employee terminal corresponding to the employee; A judgment module, configured to judge in real time whether the employee modifies the initial work plan through the employee terminal when the employee receives the initial work plan through the employee terminal; The output module is used to obtain the corresponding modification content in real time if it is determined in real time that the employee has modified the initial work plan through the employee terminal, and adaptively adjust the initial work plan according to the modification content to generate a corresponding target work plan, and transmit the target work plan to the leader terminal corresponding to the employee.

9. A computer comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the work plan management method according to any one of claims 1 to 7 is implemented.

10. A readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the work plan management method as described in any one of claims 1 to 7 is implemented.

Citation Information

Patent Citations

  • Method and device for automatically generating work plans

    CN105976170A

  • Automatic employee management method and apparatus

    CN106203773A

  • Task dispatching method, server, and computer readable storage medium

    CN108764697A

  • Enterprise strategic development target making and result evaluation method and system and storage medium

    CN113935627A

  • Enterprise evaluation service system and method based on cloud computing

    CN118780677A