Anti-landslide reinforcing structure and protection method for embankment
By laying protective walls and partition walls on the embankment, and using tensioners and pillar walls to share pressure and waterproof treatment, combined with real-time monitoring of pressure sensors and fiber detection groups, the problem of traditional embankment landslide reinforcement methods is difficult to effectively share pressure and monitor soil movement, and the stability and safety of the embankment are improved.
Patent Information
- Application Number
- CN202510216915.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-02-26
- Publication Date
- 2025-04-08
AI Technical Summary
The traditional anti-slip landslide reinforcement method of embankment is difficult to effectively share the pressure under the embankment, resulting in a high risk of landslides under long-term stress. It is impossible to monitor the pressure changes and soil movement of the embankment in real time, making it difficult to detect potential safety hazards in a timely manner.
A bank anti-slip reinforcement structure is adopted, including protective walls and partition walls laid on the bank. The pressure of the partition wall is transmitted to the tension wall through a tensioner to share the pressure resistance. At the same time, the pillar wall is used for waterproofing treatment, and pressure sensors and optical fiber detection groups are installed on the partition wall for real-time monitoring.
Effectively share the pressure of the embankment, enhance the stability of the embankment, reduce the risk of landslides, and promptly detect soil pressure and movement abnormalities through real-time monitoring to ensure the safety and stability of the embankment.
Smart Images

Figure CN119777314A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of embankment reinforcement, and in particular to an embankment anti-landslide reinforcement structure and a protection method. Background Art
[0002] In water conservancy projects, the stability of the embankment is of vital importance. The embankment must not only withstand the continuous impact of water flow, but also resist the effect of soil pressure. Once the embankment landslides, it will pose a serious threat to the surrounding ecological environment, infrastructure, and people's lives and property safety.
[0003] Traditional methods of reinforcing embankments to prevent landslides have many limitations. For example, common reinforcement structures are difficult to effectively share the pressure on the embankment, resulting in a high risk of landslides under long-term stress. At the same time, insufficient consideration of waterproofing and support at the bottom of the protective wall makes the protective wall susceptible to groundwater erosion and affects stability. In addition, in terms of monitoring, existing technologies cannot monitor the pressure changes and soil movement of the embankment in real time and accurately, making it difficult to detect potential safety hazards in a timely manner and take effective protective measures.
[0004] Therefore, it is of great practical significance to develop a new type of embankment anti-landslide reinforcement structure and protection method that can effectively share pressure, enhance embankment stability, and realize real-time monitoring of embankment status. Summary of the invention
[0005] In view of the above-mentioned deficiencies in the prior art, the present invention provides a bank anti-landslide reinforcement structure and a protection method, which can effectively share the pressure and enhance the stability of the bank.
[0006] The present invention provides the following technical solution: a bank landslide prevention reinforcement structure, comprising a protective wall laid on the bank side and a partition wall laid on the inner side of the protective wall and connected thereto, a plurality of partition walls being connected to the inner side of the protective wall, a tension wall being laid on the soil layer on the bank side, and the tension wall and the plurality of partition walls being connected by a plurality of groups of detachable tensioners, and a tensioner being provided on the side and the top of each partition wall and connected to the tension wall;
[0007] The pressure of the partition wall and the protective wall is transferred to the tension wall through the tensioner, sharing the pressure resistance of the partition wall and the protective wall;
[0008] A support wall inserted into the soil layer is arranged at the bottom of the protection wall, and waterproofing is performed on the bottom of the protection wall through the support wall;
[0009] The partition wall is laid in an L shape with the right-angled surface of the partition wall facing inward. A plurality of groups of slots are provided on the inner side surface of the partition wall, and pressure sensors for detecting pressure are installed in the slots. Each inner side surface of the partition wall is provided with an optical fiber detection group for detecting soil movement.
[0010] Preferably, steel bars are reserved on the outer side of the partition wall and embedded in the protective wall, so that the protective wall and the partition wall form a whole.
[0011] Preferably, a plurality of groups of holes are reserved at the top of the tension wall, a plurality of groups of positioning columns are inserted into the tension wall, the positioning columns are inserted into the holes to fix the tension wall in the soil layer, and the positioning columns are bamboo columns.
[0012] Preferably, the tensioner includes a U-shaped card and a fastener arranged on the U-shaped card, and the fastener is detachably connected to a load-bearing rod, a ball is installed at one end of the load-bearing rod, several groups of U-shaped rods are inserted into the top and side of the tension wall, and the U-shaped card is hinged to the U-shaped rod by bolts, each of the partition walls is provided with two circular groove holes, and the load-bearing rod is inserted into the circular groove holes, and the ball is located in the circular groove holes, applying tension inward to the partition wall.
[0013] Preferably, the fastener includes a movable stud inserted from the bottom of the U-shaped card, a fixing column is installed on the top of the stud, a bearing frame is provided on the contact surface between the fixing column and the fastener, a spirally rotatable fastening nut is provided on the stud, and the stud is locked by rotating the fastening nut, an adjusting nut is installed on the other end of the stud, and a threaded groove is provided on the other end of the stud, and the threaded end of the load-bearing rod is threadedly connected to the stud.
[0014] Preferably, the supporting wall includes several groups of columns inserted into the soil layer on the edge of the embankment, the upper ends of the columns are forked, waterproof cloth is laid in the fork grooves at the upper ends of the columns, steel bars are reserved on the upper end faces of the columns and are connected to the protective wall, so that the waterproof cloth can be introduced into the protective wall.
[0015] Preferably, the optical fiber detection group includes pipe A and pipe B laid on the top and inner side of multiple partition walls, pipe A and pipe B are used for the introduction and export of optical fibers respectively, two connecting columns distributed up and down are installed on each partition wall, and an optical fiber is exported from one end of the two connecting columns away from the partition wall, and the two ends of the optical fiber are respectively introduced into pipe A and pipe B from the ends of the connecting columns, and the conveying pipelines in pipe A and pipe B are connected by optical fiber sensors to detect the shape of the exposed optical fiber between the two connecting columns and the shape change of the optical fiber caused by soil movement.
[0016] A method for protecting embankment from landslides, the specific operation is as follows:
[0017] S1. First, isolate the embankment area A on the bank side, then dig out the stress-bearing area B, cast the tension wall in the stress-bearing area B, then lay the partition wall to the embankment area A, then drill holes through the holes on the partition wall toward the embankment area A, then connect the tensioner to the tension wall through the partition wall, finally insert the support wall, and cast the protective wall, so that the protective wall and the partition wall form a whole;
[0018] S2. The pressure of the soil is applied to the partition wall, and the pressure of the partition wall is shared to the tension wall through the tensioner. The tension wall is buried in the soil to enhance the bearing capacity of the partition wall;
[0019] S3, the support wall protects the bottom of the protective wall, and introduces the support at the same time as the waterproof layer to enhance the stability of the protective wall;
[0020] S4. When the soil exerts pressure on the partition wall, the pressure sensor on the partition wall detects the pressure change of the soil, and the movement of the soil in front of each partition wall can be detected through the optical fiber detection group, thereby protecting the embankment.
[0021] Compared with the prior art, the present invention has the following beneficial effects:
[0022] (1) Through the unique design of partition wall and tension wall, the soil pressure on the partition wall is transferred to the tension wall by using a tensioner. The tension wall can effectively share the pressure of the partition wall by virtue of the friction and anchoring force between the tension wall and the soil, greatly enhance the bearing capacity of the embankment, reduce the risk of landslide, and ensure the stability of the embankment under complex stress environment.
[0023] (2) The column of the support wall is inserted into the soil layer, and the waterproof cloth at the upper end is introduced into the protective wall to form a waterproof layer, which effectively prevents groundwater from penetrating from the bottom of the protective wall and protects the bottom of the protective wall. At the same time, the column is connected to the protective wall to provide additional support for the protective wall, significantly enhancing the stability of the protective wall and extending its service life.
[0024] (3) Installing pressure sensors on the partition wall can detect soil pressure changes in real time; the fiber optic detection group monitors soil movement in real time by detecting changes in the shape of the optical fiber. Once the pressure or soil movement is abnormal, an alarm can be issued in time, so that relevant personnel can take protective measures such as reinforcing the embankment and adjusting the tension of the tensioner in time to ensure the safety and stability of the embankment, providing strong protection for the safe operation of the water conservancy project. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0026] Figure 2 For the present invention Figure 1 Schematic diagram of the structure on the embankment;
[0027] Figure 3 It is a schematic diagram of the construction structure of the present invention;
[0028] Figure 4 This is a schematic diagram of the partition wall structure of the present invention;
[0029] Figure 5 It is a schematic diagram of the structure of the tensioner of the present invention;
[0030] Figure 6 It is a schematic diagram of the fastener structure of the present invention;
[0031] Figure 7 It is a schematic diagram of the support wall structure of the present invention.
[0032] In the figure: 1. protective wall; 2. partition wall; 3. tension wall; 4. tensioner; 5. support wall; 6. pressure sensor; 7. optical fiber detection group; 8. positioning column; 9. U-shaped rod; 10. circular groove hole; 41. U-shaped card; 42. fastener; 43. load-bearing rod; 44. ball; 421. stud; 422. fixing column; 423. bearing frame; 424. fastening nut; 425. adjusting nut; 51. column; 52. waterproof cloth; 71. pipe A; 72. pipe B; 73. connecting column. DETAILED DESCRIPTION
[0033] In order to make the objectives, technical solutions and advantages of the embodiments of the present disclosure clearer, the technical solutions of the embodiments of the present disclosure will be clearly and completely described below in conjunction with the drawings of the embodiments of the present disclosure. In order to keep the following description of the embodiments of the present disclosure clear and concise, the present disclosure omits detailed descriptions of known functions and known components to avoid unnecessary confusion of the concepts of the present invention.
[0034] See also Figure 1 , Figure 2 and Figure 3 , a levee anti-landslide reinforcement structure, when implementing the levee anti-landslide reinforcement project, the levee site must first be surveyed to determine the location of the levee area A and the stress area B. The levee area A is the part of the levee edge that directly bears the impact of water flow and soil pressure, and the stress area B is the rear area used to bear the tension wall 3 to share the pressure of the levee area A.
[0035] A suitable foundation pit is excavated in the stress area B. The depth and area of the foundation pit should be determined according to the actual situation of the embankment and the design size of the tension wall 3. A formwork is set up in the foundation pit, and the steel bars are tied according to the design requirements, and then concrete is poured to form the tension wall 3. When pouring the tension wall 3, it is necessary to reserve several groups of holes at the top thereof so as to insert the positioning column 8 later. In addition, the U-shaped rod 9 is tied to the steel bars in the tension wall 3 so that part of the U-shaped rod 9 is leaked out. The concrete of the tension wall 3 should be vibrated and compacted to ensure its strength and stability. In addition, the indirection of the U-shaped rod 9 is set according to the spacing of the partition wall 2.
[0036] The tension wall 3 is made of reinforced concrete structure, and its strength and size are designed according to the actual stress conditions of the embankment. A positioning column 8 is inserted into the hole reserved at the top of the tension wall 3. The positioning column 8 is made of bamboo because bamboo has certain toughness and strength, is easy to obtain and has low cost. After the bamboo column is inserted into the hole, the positioning column 8 is firmly fixed to the tension wall 3 by filling the hole with fixing materials such as cement mortar, thereby fixing the tension wall 3 in the soil layer to prevent the tension wall 3 from displacement.
[0037] The partition wall 2 is laid in the embankment area A according to the designed spacing and position. The partition wall 2 is L-shaped and laid with the right angle facing inward. This design can better prevent the lateral displacement of the soil and enhance the stability of the embankment. When laying the partition wall 2, it is necessary to ensure that the steel bars reserved on its outer side can be smoothly implanted into the subsequent pouring of the protective wall 1, so that the protective wall 1 and the partition wall 2 form a whole and jointly withstand the soil pressure and water flow impact.
[0038] A hole is drilled through the preset hole on the partition wall 2 toward the embankment area A, and the depth and angle of the hole should meet the installation requirements of the tensioner 4. One end of the tensioner 4 is connected to the partition wall 2, and the other end is connected to the tension wall 3.
[0039] See also Figure 5 and Figure 6 , the tensioner 4 is composed of a U-shaped card 41, a fastener 42, a load-bearing rod 43 and a ball 44. The U-shaped card 41 is hinged to the U-shaped rod 9 on the tension wall 3 by bolts to realize the connection between the tensioner 4 and the tension wall 3. The stud 421 of the fastener 42 is inserted from the bottom of the U-shaped card 41, and the fixed column 422 installed on the top thereof contacts the U-shaped card 41 through the bearing frame 423, so that the stud 421 can be rotated more smoothly. A fastening nut 424 is provided on the stud 421, and the stud 421 can be locked by rotating the fastening nut 424 to prevent it from loosening. An adjusting nut 425 is installed at the other end of the stud 421, and the threaded end of the load-bearing rod 43 is threadedly connected to the stud 421. When the tension needs to be adjusted, the adjusting nut 425 can be rotated to make the load-bearing rod 43 expand and contract, thereby changing the tension on the partition wall 2. The ball 44 installed at one end of the load-bearing rod 43 can be flexibly rotated in the circular groove hole 10 after being inserted into the circular groove hole 10 of the partition wall 2, ensuring that the direction of the pulling force is always consistent with the force direction of the partition wall 2.
[0040] When the load-bearing rod 43 is fastened, the fastening nut 424 can be pressed against the bottom end of the U-shaped clip 41 by the fastening nut 424 to lock the fastener 42 and prevent it from rotating or moving.
[0041] The load-bearing rod 43 can be a steel wire rope, and the other end of the steel wire rope needs to be connected to a threaded cylinder, so that it is convenient to connect with the fastener 42. In this way, the steel wire rope has flexibility. When the U-shaped rod 9 and the circular groove hole 10 cannot be aligned, they can be connected by a steel wire rope to facilitate the installation of the tensioner 4. After the tensioner 4 is installed, the load-bearing rod 43 needs to be adjusted to make it taut.
[0042] Specifically, the U-shaped card 41 is hinged to the U-shaped rod 9 inserted into the top and side of the tension wall 3 through bolts, and the load-bearing rod 43 is inserted into the circular groove hole 10 on the partition wall 2, so that the ball 44 is located in the circular groove hole 10, thereby achieving the inward application of tension to the partition wall 2. During the installation process, the tension and tightening degree of the tensioner 4 can be adjusted by adjusting the fastener 42. In addition, the circular groove hole 10 on the partition wall 2 is an inlaid metal ring, so the ball 44 can be adjusted in direction in the metal ring, and the metal ring is also connected to the built-in steel bar of the partition wall 2, so that when the metal ring is stressed, the partition wall 2 is evenly stressed.
[0043] See also Figure 7 , insert the supporting wall 5 at the designed position of the protective wall 1. The supporting wall 5 is composed of several groups of columns 51. The upper end of the column 51 is a fork design. The waterproof cloth 52 is laid in the fork groove at the upper end of the column 51, and then the column 51 is inserted into the soil layer on the edge of the embankment. When inserting, the verticality and depth of the column 51 must be ensured to ensure the waterproof and supporting effects. Reinforcement is reserved on the upper end surface of the column 51 so as to connect with the protective wall 1 to be poured later, so that the waterproof cloth 52 can be introduced into the protective wall 1 to play a waterproof role.
[0044] The column 51 of the supporting wall 5 is made of solid materials, such as precast concrete columns or steel pipe columns. The depth of the column 51 inserted into the soil layer should be determined according to factors such as the geological conditions of the embankment and the height of the protective wall 1. Generally, sufficient anchoring depth should be ensured to provide stable support. The waterproof cloth 52 is made of materials with good waterproof performance and strong durability, such as geomembrane. After the waterproof cloth 52 is laid in the fork groove at the upper end of the column 51, it is fixed by tying or bonding to ensure that the waterproof cloth 52 will not be displaced during the pouring of the protective wall 1. After the steel bars reserved on the upper end surface of the column 51 are connected to the steel bars of the protective wall 1, when the protective wall 1 is poured, the concrete tightly combines the column 51 with the protective wall 1, which not only enhances the stability of the protective wall 1, but also effectively introduces the waterproof cloth 52 into the protective wall 1, plays a role in preventing groundwater infiltration and protecting the bottom of the protective wall 1 from water erosion.
[0045] Finally, after the partition wall 2 and the supporting wall 5 are installed, the formwork of the protective wall 1 is set up, the steel bars are tied, the protective wall 1 and the steel bars of the partition wall 2 are connected as a whole, and then concrete is poured to form the protective wall 1. The protective wall 1 should be poured evenly to ensure its strength and integrity so that it can effectively block the impact of water flow and soil.
[0046] See also Figure 4 On the inner side of each partition wall 2, several groups of pressure sensors 6 are installed according to the designed position, and the pressure sensors 6 are embedded in the slots on the inner side of the partition wall 2 and connected to external data acquisition and analysis equipment through wires to monitor the pressure changes of the soil on the partition wall 2 in real time.
[0047] The A pipe 71 and the B pipe 72 of the optical fiber detection group 7 are made of corrosion-resistant and pressure-resistant materials, such as PVC pipes. The A pipe 71 and the B pipe 72 are laid on the top and inner side of multiple partition walls 2 respectively for importing and exporting optical fibers. Two connecting columns 73 distributed up and down are installed on each partition wall 2, and the connecting columns 73 are made of insulating and sturdy materials, such as plastic columns. The two ends of the optical fiber are respectively introduced into the A pipe 71 and the B pipe 72 from the ends of the connecting columns 73, and the optical fibers in the A pipe 71 and the B pipe 72 are connected to the monitoring system through optical fiber sensors. When the soil moves, the exposed optical fibers between the connecting columns 73 will be squeezed or stretched, causing the shape of the optical fiber to change. The optical fiber sensor can detect this shape change and transmit the signal to the monitoring system, thereby realizing real-time monitoring of soil movement.
[0048] The optical fibers in the two connecting posts 73 store longer optical fibers, so that during soil movement, the optical fibers led out between the connecting posts 73 will be compressed, and the optical fibers will be squeezed by the soil and move backwards, changing their shape according to the movement of the soil. The optical fiber will be subjected to strain such as stretching, compression or bending. According to the strain sensing principle of the optical fiber, the refractive index of the optical fiber will change, which will cause the characteristics of light propagation in the optical fiber, such as the phase, wavelength, and intensity of the light, to change. By detecting the changes in these optical characteristics through the optical fiber sensor, the strain condition of the optical fiber can be inferred, thereby knowing the movement of the soil.
[0049] A method for protecting embankment from landslides, the specific operation is as follows:
[0050] S1: Pressure sharing and increased tolerance
[0051] When the embankment is subjected to soil pressure, the soil pressure is first applied to the partition wall 2. The partition wall 2 transfers the pressure to the tension wall 3 through the tensioner 4. Since the tension wall 3 is buried in the soil, the friction and anchoring force between it and the soil can share the pressure of the partition wall 2, thereby enhancing the bearing capacity of the partition wall 2 and effectively preventing the embankment from sliding.
[0052] S2: Bottom protection and stability enhancement of the protective wall
[0053] After the column 51 of the supporting wall 5 is inserted into the soil layer, the waterproof cloth 52 at the upper end thereof is introduced into the protective wall 1 to form a waterproof layer, thereby preventing groundwater from penetrating from the bottom of the protective wall 1 and protecting the bottom of the protective wall 1. At the same time, the column 51 is connected to the protective wall 1 to provide additional support for the protective wall 1 and enhance the stability of the protective wall 1.
[0054] S3: Real-time monitoring and protection
[0055] During the daily operation of the embankment, the pressure sensor 6 on the partition wall 2 detects the pressure change of the soil in real time and transmits the data to the data acquisition and analysis equipment. The optical fiber detection group 7 monitors the soil movement in front of each partition wall 2 in real time by detecting the change of the optical fiber shape. Once the pressure or soil movement is abnormal, an alarm is issued in time so that corresponding protective measures can be taken, such as reinforcing the embankment, adjusting the tension of the tensioner 4, etc., to ensure the safety and stability of the embankment.
[0056] The above embodiments are only exemplary embodiments of the present invention and are not intended to limit the present invention. The protection scope of the present invention is defined by the claims. Those skilled in the art may make various modifications or equivalent substitutions to the present invention within the essence and protection scope of the present invention, and such modifications or equivalent substitutions shall also be deemed to fall within the protection scope of the present invention.
Claims
1. A bank landslide prevention reinforcement structure, characterized in that: It comprises a protective wall (1) laid on the bank side and a partition wall (2) laid on the inner side of the protective wall (1) and connected thereto, wherein a plurality of partition walls (2) are connected to the inner side of the protective wall (1), a tension wall (3) is laid on the soil layer on the bank side, and the tension wall (3) and the plurality of partition walls (2) are connected via a plurality of groups of detachable tensioners (4), and a tensioner (4) is provided on the side and top of each partition wall (2) and connected to the tension wall (3); The pressure of the partition wall (2) and the protective wall (1) is transmitted to the tension wall (3) through the tensioner (4), so as to share the pressure resistance performance of the partition wall (2) and the protective wall (1); A supporting wall (5) inserted into the soil layer is provided at the bottom end of the protective wall (1), and waterproofing is performed on the bottom of the protective wall (1) through the supporting wall (5); The partition wall (2) is laid in an L-shape, and the right-angled surface of the partition wall (2) is laid inwardly, a plurality of groups of slot holes are provided on the inner side surface of the partition wall (2), and pressure sensors (6) for detecting pressure are installed in the slot holes, and each inner side surface of the partition wall (2) is provided with an optical fiber detection group (7) for detecting soil movement.
2. The bank anti-landslide reinforcement structure according to claim 1, characterized in that: Steel bars are reserved on the outer side surface of the partition wall (2) and are implanted into the protective wall (1), so that the protective wall (1) and the partition wall (2) form a whole.
3. The bank anti-landslide reinforcement structure according to claim 1, characterized in that: A plurality of groups of holes are reserved at the top of the tension wall (3), and a plurality of groups of positioning columns (8) are inserted into the tension wall (3). The positioning columns (8) are inserted into the holes to fix the tension wall (3) in the soil layer, and the positioning columns (8) are bamboo columns.
4. The bank anti-landslide reinforcement structure according to claim 1, characterized in that: The tensioner (4) comprises a U-shaped card (41) and a fastener (42) arranged on the U-shaped card (41), and the fastener (42) is detachably connected to a load-bearing rod (43), and a round ball (44) is installed at one end of the load-bearing rod (43). A plurality of groups of U-shaped rods (9) are inserted into the top and side of the tension wall (3), and the U-shaped card (41) is hinged to the U-shaped rod (9) through bolts. Two circular groove holes (10) are provided on each of the partition walls (2), and the load-bearing rod (43) is inserted into the circular groove hole (10). The round ball (44) is located in the circular groove hole (10) to apply a tensile force inward to the partition wall (2).
5. The bank anti-landslide reinforcement structure according to claim 4, characterized in that: The fastener (42) comprises a movable stud (421) inserted from the bottom of the U-shaped card (41), a fixing column (422) is installed at the top of the stud (421), a bearing frame (423) is provided at the contact surface between the fixing column (422) and the fastener (42), a spirally rotatable fastening nut (424) is provided on the stud (421), and the stud (421) is locked by rotating the fastening nut (424), an adjusting nut (425) is installed at the other end of the stud (421), and a thread groove is provided at the other end of the stud (421), and the threaded end of the load-bearing rod (43) is threadedly connected to the stud (421).
6. The bank anti-landslide reinforcement structure according to claim 1, characterized in that: The supporting wall (5) comprises a plurality of groups of columns (51) inserted into the soil layer on the bank edge, the upper end of the column (51) is of a forked design, a waterproof cloth (52) is laid in the fork groove at the upper end of the column (51), and a steel bar is reserved on the upper end surface of the column (51) and connected to the protective wall (1), so that the waterproof cloth (52) is introduced into the protective wall (1).
7. The bank anti-landslide reinforcement structure according to claim 1, characterized in that: The optical fiber detection group (7) comprises an A pipe (71) and a B pipe (72) laid on the top and inner side of a plurality of partition walls (2), the A pipe (71) and the B pipe (72) being used for the introduction and export of optical fibers respectively, and each partition wall (2) is provided with two connecting columns (73) distributed up and down, and one optical fiber is guided out from one end of the two connecting columns (73) away from the partition wall (2), and the two ends of the optical fiber are respectively introduced into the A pipe (71) and the B pipe (72) from the ends of the connecting columns (73), and the conveying pipelines in the A pipe (71) and the B pipe (72) are connected by an optical fiber sensor, and the shape of the optical fiber exposed between the two connecting columns (73) is detected, so as to detect the shape change of the optical fiber caused by soil movement.
8. A method for protecting embankment from landslide, characterized in that: The bank landslide prevention reinforcement structure according to any one of claims 1 to 7 is used, and the specific operations are as follows: S1. First, isolate the dam area A at the bank, then dig out the stress-bearing area B, cast the tension wall (3) in the stress-bearing area B, then lay the partition wall (2) to the dam area A, then drill holes through the holes on the partition wall (2) toward the dam area A, then connect the tensioner (4) to the tension wall (3) through the partition wall (2), finally insert the support wall (5), and cast the protective wall (1), so that the protective wall (1) and the partition wall (2) form a whole; S2, the pressure of the soil is applied to the partition wall (2), and the pressure of the partition wall (2) is shared by the tensioner (4) to the tension wall (3), and the tension wall (3) is buried in the soil to enhance the bearing capacity of the partition wall (2); S3, the support wall (5) protects the bottom of the protective wall (1), introduces the waterproof layer and the support at the same time, and strengthens the stability of the protective wall (1); S4. When the soil exerts pressure on the partition wall (2), the pressure sensor (6) on the partition wall (2) detects the pressure change of the soil, and the movement of the soil in front of each partition wall (2) can be detected through the optical fiber detection group (7), thereby protecting the embankment.