Device for progress settlement of power distribution network
By using the main control module, sensor module and communication module devices in distribution network construction projects, a real-time three-dimensional construction model is built, which solves the problems of data deviation and lack of real-time monitoring in construction project progress settlement, and achieves high accuracy and timely progress data management.
Patent Information
- Application Number
- CN202411843314.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-13
- Publication Date
- 2025-04-08
AI Technical Summary
There are problems in the progress settlement of existing distribution network construction projects, the lack of real-time monitoring methods, the data management is scattered, and it is difficult for the owner and the construction party to share progress and cost information in real time.
Design a device including main control module, sensor module and communication module, build a real-time three-dimensional construction model through lidar, collect construction information data, analyze construction deviations, and generate construction reports, and upload them to the cloud in real time.
Real-time data acquisition and multi-dimensional analysis are realized, which reduces manual participation, improves the accuracy and timeliness of progress data, accurately measures engineering volume, and reduces manual measurement errors.
Smart Images

Figure CN119783962A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a device for distribution network progress settlement, belonging to the technical field of electric power engineering. Background Art
[0002] Distribution network construction projects usually have the following characteristics: Multi-node distribution: The construction area is wide, and multiple construction sites are carried out simultaneously, which makes management difficult. Complex process: It involves multiple links such as equipment installation, line laying, commissioning and acceptance, and deviations are prone to occur in construction period management and settlement. Large number of personnel: Multiple roles such as construction teams, supervisors, and owners work together, and settlement communication is complicated.
[0003] In the traditional model, the following problems exist: construction progress mainly relies on manual records, which is inefficient and prone to data deviations. There is a lack of real-time progress monitoring methods, and the construction plan cannot be adjusted in time. Engineering quantity accounting mainly relies on paper records, which are prone to disputes and tampering. Data management is decentralized, and it is difficult for owners and contractors to share progress and cost information in real time. Summary of the invention
[0004] In order to solve the above problems existing in the prior art, the present invention proposes a device for distribution network progress settlement.
[0005] The technical solution of the present invention is as follows:
[0006] A device for distribution network progress settlement, comprising a main control module, a sensor module and a communication module;
[0007] The main control module is used to analyze the deviation between the actual construction and the plan through the construction information data and generate a construction report;
[0008] The sensor module is used to collect construction information data;
[0009] The communication module is used to upload the construction report to the cloud.
[0010] As a preferred embodiment of the present invention, the device further comprises a built-in storage module, and the built-in storage module is used to store local data.
[0011] As a preferred embodiment of the present invention, the device further includes a positioning module, and the positioning module tracks the location of the construction site in real time based on Beidou positioning.
[0012] As a preferred embodiment of the present invention, the device further comprises a display and interaction module, and the display and interaction module comprises an LCD touch screen and physical buttons.
[0013] As a preferred embodiment of the present invention, the sensor module includes a camera and a laser radar;
[0014] The camera is used to collect image data of the construction site;
[0015] The laser radar is used to scan the laser point cloud data of the construction site.
[0016] As a preferred embodiment of the present invention, the communication module communicates via a 4G / 5G communication protocol.
[0017] As a preferred embodiment of the present invention, the main control module generates a three-dimensional digital twin model of the construction area through laser point cloud data of the construction site;
[0018] The image recognition model is used to perform image recognition on the image data of the construction site, mark the equipment installation status, and combine the equipment installation status with the 3D digital twin model to generate a 3D construction progress map of the current construction site;
[0019] The three-dimensional construction progress map of the current construction site is compared with the planned three-dimensional construction progress map stored locally to calculate the deviation information.
[0020] As a preferred embodiment of the present invention, the image recognition model is a YOLOv8 model.
[0021] As a preferred embodiment of the present invention, the device is further provided with an early warning module. When the deviation rate calculated by the main control module exceeds a preset threshold, the early warning module sends early warning information to the cloud through the communication module.
[0022] The present invention has the following beneficial effects:
[0023] 1. The present invention utilizes real-time data and multi-dimensional analysis to reduce manual involvement and improve the accuracy and timeliness of progress data; a real-time three-dimensional construction model is constructed through lidar to accurately measure the actual engineering quantity, thus reducing the errors caused by manual measurement. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a structural diagram of the device of the present invention. DETAILED DESCRIPTION
[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0026] It should be understood that the step numbers used in this document are only for convenience of description and are not intended to limit the order in which the steps are executed.
[0027] It should be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.
[0028] The terms “include” and “comprising” indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.
[0029] The term "and / or" means and includes any and all possible combinations of one or more of the associated listed items.
[0030] Embodiment 1:
[0031] See also Figure 1 , a device for distribution network progress settlement, comprising a main control module, a sensor module and a communication module;
[0032] The main control module is used to analyze the deviation between the actual construction and the plan through the construction information data and generate a construction report, which includes the current construction area location, construction progress, construction abnormality information and cost information. At the same time, the construction report is stored in PDF or EXCEL format for viewing by the construction party, the supervision party and the owner party;
[0033] The sensor module is used to collect construction information data;
[0034] The communication module is used to upload the construction report to the cloud.
[0035] As a preferred implementation of this embodiment, the device further includes a built-in storage module, and the built-in storage module is used to store local data.
[0036] As a preferred implementation of this embodiment, the device also includes a positioning module, which is based on Beidou positioning and tracks the location of the construction site in real time to ensure the geographical consistency of the construction records.
[0037] As a preferred implementation of this embodiment, the device further includes a display and interaction module, and the display and interaction module includes an LCD touch screen and physical buttons.
[0038] As a preferred implementation of this embodiment, the sensor module includes a camera and a laser radar;
[0039] The camera is used to collect image data of the construction site;
[0040] The laser radar is used to scan the laser point cloud data of the construction site.
[0041] As a preferred implementation of this embodiment, the communication module communicates via a 4G / 5G communication protocol.
[0042] As a preferred implementation of this embodiment, the main control module generates a three-dimensional digital twin model of the construction area through the laser point cloud data of the construction site;
[0043] The image data of the construction site is recognized through the image recognition model, the equipment installation status is marked, and the equipment installation status is combined with the three-dimensional digital twin model to generate a three-dimensional construction progress map of the current construction site. Specifically, the equipment installation status is bound to the corresponding node position in the three-dimensional digital twin model.
[0044] The three-dimensional construction progress map of the current construction site is compared with the planned three-dimensional construction progress map stored locally to calculate the deviation information.
[0045] As a preferred implementation of this embodiment, the image recognition model is a YOLOv8 model.
[0046] As a preferred implementation of this embodiment, the device is further provided with an early warning module. When the deviation rate calculated by the main control module exceeds a preset threshold, the early warning module sends early warning information to the cloud through the communication module.
[0047] In the embodiments of the present application, "at least one" refers to one or more, and "more than one" refers to two or more. "And / or" describes the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent the existence of A alone, the existence of A and B at the same time, and the existence of B alone. Among them, A and B can be singular or plural. The character " / " generally indicates that the previous and next associated objects are in an "or" relationship. "At least one of the following" and similar expressions refer to any combination of these items, including any combination of single or plural items. For example, at least one of a, b and c can be represented by: a, b, c, a and b, a and c, b and c, or a and b and c, where a, b, c can be single or multiple.
[0048] Those of ordinary skill in the art will appreciate that the various units and algorithm steps described in the embodiments disclosed herein can be implemented in a combination of electronic hardware, computer software, and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0049] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0050] In several embodiments provided in the present application, if any function is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (Read-Only Memory; hereinafter referred to as: ROM), random access memory (Random Access Memory; hereinafter referred to as: RAM), disk or optical disk, and other media that can store program codes.
[0051] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A device for distribution network progress settlement, characterized in that: It includes a main control module, a sensor module and a communication module; The main control module is used to analyze the deviation between the actual construction and the plan through the construction information data and generate a construction report; The sensor module is used to collect construction information data; The communication module is used to upload the construction report to the cloud.
2. The device for distribution network progress settlement according to claim 1, characterized in that: The device further comprises a built-in storage module, and the built-in storage module is used to store local data.
3. The device for distribution network progress settlement according to claim 1, characterized in that: The device also includes a positioning module, which tracks the location of the construction site in real time based on Beidou positioning.
4. The device for distribution network progress settlement according to claim 1, characterized in that: The device also includes a display and interaction module, which includes an LCD touch screen and physical buttons.
5. The device for distribution network progress settlement according to claim 1, characterized in that: The sensor module includes a camera and a laser radar; The camera is used to collect image data of the construction site; The laser radar is used to scan the laser point cloud data of the construction site.
6. The device for distribution network progress settlement according to claim 1, characterized in that: The communication module communicates via the 4G / 5G communication protocol.
7. The device for distribution network progress settlement according to claim 5, characterized in that: The main control module generates a three-dimensional digital twin model of the construction area through the laser point cloud data of the construction site; The image recognition model is used to perform image recognition on the image data of the construction site, mark the equipment installation status, and combine the equipment installation status with the 3D digital twin model to generate a 3D construction progress map of the current construction site; The three-dimensional construction progress map of the current construction site is compared with the planned three-dimensional construction progress map stored locally to calculate the deviation information.
8. The device for distribution network progress settlement according to claim 7, characterized in that: The image recognition model is a YOLOv8 model.
9. The device for distribution network progress settlement according to claim 1, characterized in that: The device is also provided with an early warning module. When the deviation rate calculated by the main control module exceeds a preset threshold, the early warning module sends early warning information to the cloud through the communication module.