Monitoring method and device for bank branch construction, program product, and storage medium

By generating task forms, executing tasks, recording execution records and comparing plans and records, and generating management forms to monitor bank outlet construction, the problem of inability to effectively monitor bank outlet construction in the existing technology is solved, and real-time tracking and monitoring of bank outlet construction is achieved.

CN119784051APending Publication Date: 2025-04-08CHINA CONSTR BANK CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411853569.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-16
Publication Date
2025-04-08

AI Technical Summary

Technical Problem

The existing technology cannot effectively monitor the construction of bank outlets, resulting in the inability to adopt targeted improvement and improvement strategies.

Method used

By generating a task form, including the execution plan of multiple tasks, executing tasks and recording execution records, comparing execution records and plans, and generating management forms to monitor bank outlet construction.

Benefits of technology

Real-time tracking and monitoring of bank branch construction has been realized, the problem of inability to effectively monitor bank branch construction has been solved, and management efficiency has been improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119784051A_ABST
    Figure CN119784051A_ABST
Patent Text Reader

Abstract

The embodiment of the present application provides a monitoring method and device, program product, and storage medium for the construction of a bank branch. The method includes: generating a task form of a target bank branch based on the construction project information of the target bank branch, wherein the task form includes execution plans of multiple tasks, and the execution plan is used to indicate the construction of the target bank branch; generating an execution form when executing the target task according to the target execution plan in the task form; comparing the target execution record and the target execution plan, and generating a management form of the target task based on the comparison result; and monitoring the construction of the target bank branch based on the management form. The present application solves the problem that the construction of bank branches cannot be effectively monitored in the related art, and achieves the effect of effectively monitoring the construction of bank branches.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present application relate to the field of computer technology, and more specifically, to a method and device for monitoring the construction of bank branches, a program product, and a storage medium. Background Art

[0002] With the continuous development of the financial market, the demand for building bank outlets is becoming increasingly diversified. In order to master and manage the construction projects of bank outlets, it is generally necessary to adopt a manual statistical model to fill in statistics from sub-branches to secondary branches and then to provincial branches. As the superior jurisdiction bank, it is unable to adopt targeted promotion and improvement strategies, and there is a problem of being unable to effectively monitor the construction of bank outlets. Summary of the invention

[0003] The embodiments of the present application provide a method and device for monitoring the construction of bank outlets, a program product, and a storage medium to at least solve the problem that the construction of bank outlets cannot be effectively monitored in the related art.

[0004] According to one embodiment of the present application, a method for monitoring the construction of bank branches is provided, comprising: generating a task form for the target bank branch based on construction project information of the target bank branch, wherein the task form includes execution plans for multiple tasks, and the execution plan is used to indicate the construction of the target bank branch; generating an execution form when executing a target task according to the target execution plan in the task form, wherein the target task is any one of the multiple tasks, the target execution plan is an execution plan corresponding to the target task among the execution plans of the multiple tasks, and the execution form includes a target execution record generated when executing the target task; comparing the target execution record with the target execution plan, and generating a management form for the target task based on the comparison result; and monitoring the construction of the target bank branch based on the management form.

[0005] In an exemplary embodiment, a task form of the target bank branch is generated based on the construction project information of the target bank branch, including: determining the construction project type and construction project name of the target bank branch based on the construction demand information of the target bank branch included in the construction project information; generating execution plans for a plurality of the above tasks according to the construction project type and the construction project information; adding the construction project type, the construction project name and the execution plans for the plurality of the above tasks to a first form template to obtain the task form.

[0006] In an exemplary embodiment, the above-mentioned execution plan for the multiple above-mentioned tasks is generated based on the above-mentioned construction project type and the above-mentioned construction project information, including: analyzing the above-mentioned construction project information to determine the multiple above-mentioned tasks for constructing the above-mentioned target bank branch; based on the construction demand information of the above-mentioned target bank branch, determining the demand information and purpose information of the multiple above-mentioned tasks, wherein the above-mentioned demand information is used to represent the resources required to execute the above-mentioned tasks, and the above-mentioned purpose information is used to represent the expected results of executing the above-mentioned tasks; generating an execution plan based on the above-mentioned demand information and the above-mentioned purpose information to obtain an execution plan for the multiple above-mentioned tasks.

[0007] In an exemplary embodiment, when executing the target task according to the target execution plan in the above-mentioned task form, an execution form is generated, including: in the process of executing the above-mentioned target task, recording the target execution information generated by executing the above-mentioned target task to obtain the above-mentioned target execution record; adding the above-mentioned target execution record to the second form template to obtain the above-mentioned execution form.

[0008] In an exemplary embodiment, the target execution record and the target execution plan are compared, and a management form for the target task is generated based on the comparison result, including: comparing the target execution information in the target execution record and the target plan information in the target execution plan to obtain a target execution deviation, wherein the target execution deviation is used to represent the deviation between the target execution record and the target execution plan, and the comparison result includes the target execution deviation; adding the target execution deviation to a third form template to obtain the management form.

[0009] In an exemplary embodiment, monitoring the construction of the target bank branch based on the management form includes: adjusting the first plan information in the first execution plan based on the target execution deviation and the construction project information to obtain a first target execution plan, wherein the first execution plan is an execution plan corresponding to the first task in the execution plans of the multiple tasks, the first task is a task among the multiple tasks to be executed after the target task is completed, and the first target plan information in the first target execution plan is information for eliminating the target execution deviation; based on the first target plan information, executing the first task to construct the target bank branch.

[0010] According to one embodiment of the present application, there is also provided a monitoring device for the construction of bank outlets, comprising: a first generating module, for generating a task form of the target bank outlet based on the construction project information of the target bank outlet, wherein the task form includes execution plans of multiple tasks, and the execution plan is used to indicate the construction of the target bank outlet; a first executing module, for generating an execution form when executing the target task according to the target execution plan in the task form, wherein the target task is any one of the multiple tasks, the target execution plan is an execution plan corresponding to the target task among the execution plans of the multiple tasks, and the execution form includes a target execution record generated when executing the target task; a second generating module, for comparing the target execution record with the target execution plan, and generating a management form of the target task based on the comparison result; and a first monitoring module, for monitoring the construction of the target bank outlet based on the management form.

[0011] In an exemplary embodiment, the above-mentioned first generation module includes: a first determination sub-module, used to determine the construction project type and construction project name of the above-mentioned target bank branch based on the construction demand information of the above-mentioned target bank branch included in the above-mentioned construction project information; a first generation sub-module, used to generate multiple execution plans for the above-mentioned tasks according to the above-mentioned construction project type and the above-mentioned construction project information; a first addition sub-module, used to add the above-mentioned construction project type, the above-mentioned construction project name and the execution plans of the multiple above-mentioned tasks to the first form template to obtain the above-mentioned task form.

[0012] In an exemplary embodiment, the above-mentioned first generation submodule includes: a first determination unit, used to analyze the above-mentioned construction project information and determine the multiple tasks of building the above-mentioned target bank branch; a second determination unit, used to determine the demand information and purpose information of the multiple tasks based on the construction demand information of the above-mentioned target bank branch, wherein the above-mentioned demand information is used to represent the resources required to perform the above-mentioned tasks, and the above-mentioned purpose information is used to represent the expected results of performing the above-mentioned tasks; the first generation unit is used to generate an execution plan based on the above-mentioned demand information and the above-mentioned purpose information to obtain an execution plan for the multiple tasks above.

[0013] In an exemplary embodiment, the above-mentioned first execution module includes: a first recording sub-module, used to record the target execution information generated by executing the above-mentioned target task in the process of executing the above-mentioned target task, and obtain the above-mentioned target execution record; a second adding sub-module, used to add the above-mentioned target execution record to the second form template to obtain the above-mentioned execution form.

[0014] In an exemplary embodiment, the second generation module includes: a first comparison sub-module, used to compare the target execution information in the target execution record and the target plan information in the target execution plan to obtain the target execution deviation, wherein the target execution deviation is used to represent the deviation between the target execution record and the target execution plan, and the comparison result includes the target execution deviation; a third adding sub-module, used to add the target execution deviation to the third form template to obtain the management form.

[0015] In an exemplary embodiment, the above-mentioned first monitoring module includes: a first adjustment sub-module, which is used to adjust the first plan information in the first execution plan based on the above-mentioned target execution deviation and the above-mentioned construction project information to obtain a first target execution plan, wherein the above-mentioned first execution plan is an execution plan corresponding to the first task in the execution plans of the multiple tasks, the above-mentioned first task is a task among the multiple tasks that is executed after the above-mentioned target task is completed, and the first target plan information in the above-mentioned first target execution plan is information used to eliminate the above-mentioned target execution deviation; a first execution sub-module, which is used to execute the above-mentioned first task based on the above-mentioned first target plan information to build the above-mentioned target bank branch.

[0016] According to another embodiment of the present application, a computer program product is provided, including a computer program, wherein the computer program is configured for a processor to execute the steps of any of the above method embodiments.

[0017] According to another embodiment of the present application, a computer-readable storage medium is provided, in which a computer program is stored, wherein the computer program is configured to enable a processor to execute the steps in any of the above method embodiments.

[0018] According to another embodiment of the present application, an electronic device is provided, comprising a memory, a processor, and a computer program stored on the memory and executable on the processor, wherein the processor is configured to execute the computer program to perform the steps in any one of the method embodiments.

[0019] Through this application, based on the construction project information of the target bank branch, an execution plan for multiple tasks of building the target bank branch is generated; when the target task is executed according to the target execution plan in the task form, the target execution record and the target execution plan in the execution form are compared, and a management form for the target task is generated based on the comparison result; the construction of the target bank branch is monitored based on the management form. Since the task form and the execution form provide clear plans and records, the construction progress of the target bank branch can be tracked in real time. Therefore, the problem that the related technology cannot effectively monitor the construction of bank branches is solved, and the effect of effectively monitoring the construction of bank branches is achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 This is a hardware structure block diagram of a mobile terminal for monitoring bank branch construction according to an embodiment of the present application;

[0021] Figure 2 is a flow chart of a method for monitoring bank branch construction according to an embodiment of the present application;

[0022] Figure 3 It is a flow chart of a monitoring method for bank branch construction according to a specific embodiment of the present application;

[0023] Figure 4 It is a structural block diagram of a monitoring device for bank branch construction according to an embodiment of the present application. DETAILED DESCRIPTION

[0024] The embodiments of the present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0025] It should be noted that the terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence.

[0026] The method embodiments provided in the embodiments of the present application can be executed in a mobile terminal, a computer terminal or a similar computing device. Taking running on a mobile terminal as an example, Figure 1 1 is a hardware structure block diagram of a mobile terminal for monitoring bank branch construction in an embodiment of the present application. Figure 1 As shown, the mobile terminal may include one or more ( Figure 1 Only one is shown in the figure) a processor 102 (the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA) and a memory 104 for storing data, wherein the mobile terminal may also include a transmission device 106 and an input / output device 108 for communication functions. It can be understood by those skilled in the art that Figure 1 The structure shown is only for illustration and does not limit the structure of the mobile terminal. Figure 1 More or fewer components as shown, or with Figure 1 Different configurations are shown.

[0027] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as a computer program corresponding to a method for monitoring the construction of bank outlets in an embodiment of the present application. The processor 102 executes various functional applications and data processing by running the computer program stored in the memory 104, that is, to implement the above method. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories may be connected to the mobile terminal via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0028] The transmission device 106 is used to receive or send data via a network. The specific example of the above network may include a wireless network provided by a communication provider of the mobile terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 can be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.

[0029] In this embodiment, a method for monitoring the construction of bank branches is provided. Figure 2 is a flow chart of a method for monitoring bank branch construction according to an embodiment of the present application, such as Figure 2 As shown, the process includes the following steps:

[0030] Step S202, based on the construction project information of the target bank branch, generating a task form of the target bank branch, wherein the task form includes execution plans of multiple tasks, and the execution plan is used to indicate the construction of the target bank branch;

[0031] Optionally, the construction project information includes but is not limited to construction demand information.

[0032] Step S204, generating an execution form when executing the target task according to the target execution plan in the task form, wherein the target task is any one of the multiple tasks, the target execution plan is an execution plan corresponding to the target task among the execution plans of the multiple tasks, and the execution form includes a target execution record generated when executing the target task;

[0033] Optionally, the target execution record is used to describe the target execution information generated by executing the target task.

[0034] Optionally, a reminder form of the target task is generated based on the target execution plan, and the target task is executed based on the execution reminder form and the target execution plan, wherein the reminder form includes time limit information for describing the time limit of the target task.

[0035] Step S206, comparing the target execution record and the target execution plan, and generating a management form for the target task based on the comparison result;

[0036] Step S208: monitoring the construction of target bank outlets based on the management form.

[0037] Optionally, identify the comparison results to obtain risk information of the target task, wherein the risk information is used to indicate the risk of executing the target task; formulate corresponding risk response strategies based on the risk information. Risk information includes but is not limited to the risk of task delay, the risk of project cost overrun, and project quality issues. Risk response strategies include but are not limited to adjusting resource allocation, optimizing work processes, and introducing new technologies.

[0038] The execution subject of the above steps in this embodiment can be a terminal, a server, a specific processor set in the terminal or server, or a processor or processing device set relatively independently from the terminal or server, but is not limited to this, for example, a network construction management system.

[0039] Through the above steps, based on the construction project information of the target bank outlets, an execution plan for multiple tasks of building the target bank outlets is generated; when the target task is executed according to the target execution plan in the task form, the target execution record is compared with the target execution plan in the execution form, and a management form for the target task is generated based on the comparison result; the construction of the target bank outlets is monitored based on the management form. Since the task form and the execution form provide clear plans and records, the construction progress of the target bank outlets can be tracked in real time, thus solving the problem of the inability to effectively monitor the construction of bank outlets in related technologies and achieving the effect of effectively monitoring the construction of bank outlets.

[0040] In an exemplary embodiment, a task form of the target bank branch is generated based on the construction project information of the target bank branch, including: determining the construction project type and construction project name of the target bank branch based on the construction demand information of the target bank branch included in the construction project information; generating execution plans for a plurality of the above tasks according to the construction project type and the construction project information; adding the construction project type, the construction project name and the execution plans for the plurality of the above tasks to a first form template to obtain the task form.

[0041] Optionally, the construction demand information includes but is not limited to address demand information, design demand information, cost demand information, project duration demand information, service area demand information, service population demand information, service function demand information, technical demand information, and expected result information. Construction project types include but are not limited to new network construction projects, expansion or renovation projects, relocation projects, green energy-saving renovation projects, and technology upgrade projects.

[0042] Optionally, for example, the construction requirement information includes: Address requirement information: a commercial district in a certain city in a certain province. Project duration requirement information: starting from January 1, 2025, for a period of one year. Design requirement information: meet the financial service needs of surrounding residents and businesses in the commercial district. Technical requirement information: integrate the latest banking technology, including self-service terminals and online banking services. Environmental protection requirement information: branch construction must comply with green building standards. Security requirement information: high-standard physical security and network security measures. Based on the above construction requirement information, the construction project type is determined to be a new branch construction. The construction project name can be a green smart branch. Based on the construction project type and construction requirement information, an execution plan for multiple tasks is generated: Task 1: Project planning and design: Design phase: from January 1, 2025 to February 15, 2025, complete the preliminary design and detailed design of the branch; Approval phase: from February 16, 2025 to March 1, 2025, submit the design to the relevant department for approval. Task 2: Site selection and land acquisition: Market research: From January 1, 2025 to January 15, 2025, investigate potential locations and assess their commercial value; Land purchase: From January 16, 2025 to February 15, 2025, complete the land purchase procedures. Task 3: Construction preparation: Construction bidding: From March 1, 2025 to March 31, 2025, conduct bidding for construction units; Material preparation: From April 1, 2025 to April 30, 2025, prepare materials and equipment required for construction. Task 4: Building construction: Foundation construction: From May 1, 2025 to July 15, 2025, complete the construction of the building foundation; Main construction: From July 16, 2025 to September 30, 2025, complete the construction of the main structure of the building. Task 5: Interior decoration: Interior decoration design: From August 1, 2025 to August 31, 2025, complete the interior decoration design; Interior decoration construction: From September 1, 2025 to November 15, 2025, carry out interior decoration construction. Task 6: Technical equipment installation: Equipment procurement: From September 1, 2025 to October 15, 2025, purchase the required banking technical equipment; Equipment installation: From October 16, 2025 to November 30, 2025, install and test all technical equipment. Add the above construction project type, construction project name and execution plan of multiple tasks to the first form template to obtain the task form. This task form will serve as the core document of project management to monitor project progress, coordinate resources and communicate project status.

[0043] This embodiment achieves the purpose of avoiding waste of construction resources and time delay by generating a task form based on the construction project information of the target bank branch. At the same time, the construction project type, project name and task execution plan are integrated into one form template, which reduces the time for information search and communication and improves the overall work efficiency.

[0044] In an exemplary embodiment, the above-mentioned execution plan for the multiple above-mentioned tasks is generated based on the above-mentioned construction project type and the above-mentioned construction project information, including: analyzing the above-mentioned construction project information to determine the multiple above-mentioned tasks for constructing the above-mentioned target bank branch; based on the construction demand information of the above-mentioned target bank branch, determining the demand information and purpose information of the multiple above-mentioned tasks, wherein the above-mentioned demand information is used to represent the resources required to execute the above-mentioned tasks, and the above-mentioned purpose information is used to represent the expected results of executing the above-mentioned tasks; generating an execution plan based on the above-mentioned demand information and the above-mentioned purpose information to obtain an execution plan for the multiple above-mentioned tasks.

[0045] Optionally, the demand information includes but is not limited to address demand information, design demand information, cost demand information, project duration demand information, service area demand information, service population demand information, service function demand information, and technical demand information. The purpose information includes but is not limited to expected result information.

[0046] Optionally, for example, to renovate a bank branch, the construction project information includes: Address requirement information - a certain district in a certain city in a certain province (original address). Project duration requirement information: Starting from March 1, 2025, for a period of half a year. Design requirement information: Meet the financial service needs of enterprises in the surrounding commercial districts. Technical requirement information: Update banking technology, including self-service terminals and online banking services. Based on the above construction project information, multiple tasks for the construction of the target bank branch are determined, including: Task 1: Project planning and design, Task 2: Pre-construction preparation, Task 3: Internal structure transformation, Task 4: Technical system upgrade, Task 5: Interior decoration. Based on the construction requirement information of the target bank branch, the requirement information for Task 1 is determined to include: Resource information: design team information, design software information, market research report; Budget information: The budget for the design phase is 300,000 yuan; Time information: The preliminary design is expected to be completed within 15 days. The purpose information of Task 1 includes: Expected results: Complete the preliminary plan for branch layout and functional area design. The requirements for Task 2 include: Resource information: construction team, safety assessment report, construction equipment; Budget information: the pre-construction preparation budget is 200,000 yuan; Time information: it is expected that all preparations will be completed within 10 days. The purpose information for Task 2 includes: Expected results: obtain construction permits and ensure construction safety and compliance. The requirements for Task 3 include: Resource information: construction workers, construction materials, engineering supervision; Budget information: the budget for structural renovation is 2 million yuan. Time information: it is expected that the structural renovation will be completed within 45 days. The purpose information for Task 3 includes: Expected results: complete the renovation of the walls, floors and ceilings of the outlets. The requirements for Task 4 include: Resource information: decoration team, decoration materials, interior design drawings. Budget information: the budget for interior decoration is 1 million yuan. Time information: it is expected that the decoration will be completed within 30 days. The purpose information for Task 4 includes: Expected results: complete the interior decoration of the outlets, including customer service areas, VIP rooms and office areas. The requirements for Task 5 include: Resource information: IT experts, network equipment, security systems; Budget information: the budget for technology upgrades is 500,000 yuan; Time information: it is expected that the system upgrade will be completed within 20 days. The purpose information of Task 5 includes: Expected results: Install the latest banking technology system, including data servers and security monitoring. Based on the above requirements and purpose information, the following execution plan can be generated: Task 1: Project planning and design: Design phase: January 1, 2025 to February 15, 2025, complete the preliminary design and detailed design of the branch; Approval phase: February 16, 2025 to March 1, 2025, submit the design to the relevant departments for approval. Task 2: Site selection and land acquisition: Market research: January 1, 2025 to January 15, 2025, investigate potential locations and evaluate their commercial value; Land purchase: January 16, 2025 to February 15, 2025, complete the land purchase procedures.Task 3: Construction preparation: Construction bidding: From March 1, 2025 to March 31, 2025, conduct bidding for construction units; Material preparation: From April 1, 2025 to April 30, 2025, prepare materials and equipment required for construction; Foundation construction: From May 1, 2025 to July 15, 2025, complete the construction of the building foundation; Main construction: From July 16, 2025 to September 30, 2025, complete the construction of the main structure of the building. Task 4: Interior decoration: Decoration design: From August 1, 2025 to August 31, 2025, complete the interior decoration design; Decoration construction: From September 1, 2025 to November 15, 2025, carry out interior decoration construction. Task 5: Technical Equipment Installation: Equipment Procurement: From September 1, 2025 to October 15, 2025, purchase the required banking technical equipment; Equipment Installation: From October 16, 2025 to November 30, 2025, install and test all technical equipment.

[0047] By generating a detailed task execution plan, the project team can manage the project more effectively, thereby achieving the purpose of reducing the uncertainty and risk of the construction project.

[0048] In an exemplary embodiment, when executing the target task according to the target execution plan in the above-mentioned task form, an execution form is generated, including: in the process of executing the above-mentioned target task, recording the target execution information generated by executing the above-mentioned target task to obtain the above-mentioned target execution record; adding the above-mentioned target execution record to the second form template to obtain the above-mentioned execution form.

[0049] Optionally, for example, there is a task form that contains a target task: "Interior decoration", whose target execution plan is from May 1, 2025 to June 15, 2025. In the process of executing the "Interior decoration" task, the following target execution information can be recorded: Task name: Interior decoration. Actual start date: May 1, 2025. Actual end date: June 10, 2025 (completed ahead of schedule). Person in charge: Mr. Wang, the leader of the decoration team, and participants: decoration workers, designers, quality inspectors. Materials used: environmentally friendly paint, anti-slip floor tiles, energy-saving lamps, etc. Daily progress: May 1, 2025: Remove the old decoration materials and start wall treatment; May 8, 2025: Complete wall painting and start installing new lamps; May 15, 2025: Complete lamp installation and start laying non-slip floor tiles; May 22, 2025: Floor tiles are laid and quality inspection is carried out; May 29, 2025: Complete interior decoration and furniture installation; June 5, 2025: Final cleaning and detail adjustment; June 10, 2025: All interior decoration is completed and passes quality inspection. Problems encountered and solutions: Problem: It was found that some building materials did not meet environmental protection standards; Solution: Immediately replace building materials that meet the standards and strengthen material entry inspection. Actual cost: 1.2 million yuan (saving 300,000 yuan compared to the budget). Quality inspection results: All decoration work meets quality standards. Based on the target execution information recorded above, generate a target execution record. Add the target execution record to the second form template to obtain an execution form.

[0050] This embodiment records detailed execution information through the execution form, thereby achieving the purpose of effectively monitoring the project progress and adjusting the plan in a timely manner.

[0051] In an exemplary embodiment, the target execution record and the target execution plan are compared, and a management form for the target task is generated based on the comparison result, including: comparing the target execution information in the target execution record and the target plan information in the target execution plan to obtain a target execution deviation, wherein the target execution deviation is used to represent the deviation between the target execution record and the target execution plan, and the comparison result includes the target execution deviation; adding the target execution deviation to a third form template to obtain the management form.

[0052] Optionally, the target plan information includes the requirement information and purpose information of the target task. The target execution deviation includes but is not limited to time deviation, cost deviation and the reason for the deviation.

[0053] In an exemplary embodiment, monitoring the construction of the target bank branch based on the management form includes: adjusting the first plan information in the first execution plan based on the target execution deviation and the construction project information to obtain a first target execution plan, wherein the first execution plan is an execution plan corresponding to the first task in the execution plans of the multiple tasks, the first task is a task among the multiple tasks to be executed after the target task is completed, and the first target plan information in the first target execution plan is information for eliminating the target execution deviation; based on the first target plan information, executing the first task to construct the target bank branch.

[0054] Optionally, from the target execution deviation in the management form: time deviation: -5 days, cost deviation: -300,000 yuan, it can be obtained that the interior decoration task was completed 5 days ahead of schedule and the cost was saved by 300,000 yuan. For example, if the next task is "technical system procurement and installation", the execution information of "technical system procurement and installation" can be adjusted according to the execution deviation of the internal decoration task, such as starting the procurement and installation of the technical system in advance and upgrading the technical system with cost savings.

[0055] The present invention will be described below in conjunction with specific embodiments:

[0056] This embodiment is explained by taking the transformation of a bank branch as an example. Figure 3 This is a flow chart of a monitoring method for bank branch construction according to a specific embodiment of the present application, comprising the following steps:

[0057] S302, construction project information includes: address requirement information - a district in a city in a province (original address). Project duration requirement information: starting from March 1, 2025, for a period of half a year. Design requirement information: meet the financial service needs of enterprises in surrounding commercial areas. Technical requirement information: update banking technology, including self-service terminals and online banking services. Based on the above construction project information, multiple tasks for building the target bank branch are determined, including: Task 1: project planning and design, Task 2: pre-construction preparation, Task 3: internal structure transformation, Task 4: technical system upgrade, Task 5: interior decoration. Based on the above construction requirement information, the type of construction project is determined to be the transformation of branch construction. The name of the construction project can be a smart branch.

[0058] Based on the construction demand information of the target bank branch, the demand information of Task 1 includes: resource information: design team information, design software information, market research report; budget information: the design phase budget is 300,000 yuan; time information: the preliminary design is expected to be completed within 15 days. The purpose information of Task 1 includes: expected results: complete the preliminary plan of branch layout and functional area design. The demand information of Task 2 includes: resource information: construction team, safety assessment report, construction equipment; budget information: the pre-construction preparation budget is 200,000 yuan; time information: all preparations are expected to be completed within 10 days. The purpose information of Task 2 includes: expected results: obtain construction permits to ensure construction safety and compliance. The demand information of Task 3 includes: resource information: construction workers, construction materials, engineering supervision; budget information: the structural renovation budget is 2 million yuan. Time information: the structural renovation is expected to be completed within 45 days. The purpose information of Task 3 includes: expected results: complete the renovation of the walls, floors and ceilings of the branch. The demand information of Task 4 includes: resource information: decoration team, decoration materials, interior design drawings. Budget information: the interior decoration budget is 1 million yuan. Time information: The renovation is expected to be completed within 30 days. The purpose information of Task 4 includes: Expected results: Complete the internal decoration of the branch, including the customer service area, VIP room and office area. The demand information of Task 5 includes: Resource information: IT experts, network equipment, security system; Budget information: The budget for technology upgrade is 500,000 yuan; Time information: The system upgrade is expected to be completed within 20 days. The purpose information of Task 5 includes: Expected results: Install the latest banking technology system, including data servers and security monitoring;

[0059] S304, based on the above demand information, purpose information and construction project type, generate the following execution plan: Task 1: Project planning and design: Design phase: January 1, 2025 to February 15, 2025, complete the preliminary design and detailed design of the outlets; Approval phase: February 16, 2025 to March 1, 2025, submit the design to the relevant departments for approval. Task 2: Site selection and land acquisition: Market research: January 1, 2025 to January 15, 2025, investigate potential locations and evaluate their commercial value; Land purchase: January 16, 2025 to February 15, 2025, complete the land purchase procedures. Task 3: Construction preparation: Construction bidding: From March 1, 2025 to March 31, 2025, conduct bidding for construction units; Material preparation: From April 1, 2025 to April 30, 2025, prepare materials and equipment required for construction; Foundation construction: From May 1, 2025 to July 15, 2025, complete the construction of the building foundation; Main construction: From July 16, 2025 to September 30, 2025, complete the construction of the main structure of the building. Task 4: Interior decoration: Decoration design: From August 1, 2025 to August 31, 2025, complete the interior decoration design; Decoration construction: From September 1, 2025 to November 15, 2025, carry out interior decoration construction. Task 5: Technical Equipment Installation: Equipment procurement: September 1, 2025 to October 15, 2025, to purchase the required banking technical equipment; Equipment installation: October 16, 2025 to November 30, 2025, to install and test all technical equipment;

[0060] S306, executing Task 1 according to the execution plan of Task 1 in the task form;

[0061] S308, recording the execution information generated by executing task 1, obtaining the execution record, and generating an execution form;

[0062] S310, comparing the execution information and the plan information of Task 1 in the execution record to obtain the execution deviation and generate a management form;

[0063] S312: Based on the management form, adjust the execution plan of task 2.

[0064] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, computer, server, or network device, etc.) to execute the methods of each embodiment of the present application.

[0065] In the present embodiment, a monitoring device for bank branch construction is also provided, which is used to implement the above-mentioned embodiments and preferred embodiments, and the descriptions that have been made will not be repeated. As used below, the term "module" can implement a combination of software and / or hardware of a predetermined function. Although the device described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware is also possible and conceived.

[0066] Figure 4 is a structural block diagram of a monitoring device for bank branch construction according to an embodiment of the present application, such as Figure 4 As shown, the device comprises:

[0067] A first generating module 402 is used to generate a task form of the target bank branch based on the construction project information of the target bank branch, wherein the task form includes execution plans of multiple tasks, and the execution plans are used to indicate the construction of the target bank branch;

[0068] A first execution module 404 is used to generate an execution form when executing a target task according to the target execution plan in the task form, wherein the target task is any one of the multiple tasks, the target execution plan is an execution plan corresponding to the target task among the execution plans of the multiple tasks, and the execution form includes a target execution record generated when executing the target task;

[0069] The second generating module 406 is used to compare the target execution record with the target execution plan, and generate a management form of the target task based on the comparison result;

[0070] The first monitoring module 408 is used to monitor the construction of the target bank outlets based on the management form.

[0071] In an exemplary embodiment, the above-mentioned first generation module includes: a first determination sub-module, used to determine the construction project type and construction project name of the above-mentioned target bank branch based on the construction demand information of the above-mentioned target bank branch included in the above-mentioned construction project information; a first generation sub-module, used to generate multiple execution plans for the above-mentioned tasks according to the above-mentioned construction project type and the above-mentioned construction project information; a first addition sub-module, used to add the above-mentioned construction project type, the above-mentioned construction project name and the execution plans of the multiple above-mentioned tasks to the first form template to obtain the above-mentioned task form.

[0072] In an exemplary embodiment, the above-mentioned first generation submodule includes: a first determination unit, used to analyze the above-mentioned construction project information and determine the multiple tasks of building the above-mentioned target bank branch; a second determination unit, used to determine the demand information and purpose information of the multiple tasks based on the construction demand information of the above-mentioned target bank branch, wherein the above-mentioned demand information is used to represent the resources required to perform the above-mentioned tasks, and the above-mentioned purpose information is used to represent the expected results of performing the above-mentioned tasks; the first generation unit is used to generate an execution plan based on the above-mentioned demand information and the above-mentioned purpose information to obtain an execution plan for the multiple tasks above.

[0073] In an exemplary embodiment, the above-mentioned first execution module includes: a first recording sub-module, used to record the target execution information generated by executing the above-mentioned target task in the process of executing the above-mentioned target task, and obtain the above-mentioned target execution record; a second adding sub-module, used to add the above-mentioned target execution record to the second form template to obtain the above-mentioned execution form.

[0074] In an exemplary embodiment, the second generation module includes: a first comparison sub-module, used to compare the target execution information in the target execution record and the target plan information in the target execution plan to obtain the target execution deviation, wherein the target execution deviation is used to represent the deviation between the target execution record and the target execution plan, and the comparison result includes the target execution deviation; a third adding sub-module, used to add the target execution deviation to the third form template to obtain the management form.

[0075] In an exemplary embodiment, the above-mentioned first monitoring module includes: a first adjustment sub-module, which is used to adjust the first plan information in the first execution plan based on the above-mentioned target execution deviation and the above-mentioned construction project information to obtain a first target execution plan, wherein the above-mentioned first execution plan is an execution plan corresponding to the first task in the execution plans of the multiple tasks, the above-mentioned first task is a task among the multiple tasks that is executed after the above-mentioned target task is completed, and the first target plan information in the above-mentioned first target execution plan is information used to eliminate the above-mentioned target execution deviation; a first execution sub-module, which is used to execute the above-mentioned first task based on the above-mentioned first target plan information to build the above-mentioned target bank branch.

[0076] An embodiment of the present application provides a computer program product, including a computer program, and when the computer program is executed by a processor, the steps in any one of the above method embodiments are implemented.

[0077] An embodiment of the present application further provides a computer-readable storage medium, in which a computer program is stored, wherein the computer program is configured to execute the steps of any of the above method embodiments when running.

[0078] In an exemplary embodiment, the computer-readable storage medium may include, but is not limited to, various media that can store computer programs, such as a USB flash drive, a read-only memory (ROM), a random access memory (RAM), a mobile hard disk, a magnetic disk or an optical disk.

[0079] An embodiment of the present application further provides an electronic device, including a memory and a processor, wherein a computer program is stored in the memory, and the processor is configured to run the computer program to execute the steps in any one of the above method embodiments.

[0080] In an exemplary embodiment, the electronic device may further include a transmission device and an input / output device, wherein the transmission device is connected to the processor, and the input / output device is connected to the processor.

[0081] For specific examples in this embodiment, reference may be made to the examples described in the above embodiments and exemplary implementation modes, and this embodiment will not be described in detail herein.

[0082] Obviously, those skilled in the art should understand that the above modules or steps of the present application can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order from that herein, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present application is not limited to any specific combination of hardware and software.

[0083] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the principles of the present application shall be included in the protection scope of the present application.

Claims

1. A method for monitoring bank branch construction, characterized in that: include: Based on the construction project information of the target bank branch, a task form of the target bank branch is generated, wherein the task form includes an execution plan of multiple tasks, and the execution plan is used to indicate the construction of the target bank branch; In the case of executing a target task according to the target execution plan in the task form, an execution form is generated, wherein the target task is any one of the multiple tasks, the target execution plan is an execution plan corresponding to the target task among the execution plans of the multiple tasks, and the execution form includes a target execution record generated when the target task is executed; Comparing the target execution record with the target execution plan, and generating a management form for the target task based on the comparison result; The construction of the target bank outlets is monitored based on the management form.

2. The method according to claim 1, characterized in that Based on the construction project information of the target bank branch, a task form of the target bank branch is generated, including: Determine the construction project type and construction project name of the target bank branch based on the construction demand information of the target bank branch included in the construction project information; Generating execution plans for a plurality of the tasks according to the construction project type and the construction project information; The construction project type, the construction project name and the execution plans of the multiple tasks are added to the first form template to obtain the task form.

3. The method according to claim 2, characterized in that Generating the execution plan of the plurality of tasks according to the construction project type and the construction project information, including: Analyze the construction project information to determine a plurality of tasks for constructing the target bank outlets; Based on the construction demand information of the target bank outlets, determining the demand information and purpose information of the plurality of tasks, wherein the demand information is used to indicate the resources required to perform the tasks, and the purpose information is used to indicate the expected results of performing the tasks; An execution plan is generated based on the demand information and the purpose information to obtain execution plans for the multiple tasks.

4. The method according to claim 1, characterized in that: When executing the target task according to the target execution plan in the task form, an execution form is generated, including: In the process of executing the target task, target execution information generated by executing the target task is recorded to obtain the target execution record; The target execution record is added to the second form template to obtain the execution form.

5. The method according to claim 1, characterized in that: Comparing the target execution record with the target execution plan, and generating a management form for the target task based on the comparison result, including: Comparing the target execution information in the target execution record with the target plan information in the target execution plan to obtain a target execution deviation, wherein the target execution deviation is used to represent the deviation between the target execution record and the target execution plan, and the comparison result includes the target execution deviation; The target execution deviation is added to the third form template to obtain the management form.

6. The method according to claim 5, characterized in that Monitoring the construction of the target bank outlets based on the management form includes: Based on the target execution deviation and the construction project information, the first plan information in the first execution plan is adjusted to obtain a first target execution plan, wherein the first execution plan is an execution plan corresponding to a first task among the execution plans of the multiple tasks, the first task is a task among the multiple tasks that is executed after the target task is completed, and the first target plan information in the first target execution plan is information used to eliminate the target execution deviation; Based on the first target plan information, the first task is executed to build the target bank branch.

7. A monitoring device for bank branch construction, characterized in that: include: A first generating module, configured to generate a task form of a target bank branch based on the construction project information of the target bank branch, wherein the task form includes execution plans of multiple tasks, and the execution plans are used to indicate the construction of the target bank branch; A first execution module is used to generate an execution form when executing a target task according to a target execution plan in the task form, wherein the target task is any one of the multiple tasks, the target execution plan is an execution plan corresponding to the target task among the execution plans of the multiple tasks, and the execution form includes a target execution record generated when executing the target task; A second generating module, used for comparing the target execution record with the target execution plan, and generating a management form of the target task based on the comparison result; The first monitoring module is used to monitor the construction of the target bank branch based on the management form.

8. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method described in any one of claims 1 to 6 are implemented.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, wherein the computer program implements the steps of the method described in any one of claims 1 to 6 when executed by a processor.

10. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the method described in any one of claims 1 to 6 are implemented.