A monitoring system for the construction quality of four power projects

By constructing BIM models and dividing molecular regions, calculating quality scores and establishing a trend chart, the problems of low efficiency and low accuracy of traditional four-electric engineering quality monitoring are solved, and efficient and accurate management of the quality of four-electric engineering is achieved.

CN119784236APending Publication Date: 2025-04-08SI CHUAN SHU DAO DIAN QI HUA JIAN SHE YOU XIAN GONG SI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411851367.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-16
Publication Date
2025-04-08

AI Technical Summary

Technical Problem

The quality monitoring of traditional four-electric engineering relies on manual statistics or office software, which has problems such as large workload, long time and low accuracy, making it difficult to achieve timely tracking and management of quality problems.

Method used

A monitoring system is adopted. By obtaining monitoring data of the construction area of ​​the four electrical engineering, building a BIM model, and dividing molecular areas on the construction path, calculating the quality score of each sub-region, establishing a quality score trend chart, and performing quality monitoring and decision-making generation.

Benefits of technology

This system can effectively reduce the amount and difficulty of quality monitoring, achieve objective, accurate and timely management of the quality of four-electric projects, and improve quality management efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119784236A_ABST
    Figure CN119784236A_ABST
Patent Text Reader

Abstract

The present invention discloses a monitoring system for the construction quality of four-electricity engineering, which relates to the technical field of engineering monitoring. By acquiring the monitoring data of the four-electricity engineering, a multi-directional image is obtained and processed, and a global internal and external parameter matrix of the image is obtained. The basic data of the four-electricity engineering is combined to construct a BIM model; the BIM model is divided into sub-areas according to the construction path, and the quality monitoring of the entire four-electricity engineering is converted into the quality monitoring of several sub-areas; the quality data of each sub-area is obtained, and all the quality data are processed by setting a first formula to obtain the quality score of each sub-area; then, a trend chart of the quality score is established, and based on the trend chart, the quality of the entire sub-area is monitored; finally, based on the quality monitoring results obtained from the trend chart, a corresponding processing decision is generated for a single sub-area. The quality monitoring system provided by the present invention can well help managers to manage and control the quality of the project objectively, accurately and timely.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering monitoring, and in particular to a monitoring system for the construction quality of four-electricity engineering. Background Art

[0002] The Four-Electricity Project is the general term for communication, signal, electricity and electric traction power supply projects in high-speed railway construction. It is the "central brain" and source of power for the entire high-speed railway, and the last hurdle in high-speed railway construction. It involves many disciplines such as disaster monitoring engineering, water supply and drainage, stations, and four-electricity housing engineering. The Four-Electricity Project is a high-speed railway train that obtains electricity from the contact network through the pantograph on the roof to provide power for the train. It is the basis for the operation of high-speed railways, and its technology and standards have very high requirements.

[0003] The engineering quality control of the four power projects is the top priority of construction project management. Since the construction of the four power projects involves many professions, the quality management work is more complicated and difficult to quantify. The construction process must strengthen pre-control, process control and real-time control, discover and solve quality problems in the construction process at any time, and correct quality management trend problems in a timely manner. In addition, there are a large number of power construction project acceptance projects, so the monitoring of the construction quality of the four power projects is particularly important. The traditional monitoring of the quality information of the four power projects mainly relies on manual statistics by managers or the use of office software for statistics, which has problems such as large workload, long time consumption and low accuracy. There is an urgent need for a monitoring system that can help managers objectively, accurately and timely manage and control the quality of the project, realize the closed-loop management of quality problem projects, and provide warning functions to improve the efficiency of quality management. Summary of the invention

[0004] In order to solve the above-mentioned deficiencies in the prior art, the present invention provides a monitoring system for the construction quality of four-electricity engineering, the monitoring system comprising:

[0005] Model unit: obtain monitoring data of the construction area of ​​the four power projects to obtain multi-directional images, perform feature point matching on all multi-directional images to obtain matching feature point data; perform inter-image matrix calculation on all multi-directional images based on all matching feature point data to obtain a global internal and external parameter matrix of the image; construct a BIM model of the four power projects based on the global internal and external parameter matrix of the image and the basic data of the four power projects;

[0006] Area division unit: determining a number of construction nodes on the construction path of the four power projects, taking the construction nodes as the center and a preset distance as the radius to construct a number of sub-areas to obtain construction results, any construction project in the four power projects is located in at least one sub-area, and based on the construction results, the BIM model is divided into sub-areas accordingly;

[0007] Quality score unit: obtains quality data of all construction projects in a single sub-area of ​​the BIM model to obtain a first acquisition result; based on the first acquisition result, a first formula is used to calculate the quality score of the single sub-area, specifically:

[0008] K=K a +K b +K c +K d

[0009] K is the quality score of a single sub-region, K a is the quality score of the communication engineering in a single sub-region, K b is the quality score of signal engineering in a single sub-region, K c is the quality score of power engineering in a single sub-region, K d The quality score of the electric traction power supply project in a single sub-region;

[0010] The quality monitoring unit: obtains all quality scores of a single sub-region within a preset time period to obtain a second acquisition result; based on the second acquisition result, establishes a trend graph of the quality scores of the single sub-region within the preset time period; and performs quality monitoring on the single sub-region based on the trend graph;

[0011] A decision generating unit: based on the trend graph, obtains an average value of the quality score of the single sub-region within the preset time period to obtain a third acquisition result, and based on the third acquisition result, generates a corresponding processing decision for the single sub-region.

[0012] The present invention is achieved through the following technical solutions:

[0013] Model unit: obtain multi-directional images by acquiring monitoring data of the construction area of ​​the four power projects, and perform feature point matching processing on the multi-directional images to obtain matching feature point data. Through matching feature point data, perform inter-image matrix calculation on the multi-directional images to obtain the image global internal and external parameter matrix. Then, through the image global internal and external parameters and the basic data of the four power projects (such as measurement data, drawing data, etc.), construct the BIM model of the four power projects.

[0014] Regional division unit: Since the four-electricity project serves the high-speed rail construction, the entire project is built around the high-speed rail route. This plan determines several construction nodes on the high-speed rail construction route, takes each construction node as the center, and constructs several sub-areas with a preset distance as the radius. The quality monitoring of the entire four-electricity project is converted into quality monitoring of multiple sub-areas, and the BIM model is divided into corresponding sub-areas. Different from the previous quality monitoring of different projects of the entire project, the quality monitoring after regional division greatly reduces both the amount of monitoring data and the difficulty of monitoring;

[0015] Quality score unit: obtain the quality data of all construction projects in each sub-region to obtain the acquisition results, and based on the acquisition results, use the first formula to calculate the quality score of each sub-region. The quality score is used as the quality indicator of the construction projects in each sub-region, so that the project quality of each sub-region can be more intuitively understood;

[0016] Quality monitoring unit: obtains all quality scores of a single sub-area within a preset time period to obtain an acquisition result, and based on the acquisition result, establishes a trend graph about the quality score of the single sub-area. Based on the trend graph, by monitoring the quality score within the preset time period, the quality monitoring effect of the entire sub-area is achieved;

[0017] Decision making unit: Obtain the average value of the quality score of a single sub-region within a preset time period through the trend graph of the quality score in the quality monitoring unit, and generate a corresponding processing decision for the single sub-region by analyzing the average value.

[0018] As an optional technical solution, the monitoring system further includes calculating the quality score of the communication engineering, the quality score of the signal engineering, the quality score of the power engineering and the quality score of the electric traction engineering in a single sub-area:

[0019]

[0020] β i is the quality score of a single construction project under a communication project in a single sub-region, n is the number of construction projects included in the communication project in a single sub-region, γ j is the quality score of a single construction project under the signal engineering in a single sub-region, m is the number of construction projects included in the signal engineering in a single sub-region, δ x is the quality score of a single construction project under the power engineering in a single sub-region, r is the number of construction projects included in the power engineering in a single sub-region, ε y is the quality score of a single construction project under the electric traction project in a single sub-area, and t is the number of construction projects included in the electric traction project in a single sub-area.

[0021] As an optional technical solution, feature point matching is performed on all multi-directional images to obtain matching feature point data including:

[0022] Perform characteristic structure point recognition on all multi-directional images to obtain characteristic structure point data;

[0023] Calculating the regional pixel value of the characteristic structure point data to obtain a characteristic pixel vector;

[0024] Based on the characteristic pixel vector, feature point matching is performed on all multi-directional images to obtain the matching feature point data.

[0025] As an optional technical solution, the monitoring system further includes obtaining the quality score of any construction project in a single sub-area:

[0026] Obtaining any construction project as a first construction project, and obtaining historical quality data of the first construction project;

[0027] Based on the historical quality data, a plurality of data intervals are divided, each data interval is preset with a quality score value, and the quality score value is proportional to the data interval;

[0028] Acquire actual quality data of the first construction project as first quality data, and acquire a data interval in which the first quality data is located as a first data interval;

[0029] A quality score value corresponding to the first data interval is obtained as the quality score of the first construction project.

[0030] As an optional technical solution, based on the second acquisition result, establishing a trend graph of the quality score of a single sub-region within the preset time period includes:

[0031] With the time in the preset time period as the abscissa and the quality score of the single sub-region in the preset time period as the ordinate, a trend graph of the quality score of the single sub-region in the preset time period is established.

[0032] As an optional technical solution, based on the trend graph, quality monitoring of a single sub-area includes:

[0033] Setting a qualified value of the quality score in the trend graph;

[0034] Determine whether there is a quality score lower than the qualified value in the trend graph, if so, send a first-level quality warning message to a preset terminal, if not, process the trend graph using the first method.

[0035] As an optional technical solution, the first method includes:

[0036] Dividing the preset time period into a plurality of continuous time intervals;

[0037] All mass fractions in each time interval are fitted to obtain the slope of the mass fraction corresponding to each time interval;

[0038] When it is determined that the slopes of the quality scores corresponding to at least two consecutive time intervals are negative, a second-level quality warning message is sent to the preset terminal.

[0039] As an optional technical solution, based on the third acquisition result, generating a corresponding processing decision for a single sub-region includes:

[0040] Obtaining an average value of the quality score of a single sub-region within the preset time period and recording it as a first average value;

[0041] Obtaining a qualified value of the quality score in the trend graph of a single sub-region as a first qualified value;

[0042] It is determined whether the first average value is less than or equal to the first qualified value. If so, a quality inspection is performed on all construction projects in the single sub-area; if not, the single sub-area is processed using the second method.

[0043] As an optional technical solution, the second method includes:

[0044] Calculate the difference between the first average value and the first qualified value, and determine whether the difference exceeds a set threshold, and if so, take no action;

[0045] If not, then respectively calculate the average value of the communication engineering quality score, the average value of the signal engineering quality score, the average value of the power engineering quality score and the average value of the electric traction engineering quality score of the single sub-area within the preset time period, and record the average value of the communication engineering quality score as the second average value, the average value of the signal engineering quality score as the third average value, the average value of the power engineering quality score as the fourth average value, and the average value of the electric traction engineering quality score as the fifth average value;

[0046] Calculate the difference between the second average value and the first qualified value as a first difference, determine whether the first difference exceeds the set threshold, if yes, do not take any action, if no, check the construction project of the corresponding communication project;

[0047] Calculate the difference between the third average value and the first qualified value as a second difference, determine whether the second difference exceeds the set threshold, if yes, do not take any action, if no, check the construction project of the corresponding signal engineering;

[0048] Calculate the difference between the fourth average value and the first qualified value as a third difference, determine whether the third difference exceeds the set threshold, if yes, do not take any action, if no, check the construction project of the corresponding power engineering;

[0049] The difference between the fifth average value and the first qualified value is calculated as the fourth difference, and it is determined whether the fourth difference exceeds the set threshold value. If so, no action is taken; if not, the construction project of the corresponding electric traction project is inspected.

[0050] One or more technical solutions provided by the present invention have at least the following technical effects or advantages:

[0051] The present invention discloses a monitoring system for the construction quality of four-electricity engineering. By acquiring the monitoring data of the four-electricity engineering, a multi-directional image is obtained and processed to obtain the global internal and external parameter matrix of the image, and the basic data of the four-electricity engineering is combined to construct a corresponding BIM model; the BIM model is divided into sub-areas according to the construction path, and the quality monitoring of the entire four-electricity engineering is converted into the quality monitoring of several sub-areas, which greatly reduces the amount of data and difficulty of monitoring; the quality data of each sub-area is obtained, and all the quality data are processed by setting a first formula to obtain the quality score of each sub-area, and the quality score is used as the quality indicator of the sub-area construction project, so that managers can more intuitively understand the quality profile of each sub-area; then by establishing a trend chart of the quality score, and based on the trend chart, the quality monitoring of the entire sub-area is carried out; finally, based on the quality monitoring results obtained by the trend chart, a corresponding processing decision is generated for a single sub-area. The quality monitoring system provided by the present invention can well help managers to manage and control the quality of the project objectively, accurately and timely. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of the present invention, and do not constitute a limitation on the embodiments of the present invention;

[0053] Figure 1 It is a schematic diagram of the composition of a monitoring system for the construction quality of four-electricity engineering in the present invention. DETAILED DESCRIPTION

[0054] In order to more clearly understand the above-mentioned purpose, features and advantages of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict.

[0055] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those within the scope of this description. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0056] Example

[0057] Please refer to Figure 1 , Figure 1 This is a schematic diagram of the composition of a monitoring system for the construction quality of four power engineering projects in the present invention, and the monitoring system includes:

[0058] Model unit: obtain monitoring data of the construction area of ​​the four power projects to obtain multi-directional images, perform feature point matching on all multi-directional images to obtain matching feature point data; perform inter-image matrix calculation on all multi-directional images based on all matching feature point data to obtain a global internal and external parameter matrix of the image; construct a BIM model of the four power projects based on the global internal and external parameter matrix of the image and the basic data of the four power projects;

[0059] Area division unit: determining a number of construction nodes on the construction path of the four power projects, taking the construction nodes as the center and a preset distance as the radius to construct a number of sub-areas to obtain construction results, any construction project in the four power projects is located in at least one sub-area, and based on the construction results, the BIM model is divided into sub-areas accordingly;

[0060] Quality score unit: obtains quality data of all items in a single sub-area of ​​the BIM model to obtain a first acquisition result; based on the first acquisition result, a first formula is used to calculate the quality score of the single sub-area, specifically:

[0061] K=K a +K b +K c +K d

[0062] K is the quality score of a single sub-region, K a is the quality score of the communication engineering in a single sub-region, K b is the quality score of signal engineering in a single sub-region, K c is the quality score of power engineering in a single sub-region, K d The quality score of the electric traction power supply project in a single sub-region;

[0063] The quality monitoring unit: obtains all quality scores of a single sub-region within a preset time period to obtain a second acquisition result; based on the second acquisition result, establishes a trend graph of the quality scores of the single sub-region within the preset time period; and performs quality monitoring on the single sub-region based on the trend graph;

[0064] A decision generating unit: based on the trend graph, obtains an average value of the quality score of the single sub-region within the preset time period to obtain a third acquisition result, and based on the third acquisition result, generates a corresponding processing decision for the single sub-region.

[0065] The specific embodiments of the present invention are as follows:

[0066] Model unit: Obtain corresponding monitoring data through cameras arranged in the construction area to obtain multi-directional images of the four power engineering projects, perform feature point matching on all multi-directional images to obtain matching feature point data, perform inter-image matrix calculation on all multi-directional images based on all matching feature point data to obtain the global internal and external parameter matrix of the image; Regarding inter-image matrix calculation, the image can be regarded as a two-dimensional digital matrix, each element represents a pixel point in the image, and various image processing and analysis (such as smoothing, denoising, transformation, etc.) can be achieved by performing matrix calculation on these pixel points. Common matrix calculation methods include convolution operations and matrix multiplication; Then, based on the global internal and external parameter matrix of the image and the basic data of the four power engineering projects (such as measurement data, drawing data, component parameters, etc.), construct a BIM model of the four power engineering projects, and reflect the quality monitoring of the entire four power engineering projects through the BIM model, which is more intuitive and concise;

[0067] Perform feature point matching on all multi-directional images, and obtain matching feature point data including:

[0068] Perform characteristic structure point recognition on all multi-directional images to obtain characteristic structure point data;

[0069] Calculating the regional pixel value of the characteristic structure point data to obtain a characteristic pixel vector;

[0070] Based on the characteristic pixel vector, feature point matching is performed on all multi-directional images to obtain the matching feature point data.

[0071] Area division unit: Since the four-electricity project serves the high-speed railway construction, the entire project is carried out around the high-speed railway route. This embodiment determines multiple construction nodes on the construction path of the high-speed railway, and uses each construction node as the center and presets a radius to form multiple sub-areas. The quality monitoring of the entire four-electricity project is converted into quality monitoring of multiple sub-areas, and the BIM model is divided into corresponding sub-areas. Different from the previous quality monitoring of different projects of the entire project, the quality monitoring after regional division greatly reduces the amount of monitoring data and the difficulty of monitoring.

[0072] Quality score unit: obtain the quality data of all construction projects in a single sub-area in the BIM model, and process these quality data using the first formula to obtain the quality score of the single sub-area. The first formula is specifically:

[0073] K=K a +K b +K c +K d

[0074] K is the quality score of a single sub-region, K ais the quality score of the communication engineering in a single sub-region, K b is the quality score of signal engineering in a single sub-region, K c is the quality score of power engineering in a single sub-region, K d The quality score of the electric traction power supply project in a single sub-region;

[0075] This embodiment also includes calculating the quality score of the communication engineering, the quality score of the signal engineering, the quality score of the power engineering, and the quality score of the electric traction engineering in a single sub-area:

[0076]

[0077] β i is the quality score of a single construction project under a communication project in a single sub-region, n is the number of construction projects included in the communication project in a single sub-region, γ j is the quality score of a single construction project under the signal engineering in a single sub-region, m is the number of construction projects included in the signal engineering in a single sub-region, δ x is the quality score of a single construction project under the power engineering in a single sub-region, r is the number of construction projects included in the power engineering in a single sub-region, ε y is the quality score of a single construction project under the electric traction project in a single sub-region, and t is the number of construction projects included in the electric traction project in a single sub-region;

[0078] This embodiment also includes obtaining the quality score of any construction project in a single sub-area:

[0079] Obtaining any construction project as a first construction project, and obtaining historical quality data of the first construction project;

[0080] Based on the historical quality data, a plurality of data intervals are divided, each data interval is preset with a quality score value, and the quality score value is proportional to the data interval;

[0081] Acquire actual quality data of the first construction project as first quality data, and acquire a data interval in which the first quality data is located as a first data interval;

[0082] A quality score value corresponding to the first data interval is obtained as the quality score of the first construction project.

[0083] Among them, the quality score unit of this embodiment obtains the quality data of all projects in each sub-area, and then divides the data into intervals and uses preset quality score values ​​to unify the quality judgment standards of the entire sub-area including the construction projects of the entire four-electricity project, and then calculates the quality scores of different engineering projects in a single sub-area and the quality score of the entire sub-area respectively. The set quality score is used as the quality indicator of each sub-area and the construction projects included, which helps the group manager to more intuitively understand the quality status of each sub-area and its construction projects in the entire four-electricity project.

[0084] Quality monitoring unit: obtains all quality scores of a single sub-area within a preset time period to obtain an acquisition result, and based on the acquisition result, establishes a trend graph about the quality score of the single sub-area. Based on the trend graph, by monitoring the quality score within the preset time period, the quality monitoring effect of the entire sub-area is achieved;

[0085] In this embodiment, based on the second acquisition result, establishing a trend graph of the quality score of a single sub-region within the preset time period includes:

[0086] With the time in the preset time period as the abscissa and the quality score of the single sub-region in the preset time period as the ordinate, a trend graph of the quality score of the single sub-region in the preset time period is established.

[0087] In this embodiment, quality monitoring of a single sub-area is also performed based on the trend graph, including:

[0088] Setting a qualified value of the quality score in the trend graph;

[0089] Determine whether there is a quality score lower than the qualified value in the trend graph, if so, send a first-level quality warning message to a preset terminal, if not, process the trend graph using a first method;

[0090] The first method comprises:

[0091] Dividing the preset time period into a plurality of continuous time intervals;

[0092] All mass fractions in each time interval are fitted to obtain the slope of the mass fraction corresponding to each time interval;

[0093] When it is determined that the slopes of the quality scores corresponding to at least two consecutive time intervals are negative, a second-level quality warning message is sent to the preset terminal.

[0094] Among them, this embodiment constructs a trend graph of the quality score of a single sub-region within a preset time period, and sets a qualified value of the quality score, that is, a quality qualified line, in the trend graph. When it is determined that there is a quality score in the trend graph that is lower than the quality qualified line, a first-level quality warning message is sent to a preset terminal. If all quality scores in the trend graph are higher than the quality qualified line, the preset time period is divided into several continuous time intervals, and then the quality score in each time interval is fitted to obtain the slope of the quality score corresponding to each time interval. When it is determined that the slope of the quality score corresponding to at least two consecutive time intervals is negative, it indicates that the quality of the sub-region is continuously declining at this time, and a second-level quality warning message is sent to the preset terminal.

[0095] Furthermore, this embodiment also provides: if a single sub-area sends a first-level quality warning message, the corresponding sub-area of ​​the BIM model is marked with a color (such as red); if a single sub-area sends a second-level quality warning message, the corresponding sub-area of ​​the BIM model is marked with a color (such as yellow). Similarly, for sub-areas in the BIM model that have no quality warning information, other colors (such as green) are used for marking. This helps managers to intuitively obtain the quality profile of the corresponding sub-areas through the colors of different sub-areas in the BIM.

[0096] A decision generating unit: based on the trend graph, obtaining an average value of the quality score of the single sub-region within the preset time period to obtain a third obtaining result, and generating a corresponding processing decision for the single sub-region based on the third obtaining result;

[0097] In this embodiment, based on the third acquisition result, generating a corresponding processing decision for a single sub-region includes:

[0098] Obtaining an average value of the quality score of a single sub-region within the preset time period and recording it as a first average value;

[0099] Obtaining a qualified value of the quality score in the trend graph of a single sub-region as a first qualified value;

[0100] Determine whether the first average value is less than or equal to the first qualified value, if so, perform quality inspection on all construction projects in the single sub-area; if not, use the second method to process the single sub-area;

[0101] The second method comprises:

[0102] Calculate the difference between the first average value and the first qualified value, and determine whether the difference exceeds a set threshold, and if so, take no action;

[0103] If not, then respectively calculate the average value of the communication engineering quality score, the average value of the signal engineering quality score, the average value of the power engineering quality score and the average value of the electric traction engineering quality score of the single sub-area within the preset time period, and record the average value of the communication engineering quality score as the second average value, the average value of the signal engineering quality score as the third average value, the average value of the power engineering quality score as the fourth average value, and the average value of the electric traction engineering quality score as the fifth average value;

[0104] Calculate the difference between the second average value and the first qualified value as a first difference, determine whether the first difference exceeds the set threshold, if yes, do not take any action, if no, check the construction project of the corresponding communication project;

[0105] Calculate the difference between the third average value and the first qualified value as a second difference, determine whether the second difference exceeds the set threshold, if yes, do not take any action, if no, check the construction project of the corresponding signal engineering;

[0106] Calculate the difference between the fourth average value and the first qualified value as a third difference, determine whether the third difference exceeds the set threshold, if yes, do not take any action, if no, check the construction project of the corresponding power engineering;

[0107] The difference between the fifth average value and the first qualified value is calculated as the fourth difference, and it is determined whether the fourth difference exceeds the set threshold value. If so, no action is taken; if not, the construction project of the corresponding electric traction project is inspected.

[0108] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.

[0109] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A monitoring system for the construction quality of four power engineering projects, characterized in that: The monitoring system comprises: Model unit: obtain monitoring data of the construction area of ​​the four power projects to obtain multi-directional images, perform feature point matching on all multi-directional images to obtain matching feature point data; perform inter-image matrix calculation on all multi-directional images based on all matching feature point data to obtain a global internal and external parameter matrix of the image; construct a BIM model of the four power projects based on the global internal and external parameter matrix of the image and the basic data of the four power projects; Area division unit: determining a number of construction nodes on the construction path of the four power projects, taking the construction nodes as the center and a preset distance as the radius to construct a number of sub-areas to obtain construction results, any construction project in the four power projects is located in at least one sub-area, and based on the construction results, the BIM model is divided into sub-areas accordingly; Quality score unit: obtains quality data of all items in a single sub-area of ​​the BIM model to obtain a first acquisition result; based on the first acquisition result, a first formula is used to calculate the quality score of the single sub-area, specifically: K=K a +K b +K c +K d K is the quality score of a single sub-region, K a is the quality score of the communication engineering in a single sub-region, K b is the quality score of signal engineering in a single sub-region, K c is the quality score of power engineering in a single sub-region, K d The quality score of the electric traction power supply project in a single sub-region; The quality monitoring unit: obtains all quality scores of a single sub-region within a preset time period to obtain a second acquisition result; based on the second acquisition result, establishes a trend graph of the quality scores of the single sub-region within the preset time period; and performs quality monitoring on the single sub-region based on the trend graph; A decision generating unit: based on the trend graph, obtains an average value of the quality score of the single sub-region within the preset time period to obtain a third acquisition result, and based on the third acquisition result, generates a corresponding processing decision for the single sub-region.

2. A monitoring system for the construction quality of four power engineering projects according to claim 1, characterized in that: Perform feature point matching on all multi-directional images, and obtain matching feature point data including: Perform characteristic structure point recognition on all multi-directional images to obtain characteristic structure point data; Calculating the regional pixel value of the characteristic structure point data to obtain a characteristic pixel vector; Based on the characteristic pixel vector, feature point matching is performed on all multi-directional images to obtain the matching feature point data.

3. A monitoring system for the construction quality of four power engineering projects according to claim 1, characterized in that: The monitoring system further comprises calculating the quality score of the communication engineering, the quality score of the signal engineering, the quality score of the power engineering and the quality score of the electric traction engineering in a single sub-area: β i is the quality score of a single construction project under a communication project in a single sub-region, n is the number of construction projects included in the communication project in a single sub-region, γ j is the quality score of a single construction project under the signal engineering in a single sub-region, m is the number of construction projects included in the signal engineering in a single sub-region, δ x is the quality score of a single construction project under the power engineering in a single sub-region, r is the number of construction projects included in the power engineering in a single sub-region, ε y is the quality score of a single construction project under the electric traction project in a single sub-area, and t is the number of construction projects included in the electric traction project in a single sub-area.

4. A monitoring system for the construction quality of four power engineering projects according to claim 3, characterized in that: The monitoring system also includes obtaining the quality score of any construction project in a single sub-area: Obtaining any construction project as a first construction project, and obtaining historical quality data of the first construction project; Based on the historical quality data, a plurality of data intervals are divided, each data interval is preset with a quality score value, and the quality score value is proportional to the data interval; Acquire actual quality data of the first construction project as first quality data, and acquire a data interval in which the first quality data is located as a first data interval; A quality score value corresponding to the first data interval is obtained as the quality score of the first construction project.

5. A monitoring system for the construction quality of four power engineering projects according to claim 1, characterized in that: Based on the second acquisition result, establishing a trend graph of the quality score of a single sub-region within the preset time period includes: With the time in the preset time period as the abscissa and the quality score of the single sub-region in the preset time period as the ordinate, a trend graph of the quality score of the single sub-region in the preset time period is established.

6. A monitoring system for the construction quality of four power engineering projects according to claim 5, characterized in that: Based on the trend graph, quality monitoring of a single sub-area includes: Setting a qualified value of the quality score in the trend graph; Determine whether there is a quality score lower than the qualified value in the trend graph, if so, send a first-level quality warning message to a preset terminal, if not, process the trend graph using the first method.

7. A monitoring system for the construction quality of four power engineering projects according to claim 6, characterized in that: The first method comprises: Dividing the preset time period into a plurality of continuous time intervals; All mass fractions in each time interval are fitted to obtain the slope of the mass fraction corresponding to each time interval; When it is determined that the slopes of the quality scores corresponding to at least two consecutive time intervals are negative, a second-level quality warning message is sent to the preset terminal.

8. A monitoring system for the construction quality of four power engineering projects according to claim 6, characterized in that: Based on the third acquisition result, generating a corresponding processing decision for a single sub-region includes: Obtaining an average value of the quality score of a single sub-region within the preset time period and recording it as a first average value; Obtaining a qualified value of the quality score in the trend graph of a single sub-region as a first qualified value; It is determined whether the first average value is less than or equal to the first qualified value. If so, a quality inspection is performed on all construction projects in the single sub-area; if not, the single sub-area is processed using the second method.

9. A monitoring system for the construction quality of four power engineering projects according to claim 8, characterized in that: The second method comprises: Calculate the difference between the first average value and the first qualified value, and determine whether the difference exceeds a set threshold, and if so, take no action; If not, then respectively calculate the average value of the communication engineering quality score, the average value of the signal engineering quality score, the average value of the power engineering quality score and the average value of the electric traction engineering quality score of the single sub-area within the preset time period, and record the average value of the communication engineering quality score as the second average value, the average value of the signal engineering quality score as the third average value, the average value of the power engineering quality score as the fourth average value, and the average value of the electric traction engineering quality score as the fifth average value; Calculate the difference between the second average value and the first qualified value as a first difference, determine whether the first difference exceeds the set threshold, if yes, do not take any action, if no, check the construction project of the corresponding communication project; Calculate the difference between the third average value and the first qualified value as a second difference, determine whether the second difference exceeds the set threshold, if yes, do not take any action, if no, check the construction project of the corresponding signal engineering; Calculate the difference between the fourth average value and the first qualified value as a third difference, determine whether the third difference exceeds the set threshold, if yes, do not take any action, if no, check the construction project of the corresponding power engineering; The difference between the fifth average value and the first qualified value is calculated as the fourth difference, and it is determined whether the fourth difference exceeds the set threshold value. If so, no action is taken; if not, the construction project of the corresponding electric traction project is inspected.