Bridge construction violation behavior monitoring method, device and equipment and storage medium

By obtaining bridge construction plan information and determining construction monitoring points, combining monitoring types and risk levels, optimizing the drone image acquisition path planning strategy, the problem that drones are difficult to adapt to the monitoring distance and frequency standards of various violations in the existing technology is solved, and efficient and accurate monitoring of bridge construction violations is achieved.

CN119785248AActive Publication Date: 2025-04-08SICHUAN CHUANJIAO ROAD & BRIDGE

Patent Information

Application Number
CN202411938111.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-26
Publication Date
2025-04-08
Estimated Expiration
2044-12-26

AI Technical Summary

Technical Problem

The existing bridge construction violation monitoring drones are difficult to adapt to the monitoring distance and frequency standards of various violations under different construction links and scenarios, resulting in difficult flight planning and image acquisition and limited endurance.

Method used

By obtaining bridge construction plan information, determining construction monitoring points and effective monitoring periods, combining monitoring types and risk levels, optimizing the drone image acquisition path planning strategy, taking the minimum flight distance as the optimization goal, and generating flight and image acquisition control instructions that are adapted to different construction links and scenarios.

Benefits of technology

It improves the accuracy and efficiency of monitoring of bridge construction violations, extends the monitoring time of drones, is highly adaptable, and can effectively respond to monitoring needs in different construction links and scenarios.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119785248A_ABST
    Figure CN119785248A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of data processing, and discloses a bridge construction violation behavior monitoring method, device and equipment and a storage medium, and the method comprises the steps: determining an effective monitoring time period of a construction monitoring point through obtaining a planned time period of executing each construction process in each bridge construction section; according to the monitoring type information and the monitoring risk level of each construction monitoring point, taking an image acquisition distance interval corresponding to the monitoring type information and an image acquisition frequency interval corresponding to the monitoring risk level as constraints, taking a flight distance as an optimization target, and optimizing and solving an unmanned aerial vehicle image acquisition path planning strategy; according to the method, the unmanned aerial vehicle is controlled to execute flight, image acquisition and bridge construction violation judgment, and an unmanned aerial vehicle image acquisition scheme meeting different monitoring distances and different monitoring frequencies of different construction procedures is provided, so that the bridge construction violation behavior monitoring accuracy and efficiency are improved; the monitoring duration of the illegal behavior monitoring unmanned aerial vehicle is prolonged, and the method has good scene adaptability.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing technology, and in particular to a method, device, equipment and storage medium for monitoring illegal behaviors in bridge construction. Background Art

[0002] As an important means of transportation connecting two places, bridges have an important strategic position. Bridge construction is difficult and the construction process is very complicated, involving many links. At the same time, monitoring of bridge construction violations has become an indispensable safety project in the process of bridge construction because of its significant role and significance in ensuring the quality of bridge projects, ensuring construction safety, controlling construction progress, and improving construction efficiency.

[0003] The traditional manual monitoring of bridge construction violations has the problems of low monitoring efficiency, strong subjectivity, difficulty in monitoring multiple steps in multiple links, and low monitoring accuracy. With the maturity and application of drone technology, the introduction of violation monitoring drones in bridge construction violation monitoring has become a hot trend. The application of drones can provide more efficient and accurate violation monitoring for bridge construction, avoiding the influence of human subjective judgment. However, the existing violation monitoring drones still have some limitations in bridge construction monitoring in some scenarios: (1) There are differences in the monitoring distances for violations: Considering that the bridge construction process is complex, it usually includes multiple construction steps in multiple links. In view of the different construction scenarios and requirements of different bridges, different violation monitoring distance standards are applied to many links and steps (for example, in the upper structure construction link, the image acquisition of the joints between precast beams and cast-in-place beams to check the setting of connecting steel bars and the pouring quality of concrete requires close-range image acquisition within 20 meters; in the lower structure construction link, the image acquisition of the construction of piers and abutments to check whether the spacing, number, and binding firmness of steel bars meet the design requirements requires medium-range image acquisition of 20 to 50 meters; and the image acquisition for the location and status monitoring of large equipment requires long-range image acquisition of more than 50 meters). Different violation monitoring distance standards increase the difficulty of drones in executing flight planning and image acquisition in the construction area. (2) There are differences in the frequency of monitoring violations: Considering that in the scenario of progressive bridge construction, since each bridge construction section may perform different construction processes at the same time, violation monitoring drones need to simultaneously respond to the monitoring needs of different construction processes and different construction scenarios. Different construction processes in different construction scenarios usually have different violation monitoring frequency standards (for example, the concrete pouring process of large-volume bridge piers requires image acquisition every hour or even shorter time intervals to ensure timely detection of violations such as segregation and loose vibration during the layered pouring of concrete; the image acquisition every 3-6 hours is required to monitor the sealing degree and use status of drainage pipes during construction; the image acquisition every 3-5 days is required to monitor cracks, peeling, rust, etc. on the surface of bridge piers and beams). Different violation monitoring frequency standards further increase the difficulty of flight planning and image acquisition of drones in the construction area. (3) There are limitations on the endurance of violation monitoring drones in actual applications. In order to improve the monitoring capability of violation monitoring drones, it is necessary to optimize the flight path of violation monitoring drones when performing flight planning and image acquisition.

[0004] Therefore, how to provide flight planning and image acquisition control solutions for violation monitoring UAVs that are adapted to different violation monitoring distances and violation monitoring frequencies for several construction steps in the numerous links of bridge construction, while improving the accuracy and efficiency of bridge construction violation monitoring, and extending the monitoring time of violation monitoring UAVs during flight planning and image acquisition as much as possible, is a technical problem that needs to be solved urgently. Summary of the invention

[0005] The present invention provides a method, device, equipment and storage medium for monitoring bridge construction violations, aiming to solve at least one of the above-mentioned technical problems.

[0006] To achieve the above object, the present invention provides a method for monitoring bridge construction violations, comprising the following steps: Acquire bridge construction plan information; wherein the bridge construction plan information includes a number of bridge construction sections in the target construction bridge, a number of construction processes in each bridge construction section, and a planned time period for each bridge construction section to perform each construction process; According to a number of construction procedures of each bridge construction section and a planned period for each bridge construction section to perform each construction procedure, a number of construction monitoring points of the target construction bridge and an effective monitoring period of each construction monitoring point are determined; Obtain the pre-established bridge construction monitoring requirements, extract the monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirements, consider the effective monitoring period of each construction monitoring point, use the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level as constraints, and use the minimum flight distance as the optimization target to optimize and solve the UAV image acquisition path planning strategy for the target construction bridge; Based on the UAV image acquisition path planning strategy, UAV flight and image acquisition control instructions are generated to drive the violation monitoring UAV to perform corresponding flight and image acquisition actions, and perform bridge construction violation judgment based on the collected bridge construction images; After the violation monitoring UAV completes each flight and image acquisition action, the bridge construction progress is obtained, the bridge construction plan information is updated based on the bridge construction progress, and the UAV image acquisition path planning strategy is regenerated using the updated bridge construction plan information.

[0007] Optionally, the steps for obtaining bridge construction plan information include: Obtain historical bridge construction progress information of the bridge construction subject, extract the historical time consumption of each construction process in different reference bridge construction sections from the historical bridge construction progress information, obtain the target bridge construction task, extract several bridge construction sections in the target construction bridge recorded in the target bridge construction task and several construction processes in each bridge construction section; Similarity matching is performed based on the construction content characteristics of the reference bridge construction section and each bridge construction section in the target construction bridge, and a number of reference bridge construction sections whose construction content characteristics similarity is higher than the target value are matched for each bridge construction section; Based on the historical time consumption of each construction process in a number of reference bridge construction sections with matching relationships in each bridge construction section, the planned time consumption of each construction process in each bridge construction section is calculated by accumulating the average value of the historical time consumption; According to the planned time consumption of each construction process in each bridge construction section, the planned time period for executing each construction process in each bridge construction section of the target construction bridge is determined, and the planned time period of each construction process is used to generate bridge construction plan information.

[0008] Optionally, according to a number of construction procedures of each bridge construction section and a planned period for each bridge construction section to execute each construction procedure, a number of construction monitoring points of the target construction bridge and an effective monitoring period of each construction monitoring point are determined, specifically including: Using several construction processes of each bridge construction section, matching the construction monitoring items of each construction process in the pre-established bridge construction monitoring item list, querying the construction monitoring position of each construction monitoring item by calling the target construction bridge drawing, and obtaining several construction monitoring points; According to the planned time period for executing each construction process in each bridge construction section, the effective monitoring time period of each construction monitoring point corresponding to each construction process is determined.

[0009] Optionally, a pre-established bridge construction monitoring requirement is obtained, the monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirement are extracted, the effective monitoring period of each construction monitoring point is considered, the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level are used as constraints, and the minimum flight distance is used as the optimization target, and the steps of optimizing and solving the UAV image acquisition path planning strategy for the target construction bridge are specifically included: Obtaining a pre-established bridge construction monitoring requirement, and extracting the monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirement; wherein the monitoring type includes monitoring types of construction violations corresponding to a number of different image acquisition distance intervals, and the monitoring risk level includes monitoring risk levels of construction violations corresponding to a number of different image acquisition frequency intervals; Using the monitoring type information and the monitoring risk level, the image acquisition distance and the image acquisition frequency of each construction monitoring point are matched in a first mapping comparison table of preset monitoring types and image acquisition distance intervals and a second mapping comparison table of preset monitoring risk levels and image acquisition frequency intervals; Considering the effective monitoring period of each construction monitoring point, taking the image acquisition distance interval and the image acquisition frequency interval as constraints, and taking the minimum flight distance as the optimization goal, the UAV image acquisition path planning strategy for the target construction bridge is optimized.

[0010] Optionally, considering the effective monitoring period of each construction monitoring point, taking the image acquisition distance interval and the image acquisition frequency interval as constraints, taking the minimum flight distance as the optimization target, optimizing and solving the UAV image acquisition path planning strategy steps for the target construction bridge, specifically including: Constructing a three-dimensional model map of the target construction bridge, and generating an effective monitoring area for each construction monitoring point in the three-dimensional model map according to the image acquisition distance interval of each construction monitoring point; Obtain the flight speed range of the violation monitoring drone, consider the effective monitoring period and effective monitoring area of ​​each of the construction monitoring points, select several drone collection points within the effective monitoring period and the effective monitoring area, and use the image collection interval time corresponding to two adjacent drone collection points in each drone image collection path in the generated drone image collection path as the first constraint condition and the image collection interval time corresponding to two adjacent drone collection points of each construction monitoring point in the generated drone image collection path as the second constraint condition, and use the minimum cumulative sum of flight distances of the violation monitoring drone in the generated drone image collection paths as the optimization goal, and optimize the image collection time and image collection position of each drone collection point in the drone image collection paths; According to the image acquisition time and image acquisition position of each UAV acquisition point in several UAV image acquisition paths, a UAV image acquisition path planning strategy for the target construction bridge is generated.

[0011] Optionally, based on the UAV image acquisition path planning strategy, UAV flight and image acquisition control instructions are generated to drive the violation monitoring UAV to perform corresponding flight and image acquisition actions, and perform bridge construction violation judgment steps according to the collected bridge construction images, specifically including: Extract the image acquisition time and image acquisition position of each drone acquisition point in each drone image acquisition path in the drone image acquisition path planning strategy, and calculate the flight speed between two adjacent drone acquisition points in each drone image acquisition path; Based on the image acquisition position of each drone acquisition point and the flight speed between two adjacent drone acquisition points, a drone flight control instruction is generated; based on the image acquisition time of each drone acquisition point, a drone image acquisition instruction is generated to obtain drone flight and image acquisition control instructions; The UAV flight and image acquisition control instructions are sent to the violation monitoring UAV, driving the violation monitoring UAV to execute corresponding flight and image acquisition actions, and perform bridge construction violation judgment based on the collected bridge construction images.

[0012] Optionally, after the violation monitoring drone completes each flight and image acquisition action, the bridge construction progress is obtained, the bridge construction plan information is updated based on the bridge construction progress, and the drone image acquisition path planning strategy steps are regenerated using the updated bridge construction plan information, specifically including: After the violation monitoring drone completes each flight and image acquisition action, the bridge construction progress of the target construction bridge is obtained, and the actual time period during which the construction process is currently being executed in each bridge construction section in the bridge construction progress is extracted; Based on the planned time period for executing each construction process in each bridge construction section in the bridge construction plan information and the actual time period for currently executing the construction process in each bridge construction section in the bridge construction progress, it is determined whether the time overlap ratio between the actual time period and the planned time period for executing the corresponding construction process is lower than a preset target ratio, and if so, the construction process corresponding to the actual time period is defined as an error process; Determine whether the number of error processes in the construction processes currently being executed in each bridge construction section in the bridge construction progress exceeds the preset target number. If so, update the bridge construction plan information based on the bridge construction progress, and use the updated bridge construction plan information to regenerate the drone image acquisition path planning strategy.

[0013] In addition, in order to achieve the above-mentioned purpose, the present invention also provides a bridge construction violation monitoring device, comprising: An acquisition module is used to acquire bridge construction plan information; wherein the bridge construction plan information includes a number of bridge construction sections in the target construction bridge, a number of construction processes of each bridge construction section, and a planned time period for each bridge construction section to execute each construction process; A determination module, for determining a number of construction monitoring points of the target construction bridge and an effective monitoring period of each construction monitoring point according to a number of construction procedures of each bridge construction section and a planned period for each bridge construction section to perform each construction procedure; A solution module is used to obtain a pre-determined bridge construction monitoring requirement, extract the monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirement, consider the effective monitoring period of each construction monitoring point, take the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level as constraints, take the minimum flight distance as the optimization target, and optimize and solve the UAV image acquisition path planning strategy for the target construction bridge; An execution module, for generating UAV flight and image acquisition control instructions based on the UAV image acquisition path planning strategy, driving the violation monitoring UAV to execute corresponding flight and image acquisition actions, and performing bridge construction violation judgment based on the acquired bridge construction images; The update module is used to obtain the bridge construction progress after the violation monitoring drone completes each flight and image acquisition action, update the bridge construction plan information based on the bridge construction progress, and use the updated bridge construction plan information to regenerate the drone image acquisition path planning strategy.

[0014] In addition, in order to achieve the above-mentioned purpose, the present invention also provides a bridge construction violation monitoring device, which includes: a memory, a processor, and a bridge construction violation monitoring program stored in the memory and executable on the processor, and when the bridge construction violation monitoring program is executed by the processor, the steps of the bridge construction violation monitoring method described above are implemented.

[0015] In addition, in order to achieve the above-mentioned purpose, the present invention also provides a storage medium, on which a bridge construction violation monitoring program is stored, and when the bridge construction violation monitoring program is executed by a processor, the steps of the above-mentioned bridge construction violation monitoring method are implemented.

[0016] The beneficial effects of the present invention are as follows: a method, device, equipment and storage medium for monitoring violations in bridge construction are proposed, by obtaining bridge construction plan information, using the planned time period of each bridge construction section in executing each construction process, determining the effective monitoring period of each construction monitoring point, according to the monitoring type information and monitoring risk level of each construction monitoring point in the pre-formulated bridge construction monitoring requirements, considering the monitoring type information and monitoring risk level, taking the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level as constraints, taking the flight distance as the optimization target, optimizing and solving the drone image acquisition path planning strategy for the target construction bridge, and then controlling the drone to perform flight and image acquisition and bridge construction violation judgment. Therefore, the present invention proposes a construction image acquisition scheme that adapts to different monitoring distances and different monitoring frequencies in different construction links during the bridge construction process, while improving the accuracy and efficiency of bridge construction violation monitoring, and extending the monitoring time of the violation monitoring drone as much as possible, with good scene adaptability. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 A schematic diagram of the device structure of the hardware operating environment involved in the embodiment of the present invention; Figure 2A schematic diagram of a flow chart of an embodiment of a method for monitoring violations in bridge construction according to the present invention; Figure 3 The present invention is a structural block diagram of a bridge construction violation monitoring device in an embodiment of the present invention.

[0018] The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0019] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0020] like Figure 1 As shown, Figure 1 It is a schematic diagram of the device structure of the hardware operating environment involved in the embodiment of the present invention.

[0021] like Figure 1 As shown, the device may include: a processor 1001, such as a CPU, a communication bus 1002, a user interface 1003, a network interface 1004, and a memory 1005. Among them, the communication bus 1002 is used to realize the connection and communication between these components. The user interface 1003 may include a display screen (Display), an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a WI-FI interface). The memory 1005 may be a high-speed RAM memory, or it may be a stable memory (non-volatile memory), such as a disk memory. The memory 1005 may also be a storage device independent of the aforementioned processor 1001.

[0022] Those skilled in the art will understand that Figure 1 The structure of the device shown in the figure does not constitute a limitation of the device, and may include more or less components than shown in the figure, or combine certain components, or arrange the components differently.

[0023] like Figure 1 As shown, the memory 1005 as a computer storage medium may include an operating system, a network communication module, a user interface module, and a bridge construction violation monitoring program.

[0024] exist Figure 1In the terminal shown, the network interface 1004 is mainly used to connect to the backend server and perform data communication with the backend server; the user interface 1003 is mainly used to connect to the client (user end) and perform data communication with the client; and the processor 1001 can be used to call the bridge construction violation monitoring program stored in the memory 1005 and perform the following operations: Acquire bridge construction plan information; wherein the bridge construction plan information includes a number of bridge construction sections in the target construction bridge, a number of construction processes in each bridge construction section, and a planned time period for each bridge construction section to perform each construction process; According to a number of construction procedures of each bridge construction section and a planned period for each bridge construction section to perform each construction procedure, a number of construction monitoring points of the target construction bridge and an effective monitoring period of each construction monitoring point are determined; Obtain the pre-established bridge construction monitoring requirements, extract the monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirements, consider the effective monitoring period of each construction monitoring point, use the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level as constraints, and use the minimum flight distance as the optimization target to optimize and solve the UAV image acquisition path planning strategy for the target construction bridge; Based on the UAV image acquisition path planning strategy, UAV flight and image acquisition control instructions are generated to drive the violation monitoring UAV to perform corresponding flight and image acquisition actions, and perform bridge construction violation judgment based on the collected bridge construction images; After the violation monitoring UAV completes each flight and image acquisition action, the bridge construction progress is obtained, the bridge construction plan information is updated based on the bridge construction progress, and the UAV image acquisition path planning strategy is regenerated using the updated bridge construction plan information.

[0025] The specific embodiments of the present invention applied to the device are basically the same as the embodiments of the following bridge construction violation monitoring method, and will not be described in detail here.

[0026] The embodiment of the present invention provides a method for monitoring illegal behavior in bridge construction, referring to Figure 2 , Figure 2 It is a flow chart of an embodiment of a method for monitoring bridge construction violations according to the present invention.

[0027] In this embodiment, the bridge construction violation monitoring method includes the following steps: S100: Obtaining bridge construction plan information; wherein the bridge construction plan information includes a number of bridge construction sections in the target construction bridge, a number of construction processes of each bridge construction section, and a planned time period for each bridge construction section to perform each construction process; S200: determining a number of construction monitoring points of the target construction bridge and an effective monitoring period of each construction monitoring point according to a number of construction procedures of each bridge construction section and a planned period for each bridge construction section to execute each construction procedure; S300: obtaining a pre-determined bridge construction monitoring requirement, extracting the monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirement, considering the effective monitoring period of each construction monitoring point, taking the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level as constraints, taking the minimum flight distance as the optimization target, and optimizing and solving the UAV image acquisition path planning strategy for the target construction bridge; S400: Based on the UAV image acquisition path planning strategy, generate UAV flight and image acquisition control instructions, drive the violation monitoring UAV to perform corresponding flight and image acquisition actions, and perform bridge construction violation judgment based on the collected bridge construction images; S500: After the violation monitoring UAV completes each flight and image acquisition action, the bridge construction progress is obtained, the bridge construction plan information is updated based on the bridge construction progress, and the UAV image acquisition path planning strategy is regenerated using the updated bridge construction plan information.

[0028] It should be noted that the existing violation monitoring drones still have some limitations in bridge construction monitoring in some scenarios: (1) There are differences in violation monitoring distances: Considering that the bridge construction process is complex, it usually includes multiple construction steps in multiple links. Different construction scenarios and requirements of different bridges make different violation monitoring distance standards for many links and many construction steps. Different violation monitoring distance standards increase the difficulty of drones in executing flight planning and image acquisition in the construction area. (2) There are differences in violation monitoring frequency: Considering that in the scenario of progressive bridge construction, each bridge construction section may perform different construction processes at the same time, and the violation monitoring drone needs to simultaneously respond to the monitoring needs of different construction processes and construction scenarios. Different construction processes in different construction scenarios usually have different violation monitoring frequency standards. Different violation monitoring frequency standards further increase the difficulty of drones in executing flight planning and image acquisition in the construction area. (3) There are endurance limitations in the actual application of violation monitoring drones. In order to improve the monitoring capability of violation monitoring drones, it is necessary to optimize the flight path of violation monitoring drones when executing flight planning and image acquisition.

[0029] In order to solve the above problems, this embodiment obtains the bridge construction plan information, uses the planned time period of each bridge construction section in executing each construction process, determines the effective monitoring period of each construction monitoring point, and considers the monitoring type information and monitoring risk level of each construction monitoring point in the pre-formulated bridge construction monitoring requirements, takes the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level as constraints, takes the flight distance as the optimization target, optimizes and solves the drone image acquisition path planning strategy for the target construction bridge, and then controls the drone to perform flight and image acquisition and bridge construction violation judgment. Therefore, the present invention proposes a construction image acquisition scheme that adapts to the different monitoring distances and different monitoring frequencies of different construction links in the bridge construction process, while improving the accuracy and efficiency of bridge construction violation monitoring, and prolongs the monitoring time of the violation monitoring drone as much as possible, and has good scene adaptability.

[0030] In a preferred embodiment, the step of obtaining bridge construction plan information specifically includes: S110: Acquire historical bridge construction progress information of the bridge construction subject, extract the historical time consumption of each construction process in different reference bridge construction sections in the historical bridge construction progress information, acquire the target bridge construction task, and extract several bridge construction sections and several construction processes of each bridge construction section in the target construction bridge recorded in the target bridge construction task; S120: performing similarity matching between the construction content features of the reference bridge construction section and each bridge construction section in the target construction bridge, and matching each bridge construction section with a number of reference bridge construction sections whose construction content feature similarity is higher than a target value; S130: based on the historical time consumption of each construction process in a plurality of reference bridge construction sections having a matching relationship in each bridge construction section, the planned time consumption of each construction process in each bridge construction section is calculated by accumulating the average value of the historical time consumption; S140: Determine the planned time period for executing each construction process in each bridge construction section according to the planned time consumption of each construction process in each bridge construction section, and generate bridge construction plan information using the planned time period for each construction process.

[0031] In this embodiment, by obtaining the historical bridge construction progress information of the bridge construction entity, according to the historical time consumption of each construction process in different reference bridge construction sections of the bridge construction entity, firstly, a construction content feature similarity matching method is used to match each bridge construction section with several corresponding reference bridge construction sections, and then the historical time consumption of each construction process in several reference bridge construction sections is averaged, which is used as the planned time consumption of each construction process in each bridge construction section. Finally, according to the planned time consumption of each construction process and the execution order of the bridge construction sections and the construction processes, the planned time period of each construction process is determined to generate the final bridge construction plan information.

[0032] In a preferred embodiment, according to a number of construction processes of each bridge construction section and a planned period for each bridge construction section to execute each construction process, a number of construction monitoring points of the target construction bridge and an effective monitoring period of each construction monitoring point are determined, specifically including: S210: using a number of construction processes of each bridge construction section, matching the construction monitoring project of each construction process in a pre-defined list of bridge construction monitoring projects, querying the construction monitoring position of each construction monitoring project by calling the target construction bridge drawing, and obtaining a number of construction monitoring points; S220: Determine the effective monitoring period of each construction monitoring point corresponding to each construction process according to the planned period of execution of each construction process in each bridge construction section.

[0033] In this embodiment, by calling a pre-established list of bridge construction monitoring items, the construction monitoring points of each construction process in each bridge construction section are determined through the construction monitoring items of each construction process recorded in the list of bridge construction monitoring items, and then the effective monitoring time period of each construction monitoring point corresponding to each construction process is determined in combination with the planned time period of each construction process.

[0034] In a preferred embodiment, a pre-established bridge construction monitoring requirement is obtained, the monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirement are extracted, the effective monitoring period of each construction monitoring point is considered, the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level are used as constraints, and the minimum flight distance is used as the optimization target. The steps of optimizing and solving the UAV image acquisition path planning strategy for the target construction bridge specifically include: S310: obtaining a pre-determined bridge construction monitoring requirement, and extracting monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirement; wherein the monitoring type includes monitoring types of construction violations corresponding to a number of different image acquisition distance intervals, and the monitoring risk level includes monitoring risk levels of construction violations corresponding to a number of different image acquisition frequency intervals; S320: using the monitoring type information and the monitoring risk level, respectively matching the image acquisition distance and the image acquisition frequency of each construction monitoring point in a first mapping comparison table of preset monitoring types and image acquisition distance intervals and a second mapping comparison table of preset monitoring risk levels and image acquisition frequency intervals; S330: Considering the effective monitoring period of each of the construction monitoring points, taking the image acquisition distance interval and the image acquisition frequency interval as constraints, taking the minimum flight distance as the optimization goal, optimizing and solving the UAV image acquisition path planning strategy for the target construction bridge.

[0035] Furthermore, considering the effective monitoring period of each construction monitoring point, taking the image acquisition distance interval and the image acquisition frequency interval as constraints, taking the minimum flight distance as the optimization goal, the steps of optimizing and solving the UAV image acquisition path planning strategy for the target construction bridge include: S331: constructing a three-dimensional model map of the target construction bridge, and generating an effective monitoring area for each construction monitoring point in the three-dimensional model map according to the image acquisition distance interval of each construction monitoring point; S332: Obtain the flight speed range of the violation monitoring drone, consider the effective monitoring period and effective monitoring area of ​​each of the construction monitoring points, select a number of drone collection points within the effective monitoring period and the effective monitoring area, and use the image collection interval time corresponding to two adjacent drone collection points in each drone image collection path in the generated drone image collection path as the first constraint condition and the image collection interval time corresponding to two adjacent drone collection points of each construction monitoring point in the generated drone image collection path as the second constraint condition, and use the minimum cumulative sum of flight distances of the violation monitoring drone in the generated drone image collection paths as the optimization goal, and optimize the image collection time and image collection position of each drone collection point in the generated drone image collection paths; S333: Generate a UAV image acquisition path planning strategy for the target construction bridge according to the image acquisition time and image acquisition position of each UAV acquisition point in several UAV image acquisition paths.

[0036] In this embodiment, after determining the effective monitoring period of each construction monitoring point, the monitoring type information and the monitoring risk level of each construction monitoring point in the pre-established bridge construction monitoring requirements are taken into consideration, and the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level are used as constraints. The flight distance is taken as the optimization target, and the UAV image acquisition path planning strategy for the target construction bridge is optimized. Finally, a number of UAV acquisition points used for UAV flight and image acquisition when performing bridge construction violation monitoring on the target construction bridge, as well as the image acquisition time and image acquisition position of each UAV acquisition point are obtained, so as to obtain a construction image acquisition scheme that adapts to different monitoring distances and different monitoring frequencies in different construction links during the bridge construction process.

[0037] In a preferred embodiment, based on the UAV image acquisition path planning strategy, UAV flight and image acquisition control instructions are generated to drive the violation monitoring UAV to perform corresponding flight and image acquisition actions, and perform bridge construction violation judgment steps according to the collected bridge construction images, specifically including: S410: extracting the image acquisition time and image acquisition position of each drone acquisition point in each drone image acquisition path in the drone image acquisition path planning strategy, and calculating the flight speed between two adjacent drone acquisition points in each drone image acquisition path; S420: generating a UAV flight control instruction based on the image acquisition position of each UAV acquisition point and the flight speed between two adjacent UAV acquisition points, generating a UAV image acquisition instruction based on the image acquisition time of each UAV acquisition point, and obtaining a UAV flight and image acquisition control instruction; S430: Sending the UAV flight and image acquisition control instructions to the violation monitoring UAV, driving the violation monitoring UAV to execute corresponding flight and image acquisition actions, and performing bridge construction violation judgment based on the collected bridge construction images.

[0038] On this basis, after the violation monitoring drone completes each flight and image acquisition action, the bridge construction progress is obtained, the bridge construction plan information is updated based on the bridge construction progress, and the drone image acquisition path planning strategy steps are regenerated using the updated bridge construction plan information, specifically including: S510: After the violation monitoring drone completes each flight and image acquisition action, the bridge construction progress of the target construction bridge is obtained, and the actual time period during which the construction process is currently being executed in each bridge construction section in the bridge construction progress is extracted; S520: Based on the planned time period for executing each construction process in each bridge construction section in the bridge construction plan information and the actual time period for currently executing the construction process in each bridge construction section in the bridge construction progress, it is determined whether the time overlap ratio between the actual time period and the planned time period for executing the corresponding construction process is lower than a preset target ratio; if so, the construction process corresponding to the actual time period is defined as an error process; S530: Determine whether the number of error processes in the construction processes currently being executed in each bridge construction section in the bridge construction progress exceeds the preset target number. If so, update the bridge construction plan information based on the bridge construction progress, and use the updated bridge construction plan information to regenerate the drone image acquisition path planning strategy.

[0039] In this embodiment, after obtaining the UAV image acquisition path planning strategy for the target construction bridge, the flight speed between two adjacent unmanned acquisition points in each UAV image acquisition path is calculated according to the image acquisition time and image acquisition position of each UAV acquisition point, so as to guide the UAV to perform the corresponding flight and image acquisition actions. At the same time, considering the randomness of accidents in the bridge construction process, in order to avoid the impact of the early completion or delayed completion of a construction process in the bridge construction on the subsequent UAV monitoring of bridge construction violations, this embodiment needs to judge the difference between the actual time period in which each bridge construction section in the bridge construction progress is currently executing the construction process and the planned time period for each bridge construction section to execute each construction process after the UAV completes each flight and image acquisition action, so as to realize the update of the bridge construction plan information, thereby improving the adaptability of the UAV's flight and image acquisition actions to the current construction progress, and improving the accuracy and rationality of monitoring bridge construction violations.

[0040] Reference Figure 3 , Figure 3 It is a structural block diagram of an embodiment of a bridge construction violation monitoring device of the present invention.

[0041] like Figure 3 As shown, the bridge construction violation monitoring device proposed in the embodiment of the present invention includes: The acquisition module 10 is used to acquire bridge construction plan information; wherein the bridge construction plan information includes a number of bridge construction sections in the target construction bridge, a number of construction processes of each bridge construction section, and a planned time period for each bridge construction section to perform each construction process; The determination module 20 is used to determine a number of construction monitoring points of the target construction bridge and an effective monitoring period of each construction monitoring point according to a number of construction processes of each bridge construction section and a planned period of execution of each construction process of each bridge construction section; A solution module 30 is used to obtain a pre-determined bridge construction monitoring requirement, extract the monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirement, consider the effective monitoring period of each construction monitoring point, take the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level as constraints, take the minimum flight distance as the optimization target, and optimize and solve the UAV image acquisition path planning strategy for the target construction bridge; An execution module 40 is used to generate UAV flight and image acquisition control instructions based on the UAV image acquisition path planning strategy, drive the violation monitoring UAV to execute corresponding flight and image acquisition actions, and perform bridge construction violation judgment based on the collected bridge construction images; The updating module 50 is used to obtain the bridge construction progress after the violation monitoring UAV completes each flight and image acquisition action, update the bridge construction plan information based on the bridge construction progress, and use the updated bridge construction plan information to regenerate the UAV image acquisition path planning strategy.

[0042] Other embodiments or specific implementations of the bridge construction violation monitoring device of the present invention can refer to the above-mentioned method embodiments and will not be described in detail here.

[0043] In addition, the present invention also proposes a bridge construction violation monitoring device, which includes: a memory, a processor, and a bridge construction violation monitoring program stored in the memory and executable on the processor, and when the bridge construction violation monitoring program is executed by the processor, the steps of the bridge construction violation monitoring method described above are implemented.

[0044] The specific implementation of the bridge construction violation monitoring device of the present application is basically the same as the various embodiments of the above-mentioned bridge construction violation monitoring method, and will not be repeated here.

[0045] In addition, the present invention also proposes a readable storage medium, which includes a computer-readable storage medium on which a bridge construction violation monitoring program is stored. The readable storage medium may be Figure 1 The memory 1005 in the terminal may also be at least one of a ROM (Read-Only Memory) / RAM (Random Access Memory), a magnetic disk, and an optical disk. The readable storage medium includes a number of instructions for enabling a bridge construction violation monitoring device having a processor to execute the bridge construction violation monitoring method described in each embodiment of the present invention.

[0046] The specific implementation methods in the readable storage medium of the present application are basically the same as the various embodiments of the above-mentioned bridge construction violation monitoring method, and will not be repeated here.

[0047] It is understood that, in the description of this specification, the description with reference to the terms "one embodiment", "another embodiment", "other embodiments", or "first to Nth embodiments" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0048] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or system. In the absence of further restrictions, an element defined by the sentence "comprises a ..." does not exclude the existence of other identical elements in the process, method, article or system including the element.

[0049] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.

[0050] Through the description of the above implementation methods, those skilled in the art can clearly understand that the above-mentioned embodiment methods can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present invention is essentially or the part that contributes to the prior art can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk) as described above, and includes a number of instructions for a terminal device (which can be a mobile phone, a computer, a server, or a network device, etc.) to execute the methods described in each embodiment of the present invention.

[0051] The above are only preferred embodiments of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A method for monitoring illegal behaviors in bridge construction, characterized in that: The following steps are involved: Acquire bridge construction plan information; wherein the bridge construction plan information includes a number of bridge construction sections in the target construction bridge, a number of construction processes in each bridge construction section, and a planned time period for each bridge construction section to perform each construction process; According to a number of construction procedures of each bridge construction section and a planned period for each bridge construction section to perform each construction procedure, a number of construction monitoring points of the target construction bridge and an effective monitoring period of each construction monitoring point are determined; Obtain the pre-established bridge construction monitoring requirements, extract the monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirements, consider the effective monitoring period of each construction monitoring point, use the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level as constraints, and use the minimum flight distance as the optimization target to optimize and solve the UAV image acquisition path planning strategy for the target construction bridge; Based on the UAV image acquisition path planning strategy, UAV flight and image acquisition control instructions are generated to drive the violation monitoring UAV to perform corresponding flight and image acquisition actions, and perform bridge construction violation judgment based on the collected bridge construction images; After the violation monitoring UAV completes each flight and image acquisition action, the bridge construction progress is obtained, the bridge construction plan information is updated based on the bridge construction progress, and the UAV image acquisition path planning strategy is regenerated using the updated bridge construction plan information.

2. The bridge construction violation monitoring method according to claim 1, characterized in that: The steps to obtain bridge construction plan information include: Obtain historical bridge construction progress information of the bridge construction subject, extract the historical time consumption of each construction process in different reference bridge construction sections from the historical bridge construction progress information, obtain the target bridge construction task, extract several bridge construction sections in the target construction bridge recorded in the target bridge construction task and several construction processes in each bridge construction section; Similarity matching is performed based on the construction content characteristics of the reference bridge construction section and each bridge construction section in the target construction bridge, and a number of reference bridge construction sections whose construction content characteristics similarity is higher than the target value are matched for each bridge construction section; Based on the historical time consumption of each construction process in a number of reference bridge construction sections with matching relationships in each bridge construction section, the planned time consumption of each construction process in each bridge construction section is calculated by accumulating the average value of the historical time consumption; According to the planned time consumption of each construction process in each bridge construction section, the planned time period for executing each construction process in each bridge construction section of the target construction bridge is determined, and the planned time period of each construction process is used to generate bridge construction plan information.

3. The bridge construction violation monitoring method according to claim 1, characterized in that: According to a number of construction procedures of each bridge construction section and a planned period for each bridge construction section to execute each construction procedure, a number of construction monitoring points of the target construction bridge and an effective monitoring period of each construction monitoring point are determined, specifically including: Using several construction processes of each bridge construction section, matching the construction monitoring items of each construction process in the pre-established bridge construction monitoring item list, querying the construction monitoring position of each construction monitoring item by calling the target construction bridge drawing, and obtaining several construction monitoring points; According to the planned time period for executing each construction process in each bridge construction section, the effective monitoring time period of each construction monitoring point corresponding to each construction process is determined.

4. The bridge construction violation monitoring method according to claim 1, characterized in that: Obtain the pre-established bridge construction monitoring requirements, extract the monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirements, consider the effective monitoring period of each construction monitoring point, take the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level as constraints, take the minimum flight distance as the optimization goal, and optimize the UAV image acquisition path planning strategy steps for the target construction bridge, specifically including: Obtaining a pre-established bridge construction monitoring requirement, and extracting the monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirement; wherein the monitoring type includes monitoring types of construction violations corresponding to a number of different image acquisition distance intervals, and the monitoring risk level includes monitoring risk levels of construction violations corresponding to a number of different image acquisition frequency intervals; Using the monitoring type information and the monitoring risk level, the image acquisition distance and the image acquisition frequency of each construction monitoring point are matched in a first mapping comparison table of preset monitoring types and image acquisition distance intervals and a second mapping comparison table of preset monitoring risk levels and image acquisition frequency intervals; Taking into account the effective monitoring period of each construction monitoring point, taking the image acquisition distance interval and the image acquisition frequency interval as constraints, and taking the minimum flight distance as the optimization goal, the UAV image acquisition path planning strategy for the target construction bridge is optimized.

5. The bridge construction violation monitoring method according to claim 4, characterized in that: Considering the effective monitoring period of each construction monitoring point, taking the image acquisition distance interval and the image acquisition frequency interval as constraints, taking the minimum flight distance as the optimization goal, optimizing and solving the UAV image acquisition path planning strategy steps for the target construction bridge, specifically including: Constructing a three-dimensional model map of the target construction bridge, and generating an effective monitoring area for each construction monitoring point in the three-dimensional model map according to the image acquisition distance interval of each construction monitoring point; Obtain the flight speed range of the violation monitoring drone, consider the effective monitoring period and effective monitoring area of ​​each of the construction monitoring points, select several drone collection points within the effective monitoring period and the effective monitoring area, and use the image collection interval time corresponding to two adjacent drone collection points in each drone image collection path in the generated drone image collection path as the first constraint condition and the image collection interval time corresponding to two adjacent drone collection points of each construction monitoring point in the generated drone image collection path as the second constraint condition, and use the minimum cumulative sum of flight distances of the violation monitoring drone in the generated drone image collection paths as the optimization goal, and optimize the image collection time and image collection position of each drone collection point in the drone image collection paths; According to the image acquisition time and image acquisition position of each UAV acquisition point in several UAV image acquisition paths, a UAV image acquisition path planning strategy for the target construction bridge is generated.

6. The bridge construction violation monitoring method according to claim 5, characterized in that: Based on the UAV image acquisition path planning strategy, UAV flight and image acquisition control instructions are generated to drive the violation monitoring UAV to perform corresponding flight and image acquisition actions, and perform bridge construction violation judgment steps according to the collected bridge construction images, specifically including: Extract the image acquisition time and image acquisition position of each drone acquisition point in each drone image acquisition path in the drone image acquisition path planning strategy, and calculate the flight speed between two adjacent drone acquisition points in each drone image acquisition path; Based on the image acquisition position of each drone acquisition point and the flight speed between two adjacent drone acquisition points, a drone flight control instruction is generated; based on the image acquisition time of each drone acquisition point, a drone image acquisition instruction is generated to obtain drone flight and image acquisition control instructions; The UAV flight and image acquisition control instructions are sent to the violation monitoring UAV, driving the violation monitoring UAV to execute corresponding flight and image acquisition actions, and perform bridge construction violation judgment based on the collected bridge construction images.

7. The bridge construction violation monitoring method according to claim 6, characterized in that: After the violation monitoring drone completes each flight and image acquisition action, the bridge construction progress is obtained, the bridge construction plan information is updated based on the bridge construction progress, and the drone image acquisition path planning strategy steps are regenerated using the updated bridge construction plan information, specifically including: After the violation monitoring drone completes each flight and image acquisition action, the bridge construction progress of the target construction bridge is obtained, and the actual time period during which the construction process is currently being executed in each bridge construction section in the bridge construction progress is extracted; Based on the planned time period for executing each construction process in each bridge construction section in the bridge construction plan information and the actual time period for currently executing the construction process in each bridge construction section in the bridge construction progress, it is determined whether the time overlap ratio between the actual time period and the planned time period for executing the corresponding construction process is lower than a preset target ratio, and if so, the construction process corresponding to the actual time period is defined as an error process; Determine whether the number of error processes in the construction processes currently being executed in each bridge construction section in the bridge construction progress exceeds the preset target number. If so, update the bridge construction plan information based on the bridge construction progress, and use the updated bridge construction plan information to regenerate the drone image acquisition path planning strategy.

8. A bridge construction violation monitoring device, characterized in that: include: An acquisition module is used to acquire bridge construction plan information; wherein the bridge construction plan information includes a number of bridge construction sections in the target construction bridge, a number of construction processes of each bridge construction section, and a planned time period for each bridge construction section to execute each construction process; A determination module, for determining a number of construction monitoring points of the target construction bridge and an effective monitoring period of each construction monitoring point according to a number of construction procedures of each bridge construction section and a planned period for each bridge construction section to perform each construction procedure; A solution module is used to obtain a pre-determined bridge construction monitoring requirement, extract the monitoring type information and monitoring risk level of each construction monitoring point in the bridge construction monitoring requirement, consider the effective monitoring period of each construction monitoring point, take the image acquisition distance interval corresponding to the monitoring type information and the image acquisition frequency interval corresponding to the monitoring risk level as constraints, take the minimum flight distance as the optimization target, and optimize and solve the UAV image acquisition path planning strategy for the target construction bridge; An execution module, for generating UAV flight and image acquisition control instructions based on the UAV image acquisition path planning strategy, driving the violation monitoring UAV to execute corresponding flight and image acquisition actions, and performing bridge construction violation judgment based on the acquired bridge construction images; The update module is used to obtain the bridge construction progress after the violation monitoring drone completes each flight and image acquisition action, update the bridge construction plan information based on the bridge construction progress, and use the updated bridge construction plan information to regenerate the drone image acquisition path planning strategy.

9. A bridge construction violation monitoring device, characterized in that: The bridge construction violation monitoring device includes: a memory, a processor, and a bridge construction violation monitoring program stored in the memory and executable on the processor. When the bridge construction violation monitoring program is executed by the processor, the steps of the bridge construction violation monitoring method as described in any one of claims 1 to 7 are implemented.

10. A storage medium, characterized in that: The storage medium stores a bridge construction violation monitoring program, which, when executed by the processor, implements the steps of the bridge construction violation monitoring method according to any one of claims 1 to 7.

Citation Information

Patent Citations

  • Photovoltaic power station construction patrol method

    CN118170164A

  • Building construction progress management system and method

    CN118333568A

  • Bridge construction quality supervision method based on small multi-rotor unmanned aerial vehicle

    CN118586757A

  • Engineering detection method and system based on unmanned aerial vehicle, medium and program product

    CN118706089A

  • Method and system for maintaining bridge using bridge image data

    US11600061B1

Cited By

  • Pipeline detection method and system based on unmanned aerial vehicle

    CN120410153A