By analyzing and processing the dynamic ring monitoring data of the data center and controlling the operation of the first air conditioner, the problem of high operating costs of the data center is solved, and the significant reduction in the energy consumption of the air conditioner and environmental stability are achieved.

CN119789364APending Publication Date: 2025-04-08BYD CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411196510.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2025-04-08

AI Technical Summary

Technical Problem

The operating cost of data centers is relatively high, and the existing technology has failed to effectively determine the energy-saving and consumption reduction plan through the global monitoring of the dynamic ring system, especially the energy-saving and consumption reduction of air conditioners.

Method used

By acquiring the dynamic ring monitoring data of the data center, the operation control of the first air conditioner is carried out based on these data, including adjusting the working parameters and working mode, and activating the second air conditioner if necessary to maintain a reasonable temperature and humidity environment and reduce the energy consumption of the air conditioner.

Benefits of technology

It achieves a significant reduction in air conditioning energy consumption while ensuring the stability of the data center environment, thereby reducing the operating cost and failure rate of the data center.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119789364A_ABST
    Figure CN119789364A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a control method, a data center, a storage medium and a program product, and relates to the technical field of intelligent control, and the method comprises the steps: obtaining power and environment monitoring data of the data center; and according to the dynamic environment monitoring data, operation control is conducted on a first air conditioner of the data center. Through the mode, the energy consumption of the air conditioner in the data center can be greatly reduced, so that the operation cost of the data center is reduced, and the fault rate of the data center is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of intelligent control technology, and in particular to a control method, a data center, a storage medium and a program product. Background Art

[0002] The data center (also known as a micro-intelligent cabin) can provide a stable energy supply and accurate real-time data information for various communication signal equipment during the operation of related equipment (for example, Yunba Cloud Rail, high-speed rail, Internet of Things and other equipment). It can be used outdoors to replace the traditional computer room.

[0003] In the related technologies, the control of the data center is only the monitoring and management of its environmental parameters, equipment status information, security conditions and other data, and the operation cost of the data center is relatively high. Summary of the invention

[0004] The embodiments of the present application provide a control method, a data center, a storage medium, and a program product, which can effectively reduce the operating costs of the data center.

[0005] In a first aspect, an embodiment of the present application provides a control method, the method comprising:

[0006] Obtaining dynamic environment monitoring data of the data center;

[0007] The operation of the first air conditioner is controlled according to the dynamic environment monitoring data.

[0008] By controlling the operation of the first air conditioner based on the dynamic environment monitoring data, the data center can be kept in a reasonable temperature and humidity environment in an efficient and energy-saving manner, which can significantly reduce the energy consumption of the air conditioner and thus reduce the operating costs of the data center.

[0009] In some embodiments, the dynamic environment monitoring data includes operating parameters of the first air conditioner, and the operating control of the first air conditioner according to the dynamic environment monitoring data includes:

[0010] The magnitude relationship between the operating parameter and a threshold value corresponding to the operating parameter is compared, and when the magnitude relationship does not satisfy a preset magnitude relationship, the operating parameter of the first air conditioner is adjusted to the threshold value.

[0011] In some embodiments, the dynamic environment monitoring data includes a working period of the data center, and the operation control of the first air conditioner of the data center according to the dynamic environment monitoring data includes:

[0012] Obtaining a first target working mode corresponding to the working period;

[0013] When the current operating mode of the first air conditioner is not the first target operating mode, the operating mode of the first air conditioner is adjusted to the first target operating mode.

[0014] In some embodiments, the data center is deployed with at least one temperature and humidity sensor, and the dynamic environment monitoring data further includes: temperature values ​​and humidity values ​​collected by the temperature and humidity sensor; and the operation control of the first air conditioner according to the dynamic environment monitoring data includes:

[0015] Determine the comprehensive temperature value and comprehensive humidity value of the data center according to the temperature value and humidity value collected by the temperature and humidity sensor;

[0016] determining a first target operating mode of the first air conditioner according to a comprehensive temperature value and a comprehensive humidity value of the data center;

[0017] When the current operating mode of the first air conditioner is not the target operating mode, the operating mode of the first air conditioner is adjusted to the second target operating mode.

[0018] In some embodiments, determining the second target operating mode of the first air conditioner according to the comprehensive temperature value and the comprehensive humidity value of the data center includes:

[0019] Determine whether the temperature and humidity sensor is working abnormally according to the comprehensive temperature value and the comprehensive humidity value of the data center, and the temperature value and the humidity value collected by the temperature and humidity sensor;

[0020] If the temperature and humidity sensor works abnormally, remove the temperature and humidity sensor;

[0021] Based on the number of remaining temperature and humidity sensors, determine the first target operating mode of the first air conditioner; or, based on the temperature values ​​and humidity values ​​collected by the remaining temperature and humidity sensors, redetermine the comprehensive temperature value and comprehensive humidity value of the data center, and based on the redetermined comprehensive temperature value and comprehensive humidity value, determine the second target operating mode of the first air conditioner.

[0022] In some embodiments, the dynamic environment monitoring data includes: alarm data of the first air conditioner; and the operation control of the first air conditioner according to the dynamic environment monitoring data includes:

[0023] Determining whether to enable the second air conditioner according to the alarm data of the first air conditioner currently in working state and / or the comprehensive temperature value and comprehensive humidity value of the data center within a preset time period;

[0024] If it is determined that the second air conditioner is to be activated, the second air conditioner is activated.

[0025] In some embodiments, the working period of the data center is determined based on the operating hours of devices connected to the data center.

[0026] In some embodiments, the data center further includes a power supply device and a power distribution unit, the power supply output interface of the power supply device is connected to the power supply input interface of the power distribution unit, the power distribution unit includes a plurality of power supply output interfaces, each power supply output interface is connected to an electric device of the data center to supply power to the electric device; the dynamic environment monitoring data of the data center includes: the power consumption data and power consumption alarm data of the electric device;

[0027] The method further comprises:

[0028] The power distribution unit controls the power supply of the power-consuming device according to the power consumption data and the power consumption alarm data of the power-consuming device; the power supply control includes power on and off and / or time-sharing power off.

[0029] In some embodiments, the data center further includes a touch screen, and the method further includes:

[0030] Displaying the dynamic environment monitoring data via the touch screen, and / or;

[0031] The control instruction of the dynamic environment system is received through the touch screen, and the operation of the first air conditioner and / or the electrical equipment of the data center is controlled based on the control instruction.

[0032] In a second aspect, an embodiment of the present application provides a data center, wherein a control device is deployed in the data center;

[0033] The control device is used to execute the method as described in any one of the first aspects.

[0034] In some embodiments, the data center further includes a power supply device and a power distribution unit, the power supply output interface of the power supply device is connected to the power supply input interface of the power distribution unit, the power distribution unit includes a plurality of power supply output interfaces, each power supply output interface is connected to an electric device of the data center to supply power to the electric device; the dynamic environment monitoring data also includes: power consumption data and power consumption alarm data of the electric device;

[0035] The control device is also used to control the power supply of the power-consuming equipment through the power distribution unit according to the power consumption data and power consumption alarm data of the power-consuming equipment; the power supply control includes power on and off and / or time-sharing power off.

[0036] In some embodiments, the control device includes a touch screen;

[0037] The control device is also used to display the dynamic environment monitoring data through the touch screen, and / or; receive control instructions of the dynamic environment system through the touch screen, and control the operation of the first air conditioner based on the control instructions.

[0038] In a third aspect, the present application provides a computer-readable storage medium having a computer program stored thereon, and the computer program is executed by a processor to implement any one of the methods in the first aspect.

[0039] In a fourth aspect, the present application provides a computer program product, comprising a computer program, which implements any one of the methods in the first aspect when executed by a processor.

[0040] The control method, data center, storage medium and program product provided by the embodiment of the present application, the data center deploys a first air conditioner, and the method includes: obtaining the dynamic environment monitoring data of the data center, and controlling the operation of the first air conditioner according to the dynamic environment monitoring data. Through the above method, the data center can be placed in a reasonable air environment in an efficient and energy-saving manner, thereby greatly reducing the energy consumption of the air conditioner, thereby reducing the operating cost of the data center and reducing the failure rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 A structural diagram of a data center is shown;

[0042] Figure 2 A schematic diagram of a data center structure provided in an embodiment of the present application Figure 1 ;

[0043] Figure 3 A flow chart of a control method provided in an embodiment of the present application Figure 1 ;

[0044] Figure 4 A flow chart of a control method provided in an embodiment of the present application Figure 2 ;

[0045] Figure 5 A schematic diagram of a data center structure provided in an embodiment of the present application Figure 2 ;

[0046] Figure 6 A schematic diagram of a data center structure provided in an embodiment of the present application Figure 3 ;

[0047] Figure 7 A schematic diagram of a data center structure provided in an embodiment of the present application Figure 4 ;

[0048] Figure 8 A schematic diagram of a data center structure provided in an embodiment of the present application Figure 5 ;

[0049] Fig. 9 A schematic diagram of the structure of a control device provided in an embodiment of the present application;

[0050] Fig.10 A schematic diagram of the structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0051] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0052] In the embodiments of the present application, words such as "first" and "second" are used to distinguish the same or similar items with substantially the same functions and effects, and do not limit their order. Those skilled in the art can understand that words such as "first" and "second" do not limit the quantity and execution order, and words such as "first" and "second" do not necessarily limit them to be different.

[0053] It should be noted that in the embodiments of the present application, words such as "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.

[0054] The data center can provide stable energy supply and accurate real-time data information for various communication signal equipment during the operation of related equipment (for example, Yunba Cloud Rail, high-speed rail and other rail transportation vehicles, Internet of Things devices, etc.), and can be used outdoors to replace traditional computer rooms.

[0055] Taking rail transit vehicles as an example, a data center may include communication signal equipment for communicating with rail transit vehicles, as well as a dynamic environment system that supports its normal operation. The dynamic environment system may include a sub-power system, a sub-environmental system, a sub-fire and security system, etc. The sub-power system (also known as the power system of the data center) is used to provide power support for the operation of the data center, the sub-environmental system (environmental system) is used to ensure that the data center is in a suitable environment, and the sub-fire and security system (fire and security system) is used to provide fire and security functions for the data center.

[0056] As an outdoor cabinet, the data center needs to face extremely complex environments. In order to ensure the normal operation of the data center and detect abnormalities in the data center in advance, the data center can be monitored through the power environment monitoring system (abbreviated as: power environment monitoring system).

[0057] Among them, the dynamic environment monitoring system may include a monitoring host deployed in a data center and a monitoring center server or client.

[0058] The objects monitored by the dynamic environment monitoring system are generally temperature and humidity, water leakage, fresh air, air conditioning, electricity, uninterrupted power supply (UPS), batteries, fire protection, video surveillance, security monitoring, access control and other systems in the data center.

[0059] Figure 1 A schematic diagram of a power environment monitoring system is shown in FIG. Figure 1 As shown, the dynamic environment monitoring system mainly monitors the power system 1, environmental system 2 and fire protection and security system 3 of the data center.

[0060] Among them, the power system 1 is composed of a UPS host 101, a battery 102, a distribution box 103, etc.; the environmental system is composed of a temperature and humidity sensor 201, an air conditioner 202, a water immersion sensor 203, etc.; the fire protection and security system 1 is composed of an access control system 301, a smoke sensor 302, a monitoring system 303, etc.

[0061] The monitoring host 4 of the dynamic environment monitoring system can collect and process the equipment information of each system in the data center, and then upload it to the monitoring center server / client 6 through the switch 5, so that the monitoring center server / client 6 can display the equipment information uploaded by the monitoring host 4, so that the relevant monitoring personnel can judge whether the data center is operating normally based on the equipment information displayed by the monitoring center server / client 6.

[0062] Among them, the dynamic environment monitoring system has the following functional characteristics:

[0063] 1. The power equipment in the data center is connected to the power environment monitoring system through an intelligent data interface (for example, RS232, RS485, RS422) or by adding data acquisition sensor equipment to realize functions such as normal equipment operation status monitoring, abnormal status prediction, and online intelligent fault diagnosis.

[0064] 2. The working environment of power equipment, servers, and transmission and switching equipment, such as temperature and humidity, water leakage, fire protection and other environmental parameter monitoring, and air conditioning monitoring are connected to the power environment monitoring system to achieve real-time data monitoring, alarm threshold setting, alarm prediction, and take corresponding processing strategies in combination with emergency plans when alarms occur, to ensure that the working environment is in a healthy state and provide strong guarantee for the reliable operation of equipment.

[0065] 3. As an important area, the data center's security environment is connected to the power environment monitoring system to realize the functions of data center access control, intrusion and anti-theft alarm management, video monitoring, intercom, etc., to ensure the security of the data center, realize remote unattended management, and save human resources.

[0066] 4. Data center servers and network equipment (switches, routers, etc.) support simple network management protocols and are connected to the power environment monitoring system to monitor the working status of the equipment and set alarm thresholds to implement early warning functions, so as to timely grasp the health index of each device that provides core services.

[0067] However, during the operation of the data center, cost reduction needs to be considered from all aspects. The existing power environment monitoring system only completes the monitoring and management of the environmental parameters of the data center, the status information of each device in the data center, the security status and other data, and performs emergency response actions under special circumstances. It does not consider the overall monitoring of the power environment system to formulate energy-saving and consumption-reduction plans for the data center, especially the energy-saving and consumption-reduction plans for the air conditioners in the data center, which makes the operation cost of the data center relatively high.

[0068] In view of this, the embodiments of the present application provide a control method, a data center, a storage medium and a program product, which control the operation of the air conditioner in the data center through the monitoring data of the data center, so as to keep the data center in a suitable air environment while ensuring the safe operation of the air conditioner, greatly reduce the energy consumption of the air conditioner, and thus reduce the operating cost and failure rate of the data center.

[0069] The following specific embodiments are used to describe in detail the technical solution of the present application and how the technical solution of the present application solves the above technical problems. The following specific embodiments can be implemented independently or in combination with each other, and the same or similar concepts or processes may not be described in detail in some embodiments.

[0070] Figure 2 A schematic diagram of an exemplary data center structure provided in an embodiment of the present application is shown in FIG. Figure 2 As shown, the data center is deployed with a dynamic environment system and a control device, the dynamic environment system is deployed with a first air conditioner and a second air conditioner, and the first air conditioner is in operation.

[0071] In some embodiments, the control device may be Figure 1 The monitoring host shown in the figure, the other devices included in the dynamic environment system and Figure 1 The devices included in the dynamic environment system of the data center shown are similar and will not be described here. Optionally, the control device can also be a virtual device or a virtual and physical device, for example, the control system of the data center. The embodiment of the present application does not limit the form of the control device.

[0072] In some embodiments, the control device can obtain internal and external environmental information of the data center, status information or operation information of each device (also known as monitoring information of the dynamic environment system, dynamic environment monitoring data), and perform operation control of the equipment in the dynamic environment system based on the monitoring information.

[0073] In some embodiments, the data center may also upload the collected monitoring data to the monitoring center server / client through the switch, so that relevant monitoring personnel can view the monitoring data.

[0074] In some embodiments, the first air conditioner and the second air conditioner can also be set separately from the data center, for example, set outside the data center to provide air or environmental support services such as temperature and humidity adjustment for the data center. The embodiment of the present application does not limit the deployment method of the first air conditioner and the second air conditioner in the data center. Optionally, the data center can also be equipped with multiple air conditioners, and the embodiment of the present application does not limit the number of air conditioners.

[0075] In some embodiments, the data center is a data center applied to rail transit. Optionally, the data center can be a micro modular data center. A micro modular data center refers to a small, prefabricated, modular data center solution. It usually includes all necessary components, such as computing, storage, network equipment, power supply and cooling systems, integrated in a compact unit that can be expanded or reduced according to demand, with high flexibility.

[0076] The following takes the execution subject as the above control device as an example. Figure 3 The control method provided in the embodiment of the present application is described.

[0077] Figure 3 Schematic diagram of the control method provided in the embodiment of the present application Figure 1 , applied to Figure 2 The control device shown, such as Figure 3 As shown, the steps include:

[0078] S301. Obtain dynamic environment monitoring data of the data center.

[0079] In some embodiments, the dynamic environment monitoring data includes environmental data of the data center. The environmental data may include internal environmental data of the data center and external environmental data. For example, the internal environmental data may refer to the temperature and humidity inside the data center, and the external environmental data may refer to the working hours of the data center.

[0080] In some embodiments, the dynamic environment monitoring data may also include operating parameters of the first air conditioner.

[0081] Exemplarily, the working parameters may include working parameters under different working modes, such as cooling start temperature, cooling stop temperature, dehumidification start temperature, dehumidification stop temperature, dehumidification start humidity, dehumidification stop humidity, heating start temperature, heating stop temperature, high and low temperature alarm temperatures, etc.

[0082] The working mode may include at least one of the following: cooling mode, heating mode, dehumidification mode, air supply mode, etc.

[0083] In some embodiments, the dynamic environment monitoring data may also include alarm data of the first air conditioner.

[0084] S302: Control the operation of the first air conditioner according to the dynamic environment monitoring data.

[0085] In some embodiments, when the control device obtains the monitoring data, it can judge the working state of the first air conditioner corresponding to the monitoring data. If it is determined that the operating data (e.g., mode or working parameters) of the first air conditioner is abnormal or the operating data is unreasonable (e.g., the operating energy consumption is high under the operating data), the first air conditioner can be operated and controlled to reduce the energy consumption of the first air conditioner and maintain the temperature and humidity of the data center normal. The operation control includes at least one of the following: adjusting the working parameters of the first air conditioner, adjusting the working mode of the first air conditioner, and switching between the first air conditioner and the second air conditioner.

[0086] Several possible methods for controlling the operation of the first air conditioner are described in detail below.

[0087] The first method is to control the operation of the air conditioner: adjusting the working parameters of the first air conditioner.

[0088] In a possible implementation manner, adjusting the operating parameters of the first air conditioner may refer to correcting the operating parameters of the first air conditioner.

[0089] Exemplarily, the control device may determine a magnitude relationship between the operating parameter and a threshold value corresponding to the operating parameter, and, if the magnitude relationship does not satisfy a preset magnitude relationship, adjust the operating parameter of the first air conditioner to the threshold value.

[0090] For example, when the working parameter is the cooling start-up temperature, if the current setting value of the cooling start-up temperature is less than the corresponding threshold value, the setting value of the cooling start-up temperature is adjusted to the corresponding threshold value. For example, when the current first air-conditioning cooling start-up temperature is 10°, which is less than 16 degrees (the threshold value, also called the default value), the first air-conditioning cooling start-up temperature is adjusted to 16 degrees.

[0091] Several possible ways of correcting the working parameters of the first air conditioner are described below using a specific example:

[0092] 1. The default refrigeration stop temperature is the refrigeration start temperature minus 5 degrees. When the refrigeration stop temperature is set higher than the refrigeration start temperature, it is set to the refrigeration start temperature minus 5 degrees. When the difference between the refrigeration stop temperature and the refrigeration start temperature exceeds 10 degrees, it is set to the refrigeration start temperature minus 10 degrees.

[0093] 2. The default setting of dehumidification start temperature is 22 degrees. If it exceeds 22 degrees, it will be set to 22 degrees.

[0094] 3. The default value of high temperature alarm temperature setting is 45 degrees. When it exceeds 45 degrees, it is set to 45 degrees.

[0095] 4. The default value of low temperature alarm temperature setting is 0 degrees, and it is set to 0 degrees when it is lower than 0 degrees.

[0096] 5. The default value of the dehumidification stop temperature setting is 27 degrees. When the set value is higher than the cooling start temperature, it is set to the cooling start temperature minus 3 degrees. When the set value is lower than the dehumidification start temperature, it is set to the dehumidification start temperature plus 5 degrees.

[0097] 6. The default value for dehumidification start humidity is 80%, and the default value for dehumidification stop humidity is 50%.

[0098] The control strategy of the first air conditioner can prevent the staff from setting unreasonable working parameters of the first air conditioner, which may lead to abnormal environmental conditions in the data center and equipment operation failure. It should be understood that the above threshold values ​​and the specific adjusted temperatures can be adjusted according to actual needs, and the embodiments of the present application do not limit this.

[0099] In another possible implementation, adjusting the working parameters of the first air conditioner may refer to adjusting the working mode of the first air conditioner to a working mode that matches a working period.

[0100] Exemplarily, the control device may obtain a first target working model corresponding to the working period; and when a current working mode of the first air conditioner is not the first target working mode, adjust the working mode of the first air conditioner to the first target working mode.

[0101] For example, taking the data center as being used for rail transit, rail transit has corresponding working hours (for example, operating hours and non-operating hours), and accordingly, the data center also has corresponding working hours. In order to further reduce the energy consumption of the first air conditioner, during different working hours, the control device can adjust the working mode of the first air conditioner to a working mode that matches the working period according to changes in the working period.

[0102] For example, the operating period is from 8 am to 24 pm every day, and the non-operating period is from 0 am to 8 am every day. During the operating period, the first air conditioner is in the working cooling state, and the cooling start temperature of the working cooling state is 30℃, ±5℃; the humidity is 65%, ±15%; during the non-operating period, the first air conditioner is in the dormant cooling state, and the cooling start temperature of the dormant cooling state is 35℃, ±5℃; the humidity is 65%, ±15%.

[0103] The control device determines whether the working period of the data center belongs to the operating period or the non-operating period. If it is currently in the non-operating period, and the working mode of the first air conditioner is the working mode corresponding to the operating period, the working mode of the first air conditioner is adjusted to the first target working mode corresponding to the non-operating period.

[0104] It should be understood that the specific working modes corresponding to different working time periods can be set according to actual needs, and the embodiments of the present application do not limit this.

[0105] Optionally, the working hours of the data center can also be set based on other methods. For example, taking the Internet of Things devices as an example, the working hours of the data center can be idle hours, busy hours, etc. based on the Internet of Things devices. The embodiments of the present application do not limit this.

[0106] The second method of controlling the operation of the air conditioner is to switch between the first air conditioner and the second air conditioner.

[0107] Exemplarily, the dynamic environment monitoring data also includes alarm data of the first air conditioner. The control device can determine whether to enable the second air conditioner based on the alarm data of the first air conditioner which is currently in working state, and / or the comprehensive temperature value and comprehensive humidity value of the data center within a preset time period; if it is determined that the second air conditioner is to be enabled, the second air conditioner is enabled.

[0108] Exemplarily, when the control device determines that the first air conditioner alarms according to the dynamic environment monitoring data, the first air conditioner can be turned off and the second air conditioner can be enabled to avoid abnormal temperature and humidity in the data center caused by the abnormality of the first air conditioner. Optionally, when it is determined that the first air conditioner has alarm information, the control device can also send an alarm information to the monitoring center server or client to prompt the relevant user to repair the first air conditioner.

[0109] In some embodiments, the control device may also obtain the temperature and humidity values ​​of the data center in multiple preset time periods, and determine whether the temperature and humidity of the data center are abnormal based on the temperature and humidity values ​​of the data center obtained in the multiple preset time periods, and if there is an abnormality, turn on the second air conditioner. Optionally, the control device may also send an alarm message to the monitoring center server or client to prompt relevant users to conduct abnormality investigation.

[0110] For example, the control device can obtain the temperature of the data center at 10:00, 12:00, 14:00, 16:00, and 18:00 every day. If the accumulated temperature is greater than the cooling start temperature for three consecutive times, it means that there is a special reason that causes the first air conditioner to fail to complete the cooling task, and the second air conditioner is turned on. After the abnormality is checked, the control device or maintenance personnel can turn off the first air conditioner or the second air conditioner.

[0111] In some embodiments, in order to increase the service life of the air conditioner, the control device can also enable different air conditioners at different time periods. For example, the first air conditioner is turned on from the 1st to the 4th, 10th to the 14th, and 20th to the 24th of each month; the second air conditioner is turned on from the 5th to the 9th, 15th to the 19th, and 25th to the 30th of each month.

[0112] In some embodiments, the control device can also determine whether the temperature and humidity of the data center are abnormal based on the first air conditioner alarm data and the temperature and humidity values ​​of the data center within a preset time period based on the multiple preset time periods, and turn on the second air conditioner.

[0113] The third method of controlling the operation of the air conditioner is to adjust the working mode of the first air conditioner.

[0114] Exemplarily, the dynamic environment system of the data center is also deployed with at least one temperature and humidity sensor, and the monitoring data also includes the temperature and humidity values ​​of the data center collected by the temperature and humidity sensors. The control device can determine the second target operating mode of the first air conditioner based on the temperature and humidity values, and adjust the operating mode of the first air conditioner to the second target operating mode when the current operating mode of the first air conditioner is not the second target operating mode.

[0115] Exemplarily, the control device can determine the operating mode of the first air conditioner according to the acquired temperature value and humidity value, so that the operating mode matches the current temperature value and humidity value, thereby further reducing the energy consumption of the first air conditioner. For example, when the acquired temperature value is greater than the cooling start temperature, the target operating mode of the first air conditioner is the cooling mode. If the first air conditioner is currently not in the cooling mode, the operating mode of the first air conditioner is adjusted to the cooling mode. The control device continuously acquires the temperature value, and when the acquired temperature value is less than the cooling stop temperature, the cooling mode is turned off and the air supply mode is turned on.

[0116] To sum up, the control method provided in the embodiment of the present application, by setting multiple control strategies for the first air conditioner, can ensure the safe operation of the first air conditioner while being efficient and energy-saving to place the data center in a reasonable air environment, thereby greatly reducing air conditioning energy consumption, thereby reducing the operating cost of the data center and reducing the failure rate.

[0117] Based on the above embodiments, Figure 4 The above-mentioned adjustment of the working mode of the first air conditioner to the target working mode is described in detail.

[0118] Figure 4 A schematic diagram of a control method provided in an embodiment of the present application Figure 2 ,like Figure 4 As shown, including:

[0119] S401. Determine a comprehensive temperature value and a comprehensive humidity value of the data center according to the temperature value and the humidity value collected by the temperature and humidity sensor.

[0120] In some embodiments, the dynamic environment system of the data center is deployed with temperature and humidity sensors located around the first air conditioner, temperature and humidity sensors located around the second air conditioner, and temperature and humidity sensors arranged on the inner wall of the cabinet door of the data center.

[0121] The control device may use the average or median value of the temperature values ​​and humidity values ​​collected by the three temperature and humidity sensors as the comprehensive temperature value and comprehensive humidity value of the data center.

[0122] In some embodiments, in order to avoid errors in the comprehensive temperature value and comprehensive humidity value of the data center determined by the control device due to abnormalities of certain temperature and humidity sensors, the control device can also determine whether the temperature and humidity sensor is working abnormally based on the comprehensive temperature value and comprehensive humidity value of the data center, and the temperature value and humidity value collected by the temperature and humidity sensor. If the temperature and humidity sensor is working abnormally, the temperature and humidity sensor is eliminated; based on the number of remaining temperature and humidity sensors, the target operating mode of the first air conditioner is determined; or, based on the temperature value and humidity value collected by the remaining temperature and humidity sensors, the comprehensive temperature value and comprehensive humidity value of the data center are re-determined.

[0123] Exemplarily, if the temperature and humidity sensors deployed in the data center are t1, t2, and t3, and the comprehensive temperature value of the data center determined based on the average of the above three temperature and humidity sensors is T1 and the comprehensive humidity value R1, the control device can compare the comprehensive temperature value T1 and the comprehensive humidity value R1 with the sum of the temperature and humidity values ​​collected by the temperature and humidity sensors t1, t2, and t3, respectively. If the difference between the temperature value or humidity value collected by a certain temperature and humidity sensor and the comprehensive temperature value T1 and the comprehensive humidity value R1 is greater than a preset threshold (for example, 3°), it can be determined that the temperature and humidity sensor is abnormal.

[0124] The control device can remove the abnormal temperature and humidity sensor, calculate the temperature average and humidity average of the remaining two temperature and humidity sensors, and use them as the comprehensive temperature value T1 and the comprehensive humidity value R1. And continue to compare with the temperature value and humidity value collected by the temperature and humidity sensor to determine whether there is still an abnormal temperature and humidity sensor.

[0125] Optionally, after comparing the temperature value and the humidity value, if only one temperature and humidity sensor is normal, the control device may set the first air conditioner to a cooling mode.

[0126] Optionally, if it is determined that all the temperature and humidity sensors are abnormal, the control device may send an alarm message to the client.

[0127] S402: Determine a second target operating mode of the first air conditioner according to the comprehensive temperature value and the comprehensive humidity value of the data center.

[0128] The specific implementation method of the step S402 shown in the embodiment of the present application can refer to the specific implementation method of the third operating mode control mentioned above, which will not be repeated here.

[0129] S403: When the current operating mode of the first air conditioner is not the target operating mode, adjust the operating mode of the first air conditioner to the second target operating mode.

[0130] Exemplarily, the control device determines that the start conditions of the cooling mode are met based on the comprehensive temperature value and the comprehensive humidity value, and then determines that the target operating mode of the first air conditioner is the cooling mode; if the first air conditioner is currently not in the cooling mode, the operating mode of the first air conditioner is adjusted to the cooling mode.

[0131] The control device can also continuously obtain the temperature value and the humidity value. When the temperature value and the humidity value meet the cooling stop condition, the cooling mode is maintained for a preset time (for example, after 5 minutes), and the temperature value and the humidity value are judged again to meet the cooling stop condition. If they meet, the cooling mode is turned off and the air supply mode is turned on. Otherwise, the cooling mode is maintained. After a period of time, when the temperature value and the humidity value meet the dehumidification start condition, the dehumidification mode is turned on. When the temperature value and the humidity value meet the dehumidification stop condition, the dehumidification mode is turned off and the air supply mode is turned on.

[0132] The control method provided in the embodiment of the present application can accurately obtain the comprehensive temperature value and the comprehensive humidity value of the data center by making an abnormal judgment on the temperature and humidity sensors, thereby obtaining the working mode of the first air conditioner that matches the comprehensive temperature value and the comprehensive humidity value, effectively solving the problem of high power consumption of the first air conditioner caused by the mismatch between the working mode and the ambient temperature and humidity.

[0133] Based on the above embodiments, Figure 1 As shown, all electrical equipment in the data center is powered by UPS or batteries. When some equipment fails and needs to be powered off, this can only be achieved by cutting off the power supply of the UPS or battery, which greatly increases the risk of other electrical equipment.

[0134] Figure 5 A schematic diagram of a data center structure provided in an embodiment of the present application, Figure 3 As shown in the basis Figure 5 As shown, the dynamic environment system also includes a power supply device and a power distribution unit.

[0135] The power output interface of the power supply device is connected to the power input interface of the power distribution unit, and the power distribution unit includes multiple power output interfaces, each of which is connected to an electrical device in the data center to supply power to the electrical device.

[0136] In some embodiments, Figure 5 As shown, the power supply device may include UPS101 and battery 102, wherein UPS101 is externally connected to the mains and is a conventional power supply unit of the data center, and battery 102 may be a backup power supply for the data center, providing temporary power for the data center after an external power outage.

[0137] In some embodiments, the power distribution unit 104 may adopt a remote power manager (ReachctrlPower), which is also called an intelligent power distribution unit (Power Distribution Unit, PDU).

[0138] In some embodiments, the power-consuming equipment in the data center may include equipment other than the power supply device and the power distribution unit in the dynamic environment system, for example, the first air conditioner, the second air conditioner, the temperature and humidity sensor, the access control, the smoke sensor, the lighting, etc. The power-consuming equipment also includes communication signal equipment, lighting, and other equipment in the data center.

[0139] In some embodiments, Figure 6 As shown, the power distribution unit 104 includes multiple power output interfaces, and the power distribution unit 104 can power the communication signal equipment 8 (including the signal optical switch 801, the power timing controller 802, the optical fiber transceiver 803, the signal access switch 804), the air conditioner 202, the dynamic ring AC / DC (AC / DC) conversion equipment 105, the signal AC / DC conversion equipment 106, the lighting 9 and other equipment in the data center through the power output interface.

[0140] When the power distribution unit 104 supplies power to the power-consuming equipment of the data center, it can also collect power consumption data of the power-consuming equipment, such as the current, voltage, power, electricity consumption and power supply operation status of the power-consuming equipment. The power distribution unit 104 can also send the collected power consumption data of the power-consuming equipment to the control device, so that the control device uses the power consumption data as the monitoring data to monitor the operation of the power-consuming equipment.

[0141] In some embodiments, the power distribution unit 104 may also collect power usage alarm information of the power-consuming device, for example, the current load of the power-consuming device exceeds a preset threshold, the power-consuming device is down, etc. The power distribution unit 104 may also send the power usage alarm information to the control device, so that the control device uses the power usage alarm data as the monitoring data.

[0142] After the control device obtains the power consumption data and the power consumption alarm data, it can control the power supply of the power-consuming device based on the power consumption data and the power consumption alarm data. The power supply control includes power on and off, time-sharing power off, etc.

[0143] Exemplarily, after the control device determines that a certain power-consuming device is down based on the power alarm information, it can control the power supply output interface corresponding to the power-consuming device in the power distribution unit to switch on and off to try to restart the power-consuming device. When the control device determines that the current load of the power-consuming device exceeds a preset threshold based on the power alarm information, the power supply of the power-consuming device can be reduced, or the power supply of the device can be turned off to reduce the probability of damage to the device.

[0144] When the AC power is disconnected and the battery is used for power supply, if the battery power is insufficient, the control device can realize time-sharing power off through the power distribution unit (turn off the power output interface of unimportant electrical equipment), give priority to powering off unimportant equipment, and extend the operating time of important equipment.

[0145] In some embodiments, when the control device determines that there is an abnormal power-consuming device based on the power usage alarm information and the power usage information, it can send the power usage alarm information to a remote monitoring server or client so that relevant users can handle it in time.

[0146] In summary, by setting up a power distribution unit, the control device can perform refined on-off control of electrical equipment in the data center through the power distribution unit, thereby reducing the risk of equipment operation.

[0147] On the basis of the above embodiments, in order to further improve the work efficiency of the inspection personnel, Figure 7 As shown, the control device may further include a touch screen, and the control device may display the dynamic environment monitoring data through the touch screen, so that the inspection personnel can clearly and intuitively understand the status of each device through the touch screen during the inspection, without having to check each device one by one, thereby effectively improving the inspection efficiency.

[0148] In some embodiments, the inspection personnel can also control the dynamic environment system through the touch screen. For example, the inspection personnel can also input control instructions through the touch screen. The control device receives the control instructions through the touch screen and controls the operation of the dynamic environment system based on the control instructions.

[0149] Exemplarily, the inspection personnel can input a control instruction to adjust the working mode of the first air conditioner to the air supply mode through the touch screen, and when the control device receives the control instruction, it can switch the working mode of the first air conditioner.

[0150] The inspection personnel can input the command to stop supplying power to the second air conditioner through the touch screen. When the control device receives the control command, it can close the power output port corresponding to the second air conditioner in the power distribution unit, thereby stopping supplying power to the second air conditioner.

[0151] In some embodiments, Figure 8 As shown, the control device can also be a microcomputer with a touch screen, which is a separate device outside the monitoring host, deployed in the data center, and connected to the monitoring host.

[0152] The monitoring host may send the acquired monitoring data to the control device, and the control device displays the monitoring data when receiving the monitoring data.

[0153] When the inspection personnel output the control instruction through the control device, the control device can also send the control instruction to the monitoring host so that the monitoring host device executes the control instruction.

[0154] In some embodiments, the monitoring host can also be a control device that only has the function of executing control instructions. The monitoring host can send the collected monitoring data to the control device. When the control device receives the monitoring data, it can generate corresponding control instructions based on the monitoring data and send the control instructions to the monitoring host so that the monitoring host executes the instructions.

[0155] For example, the monitoring host can send the collected operation data of the first air conditioner to the control device. When the control device receives the operation data, it can generate a control instruction for the first air conditioner (for example, an operation parameter adjustment instruction, an operation mode switching instruction) according to the operation data, and send the control instruction for the first air conditioner to the monitoring host. The monitoring host can send the collected power consumption information and power consumption alarm information of the electrical equipment to the control device. The control device can generate a power supply control instruction for the electrical equipment according to the power consumption information and power consumption alarm information, and send the power supply control instruction to the monitoring host.

[0156] On the basis of the above embodiments, an embodiment of the present application further provides a monitoring device, which is applied to the control device in any of the above embodiments.

[0157] Fig. 9 A schematic diagram of the structure of a monitoring device 90 provided in an embodiment of the present application is shown in FIG. Fig. 9 As shown, it includes: an acquisition module 901 and a control module 902.

[0158] The acquisition module 901 is used to acquire the dynamic environment monitoring data of the dynamic environment system.

[0159] The control module 902 is used to control the operation of the first air conditioner according to the dynamic environment monitoring data.

[0160] In some embodiments, the dynamic environment monitoring data includes: the working period of the data center. The control module 902 is also used to obtain a first target working mode corresponding to the working period; if the current working mode of the first air conditioner is not the first target working mode, adjust the working mode of the first air conditioner to the first target working mode.

[0161] In some embodiments, the dynamic environment monitoring data includes: the working parameters of the first air conditioner. The control module 902 is further used to compare the magnitude relationship between the working parameters and the threshold value corresponding to the working parameters, and, if the magnitude relationship does not satisfy the preset magnitude relationship, adjust the working parameters of the first air conditioner to the threshold value.

[0162] In some embodiments, the dynamic environment monitoring data also includes temperature and humidity values ​​collected by the temperature and humidity sensor. The control module 902 is also used to determine the comprehensive temperature and humidity values ​​of the data center according to the temperature and humidity values ​​collected by the temperature and humidity sensor; determine the second target working mode of the first air conditioner according to the comprehensive temperature and humidity values ​​of the data center; and adjust the working mode of the first air conditioner to the second target working mode when the current working mode of the first air conditioner is not the target working mode.

[0163] In some embodiments, the control module 902 is also used to determine whether the temperature and humidity sensor is operating abnormally based on the comprehensive temperature value and comprehensive humidity value of the data center, and the temperature value and humidity value collected by the temperature and humidity sensor; if the temperature and humidity sensor is operating abnormally, the temperature and humidity sensor is eliminated; based on the number of remaining temperature and humidity sensors, the target operating mode of the first air conditioner is determined; or, based on the temperature values ​​and humidity values ​​collected by the remaining temperature and humidity sensors, the comprehensive temperature value and comprehensive humidity value of the data center are re-determined, and based on the re-determined comprehensive temperature value and comprehensive humidity value, the target operating mode of the first air conditioner is determined.

[0164] In some embodiments, the dynamic environment monitoring data includes: alarm data of the first air conditioner. The control module 902 is further used to determine whether to enable the second air conditioner based on the alarm data of the first air conditioner currently in operation, and / or the comprehensive temperature value and comprehensive humidity value of the data center within a preset time period; if it is determined that the second air conditioner is enabled, enable the second air conditioner.

[0165] In some embodiments, the dynamic environment monitoring data also includes: power consumption data and power consumption alarm data of the electrical equipment.

[0166] The control module 902 is also used to control the power supply of the power-consuming device through the power distribution unit according to the power consumption data and power consumption alarm data of the power-consuming device; the power supply control includes power on and off and / or time-sharing power off.

[0167] In some embodiments, the control module 902 is also used to display the dynamic environment monitoring data through the touch screen, and / or; receive control instructions of the dynamic environment system through the touch screen, and control the operation of the dynamic environment system based on the control instructions.

[0168] The monitoring device provided in the embodiment of the present application can execute the control method provided in any of the above embodiments, and its principles and technical effects are similar, which will not be repeated here.

[0169] The present application also provides an electronic device, which can be the control device in any of the above embodiments.

[0170] Fig.10 A schematic diagram of the structure of an electronic device 100 provided in an embodiment of the present application is shown in FIG. Fig.10 As shown, the electronic device may include: a transceiver 1001 , a processor 1002 , and a memory 1003 .

[0171] The processor 1002 executes the computer execution instructions stored in the memory, so that the processor 1002 executes the scheme in the above embodiment. The processor 1002 can be a general-purpose processor, including a central processing unit CPU, a network processor (network processor, NP), etc.; it can also be a digital signal processor DSP, an application-specific integrated circuit ASIC, a field programmable gate array FPGA or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components.

[0172] The memory 1003 is connected to the processor 1002 via a system bus and completes communication between them. The memory 1003 is used to store computer program instructions.

[0173] The transceiver 1001 can receive monitoring data and send control instructions.

[0174] Optionally, the electronic device 100 may further include a communication interface 1004, so that it can communicate and interact with an external or internal device through the communication interface 1003. The external device may be, for example, a client (e.g., a mobile phone, a tablet). In a specific implementation, if the communication interface 1004, the memory 1003, and the processor 1002 are implemented independently, the communication interface 1004, the memory 1003, and the processor 1002 may be interconnected through a bus and communicate with each other.

[0175] The system bus can be a peripheral component interconnect (PCI) bus or an extended industry standard architecture (EISA) bus, etc. The system bus can be divided into an address bus, a data bus, a control bus, etc. For ease of representation, only one thick line is used in the figure, but it does not mean that there is only one bus or one type of bus. The transceiver is used to realize the communication between the database access device and other computers (such as clients, read-write libraries, and read-only libraries). The memory may include random access memory (RAM) and may also include non-volatile memory.

[0176] Optionally, in a specific implementation, if the communication interface 1004, the memory 1003 and the processor 1002 are integrated on a chip, the communication interface 1004, the memory 1003 and the processor 1002 can communicate through an internal interface.

[0177] An embodiment of the present application also provides a chip for running instructions, which is used to execute the technical solution of the control method in the above embodiment.

[0178] A computer-readable storage medium is also provided in an embodiment of the present application, on which a computer program is stored. When the computer program is executed by a processor, the technical solution of the above-mentioned control method embodiment is implemented. The implementation principle and technical effect are similar and will not be repeated here.

[0179] In one possible implementation, a computer-readable medium may include a random access memory (RAM), a read-only memory (ROM), a compact disc read-only memory (CD-ROM) or other optical disk storage, a magnetic disk storage or other magnetic storage device, or any other medium that is intended to carry or store the required program code in the form of instructions or data structures and can be accessed by a computer. Moreover, any connection is appropriately referred to as a computer-readable medium. For example, if the software is transmitted from a website, server or other remote source using a coaxial cable, a fiber optic cable, a twisted pair, a digital subscriber line (DSL) or wireless technologies such as infrared, radio and microwave, then the coaxial cable, fiber optic cable, twisted pair, DSL or wireless technologies such as infrared, radio and microwave are included in the definition of the medium. Disks and optical disks as used herein include optical disks, laser disks, optical disks, digital versatile disks (DVDs), floppy disks and Blu-ray disks, where disks usually reproduce data magnetically, while optical disks reproduce data optically using lasers. Combinations of the above should also be included within the scope of computer-readable media.

[0180] A computer program product is also provided in an embodiment of the present application, including a computer program. When the computer program is executed by a processor, the technical solution of the above-mentioned control method embodiment is implemented. The implementation principle and technical effect are similar and will not be repeated here.

[0181] In the specific implementation of the above-mentioned terminal device or server, it should be understood that the processor can be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), etc. The general-purpose processor can be a microprocessor or the processor can be any conventional processor, etc. The steps of the method disclosed in the embodiments of the present application can be directly embodied as being executed by a hardware processor, or can be executed by a combination of hardware and software modules in the processor.

[0182] Those skilled in the art will appreciate that all or part of the steps of any of the above method embodiments may be completed by hardware associated with program instructions. The aforementioned program may be stored in a computer-readable storage medium, and when the program is executed, all or part of the steps of the above method embodiments are executed.

[0183] If the technical solution of the present application is implemented in the form of software and sold or used as a product, it can be stored in a computer-readable storage medium. Based on such an understanding, all or part of the technical solution of the present application can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a computer program or several instructions. The computer software product enables a computer device (which can be a personal computer, a server, a network device, or a similar electronic device) to perform all or part of the steps of the method described in the embodiment of the present application.

[0184] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all optional embodiments, and the actions and modules involved are not necessarily required by the present application.

[0185] It should be further noted that, although the various steps in the flowchart are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence in the order indicated by the arrows. Unless there is a clear description in this article, the execution of these steps is not strictly limited in order, and these steps can be executed in other orders. Moreover, at least a portion of the steps in the flowchart may include multiple sub-steps or multiple stages, and these sub-steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these sub-steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.

[0186] It should be understood that the above-mentioned device embodiments are only illustrative, and the device of the present application can also be implemented in other ways. For example, the division of units / modules in the above-mentioned embodiments is only a logical function division, and there may be other division methods in actual implementation. For example, multiple units, modules or components can be combined, or can be integrated into another system, or some features can be ignored or not executed.

[0187] In addition, unless otherwise specified, each functional unit / module in each embodiment of the present application may be integrated into one unit / module, each unit / module may exist physically separately, or two or more units / modules may be integrated together. The above-mentioned integrated unit / module may be implemented in the form of hardware or in the form of a software program module.

[0188] If the integrated unit / module is implemented in the form of hardware, the hardware may be a digital circuit, an analog circuit, etc. The physical implementation of the hardware structure includes but is not limited to transistors, memristors, etc. If not specifically stated, the processor may be any appropriate hardware processor, such as a CPU, a GPU, an FPGA, a DSP, an ASIC, etc. If not specifically stated, the storage unit may be any appropriate magnetic storage medium or magneto-optical storage medium, such as a resistive random access memory RRAM (Resistive Random Access Memory), a dynamic random access memory DRAM (Dynamic Random Access Memory), a static random access memory SRAM (Static Random-Access Memory), an enhanced dynamic random access memory EDRAM (Enhanced Dynamic Random Access Memory), a high-bandwidth memory HBM (High-Bandwidth Memory), a hybrid memory cube HMC (Hybrid Memory Cube), etc.

[0189] If the integrated unit / module is implemented in the form of a software program module and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application, or the part that contributes to the prior art or all or part of the technical solution, can be embodied in the form of a software product, which is stored in a memory and includes several instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the various embodiments of the present application. The aforementioned memory includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, disk or optical disk and other media that can store program codes.

[0190] In the above embodiments, the description of each embodiment has its own emphasis. For the part not described in detail in a certain embodiment, please refer to the relevant description of other embodiments. The technical features of the above embodiments can be combined arbitrarily. In order to make the description concise, all possible combinations of the technical features in the above embodiments are not described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0191] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

Claims

1. A control method, characterized in that: include: Obtain dynamic environment monitoring data of the data center; The operation of the first air conditioner in the data center is controlled according to the dynamic environment monitoring data.

2. The method according to claim 1, characterized in that The dynamic environment monitoring data includes: the working period of the data center, and the operation control of the first air conditioner of the data center according to the dynamic environment monitoring data includes: Obtaining a first target working mode corresponding to the working period; When the current operating mode of the first air conditioner is not the first target operating mode, the operating mode of the first air conditioner is adjusted to the first target operating mode.

3. The method according to claim 1, characterized in that At least one temperature and humidity sensor is deployed in the data center, and the dynamic environment monitoring data further includes: temperature values ​​and humidity values ​​collected by the temperature and humidity sensor; and the operation control of the first air conditioner in the data center according to the dynamic environment monitoring data includes: Determine the comprehensive temperature value and comprehensive humidity value of the data center according to the temperature value and humidity value collected by the temperature and humidity sensor; determining a second target operating mode of the first air conditioner according to a comprehensive temperature value and a comprehensive humidity value of the data center; When the current operating mode of the first air conditioner is not the target operating mode, the operating mode of the first air conditioner is adjusted to the second target operating mode.

4. The method according to claim 1, characterized in that The dynamic environment monitoring data also includes: operating parameters of the first air conditioner, and the operation control of the first air conditioner of the data center according to the dynamic environment monitoring data includes: Determining a magnitude relationship between the operating parameter and a threshold value corresponding to the operating parameter; When the size relationship does not satisfy a preset size relationship, the operating parameter of the first air conditioner is adjusted to the threshold value.

5. The method according to claim 3, characterized in that: The data center is further equipped with a second air conditioner, and the dynamic environment monitoring data further includes: alarm data of the first air conditioner; the method further includes: Determining whether to enable the second air conditioner according to the alarm data of the first air conditioner and / or the comprehensive temperature value and the comprehensive humidity value of the data center within a preset time period; If it is determined that the second air conditioner is to be activated, the second air conditioner is activated.

6. The method according to claim 3, characterized in that The determining, according to the comprehensive temperature value and the comprehensive humidity value of the data center, the second target operating mode of the first air conditioner comprises: Determine whether the temperature and humidity sensor is working abnormally according to the comprehensive temperature value and the comprehensive humidity value of the data center, and the temperature value and the humidity value collected by the temperature and humidity sensor; If the temperature and humidity sensor works abnormally, remove the temperature and humidity sensor; Based on the number of remaining temperature and humidity sensors, determine the second target operating mode of the first air conditioner; or, based on the temperature values ​​and humidity values ​​collected by the remaining temperature and humidity sensors, redetermine the comprehensive temperature value and comprehensive humidity value of the data center, and based on the redetermined comprehensive temperature value and comprehensive humidity value, determine the second target operating mode of the first air conditioner.

7. The method according to claim 2, characterized in that The working period of the data center is determined based on the operating hours of the devices connected to the data center.

8. The method according to claim 1, characterized in that The data center further comprises a power supply device and a power distribution unit, wherein the power output interface of the power supply device is connected to the power input interface of the power distribution unit, and the power distribution unit comprises a plurality of power output interfaces, each of which is connected to an electric device of the data center to supply power to the electric device; The dynamic environment monitoring data also includes: power consumption data and power consumption alarm data of the power-consuming equipment; The method further comprises: According to the power consumption data and power consumption alarm data of the power-consuming device, the power supply of the power-consuming device is controlled by the power distribution unit; the power supply control includes power on and off and / or time-sharing power off.

9. The method according to claim 8, characterized in that The data center further includes a touch screen, and the method further includes: Displaying the dynamic environment monitoring data via the touch screen, and / or; A control instruction is received through the touch screen, and the operation of the first air conditioner and / or the electrical equipment is controlled based on the control instruction.

10. The method according to any one of claims 1 to 8, characterized in that: The data center is a micro modular data center applied to rail transportation.

11. A data center, characterized in that: The data center is equipped with a control device; The control device is used to execute the method according to any one of claims 1 to 7.

12. The data center according to claim 11, characterized in that: The data center further comprises a power supply device and a power distribution unit, wherein the power output interface of the power supply device is connected to the power input interface of the power distribution unit, and the power distribution unit comprises a plurality of power output interfaces, each of which is connected to an electric device of the data center to supply power to the electric device; The dynamic environment monitoring data of the data center includes: the power consumption data and power consumption alarm data of the power-consuming equipment; The control device is also used to control the power supply of the power-consuming equipment through the power distribution unit according to the power consumption data and power consumption alarm data of the power-consuming equipment; the power supply control includes power on and off and / or time-sharing power off.

13. The data center according to claim 12, characterized in that: The data center also includes a touch screen; The control device is also used to display the dynamic environment monitoring data through the touch screen, and / or; receive control instructions through the touch screen, and, based on the control instructions, perform operation control on the first air conditioner and / or the electrical equipment of the data center.

14. A computer-readable storage medium, characterized in that: A computer program is stored thereon, and the computer program is executed by a processor to implement the method according to any one of claims 1 to 10.

15. A computer program product, characterized in that The invention comprises a computer program, which implements the method according to any one of claims 1 to 10 when being executed by a controller.