Method and device for controlling geometric short-wave band dynamic irregularity of high-speed railway track
By analyzing the disease and dynamic uneven data of high-speed railway tracks, the short-band control band and related limits are determined, which solves the problem of insufficient dynamic uneven control of short-band short-band high-speed railway tracks and improves driving safety.
Patent Information
- Application Number
- CN202411940499.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-26
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2044-12-26
AI Technical Summary
The prior art has not yet formed effective management standards in controlling short-band dynamic unevenness of high-speed railway tracks, affecting driving safety.
By conducting characteristic analysis of disease data and dynamic uneven data of high-speed railway tracks, the dynamic short-wave uneven control band of tracks is determined, and through statistical analysis and vehicle-rail coupling power simulation, the initial limit of dynamic uneven, daily maintenance limit, speed limit, planned maintenance limit and temporary repair limit are determined.
The management standards for dynamic unevenness of geometric short-band rails of high-speed railway tracks have been effectively established, which has improved the safety of high-speed railway driving.
Smart Images

Figure CN119796292A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of rail transit technology, and in particular to a method and device for controlling geometric short-wave dynamic irregularity of a high-speed railway track. Background Art
[0002] This section is intended to provide a background or context to the embodiments of the invention recited in the claims. No admission is made that the description herein is prior art by inclusion in this section.
[0003] At present, different track quality management systems have been established for the management of high-speed railway track unevenness. Different measurement chord lengths or wavelengths are adopted for control of different wavelengths of unevenness. The wavelengths for dynamic unevenness management of high-speed railway tracks at different speed levels are set as 1.5-42m, 1.5-70m and 1.5-120m respectively. However, track unevenness below 10m has a more obvious impact on driving safety indicators. From the perspective of driving safety, there is still room for improvement in the current temporary track dynamic unevenness management in the short-wave band control.
[0004] At present, there is still a gap in the research on methods for controlling driving safety due to short-wave dynamic roughness. Summary of the invention
[0005] The embodiment of the present invention provides a method for controlling short-band dynamic irregularity of high-speed railway track geometry, which is used to establish a short-band track dynamic irregularity management standard. The method includes:
[0006] Conduct feature analysis on the disease data and dynamic irregularity data of high-speed railway tracks to obtain feature analysis results, and determine the track dynamic short-wave irregularity control band based on the feature analysis results;
[0007] Statistical analysis was performed on the dynamic irregularity data of high-speed railway tracks to obtain the correlation between the dynamic irregularity data of tracks in different bands;
[0008] According to the correlation between the track dynamic irregularity data of different bands and the allowable deviation management values of the track dynamic irregularity data of different bands, the initial limit value of the dynamic irregularity of the track dynamic short-wave irregularity control band is determined;
[0009] Select lines with different speed levels, conduct statistical analysis on the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band, and obtain the peak value and cumulative distribution value of the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band; according to the peak value and cumulative distribution value, the initial limit value of dynamic irregularity, determine the daily maintenance limit value of dynamic irregularity of the track dynamic short-wave irregularity control band;
[0010] According to the vehicle and track coupled dynamic simulation results and the initial limit of dynamic irregularity, the dynamic irregularity speed limit, dynamic irregularity planned maintenance limit and dynamic irregularity temporary repair limit of the track dynamic short-wave irregularity control band are determined.
[0011] The embodiment of the present invention further provides a high-speed railway track geometric short-band dynamic irregularity control device, which is used to establish a short-band track dynamic irregularity management standard, and the device includes:
[0012] The control band determination module is used to perform feature analysis on the disease data and dynamic irregularity data of the high-speed railway track, obtain feature analysis results, and determine the track dynamic short-wave irregularity control band according to the feature analysis results;
[0013] A correlation determination module is used to perform statistical analysis on the dynamic irregularity data of high-speed railway tracks to obtain the correlation between the dynamic irregularity data of tracks in different bands;
[0014] An initial limit value determination module is used to determine the initial limit value of dynamic irregularity of the track dynamic short-wave irregularity control band according to the correlation between the track dynamic irregularity data of different bands and the allowable deviation management value of the track dynamic irregularity data of different bands;
[0015] The daily maintenance limit determination module is used to select lines with different speed levels, perform statistical analysis on the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band, and obtain the peak value and cumulative distribution value of the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band; according to the peak value and cumulative distribution value, the initial limit of dynamic irregularity, determine the daily maintenance limit of the dynamic irregularity of the track dynamic short-wave irregularity control band;
[0016] The speed limit and maintenance limit determination module is used to determine the dynamic irregularity speed limit, dynamic irregularity planned maintenance limit, and dynamic irregularity temporary repair limit of the track dynamic short-wave irregularity control band according to the vehicle and track coupled dynamic simulation results and the dynamic irregularity initial limit.
[0017] An embodiment of the present invention also provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned method for controlling dynamic irregularity of high-speed railway track geometry in short-wave bands when executing the computer program.
[0018] An embodiment of the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the above-mentioned method for controlling dynamic irregularity of high-speed railway track geometry in a short-wave band is implemented.
[0019] An embodiment of the present invention further provides a computer program product, which includes a computer program. When the computer program is executed by a processor, it implements the above-mentioned method for controlling dynamic irregularity of high-speed railway track geometry in short-wave bands.
[0020] The method and device for controlling dynamic irregularity of a high-speed railway track in a geometric short-wave irregularity control band of the embodiment of the present invention determine the track dynamic short-wave irregularity control band; obtain the correlation between track dynamic irregularity data of different bands; determine the initial limit value of dynamic irregularity of the track dynamic short-wave irregularity control band; perform statistical analysis on the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band to obtain the peak value and cumulative distribution value of the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band; determine the daily maintenance limit value of dynamic irregularity of the track dynamic short-wave irregularity control band; determine the dynamic irregularity speed limit value, dynamic irregularity planned maintenance limit value, and dynamic irregularity temporary repair limit value of the track dynamic short-wave irregularity control band according to the vehicle-track coupling dynamic simulation result; the embodiment of the present invention can effectively establish the management standard of track dynamic irregularity of a high-speed railway track in a geometric short-wave irregularity control band to improve the safety of high-speed railway driving. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the prior art descriptions. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work. In the drawings:
[0022] Figure 1 This is an example diagram of a method for controlling short-band dynamic irregularity of high-speed railway track geometry in an embodiment of the present invention;
[0023] Figure 2 This is a spectrum diagram of track irregularity of a 32m simply supported beam bridge on a ballastless track in an embodiment of the present invention;
[0024] Figure 3 A specific example diagram of determining the daily maintenance limit value of the dynamic irregularity of the track dynamic short-wave irregularity control band in an embodiment of the present invention;
[0025] Figure 4 This is a specific example diagram of cumulative distribution statistics of the [1.5m, 10m] and [1.5m, 42m] bands in an embodiment of the present invention;
[0026] Figure 5 This is a structural example diagram of a high-speed railway track geometric short-band dynamic irregularity control device in an embodiment of the present invention;
[0027] Figure 6 It is a specific example diagram of the structure of the high-speed railway track geometric short-band dynamic irregularity control device in an embodiment of the present invention. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] First, the technical terms in the embodiments of the present invention are introduced:
[0030] Initial limit of track dynamic irregularity: the initially determined limit of track dynamic irregularity, including daily maintenance limit of track dynamic irregularity, planned maintenance limit of track dynamic irregularity, temporary repair limit of track dynamic irregularity, and speed limit of track dynamic irregularity;
[0031] Daily maintenance limit of track dynamic irregularity: a standard limit set to maintain the track in good condition during daily operation. Track dynamic irregularity should be controlled within this limit as much as possible;
[0032] Track dynamic irregularity planned maintenance limit: When the track dynamic irregularity reaches this limit, systematic maintenance is required according to the pre-established maintenance plan to restore the track to good performance;
[0033] Temporary repair limit for track dynamic irregularity: When the track dynamic irregularity reaches this limit, temporary repair work needs to be carried out immediately;
[0034] Track dynamic irregularity speed limit: When the dynamic irregularity of the track reaches this limit, the train speed must be limited to ensure the safety of train operation and relatively reasonable comfort.
[0035] As mentioned above, there is currently no research on methods for controlling driving safety due to short-wave dynamic irregularities. Therefore, the inventors have conducted research on the relationship between track irregularities and driving performance, determined the short-wave band for controlling driving safety, and based on the measured data of high-speed railway track irregularities, used vehicle-track coupling dynamics simulation, mathematical statistics and other methods to establish a short-wave track dynamic geometric irregularity management method and standard.
[0036] Figure 1 FIG. 1 is an example diagram of a method for controlling short-band dynamic irregularity of a high-speed railway track geometry according to an embodiment of the present invention. Figure 1 As shown, the method includes:
[0037] Step 101, performing feature analysis on the disease data and dynamic irregularity data of the high-speed railway track to obtain feature analysis results, and determining the track dynamic short-wave irregularity control band according to the feature analysis results;
[0038] Step 102, statistically analyzing the dynamic irregularity data of the high-speed railway track to obtain the correlation between the dynamic irregularity data of the track in different bands;
[0039] Step 103, determining the initial limit value of dynamic irregularity of the track dynamic short-wave irregularity control band according to the correlation between the track dynamic irregularity data of different bands and the allowable deviation management value of the track dynamic irregularity data of different bands;
[0040] Step 104, selecting lines of different speed levels, performing statistical analysis on the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band, and obtaining the peak value and cumulative distribution value of the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band; determining the dynamic irregularity daily maintenance limit of the track dynamic short-wave irregularity control band according to the peak value and cumulative distribution value and the dynamic irregularity initial limit;
[0041] Step 105: According to the vehicle-track coupled dynamic simulation results and the initial limit of dynamic irregularity, the dynamic irregularity speed limit, the dynamic irregularity planned maintenance limit, and the dynamic irregularity temporary repair limit of the track dynamic short-wave irregularity control band are determined.
[0042] The inventors have found that the periodic irregularities caused by reasons such as railway infrastructure and track structure deformation correspond to the periodic characteristics of wheel-rail force, axle box acceleration and vehicle body acceleration, such as the periodic track irregularities caused by creep of commonly used span simply supported beam bridges and arching of track slabs. The shorter the wavelength of track dynamic irregularities, the greater the peak values of axle box acceleration and wheel-rail force spectrum, and the wheel-rail force and axle box acceleration responses have the largest amplitude in the short-wave section below 10m.
[0043] In an embodiment, feature analysis is performed on the disease data and dynamic irregularity data of the high-speed railway track to obtain feature analysis results, and the track dynamic short-wave irregularity control band is determined according to the feature analysis results, which may include: feature analysis is performed on the frequency spectrum of the disease data and dynamic irregularity data of the high-speed railway track to obtain feature analysis results, and according to the feature analysis results, it is determined that the [1.5m, 10m] band is the track dynamic short-wave irregularity control band.
[0044] For example, by conducting characteristic analysis on track slab defects of ballastless track, measured track height at the end of a long-span bridge beam, and dynamic irregularity of the track; Figure 2 FIG. 1 is a spectrum diagram of track irregularity of a 32 m simply supported beam bridge on a ballastless track in an embodiment of the present invention; Figure 2As shown in the figure, the track irregularity amplitude is most obvious in the [1.5m, 10m] band; according to the analysis results, the dynamic track irregularity in the [1.5m, 10m] band is clearly controlled.
[0045] In an embodiment, statistical analysis is performed on the dynamic irregularity data of the high-speed railway track to obtain the correlation between the dynamic irregularity data of the track in different bands, which may include: statistical analysis is performed on the dynamic irregularity data of the high-speed railway track to obtain the correlation between the dynamic irregularity data of the track in the [1.5m, 10m] and [1.5m, 42m] bands at different speed levels.
[0046] For example, based on the dynamic irregularity data of ballastless and ballasted tracks of high-speed railways, the linear relationship between the height and amplitude of the [1.5m, 10m] and [1.5m, 42m] bands and the track irregularity at different speed levels is statistically analyzed, and the correlation equation is given;
[0047] Roughness amplitude:
[0048] y=0.447x+0.597 (1)
[0049] y=0.526x+0.308 (2)
[0050] Track irregularity amplitude:
[0051] y=0.523x+0.520 (3)
[0052] y=0.507x+0.529 (4)
[0053] Where y is the roughness amplitude of the [1.5m, 10m] band, in mm; x is the roughness amplitude of the [1.5m, 42m] band, in mm. Formulas (1) and (3) are applicable to the speed level of [200km / h, 250km / h]; Formulas (2) and (4) are applicable to the speed level of (250km / h, 350km / h].
[0054] In an embodiment, determining the initial limit value of dynamic irregularity of the track dynamic shortwave irregularity control band according to the correlation between track dynamic irregularity data of different bands and the allowable deviation management value of track dynamic irregularity data of different bands may include: determining the initial limit value of dynamic irregularity of the [1.5m, 10m] band track dynamic shortwave irregularity control band according to the correlation between track dynamic irregularity data of [1.5m, 10m] bands and [1.5m, 42m] bands at different speed levels and the allowable deviation management value of track dynamic irregularity data of [1.5m, 42m] bands.
[0055] For example, based on the linear relationship between the track dynamic irregularity data of the [1.5m, 42m] band and the [1.5m, 10m] band, referring to the allowable deviation management values of the high and low and track-direction dynamic irregularities of the [1.5m, 42m] band, the initial limit values of the hierarchical management of track dynamic irregularity of the [1.5m, 10m] band are preliminarily given; Table 1 is the initial limit values of the hierarchical management of track dynamic irregularity of the [1.5m, 10m] band in an embodiment of the present invention; as shown in Table 1:
[0056] Table 1 Initial limits for graded management of track dynamic irregularities in the [1.5m, 10m] band
[0057]
[0058] In the embodiment, lines with different speed levels are selected, and the dynamic roughness amplitude of the track dynamic short-wave roughness control band is statistically analyzed to obtain the peak value and cumulative distribution value of the dynamic roughness amplitude of the track dynamic short-wave roughness control band; based on the peak value and cumulative distribution value and the initial limit value of the dynamic roughness, the daily maintenance limit value of the dynamic roughness of the track dynamic short-wave roughness control band is determined.
[0059] Figure 3 FIG. 1 is a specific example diagram of determining the daily maintenance limit of the track dynamic short-wave irregularity control band in an embodiment of the present invention; Figure 3 As shown, lines with different speed levels are selected, and the dynamic roughness amplitude curve of the track dynamic short-wave roughness control band is obtained by high-pass filtering. The dynamic roughness amplitude curve is statistically analyzed to obtain the maximum value and the cumulative distribution value of the preset confidence interval of the dynamic roughness amplitude of the track dynamic short-wave roughness control band; according to the maximum value and the cumulative distribution value of the preset confidence interval, the initial limit of dynamic roughness is used to determine the daily maintenance limit of the dynamic roughness of the track dynamic short-wave roughness control band.
[0060] For example, multiple high-speed railway lines with operating speeds of 250km / h, 350km / h and 400km / h were selected, and the amplitude curves of the height and dynamic track irregularity in the [1.5m, 10m] band were obtained through high-pass filtering. The maximum values and positions of the height and dynamic track irregularity in the [1.5m, 10m] band were counted, and the cumulative distribution statistics of the height and track irregularity of the entire line were performed. Figure 4 FIG. 4 is a specific example diagram of cumulative distribution statistics of the [1.5m, 10m] and [1.5m, 42m] bands in an embodiment of the present invention. Figure 4 As shown, the corresponding 95% cumulative distribution value is given, and the daily maintenance limit of dynamic irregularity level I in the track dynamic shortwave irregularity control band is determined based on the maximum value and the 95% cumulative distribution value.
[0061] In an embodiment, determining the dynamic irregularity speed limit value, the dynamic irregularity planned maintenance limit value, and the dynamic irregularity temporary repair limit value of a track dynamic shortwave irregularity control band according to the vehicle and track coupled dynamic simulation results and the initial limit value of dynamic irregularity may include: determining the dynamic irregularity speed limit value of a track dynamic shortwave irregularity control band according to the vehicle and track coupled dynamic simulation results and the initial limit value of track dynamic irregularity in the [1.5m, 10m] band in combination with a predetermined safety index, determining the dynamic irregularity planned maintenance limit value, and the dynamic irregularity temporary repair limit value of a track dynamic irregularity control band.
[0062] For example, through vehicle-track coupling dynamic simulation, the speed limit value of level IV of the dynamic unevenness of the [1.5m, 10m] band track is determined according to the driving safety index and the card control standard, and then the dynamic unevenness level II planned maintenance and dynamic unevenness level III temporary repair management values are clarified. Table 2 shows the allowable deviation management values of the dynamic quality of the [1.5m, 10m] band track in the embodiment of the present invention; including: the daily maintenance limit value of the dynamic unevenness of the track dynamic short-wave unevenness control band, the dynamic unevenness speed limit value, the dynamic unevenness planned maintenance limit value, and the dynamic unevenness temporary repair limit value; as shown in Table 2:
[0063] Table 2 [1.5m, 10m] band track dynamic quality allowable deviation management values
[0064]
[0065]
[0066] In an embodiment, after determining the dynamic irregularity speed limit value, dynamic irregularity planned maintenance limit value, and dynamic irregularity temporary repair limit value of the track dynamic shortwave irregularity control band according to the vehicle and track coupled dynamic simulation results and the dynamic irregularity initial limit value, it may also include: verifying the applicability of the dynamic irregularity speed limit value, dynamic irregularity daily maintenance limit value, dynamic irregularity planned maintenance limit value, and dynamic irregularity temporary repair limit value of the track dynamic shortwave irregularity control band according to the actual measured track dynamic irregularity data of high-speed railways at multiple different speed levels.
[0067] The embodiment of the present invention also provides a high-speed railway track geometric short-band dynamic unevenness control device, as described in the following embodiment. Since the principle of solving the problem by the device is similar to the high-speed railway track geometric short-band dynamic unevenness control method, the implementation of the device can refer to the implementation of the high-speed railway track geometric short-band dynamic unevenness control method, and the repeated parts will not be repeated.
[0068] Figure 5 FIG. 1 is a structural example diagram of a high-speed railway track geometric short-band dynamic irregularity control device according to an embodiment of the present invention. Figure 5 As shown, the device comprises:
[0069] The control band determination module 501 is used to perform feature analysis on the disease data and dynamic irregularity data of the high-speed railway track, obtain feature analysis results, and determine the track dynamic short-wave irregularity control band according to the feature analysis results;
[0070] A correlation determination module 502 is used to perform statistical analysis on the dynamic irregularity data of the high-speed railway track to obtain the correlation between the dynamic irregularity data of the track in different bands;
[0071] The initial limit value determination module 503 is used to determine the initial limit value of the dynamic irregularity of the track dynamic short-wave irregularity control band according to the correlation between the track dynamic irregularity data of different bands and the allowable deviation management value of the track dynamic irregularity data of different bands;
[0072] The daily maintenance limit determination module 504 is used to select lines with different speed levels, perform statistical analysis on the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band, and obtain the peak value and cumulative distribution value of the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band; according to the peak value and cumulative distribution value, the dynamic irregularity initial limit value, determine the dynamic irregularity daily maintenance limit value of the track dynamic short-wave irregularity control band;
[0073] The speed limit and maintenance limit determination module 505 is used to determine the dynamic irregularity speed limit, dynamic irregularity planned maintenance limit, and dynamic irregularity temporary repair limit of the track dynamic short-wave irregularity control band according to the vehicle and track coupled dynamic simulation results and the dynamic irregularity initial limit.
[0074] In one embodiment, the control band determination module 501 is specifically used to perform feature analysis on the frequency spectrum of the disease data and dynamic irregularity data of the high-speed railway track to obtain feature analysis results, and determine the [1.5m, 10m] band as the track dynamic short-wave irregularity control band based on the feature analysis results.
[0075] In one embodiment, the correlation determination module 502 is specifically used to statistically analyze the dynamic irregularity data of the high-speed railway track to obtain the correlation between the [1.5m, 10m] and [1.5m, 42m] band track dynamic irregularity data at different speed levels.
[0076] In one embodiment, the initial limit determination module 503 is specifically used to determine the initial limit value of the dynamic irregularity of the [1.5m, 10m] band track dynamic shortwave irregularity control band according to the correlation between the [1.5m, 10m] band track dynamic irregularity data at different speed levels and the allowable deviation management value of the [1.5m, 42m] band track dynamic irregularity data.
[0077] In one embodiment, the daily maintenance limit determination module 504 is specifically used to select lines with different speed levels, obtain the dynamic roughness amplitude curve of the track dynamic short-wave roughness control band through high-pass filtering, and perform statistical analysis on the dynamic roughness amplitude curve to obtain the dynamic roughness amplitude of the track dynamic short-wave roughness control band: the maximum value and the cumulative distribution value of the preset confidence interval; according to the maximum value and the cumulative distribution value of the preset confidence interval, the dynamic roughness initial limit is determined to determine the dynamic roughness daily maintenance limit of the track dynamic short-wave roughness control band.
[0078] In one embodiment, the speed limit and maintenance limit determination module 505 is specifically used to determine the dynamic irregularity speed limit of the track dynamic short-wave irregularity control band according to the vehicle and track coupled dynamic simulation results and the initial limit of the track dynamic irregularity in the [1.5m, 10m] band, combined with a predetermined safety index, and determine the dynamic irregularity planned maintenance limit of the track dynamic irregularity control band, and the dynamic irregularity temporary repair limit.
[0079] Figure 6 FIG. 1 is a specific example of the structure of the high-speed railway track geometric short-band dynamic irregularity control device in an embodiment of the present invention. Figure 6 As shown, in one embodiment, Figure 5 The structure of the high-speed railway track geometric short-band dynamic unevenness control device in the embodiment of the present invention shown may also include: a verification module 601, which is used to verify the applicability of the dynamic unevenness speed limit value, dynamic unevenness daily maintenance limit value, dynamic unevenness planned maintenance limit value and dynamic unevenness temporary repair limit value of the track dynamic short-wave unevenness control band after obtaining the dynamic unevenness limit value of the track dynamic unevenness control band.
[0080] In this example, the verification module 601 is specifically used to verify the applicability of the dynamic unevenness speed limit, dynamic unevenness daily maintenance limit, dynamic unevenness planned maintenance limit and dynamic unevenness temporary repair limit of the track dynamic shortwave unevenness control band based on the measured dynamic unevenness data of high-speed railways at multiple speed levels.
[0081] An embodiment of the present invention also provides a computer device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned high-speed railway track geometric short-band dynamic irregularity control method when executing the computer program.
[0082] An embodiment of the present invention further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the above-mentioned high-speed railway track geometric short-band dynamic irregularity control method is implemented.
[0083] An embodiment of the present invention further provides a computer program product, which includes a computer program. When the computer program is executed by a processor, the above-mentioned high-speed railway track geometric short-band dynamic irregularity control method is implemented.
[0084] The method and device for controlling dynamic irregularity of a high-speed railway track in a geometric short-wave irregularity control band of the embodiment of the present invention determine the track dynamic short-wave irregularity control band; obtain the correlation between track dynamic irregularity data of different bands; determine the initial limit value of dynamic irregularity of the track dynamic short-wave irregularity control band; perform statistical analysis on the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band to obtain the peak value and cumulative distribution value of the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band; determine the daily maintenance limit value of dynamic irregularity of the track dynamic short-wave irregularity control band; determine the dynamic irregularity speed limit value, dynamic irregularity planned maintenance limit value, and dynamic irregularity temporary repair limit value of the track dynamic short-wave irregularity control band according to the vehicle-track coupling dynamic simulation result; the embodiment of the present invention can effectively establish the management standard of track dynamic irregularity of a high-speed railway track in a geometric short-wave irregularity control band to improve the safety of high-speed railway driving.
[0085] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0086] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0087] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0088] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0089] The specific embodiments described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for controlling short-band dynamic irregularity of high-speed railway track geometry, characterized in that: include: Conduct feature analysis on the disease data and dynamic irregularity data of high-speed railway tracks to obtain feature analysis results, and determine the track dynamic short-wave irregularity control band based on the feature analysis results; Statistical analysis was performed on the dynamic irregularity data of high-speed railway tracks to obtain the correlation between the dynamic irregularity data of tracks in different bands; According to the correlation between the track dynamic irregularity data of different bands and the allowable deviation management values of the track dynamic irregularity data of different bands, the initial limit value of the dynamic irregularity of the track dynamic short-wave irregularity control band is determined; Select lines with different speed levels, conduct statistical analysis on the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band, and obtain the peak value and cumulative distribution value of the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band; according to the peak value and cumulative distribution value, the initial limit value of dynamic irregularity, determine the daily maintenance limit value of dynamic irregularity of the track dynamic short-wave irregularity control band; According to the vehicle and track coupled dynamic simulation results and the initial limit of dynamic irregularity, the dynamic irregularity speed limit, dynamic irregularity planned maintenance limit and dynamic irregularity temporary repair limit of the track dynamic short-wave irregularity control band are determined.
2. The method according to claim 1, characterized in that Perform feature analysis on the disease data and dynamic irregularity data of high-speed railway tracks to obtain feature analysis results. According to the feature analysis results, the track dynamic short-wave irregularity control band is determined, including: The frequency spectrum of the disease data and dynamic irregularity data of the high-speed railway track is subjected to characteristic analysis to obtain characteristic analysis results. According to the characteristic analysis results, the [1.5m, 10m] band is determined as the track dynamic short-wave irregularity control band.
3. The method according to claim 1, characterized in that The dynamic irregularity data of high-speed railway tracks are statistically analyzed to obtain the correlation between the dynamic irregularity data of tracks in different bands, including: The dynamic irregularity data of high-speed railway tracks were statistically analyzed to obtain the correlation between the dynamic irregularity data of the [1.5m, 10m] and [1.5m, 42m] bands at different speed levels.
4. The method according to claim 3, characterized in that According to the correlation between track dynamic irregularity data of different bands and the allowable deviation management value of track dynamic irregularity data of different bands, the initial limit value of dynamic irregularity of track dynamic short-wave irregularity control band is determined, including: According to the correlation between the [1.5m, 10m] and [1.5m, 42m] band track dynamic irregularity data at different speed levels, and the allowable deviation management value of the [1.5m, 42m] band track dynamic irregularity data, the initial limit value of the dynamic irregularity of the [1.5m, 10m] band track dynamic shortwave irregularity control band is determined.
5. The method according to claim 1, characterized in that Select lines with different speed levels, conduct statistical analysis on the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band, and obtain the peak value and cumulative distribution value of the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band; according to the peak value and cumulative distribution value, the initial limit value of dynamic irregularity, determine the daily maintenance limit value of dynamic irregularity of the track dynamic short-wave irregularity control band, including: Lines with different speed levels are selected, and the dynamic roughness amplitude curve of the track dynamic shortwave roughness control band is obtained through high-pass filtering. The dynamic roughness amplitude curve is statistically analyzed to obtain the dynamic roughness amplitude of the track dynamic shortwave roughness control band: the maximum value and the cumulative distribution value of the preset confidence interval; according to the maximum value and the cumulative distribution value of the preset confidence interval, the initial limit of dynamic roughness is used to determine the daily maintenance limit of the dynamic roughness of the track dynamic shortwave roughness control band.
6. The method according to claim 1, characterized in that According to the vehicle and track coupled dynamic simulation results and the initial limit of dynamic roughness, the dynamic roughness speed limit, dynamic roughness planned maintenance limit, and dynamic roughness temporary repair limit of the track dynamic short-wave roughness control band are determined, including: According to the vehicle and track coupled dynamic simulation results, and the initial limit value of track dynamic irregularity in the [1.5m, 10m] band, the dynamic irregularity speed limit value of the track dynamic shortwave irregularity control band is determined in combination with the predetermined safety indicators, the dynamic irregularity planned maintenance limit value of the track dynamic irregularity control band, and the dynamic irregularity temporary repair limit value are determined.
7. The method according to claim 1, characterized in that After determining the dynamic irregularity speed limit, dynamic irregularity planned maintenance limit, and dynamic irregularity temporary repair limit of the track dynamic short-wave irregularity control band according to the vehicle and track coupled dynamic simulation results and the initial limit of dynamic irregularity, it also includes: Based on the measured track dynamic irregularity data of high-speed railways at multiple different speed levels, the applicability of the dynamic irregularity speed limit, dynamic irregularity daily maintenance limit, dynamic irregularity planned maintenance limit and dynamic irregularity temporary repair limit in the track dynamic shortwave irregularity control band is verified.
8. A high-speed railway track geometric short-band dynamic irregularity control device, characterized in that: include: The control band determination module is used to perform feature analysis on the disease data and dynamic irregularity data of the high-speed railway track, obtain feature analysis results, and determine the track dynamic short-wave irregularity control band according to the feature analysis results; A correlation determination module is used to perform statistical analysis on the dynamic irregularity data of high-speed railway tracks to obtain the correlation between the dynamic irregularity data of tracks in different bands; An initial limit value determination module is used to determine the initial limit value of dynamic irregularity of the track dynamic short-wave irregularity control band according to the correlation between the track dynamic irregularity data of different bands and the allowable deviation management value of the track dynamic irregularity data of different bands; The daily maintenance limit determination module is used to select lines with different speed levels, perform statistical analysis on the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band, and obtain the peak value and cumulative distribution value of the dynamic irregularity amplitude of the track dynamic short-wave irregularity control band; according to the peak value and cumulative distribution value, the initial limit of dynamic irregularity, determine the daily maintenance limit of the dynamic irregularity of the track dynamic short-wave irregularity control band; The speed limit and maintenance limit determination module is used to determine the dynamic irregularity speed limit, dynamic irregularity planned maintenance limit, and dynamic irregularity temporary repair limit of the track dynamic short-wave irregularity control band according to the vehicle and track coupled dynamic simulation results and the dynamic irregularity initial limit.
9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the method according to any one of claims 1 to 7 is implemented.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
11. A computer program product, characterized in that The computer program product comprises a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 7 is implemented.
Citation Information
Patent Citations
Roadbed deformation defect identification method and device
CN110254478A
Vehicle-mounted track uneven peak value interval detection method
CN112948984A
Rail irregularity treatment method and device
CN115422668A
Method and device for evaluating smoothness of long-span bridge track of high-speed railway
CN115525944A
Track geometric large value overrun monitoring method and device
CN116090235A