Large-span steel platform structure assembling jig frame mounting and leveling device and construction method

By introducing and installing leveling devices into the assembly tire frame of the large-span steel platform structure, the precise leveling of truss is achieved using hydraulic devices and support structures, the problems of high construction and installation control difficulty, high resource consumption and low component qualification rate are solved, and efficient and stable welding process and quality assurance are achieved.

CN119800939APending Publication Date: 2025-04-11THE FIRST COMPARY OF CHINA EIGHTH ENG BUREAU LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510132444.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-06
Publication Date
2025-04-11

AI Technical Summary

Technical Problem

The construction and installation control of the assembly tire frame of the large-span steel platform structure is difficult, consumes a lot of resources and cannot guarantee the component pass rate.

Method used

A large-span steel platform structure assembly tire frame installation leveling device is provided, including a steel platform structure assembly tire frame system. Each system consists of 55 units of the same structure, each unit includes an installation leveling mechanism and a support mechanism. It uses hydraulic devices, L-shaped baffles, L-shaped pads, corrupt leg structure and other components to achieve horizontal and vertical leveling of the truss.

Benefits of technology

The assembly tire frame is set up through the automatic system unit to achieve the fast reaching the correct plane position and fixing of the truss to be welded, ensuring stability during the welding process, reducing welding difficulty, improving welding quality, and saving construction costs and labor costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119800939A_ABST
    Figure CN119800939A_ABST
Patent Text Reader

Abstract

The invention discloses a large-span steel platform structure assembly jig frame mounting and leveling device and a construction method, and relates to the technical field of large-span steel platform structure assembly jig frame construction.The technical scheme is that the large-span steel platform structure assembly jig frame mounting and leveling device comprises steel platform structure assembly jig frame systems, and each steel platform structure assembly jig frame system is composed of 55 units of the same structure; each structural unit comprises a mounting leveling mechanism and a supporting mechanism, and each mounting leveling mechanism comprises a hydraulic device, an L-shaped baffle, an L-shaped base plate, a vertical base plate, a vertical baffle, a bottom plate and a bottom support; the supporting mechanism comprises a bracket structure and a vertical rod structure. The method has the beneficial effects that the scheme is different from a traditional high-altitude bulk mode and a traditional jig frame assembling mode, the assembled jig frame is arranged in a system unit automation mode, a to-be-welded truss can quickly reach a correct plane position and is fixed, it is guaranteed that shaking does not occur in the welding process, and the welding efficiency is improved. And the problem of disqualification in the welding process is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of large-span steel platform structure assembly frame construction, and in particular to a large-span steel platform structure assembly frame installation and leveling device and a construction method. Background Art

[0002] The offshore photovoltaic project needs to build 936 steel platforms at sea. The plane projection size of each support platform is 35m×60m. The number of support platform components is 432,442, and the number of purlins is 194,460. The number of components is very large. The 936 steel platforms also need to be placed on 3,744 steel pipe piles, which makes the construction and installation control extremely difficult. It is impossible to construct by using the traditional method of high-altitude bulk installation. The number of machines and labor is incalculable, so the steel platform assembly task needs to be completed on land in advance. At present, the traditional assembly tire frame adopts the suspension method plus cranes and other lifting tools for assembly. During the construction process, when assembling components of different sizes, matching tools are needed to fix them, so a large number of machines are needed to meet the construction. In the process of fixing components, the unstable lifting will cause the qualified rate of component assembly to be low. Therefore, the traditional assembly tire frame wastes manpower and machinery, and cannot guarantee the qualified rate of components.

[0003] Therefore, in order to solve the above problems, a large-span steel platform structure assembly frame installation and leveling device and a construction method are now provided. Summary of the invention

[0004] In order to achieve the above-mentioned purpose of the invention and to address the above-mentioned technical problems, the present invention provides a large-span steel platform structure assembly cradle installation and leveling device and construction method to solve the problems in the above-mentioned background technology that the large-span steel platform structure assembly cradle construction and installation control are extremely difficult, consume a lot of resources and cannot guarantee the component qualification rate.

[0005] The technical solution is that the present invention provides a large-span steel platform structure assembly frame installation and leveling device, including a steel platform structure assembly frame system, wherein a single steel platform structure assembly frame system is composed of 55 units of the same structure;

[0006] Each structural unit includes an installation and leveling mechanism and a supporting mechanism, wherein the installation and leveling mechanism includes a hydraulic device, an L-shaped baffle, an L-shaped pad, an upright pad, an upright baffle, a bottom plate and a bottom support;

[0007] The supporting mechanism includes a corbel structure and a pole structure;

[0008] The hydraulic device comprises a horizontal hydraulic device and a vertical hydraulic device. The horizontal hydraulic device is fixed on one side of the vertical pole structure, and the vertical hydraulic device is fixed on the top surfaces of the two corbel structures.

[0009] The fixed end of the horizontal hydraulic device is fixedly connected to the side wall of the vertical pole structure, and the telescopic end of the horizontal hydraulic device is connected to the side wall of the upright baffle;

[0010] The said corbel structure is divided into two parts, the upper and lower parts, which are respectively fixed on the same side of the upright structure, and the said vertical hydraulic device is arranged on the upper and lower parts of the corbel structure;

[0011] The fixed end of the vertical hydraulic device on the upper corbel structure is fixedly connected to the upper surface of the corbel structure, and the telescopic end of the vertical hydraulic device is connected to the lower surface of the bottom plate;

[0012] The fixed end of the vertical hydraulic device on the lower corbel structure is fixedly connected to the upper surface of the corbel structure, and the telescopic end of the vertical hydraulic device is connected to the lower surface of the base.

[0013] The L-shaped baffle is fixed on the top surface of the bottom plate, and the L-shaped pad is fixed on the inner side of the L-shaped baffle;

[0014] The upright pad is fixed on one side of the upright baffle, one side of the upright baffle is connected to the upright pad, and the other side is fixed on the horizontal hydraulic device;

[0015] The pole structure is fixed to the ground through concrete foundation, embedded steel plates and I-beams.

[0016] The hydraulic device is a customized ultra-thin electric hydraulic jack with a lifting weight of 0.2 tons, which needs to achieve leveling work in the horizontal and vertical directions of each unit node;

[0017] The L-shaped baffle is a steel structure and is fixed to the base plate by welding;

[0018] The L-shaped pad is made of rubber material and is completely attached to the inner side of the L-shaped baffle by bonding;

[0019] The bracket structure is a steel structure, fixed on the same side of the pole structure by welding, and has strong bearing capacity;

[0020] The upright pad is made of rubber material and is completely attached to one side of the upright baffle by bonding;

[0021] The upright baffle is a steel structure, one side of which is attached to the upright pad, and the other side is fixed to the horizontal hydraulic device by welding, so that it can move freely above the L-shaped pad;

[0022] The bottom plate is a steel plate that is not easily deformed.

[0023] The vertical pole structure is composed of a concrete foundation, an embedded steel plate and a vertical I-beam. The embedded steel plate and the concrete foundation can serve as the base of the vertical pole structure, and the vertical I-beam is vertically fixed on the embedded steel plate by welding.

[0024] The base is a steel structure and meets the size requirements of the truss accessories.

[0025] The construction method of assembling a tire frame and installing a leveling device based on a large-span steel platform structure includes the following steps:

[0026] S1. According to the required size of the assembled truss and design requirements, set the length of the vertical pole structure, the spacing of the vertical pole structure, and the height difference between the bracket structures on the vertical pole structure;

[0027] S2. After accurate surveying and setting out, complete the construction of systematic pole structure and top support, and harden the assembly site;

[0028] S3. Install the hydraulic device, bottom plate, upright baffle and L-shaped baffle in each unit pole structure by welding;

[0029] S4. Install the upright pad and the L-shaped pad in each unit pole structure by bonding;

[0030] S5. The required assembled trusses are hoisted onto the installation and leveling mechanism of the corbel structure on the top of the vertical pole structure. The bottom of the truss is located on the lower corbel structure. The height of the installation and leveling mechanism of the corbel structure on the bottom support and the vertical pole structure is adjusted according to the vertical size of the truss and the position relationship of the adjacent trusses.

[0031] S6. Push the upright baffle plate by the horizontal hydraulic device and push the bottom plate by the vertical hydraulic device so that the truss to be assembled reaches the designed plane position. After the height and plane position of the truss to be assembled are accurate, fix the truss;

[0032] S7, repeat S5 and S6 until the overall system positioning of the truss in the large-span steel platform structure is completed;

[0033] S8. After the above overall process is completed, the welding work of the assembled truss structure in the large-span steel platform structure is carried out.

[0034] The technical solution provided by the embodiment of the present invention has the following beneficial effects: the present invention can solve the problems of unqualified structural dimensions and stress deformation after welding or assembly caused by non-standard relative dimensions in the traditional method of high-altitude bulk assembly and the traditional method of assembling the tire frame, and the inability to form a system unitized construction, through a large-span steel platform structure assembly tire frame installation and leveling device and construction method;

[0035] This solution is different from the traditional method of high-altitude bulk loading and traditional assembly cradle method. It uses the system unit automation method to set up the assembly cradle, which can not only achieve the truss to be welded to quickly reach the correct plane position and fix it, but also ensure that there is no shaking during the welding process, avoiding unqualified problems during the welding process;

[0036] It greatly reduces the difficulty of welding operations, ensures the quality of welding operations, overcomes the difficulty of high-quality welding and assembly of large-span trusses, and saves a lot of construction costs and labor costs;

[0037] It can support the truss in the vertical direction, control the accuracy of the vertical dimension of the truss, and reduce the influence of the weight of the truss to be welded;

[0038] At the same time, it can realize the joint assembly of large-span steel structure platforms, optimize the construction process, and save a lot of construction time and resources;

[0039] In addition, all components and accessories involved in this solution can be recycled repeatedly, and multiple recycling of components can effectively improve economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 It is a schematic diagram of the structure of each structural unit in an embodiment of the present invention.

[0041] Figure 2 It is a schematic diagram of the arrangement of the systematically assembled tire frame according to an embodiment of the present invention.

[0042] Among them, the figure markings are: 1. hydraulic device; 2. L-shaped baffle; 3. L-shaped pad; 4. corbel structure; 5. upright pad; 6. upright baffle; 7. bottom plate; 8. pole structure; 9. bottom support. DETAILED DESCRIPTION

[0043] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. Of course, the specific embodiments described here are only used to explain the present invention and are not used to limit the present invention.

[0044] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0045] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", etc. may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0046] In the description of the invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the invention can be understood according to specific circumstances.

[0047] Example 1

[0048] See also Figure 1 to Figure 2 The present invention provides a large-span steel platform structure assembly frame installation and leveling device, including a steel platform structure assembly frame system, wherein a single steel platform structure assembly frame system is composed of 55 units of the same structure;

[0049] Each structural unit includes an installation and leveling mechanism and a supporting mechanism, wherein the installation and leveling mechanism includes a hydraulic device 1, an L-shaped baffle plate 2, an L-shaped pad plate 3, an upright pad plate 5, an upright baffle plate 6, a bottom plate 7 and a bottom support 9;

[0050] The supporting mechanism includes a corbel structure 4 and a pole structure 8;

[0051] The hydraulic device 1 includes a horizontal hydraulic device and a vertical hydraulic device. The horizontal hydraulic device is fixed on one side of the upright structure 8 , and the vertical hydraulic device is fixed on the top surfaces of the two corbel structures 4 .

[0052] The fixed end of the horizontal hydraulic device is fixedly connected to the side wall of the upright structure 8, and the telescopic end of the horizontal hydraulic device is connected to the side wall of the upright baffle 6;

[0053] The corbel structure 4 is divided into two parts, the upper and lower parts, which are respectively fixed on the same side of the upright structure 8, and the upper and lower parts of the corbel structure 4 are both provided with vertical hydraulic devices;

[0054] The fixed end of the vertical hydraulic device on the upper corbel structure 4 is fixedly connected to the upper surface of the corbel structure 4, and the telescopic end of the vertical hydraulic device is connected to the lower surface of the bottom plate 7;

[0055] The fixed end of the vertical hydraulic device on the lower corbel structure 4 is fixedly connected to the upper surface of the corbel structure 4 , and the telescopic end of the vertical hydraulic device is connected to the lower surface of the base 9 .

[0056] The L-shaped baffle plate 2 is fixed on the top surface of the bottom plate 7, and the L-shaped pad plate 3 is fixed on the inner side surface of the L-shaped baffle plate 2;

[0057] The upright pad 5 is fixed on one side of the upright baffle 6. One side of the upright baffle 6 is connected to the upright pad 5, and the other side is fixed on the horizontal hydraulic device.

[0058] The pole structure 8 is fixed to the ground surface by means of a concrete foundation, embedded steel plates and I-beams.

[0059] Hydraulic device 1 is a customized ultra-thin electric hydraulic jack with a lifting weight of 0.2 tons, which needs to achieve leveling work in the horizontal and vertical directions of each unit node;

[0060] The L-shaped baffle 2 is a steel structure and is fixed to the bottom plate 7 by welding;

[0061] The L-shaped pad 3 is made of rubber material and is completely attached to the inner side of the L-shaped baffle 2 by bonding;

[0062] The bracket structure 4 is a steel structure, fixed on the same side of the upright structure 8 by welding, and has strong bearing capacity;

[0063] The upright pad 5 is made of rubber material and is completely attached to one side of the upright baffle 6 by bonding;

[0064] The upright baffle 6 is a steel structure, one side of which is attached to the upright pad 5, and the other side is fixed to the horizontal hydraulic device by welding, so that it can move freely above the L-shaped pad 3;

[0065] The bottom plate 7 is a steel plate that is not easily deformed.

[0066] The pole structure 8 is composed of a concrete foundation, an embedded steel plate and a vertical I-beam. The embedded steel plate and the concrete foundation can serve as the base of the pole structure 8, and the vertical I-beam is vertically fixed to the embedded steel plate by welding.

[0067] The bottom bracket 9 is a steel structure and meets the size requirements of the truss accessories.

[0068] The construction method of assembling a tire frame and installing a leveling device based on a large-span steel platform structure includes the following steps:

[0069] S1. According to the required size of the assembled truss and design requirements, set the length of the upright structure 8, the spacing of the upright structure 8, and the height difference between the corbel structures 4 on the upright structure 8;

[0070] S2. After accurate surveying and setting out, the construction of the systematic pole structure 8 and the top support 9 is completed, and the assembly site is hardened;

[0071] S3, installing the hydraulic device 1, the bottom plate 7, the upright baffle 6 and the L-shaped baffle 2 in each unit upright structure 8 by welding;

[0072] S4, installing the upright pad 6 and the L-shaped pad 3 in each unit upright structure 8 by bonding;

[0073] S5, hoist the required assembled truss to the installation and leveling mechanism of the corbel structure 4 on the top of the vertical pole structure 8, the bottom of the truss is located on the lower corbel structure 4, and the height of the installation and leveling mechanism of the bottom bracket 9 and the corbel structure 4 on the vertical pole structure 8 is adjusted according to the vertical size of the truss and the position relationship of the adjacent trusses;

[0074] S6, push the upright baffle 6 horizontally and the bottom plate 7 vertically by the hydraulic device 1, so that the truss to be assembled reaches the designed plane position, and the truss is fixed after the height and plane position of the truss to be assembled are accurate;

[0075] S7, repeat S5 and S6 until the overall system positioning of the truss in the large-span steel platform structure is completed;

[0076] S8. After the above overall process is completed, the welding work of the assembled truss structure in the large-span steel platform structure is carried out.

[0077] When the present invention is in use, it is necessary to check whether various functions of the hydraulic device 1 are operating normally, ensure that each hydraulic device 1 is fixed at the designed position, whether the L-shaped baffle 2 is firm and the overall size is larger than the size of the truss to be assembled, whether the L-shaped pad 3 is completely fitted with the L-shaped baffle 2, the position of the corbel structure 4 welded on the vertical pole must strictly meet the design height of the truss to be assembled and have a certain bearing capacity, the upright pad 5 is completely fitted with the upright baffle 6, the upright baffle 6 is fixed on the hydraulic device 1 and ensured to be perpendicular to the hydraulic device 1, and will not tilt or deform during movement, the bottom plate 7 is fixed on the vertical hydraulic device 1 and is perpendicular to the hydraulic device 1, and will not tilt or deform during movement, the vertical pole structure 8 is strictly fixed at the designed position on the ground, and the strength of the concrete foundation needs to be ensured, the bottom support 9 needs to not tilt when moving vertically toward the hydraulic device and have a certain bearing capacity, and on this basis, a large-span steel structure truss platform is assembled and welded.

[0078] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A large-span steel platform structure assembly frame installation and leveling device, characterized in that: It includes a steel platform structure assembly frame system, wherein a single steel platform structure assembly frame system is composed of 55 units of the same structure; Each structural unit comprises an installation and leveling mechanism and a supporting mechanism, wherein the installation and leveling mechanism comprises a hydraulic device (1), an L-shaped baffle plate (2), an L-shaped pad plate (3), an upright pad plate (5), an upright baffle plate (6), a bottom plate (7) and a bottom support (9); The supporting mechanism comprises a bracket structure (4) and a vertical pole structure (8); The hydraulic device (1) comprises a horizontal hydraulic device and a vertical hydraulic device, wherein the horizontal hydraulic device is fixed on one side of the vertical pole structure (8), and the vertical hydraulic device is fixed on the top surfaces of the two corbel structures (4).

2. The large-span steel platform structure assembly frame installation and leveling device according to claim 1 is characterized in that: The fixed end of the horizontal hydraulic device is fixedly connected to the side wall of the upright structure (8), and the telescopic end of the horizontal hydraulic device is connected to the side wall of the upright baffle (6); The bracket structure (4) is divided into two parts, an upper part and an lower part, which are respectively fixed on the same side of the upright structure (8), and the vertical hydraulic device is arranged on both the upper and lower parts of the bracket structure (4); The fixed end of the vertical hydraulic device on the upper corbel structure (4) is fixedly connected to the upper surface of the corbel structure (4), and the telescopic end of the vertical hydraulic device is connected to the lower surface of the bottom plate (7); The fixed end of the vertical hydraulic device on the lower corbel structure (4) is fixedly connected to the upper surface of the corbel structure (4), and the telescopic end of the vertical hydraulic device is connected to the lower surface of the base (9).

3. The large-span steel platform structure assembly frame installation and leveling device according to claim 2 is characterized in that: The L-shaped baffle (2) is fixed on the top surface of the bottom plate (7), and the L-shaped pad (3) is fixed on the inner side of the L-shaped baffle (2); The upright pad (5) is fixed on one side of the upright baffle (6); one side of the upright baffle (6) is connected to the upright pad (5), and the other side is fixed on the horizontal hydraulic device; The pole structure (8) is fixed to the ground surface by means of a concrete foundation, embedded steel plates and I-beams.

4. The large-span steel platform structure assembly frame installation and leveling device according to claim 3 is characterized in that: The hydraulic device (1) is an electric hydraulic jack; The L-shaped baffle (2) is a steel structure and is fixed on the bottom plate (7) by welding; The L-shaped pad (3) is made of rubber material and is adhered to the inner side of the L-shaped baffle (2) by bonding; The bracket structure (4) is a steel structure and is fixed on the same side of the upright structure (8) by welding; The upright pad (5) is made of rubber material and is bonded to one side of the upright baffle (6). The upright baffle (6) is a steel structure, one side of which is in contact with the upright pad (5), and the other side is fixed to the horizontal hydraulic device by welding; The bottom plate (7) is a steel plate.

5. The large-span steel platform structure assembly frame installation and leveling device according to claim 3 is characterized in that: The vertical pole structure (8) is composed of a concrete foundation, a pre-embedded steel plate and a vertical I-beam. The pre-embedded steel plate and the concrete foundation can serve as the base of the vertical pole structure (8). The vertical I-beam is vertically fixed on the pre-embedded steel plate by welding.

6. The large-span steel platform structure assembly frame installation and leveling device according to claim 3 is characterized in that: The base (9) is a steel structure.

7. A construction method for installing a leveling device for assembling a tire frame of a large-span steel platform structure according to any one of claims 1 to 6, characterized in that: The following steps are involved: S1. According to the required size of the assembled truss and design requirements, the length of the upright structure (8), the spacing of the upright structure (8), and the height difference between the bracket structures (4) on the upright structure (8) are set; S2. After accurate surveying and setting out, the construction of the systematic pole structure (8) and the top support (9) is completed, and the assembly site is hardened; S3, installing the hydraulic device (1), the bottom plate (7), the upright baffle (6) and the L-shaped baffle (2) in each unit upright structure (8) by welding; S4, installing the upright pad (6) and the L-shaped pad (3) in each unit upright structure (8) by bonding; S5, hoist the required assembled truss onto the installation and leveling mechanism of the corbel structure (4) on the top of the vertical pole structure (8), the bottom of the truss is seated on the lower corbel structure (4), and the height of the installation and leveling mechanism of the bottom support (9) and the corbel structure (4) on the vertical pole structure (8) is adjusted according to the vertical size of the truss and the position relationship of the adjacent trusses; S6, pushing the upright baffle (6) through the horizontal hydraulic device (1) and the bottom plate (7) through the vertical hydraulic device (1), so that the truss to be assembled reaches the designed plane position, and after the height and plane position of the truss to be assembled are accurate, the truss is fixed; S7, repeat S5 and S6 until the overall system positioning of the truss in the large-span steel platform structure is completed; S8. After the above overall process is completed, the welding work of the assembled truss structure in the large-span steel platform structure is carried out.