Railway signal simulation experiment system and method based on cloud server
Through the railway signal simulation experimental system based on cloud servers, the problem of insufficient traditional experimental facilities is solved, the smooth progress of the experiment and the accuracy of the results are achieved, and the working process of simulated railway signal equipment is simulated through logic circuit analysis platforms and other logic circuit analysis platforms.
Patent Information
- Application Number
- CN202411621667.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-07
- Publication Date
- 2025-04-11
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional railway signal simulation experiments have the problem of insufficient experimental facilities, which leads to the inability to proceed smoothly, affecting the process and results of the experiment.
A railway signal simulation experimental system based on cloud server is adopted, which includes a logic circuit analysis platform, a display management platform, a database storage platform and a network communication platform. Through these platforms, the working process of railway signal equipment is simulated and the experiment is carried out.
Through the cloud server system, circuit data input can be performed in multiple clients, and the connection to the backend database can be realized on the server side, data matching and result output can be completed, ensuring the smooth progress of the experiment and the accuracy of the results.
Smart Images

Figure CN119805025A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of railway signal simulation experiments, and in particular to a railway signal simulation experiment system and method based on a cloud server. Background Art
[0002] Railway signal technology is the infrastructure of railway transportation, and is also an important equipment to ensure driving safety, improve transportation efficiency and improve working conditions. Modern railway signal technology has become an important means to provide real-time information to transportation organizers, realize effective train control, improve railway section capacity, and improve marshaling capacity. It is also one of the key technologies for railway train speed-up and the development of high-speed railways. Railway signal technology has gradually integrated with communication and computer technology in the information age. With the development of information technology and network technology, the traditional concept of railway signals is changing, and the function of signals is gradually expanding. Railway signals have changed from the "eyes" of railway transportation in the past to the "central nervous system" of railways, playing an increasingly important role. As an indispensable means of railway transportation information operation management, railway signals occupy a very important position in railway transportation, and their development level has become one of the symbols of railway modernization.
[0003] The application of relay circuits in railway signal equipment is very extensive. During the study of traffic information engineering and control in colleges and universities, due to the lack of on-site equipment or the non-reproducibility of the on-site operating environment, railway signal simulation experiments are used for theoretical research. The railway signal simulation experiment simulates the working process of the circuits of power equipment such as relays. The railway signal simulation experiment is also carried out in conjunction with the user interface to logically realize the working mode of power equipment such as relays.
[0004] However, traditional railway signal simulation experiments have the following disadvantages:
[0005] During the operation of traditional railway signal simulation experiments, insufficient experimental facilities may prevent the experiment from proceeding smoothly, affecting the progress and results of the experiment. Summary of the invention
[0006] The purpose of the present invention is to provide a railway signal simulation experiment system and method based on a cloud server, so as to solve the problem that the traditional railway signal simulation experiment proposed in the above background technology may not be able to proceed smoothly during operation due to insufficient experimental facilities, thus affecting the progress and results of the experiment.
[0007] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a railway signal simulation experiment system based on a cloud server, comprising an experiment system body, the experiment system body comprising a logic circuit analysis platform, a display management platform, a database storage platform and a network communication platform, the logic circuit analysis platform comprising an entry signal lighting analysis module, a two-way exit signal lighting analysis module, a three-way exit signal lighting analysis module, a shunting signal lighting analysis module, a main filament broken wire alarm module, a single-action turnout control module, an S7K00 type turnout control module and an S7K00 type electric switch control module, the entry signal lighting analysis module comprising a main line passing analysis unit, a main line receiving car analysis unit, a side line receiving car analysis unit and a guide receiving car analysis unit The train analysis unit and the station entry signal lighting analysis module are based on the station entry signal lighting simulation circuit diagram. Under normal circumstances, the train signal relay falls and the station entry signal displays a red light; when the main line passes, the train signal relay, the main line relay and the passing signal relay are all attracted, and the station entry signal displays a green light; when the main line receives a train, the train signal relay and the main line relay are attracted at the same time, and the station entry signal displays a yellow light; when the lateral line receives a train, the train signal relay is attracted, and the station entry signal displays two yellow lights. At this time, the circuit of the second yellow light is connected first; when the guide receives a train, the train signal relay is attracted, and the station entry signal displays two lights, one is red and the other is moonlight white. The circuit of the red light is the same as that under normal circumstances.
[0008] As a preferred technical solution of the present invention, the single-action turnout control module and the S7K00 turnout control module both include a turnout reverse position unit and a turnout positive position unit. When the route operation turns the turnout to the reverse position, the circuit needs to be connected through the front contact of the reverse position operating relay; when the single operation turns the turnout to the reverse position, there is no need to use the reverse position operating relay, but a button relay is used to connect the circuit; when the route operation turns the turnout to the positioning position, the circuit needs to be connected through the front contact of the positioning operating relay; when the single operation turns the turnout to the positioning position, there is no need to use the positioning operating relay, but a button relay is used to connect the circuit.
[0009] As a preferred technical solution of the present invention, the S7K00 electric switch control module includes an electric switch reversing unit and an electric switch forward unit. When the electric switch is reversed, the starter relay is sucked up, and after the starter relay is completed, a three-phase AC motor circuit is formed, and the phase sequence of the motor is ACB respectively;
[0010] As a preferred technical solution of the present invention, when the electric switch machine rotates forward, the starting relay is attracted, and the starting relay is attracted to cause the starting relay to switch, thereby forming a motor switch machine circuit, and the phase sequence of the motor is ABC respectively.
[0011] As a preferred technical solution of the present invention, the display management platform includes an input display module, an output display module and an information management module, and the experimenter can understand the input and output related content through the display management platform.
[0012] As a preferred technical solution of the present invention, the database storage platform includes a data source configuration module, a data source connection module and a database operation module.
[0013] As a preferred technical solution of the present invention, the network communication platform includes a service communication module and a client communication module. The installation of the network communication platform facilitates the establishment of a connection between the server and the client.
[0014] The method for using the railway signal simulation experiment system based on the cloud server of the present invention comprises the following steps:
[0015] Step 1: Establish a connection: Establish a connection between the railway signal simulation experiment system client and server;
[0016] Step 2: Send data: The client sends data to the server;
[0017] Step 3: Receive data: The server receives data from the client;
[0018] Step 4: Data matching: The server matches the data with the data in the database storage platform;
[0019] Step 5: Output corresponding results: the database storage platform outputs corresponding matching results;
[0020] Step 6. Perform simulation based on the results: Based on the matching results, the logic circuit analysis platform performs experimental simulation.
[0021] Compared with the prior art, the present invention has the following beneficial effects:
[0022] 1. By setting up a logic circuit analysis platform, in each logic circuit, each relay plays a very important role and plays a very important role. They are indispensable. It is because of their safe and effective work that the reliable and safe operation of the train can be maintained and driving safety can be ensured. Different relays play different roles in the circuit. When all the relays in a circuit work normally according to the established mode, the circuit can express the function it performs. The relays in the circuit rely on each other to play an important role.
[0023] 2. In the final realization of the function, the circuit data input in multiple clients is completed, and the server-side data reception is completed. The connection to the background database is realized on the server side, and the received data is matched with the data in the database, and the final result is output, thereby reflecting the circuit in a specific state and the relay in a certain connection state, and the function that the logic circuit can achieve;
[0024] 3. This experimental system can be applied to actual work and provide applicable background logic for basic railway signal experiments, so as to simulate various relay circuits in the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the structure of the experimental system of the present invention;
[0026] Figure 2 It is a structural schematic diagram of the logic circuit analysis platform of the present invention;
[0027] Figure 3 This is a structural schematic diagram of the station entry signal lighting analysis module of the present invention;
[0028] Figure 4 It is a structural schematic diagram of a single-action turnout control module of the present invention;
[0029] Figure 5 It is a structural schematic diagram of the S7K00 electric switch machine control module of the present invention;
[0030] Figure 6 It is a schematic diagram of the structure of the display management platform of the present invention;
[0031] Figure 7 It is a structural schematic diagram of the database storage platform of the present invention;
[0032] Figure 8 It is a structural schematic diagram of the network communication platform of the present invention;
[0033] Fig. 9 It is a flow chart of the present invention.
[0034] In the figure: 1. Experimental system body; 2. Logic circuit analysis platform; 21. Station entry signal lighting analysis module; 211. Main line passing analysis unit; 212. Main line receiving car analysis unit; 213. Side line receiving car analysis unit; 214. Guide receiving car analysis unit; 22. Two-way exit signal lighting analysis module; 23. Three-way exit signal lighting analysis module; 24. Shunting signal lighting analysis module; 25. Main filament broken wire alarm module; 26. Single-action turnout control module; 261. Turnout reverse unit; 262. Turnout alignment unit; 27. S7K00 turnout control module; 28. S7K00 electric switch control module; 281. Electric switch reversing unit; 282. Electric switch forward unit; 3. Display management platform; 31. Input display module; 32. Output display module; 33. Information management module; 4. Database storage platform; 41. Data source configuration module; 42. Data source connection module; 43. Database operation module; 5. Network communication platform; 51. Service communication module; 52. Client communication module. DETAILED DESCRIPTION
[0035] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0036] See also Figure 1-9The present invention provides a railway signal simulation experiment system based on a cloud server, including an experiment system body 1, the experiment system body 1 includes a logic circuit analysis platform 2, a display management platform 3, a database storage platform 4 and a network communication platform 5, the logic circuit analysis platform 2 includes an entry signal lighting analysis module 21, a two-way exit signal lighting analysis module 22, a three-way exit signal lighting analysis module 23, a shunting signal lighting analysis module 24, a main filament broken wire alarm module 25, a single-action turnout control module 26, an S7K00 type turnout control module 27 and an S7K00 type electric switch control module 28, the entry signal lighting analysis module 21 includes a main line passing analysis unit 211, a main line receiving car analysis unit 212, and a side line receiving car analysis unit 21 3 and the guiding and receiving train analysis unit 214, the station entry signal lighting analysis module 21 is based on the station entry signal lighting simulation circuit diagram. Under normal circumstances, the train signal relay falls and the station entry signal displays a red light; when the main line passes, the train signal relay, the main line relay and the passing signal relay are all attracted, and the station entry signal displays a green light; when the main line receives a train, the train signal relay and the main line relay are attracted at the same time, and the station entry signal displays a yellow light; when the side line receives a train, the train signal relay is attracted, and the station entry signal displays two yellow lights. At this time, the circuit of the second yellow light is connected first; when the guiding and receiving train is attracted, the train signal relay is attracted, and the station entry signal displays two lights, one is red and the other is moon white, and the circuit of the red light is the same as the circuit under normal circumstances.
[0037] The single-action turnout control module 26 and the S7K00 turnout control module 27 both include a turnout reverse position unit 261 and a turnout positive position unit 262. When the route operation turns the turnout to the reverse position, the circuit needs to be connected through the front contact of the reverse position operating relay; when the single operation turns the turnout to the reverse position, there is no need to use the reverse position operating relay, but a button relay is used to connect the circuit; when the route operation turns the turnout to the positioning position, the circuit needs to be connected through the front contact of the positioning operating relay; when the single operation turns the turnout to the positioning position, there is no need to use the positioning operating relay, but a button relay is used to connect the circuit.
[0038] The S7K00 electric switch control module 28 includes an electric switch reversing unit 281 and an electric switch forward unit 282. When the electric switch is reversed, the starter relay is attracted, and after the starter relay is completed, a three-phase AC motor circuit is formed, and the phase sequence of the motor is ACB;
[0039] When the electric switch machine rotates forward, the starting relay is energized, which causes the starting relay to shift, thus forming the motor switch machine circuit. The phase sequence of the motor is ABC.
[0040] The display management platform 3 includes an input display module 31 , an output display module 32 and an information management module 33 . Experimenters can learn about input and output related contents through the display management platform 3 .
[0041] The database storage platform 4 includes a data source configuration module 41 , a data source connection module 42 and a database operation module 43 .
[0042] The network communication platform 5 includes a service communication module 51 and a client communication module 52. The installation of the network communication platform 5 facilitates the establishment of a connection between the server and the client.
[0043] The method for using the railway signal simulation experiment system based on the cloud server of the present invention comprises the following steps:
[0044] Step 1: Establish a connection: Establish a connection between the railway signal simulation experiment system client and server;
[0045] Step 2: Send data: The client sends data to the server;
[0046] Step 3: Receive data: The server receives data from the client;
[0047] Step 4: Data matching: The server matches the data with the data in the database storage platform 4;
[0048] Step 5: Output corresponding results: the database storage platform 4 outputs corresponding matching results;
[0049] Step 6: Perform simulation based on the results: Based on the matching results, the logic circuit analysis platform 2 performs experimental simulation.
[0050] Embodiment 1:
[0051] When the present invention is in use: the user establishes a connection between the client and the server of the railway signal simulation experiment system, the client sends data to the server, the server receives the data from the client, the server matches the data with the data in the database storage platform 4, the database storage platform 4 outputs the corresponding matching result, the matching is the same or the matching is different, according to the matching result, the logic circuit analysis platform 2 performs the experimental simulation of the station entry signal lighting analysis module 21, the station entry signal lighting analysis module 21 is based on the station entry signal lighting simulation circuit diagram, under normal circumstances, the train signal relay falls, and the station entry signal displays a red light; when the main line passes, the train signal relay, the main line relay and the passing signal relay are all attracted, and the station entry signal displays a green light; when the main line receives a car, the train signal relay and the main line relay are attracted at the same time, and the station entry signal displays a yellow light; when the side line receives a car, the train signal relay is attracted, and the station entry signal displays two yellow lights, and the circuit of the second yellow light is first connected at this time; when the train signal relay is guided to receive the car, the station entry signal displays two lights, one is red and the other is moon white, and the circuit of the red light is the same as the circuit under normal circumstances.
[0052] Embodiment 2:
[0053] When the present invention is used: the user establishes a connection between the client and the server of the railway signal simulation experiment system, the client sends data to the server, the server receives the data from the client, the server matches the data with the data in the database storage platform 4, the database storage platform 4 outputs the corresponding matching result, the matching is the same or the matching is different, according to the matching result, the logic circuit analysis platform 2 performs the experimental simulation of the two-way exit signal lighting analysis module 22, the two-way exit signal lighting analysis module 22 under normal circumstances, the train signal relay and the shunting signal relay are both down at this time, and the signal machine displays a red light; when the train is dispatched in the main direction, there are more than two block sections in front of it and they are idle. In this case, the main signal relay, the train signal relay and the large-capacity generator are all in the suction state, and the exit signal machine lights a green light; when the train is dispatched in the main direction, there is an idle block section in front of it. At this time, the train signal relay and the main signal relay are both sucked up, and the large-capacity generator is in the down state, and the exit signal machine displays a yellow light; when handling the shunting route, the shunting signal relay is in the suction state, and the exit signal machine displays a moon white light, and the exit signal machine is regarded as a shunting signal.
[0054] Embodiment 3:
[0055] When the present invention is used: the user establishes a connection between the client and the server of the railway signal simulation experiment system, the client sends data to the server, the server receives the data from the client, the server matches the data with the data in the database storage platform 4, the database storage platform 4 outputs the corresponding matching result, the matching is the same or the matching is different, according to the matching result, the logic circuit analysis platform 2 performs the experimental simulation of the three-direction exit signal lighting analysis module 23, the three-direction exit signal lighting analysis module 23 sends a train in the positive direction, and the second departure section is occupied by the train at this time, the large-capacity generator is in a down state, and the exit signal displays a yellow light; sends a train in the positive direction, and the second departure section is in an idle state, and the third departure section is occupied by the train at this time, because the large-capacity generator is in a suction state, the other large-capacity generators are in a down state, and the signal lights up the green-yellow light; sends a train in the positive direction, and the second and third departure sections are both in an idle state at this time, the large-capacity generator and other large-capacity generators are in the suction state at the same time, then the signal lights up the green light;
[0056] When the train starts in the opposite direction, the main signal relay is in the down state, and the section reverse direction relay is in the up state, and the signal lights up a green light.
[0057] Embodiment 4:
[0058] When the present invention is in use: the user establishes a connection between the client and the server of the railway signal simulation experiment system, the client sends data to the server, the server receives the data from the client, the server matches the data with the data in the database storage platform 4, the database storage platform 4 outputs the corresponding matching result, the match is the same or the match is different, according to the matching result, the logic circuit analysis platform 2 performs an experimental simulation of the shunting signal lighting analysis module 24, the shunting signal lighting analysis module 24 under normal circumstances, at this time, the shunting signal relay is in the down state, and the shunting signal lights a blue light; when performing shunting operations, at this time, the shunting signal relay is in the up state, and the shunting signal lights a white light.
[0059] Embodiment 5:
[0060] When the present invention is in use: the user establishes a connection between the client and the server of the railway signal simulation experiment system, the client sends data to the server, the server receives the data from the client, the server matches the data with the data in the database storage platform 4, the database storage platform 4 outputs the corresponding matching result, the match is the same or the match is different, according to the matching result, the logic circuit analysis platform 2 performs the main filament broken wire alarm module 25 experimental simulation, the main filament broken wire alarm module 25 yellow light bulb main filament broken at this time, the yellow light filament conversion relay is in the dropped state, thereby connecting the broken wire alarm relay circuit; the second green light filament broken at this time, the switch is in the dropped state, thereby connecting the broken wire alarm relay circuit.
[0061] Embodiment 6:
[0062] When the present invention is in use: the user establishes a connection between the client and the server of the railway signal simulation experiment system, the client sends data to the server, the server receives the data from the client, the server matches the data with the data in the database storage platform 4, the database storage platform 4 outputs the corresponding matching result, the match is the same or the match is different, according to the matching result, the logic circuit analysis platform 2 performs an experimental simulation of the single-action turnout control module 26, the single-action turnout control module 26 is operated by the route to turn the turnout to the reverse position, at this time, it is necessary to connect the circuit through the front contact of the reverse position operation relay; the single operation turns the turnout to the reverse position at this time, there is no need to use the reverse position operation relay, but the circuit is connected by a button relay; the route operation turns the turnout to the positioning position at this time, it is necessary to connect the circuit through the front contact of the positioning operation relay; the single operation turns the turnout to the positioning position at this time, there is no need to use the positioning operation relay, but the circuit is connected by a button relay.
[0063] Embodiment 7:
[0064] When the present invention is in use: the user establishes a connection between the client and the server of the railway signal simulation experiment system, the client sends data to the server, the server receives the data from the client, the server matches the data with the data in the database storage platform 4, the database storage platform 4 outputs the corresponding matching result, the match is the same or the match is different, according to the matching result, the logic circuit analysis platform 2 performs the S7K00 type turnout control module 27 experimental simulation, the S7K00 type turnout control module 27 route operation makes the turnout turn to the reverse position at this time, it is necessary to connect the circuit through the front contact of the reverse position operation relay; the single operation makes the turnout turn to the reverse position at this time, there is no need to use the reverse position operation relay, but the circuit is connected by the button relay; the route operation makes the turnout turn to the positioning at this time, it is necessary to connect the circuit through the front contact of the positioning operation relay; the single operation makes the turnout turn to the positioning at this time, there is no need to use the positioning operation relay, but the circuit is connected by the button relay.
[0065] Embodiment 8:
[0066] When the present invention is in use: the user establishes a connection between the client and the server of the railway signal simulation experiment system, the client sends data to the server, the server receives the data from the client, the server matches the data with the data in the database storage platform 4, the database storage platform 4 outputs the corresponding matching result, the match is the same or the match is different, according to the matching result, the logic circuit analysis platform 2 performs the S7K00 type electric switch machine control module 28 experimental simulation, the S7K00 type electric switch machine control module 28 electric switch machine reverses at this time, the starting relay is sucked up, and after the starting relay is completed, a three-phase AC motor circuit is formed, and the phase sequence of the motor is ACB; when the electric switch machine rotates forward, the starting relay is sucked up, and the starting relay is sucked up and causes the starting relay to be rotated, thereby forming a motor switch machine circuit, and the phase sequence of the motor is ABC.
[0067] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A railway signal simulation experiment system based on a cloud server, comprising an experiment system body (1), characterized in that: The experimental system body (1) comprises a logic circuit analysis platform (2), a display management platform (3), a database storage platform (4) and a network communication platform (5); the logic circuit analysis platform (2) comprises an entry signal lighting analysis module (21), a two-way exit signal lighting analysis module (22), a three-way exit signal lighting analysis module (23), a shunting signal lighting analysis module (24), a main filament break alarm module (25), a single-action turnout control module (26), an S7K00 type turnout control module (27) and an S7K00 type electric switch control module (28); the entry signal lighting analysis module (21) comprises a main line passing analysis unit (211), a main line receiving analysis unit (212), a side line receiving analysis unit (213) and a guide receiving analysis unit (214).
2. The railway signal simulation experiment system based on cloud server according to claim 1 is characterized in that: The single-action turnout control module (26) and the S7K00 type turnout control module (27) both comprise a turnout reverse position unit (261) and a turnout normal position unit (262).
3. The railway signal simulation experiment system based on cloud server according to claim 1 is characterized in that: The S7K00 type electric switch machine control module (28) comprises an electric switch machine reversing unit (281) and an electric switch machine forward rotation unit (282).
4. The railway signal simulation experiment system based on cloud server according to claim 1 is characterized in that: The display management platform (3) comprises an input display module (31), an output display module (32) and an information management module (33).
5. The railway signal simulation experiment system based on cloud server according to claim 1 is characterized in that: The database storage platform (4) comprises a data source configuration module (41), a data source connection module (42) and a database operation module (43).
6. The railway signal simulation experiment system based on cloud server according to claim 1 is characterized in that: The network communication platform (5) comprises a service communication module (51) and a client communication module (52).
7. The method for using the railway signal simulation experiment system based on a cloud server according to any one of claims 1 to 6, characterized in that: The following steps are involved: Step 1: Establish a connection: Establish a connection between the railway signal simulation experiment system client and server; Step 2: Send data: The client sends data to the server; Step 3: Receive data: The server receives data from the client; Step 4: Data matching: The server matches the data with the data in the database storage platform (4); Step 5: Output corresponding results: the database storage platform (4) outputs corresponding matching results; Step 6: Perform simulation based on the results: Based on the matching results, the logic circuit analysis platform (2) performs experimental simulation.