Method for improving power failure operation process efficiency
Through the mobile device, 4 tickets are automatically generated at one time, and the concurrent flow is transferred, and the approval is synchronously linked, which solves the problem of excessive time-consuming operation process of the existing power outage operation process and realizes efficient handling of the power outage operation process.
Patent Information
- Application Number
- CN202411976408.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-31
- Publication Date
- 2025-04-11
AI Technical Summary
The existing power outage operation process takes too long, mainly because there are many tickets and long processes. When one of the tickets is incorrect, it needs to be filled in again. The process completed before also needs to be repeated, which makes it time-consuming and labor-intensive.
Fill in the "one ticket and multiple orders" at one time through the mobile device, automatically generate 4 related tickets, transfer concurrently, and synchronously connect the approvals to achieve "only run once" emergency repairs.
Through concurrent flow and synchronous association, the processing timeliness is increased by more than 4 times, improving the efficiency of the power outage operation process and reducing the number and time of manual operations.
Smart Images

Figure CN119809566A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of power outage operation process, and in particular to a method for improving the efficiency of a power outage operation process. Background Art
[0002] The existing power outage operation process takes too long and has the following main problems.
[0003] The main reason is that there are too many tickets and the process is long. For example, in a high-voltage power outage operation, four tickets need to be processed in sequence, and each ticket has its own process:
[0004] The first step is to conduct on-site inspection to determine the scope of the power outage, and then apply for a power outage ticket from the dispatcher;
[0005] The second step is that after receiving the power outage application ticket, the dispatcher will issue a dispatch order ticket;
[0006] Step 3: After receiving the dispatch order, the operation and maintenance team must fill out the operation ticket;
[0007] After completing the fourth step, you still need to fill out a work ticket and then obtain permission before you can start work.
[0008] The above operations make the whole process time-consuming and laborious. When an error occurs in one of the tickets, it needs to be filled in again, and the previously completed process also needs to be started again, which makes the whole process time-consuming and laborious.
[0009] Therefore, the present invention needs to design a method for improving the efficiency of the power outage operation process to solve the above-mentioned problems. Summary of the invention
[0010] The purpose of the present invention is to provide a method for improving the efficiency of the power outage operation process in order to solve the above-mentioned problems, thereby solving the problems mentioned in the background technology.
[0011] In order to solve the above problems, the present invention provides a technical solution:
[0012] A method for improving the efficiency of a power outage operation process comprises the following specific steps:
[0013] S1. Use the mobile phone to handle "one ticket, multiple forms" and fill out the form at one time. Four related forms will be automatically generated at one time: power outage application form, dispatch order, switching operation form, and work form. These forms will be sent to relevant departments to complete multiple processes in sequence.
[0014] S2. The process of handling 4 tickets is concurrently circulated, and the approval is synchronized and linked, which increases the processing time by more than 4 times;
[0015] S3. Through the mobile device view "click on the picture to turn into a ticket", the problem of on-site ticket processing on the mobile phone is mainly solved, and emergency repairs can be completed "only once". According to the on-site mobile phone positioning, a list of nearby equipment will be automatically pushed. Click to select equipment and operation type, and a power outage work ticket will be automatically generated. At the same time, through computer intelligent tools, the power outage area is automatically topologically mapped, and the preparation of power outage safety measures is automatically completed, and corresponding power outage safety measures are generated.
[0016] As a preferred technical solution, the multiple processes in step S1 include review, acceptance, ordering, receiving orders, issuing, permitting, and termination processes.
[0017] As a preferred technical solution, the work ticket filling information in step S1 includes on-site investigation records.
[0018] As a preferred technical solution, in step S2, the four tickets are reviewed separately. When one ticket fails the review, it is manually modified and the approval process is re-executed until all four tickets have completed the review process.
[0019] As a preferred technical solution, in step S3, the person in charge of the work needs to review and sign before generating the corresponding power outage safety measures.
[0020] As a preferred technical solution, the operation process efficiency management system includes a mobile control module, a ticket filling and generating module, a process management module and a permission to start work module. The output end of the ticket filling and generating module is communicatively connected to the input end of the process management module, the output end of the process management module is communicatively connected to the input end of the permission to start work module, and the permission to start work module and the mobile control module are bidirectionally communicatively connected.
[0021] As a preferred technical solution, the mobile control module includes a mobile control unit, a field survey data collection unit and an emergency contact unit, and the output ends of the field survey data collection unit and the emergency contact unit are respectively communicatively connected to the input end of the mobile control unit; the mobile control unit is used for remote control and management, and the user can remotely control the connected device through the mobile device to perform mobile ticket processing and filling operations, and modify the ticket order; the field survey data collection unit is used to collect and process data obtained during the survey at the power outage site, collect data from various sensors, instruments and equipment, and monitor the environmental conditions after the power outage in real time, including meteorological changes, geological changes, etc., so as to timely detect potential problems or dangers; the emergency contact unit is used to allow the user to quickly call the emergency service number or notify relevant personnel, such as medical, fire or police, in an emergency.
[0022] As a preferred technical solution, the ticket filling and generating module includes a one-time filling unit, an automatic ticket generating unit and a ticket checking unit. The output end of the one-time filling unit is communicatively connected to the input end of the automatic ticket generating unit, the output end of the automatic ticket generating unit is communicatively connected to the input end of the process management module, and the ticket checking unit is integrated inside the automatic ticket generating unit; the one-time filling unit is used to generate a form, and the information data coverage of 4 tickets is achieved by filling in only one form; the automatic ticket generating unit is used to automatically create, manage and process 4 tickets, using manually predefined ticket templates, and the user only needs to input the necessary data information, and the system can automatically generate 4 complete tickets; the ticket checking unit is used to review, verify and confirm the generated tickets to ensure the accuracy and compliance of the information of the 4 tickets, identify possible abnormalities or error information in the tickets, and automatically issue an alarm to prompt relevant personnel to conduct manual review.
[0023] As a preferred technical solution, the process management module includes a license application management unit, a process optimization unit and a process management terminal. The license application management unit and the process optimization unit are respectively communicated with the process management terminal, and the output end of the process management terminal is communicated with the input end of the license start-up module; the license application management unit is used to provide a standardized license application form for review by relevant personnel and allow users to upload relevant supporting documents and materials; the process optimization unit is used to perform data statistics and analysis on the executed process, identify bottlenecks and improvement points, and perform subsequent optimization; the process management terminal is used to perform access management when abnormalities occur in the above process, and abnormal keywords and key behaviors can be set in advance.
[0024] As a preferred technical solution, the construction permit module includes a compliance check unit, a data statistics and analysis unit and a construction permit unit. The output end of the compliance check unit is communicatively connected to the input end of the data statistics and analysis unit, and the data statistics and analysis unit and the construction permit unit are bidirectionally communicatively connected. The compliance check unit is used to ensure that all construction permit applications comply with local laws, regulations and industry standards, and to conduct necessary risk assessments before construction starts to ensure the legal and safety compliance of the project. The data statistics and analysis unit is used to count the application and approval time for each ticket, analyze approval efficiency, identify potential bottlenecks, record historical approval data, and analyze compliance issues and trends. The construction permit unit is used to manage and control the construction permit process for whether a power outage plan is adopted.
[0025] The beneficial effects of the present invention are as follows: the present invention constructs a complete operation process efficiency management system by setting a mobile terminal control module, a ticket filling and generating module, a process management module and a permission to start work module. In actual use, the ticket is filled in at one time through the mobile phone ticket application, and four related tickets are automatically generated at one time: a power outage application ticket, a dispatch order, a switching operation ticket, and a work ticket, and sent to relevant departments to complete multiple processes. At the same time, the processes of the four tickets are processed concurrently, and the approval is synchronously associated. According to the on-site mobile phone positioning, a list of nearby equipment is automatically pushed, and the equipment and operation type are selected by clicking to automatically generate a power outage work ticket. At the same time, through computer intelligent tools, the power outage area is automatically topologically mapped, the power outage safety measures are automatically compiled, and corresponding power outage safety measures are generated. Multiple ticket data and corresponding filling and analysis results are managed, visualized and stored, which is helpful to realize ticket application and review source management through Internet cloud management and control, and improve the intelligence level of ticket review management. The purpose of the present invention is to provide a method for improving the efficiency of the power outage operation process, which has the effects of concurrent circulation, synchronous association, and improved efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] For ease of explanation, the present invention is described in detail with reference to the following specific implementations and the accompanying drawings.
[0027] Figure 1 It is a flowchart of a method for improving the efficiency of a power outage operation process of the present invention;
[0028] Figure 2 The present invention is a flowchart of a method for improving the efficiency of a power outage operation process. DETAILED DESCRIPTION
[0029] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.
[0030] The terms used in the embodiments of the present application are only for the purpose of describing specific embodiments, and are not intended to limit the present application. The singular forms "a", "said" and "the" used in the embodiments of the present application and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings, and "multiple" generally includes at least two.
[0031] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0032] It should be understood that although the terms first, second, third, etc. may be used to describe in the embodiments of the present application, these descriptions should not be limited to these terms. These terms are only used to distinguish the descriptions. For example, without departing from the scope of the embodiments of the present application, the first may also be referred to as the second, and similarly, the second may also be referred to as the first.
[0033] As used herein, the words "if" and "if" may be interpreted as "at the time of" or "when" or "in response to determining" or "in response to detecting", depending on the context. Similarly, the phrases "if it is determined" or "if (stated condition or event) is detected" may be interpreted as "when it is determined" or "in response to determining" or "when detecting (stated condition or event)" or "in response to detecting (stated condition or event)", depending on the context.
[0034] It should also be noted that the term "includes", "comprising" or any other variation thereof is intended to cover non-exclusive inclusion, so that a commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprising a ..." do not exclude the existence of other identical elements in the commodity or device including the elements.
[0035] It should be particularly noted that any symbols and / or numbers in the specification that are not marked in the accompanying drawings are not drawing marks.
[0036] The optional embodiments of the present application are described in detail below with reference to the accompanying drawings.
[0037] like Figure 1 and Figure 2 As shown, this specific implementation adopts the following technical solutions:
[0038] A method for improving the efficiency of a power outage operation process comprises the following specific steps:
[0039] S1. Use the mobile phone to handle "one ticket, multiple forms" and fill out the form at one time. Four related forms will be automatically generated at one time: power outage application form, dispatch order, switching operation form, and work form. These forms will be sent to relevant departments to complete multiple processes in sequence. The multiple processes include review, acceptance, order, order receipt, issuance, permission, and termination. The work form filling information includes on-site investigation records.
[0040] S2. The process of handling 4 tickets is concurrently circulated, and the approval is synchronized and linked. The processing efficiency is improved by more than 4 times. The 4 tickets are reviewed separately. When one ticket fails the review, it is manually modified and the approval process is re-executed until all 4 tickets have completed the review and passed the process;
[0041] S3. Through the mobile device view "click on the picture to turn into a ticket", the problem of on-site ticket processing on the mobile phone is mainly solved, and emergency repairs can be completed "only once". According to the on-site mobile phone positioning, a list of nearby equipment will be automatically pushed. Click to select equipment and operation type, and a power outage work ticket will be automatically generated. At the same time, through computer intelligent tools, the power outage area will be automatically topologically mapped, and the power outage safety measures will be automatically compiled. After receiving the review and signature of the person in charge of the work, the corresponding power outage safety measures will be generated.
[0042] In the present scheme, the operation process efficiency management system includes a mobile control module, a ticket filling and generating module, a process management module and a permission to start work module. The output end of the ticket filling and generating module is communicatively connected to the input end of the process management module, the output end of the process management module is communicatively connected to the input end of the permission to start work module, and the permission to start work module and the mobile control module are bidirectionally communicatively connected.
[0043] In this solution, the mobile terminal control module includes a mobile terminal control unit, a field survey data collection unit and an emergency contact unit, and the output ends of the field survey data collection unit and the emergency contact unit are respectively communicatively connected to the input end of the mobile terminal control unit;
[0044] The mobile terminal control unit is used for remote control and management. Users can remotely control the connected devices through mobile devices, conduct mobile ticket processing and filling operations, and modify ticket orders;
[0045] The field survey data collection unit is used to collect and process data obtained when surveying the power outage site, collect data from various sensors, instruments and equipment, and monitor the environmental conditions after the power outage in real time, including meteorological changes, geological changes, etc., so as to timely discover potential problems or dangers;
[0046] The emergency contact unit is used to allow the user to quickly dial emergency services or notify relevant personnel, such as medical, fire or police, in an emergency.
[0047] In this solution, the ticket filling and generating module includes a one-time filling unit, an automatic ticket generating unit and a ticket checking unit. The output end of the one-time filling unit is communicatively connected to the input end of the automatic ticket generating unit, the output end of the automatic ticket generating unit is communicatively connected to the input end of the process management module, and the ticket checking unit is integrated inside the automatic ticket generating unit.
[0048] The one-time filling unit is used to generate a form, and the information data of four tickets can be covered by filling in only one form;
[0049] The automatic ticket generation unit is used to automatically create, manage and process 4 tickets. Using the manually predefined ticket template, the user only needs to input the necessary data information, and the system can automatically generate complete 4 tickets;
[0050] The ticket checking unit is used to review, verify and confirm the generated tickets to ensure the accuracy and compliance of the 4 ticket information, identify possible abnormal or erroneous information in the tickets, and automatically issue an alarm to prompt relevant personnel to perform manual review.
[0051] In this solution, the process management module includes a permit application management unit, a process optimization unit and a process management terminal. The permit application management unit and the process optimization unit are respectively connected to the process management terminal for communication. The output end of the process management terminal is connected to the input end of the permit start module for communication.
[0052] The license application management unit is used to provide a standardized license application form for review by relevant personnel and allow users to upload relevant certification documents and information;
[0053] The process optimization unit is used to collect data and analyze the executed process, identify bottlenecks and improvement points, and perform subsequent optimization;
[0054] The process management terminal is used to perform access management when an abnormality occurs in the above process, and abnormal keywords and key behaviors can be pre-set.
[0055] In this solution, the construction permit module includes a compliance check unit, a data statistics and analysis unit and a construction permit unit. The output end of the compliance check unit is communicatively connected to the input end of the data statistics and analysis unit. The data statistics and analysis unit and the construction permit unit are bidirectionally communicatively connected.
[0056] The compliance check unit is used to ensure that all permit applications comply with local laws, regulations and industry standards, conduct necessary risk assessments before construction begins, and ensure the project's legal and safety compliance;
[0057] The data statistics and analysis unit is used to count the application and approval time of each ticket, analyze approval efficiency, identify potential bottlenecks, record historical approval data, and analyze compliance issues and trends;
[0058] The construction permit unit is used to manage and control the construction permit process of whether to adopt the power outage plan.
[0059] Example
[0060] When the operation process efficiency management system is connected to the power outage operation management:
[0061] S1. The staff checks the required power equipment one by one. After checking that they are all correct, the operation process efficiency management system is started. The mobile control unit is used for remote control and management. Users can remotely control the connected equipment through mobile devices, make and fill in tickets on the mobile phone, and modify tickets. The on-site survey data collection unit collects and processes data obtained during the survey at the power outage site, collects data from various sensors, instruments and equipment, and monitors the environmental conditions after the on-site power outage in real time. The emergency contact unit allows users to quickly call emergency services or notify relevant personnel in an emergency. Through the mobile phone ticket "one ticket, multiple tickets", the ticket is filled in at one time, and 4 related tickets are automatically generated at one time: power outage application ticket, dispatch order, switching operation ticket, work ticket, and send them to relevant departments to complete multiple processes in sequence. The multiple processes include review, acceptance, order, receipt of order, issuance, permission, and termination process. The work ticket filling information includes on-site survey records;
[0062] S2. The one-time filling unit generates a form, and the information data of 4 tickets is covered by filling in only one form. The automatic ticket generation unit automatically creates, manages and processes 4 tickets. Using the manually predefined ticket template, the user only needs to enter the necessary data information, and the system can automatically generate 4 complete tickets. The ticket verification unit reviews, verifies and confirms the generated tickets, identifies possible abnormalities or error information in the tickets, and automatically issues an alarm. By processing the 4 tickets concurrently, the approval is synchronized and associated, and the processing time is increased by more than 4 times. The 4 tickets are reviewed separately. When one ticket fails the review, it is manually modified and the approval process is re-executed until all 4 tickets have completed the review and passed the process;
[0063] S3. The permit application management unit provides a standardized permit application form for review by relevant personnel, allowing users to upload relevant certification documents and information. The process optimization unit performs data statistics and analysis on the executed process to identify bottlenecks and improvement points. The process management terminal is used to manage access when abnormalities occur in the above process. The compliance inspection unit ensures that all permit applications comply with local laws, regulations and industry standards. The data statistics and analysis unit counts the application and approval time of each ticket, records historical approval data, and analyzes compliance issues and trends. The permit start-up unit manages and controls the start-up permit process for whether the power outage plan is adopted. Through the mobile device view "click on the picture to make a ticket", the focus is on solving the problem of on-site ticket processing on the mobile phone, and realizes "only one trip" for emergency repairs. Based on the on-site mobile phone positioning, a list of nearby equipment will be automatically pushed. Click to select equipment and operation type to automatically generate a power outage work ticket. At the same time, through computer intelligent tools, the power outage area is automatically topologically mapped and the power outage safety measures are automatically compiled. After receiving the review and signature of the work leader, the corresponding power outage safety measures are generated.
[0064] Specifically: In actual applications, there are multiple ticket filling and generating modules, which are used in conjunction with the mobile terminal control module, the process management module and the permit start module respectively. The multiple ticket filling and generating modules are located in different geographical locations. The present invention constructs a complete operation process efficiency management system by setting up the mobile terminal control module, the ticket filling and generating module, the process management module and the permit start module. In actual use, the ticket is filled in at one time through the mobile phone ticket application, and 4 related tickets are automatically generated at one time: power outage application ticket, dispatch order, switching operation ticket, work ticket, and sent to the relevant departments to complete multiple processes and handle the process of 4 tickets at the same time. The process is circulated concurrently, and the approval is synchronously associated. According to the on-site mobile phone positioning, a list of nearby equipment is automatically pushed. Click to select equipment and operation type, and a power outage work ticket is automatically generated. At the same time, through computer intelligent tools, the power outage area is automatically topologically mapped, and the power outage safety measures are automatically compiled. The corresponding power outage safety measures are generated, and multiple ticket data and corresponding filling analysis results are managed, visualized and stored, which helps to realize ticket application and review source management through Internet cloud management and control, and improve the intelligence level of ticket review management. The purpose of the present invention is to provide a method for improving the efficiency of the power outage operation process, with the effects of concurrent circulation, synchronous association, and improved efficiency.
[0065] Those of ordinary skill in the art will appreciate that the modules and method steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0066] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the above-described devices, equipment and modules can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.
[0067] In the several embodiments provided in the present application, it should be understood that the disclosed devices, systems and methods can be implemented in other ways. For example, the system embodiments described above are only schematic. For example, the division of the modules is only a logical function division. There may be other division methods in actual implementation, such as multiple modules or units can be combined or integrated into another device, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some interfaces, devices or equipment, which can be electrical, mechanical or other forms.
[0068] The modules for mobile terminal control, ticket filling and generation, process management, and work permit start-up may or may not be physically separated, and the components displayed as modules may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0069] In addition, each functional module in each embodiment of the present invention may be integrated into one processing module, or each module may exist physically separately, or two or more modules may be integrated into one module.
[0070] If the functions are implemented in the form of software function modules and sold or used as independent products, they can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art or the part of the technical solution, can be embodied in the form of a software product. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, server, or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: various media that can store program instructions, such as a USB flash drive, a mobile hard disk, a read-only storage server, a random access storage server, a magnetic disk or an optical disk.
[0071] In addition, it should be noted that the combination of the various technical features in this case is not limited to the combination described in the claims of this case or the combination described in the specific embodiments. All technical features described in this case can be freely combined or combined in any way unless there is a contradiction between them.
[0072] It should be noted that the above examples are only specific embodiments of the present invention, and the present invention is obviously not limited to the above examples, and there are many similar variations. All variations directly derived or associated from the contents disclosed by the technicians in this field should fall within the protection scope of the present invention.
[0073] The above are only preferred embodiments of the present invention and are not intended to limit the protection scope of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A method for improving the efficiency of a power outage operation process, characterized in that: The specific steps include: S1. Fill out the ticket form once through the mobile phone, and automatically generate 4 related tickets at a time: power outage application ticket, dispatch order, switching operation ticket, and work ticket, and send them to relevant departments to complete multiple processes; S2. Process 4 tickets at the same time and transfer simultaneously, with approvals linked synchronously; S3. Based on the on-site mobile phone positioning, a list of nearby equipment is automatically pushed. Click to select the equipment and operation type, and a power outage work ticket is automatically generated. At the same time, through computer intelligent tools, the power outage area is automatically topologically mapped, the power outage safety measures are automatically compiled, and the corresponding power outage safety measures are generated.
2. The method for improving the efficiency of power outage operation process according to claim 1, characterized in that: The multiple processes in step S1 include review, acceptance, ordering, receiving orders, issuing, permitting, and termination processes.
3. The method for improving the efficiency of power outage operation process according to claim 1, characterized in that: The work ticket filling information in step S1 includes on-site investigation records.
4. The method for improving the efficiency of power outage operation process according to claim 3, characterized in that: In step S2, the four tickets are reviewed separately. If one ticket fails the review, it is manually modified and the approval process is re-executed until all four tickets have passed the review process.
5. The method for improving the efficiency of power outage operation process according to claim 1, characterized in that: In step S3, the person in charge of the work needs to review and sign before generating the corresponding power outage safety measures.
6. The method for improving the efficiency of power outage operation process according to claim 5, characterized in that: The operation process efficiency management system includes a mobile control module, a ticket filling and generating module, a process management module and a permission to start work module. The output end of the ticket filling and generating module is communicatively connected to the input end of the process management module, the output end of the process management module is communicatively connected to the input end of the permission to start work module, and the permission to start work module and the mobile control module are bidirectionally communicatively connected.
7. The method for improving the efficiency of power outage operation process according to claim 6, characterized in that: The mobile terminal control module includes a mobile terminal control unit, a field survey data collection unit and an emergency contact unit, wherein the output ends of the field survey data collection unit and the emergency contact unit are respectively communicatively connected to the input end of the mobile terminal control unit; The mobile terminal control unit is used for remote control and management. Users can remotely control the connected devices through mobile devices, conduct mobile ticket processing and filling operations, and modify ticket orders; The field survey data collection unit is used to collect and process data obtained when surveying the power outage site, collect data from various sensors, instruments and equipment, and monitor the environmental conditions of the site after the power outage in real time; The emergency contact unit is used to allow the user to quickly dial an emergency service number or notify relevant personnel in an emergency.
8. The method for improving the efficiency of power outage operation process according to claim 6, characterized in that: The ticket filling and generating module includes a one-time filling unit, an automatic ticket generating unit and a ticket checking unit. The output end of the one-time filling unit is communicatively connected to the input end of the automatic ticket generating unit, the output end of the automatic ticket generating unit is communicatively connected to the input end of the process management module, and the ticket checking unit is integrated inside the automatic ticket generating unit. The one-time filling unit is used to generate a form, and the information data of four tickets can be covered by filling in only one form; The automatic ticket generation unit is used to automatically create, manage and process 4 tickets. Using the manually predefined ticket template, the user only needs to input the necessary data information, and the system can automatically generate complete 4 tickets; The ticket checking unit is used to review, verify and confirm the generated ticket, identify possible abnormal or erroneous information in the ticket, and automatically issue an alarm.
9. The method for improving the efficiency of power outage operation process according to claim 6, characterized in that: The process management module includes a permit application management unit, a process optimization unit and a process management terminal. The permit application management unit and the process optimization unit are respectively connected to the process management terminal for communication. The output end of the process management terminal is connected to the input end of the permit start module for communication. The license application management unit is used to provide a standardized license application form for review by relevant personnel and allow users to upload relevant certification documents and information; The process optimization unit is used to collect data and analyze the executed process to identify bottlenecks and improvement points; The process management terminal is used to perform access management when an abnormality occurs in the above process.
10. The method for improving the efficiency of power outage operation process according to claim 6, characterized in that: The construction permit module includes a compliance check unit, a data statistics and analysis unit and a construction permit unit, wherein the output end of the compliance check unit is communicatively connected to the input end of the data statistics and analysis unit, and the data statistics and analysis unit is bidirectionally communicatively connected to the construction permit unit; The compliance checking unit is used to ensure that all license applications comply with local laws, regulations and industry standards; The data statistics and analysis unit is used to count the application and approval time of each ticket, record historical approval data, and analyze compliance issues and trends; The construction permit unit is used to manage and control the construction permit process of whether to adopt the power outage plan.