Trench cover plate and electric power product production intelligent management system based on production whole process tracking

By using high-performance concrete body and composite glass fiber reinforced structure in the groove cover plate, and combining with intelligent production management system, the problems of unstable material performance and low production efficiency are solved, and the stability and production efficiency of material performance are improved.

CN119824952APending Publication Date: 2025-04-15JIANGMEN XINHUI DISTRICT TIANHAI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411496198.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-25
Publication Date
2025-04-15

AI Technical Summary

Technical Problem

The existing trench cover material has unstable performance and low production efficiency, making it difficult to use in outdoor environments for a long time. At the same time, there are quality control problems during the production process.

Method used

The reinforced structure consisting of cement, volcanic limestone powder, ceramic fibers, fillers that crush urban solid waste and industrial solid waste into particles, and nest composite glass fiber reinforcement ribs inside it, is produced in combination with an intelligent power product production management system based on full production process tracking.

Benefits of technology

By using the material performance superposition of volcanic ash and solid waste crushed particles and combined with composite glass fiber reinforcement ribs, the material performance stability and production efficiency of the groove cover plate are significantly improved, and the accurate analysis and alarm of production line efficiency is achieved through an intelligent management system, ensuring the improvement of product quality and production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119824952A_ABST
    Figure CN119824952A_ABST
Patent Text Reader

Abstract

The invention discloses a trench cover plate, and belongs to the technical field of electric power products. The concrete block is composed of a concrete body and a reinforcing structure embedded in the concrete body. The concrete main body is prepared from raw materials including cement, volcanic limestone powder, ceramic fibers and filler, and the reinforcing structure is composed of composite glass fiber reinforcing ribs; wherein the filler is from particles formed by crushing urban solid waste and industrial solid waste; the production process of the trench cover plate adopts an electric power product production intelligent management system based on production full-process tracking. The technical effects that the material performance is stable, and the production efficiency is improved are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric power products, and in particular to a trench cover, and more particularly to a trench cover and an intelligent management system for electric power product production based on full production process tracking. Background Art

[0002] The underground trench is excavated and built according to the design requirements, the side walls of the trench are welded with load-bearing angle steel frames and grounded as required, and the underground trench covered with a cover plate is a cable trench. Its purpose is to lay cables in an underground special channel. The cover plate covering the underground special channel for laying cables is called a trench cover or a cable trench cover.

[0003] It can be seen that the trench cover is a type of power product. However, in the process of implementing the technical solution in the prior art, the applicant found that the technical solution in the prior art has the following technical problems:

[0004] Since the trench cover is in an outdoor environment, it is often subject to weather changes, which can easily cause the material performance of the product to deteriorate. In addition, the power product production line is the main workplace for producing power equipment. Even if the hook cover is made of materials with good performance, the production process will affect its quality. If the production quality is ensured by adding production process steps, it may affect the production efficiency. Therefore, the production efficiency and quality of power products are important issues of concern to the relevant industries. Therefore, the production efficiency and quality of trench covers are important issues of concern to the relevant industries. Summary of the invention

[0005] On the one hand, the technical problem to be solved by the present invention is to provide a trench cover, which solves the technical problems of unstable material properties and low production efficiency in the prior art, and at least achieves one of the technical effects of stabilizing material properties and improving production efficiency.

[0006] In order to solve the above technical problems, the technical solution of the present invention is:

[0007] A trench cover, consisting of a concrete body and a reinforcement structure embedded in the concrete body; the concrete body is made of raw materials including cement, volcanic ash rock powder, ceramic fiber and filler, and the reinforcement structure is composed of composite glass fiber reinforcement bars; wherein the filler comes from particles crushed from urban solid waste and industrial solid waste; the production process of the trench cover adopts an intelligent management system for power product production based on full production process tracking.

[0008] Preferably, the raw materials of the concrete body also include graphene oxide, silica fume, aggregate and coral powder; the aggregate comes from at least one of recycled concrete or recycled bricks.

[0009] More preferably, the raw materials of the concrete body also include bio-calcium particles; and the composite glass fiber is composed of glass fiber, carbon fiber and basalt fiber.

[0010] Particularly preferably, the reinforcement structure is composed of inner reinforcement ribs, outer ring reinforcement ribs and steel bars wrapped by the inner reinforcement ribs and outer ring reinforcement ribs; the inner reinforcement ribs and outer ring reinforcement ribs are composed of composite fibers, and the composite fibers are fibers composited from glass fibers, carbon fibers and basalt fibers.

[0011] The power product production intelligent management system based on full production process tracking includes a main control module, a production line combing module, and a production line analysis module;

[0012] The main control module is connected to the production line combing module by signal, and is used to issue control instructions to the production line combing module;

[0013] The production line combing module sequentially numbers each production line i in the production intelligent management system, where i is a positive integer, i=1, 2, ... n; and after receiving the data collection instruction sent by the main control module, the production line combing module collects and obtains the production time information of each production line, and sends the production time information to the production line analysis module to analyze the production efficiency of each production line;

[0014] The production duration information includes the preheating start-up duration value of each production line and the single-round production duration value;

[0015] After receiving the production time information sent by the production line combing module, the production line analysis module comprehensively considers the preheating start time value and the single round production time value to determine the production efficiency of each production line;

[0016] The production line analysis module obtains the production efficiency evaluation coefficient Ei of each production line by calculation. The specific calculation expression is as follows:

[0017]

[0018] In the formula, α 1 , α 2 are the preset proportional coefficients of the preheating start time value and the single round production time value, t 预 i is the preheating start-up duration of the i-th production line, t 轮 i is the single-round production duration of the i-th production line, and m is the total production rounds of the i-th production line;

[0019] The production line analysis module compares the production efficiency evaluation coefficient Ei of each production line with the standard efficiency threshold:

[0020] If the production efficiency evaluation coefficient Ei of each production line is greater than or equal to the standard efficiency threshold, the production line analysis module marks the production line as a primary slow production line and sends the production line information to the data correction module for further analysis and determination of the production line;

[0021] If the production efficiency evaluation coefficient Ei of each production line is less than the standard efficiency threshold, the production line analysis module marks the production line as a normal efficiency production line.

[0022] Preferably, after receiving the primary slow production line sent by the production line analysis module, the data correction module sends a fluctuation information query signal to the production line combing module, and the production line combing module separately collects the fluctuation information of the primary slow production line and sends it to the data correction module; the fluctuation information includes production line environment information and data transmission information, and the production line environment information includes temperature value and humidity value; the data transmission information refers to the data transmission delay value;

[0023] The reinforcement structure also includes steel bars, and the composite glass fiber reinforcement bars and the steel bars together constitute the reinforcement structure; concrete is poured in the reinforcement structure.

[0024] Another problem to be solved by the present invention is to provide an intelligent management system for the production of electric power products based on tracking of the entire production process: the intelligent management system for the production of electric power products based on tracking of the entire production process is applied to the production of trench covers described in any of the above items; wherein, the data correction module of the intelligent management system for the production of electric power products based on tracking of the entire production process.

[0025] Preferably, the data correction module calculates and analyzes the accuracy of the primary slow production line based on the production line environment information and data transmission information.

[0026] Preferably, the specific expression of the calculation is:

[0027]

[0028] Where, T 温 i is the temperature data near the ith production line, T 0 i is the standard temperature data near the ith production line, Rh 温 i is the humidity data near the ith production line, Rh 0 i is the standard humidity data near the i-th production line, Bit 延 i is the data transmission delay value of the i-th production line, Bit 0 i is the standard data transmission delay value of the i-th production line; β 1 , β 2 , β3 are respectively the temperature value, humidity value and data transmission delay value and the preset proportional coefficient; δ i An accurate assessment factor for primary slow production lines.

[0029] Preferably, the data correction module sets the standard accuracy threshold as δ 0 , will accurately evaluate the coefficient δ i Compared with the standard accurate threshold δ 0 Make comparisons;

[0030] If the coefficient δ is accurately estimated i Greater than or equal to the standard accuracy threshold δ 0 , the data correction module sends the calculation expression of the accurate evaluation coefficient to the early warning and control module, and the early warning and control module issues corresponding early warnings based on the deviation status between the production line environment information and the data transmission information.

[0031] Preferably, the data correction module sets the standard accuracy threshold as δ 0 , the data correction module calculates the accuracy evaluation coefficient δ i Compared with the standard accurate threshold δ 0 The ratio is denoted as δ i * , through formula E i * =E i / δ i * , calculate the corrected production efficiency evaluation coefficient E i * , and then the corrected production efficiency evaluation coefficient E i * Compare with standard efficiency thresholds:

[0032] If the corrected production efficiency evaluation coefficient F i * If the value is greater than or equal to the standard efficiency threshold, the data correction module will mark the production line as an inefficient production line and send the production line information to the early warning and control module, which will issue an alarm to the production line.

[0033] If the corrected production efficiency evaluation coefficient E i * If the efficiency is less than the standard threshold, the data correction module will mark the production line as a normal efficiency production line, and there is no need to issue an alarm for the production line.

[0034] One or more technical solutions provided by this application have at least the following technical effects or advantages:

[0035] The above technical solution is composed of a concrete body and a reinforcement structure embedded in the concrete body, and the concrete body is made of raw materials including cement, volcanic ash rock powder, ceramic fiber and filler. The filler comes from particles crushed from urban solid waste and industrial solid waste, and is combined with a reinforcement structure composed of composite glass fiber reinforcement ribs. In the production process, a series of technical means such as the intelligent management system for power product production that tracks the entire production process are adopted. The material properties of volcanic ash are fully utilized to superimpose the filler that is crushed into particles from urban solid waste and industrial solid waste and ceramic fiber, thereby strengthening the material properties of the main part, and further strengthening the material properties of the trench cover through a reinforcement structure composed of composite glass fiber reinforcement ribs. At the same time, the intelligent management system for power product production based on full production process tracking is also used to comprehensively analyze the preheating start time and the time of each production, comprehensively analyze the production efficiency of the production line, and remove the interference of the actual external factors affecting the collection time and the start-up production time on the judgment of production efficiency, accurately judge whether the production line efficiency is compliant, and alarm the production line that does not meet the requirements to prompt the relevant staff to carry out maintenance as soon as possible. The technical problems of unstable material properties and low production efficiency in the prior art are effectively solved, thereby achieving the technical effects of stabilizing material properties and improving production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 It is a structural schematic diagram of the present invention;

[0037] Figure 2 It is a schematic diagram of an enlarged structure of a composite fiber wrapped around a steel bar in the present invention;

[0038] Figure 3 It is a structural schematic diagram of an intelligent management system for power product production based on full production process tracking of the present invention.

[0039] In the figure, 100, concrete body; 200, reinforcement structure; 210, inner reinforcement ribs; 220, outer ring reinforcement ribs; 300, composite reinforcement ribs; 400, steel bars; 500, composite fibers. DETAILED DESCRIPTION

[0040] The specific embodiments of the present invention are further described below in conjunction with the accompanying drawings. It should be noted that the description of these embodiments is used to help understand the present invention, but does not constitute a limitation of the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0041] Ditch covers are located in outdoor environments and are often subject to weather changes. The performance of the main materials of the trench covers is easily weakened. In addition, the production efficiency is also affected by insufficient process control.

[0042] The technical solution of the implementation mode of the present application solves the problems of unstable material properties and low production efficiency in the prior art by providing a trench cover. The beneficial effects of stabilizing material properties and improving production efficiency are achieved by combining volcanic ash rock powder with urban solid waste and industrial solid waste to crush into granular filler and using a reinforcing structure 200 composed of composite reinforcing ribs 300 and adopting an intelligent management system for power product production based on full-process production tracking in the production process.

[0043] The overall idea of ​​the implementation scheme of the present invention to solve the above technical problems is as follows:

[0044] A trench cover is composed of a concrete body 100 and a reinforcement structure 200 nested in the concrete body. The concrete body is made of raw materials including cement, volcanic ash rock powder, ceramic fiber and filler, the filler comes from particles crushed from urban solid waste and industrial solid waste, and is combined with a reinforcement structure composed of composite fiber 500 reinforcement ribs. An intelligent management system for power product production that tracks the entire production process is used during the production process.

[0045] The material properties of volcanic ash are fully utilized, and the fillers made of crushed urban solid waste and industrial solid waste are combined with ceramic fibers to strengthen the material properties of the main part, and the material properties of the trench cover are further strengthened through the reinforcement structure composed of composite glass fiber reinforcement ribs. At the same time, the intelligent management system for power product production based on full production process tracking is used to comprehensively analyze the preheating start time and the time of each production, comprehensively analyze the production efficiency of the production line, and remove the interference of the actual external factors affecting the collection time and the start-up production time on the judgment of production efficiency, accurately judge whether the production line efficiency is compliant, and alarm the production line that does not meet the requirements to prompt the relevant staff to carry out maintenance as soon as possible.

[0046] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.

[0047] One embodiment of the present invention provides a trench cover, such as Figure 1 and Figure 2 As shown, it consists of a concrete body and a reinforcement structure nested in the concrete body; the concrete body is made of raw materials including cement, volcanic ash rock powder, ceramic fiber and filler, and the reinforcement structure is composed of composite glass fiber reinforcement; the filler comes from particles crushed from urban solid waste and industrial solid waste; the production process of the trench cover adopts an intelligent management system for power product production based on full production process tracking.

[0048] Specifically, the raw materials of the concrete body also include graphene oxide, silica fume, aggregates and coral powder; the aggregates come from at least one of recycled concrete or recycled bricks, which reduces resource waste and improves the environmental friendliness of the product. In addition, the coral powder is preferably powder ground from finger-shaped corals to further improve the material performance.

[0049] Specifically, the volcanic ash rock powder is preferably selected from rocks of extinct volcanoes in Enping, Guangdong as raw materials.

[0050] More specifically, the raw materials of the concrete body also include biocalcium particles; the composite fiber 500 is composed of glass fiber, carbon fiber and basalt fiber. The biocalcium particles improve the material properties of the concrete, and the material strength of the concrete is further enhanced by combining the glass fiber, carbon fiber and basalt fiber. The biocalcium particles are preferably selected from oyster shells.

[0051] Specifically, the reinforcement structure is composed of inner reinforcement ribs 210, outer ring reinforcement ribs 220 and steel bars 400 wrapped by the inner reinforcement ribs 210 and the outer ring reinforcement ribs 220; the inner reinforcement ribs 210 and the outer ring reinforcement ribs 220 are composed of composite fibers 500, and the composite fibers 500 are fibers composited from glass fibers, carbon fibers and basalt fibers.

[0052] The steel bars 400 of the reinforcing structure, the composite glass fiber reinforcing bars and the steel bars 400 together constitute a reinforcing structure; concrete is poured in the reinforcing structure.

[0053] The ratio of the raw materials can be adjusted according to the experience in the art. The size of the fibers used in the reinforced structure 200 and the concrete body 100 can also be adjusted according to the experience in the art.

[0054] The material properties of the volcanic ash are fully utilized and superimposed on the filler made of crushed urban solid waste into particles, so as to strengthen the material properties of the main part, and further strengthen the material properties of the trench cover through the reinforcement structure 200 composed of composite glass fiber reinforcement ribs 300. The material properties of the product are strengthened through both materials and structures.

[0055] The embodiments of the present invention also provide an intelligent management system for the production of power products based on full-process tracking of production. The production efficiency of the product production line is determined by comprehensively considering the pre-start time of each production line and the production time of a single product. The production efficiency of the production line is further corrected in combination with the environment and communication status of each production line to ensure that the production efficiency status of each production line is obtained in a timely and accurate manner, so as to enable timely early warning and regulation of problem production lines.

[0056] The invention provides an intelligent management system for electric power product production based on full production process tracking, including the following application examples:

[0057] Example 1

[0058] Figure 3 A schematic diagram of an intelligent management system for power product production based on full-process production tracking of the present invention is given, which specifically includes a main control module, a production line combing module, a production line analysis module, a data correction module and an early warning and control module.

[0059] The main control module is connected to the production line combing module by signal, and is used to issue control instructions to the production line combing module, that is, to send data collection instructions to the production line combing module, so as to collect data and monitor the entire production line.

[0060] The production line combing module numbers each production line i in the production intelligent management system in sequence, where i is a positive integer, i=1, 2, ... n. After receiving the data collection instruction sent by the main control module, the production line combing module collects and obtains the production time information of each production line, and sends the production time information to the production line analysis module for production efficiency analysis of each production line.

[0061] The production duration information includes the preheating start-up duration of each production line and the single-round production duration. The preheating start-up duration refers to the preheating stage required before each production line is put into operation. The purpose of preheating is to ensure that the equipment, machines and systems are at the appropriate temperature to ensure the smooth progress of the production process. Different production lines often have different preheating times due to their respective equipment differences. The longer the preheating time, the lower the production efficiency of the production line. The single-round production duration refers to the average production time used by the production line to produce a batch of power products. Obviously, the larger the single-round production duration, the lower the production efficiency.

[0062] After the production line analysis module receives the production time information sent by the production line combing module, it comprehensively considers the preheating start time value and the single-round production time value to determine the production efficiency of each production line. Specifically, since the production efficiency of the production line is mainly determined by the preheating time and the production time used to produce a batch of power products, when the batch quantity of the produced products is different, the proportion of the two in production is also different, that is, their respective weights are different. Therefore, the production line analysis module obtains the production efficiency evaluation coefficient Ei of each production line through calculation. The specific calculation expression is as follows:

[0063]

[0064] In the formula, α 1 , α 2 are the preset proportional coefficients of the preheating start time value and the single round production time value, t 预 i is the preheating start-up duration of the i-th production line, t 轮 i is the single-round production duration of the i-th production line, and m is the total production rounds of the i-th production line.

[0065] In an alternative example, for α1 , α 2 When the total production time is shorter and the batches of power products produced by the machine are smaller, the preheating start time value has a greater impact on production efficiency. 1 Increases accordingly, on the contrary, α 1 It is getting smaller and smaller.

[0066] That is, the preset ratio of the preheating start time value to the single-round production time value is determined according to the ratio of the preheating start time value to the total production time.

[0067] The present invention can more accurately analyze the production efficiency status of each production line by comprehensively analyzing the preheating start-up time of the production line and the time used for each batch of production.

[0068] Specifically, the production line analysis module compares the production efficiency evaluation coefficient Ei of each production line with the standard efficiency threshold to evaluate whether the production efficiency of each production line meets the requirements.

[0069] If the production efficiency evaluation coefficient Ei of each production line is greater than or equal to the standard efficiency threshold, it means that the production efficiency of the production line does not meet the requirements and the overall time is too long. At this time, the production line analysis module will mark the production line as a primary slow production line and send the production line information to the data correction module for further analysis and determination of the production line.

[0070] If the production efficiency evaluation coefficient Ei of each production line is less than the standard efficiency threshold, it means that the production efficiency of the production line is within the expected requirements. At this time, there is no need to issue an alarm for the production line, and the production line is a normal efficiency production line.

[0071] It should be noted that since the single-round production duration value is the average production time used by the production line to produce a batch of power products, each additional production cycle will have a greater impact on production efficiency, and the single-round production duration value collected in real time will also be different.

[0072] The data correction module is used to perform a secondary check on the primary slow production line marked by the production line analysis module to determine the cause of the low efficiency of the monitored production line.

[0073] Specifically, after the data correction module receives the primary slow production line sent by the production line analysis module, it sends a fluctuation information query signal to the production line combing module. The production line combing module separately collects the fluctuation information of the primary slow production line and sends it to the data correction module.

[0074] Fluctuation information includes production line environment information and data transmission information. Production line environment information refers to the environment information near the primary slow production line, including temperature and humidity values. Different temperatures and humidity in the production line environment will affect the preheating time of the production line. Data transmission information refers to the data transmission delay value. The greater the deviation between the data transmission delay and the standard delay, the less accurate the collected time. The data collection speed is slower than the system processing speed, resulting in data accumulation, which affects the overall time accuracy of the system. If the data collection speed is too fast, the system may not be able to process the data correctly, which will affect the time accuracy. Therefore, the greater the deviation between the data delay and the standard delay, the worse the time accuracy of the collection, and the monitoring results of the production line preheating time and production time will be correspondingly larger.

[0075] Therefore, the data correction module further analyzes the accuracy of the primary slow production line based on the production line environment information and data transmission information, that is, it performs calculation analysis based on the actual production line environment and data transmission status. The specific calculation expression is as follows:

[0076]

[0077] Where, T 温 i is the temperature data near the ith production line, T 0 i is the standard temperature data near the ith production line, Rh 温 i is the humidity data near the ith production line, Rh 0 i is the standard humidity data near the i-th production line, Bit 延 i is the data transmission delay value of the i-th production line, Bit 0 i is the standard data transmission delay value of the i-th production line; β 1 , β 2 , β 3 They are respectively the temperature value, humidity value and data transmission delay value and the preset proportional coefficient. i An accurate assessment factor for primary slow production lines.

[0078] It should be noted that in the above formula, data correction is not performed on all production lines. Only the production line environment information and data transmission information of the primary slow production line are collected and corrected accordingly, which greatly shortens the data processing volume and enables targeted secondary confirmation of the production lines with poor efficiency.

[0079] The data correction module sets the standard accuracy threshold as δ 0 , will accurately evaluate the coefficient δ i Compared with the standard accurate threshold δ0 Compare and determine the exact situation of the primary slow production line.

[0080] If the coefficient δ is accurately estimated i Greater than or equal to the standard accuracy threshold δ 0 , it means that the primary slow production line is subject to large external fluctuation factors. At this time, the data correction module sends the calculation expression of the accurate evaluation coefficient to the early warning and control module. The early warning and control module issues corresponding early warnings based on the deviation status of the production line environment information and the data transmission information. For example, when the influence of the temperature item is too large, a temperature alarm is issued.

[0081] On the contrary, if the coefficient δ is accurately evaluated i Less than the standard accuracy threshold δ 0 , no warning is given.

[0082] Furthermore, the data correction module calculates the accuracy evaluation coefficient δ i Compared with the standard accurate threshold δ 0 ratio, and set this value as δ i * , through formula E i * =E i / δ i * , calculate the corrected production efficiency evaluation coefficient E i * , and then the corrected production efficiency evaluation coefficient E i * Compare with the standard efficiency threshold to evaluate whether the production efficiency of each production line meets the requirements.

[0083] If the corrected production efficiency evaluation coefficient E i * If it is greater than or equal to the standard efficiency threshold, it means that the production efficiency of the production line still does not meet the requirements and the overall time is too long. At this time, the data correction module will mark the production line as an inefficient production line and send the production line information to the early warning and control module. The early warning and control module will issue an alarm prompt to the production line.

[0084] If the corrected production efficiency evaluation coefficient E i * If it is less than the standard efficiency threshold, it means that the actual production efficiency of the production line is within the expected requirements after removing external influences. At this time, the data correction module marks the production line as a normal efficiency production line, and there is no need to issue an alarm for the production line.

[0085] The present invention comprehensively analyzes the preheating start time and the time of each production, comprehensively analyzes the production efficiency of the production line, and removes the interference of actual external factors on the collection time and the start of production time on the judgment of production efficiency, accurately judges whether the production line efficiency is compliant, and alarms the production lines that do not meet the requirements, so as to prompt relevant staff to carry out maintenance as soon as possible.

[0086] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.

[0087] Example 2

[0088] Power products can also include trench covers. Specific requirements for making trench covers from concrete:

[0089] 1. Bearing level

[0090] Concrete covers are divided into two categories according to their application scope: pedestrian cable trench covers and vehicle cable trench covers. The design loads and application sites of different types of covers should be distinguished. The specific parameters are shown in the following table:

[0091]

[0092] 2. Quality requirements

[0093] 1) Concrete:

[0094] C40 and above fine aggregate concrete. The transportation, pouring and curing of concrete shall be strictly required and shall comply with the provisions of the current relevant specifications. Its strength shall comply with the relevant provisions of the national standard "Concrete Strength Inspection and Evaluation Standard" and the certification documents shall be retained for inspection.

[0095] 2) Steel bars:

[0096] The stress-bearing steel bars are HRB400, and the distribution steel bars are HPB300. The thickness of the protective layer is not less than 15mm. The steel bars used should be straight, and there should be no cracks, oil stains, or flaky rust on the surface.

[0097] Strength-bearing steel bars: The diameter of the pedestrian load cover plate reinforcement shall not be less than 10mm, and the diameter of the vehicle load cover plate reinforcement shall not be less than 12mm; distribution steel bars: The diameter shall not be less than 8mm, and the maximum spacing shall not exceed 200mm.

[0098] 3) Frame production and galvanizing:

[0099] The pedestrian cover is made of steel plates bent into L-shaped edging, and the driving cover is made of steel plates bent into C-shaped edging.

[0100] The surface corners of the hemming steel plate are welded after 450 stamping and trimming. The process holes of the C-type hemming steel plate shall not be at the edges.

[0101] The frame is hot-dip galvanized after being made as a whole. It cannot be welded after hot-dip galvanizing to avoid affecting the galvanized layer (except for the welding of frame anchor bars and internal reinforcement of the plate).

[0102] Appearance: The galvanized surface should be smooth and practical, with uniform color and continuous and complete coating. No burrs, nodules or excess lumps are allowed at the joints, and no defects such as over-pickling or exposed iron are allowed.

[0103] Galvanizing adhesion and galvanizing thickness: zinc adhesion should be no less than 460 g / m2, that is, the zinc layer thickness should be no less than 65um;

[0104] Uniformity: The zinc layer of the zinc part should be uniform, and no iron should be exposed after four times of etching with copper sulfate solution;

[0105] Adhesion: The zinc layer of the plated part should be firmly bonded to the base metal, and after a hammer test, the zinc layer should not peel off or bulge.

[0106] 4) Production process:

[0107] The concrete cover slab is required to be manufactured in a factory, using the fair faced concrete construction process, and the process requirements must comply with the "Technical Code for Application of Fair Faced Concrete" (JGJ169).

[0108] 5) Appearance quality:

[0109] The upper surface of the concrete should be smooth; the upper and lower surfaces should be flat and of uniform color, without defects such as honeycombs, rough surfaces, exposed reinforcement, holes, cracks (cracks), and no obvious signs of leakage, flow, scouring or repair.

[0110] For geometric dimensions and allowable deviations, the length deviation of the cover plate less than 1500mm is ±2mm, and the length deviation of the cover plate greater than 1500mm is ±3mm; the width deviation is ±2mm, the thickness deviation is ±3mm, the diagonal deviation is ±3mm, the surface flatness deviation is ±2mm, and the steel bar protection layer thickness deviation is -2mm to +8mm. The outer radius of the C-shaped steel plate is R≤3.5mm.

[0111] 3. Test load (concentrated load), as shown in the following table:

[0112] Cover Type Crack load Destruction load pedestrian 16kN 32kN Driving 112kN 224kN

[0113] The above embodiments can be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented using software, the above embodiments can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer instructions or computer programs. When the computer instructions or computer programs are loaded or executed on a computer, the process or function described in the embodiment of the present application is generated in whole or in part. The computer can be a general-purpose computer, a special-purpose computer, a computer network, or other programmable devices. The computer instructions can be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium. For example, the computer instructions can be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired (e.g., infrared, wireless, microwave, etc.). The computer-readable storage medium can be any available medium that a computer can access or a data storage device such as a server or data center that contains one or more available media sets. The available medium can be a magnetic medium (e.g., a floppy disk, a hard disk, a tape), an optical medium (e.g., a DVD), or a semiconductor medium. The semiconductor medium can be a solid-state hard disk.

[0114] Those of ordinary skill in the art will appreciate that the modules and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.

[0115] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. For example, the device embodiments described above are only schematic. For example, the division of the modules is only a logical function division. There may be other division methods in actual implementation, such as multiple modules or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or modules, which can be electrical, mechanical or other forms.

[0116] In addition, each functional module in each embodiment of the present application may be integrated into one processing module, or each module may exist physically separately, or two or more modules may be integrated into one module.

[0117] The embodiments of the present invention are described in detail above with reference to the accompanying drawings, but the present invention is not limited to the described embodiments. For those skilled in the art, various changes, modifications, substitutions and variations of these embodiments are made without departing from the principles and spirit of the present invention, and still fall within the scope of protection of the present invention.

Claims

1. A trench cover, characterized in that: It consists of a concrete body and a reinforcement structure embedded in the concrete body; the concrete body is made of raw materials including cement, volcanic ash rock powder, ceramic fiber and filler, and the reinforcement structure is composed of composite glass fiber reinforcement bars; wherein the filler comes from particles crushed from urban solid waste and industrial solid waste; the production process of the trench cover adopts an intelligent management system for power product production based on full production process tracking.

2. The trench cover according to claim 1, characterized in that: The raw materials of the concrete body also include graphene oxide, silica fume, aggregate and coral powder; the aggregate comes from at least one of recycled concrete or recycled bricks.

3. The trench cover according to claim 2, characterized in that: The raw materials of the concrete body also include biological calcium particles; the composite glass fiber is composed of glass fiber, carbon fiber and basalt fiber.

4. The trench cover according to any one of claims 1 to 3, characterized in that: The reinforcement structure is composed of inner reinforcement ribs, outer ring reinforcement ribs and steel bars wrapped by the inner reinforcement ribs and the outer ring reinforcement ribs; the inner reinforcement ribs and the outer ring reinforcement ribs are composed of composite fibers, which are composite fibers of glass fibers, carbon fibers and basalt fibers; The power product production intelligent management system based on full production process tracking includes a main control module, a production line combing module, and a production line analysis module; The main control module is connected to the production line combing module by signal, and is used to issue control instructions to the production line combing module; The production line combing module sequentially numbers each production line i in the production intelligent management system, where i is a positive integer, i=1, 2, ... n; and after receiving the data collection instruction sent by the main control module, the production line combing module collects and obtains the production time information of each production line, and sends the production time information to the production line analysis module to analyze the production efficiency of each production line; The production duration information includes the preheating start-up duration value of each production line and the single-round production duration value; After receiving the production time information sent by the production line combing module, the production line analysis module comprehensively considers the preheating start time value and the single round production time value to determine the production efficiency of each production line; The production line analysis module obtains the production efficiency evaluation coefficient Ei of each production line by calculation. The specific calculation expression is as follows: Where α1 and α2 are the preset proportional coefficients of the preheating start time value and the single round production time value, respectively. 预 i is the preheating start-up duration of the i-th production line, t 轮 i is the single-round production duration of the i-th production line, and m is the total production rounds of the i-th production line; The production line analysis module compares the production efficiency evaluation coefficient Ei of each production line with the standard efficiency threshold: If the production efficiency evaluation coefficient Ei of each production line is greater than or equal to the standard efficiency threshold, the production line analysis module marks the production line as a primary slow production line and sends the production line information to the data correction module for further analysis and determination of the production line; If the production efficiency evaluation coefficient Ei of each production line is less than the standard efficiency threshold, the production line analysis module marks the production line as a normal efficiency production line.

5. The trench cover according to claim 4, characterized in that: After receiving the primary slow production line sent by the production line analysis module, the data correction module sends a fluctuation information query signal to the production line combing module. The production line combing module separately collects the fluctuation information of the primary slow production line and sends it to the data correction module; the fluctuation information includes production line environment information and data transmission information, and the production line environment information includes temperature value and humidity value; the data transmission information refers to the data transmission delay value; The reinforcement structure also includes steel bars, and the composite glass fiber reinforcement bars and the steel bars together constitute the reinforcement structure.

6. An intelligent management system for power product production based on full production process tracking, characterized by: Applicable to the production of trench covers as described in any one of claims 1-5; wherein, the data correction module of the intelligent management system for power product production based on full production process tracking.

7. The intelligent management system for power product production according to claim 6 is characterized by: The data correction module calculates and analyzes the accuracy of the primary slow production line based on the production line environment information and data transmission information.

8. The intelligent management system for electric power product production based on full production process tracking according to claim 7 is characterized in that: The specific expression of the calculation is: Where, T 温 i is the temperature data near the ith production line, T0 i is the standard temperature data near the ith production line, Rh 湿 i is the humidity data near the i-th production line, RH0 i is the standard humidity data near the i-th production line, Bit 延 i The data transmission delay value of the i-th production line, Bit0 i is the standard data transmission delay value of the i-th production line; β1, β2, and β3 are the temperature value, humidity value, and data transmission delay value and the preset proportional coefficient respectively; δ i An accurate assessment factor for primary slow production lines.

9. The intelligent management system for electric power product production based on full production process tracking according to claim 8 is characterized in that: The data correction module sets the standard accuracy threshold as δ0 and the accuracy evaluation coefficient δ i Compare with the standard accurate threshold δ0; If the coefficient δ is accurately estimated i If it is greater than or equal to the standard accuracy threshold δ0, the data correction module sends the calculation expression of the accuracy evaluation coefficient to the early warning control module, and the early warning control module issues a corresponding early warning based on the deviation status between the production line environment information and the data transmission information.

10. The intelligent management system for electric power product production based on full production process tracking according to claim 8 is characterized in that: The data correction module sets the standard accuracy threshold as δ0, and the data correction module calculates the accuracy evaluation coefficient δ i The ratio is δ0, which is the standard accurate threshold value, and the ratio is calibrated as δ i * , through formula E i * =E i / δ i * , calculate the corrected production efficiency evaluation coefficient E i * , and then the corrected production efficiency evaluation coefficient E i * Compare with standard efficiency thresholds: If the corrected production efficiency evaluation coefficient E i * If the value is greater than or equal to the standard efficiency threshold, the data correction module will mark the production line as an inefficient production line and send the production line information to the early warning and control module, which will issue an alarm to the production line. If the corrected production efficiency evaluation coefficient E i * If the efficiency is less than the standard threshold, the data correction module will mark the production line as a normal efficiency production line, and there is no need to issue an alarm for the production line.