Ultrahigh-pressure hose joint assembly process and ultrahigh-pressure hose joint assembly

By installing the connection head on the main body of the hose joint in the ultra-high pressure hose joint assembly process, forming a moving channel and installing positioning components, the problem of thread retraction and leakage in the high-frequency vibration environment in the prior art is solved, and higher pressure resistance and sealing performance are achieved.

CN119826011APending Publication Date: 2025-04-15SHANGHAI FURIX PETROCHEMICAL CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202510219179.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-26
Publication Date
2025-04-15

AI Technical Summary

Technical Problem

The existing ultra-high pressure hose joint assembly process cannot meet the use requirements and assembly requirements for large pressure fluctuations or high-frequency vibrations in the use environment, resulting in thread retraction, leakage and external dust entering the joint, causing hydraulic system failure.

Method used

An ultra-high pressure hose joint assembly process is adopted. By attaching the connection head on the hose joint main body, a moving channel is formed, and positioning components are installed in the moving channel, glue is injected into the gap between the connection head and the hose joint main body and vulcanized to form a stable sealing structure.

Benefits of technology

It effectively avoids relative displacement of the connector in pressure fluctuations or high-frequency vibration environments, prevents thread retraction and seal damage, improves the pressure resistance and sealing performance of the connector, and reduces maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119826011A_ABST
    Figure CN119826011A_ABST
Patent Text Reader

Abstract

The invention provides an ultrahigh-pressure hose connector assembling process and an ultrahigh-pressure hose connector assembly.The ultrahigh-pressure hose connector assembling process comprises the steps that a hose connector body is sleeved with a connector, so that after the connector and the hose connector body are sleeved in place, a moving channel used for installing a positioning component is formed between the connector and the hose connector body; the positioning part is installed in the formed moving channel; and glue is injected into a gap between the connector and the hose connector body, then vulcanization treatment is conducted, and the ultrahigh-pressure hose connector assembly is obtained. According to the ultrahigh-pressure hose connector assembling technology, the technical problem that the ultrahigh-pressure hose connector assembling technology in the related technology cannot meet the use requirement and the assembling requirement of large pressure fluctuation or high-frequency vibration in the use environment is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of hydraulic pipeline joint assembly, and in particular to an ultra-high pressure hose joint assembly process and an ultra-high pressure hose joint assembly. Background Art

[0002] With the development of mining machinery, petroleum equipment, metallurgical forging, chemical industry, shipbuilding and other equipment technologies, ultra-high pressure hoses are increasingly used to transport fluid media with high pressure and a certain temperature. The maximum pressure resistance can reach 200MPa. Under more stringent conditions, the pressure resistance performance requirements are even higher. When the traditional hoses and hose joints and assembly processes are used in the use environment with large pressure fluctuations or high-frequency vibrations, the hose joints will have thread stripping, which is difficult to meet the requirements of resistance to ultra-high pressure pulsation and ultra-high pressure. The connection between the hose joint and the hose is prone to failure and leakage, which leads to joint leakage. At the same time, after the hose joints obtained by the traditional assembly process have been used for a period of time, the dust in the external environment will also enter the hose while leaking, causing hydraulic system failure, further increasing the cost of maintenance and overhaul. The existing ultra-high pressure hose joint assembly process cannot meet the use needs and assembly requirements with large pressure fluctuations or high-frequency vibrations in the use environment.

[0003] Therefore, the prior art needs to be further developed. Summary of the invention

[0004] The purpose of the present invention is to overcome the above-mentioned technical deficiencies and provide an ultra-high pressure hose joint assembly process to solve the technical problem that the ultra-high pressure hose joint assembly process in the related technology cannot meet the use needs and assembly requirements of the use environment with large pressure fluctuations or high-frequency vibrations.

[0005] In order to achieve the above technical objectives, the present invention adopts the following technical solutions: providing an ultra-high pressure hose connector assembly process, comprising: inserting a connector onto a hose connector body, so that after the connector and the hose connector body are inserted into place, a movable channel for installing a positioning component is formed between the connector and the hose connector body; installing the positioning component in the formed movable channel; injecting glue into the gap between the connector and the hose connector body, and then performing a vulcanization treatment to obtain an ultra-high pressure hose connector assembly.

[0006] Furthermore, the connecting head is sleeved on the hose connector body so that after the connecting head and the hose connector body are sleeved in place, a movable channel for installing a positioning component is formed between the connecting head and the hose connector body, including the following steps: sleeve the connecting head on the hose connector body; align the limiting groove on the connecting head with the positioning groove on the hose connector body, so that after the connecting head and the hose connector body are sleeved in place, a movable channel is formed between the connecting head and the hose connector body.

[0007] Furthermore, the positioning component is installed in the formed moving channel, including the following steps: installing multiple positioning components into the moving channel in sequence through the mounting holes on the connecting head; when all the positioning components are installed, using the blocking piece to block the mounting holes.

[0008] Furthermore, before the connecting head is mounted on the hose connector body, the following steps are included: preparing a hose without an outer rubber layer, and sequentially mounting a first crimping sleeve and a core shaft on the hose without an outer rubber layer; fixing the hose without an outer rubber layer to the first crimping sleeve and the core shaft respectively; and winding a winding material onto the surface of the hose without an outer rubber layer to form the hose connector body.

[0009] Furthermore, the winding material is wound onto the surface of the hose without the outer rubber layer to form the hose connector body, which includes the following steps: the winding material is wound layer by layer onto the surface of the hose without the outer rubber layer, thereby forming multiple layers of winding material layers on the hose, and a layer of middle rubber is wound on the surface of each layer of winding material layer.

[0010] Furthermore, the wrapping material is wrapped layer by layer onto the surface of the hose without an outer rubber layer, thereby forming multiple layers of wrapping material on the hose, and a layer of middle rubber is wound on the surface of each layer of wrapping material, including the following steps: at least one layer of wrapping material is distributed on each boss on the core shaft, and at least one layer of wrapping material is fixedly connected to the corresponding boss.

[0011] Furthermore, before the connector is sleeved onto the hose connector body, the following steps are included: sleeved the second pressing sleeve onto the hose connector body.

[0012] Furthermore, after the positioning component is installed in the formed moving channel, the following steps are included: the second pressing sleeve is fixedly connected to the connecting head and the hose connector body respectively.

[0013] Furthermore, injecting glue into the gap between the connector and the hose connector body comprises the following steps: injecting glue into the gap between the connector and the hose connector body through the glue injection hole to form a middle glue layer until the glue emitting hole continuously overflows the glue until there are no bubbles; and sealing the glue injection hole and the glue emitting hole with a plug.

[0014] An ultra-high pressure hose connector assembly is manufactured by the ultra-high pressure hose connector assembly process. Beneficial effects: During the assembly process of the hose connector, the positioning component is installed in the moving channel between the connecting head and the hose connector body, so that the positioning component is located inside the connector assembly, and the relative position between the connecting head and the hose connector body is restricted from the inside out, so that the relative position between the connecting head and the hose connector body remains unchanged. When there is a large pressure fluctuation or high-frequency vibration in the use environment, the connecting head and the hose connector body are prevented from performing irregular movements under the action of external forces, and relative displacement of the connector is prevented from causing thread stripping, resulting in damage or failure of the seal. The technical problem that the assembly process of the ultra-high pressure hose connector in the related art cannot meet the use needs and assembly requirements in the use environment with large pressure fluctuations or high-frequency vibrations is solved. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 is a flow chart of an ultra-high pressure hose connector assembly process used in an embodiment of the present invention; Figure 2 is a schematic structural diagram of an ultra-high pressure hose connector assembly used in an embodiment of the present invention; Figure 3 It is a partial structural schematic diagram of an ultra-high pressure hose connector assembly used in an embodiment of the present invention.

[0016] The above drawings include the following reference numerals: 1. Joint assembly; 11. Mandrel; 111. Positioning groove; 112. Snap-fit ​​groove; 113. Boss; 114. Sealing groove; 12. Connector; 121. Limiting groove; 122. Mounting hole; 123. Blocking piece; 124. Abutment portion; 125. First glue-containing groove; 126. Glue injection hole; 127. Glue-emerging hole; 128. Groove; 13. Positioning component; 14. First pressing sleeve; 141. Second glue-containing groove; 142. Snap-fit ​​block; 15. Second pressing sleeve; 151. Boss; 2. Tube body; 21. Wrapping material layer; 22. Middle glue layer; 3. Sealing ring. DETAILED DESCRIPTION

[0017] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0018] According to an embodiment of the present invention, an ultra-high pressure hose connector assembly process is provided. Figures 1 to 3, including: fitting the connector 12 onto the hose connector body, so that after the connector 12 and the hose connector body are fitted in place, a moving channel for installing the positioning component 13 is formed between the connector 12 and the hose connector body; installing the positioning component 13 in the formed moving channel; injecting glue into the gap between the connector 12 and the hose connector body, and then performing vulcanization treatment to obtain an ultra-high pressure hose connector assembly.

[0019] Specifically, the ultra-high pressure hose connector assembly includes a connector component 1 and a pipe body 2. The connector component 1 includes a core shaft 11 and a connector 12. The hose connector body is assembled from the core shaft 11 and a hose without an outer rubber layer.

[0020] Through the above-mentioned assembly process, during the assembly process of the hose connector, the positioning component 13 is installed in the moving channel between the connecting head 12 and the hose connector body, so that the positioning component 13 is located inside the connector assembly 1, and the relative position between the connecting head 12 and the hose connector body is restricted from the inside to the outside, so that the relative position between the connecting head 12 and the hose connector body remains unchanged, and when the use environment has large pressure fluctuations or high-frequency vibrations, the two parts of the connecting head and the hose connector body are prevented from performing irregular movements under the action of external forces, and the relative displacement of the connector is prevented from causing thread stripping, resulting in damage or failure of the seal, thereby solving the technical problem that the assembly process of the ultra-high pressure hose connector in the related art cannot meet the use needs and assembly requirements of the use environment with large pressure fluctuations or high-frequency vibrations; in addition, the above-mentioned assembly process reduces the installation difficulty of the positioning component 13 and improves the assembly efficiency of the ultra-high pressure hose connector.

[0021] In the ultra-high pressure hose connector assembly process of this embodiment, vulcanization is performed after the glue injection is completed, and the glue and the connector 12 and the glue and the hose connector body are bonded together, so that the injected glue is vulcanized and shaped to form a stable sealing structure.

[0022] In the ultra-high pressure hose connector assembly process of this embodiment, see Figure 2 , the connector 12 is mounted on the hose connector body so that after the connector 12 and the hose connector body are mounted in place, a moving channel for installing the positioning component 13 is formed between the connector 12 and the hose connector body, including the following steps: the connector 12 is mounted on the hose connector body; the limiting groove 121 on the connector 12 is aligned with the positioning groove 111 on the hose connector body, so that after the connector 12 and the hose connector body are mounted in place, a moving channel is formed between the connector 12 and the hose connector body.

[0023] Specifically, when the positioning groove 111 is opened on the core shaft 11, the axes of the core shaft 11 and the connector 12 can always remain concentric, so that the connector 12 will not move relative to the core shaft 11 along the axial direction, thereby realizing axial positioning and radial positioning of the connector 12, and by aligning the limiting groove 121 with the positioning groove 111, the positioning component 13 can enter the moving channel and be squeezed in the moving channel, thereby realizing the limiting effect of the positioning component 13 on the connector 12 and the hose connector body respectively.

[0024] Specifically, the movable channel is used to accommodate the positioning component 13, and the positioning component 13 is interference fit with the movable channel, and the positioning component 13 is respectively abutted against the positioning groove 111 and the limit groove 121, so that the positioning component 13 is embedded in the movable channel, preventing the positioning component 13 from moving back and forth in the movable channel and causing the connector 12 and the core shaft 11 to be misaligned, thereby realizing the circumferential positioning, axial positioning and radial positioning of the connector 12, and further improving the sealing performance of the hose connector.

[0025] In the ultra-high pressure hose connector assembly process of this embodiment, see Figure 3 , installing the positioning component 13 in the formed moving channel includes the following steps: installing multiple positioning components 13 in the moving channel in sequence through the mounting holes 122 located on the connector 12; when all the multiple positioning components 13 are installed, the mounting holes 122 are blocked by the blocking piece 123. Specifically, the multiple positioning components 13 are all located in the moving channel, and the multiple positioning components 13 increase the contact area between the positioning components 13 and the moving channel, further preventing the relative displacement between the connector 12 and the core shaft 11, and further improving the sealing performance between the joint assembly 1 and the pipe body 2; when all the multiple positioning components 13 are installed, the mounting holes 122 are blocked by the blocking piece 123 to complete the fixation of the positioning components 13, so as to prevent the positioning components 13 from falling out of the mounting holes 122.

[0026] In addition, since the positioning component 13 is interference fit with the moving channel, it is difficult for the positioning component 13 to move in the moving channel. Therefore, when installing the positioning component 13, it is necessary to use external force to knock the positioning component 13 into the moving channel.

[0027] In the ultra-high pressure hose connector assembly process of this embodiment, see Figure 3Before the connector 12 is mounted on the hose connector body, the following steps are included: prepare a hose without an outer rubber layer, mount the first crimping sleeve 14 and the core shaft 11 on the hose without an outer rubber layer in sequence; fix the hose without an outer rubber layer to the first crimping sleeve 14 and the core shaft 11 respectively; and wrap the winding material around the surface of the hose without an outer rubber layer to form the hose connector body. Through the above assembly process, the core shaft 11 and the hose without an outer rubber layer are connected as a whole, so that the first crimping sleeve 14 is embedded in the multi-layer winding material layer 21, thereby increasing the structural strength of the tube body 2.

[0028] Specifically, a crimping process, a threaded connection process or the like may be used to fix the hose without the outer rubber layer to the first crimping sleeve 14 and the core shaft 11 , respectively.

[0029] Specifically, the hose without an outer rubber layer is a pipe body 2 that only includes at least one layer of winding material 21 .

[0030] In some embodiments, an existing hose connector can be directly used to prepare a hose without an outer rubber layer. The corresponding connector assembly 1 peels off part of the outer rubber layer and the inner rubber layer of the existing hose connector, peels off the winding material layer 21 located on the outer layer, and only retains at least one layer of the winding material layer 21. The retained at least one layer of the winding material layer 21 is also wrapped with a layer of middle rubber.

[0031] In some embodiments, the core shaft 11 and the first buckling sleeve 14 are connected by a snap-fit ​​structure, and the snap-fit ​​structure includes: a snap-fit ​​groove 112, which is provided on the core shaft 11; a snap-fit ​​block 142, which is provided on the first buckling sleeve 14, and the snap-fit ​​block 142 is snap-fitted with the snap-fit ​​groove 112. By providing the snap-fit ​​structure, the snap-fit ​​block 142 is snapped into the snap-fit ​​groove 112, and the first buckling sleeve 14 can be "hung" on the core shaft 11, so that the first buckling sleeve 14 and the core shaft 11 become one, and then the tube body 2 and the core shaft 11 become one, thereby increasing the connection strength between the tube body and the core shaft 11, and preventing the tube body 2 from falling off from the joint assembly 1. Therefore, before the hose without the outer rubber layer is fixedly connected to the first buckling sleeve 14 and the core shaft 11 respectively, it is necessary to first snap the snap-fit ​​block 142 into the snap-fit ​​groove 112.

[0032] In some embodiments, the winding material layer 21 is a steel wire layer having strong strength and flexibility.

[0033] In the ultra-high pressure hose connector assembly process of this embodiment, see Figure 3The winding material is wound onto the surface of the hose without the outer rubber layer to form the hose connector body, which includes the following steps: the winding material is wound layer by layer onto the surface of the hose without the outer rubber layer, thereby forming a plurality of winding material layers 21 on the hose, and a layer of middle rubber is wound on the surface of each winding material layer 21. Through the above arrangement, a structure of one layer of winding material and one layer of middle rubber is formed, further improving the sealing performance of the hose connector.

[0034] In the ultra-high pressure hose connector assembly process of this embodiment, see Figure 3 , winding the winding material layer by layer onto the surface of the hose without the outer rubber layer, thereby forming multiple winding material layers 21 on the hose, and each winding material layer 21 is wound with a layer of middle rubber on the surface, including the following steps: at least one winding material layer 21 is distributed on each boss 113 located on the core shaft 11, and at least one winding material layer 21 is fixedly connected to the corresponding boss 113. Through the above-mentioned assembly process, the winding material layer 21 is fixedly connected to the boss 113, and each winding material layer 21 is fixedly connected to the corresponding boss 113, further increasing the connection strength between the pipe body 2 and the joint assembly 1, and preventing the pipe body 2 and the joint assembly 1 from falling off due to the impact of high-pressure liquid.

[0035] Preferably, when the winding material layer 21 is a steel wire layer, the winding material layer 21 is welded to the boss 113 by spot welding.

[0036] In the ultra-high pressure hose connector assembly process of this embodiment, see Figure 3 Before the connector 12 is mounted on the hose connector body, the following steps are included: the second pressing sleeve 15 is mounted on the hose connector body. Through the above process, the second pressing sleeve 15 is mounted before the connector 12 is installed, so as to avoid affecting the installation of the second pressing sleeve 15 after the connector 12 is installed.

[0037] In the ultra-high pressure hose connector assembly process of this embodiment, see Figure 3 After the positioning component 13 is installed in the formed moving channel, the following steps are included: the second pressing sleeve 15 is fixedly connected to the connector 12 and the hose connector body respectively. Specifically, after the positioning component 13 is installed, the second pressing sleeve 15 is fixedly connected to the connector 12 and the hose connector body respectively as a whole by using a pressing process or a threaded connection process.

[0038] Specifically, the second crimping sleeve 15 is connected to the connector 12 via a crimping structure, which includes a protrusion 151 and a groove 128. The protrusion 151 and the groove 128 are respectively arranged on the second crimping sleeve 15 and the connector 12. Therefore, before the second crimping sleeve 15 is fixedly connected to the connector 12 and the hose connector body, the protrusion 151 needs to be embedded in the groove 128 first, so as to further improve the connection strength between the connector assembly 1 and the pipe body 2.

[0039] In the ultra-high pressure hose connector assembly process of this embodiment, see Figure 3 , injecting glue into the gap between the connector 12 and the main body of the hose connector, including the following steps: injecting glue into the gap between the connector 12 and the main body of the hose connector through the glue injection hole 126 to form a middle glue layer 22, until the glue emitting hole 127 continuously overflows the glue until there are no bubbles; and using a plug to seal the glue injection hole 126 and the glue emitting hole 127. Glue is injected into the gap between the connector 12 and the main body of the hose connector through the glue injection hole 126 to form a middle glue layer 22 between the connector 12 and the main body of the hose connector. The glue bonds each layer of the winding material and each layer of the middle glue into a whole, so that the multiple winding material layers 21 are embedded in the middle glue layer 22, thereby increasing the sealing performance between the connector assembly 1 and the tube body 2. By checking the glue emitting condition of the glue emitting hole 127, it is ensured that enough colloid can be injected into the gap, and the middle glue layer 22 is ensured to be fully formed to prevent affecting the sealing performance of the connector. By using a plug to seal the glue injection hole 126 and the glue emitting hole 127, waterproofing and dustproofing are achieved, and the sealing performance of the ultra-high pressure hose connector is further ensured.

[0040] In the ultra-high pressure hose connector assembly process of this embodiment, before the connector 12 is mounted on the hose connector body, the following steps are included: sealing is performed between the connector 12 and the core shaft 11, and the sealing ring 3 is assembled into the sealing groove 114 on the core shaft 11. Specifically, leakage between the connector 12 and the core shaft 11 can be prevented, thereby increasing the sealing performance of the connector.

[0041] An ultra-high pressure hose connector assembly is manufactured by the ultra-high pressure hose connector assembly process.

[0042] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3The ultra-high pressure hose connector assembly includes a connector component 1 and a tube body 2. The connector component 1 includes: a core shaft 11, the outer side of the core shaft 11 is sleeved with the tube body 2, and the core shaft 11 is connected to the tube body 2; a connector 12, an installation space for inserting the tube body 2 is formed between the connector 12 and the core shaft 11, the connector 12 is fixedly connected to the outer side of the tube body 2 located in the installation space, and at least part of the connector 12 is sleeved on the core shaft 11; a positioning component 13, the positioning component 13 is located at the connection between the core shaft 11 and the connector 12, and the positioning component 13 is used to limit the relative position between the connector 12 and the core shaft 11.

[0043] The ultra-high pressure hose connector assembly process of the present embodiment is used to complete the assembly process of the ultra-high pressure hose connector. The relative position between the connector 12 and the core shaft 11 is limited by the positioning component 13, so that the relative position between the connector 12 and the core shaft 11 remains unchanged. When there is a large pressure fluctuation or high-frequency vibration in the use environment, the connector 12 and the core shaft 11 are prevented from performing irregular movement under the action of external force. The above-mentioned arrangement realizes anti-loosening treatment, avoids relative displacement of the connector resulting in thread backing, causing damage or failure of the seal, and further causing a decrease in the sealing ability, thereby maintaining the sealing between the connector assembly 1 and the tube body 2, so that it can indeed work stably and efficiently in a high-pressure, high-frequency vibration environment, so that the ultra-high pressure hose connector meets the use requirements of resistance to ultra-high pressure pulsation and ultra-high pressure, and solves the technical problem that the ultra-high pressure hose connector assembly process in the related art cannot meet the use needs and assembly requirements in the use environment with large pressure fluctuations or high-frequency vibrations.

[0044] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3 A positioning groove 111 is provided on the core shaft 11, one end of the positioning component 13 abuts against the connecting head 12, and the other end of the positioning component 13 abuts against the positioning groove 111; the connecting head 12 includes a limiting groove 121 arranged corresponding to the positioning groove 111, the limiting groove 121 abuts against the positioning component 13, and the limiting groove 121 and the positioning groove 111 together enclose a moving channel for accommodating the positioning component 13, and the positioning component 13 and the moving channel have an interference fit. Specifically, the positioning component 13 is respectively abutted against the positioning groove 111 and the limiting groove 121, and the positioning component 13 is embedded in the positioning groove 111 and the limiting groove 121, thereby limiting the axial movement and radial movement of the connecting head 12, so that the axis of the core shaft 11 and the connecting head 12 always remain concentric, so that the connecting head 12 will not move relative to the core shaft 11 along the axial direction, thereby realizing the axial positioning and radial positioning of the connecting head 12; by setting the limiting groove 121, the area of ​​the abutment surface between the positioning component 13 and the connecting head 12 is increased, thereby further limiting the relative position of the connecting head 12.

[0045] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3The limiting groove 121 and the positioning groove 111 form a moving channel, and the moving channel is used to accommodate the positioning component, and the positioning component 13 is interference fit with the moving channel to prevent the positioning component 13 from moving back and forth in the moving channel and causing the connector 12 and the core shaft 11 to be misaligned, thereby realizing the circumferential positioning, axial positioning and radial positioning of the connector 12, and further improving the sealing performance of the hose connector.

[0046] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3 The connector 12 includes: a mounting hole 122, which passes through the connector 12 and is in communication with the moving channel, and the positioning component 13 enters the moving channel through the mounting hole 122; and a blocking member 123, which is detachably connected to the mounting hole 122. Specifically, the mounting hole 122 is used to allow the positioning component 13 to enter the moving channel, and the blocking member 123 is used to block the mounting hole 122 to prevent the positioning component 13 from falling out of the mounting hole 122.

[0047] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3 The positioning component 13 includes a plurality of positioning components 13, all of which are located in the moving channel. The plurality of positioning components 13 increases the contact area between the positioning component 13 and the moving channel, further preventing the relative displacement between the connector 12 and the core shaft 11, and further improving the sealing performance between the joint assembly 1 and the pipe body 2. In addition, since the positioning component 13 and the moving channel have an interference fit, it is difficult for the positioning component 13 to move in the moving channel, so a plurality of mounting holes 122 are provided on the connector 12 to reduce the moving distance of the positioning component 13 in the moving channel, so as to facilitate the assembly of the positioning component 13.

[0048] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3 The blocking member 123 is provided with an abutting portion 124 for abutting against the positioning member 13. Specifically, the abutting portion 124 is a spherical surface that conforms to the positioning member 13 to increase the contact area between the abutting portion 124 and the positioning member 13, thereby limiting the positioning member 13 located at the mounting hole 122 and preventing the positioning member 13 from moving.

[0049] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3 The tube body 2 includes a plurality of winding material layers 21 and a middle rubber layer 22 coated with the plurality of winding material layers 21; a first rubber containing groove 125 is provided on a side of the connector 12 close to the tube body 2, and at least a portion of the middle rubber layer 22 is located in the first rubber containing groove 125. Specifically, the first rubber containing groove 125 is provided to accommodate a portion of the middle rubber layer, thereby increasing the gripping force on the middle rubber layer and increasing the connection strength between the connector 12 and the tube body 2.

[0050] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3 The tube body 2 also includes an inner rubber layer and an outer rubber layer arranged on both sides of the inner and outer sides of the middle rubber layer 22 .

[0051] In some embodiments, the winding material layer 21 is a steel wire layer having strong strength and flexibility.

[0052] In some embodiments, the steel wire layer in the tube body 2 can be replaced by non-metallic materials such as carbon fiber filaments or ceramic materials. The use of non-metallic materials can also meet the requirements of the tube body 2 for strength and toughness, reduce the weight of the tube body 2, and improve the corrosion resistance and high temperature resistance of the tube body 2. At the same time, it can not be detected by metal detectors in special application environments, which has special application significance.

[0053] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3 The joint assembly 1 includes a first pressing sleeve 14, which is embedded in the multi-layer winding material layer 21. Specifically, by providing the first pressing sleeve 14, the first pressing sleeve 14 is embedded in the multi-layer winding material layer 21, and the structural strength of the pipe body 2 is increased.

[0054] Specifically, a winding material layer 21 is laid on the side of the first crimping sleeve 14 away from the core shaft 11, and a plurality of second glue-containing grooves 141 are opened on the side of the first crimping sleeve 14 close to the core shaft 11. There is at least one layer of steel wire ring and at least part of the middle rubber layer 22 between the first crimping sleeve 14 and the core shaft 11. The first crimping sleeve 14 is embedded in the tube body 2 before the middle rubber layer 22 is formed, so that the connection between the first crimping sleeve 14 and the tube body 2 is stable, preventing the first crimping sleeve 14 from loosening and falling off.

[0055] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3 The mandrel 11 and the first pressing sleeve 14 are connected by a clamping structure, and the clamping structure includes: a clamping groove 112, which is provided on the mandrel 11; a clamping block 142, which is provided on the first pressing sleeve 14, and the clamping block 142 is clamped with the clamping groove 112. Through the above arrangement, by providing the clamping structure, the clamping block 142 is clamped into the clamping groove 112 through the clamping process, and the first pressing sleeve 14 can be "hung" on the mandrel 11, so that the first pressing sleeve 14 and the mandrel 11 become one, and then the pipe body 2 and the mandrel 11 become one, which increases the connection strength between the pipe body and the mandrel 11, and prevents the pipe body 2 and the joint assembly 1 from falling off.

[0056] It can be understood that the connection between the tube body 2 and the joint assembly 1 is a critical flow-through position. By setting the first clamping sleeve 14 at the connection between the tube body 2 and the joint assembly 1, the structural strength of the tube body can be increased; the first clamping sleeve 14 is made of a material with high structural strength, such as stainless steel, which can further improve the structural strength of the tube body.

[0057] In some embodiments, the clamping groove 112 can be opened on the first pressing sleeve 14 , and the clamping block 142 can be set on the core shaft 11 , so that the first pressing sleeve 14 is “hung” on the core shaft 11 .

[0058] It is understandable that the first pressing sleeve 14 may also be fixed to the core shaft 11 by means of screw locking or other fixing methods.

[0059] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3 The mandrel 11 includes a plurality of bosses 113 that change step by step along the axial direction of the mandrel 11, and at least one layer of winding material layer 21 is distributed on each boss 113, and at least one layer of winding material layer 21 is fixedly connected to the boss 113. By providing a plurality of bosses 113, a connection point between the mandrel 11 and the multiple steel wire layers is formed, and the winding material layer 21 is fixedly connected to the boss 113, so that the winding material layer 21 can be fixedly connected to the mandrel 11, further increasing the connection strength between the pipe body 2 and the joint assembly 1, and preventing the pipe body 2 and the joint assembly 1 from falling off due to the impact of high-pressure liquid.

[0060] It should be noted that the multiple bosses 113 change step by step along the axial direction of the core shaft 11, thereby forming a plurality of annular step surfaces with gradually decreasing heights on the surface of the core shaft 11, and the multiple step surfaces correspond to the winding material layers 21 wound layer by layer, thereby ensuring that each layer of the winding material layer 21 can be fixedly connected to the boss 113. The connecting surface between the boss 113 and the winding material layer 21 is preferably a plane to maximize the contact area between the boss 113 and the winding material layer 21, and an annular protrusion that changes step by step may also be used.

[0061] Preferably, when the winding material layer 21 is a steel wire layer, the winding material layer 21 is spot welded to the boss 113 , and different connection processes may be used according to the type of the winding material layer 21 .

[0062] In some embodiments, the winding material layer 21 includes four layers, wherein the first winding material layer 21 is located between the first crimping sleeve 14 and the core shaft 11 , the remaining three steel wire layers are located above the first crimping sleeve 14 , and the remaining three steel wire layers are welded to the boss 113 .

[0063] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3The connector 12 is provided with: a glue injection hole 126, which is connected to the installation space, and glue is injected into the installation space through the glue injection hole 126 to form a middle glue layer 22; and a glue emitting hole 127, which is connected to the installation space and is used to detect whether the glue injection is completed.

[0064] Specifically, glue is injected into the installation space through the glue injection hole 126 to form a middle glue layer 22 between the joint assembly 1 and the tube body 2, thereby increasing the sealing performance between the joint assembly 1 and the tube body 2. When the glue injection is completed, the glue will emerge from the glue emitting hole 127 to ensure that the middle glue layer 22 is completely formed to prevent affecting the sealing performance of the joint.

[0065] In some embodiments, the mounting hole 122 may also be used as the glue injection hole 126 .

[0066] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3 The joint assembly 1 includes a second pressing sleeve 15, which is sleeved on the outer side of the pipe body 2; the second pressing sleeve 15 is connected to the connector 12 through a pressing structure, which includes a convex block 151 and a groove 128, which are respectively arranged on the second pressing sleeve 15 and the connector 12. Specifically, a ring-shaped convex block 151 is arranged on the side of the second pressing sleeve 15 close to the connector 12, and a groove 128 corresponding to the convex block 151 is opened on the connector 12. The second pressing sleeve 15 is pressed on the connector 12 through the pressing structure, so that the second pressing sleeve 15 can cover the middle rubber layer, further improving the sealing performance of the joint.

[0067] In some embodiments, the protrusion 151 and the groove 128 are respectively disposed on the connector 12 and the second pressing sleeve 15 .

[0068] In the ultra-high pressure hose connector assembly of this embodiment, see Figure 3 A sealing groove 114 is provided on the outer surface of the core shaft 11, and a sealing ring 3 is contained in the sealing groove 114, so that the core shaft 11 and the connector 12 are sealed and connected. Specifically, the sealing groove 114 is located on the side of the core shaft 11 close to the port. By providing the sealing groove 114 and the sealing ring 3, leakage between the joint assembly 1 and the pipe body 2 is prevented, and the sealing performance of the joint is increased.

[0069] An optional embodiment of the present invention is described below: First, prepare a hose without an outer rubber layer, peel off the inner rubber layer and outer rubber layer that match the joint assembly 1 according to the structural size of the raw material of the tube body 2, peel off the other steel wire layers except the innermost layer of wound steel wire, put the first crimping sleeve 14 on the outside of the hose without an outer rubber layer, and axially press the core shaft 11 into the hose without an outer rubber layer, press the core shaft 11, the hose without an outer rubber layer and the first crimping sleeve 14 into one piece by crimping, then wind a layer of middle rubber around the outer surface of the hose without an outer rubber layer and the first crimping sleeve 14, and rewind the peeled second steel wire layer onto the first crimping sleeve 14 and the core shaft 11, and weld the second steel wire layer and the boss 113 on the core shaft 11 into one piece by welding, the weld size between the second steel wire layer and the boss 113 meets the use requirements of the ultra-high pressure hose joint, and the heat generated during the welding process cannot damage the various rubber layers. Then, the third layer of steel wire and the fourth layer of steel wire are wound in turn, and the middle rubber layer is used to isolate the steel wire layers. The steel wire layers are welded together with the core shaft 11 to achieve a reliable connection between the steel wire layers and the core shaft 11, and the weld size between each layer of steel wire and the boss 113 meets the use requirements of the ultra-high pressure hose connector. After the above steps, the hose connector body is formed.

[0070] After forming the main body of the hose connector, assemble the sealing ring 3 into the sealing groove 114, and then axially fit the second pressing sleeve 15 and the connector 12 onto the main body of the hose connector in turn. After the limiting groove 121 is aligned with the positioning groove 111, assemble each positioning component 13 into the moving channel in turn through the reserved mounting hole 122 on the connector 12, and evenly fill the moving channel. When a sufficient number of positioning components 13 are fully installed, the mounting hole 122 is blocked with a blocking member 123 to prevent the positioning component 13 from falling out during transportation or storage. A groove matching the size of the positioning component 13 is made at the end of the blocking member 123. After the blocking member 123 is installed in place, the positioning component 13 can be reliably fixed to prevent the positioning component 13 from falling out of the mounting hole 122. Then, the protrusion 151 on the second pressing sleeve 15 is embedded into the groove 128, and the connector 12 and the second pressing sleeve 15 are pressed into one piece by a pressing process, and then the second pressing sleeve 15 and the tube body 2 are pressed into one piece.

[0071] After the connector 12 and the hose connector body are reliably connected as one, liquid colloid is injected into the gap between the connector 12 and the hose connector body through the glue injection hole 126. After the colloid continuously overflows from the glue emitting hole 127 until there are no bubbles, the glue injection hole 126 and the glue emitting hole 127 are sealed with a plug, and then the ultra-high pressure hose connector is placed in a vulcanizing bed for vulcanization. After the vulcanization treatment, the hose and the connector can be reliably solidified together. The ultra-high pressure hose connector has good anti-pullout performance in the use environment of ultra-high pressure pulsation resistance and ultra-high pressure resistance. The ultra-high pressure hose connector can meet the use needs and assembly requirements of the use environment with large pressure fluctuations or high-frequency vibrations.

[0072] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device comprising a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0073] Optionally, the specific examples in this embodiment may refer to the examples described in the above embodiments, and this embodiment will not be described in detail here.

[0074] The serial numbers of the above-mentioned embodiments of the present application are for description only and do not represent the advantages or disadvantages of the embodiments.

[0075] In the above embodiments of the present application, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, please refer to the relevant description of other embodiments.

[0076] The above is only a preferred implementation of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

Claims

1. An ultra-high pressure hose connector assembly process, characterized in that: include: The connecting head (12) is mounted on the hose connector body, so that after the connecting head (12) and the hose connector body are mounted in place, a moving channel for mounting a positioning component (13) is formed between the connecting head (12) and the hose connector body; Installing the positioning component (13) in the formed moving channel; Glue is injected into the gap between the connector (12) and the hose connector body, and then vulcanization is performed to obtain an ultra-high pressure hose connector assembly.

2. The ultra-high pressure hose connector assembly process according to claim 1, characterized in that: The connecting head (12) is mounted on a hose connector body so that after the connecting head (12) and the hose connector body are mounted in place, a moving channel for mounting a positioning component (13) is formed between the connecting head (12) and the hose connector body, comprising the following steps: Put the connector (12) onto the hose connector body; The limiting groove (121) on the connecting head (12) is aligned with the positioning groove (111) on the hose connector body, so that the moving channel is formed between the connecting head (12) and the hose connector body after the connecting head (12) and the hose connector body are fitted into place.

3. The ultra-high pressure hose connector assembly process according to claim 2, characterized in that: Installing the positioning component (13) in the formed moving channel comprises the following steps: sequentially installing the plurality of positioning components (13) into the moving channel via the mounting holes (122) located on the connecting head (12); When all of the plurality of positioning components (13) are installed, the installation hole (122) is sealed using a sealing member (123).

4. The ultra-high pressure hose connector assembly process according to claim 1, characterized in that: Before the connector (12) is mounted on the hose connector body, the following steps are included: A hose without an outer rubber layer is prepared, and a first crimping sleeve (14) and a core shaft (11) are sequentially mounted on the hose without an outer rubber layer; The hose without the outer rubber layer is fixedly connected to the first crimping sleeve (14) and the core shaft (11) respectively; The wrapping material is wrapped around the surface of the hose without the outer rubber layer to form the hose connector body.

5. The ultra-high pressure hose joint assembly process according to claim 4, characterized in that: The winding material is wound onto the surface of the hose without the outer rubber layer to form the hose connector body, comprising the following steps: The winding material is wound layer by layer onto the surface of a hose without an outer rubber layer, thereby forming multiple winding material layers (21) on the hose, and a layer of middle rubber is wound on the surface of each winding material layer (21).

6. The ultra-high pressure hose connector assembly process according to claim 5, characterized in that: The winding material is wound layer by layer onto the surface of a hose without an outer rubber layer, thereby forming multiple layers of the winding material layer (21) on the hose, wherein a layer of the middle rubber is wound on the surface of each layer of the winding material layer (21), comprising the following steps: At least one layer of the winding material layer (21) is distributed on each boss (113) located on the core shaft (11), and at least one layer of the winding material layer (21) is fixedly connected to the corresponding boss (113).

7. The ultra-high pressure hose connector assembly process according to claim 1, characterized in that: Before the connector (12) is mounted on the hose connector body, the following steps are included: The second crimping sleeve (15) is sleeved onto the hose connector body.

8. The ultra-high pressure hose connector assembly process according to claim 7, characterized in that: After the positioning component (13) is installed in the formed moving channel, the following steps are included: The second pressing sleeve (15) is fixedly connected to the connecting head (12) and the hose connector body respectively.

9. The ultra-high pressure hose connector assembly process according to claim 1, characterized in that: Injecting glue into the gap between the connector (12) and the hose connector body comprises the following steps: Injecting glue into the gap between the connector (12) and the hose connector body through the glue injection hole (126) to form a middle glue layer (22) until the glue overflows from the glue hole (127) continuously until there are no bubbles; The glue injection hole (126) and the glue emitting hole (127) are sealed with a plug.

10. An ultra-high pressure hose connector assembly, characterized in that: The ultra-high pressure hose connector assembly is manufactured by the ultra-high pressure hose connector assembly process described in any one of claims 1 to 9.

Citation Information

Cited By

  • High-pressure fluid hose connector

    CN120368134A

  • Ultrahigh-pressure integrally vulcanized flexible hose for ocean engineering

    CN121497904A