Coal mine waste heat comprehensive utilization system
By designing a comprehensive utilization system for waste heat of coal mines and using the combined technology of the main waste heat utilization mechanism, the secondary waste heat utilization mechanism and the waste heat treatment mechanism, the problems of pipeline erosion and environmental pollution caused by impurities in the waste heat of coal mines are solved, and safe and efficient utilization of waste heat of coal mines are achieved.
Patent Information
- Application Number
- CN202510283972.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-11
- Publication Date
- 2025-04-18
AI Technical Summary
The waste heat of coal mines contains a large amount of impurities, such as mineral dust, suspended matter and heavy metals, which lead to pipeline erosion and leakage and environmental pollution.
A comprehensive utilization system for waste heat of coal mines is designed, including the main waste heat utilization mechanism, the secondary waste heat utilization mechanism and the waste heat treatment mechanism. Through the spiral winding design of the secondary waste heat utilization mechanism and the filtration treatment mechanism, the mineral dust in the exhausted wind and waste heat, suspended matter and heavy metals in the residual heat of water are removed.
It effectively reduces the impurity content in the exhausted wind and waste heat and the inrushing water heat, prevents impurities from eroding the pipeline, improves the comprehensive utilization safety of coal mine waste heat, and avoids environmental pollution.
Smart Images

Figure CN119845082A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of coal mine waste heat utilization, and in particular relates to a coal mine waste heat comprehensive utilization system. Background Art
[0002] Comprehensive utilization of coal mine waste heat refers to the use of various technical means to convert coal mine waste heat into usable energy for heating, cooling, power generation, seawater desalination and other fields; Comprehensive utilization of coal mine waste heat has the following significant advantages: Energy saving: Coal mine waste heat is a valuable secondary energy source, which can reduce the use of fossil fuels and save energy. According to statistics, the annual waste heat of a large coal mine can be equivalent to hundreds of thousands of tons of standard coal. If it can be comprehensively utilized, a large amount of fossil fuels can be saved; Environmental protection: If coal mine waste heat cannot be effectively utilized, it will be directly discharged into the atmosphere, causing greenhouse gas emissions and environmental pollution. The comprehensive utilization of coal mine waste heat can reduce waste heat emissions and reduce environmental pollution; Promote economic benefits: The comprehensive utilization of coal mine waste heat can bring additional economic benefits to coal mines. For example, using coal mine waste heat for heating can reduce the cost of purchasing fuel; using coal mine waste heat for power generation can sell surplus electricity to the power grid.
[0003] A large amount of waste heat is generated in the coal mine production process, including wind exhaust waste heat, water gushing waste heat, etc., but the coal mine waste heat contains a large amount of impurities. Among them, wind exhaust waste heat contains a large amount of suspended particles such as mine dust, and water gushing waste heat contains a large amount of suspended matter, heavy metals and other pollutants. When the wind exhaust waste heat, water gushing waste heat and other coal mine waste heat are directly used, impurities will accumulate in the pipeline, which will not only affect the normal use of coal mine waste heat, but also impurities will easily corrode the pipeline. Long-term use will easily damage the pipeline, leading to leakage of coal mine waste heat, causing serious pollution to external water bodies, air, etc., resulting in serious consequences. The Chinese patent application publication number CN112360585A discloses a system for comprehensive utilization of waste heat from coal mines, including a heat recovery component, an air-to-air heat exchanger, an air-circulating water heat exchange component, a cooling water component, an air heat source component, a natural gas boiler component, a water source heat pump, a steam-water heat exchanger, a bathing heat exchanger, a wellhead fresh air unit and a dry fresh air component. The natural gas boiler component includes a hot water type natural gas boiler and a steam type natural gas boiler. The dry fresh air component includes a cold air unit and a first electric heating unit connected in sequence. The system for comprehensive utilization of waste heat from coal mines provided by the invention selects the utilization method of waste heat according to the specific situation in coal mine operations, and can fully utilize the waste heat. By utilizing abundant waste heat resources such as energy supply equipment, exhaust air, cooling water, etc., the equipment has high safety, can realize the cascade utilization of energy, significantly improve the comprehensive utilization rate of energy, achieve the goal of energy conservation and emission reduction, and at the same time ensure the stability of energy consumption in the mining area; the system for comprehensive utilization of coal mine waste heat can realize the utilization of coal mine waste heat, but because the exhaust air waste heat of coal mines contains a large amount of suspended particles such as mine dust, and the gushing water waste heat contains a large amount of suspended matter, heavy metals and other pollutants, the presence of these impurities will not only affect the recovery and utilization of coal mine waste heat, but also easily corrode the pipeline, resulting in leakage after the pipeline is damaged, causing serious pollution to the external water and air, thereby causing serious consequences. Summary of the invention
[0004] Based on the above problems, a coal mine waste heat comprehensive utilization system is provided which can effectively treat impurities in coal mine waste heat.
[0005] Based on the above purpose, the present invention is achieved through the following technical solutions: A coal mine waste heat comprehensive utilization system comprises an air exhaust waste heat pipeline and a water gushing waste heat pipeline, the water gushing waste heat pipeline is connected with a main waste heat utilization mechanism, the main waste heat utilization mechanism is provided with a waste heat treatment mechanism and an auxiliary waste heat utilization mechanism, the main waste heat utilization mechanism comprises a waste heat utilization cylinder connected with the water gushing waste heat pipeline, and a main waste heat utilization pipeline matched with the waste heat utilization cylinder; the auxiliary waste heat utilization mechanism comprises an auxiliary waste heat utilization pipeline arranged on the top surface of the waste heat utilization cylinder and matched with the gap of the water gushing waste heat pipeline, the auxiliary waste heat utilization pipeline is spirally wound on the main waste heat utilization pipeline, thermal insulation cotton matched with the auxiliary waste heat utilization pipeline is laid on the main waste heat utilization pipeline, and the main waste heat utilization pipeline is connected with a heating equipment matched with the auxiliary waste heat utilization pipeline.
[0006] Preferably, the auxiliary waste heat utilization mechanism also includes a hollow waste heat rotating shaft arranged in the waste heat utilization cylinder and rotatably connected to the waste heat utilization cylinder through an auxiliary waste heat bearing, and a hollow waste heat support rod matched with the bottom surface of the waste heat utilization cylinder is symmetrically arranged at the bottom of the hollow waste heat rotating shaft, and the hollow waste heat support rod is connected through an annular hollow waste heat rod, and waste heat utilization holes are evenly distributed on the bottom surfaces of the hollow waste heat support rod and the annular hollow waste heat rod; the hollow waste heat rotating shaft is matched with the waste heat utilization motor arranged on the waste heat utilization cylinder, and an air exhaust pipe bearing connected to the air exhaust waste heat pipe is arranged at the top of the hollow waste heat rotating shaft; the gushing waste heat pipe and the auxiliary waste heat utilization pipe are symmetrically arranged on the waste heat utilization cylinder along the hollow waste heat rotating shaft; a mixing support rod that is gap-matched with the hollow waste heat support rod is provided on the hollow waste heat rotating shaft.
[0007] Preferably, a secondary waste heat utilization pipeline is provided with a secondary waste heat treatment structure, which includes a secondary waste heat connecting rod arranged on the secondary waste heat utilization pipeline, a secondary waste heat treatment rotating shaft is provided on the secondary waste heat connecting rod, the secondary waste heat treatment rotating shaft cooperates with a secondary waste heat motor arranged on the secondary waste heat connecting rod, and the secondary waste heat motor cooperates with a gear arranged on the secondary waste heat rotating shaft; at least one secondary waste heat treatment rod is provided on the secondary waste heat treatment rotating shaft, a waste heat treatment ring is provided at the end of the secondary waste heat treatment rod, and treatment convex rings are provided on both sides of the waste heat treatment ring A plurality of auxiliary waste heat treatment grooves are symmetrically arranged in the waste heat treatment ring, and the auxiliary waste heat treatment grooves are filled with auxiliary waste heat adsorption materials; the waste heat treatment ring cooperates with the fan ring processing hole arranged on the auxiliary waste heat utilization pipeline; the processing convex ring cooperates with the fan ring processing grooves arranged on both sides of the fan ring processing hole, and a sealing gasket cooperating with the processing convex ring is arranged in the fan ring processing groove; a processing ring groove cooperating with the auxiliary waste heat treatment rod is arranged on the inner side of the inner ring of the waste heat treatment ring, and the processing ring groove cooperates with the clamping processor arranged at the end of the auxiliary waste heat treatment rod.
[0008] Preferably, the clamping processor includes a clamping sleeve arranged at the end of the auxiliary waste heat treatment rod, a clamping shaft threadedly connected to the clamping sleeve is provided in the clamping sleeve, a pair of clamping claws are provided on the clamping shaft, the clamping claws are connected to an adjusting sleeve connected to the clamping shaft through a clamping plate, the clamping plate cooperates with the strip-shaped holes arranged on the side of the clamping sleeve, and limit baffles connected to the clamping sleeve are provided at both ends of the strip-shaped holes; the clamping claws are connected by a clamping spring; the clamping shaft cooperates with the clamping motor arranged on the clamping sleeve.
[0009] Preferably, the main waste heat utilization mechanism also includes a main waste heat sleeve which is sleeved on the hollow waste heat rotating shaft and rotatably connected to the hollow waste heat rotating shaft through a main waste heat bearing, and a waste heat utilization spray ring which is sleeved on the hollow waste heat rotating shaft and cooperates with the main waste heat sleeve. The waste heat utilization spray ring is provided with a waste heat guide ring groove, and waste heat diversion holes are evenly distributed in the waste heat guide ring groove. The waste heat guide ring groove cooperates with a waste heat guide convex ring arranged on the bottom surface of the main waste heat sleeve, and the bottom surface of the waste heat guide convex ring is evenly distributed with waste heat guide holes that cooperate with the waste heat diversion holes; the main waste heat sleeve is connected to the gushing waste heat pipeline; and spray nozzles are evenly distributed on the bottom surface of the waste heat utilization spray ring.
[0010] Preferably, the waste heat treatment mechanism includes a waste heat guide pipe arranged at the bottom end of the waste heat utilization cylinder, a waste heat treatment box connected to the main waste heat utilization pipe is arranged at the bottom end of the waste heat guide pipe, a waste heat treatment structure is arranged in the waste heat treatment box, the waste heat treatment structure includes a waste heat treatment pipe arranged in the waste heat treatment box and connected to the waste heat guide pipe, a waste heat processor is arranged on the waste heat treatment pipe, the waste heat processor cooperates with a collection processor arranged at the bottom end of the waste heat treatment pipe; the waste heat treatment pipe is connected to a processing and collecting box arranged at the bottom end of the waste heat treatment box; the bottom surface of the waste heat utilization cylinder is an inverted cone bottom surface.
[0011] Preferably, the collection processor includes an elliptical collection chamber which is sleeved on the bottom end of the waste heat treatment pipeline and fixedly connected to the waste heat treatment pipe. The elliptical collection chamber cooperates with the treatment collection port arranged on the waste heat treatment pipeline, and the treatment collection port cooperates with the treatment control valve arranged in the waste heat treatment pipeline. The bottom end of the elliptical collection chamber is rotatably connected to the waste heat treatment pipeline through an integrated collection bearing.
[0012] Preferably, the waste heat treatment device includes an upper treatment plate and a lower treatment plate which are sleeved on the waste heat treatment pipeline and rotatably connected to the waste heat treatment pipeline through a waste heat treatment bearing. An annular filter screen connected to the lower treatment plate is provided on the bottom surface of the upper treatment plate, and the annular filter screen cooperates with the waste heat treatment holes distributed on the waste heat treatment pipeline; treatment guide grooves are symmetrically arranged on the waste heat treatment pipeline, and treatment guide strips connected to the waste heat treatment bearings are arranged in the treatment guide grooves, and the treatment guide strips cooperate with the guide strip adjustment push rods arranged at the top of the treatment guide grooves.
[0013] Preferably, an arc-shaped guide groove that cooperates with the gap of the treatment guide groove is symmetrically arranged at the lower part of the waste heat treatment pipeline, and a guide collection pipe connected to the lower treatment plate is arranged in the arc-shaped guide groove, and the guide collection pipe cooperates with the guide collection hole arranged at the top of the elliptical collection cavity; a waste heat treatment motor that cooperates with the waste heat treatment pipeline is arranged on the upper treatment plate.
[0014] Preferably, a guide ring cooperating with a guide collection pipe is provided at one end of the arc-shaped guide groove away from the lower processing plate, and an adjustment swivel with a clearance fit is provided on the guide ring; a guide collection spring connected to the top of the arc-shaped guide groove is sleeved on the guide collection pipe; the lower processing plate is a conical processing plate; and a negative pressure fan is provided on the processing and collecting box.
[0015] Preferably, an auxiliary cleaner that cooperates with the annular filter is provided on the waste heat treatment pipeline, and the auxiliary cleaner includes a treatment ring arranged on the waste heat treatment pipeline and threadedly connected to the waste heat treatment pipeline, and a treatment support rod is symmetrically arranged on the treatment ring, and a treatment brush that cooperates with the annular filter is provided at the end of the treatment support rod, and the treatment brush cooperates with a flexible cleaning net arranged on the treatment support rod and cooperates with the treatment ring; the treatment support rod is rotatably connected with the treatment ring through a treatment shaft, and the treatment ring is provided with an angle adjustment push rod that cooperates with the treatment support rod; the treatment brush is provided with a damping magnetic connecting rod, and the damping magnetic connecting rod cooperates with a treatment sleeve arranged at the end of the treatment support rod, and a damping electromagnet with magnetic poles repelling each other is provided in the treatment sleeve; the damping magnetic connecting rod is sleeved with a damping spring that cooperates with the treatment sleeve.
[0016] Preferably, a diversion controller is provided in the diversion collecting hole, and the diversion controller includes a conical diversion plate arranged in the diversion collecting hole and matched with the diversion collecting tube, the conical diversion plate is matched with the diversion closed groove arranged on the side of the diversion collecting hole through the diversion support rod, and the diversion closed groove is provided with a diversion closed spring connected to the diversion support rod; the conical diversion plate is provided with symmetrical diversion grooves; one end of the diversion closed spring is connected to the end of the diversion closed groove away from the conical diversion plate, and the other end is arranged in the diversion adjustment cavity at the end of the diversion support rod; guide protrusions are symmetrically arranged on both sides of the diversion support rod, and the guide protrusions are matched with the guide slide grooves arranged on the side of the diversion collecting hole.
[0017] Compared with the prior art, the present invention has the following beneficial effects: (1) The present invention processes suspended particulate matter such as mine dust contained in the exhaust air waste heat and a large amount of suspended matter, heavy metals and other pollutants contained in the gushing water waste heat through the main waste heat utilization mechanism, the auxiliary waste heat utilization mechanism and the waste heat treatment mechanism, which can effectively reduce the content of impurities in the exhaust air waste heat and the gushing water waste heat, prevent the impurities in the exhaust air waste heat and the gushing water waste heat from corroding the waste heat pipeline, and can effectively treat the impurities in the coal mine waste heat, thereby preventing the harmful pollutants in the coal mine waste heat from affecting the external environment, avoiding the impurities in the coal mine waste heat from causing serious pollution to the outside world, air, etc., improving the safety of the comprehensive utilization of coal mine waste heat, and realizing the safe utilization of coal mine waste heat.
[0018] (2) The auxiliary waste heat utilization mechanism drives the hollow waste heat shaft to rotate in the waste heat utilization cylinder through the waste heat utilization motor. The waste heat pipe flows into the hollow waste heat shaft through the waste heat pipe bearing. The waste heat is discharged into the waste heat utilization cylinder through the hollow waste heat support rod and the annular hollow waste heat rod. The waste heat is evenly mixed with the gushing water sprayed by the main waste heat utilization mechanism, which can effectively remove suspended particles such as mineral dust in the waste heat, improve the purity of the waste heat, and facilitate the comprehensive utilization of the waste heat.
[0019] (3) The main waste heat utilization mechanism is connected to the gushing water waste heat pipeline through the main waste heat sleeve, and the gushing water in the main waste heat sleeve is sprayed into the waste heat utilization cylinder by the waste heat utilization spray ring, so that the gushing water is fully mixed with the suspended particles such as mine dust in the exhaust air, thereby separating the impurities contained in the exhaust air from the exhaust air, reducing the concentration of suspended particles in the exhaust air, facilitating the comprehensive utilization of exhaust air waste heat, and meeting the needs of comprehensive utilization of coal mine waste heat; the waste heat guide ring groove and the waste heat guide convex ring are matched, and when the waste heat utilization spray ring rotates with the hollow waste heat shaft, the waste heat diversion holes in the waste heat guide ring groove can always receive the water flow in the waste heat guide holes, thereby continuously and efficiently spraying the exhaust air in the waste heat utilization cylinder and cleaning the impurities in the exhaust air waste heat.
[0020] (4) The waste heat treatment mechanism can filter and treat the suspended matter, heavy metals and other pollutants contained in the gushing water, so as to facilitate the utilization of the waste heat of the gushing water, and prevent the impurities in the gushing water from corroding the main waste heat utilization pipeline, thereby causing damage, leakage and other problems in the main waste heat utilization pipeline, causing serious pollution to the external water body, etc., resulting in serious consequences, thereby improving the safety of waste heat utilization in coal mines; the waste heat treatment mechanism can filter the suspended particles such as mineral dust contained in the exhaust air and the suspended matter, heavy metals and other pollutants in the gushing water at one time by treating the water body after the gushing water and the exhaust air are gathered in the waste heat treatment box, so as to quickly realize the treatment of impurities in the waste heat, and facilitate the comprehensive utilization of waste heat in coal mines; the waste heat treatment structure can filter and collect the impurities in the waste heat through the waste heat processor and the collection processor, so as to quickly and efficiently remove the impurities in the waste heat of coal mines, and prevent the impurities in the waste heat of coal mines from corroding and damaging the main waste heat utilization pipeline, thereby causing accidents, and improving the safety of comprehensive utilization of waste heat in coal mines.
[0021] (5) The collection processor can collect the impurities after treatment by the waste heat processor without stopping the machine, so as to avoid affecting the treatment of the gushing water and improve the treatment and utilization efficiency of the waste heat of the gushing water; the collection processor collects the filtered impurities through the elliptical collection chamber. When collecting impurities, the processing control valve is opened, and the gushing water is used in conjunction with the waste heat processor to flush the filtered impurities into the elliptical collection chamber, and then the filtered impurities are collected in a centralized manner through the processing collection box, so as to realize the cleaning of the filtered impurities while filtering the gushing water.
[0022] (6) The waste heat treatment unit filters the impurities in the gushing water by setting an annular filter between the upper treatment plate and the lower treatment plate, so as to prevent the impurities in the gushing water from corroding the main waste heat utilization pipeline, thereby causing damage, leakage and other problems in the main waste heat utilization pipeline, causing serious pollution to the external water body, etc., and thus causing serious consequences; the treatment guide bar moves up and down in the treatment guide groove under the action of the guide bar adjustment push rod, thereby driving the entire waste heat treatment unit to move on the waste heat treatment pipeline through the upper treatment plate and the lower treatment plate, so as to facilitate the discharge of the filtered impurities into the elliptical collection cavity of the collection treatment unit, and realize the cleaning action of the filtered impurities while continuously filtering the gushing water.
[0023] (7) The arc-shaped guide groove facilitates the guide collection pipe to move up and down along the waste heat treatment pipeline with the lower treatment plate, thereby facilitating the impurities in the annular filter to be guided along the guide collection hole to the elliptical collection cavity, thereby realizing the collection and treatment of impurities in the annular filter and preventing impurities from affecting the filtering efficiency of the annular filter.
[0024] (8) The guide ring and the adjusting ring can guide the movement direction of the guide collection pipe, so that the guide collection pipe can be accurately inserted into the guide collection hole, thereby accurately completing the guide treatment of impurities after filtration in the annular filter, preventing impurities in the annular filter from escaping into the filtered water, and ensuring the filtering effect of the filtered water; the guide collection spring not only facilitates the reset of the guide collection pipe, but also prevents the guide collection pipe from deformation and twisting during the up and down movement; the lower processing plate is a conical processing plate, which facilitates the diversion of impurities after filtration of the annular filter into the elliptical collection chamber; the negative pressure fan forms a negative pressure in the processing and collection box, which facilitates the negative pressure extraction of impurities in the elliptical collection chamber into the processing and collection box.
[0025] (9) A threaded treatment ring is provided on the waste heat treatment pipeline. When the annular filter rotates along the waste heat treatment pipeline, the treatment ring is affected by the contact friction between the annular filter and the treatment brush, and rotates along the thread on the waste heat treatment pipeline. The treatment ring gradually moves downward along the waste heat treatment pipeline, and can gradually clean the impurities filtered on the annular filter. As the treatment ring continues to move downward along the waste heat treatment pipeline, the flexible cleaning net can gather the cleaned impurities onto the lower treatment plate, thereby realizing the cleaning action of the filtered impurities in the annular filter; the angle adjustment push rod can adjust the angle of the treatment support rod, so as to facilitate the adjustment of the contact force between the treatment brush and the annular filter according to needs, so as to meet the purpose of cleaning the annular filter with the cleaning brush and moving the treatment ring along the thread of the waste heat treatment pipeline.
[0026] (10) The diversion controller is set to open the elliptical collection chamber when in use to collect impurities in the annular filter, and close the elliptical collection chamber when not in use to prevent the impurities remaining in the elliptical collection chamber from overflowing and affecting the water body in the main waste heat utilization pipeline; the diversion controller uses the conical guide plate in conjunction with the guide support rod. Under the action of the guide closing spring, it can automatically close the diversion collection hole to prevent the impurities in the elliptical collection chamber from overflowing. Under the action of the diversion collection pipe, it can push the conical guide plate to separate from the diversion collection hole, so as to facilitate the diversion of impurities filtered in the annular filter into the elliptical collection chamber, thereby realizing the collection and treatment of impurities in the annular filter.
[0027] In summary, the present invention uses the main waste heat utilization mechanism and the auxiliary waste heat utilization mechanism in cooperation with the gushing water to carry out dust removal treatment on the exhaust air, effectively removes the suspended particulate matter such as mineral dust contained in the exhaust air waste heat, and then uses the waste heat treatment mechanism to treat the large amount of suspended matter and pollutants such as heavy metals contained in the gushing water waste heat, thereby effectively reducing the impurity content in the exhaust air waste heat and the gushing water waste heat, and can achieve effective treatment of impurities in coal mine waste heat, prevent impurities in the exhaust air waste heat and the gushing water waste heat from corroding the waste heat pipeline, prevent harmful pollutants in the coal mine waste heat from causing pipeline leakage and affecting the external environment, avoid impurities in the coal mine waste heat from causing serious pollution to the outside world, air, etc., improve the safety of comprehensive utilization of coal mine waste heat, and achieve safe comprehensive utilization of coal mine waste heat. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the structure of the present invention in Example 1; Figure 2 is a connection diagram of the main waste heat utilization mechanism and the auxiliary waste heat utilization mechanism in Example 1; Figure 3 is a schematic structural diagram of the main residual heat sleeve in Example 1; Figure 4 is a schematic diagram of the structure of the waste heat utilization spray ring in Example 1; Figure 5 is a schematic structural diagram of the residual heat treatment mechanism in Example 1; Figure 6 is a schematic diagram of the internal structure of the residual heat treatment mechanism in Example 1; Figure 7 is a top view of the elliptical collecting chamber in Example 1; Figure 8 is a schematic structural diagram of the guide ring in Example 1; Fig. 9 is a schematic structural diagram of the auxiliary cleaner in Example 1; Fig.10 It is a structural schematic diagram of the flow diversion controller in Example 1.
[0029] In the figure, auxiliary waste heat utilization pipeline 1, exhaust air waste heat pipeline 2, auxiliary waste heat utilization mechanism 3, waste heat treatment mechanism 4, main waste heat utilization pipeline 5, waste heat diversion pipeline 6, waste heat utilization cylinder 7, gushing water waste heat pipeline 8, negative pressure fan 9, treatment and collection box 10, hollow waste heat shaft 301, exhaust air pipeline bearing 302, waste heat utilization motor 303, hollow waste heat support rod 304, annular hollow waste heat rod 305, main waste heat sleeve 701, waste heat utilization spray ring 702, main waste heat bearing 703, waste heat diversion convex ring 704, waste heat diversion ring groove 705, waste heat diversion hole 706, waste heat treatment box 401, waste heat treatment bearing 402, waste heat treatment motor Machine 403, elliptical collecting chamber 404, lower processing plate 405, annular filter 406, upper processing plate 407, waste heat processing pipeline 408, auxiliary cleaner 409, waste heat processing hole 410, diversion collection pipe 411, arc-shaped diversion groove 412, processing guide bar 413, guide bar adjustment push rod 414, processing collection port 415, diversion collection hole 416, diversion ring 417, adjustment swivel 418, processing support rod 419, processing brush 420, flexible cleaning net 421, processing shaft 422, angle adjustment push rod 423, processing collar 424, diversion support rod 425, diversion closing spring 426, diversion groove 427, conical guide plate 428. DETAILED DESCRIPTION
[0030] The present invention is further described below by means of specific examples, but the scope of the present invention is not limited thereto.
[0031] Example 1 A coal mine waste heat comprehensive utilization system, its structure is as follows Figure 1-10 As shown, it includes an exhaust air waste heat pipeline 2 and a gushing water waste heat pipeline 8, the gushing water waste heat pipeline 8 is connected to a main waste heat utilization mechanism, the main waste heat utilization mechanism is provided with a waste heat treatment mechanism 4 and an auxiliary waste heat utilization mechanism 3, the main waste heat utilization mechanism includes a waste heat utilization cylinder 7 connected to the gushing water waste heat pipeline 8, and a main waste heat utilization pipeline 5 matched with the waste heat utilization cylinder 7; the auxiliary waste heat utilization mechanism 3 includes an auxiliary waste heat utilization pipeline 1 arranged on the top surface of the waste heat utilization cylinder 7 and having a clearance matched with the gushing water waste heat pipeline 8.
[0032] The auxiliary waste heat utilization mechanism 3 also includes a hollow waste heat rotating shaft 301 arranged in the waste heat utilization cylinder 7 and rotatably connected to the waste heat utilization cylinder 7 through an auxiliary waste heat bearing. A hollow waste heat support rod 304 that matches the bottom surface of the waste heat utilization cylinder 7 is symmetrically arranged at the bottom of the hollow waste heat rotating shaft 301. The hollow waste heat support rod 304 is connected through an annular hollow waste heat rod 305. Waste heat utilization holes are evenly distributed on the hollow waste heat support rod 304 and the annular hollow waste heat rod 305; the hollow waste heat rotating shaft 301 matches the waste heat utilization motor 303 arranged on the waste heat utilization cylinder 7, and a lack of air pipe bearing 302 connected to the lack of air waste heat pipe 2 is provided at the top of the hollow waste heat rotating shaft 301.
[0033] The main waste heat utilization mechanism also includes a main waste heat sleeve 701 which is sleeved on the hollow waste heat rotating shaft 301 and rotatably connected to the hollow waste heat rotating shaft 301 through a main waste heat bearing 703, and a waste heat utilization spray ring 702 which is sleeved on the hollow waste heat rotating shaft 301 and cooperates with the main waste heat sleeve 701. The waste heat utilization spray ring 702 is provided with a waste heat guide ring groove 705, and waste heat diversion holes 706 are evenly distributed in the waste heat guide ring groove 705. The waste heat guide ring groove 705 cooperates with a waste heat guide convex ring 704 arranged on the bottom surface of the main waste heat sleeve 701, and waste heat guide holes which cooperate with the waste heat diversion holes 706 are evenly distributed on the bottom surface of the waste heat guide convex ring 704; the main waste heat sleeve 701 is connected to the gushing waste heat pipeline 8.
[0034] The waste heat treatment mechanism 4 includes a waste heat conduction pipe 6 arranged at the bottom end of the waste heat utilization cylinder 7, a waste heat treatment box 401 connected to the main waste heat utilization pipe 5 is provided at the bottom end of the waste heat conduction pipe 6, a waste heat treatment structure is provided in the waste heat treatment box 401, the waste heat treatment structure includes a waste heat treatment pipe 408 arranged in the waste heat treatment box 401 and connected to the waste heat conduction pipe 6, a waste heat processor is provided on the waste heat treatment pipe 408, and the waste heat processor cooperates with a collection processor arranged at the bottom end of the waste heat treatment pipe 408; the waste heat treatment pipe 408 is connected to a processing and collecting box 10 arranged at the bottom end of the waste heat treatment box 401; the bottom surface of the waste heat utilization cylinder 7 is an inverted cone bottom surface.
[0035] The collection processor includes an elliptical collection chamber 404 which is sleeved on the bottom end of the waste heat treatment pipe 408 and fixedly connected to the waste heat treatment pipe. The elliptical collection chamber 404 cooperates with a treatment collection port 415 arranged on the waste heat treatment pipe 408, and the treatment collection port 415 cooperates with a treatment control valve arranged in the waste heat treatment pipe 408.
[0036] The waste heat treatment device includes an upper treatment plate 407 and a lower treatment plate 405 which are sleeved on the waste heat treatment pipeline 408 and rotatably connected to the waste heat treatment pipeline 408 through a waste heat treatment bearing 402. An annular filter screen 406 connected to the lower treatment plate 405 is provided on the bottom surface of the upper treatment plate 407. The annular filter screen 406 cooperates with the waste heat treatment holes 410 distributed on the waste heat treatment pipeline 408. Treatment guide grooves are symmetrically arranged on the waste heat treatment pipeline 408. Treatment guide bars 413 connected to the waste heat treatment bearing 402 are arranged in the treatment guide grooves. The treatment guide bars 413 cooperate with the guide bar adjustment push rod 414 arranged at the top of the treatment guide grooves.
[0037] An arc-shaped guide groove 412 that matches the gap of the treatment guide groove is symmetrically arranged at the lower part of the waste heat treatment pipeline 408. A guide collection pipe 411 connected to the lower treatment plate 405 is arranged in the arc-shaped guide groove 412. The guide collection pipe 411 matches the guide collection hole 416 arranged at the top of the elliptical collection chamber 404; a waste heat treatment motor 403 that matches the waste heat treatment pipeline 408 is arranged on the upper treatment plate 407.
[0038] A guide ring 417 cooperating with the guide collection pipe 411 is provided at one end of the arc-shaped guide groove 412 away from the lower processing plate 405, and an adjusting swivel 418 with a clearance fit is provided on the guide ring 417; a guide collection spring connected to the top of the arc-shaped guide groove 412 is sleeved on the guide collection pipe 411; the lower processing plate 405 is a conical processing plate; and a negative pressure fan 9 is provided on the processing and collecting box 10.
[0039] An auxiliary cleaner 409 cooperating with the annular filter 406 is provided on the waste heat treatment pipeline 408, and the auxiliary cleaner 409 includes a treatment ring 424 arranged on the waste heat treatment pipeline 408 and threadedly connected to the waste heat treatment pipeline 408, and a treatment support rod 419 is symmetrically arranged on the treatment ring 424, and a treatment brush 420 cooperating with the annular filter 406 is provided at the end of the treatment support rod 419, and the treatment brush 420 cooperates with a flexible cleaning net 421 arranged on the treatment support rod 419 and cooperating with the treatment ring 424; the treatment support rod 419 is rotatably connected with the treatment ring 424 through a treatment shaft 422, and the treatment ring 424 is provided with an angle adjustment push rod 423 cooperating with the treatment support rod 419.
[0040] A diversion controller is provided in the diversion collection hole 416, and the diversion controller includes a conical guide plate 428 arranged in the diversion collection hole 416 and matched with the diversion collection tube 411. The conical guide plate 428 is matched with the diversion closed groove arranged on the side of the diversion collection hole 416 through the diversion support rod 425. The diversion closed groove is provided with a diversion closed spring 426 connected to the diversion support rod 425; the conical guide plate 428 is provided with a diversion groove 427.
[0041] A method for a coal mine waste heat comprehensive utilization system, the steps comprising: S1. Treatment of exhaust air and utilization of exhaust air waste heat; The auxiliary waste heat utilization mechanism 3 drives the hollow waste heat rotating shaft 301 to rotate at high speed in the waste heat utilization cylinder 7 through the waste heat utilization motor 303, and the waste air waste heat pipe 2 flows into the hollow waste heat rotating shaft 301 through the waste air pipe bearing 302. The waste air passes through the hollow waste heat support rod 304 and the annular hollow waste heat rod 305 to discharge the waste air gas into the waste heat utilization cylinder 7 using the waste heat utilization hole. Under the action of the high-speed rotating hollow waste heat rotating shaft 301, a waste air cyclone is formed.
[0042] At the same time, the gushing water in the gushing waste heat pipe 8 flows into the waste heat utilization spray ring 702 through the main waste heat sleeve 701 of the main waste heat utilization mechanism. The waste heat utilization spray ring 702 rotates in the waste heat utilization cylinder 7 with the hollow waste heat rotating shaft 301. The waste heat guide convex ring 704 on the bottom surface of the main waste heat sleeve 701 rotates in the waste heat guide ring groove 705. The gushing water can flow along the waste heat guide hole through the waste heat diversion hole 706 into the waste heat utilization spray ring 702. A spray ring 702 is used to spray gushing water spray into the waste heat utilization cylinder 7. The gushing water spray contacts the exhaust air cyclone to remove suspended particles such as mineral dust in the exhaust air, forming gushing water droplets that fall down, thereby improving the purity of the exhaust air. The treated exhaust air flows out along the auxiliary waste heat utilization pipe 1 on the top surface of the waste heat utilization cylinder 7, and the exhaust air waste heat is utilized after further adsorption and dehumidification treatment; the main waste heat sleeve 701 is fixedly connected to the waste heat utilization cylinder 7 through the main waste heat bearing 703.
[0043] When the exhaust air is in full contact with the gushing water, the waste heat from the exhaust air and the waste heat from the gushing water will quickly exchange heat, reducing the temperature difference between the waste heat from the exhaust air and the waste heat from the gushing water, making it convenient to comprehensively utilize the waste heat from the gushing water and the waste heat from the exhaust air, preventing the temperatures of the waste heat from the gushing water and the waste heat from the exhaust air from being too high or too low, and improving the utilization effect of the waste heat from the coal mine.
[0044] S2. Treatment of gushing water and utilization of residual heat from gushing water; The gushing water after the spray treatment of the exhaust air flows into the waste heat treatment box 401 through the waste heat diversion pipe 6 arranged at the bottom of the waste heat utilization cylinder 7 by the waste heat treatment mechanism 4, and the gushing water is filtered and treated by the waste heat treatment structure. Specifically, the treatment control valve is closed. At this time, the gushing water in the waste heat diversion pipe 6 flows out through the waste heat treatment hole 410 of the waste heat processor on the waste heat treatment pipe 408, and the annular filter 406 between the treatment plate and the lower treatment plate 405 filters a large amount of suspended matter and heavy metals and other pollutants in the gushing water. The treated gushing water is comprehensively utilized through the main waste heat utilization pipe 5 on the waste heat treatment box 401 in cooperation with the auxiliary waste heat utilization pipe 1, so that the coal mine waste heat containing pollutants and impurities is converted into clean waste heat resources for utilization.
[0045] The auxiliary waste heat utilization pipeline 1 is spirally wound on the main waste heat utilization pipeline 5, and thermal insulation cotton matching the auxiliary waste heat utilization pipeline 1 is laid on the main waste heat utilization pipeline 5. The main waste heat utilization pipeline 5 is connected to a heating equipment matching the auxiliary waste heat utilization pipeline 1, and the waste heat of gushing water and exhaust air is used for heating to realize the comprehensive utilization of waste heat in the coal mine.
[0046] S3, using the auxiliary cleaner 409 to clean the annular filter 406; As the impurities in the gushing water are filtered, the impurities filtered on the annular filter 406 increase, and the filtering efficiency of the annular filter 406 decreases. The angle adjustment push rod 423 of the auxiliary cleaner 409 extends a certain length, and the angle adjustment push rod 423 is used to push the processing support rod 419 to rotate along the processing shaft 422 on the processing ring 424, so that the processing brush 420 at the end of the processing support rod 419 is fully in contact with the annular filter 406, and the residual heat treatment motor 403 is started. The movable end of the residual heat treatment motor 403 is meshed with the transmission gear on the residual heat treatment pipeline 408, driving the upper processing plate 407, the annular filter 406, and the lower processing plate 405 to rotate along the residual heat treatment bearing 402 As the annular filter 406 rotates, the processing brush 420 cleans the impurities attached to the inner wall of the annular filter 406, and affected by the contact friction between the annular filter 406 and the processing brush 420, the processing collar 424 rotates along the thread on the waste heat treatment pipe 408, and the processing collar 424 gradually moves downward along the waste heat treatment pipe 408, so that the processing brush 420 can gradually clean the impurities filtered on the annular filter 406, and as the processing collar 424 continues to move downward along the waste heat treatment pipe 408, the flexible cleaning net 421 can gather the cleaned impurities onto the lower processing plate 405, thereby realizing the cleaning action of the filtered impurities in the annular filter 406.
[0047] S4, collection and treatment of impurities; After the impurities filtered on the annular filter 406 are cleaned, the position of the lower processing plate 405 is adjusted by the waste heat processor, and then the impurities on the lower processing plate 405 are collected by the collection processor. Specifically, the guide bar adjustment push rod 414 of the waste heat processor is extended to push the processing guide bar 413 to move toward the bottom end of the waste heat treatment box 401 in the processing guide groove, and the processing guide bar 413 drives the upper processing plate 407, the annular filter 406 and the lower processing plate 405 to move through the waste heat treatment bearing 402, the movable end of the waste heat treatment motor 403 is separated from the transmission gear on the waste heat treatment pipeline 408, and the diversion collection pipe 411 on the lower processing plate 405 moves along the arc-shaped guide groove 412 toward the elliptical collection chamber 404 side of the collection processor.
[0048] After the guide bar adjustment push rod 414 is extended to a certain length, the guide collection pipe 411 is inserted into the guide collection hole 416, and the guide controller is opened under the action of the guide collection pipe 411. Specifically, the guide collection pipe 411 pushes the conical guide plate 428 and the guide support rod 425 to move in the guide closed groove, the guide closed spring 426 is stretched, and the conical guide plate 428 is separated from the guide collection hole 416. Under the action of the gushing water, the impurities cleaned on the lower processing plate 405 are discharged along the guide collection pipe 411 and the guide support rod 425. The impurities flow into the elliptical collecting chamber 404 through the collecting port 415 and into the processing and collecting box 10; the negative pressure fan 9 assists the impurities to flow into the processing and collecting box 10; the guide ring 417 and the adjusting swivel 418 guide the guide collecting tube 411 to facilitate the accurate insertion of the guide collecting tube 411 into the guide collecting hole 416; the guide collecting spring facilitates the resetting of the guide collecting tube 411 and can also prevent the guide collecting tube 411 from deforming and twisting during the up and down movement.
[0049] After a period of impurity collection, the guide bar adjustment push rod 414 drives the annular filter 406 to reset, and the movable end of the residual heat treatment motor 403 is combined with the transmission gear; the angle adjustment push rod 423 is reset, and then the residual heat treatment motor 403 is reversed, and the friction force is used to drive the processing ring 424 to reset, so as to facilitate the re-cleaning and impurity collection of the impurities on the annular filter 406.
[0050] Example 2 A system for comprehensive utilization of waste heat in coal mines adopts the following method, comprising the following steps: S1. Treatment of exhaust air and utilization of exhaust air waste heat; The auxiliary waste heat utilization mechanism 3 drives the hollow waste heat rotating shaft 301 to rotate at high speed in the waste heat utilization cylinder 7 through the waste heat utilization motor 303, and the waste air waste heat pipe 2 flows into the hollow waste heat rotating shaft 301 through the waste air pipe bearing 302. The waste air passes through the hollow waste heat support rod 304 and the annular hollow waste heat rod 305 to discharge the waste air gas into the waste heat utilization cylinder 7 using the waste heat utilization hole. Under the action of the high-speed rotating hollow waste heat rotating shaft 301, a waste air cyclone is formed.
[0051] At the same time, the gushing water in the gushing waste heat pipe 8 flows into the waste heat utilization spray ring 702 through the main waste heat sleeve 701 of the main waste heat utilization mechanism. The waste heat utilization spray ring 702 rotates in the waste heat utilization cylinder 7 with the hollow waste heat rotating shaft 301. The waste heat guide convex ring 704 on the bottom surface of the main waste heat sleeve 701 rotates in the waste heat guide ring groove 705. The gushing water can flow along the waste heat guide hole through the waste heat diversion hole 706 into the waste heat utilization spray ring 702. A spray ring 702 is used to spray gushing water spray into the waste heat utilization cylinder 7. The gushing water spray contacts the exhaust air cyclone to remove suspended particles such as mineral dust in the exhaust air, forming gushing water droplets that fall down, thereby improving the purity of the exhaust air. The treated exhaust air flows out along the auxiliary waste heat utilization pipe 1 on the top surface of the waste heat utilization cylinder 7, and the exhaust air waste heat is utilized after further adsorption and dehumidification treatment; the main waste heat sleeve 701 is fixedly connected to the waste heat utilization cylinder 7 through the main waste heat bearing 703.
[0052] When the exhaust air is in full contact with the gushing water, the waste heat from the exhaust air and the waste heat from the gushing water will quickly exchange heat, reducing the temperature difference between the waste heat from the exhaust air and the waste heat from the gushing water, making it convenient to comprehensively utilize the waste heat from the gushing water and the waste heat from the exhaust air, preventing the temperatures of the waste heat from the gushing water and the waste heat from the exhaust air from being too high or too low, and improving the utilization effect of the waste heat from the coal mine.
[0053] S2. Treatment of gushing water and utilization of residual heat from gushing water; The gushing water after the spray treatment of the exhaust air flows into the waste heat treatment box 401 through the waste heat diversion pipe 6 arranged at the bottom of the waste heat utilization cylinder 7 by the waste heat treatment mechanism 4, and the gushing water is filtered and treated by the waste heat treatment structure. Specifically, the treatment control valve is closed. At this time, the gushing water in the waste heat diversion pipe 6 flows out through the waste heat treatment hole 410 of the waste heat processor on the waste heat treatment pipe 408, and the annular filter 406 between the treatment plate and the lower treatment plate 405 filters a large amount of suspended matter and heavy metals and other pollutants in the gushing water. The treated gushing water is comprehensively utilized through the main waste heat utilization pipe 5 on the waste heat treatment box 401 in cooperation with the auxiliary waste heat utilization pipe 1, so that the coal mine waste heat containing pollutants and impurities is converted into clean waste heat resources for utilization.
[0054] The auxiliary waste heat utilization pipeline 1 is spirally wound on the main waste heat utilization pipeline 5, and thermal insulation cotton matching the auxiliary waste heat utilization pipeline 1 is laid on the main waste heat utilization pipeline 5. The main waste heat utilization pipeline 5 is connected to a heating equipment matching the auxiliary waste heat utilization pipeline 1, and the waste heat of gushing water and exhaust air is used for heating to realize the comprehensive utilization of waste heat in the coal mine.
[0055] S3, using the auxiliary cleaner 409 to clean the annular filter 406; As the impurities in the gushing water are filtered, the impurities filtered on the annular filter 406 increase, and the filtering efficiency of the annular filter 406 decreases. The angle adjustment push rod 423 of the auxiliary cleaner 409 extends a certain length, and the angle adjustment push rod 423 is used to push the processing support rod 419 to rotate along the processing shaft 422 on the processing ring 424, so that the processing brush 420 at the end of the processing support rod 419 is fully in contact with the annular filter 406, and the residual heat treatment motor 403 is started. The movable end of the residual heat treatment motor 403 is meshed with the transmission gear on the residual heat treatment pipeline 408, driving the upper processing plate 407, the annular filter 406, and the lower processing plate 405 to rotate along the residual heat treatment bearing 402 As the annular filter 406 rotates, the processing brush 420 cleans the impurities attached to the inner wall of the annular filter 406, and affected by the contact friction between the annular filter 406 and the processing brush 420, the processing collar 424 rotates along the thread on the waste heat treatment pipe 408, and the processing collar 424 gradually moves downward along the waste heat treatment pipe 408, so that the processing brush 420 can gradually clean the impurities filtered on the annular filter 406, and as the processing collar 424 continues to move downward along the waste heat treatment pipe 408, the flexible cleaning net 421 can gather the cleaned impurities onto the lower processing plate 405, thereby realizing the cleaning action of the filtered impurities in the annular filter 406.
[0056] S4, collection and treatment of impurities; After the impurities filtered on the annular filter 406 are cleaned, the position of the lower processing plate 405 is adjusted by the waste heat processor, and then the impurities on the lower processing plate 405 are collected by the collection processor. Specifically, the guide bar adjustment push rod 414 of the waste heat processor is extended to push the processing guide bar 413 to move toward the bottom end of the waste heat treatment box 401 in the processing guide groove, and the processing guide bar 413 drives the upper processing plate 407, the annular filter 406 and the lower processing plate 405 to move through the waste heat treatment bearing 402, the movable end of the waste heat treatment motor 403 is separated from the transmission gear on the waste heat treatment pipeline 408, and the diversion collection pipe 411 on the lower processing plate 405 moves along the arc-shaped guide groove 412 toward the elliptical collection chamber 404 side of the collection processor.
[0057] After the guide bar adjustment push rod 414 is extended to a certain length, the guide collection pipe 411 is inserted into the guide collection hole 416, and the guide controller is opened under the action of the guide collection pipe 411. Specifically, the guide collection pipe 411 pushes the conical guide plate 428 and the guide support rod 425 to move in the guide closed groove, the guide closed spring 426 is stretched, and the conical guide plate 428 is separated from the guide collection hole 416. Under the action of the gushing water, the impurities cleaned on the lower processing plate 405 are discharged along the guide collection pipe 411 and the guide support rod 425. The impurities flow into the elliptical collecting chamber 404 through the collecting port 415 and into the processing and collecting box 10; the negative pressure fan 9 assists the impurities to flow into the processing and collecting box 10; the guide ring 417 and the adjusting swivel 418 guide the guide collecting tube 411 to facilitate the accurate insertion of the guide collecting tube 411 into the guide collecting hole 416; the guide collecting spring facilitates the resetting of the guide collecting tube 411 and can also prevent the guide collecting tube 411 from deforming and twisting during the up and down movement.
[0058] After a period of impurity collection, the guide bar adjustment push rod 414 drives the annular filter 406 to reset, and the movable end of the residual heat treatment motor 403 is combined with the transmission gear; the angle adjustment push rod 423 is reset, and then the residual heat treatment motor 403 is reversed, and the friction force is used to drive the processing ring 424 to reset, so as to facilitate the re-cleaning and impurity collection of the impurities on the annular filter 406.
[0059] Example 3 A coal mine waste heat comprehensive utilization system, which is different from Example 1 in that: a secondary waste heat utilization pipeline 1 is provided with a secondary waste heat treatment structure, the secondary waste heat treatment structure includes a secondary waste heat connecting rod arranged on the secondary waste heat utilization pipeline 1, the secondary waste heat connecting rod is provided with a secondary waste heat treatment rotating shaft, the secondary waste heat treatment rotating shaft is matched with a secondary waste heat motor arranged on the secondary waste heat connecting rod, and the secondary waste heat motor is matched with a gear arranged on the secondary waste heat rotating shaft; at least one secondary waste heat treatment rod is provided on the secondary waste heat treatment rotating shaft, and a waste heat treatment ring is provided at the end of the secondary waste heat treatment rod, and the waste heat Processing convex rings are provided on both sides of the processing ring, and a plurality of auxiliary waste heat processing grooves are symmetrically arranged in the waste heat processing ring, and the auxiliary waste heat processing grooves are filled with auxiliary waste heat adsorption materials; the waste heat processing ring cooperates with the fan ring processing hole arranged on the auxiliary waste heat utilization pipeline 1; the processing convex ring cooperates with the fan ring processing grooves arranged on both sides of the fan ring processing hole, and the fan ring processing groove is provided with a sealing gasket that cooperates with the processing convex ring; the inner side of the inner ring of the waste heat processing ring is provided with a processing ring groove that cooperates with the auxiliary waste heat processing rod, and the processing ring groove cooperates with the clamping processor arranged at the end of the auxiliary waste heat processing rod.
[0060] The clamping processor includes a clamping sleeve arranged at the end of the auxiliary waste heat treatment rod, a clamping shaft threadedly connected to the clamping sleeve is arranged in the clamping sleeve, a pair of clamping claws are arranged on the clamping shaft, the clamping claws are connected to an adjusting sleeve connected to the clamping shaft through a clamping plate, the clamping plate cooperates with a strip hole arranged on the side of the clamping sleeve, and limit baffles connected to the clamping sleeve are arranged at both ends of the strip hole; the clamping claws are connected by a clamping spring; the clamping shaft cooperates with a clamping motor arranged on the clamping sleeve.
[0061] Example 4 A comprehensive utilization system of coal mine waste heat, which is different from Example 1 in that: a damping magnetic connecting rod is provided on the processing brush 420, and the damping magnetic connecting rod cooperates with the processing sleeve arranged at the end of the processing support rod 419, and a damping electromagnet with repelling magnetic poles of the damping magnetic connecting rod is provided in the processing sleeve; a damping spring cooperating with the processing sleeve is sleeved on the damping magnetic connecting rod.
[0062] Example 5 A comprehensive utilization system of coal mine waste heat, which is different from Example 1 in that: one end of the diversion closing spring 426 is connected to the end of the diversion closing groove away from the conical guide plate 428, and the other end is arranged in the diversion adjustment cavity at the end of the diversion support rod 425; guide protrusions are symmetrically arranged on both sides of the diversion support rod 425, and the guide protrusions are matched with the guide grooves arranged on the sides of the diversion collection hole 416.
[0063] The above description is only a preferred embodiment of the present invention, but is not limited to the above examples. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A coal mine waste heat comprehensive utilization system, characterized in that: It includes an exhaust air waste heat pipeline and a gushing water waste heat pipeline. The gushing water waste heat pipeline is connected to a main waste heat utilization mechanism. The main waste heat utilization mechanism is provided with a waste heat treatment mechanism and an auxiliary waste heat utilization mechanism. The main waste heat utilization mechanism includes a waste heat utilization cylinder connected to the gushing water waste heat pipeline and a main waste heat utilization pipeline matched with the waste heat utilization cylinder; the auxiliary waste heat utilization mechanism includes an auxiliary waste heat utilization pipeline arranged on the top surface of the waste heat utilization cylinder and matched with the gap of the gushing water waste heat pipeline.
2. The coal mine waste heat comprehensive utilization system according to claim 1, characterized in that: The auxiliary waste heat utilization mechanism also includes a hollow waste heat rotating shaft arranged in the waste heat utilization cylinder and rotatably connected to the waste heat utilization cylinder. A hollow waste heat support rod matched with the bottom surface of the waste heat utilization cylinder is symmetrically arranged at the bottom of the hollow waste heat rotating shaft. The hollow waste heat support rod is connected through annular hollow waste heat rods. Waste heat utilization holes are evenly distributed on the hollow waste heat support rod and the annular hollow waste heat rod; the hollow waste heat rotating shaft is matched with a waste heat utilization motor arranged on the waste heat utilization cylinder, and an exhaust air duct bearing connected to the exhaust air waste heat duct is arranged at the top of the hollow waste heat rotating shaft.
3. The coal mine waste heat comprehensive utilization system according to claim 2 is characterized in that: The main waste heat utilization mechanism also includes a main waste heat sleeve which is sleeved on the hollow waste heat rotating shaft and rotatably connected to the hollow waste heat rotating shaft, and a waste heat utilization spray ring which is sleeved on the hollow waste heat rotating shaft and cooperates with the main waste heat sleeve. The waste heat utilization spray ring is provided with a waste heat guide ring groove, and waste heat drainage holes are evenly distributed in the waste heat guide ring groove. The waste heat guide ring groove cooperates with a waste heat guide convex ring arranged on the bottom surface of the main waste heat sleeve, and the bottom surface of the waste heat guide convex ring is evenly distributed with waste heat guide holes which cooperate with the waste heat drainage holes. The main waste heat sleeve is connected to the gushing waste heat pipeline.
4. The coal mine waste heat comprehensive utilization system according to claim 3 is characterized in that: The waste heat treatment mechanism includes a waste heat conduction pipe arranged at the bottom end of the waste heat utilization cylinder, a waste heat treatment box connected to the main waste heat utilization pipe is arranged at the bottom end of the waste heat conduction pipe, a waste heat treatment structure is arranged in the waste heat treatment box, the waste heat treatment structure includes a waste heat treatment pipe arranged in the waste heat treatment box and connected to the waste heat conduction pipe, a waste heat processor is arranged on the waste heat treatment pipe, and the waste heat processor cooperates with a collection processor arranged at the bottom end of the waste heat treatment pipe; the waste heat treatment pipe is connected to a processing and collecting box arranged at the bottom end of the waste heat treatment box; the bottom surface of the waste heat utilization cylinder is an inverted cone bottom surface.
5. The coal mine waste heat comprehensive utilization system according to claim 4 is characterized in that: The collection processor includes an elliptical collection chamber which is sleeved on the bottom end of the waste heat treatment pipeline and fixedly connected to the waste heat treatment pipe. The elliptical collection chamber cooperates with a treatment collection port arranged on the waste heat treatment pipeline, and the treatment collection port cooperates with a treatment control valve arranged in the waste heat treatment pipeline.
6. The coal mine waste heat comprehensive utilization system according to claim 5, characterized in that: The waste heat treatment device includes an upper treatment plate and a lower treatment plate which are sleeved on the waste heat treatment pipeline and rotatably connected to the waste heat treatment pipeline through a waste heat treatment bearing. An annular filter screen connected to the lower treatment plate is provided on the bottom surface of the upper treatment plate, and the annular filter screen cooperates with the waste heat treatment holes distributed on the waste heat treatment pipeline; treatment guide grooves are symmetrically arranged on the waste heat treatment pipeline, and treatment guide bars connected to the waste heat treatment bearings are arranged in the treatment guide grooves, and the treatment guide bars cooperate with the guide bar adjustment push rods arranged at the top of the treatment guide grooves.
7. The coal mine waste heat comprehensive utilization system according to claim 6, characterized in that: The lower part of the waste heat treatment pipeline is symmetrically provided with an arc-shaped guide groove that matches the gap of the treatment guide groove. A guide collection pipe connected to the lower treatment plate is provided in the arc-shaped guide groove. The guide collection pipe matches the guide collection hole arranged at the top of the elliptical collection cavity; the upper treatment plate is provided with a waste heat treatment motor that matches the waste heat treatment pipeline.
8. The coal mine waste heat comprehensive utilization system according to claim 7, characterized in that: The end of the arc-shaped guide groove away from the lower processing plate is provided with a guide ring that cooperates with the guide collection pipe, and the guide ring is provided with an adjustment ring with a clearance fit; the guide collection pipe is provided with a guide collection spring connected to the top of the arc-shaped guide groove; the lower processing plate is a conical processing plate; the processing and collection box body is provided with a negative pressure fan.
9. The coal mine waste heat comprehensive utilization system according to claim 8, characterized in that: The waste heat treatment pipeline is provided with an auxiliary cleaner matched with an annular filter, the auxiliary cleaner includes a treatment ring arranged on the waste heat treatment pipeline and threadedly connected with the waste heat treatment pipeline, a treatment support rod is symmetrically arranged on the treatment ring, a treatment brush matched with the annular filter is arranged at the end of the treatment support rod, and the treatment brush is matched with a flexible cleaning net arranged on the treatment support rod and matched with the treatment ring; the treatment support rod is rotatably connected with the treatment ring through a treatment shaft, and the treatment ring is provided with an angle adjustment push rod matched with the treatment support rod.
10. The coal mine waste heat comprehensive utilization system according to claim 9, characterized in that: A diversion controller is provided in the diversion collection hole, and the diversion controller includes a conical diversion plate arranged in the diversion collection hole and matched with the diversion collection pipe. The conical diversion plate is matched with the diversion closed groove arranged on the side of the diversion collection hole through a diversion support rod. A diversion closed spring connected to the diversion support rod is provided in the diversion closed groove; a diversion groove is provided on the conical diversion plate.
Citation Information
Patent Citations
System for comprehensively utilizing coal mine waste heat
CN112360585A