Test resource management and control method and device, equipment, storage medium and program product

By obtaining and analyzing the operational statistics of the battery test group, predicting the waiting time for the battery test, and performing resource regulation when the threshold is exceeded, the problem of untimely control of battery test resource is solved, and the test efficiency and timeliness of result delivery are improved.

CN119863225AActive Publication Date: 2025-04-22CONTEMPORARY AMPEREX TECHNOLOGY CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202311359595.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-10-19
Publication Date
2025-04-22
Estimated Expiration
2043-10-19

AI Technical Summary

Technical Problem

In the prior art, battery testing resources cannot be controlled in time, resulting in too long waiting time for tests, affecting test efficiency and result delivery.

Method used

By obtaining the test operation statistics of the target test group to which the target battery is to be tested, predict the test waiting time of the target battery to be tested, and perform test resource management and control processing when the waiting time exceeds the threshold to ensure timely control of the test resources.

Benefits of technology

It effectively reduces the test waiting time of the target battery to be tested, improves the test efficiency, and reduces the risk of test results being delivered beyond the deadline.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119863225A_ABST
    Figure CN119863225A_ABST
Patent Text Reader

Abstract

The invention relates to a test resource management and control method, device and equipment, a storage medium and a program product, and the method comprises the steps: obtaining the test operation statistical data of a target test group to which a target to-be-tested battery belongs, predicting the test waiting time of the target to-be-tested battery according to the test operation statistical data of the target test group, and under the condition that the test waiting duration exceeds the test duration threshold value of the target to-be-tested battery, performing test resource management and control processing on the target to-be-tested battery. According to the method, the timeliness of management and control of the test resources of the battery is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of testing technology, and in particular to a test resource management method, device, equipment, storage medium and program product. Background Art

[0002] With the continuous development and progress of science and technology, testing technology is playing an increasingly important role in industrial development.

[0003] Taking battery testing as an example, in the related art, test resources are configured for the battery in advance, and the battery to be tested is tested using the configured test resources.

[0004] However, there is a problem in the related art that battery testing resources cannot be managed and controlled in a timely manner. Summary of the invention

[0005] Based on this, it is necessary to provide a test resource management method, device, equipment, storage medium and program product to address the above technical problems, so as to improve the timeliness of the management and control of battery test resources.

[0006] In a first aspect, an embodiment of the present application provides a test resource management method, including:

[0007] Obtain test operation statistics of the target test group to which the target battery to be tested belongs;

[0008] According to the test operation statistics of the target test group, the test waiting time of the target battery to be tested is predicted;

[0009] When the test waiting time exceeds the test time threshold of the target battery to be tested, test resource management and control processing is performed on the target battery to be tested.

[0010] In the test resource control method provided in the embodiment of the present application, the test operation statistics of the target test group to which the target battery to be tested belongs are obtained, and the test waiting time of the target battery to be tested is predicted according to the test operation statistics of the target test group. When the test waiting time exceeds the test time threshold of the target battery to be tested, the target battery to be tested is subjected to test resource control processing. In this method, since the test operation statistics of the target test group can be data collected and counted in real time by the target test group during the test process, the test waiting time of the target battery to be tested is predicted through the test operation statistics of the target test group, so that the use of the test resources of the target test group can be better determined, so that when the test waiting time of the target battery to be tested exceeds the test time threshold, the test resources of the target battery to be tested can be timely controlled, the test waiting time of the target battery to be tested is reduced, and the test efficiency is improved; and, when the test waiting time of the target battery to be tested is greater than the test time threshold of the target battery to be tested, the test resources are timely adjusted for the target battery to be tested, reducing the risk of overdue delivery of the test results of the target battery to be tested.

[0011] In one embodiment, obtaining test operation statistics of a target test group to which a target battery to be tested belongs includes:

[0012] Obtain the basic test information of each battery to be tested under different test groups collected in real time;

[0013] According to the basic test information, determine multiple test operation indicator values ​​corresponding to each battery to be tested;

[0014] Determine test operation statistics of each test group based on multiple test operation indicator values ​​corresponding to each battery to be tested;

[0015] The test operation statistics of the target test group to which the target battery to be tested belongs are obtained from the test operation statistics of each test group.

[0016] In the test resource management and control method provided in the embodiment of the present application, the test basic information of each battery to be tested under different test groups collected in real time is obtained, and based on the test basic information, multiple test operation index values ​​corresponding to each battery to be tested are determined, and then the test operation statistics of each test group are determined based on the multiple test operation index values ​​corresponding to each battery to be tested, and finally, the test operation statistics of the target test group to which the target battery to be tested belongs are obtained from the test operation statistics of each test group. In this method, the test operation index value corresponding to each battery to be tested is determined by the test basic information of each battery to be tested collected in real time, so that the current test status of each battery to be tested can be determined more accurately; and the test operation statistics of each test group are determined by each test operation index value, so that the operation status and test resource usage of each test group can be evaluated more objectively, reducing the error caused by subjective judgment, thereby improving the accuracy of test resource management and control of the target battery to be tested.

[0017] In one embodiment, the basic test information is collected by a data collection tool, and the basic test information of each battery to be tested under different test groups collected in real time is obtained, including:

[0018] Receive the basic test information of each battery to be tested sent by the data acquisition tool.

[0019] In the test resource management method provided in the embodiment of the present application, the basic test information can be collected by a data acquisition tool, and the basic test information of each battery to be tested sent by the data acquisition tool is received. In this method, the basic test information of the battery to be tested is collected by the data acquisition tool, which improves the efficiency and convenience of collecting the test data of the battery to be tested. In this way, the test operation statistics of the target test battery can have a high real-time performance, thereby improving the accuracy of the test resource management of the target battery to be tested.

[0020] In one embodiment, the display end of the data acquisition tool includes a plurality of action-type acquisition function controls, and each battery to be tested includes a battery identification; the data acquisition tool collects basic test information of each battery to be tested, including:

[0021] For any battery to be tested, the battery identification is collected by a data collection tool and the collection function control of the currently corresponding action type on the data collection tool is triggered to obtain the basic test information of the battery to be tested.

[0022] In the test resource management method provided in the embodiment of the present application, for any battery to be tested, the battery identification is collected by the data collection tool and the collection function control of the action type currently corresponding to the data collection tool is triggered to obtain the basic test information of the battery to be tested; wherein, the display end of the data collection tool includes a plurality of collection function controls of action types, and each battery to be tested includes a battery identification. In this method, by setting a battery identification for each battery to be tested, the accuracy and traceability of the basic test information collected for the battery to be tested can be improved; in addition, by setting a plurality of collection function controls of action types on the display end of the data collection tool, the automatic collection of the basic test information of the battery to be tested can be realized, which improves the collection efficiency and thus improves the real-time nature of the basic test information.

[0023] In one embodiment, the basic test information includes different action types that have been executed by each battery to be tested and the collection time of executing each action type; according to the basic test information, multiple test operation indicator values ​​corresponding to each battery to be tested are determined, including:

[0024] Determine at least one test operation indicator corresponding to each battery to be tested according to different action types that have been performed by each battery to be tested;

[0025] According to the collection time when each battery to be tested performs each action type, the value of each test operation indicator corresponding to each battery to be tested is determined, and a plurality of test operation indicator values ​​corresponding to each battery to be tested are obtained.

[0026] In the test resource management and control method provided in the embodiment of the present application, at least one test operation indicator corresponding to each battery to be tested is determined according to the different action types that have been performed by each battery to be tested, and the value of each test operation indicator corresponding to each battery to be tested is determined according to the collection time when each battery to be tested performs each action type, so as to obtain multiple test operation indicator values ​​corresponding to each battery to be tested. In this method, since the test operation indicator is obtained based on the basic test information of the battery to be tested, it is possible to determine the test operation indicator corresponding to the battery to be tested according to the different action types that have been performed by each battery to be tested; and, by determining the value of the test operation indicator corresponding to each battery to be tested through the collection time when each battery to be tested performs each action type, the accuracy of the test operation indicator value of the battery to be tested is improved.

[0027] In one embodiment, based on a plurality of test operation indicator values ​​corresponding to each battery to be tested, test operation statistics of each test group are determined, including:

[0028] Obtain the data acquisition tool identifier, tester identifier, and test channel identifier corresponding to the test basic information of each battery to be tested;

[0029] According to the correspondence between the tester identification and the test group, the correspondence between the test channel identification and the test group, and multiple test operation indicator values ​​corresponding to each battery to be tested, test operation statistics of each test group are generated.

[0030] In the test resource management and control method provided in the embodiment of the present application, the data acquisition tool identifier, tester identifier and test channel identifier corresponding to the test basic information of each battery to be tested are obtained, and the test operation statistics of each test group are generated according to the correspondence between the tester identifier and the test group, the correspondence between the test channel identifier and the test group, and the multiple test operation indicator values ​​corresponding to each battery to be tested. In this method, each battery to be tested is classified by the test group through the correspondence between the tester identifier and the test group, and the correspondence between the test channel identifier and the test group, and the test operation statistics of each test group are obtained. In this way, the test operation statistics of each test group are analyzed in a targeted manner, which can make the test operation status of each test group clearer and improve the accuracy of subsequent test resource management of each test group.

[0031] In one embodiment, the method further comprises:

[0032] The test operation statistics of each test group are displayed in a visual format to indicate resource management of each test group based on the test operation statistics of each test group.

[0033] In the test resource management method provided in the embodiment of the present application, the test operation statistics of each test group are displayed in a visual format to indicate that the resource management of each test group is performed based on the test operation statistics of each test group. In this method, the test operation statistics of each test group are displayed in a visual format, which enables the test business personnel to obtain the operating efficiency of each test group in a timely manner and the test progress of each test group in real time.

[0034] In one embodiment, predicting the test waiting time of the target battery to be tested according to the test operation statistical data of the target test group includes:

[0035] According to the test operation statistics of the target test group, the test time required for other batteries to be tested in the target test group to occupy test resources except the target battery to be tested is obtained;

[0036] The test waiting time of the target battery to be tested is predicted based on the test time of the test resources required by other batteries to be tested.

[0037] In the test resource management method provided in the embodiment of the present application, the test time required for the other batteries to be tested in the target test group to occupy the test resources except the target battery to be tested is obtained according to the test operation statistical data of the target test group, and the test waiting time of the target battery to be tested is predicted according to the test time required for the other batteries to be tested to occupy the test resources. In this method, since the other batteries to be tested are the batteries to be tested in the target test group except the target battery to be tested, and are the batteries to be tested that need to be tested before the target battery to be tested is tested, the test time of the target battery to be tested is predicted by the test time required for the other batteries to be tested in the target test group except the target battery to be tested, the test time of the target battery to be tested is taken into account, and the test time of the other batteries to be tested in the target test group is improved, and the accuracy of the predicted test waiting time of the target battery to be tested is improved.

[0038] In one embodiment, obtaining the test time required for other batteries to be tested in the target test group to occupy test resources except the target battery to be tested includes:

[0039] Determine the types of actions to be performed on other batteries to be tested in the target test group except the target battery to be tested according to the test operation statistical data of the target test group;

[0040] According to the types of actions to be performed of the other batteries to be tested, multiple operation indicator values ​​corresponding to the types of actions to be performed of the other batteries to be tested are obtained;

[0041] According to multiple operation indicator values ​​corresponding to the action type to be executed, the test time required for each other battery to be tested to occupy the test resources is determined.

[0042] In the test resource management and control method provided in the embodiment of the present application, the types of actions to be performed of other batteries to be tested in the target test group other than the target battery to be tested are determined based on the test operation statistical data of the target test group, and based on the types of actions to be performed of each other battery to be tested, multiple operation indicator values ​​corresponding to the types of actions to be performed of each other battery to be tested are obtained, and then the test duration required for each other battery to be tested to occupy the test resources is determined based on the multiple operation indicator values ​​corresponding to the types of actions to be performed. In this method, when determining the test duration required for each other battery to be tested to occupy the test resources, the action types that have been executed by other batteries to be tested and the types of actions to be performed are taken into consideration, and the test duration required for other batteries to be tested to occupy the test resources is determined through the multiple operation indicator values ​​corresponding to the types of actions to be performed, so that the calculated test duration required to occupy the test resources is more accurate.

[0043] In one embodiment, the multiple operating indicator values ​​corresponding to the action type to be performed include the test cycle and the time for dismantling and setting up the test bench of each other battery to be tested; according to the multiple operating indicator values ​​corresponding to the action type to be performed, determining the test time required for each other battery to be tested to occupy the test resources includes:

[0044] For any of the other batteries to be tested, the sum of the test cycle and the time for dismantling and setting up the test bench corresponding to the battery to be tested is determined as the test time required for the battery to be tested to occupy the test resources.

[0045] In the test resource management method provided in the embodiment of the present application, the multiple operation index values ​​corresponding to the action type to be executed include the test cycle and the time for dismantling the test bench of each other battery to be tested. For any of the other batteries to be tested, the sum of the test cycle and the time for dismantling the test bench corresponding to the battery to be tested is determined as the test time required for the battery to be tested to occupy the test resources. In this method, since the test time required for the battery test includes the test cycle and the time for dismantling the test bench during the battery testing process, the sum of the test cycle and the time for dismantling the test bench corresponding to the battery to be tested is determined as the test time required for the battery to be tested to occupy the test resources, so that the determined test time required for the battery to be tested to occupy the test resources is more accurate.

[0046] In one embodiment, predicting the test waiting time of the target battery to be tested according to the test time of the test resources required to be occupied by other batteries to be tested includes:

[0047] According to the test time required for other batteries to be tested to occupy test resources, obtain the test resource occupation time of the target test group;

[0048] Obtain the number of test channels and maintenance time ratio of the target test group;

[0049] Determine the test waiting time of the target battery to be tested based on the test resource occupancy time, the number of test channels and the maintenance time ratio.

[0050] In the test resource management method provided in the embodiment of the present application, the test resource occupation time of the target test group is obtained according to the test time required for the test resources to be occupied by other batteries to be tested, and the number of test channels and the maintenance time ratio of the target test group are obtained, and then the test waiting time of the target battery to be tested is determined according to the test resource occupation time, the number of test channels and the maintenance time ratio. In this method, when determining the test waiting time of the target battery to be tested, not only the test time required for the test resources to be occupied by other batteries to be tested in the target test group is considered, but also the current test resource information of the target test group is considered, thereby improving the accuracy of the test waiting time of the target battery to be tested.

[0051] In one embodiment, the test resource management and control process is performed on the target battery to be tested, including:

[0052] According to the test operation statistics of the target test group, the test resource information required for the target battery to be tested is obtained;

[0053] Determine a resource control scheme for the target battery to be tested according to the test resource information required by the target battery to be tested and the test time threshold of the target battery to be tested;

[0054] By executing the resource control plan of the target battery to be tested, the test resource control processing is performed on the target battery to be tested.

[0055] In the test resource control method provided in the embodiment of the present application, the test resource information required by the target battery to be tested is obtained according to the test operation statistical data of the target test group, and the resource control scheme of the target battery to be tested is determined according to the test resource information required by the target battery to be tested and the test duration threshold of the target battery to be tested, and then the test resource control processing is performed on the target battery to be tested by executing the resource control scheme of the target battery to be tested. In this method, the resource control scheme is determined by the test duration threshold of the target battery to be tested and the test resource information required by the target battery to be tested. The resource control scheme can ensure that the test waiting time of the target battery to be tested does not exceed the test duration threshold, thereby improving the test efficiency of the target battery to be tested and reducing the risk of overdue delivery of the test results of the target battery to be tested.

[0056] In one of the embodiments, a resource control scheme of the target battery to be tested is determined according to the test resource information required by the target battery to be tested and the test time threshold of the target battery to be tested, including:

[0057] According to the test resource information required by the target battery to be tested and the test time threshold of the target battery to be tested, multiple candidate resource control schemes are obtained;

[0058] Obtaining the basic value of execution resource consumption of each candidate resource control scheme;

[0059] The candidate resource control scheme with the smallest basic value of resource consumption is determined as the resource control scheme of the target battery to be tested.

[0060] In the test resource control method provided in the embodiment of the present application, according to the test resource information required by the target battery to be tested and the test duration threshold of the target battery to be tested, a plurality of candidate resource control schemes are obtained, and the basic value of the execution resource consumption of each candidate resource control scheme is obtained, and then the candidate resource control scheme with the smallest basic value of the execution resource consumption is determined as the resource control scheme of the target battery to be tested. In this method, since the plurality of candidate resource control schemes are all determined according to the test resource information required by the target battery to be tested and the test duration threshold of the target battery to be tested, the plurality of candidate resource control schemes can satisfy that the test waiting time of the target battery to be tested does not exceed the test duration threshold, therefore, the candidate resource control scheme with the smallest basic value of the resource consumption is determined as the resource control scheme of the target battery to be tested, which can reduce the cost of test resource control of the target battery to be tested.

[0061] In one embodiment, obtaining the basic value of execution resource consumption of each candidate resource control scheme includes:

[0062] When the candidate resource control scheme is to adjust multiple adjustable resource index values ​​in the target test group, multiple different adjustable resource adjustment strategies are obtained; each adjustable resource adjustment strategy has a different increase in each adjustable resource index;

[0063] According to the preset basic value of unit consumption for adjusting each adjustable resource indicator, the basic value of resource consumption corresponding to each adjustable resource adjustment strategy is determined.

[0064] In the test resource control method provided in the embodiment of the present application, when the candidate resource control scheme is to adjust multiple adjustable resource indicator values ​​in the target test group, a plurality of different adjustable resource adjustment strategies are obtained; wherein, the increase of each adjustable resource indicator in each adjustable resource adjustment strategy is different; and the basic value of resource consumption corresponding to each adjustable resource adjustment strategy is determined according to the preset basic value of unit consumption for adjusting each adjustable resource indicator. In this method, since each adjustable resource adjustment strategy includes the increase of each adjustable resource indicator, the basic value of resource consumption corresponding to each adjustable resource adjustment strategy can be calculated through the preset basic value of unit consumption for adjusting each adjustable resource indicator, thereby improving the speed of determining the basic value of resource consumption corresponding to each adjustable resource adjustment strategy.

[0065] In one embodiment, obtaining the basic value of execution resource consumption of each candidate resource control scheme includes:

[0066] When the candidate resource control scheme is to entrust a third-party organization to conduct the test, the number of batteries to be tested in the target test group to be entrusted is obtained;

[0067] According to the number of batteries to be tested that need to be commissioned in the target test group and the preset basic value of commissioned resource consumption of the third-party organization, the basic value of execution resource consumption for commissioning the third-party organization to conduct the test is determined.

[0068] In the test resource control method provided in the embodiment of the present application, when the candidate resource control scheme is to entrust a third-party organization to conduct the test, the number of batteries to be tested in the target test group that need to be entrusted is obtained, and the basic value of the execution resource consumption of entrusting the third-party organization to conduct the test is determined based on the number of batteries to be entrusted in the target test group and the preset basic value of the entrusted resource consumption of the third-party organization. In this method, the candidate resource control scheme is to entrust a third-party organization to conduct the test, and a resource control scheme other than the method of increasing resources is proposed, which improves the diversity of the test resource control of the target battery to be tested, thereby enriching the control method of the test resources.

[0069] In one embodiment, the method further comprises:

[0070] When the test waiting time exceeds the test time threshold of the target battery to be tested, a warning message is generated; the warning message is used to indicate that the test resources of the target battery to be tested are insufficient.

[0071] In the test resource management method provided in the embodiment of the present application, when the test waiting time exceeds the test time threshold of the target battery to be tested, an early warning message is generated; wherein the early warning message is used to indicate that the test resources of the target battery to be tested are insufficient. In this method, when the test waiting time exceeds the test time threshold of the target battery to be tested, an early warning prompt is issued, so that the test management personnel can timely manage the test resources of the target battery to be tested.

[0072] In one embodiment, the method further comprises:

[0073] When the test waiting time does not exceed the test time threshold of the target battery to be tested, obtaining a waiting time difference between the test time threshold and the test waiting time;

[0074] The measurable battery remaining of the target test group is determined based on the waiting time difference, the test operation statistics of the target test group, and the current test resource information of the target test group; the measurable battery remaining is used for test resource management and control of the target test group.

[0075] In the test resource management and control method provided in the embodiment of the present application, when the test waiting time does not exceed the test time threshold of the target battery to be tested, the waiting time difference between the test time threshold and the test waiting time is obtained, and the measurable battery remaining amount of the target test group is determined according to the waiting time difference, the test operation statistics data of the target test group and the current test resource information of the target test group; wherein the measurable battery remaining amount is used for test resource management and control of the target test group. In this method, the existing resources are quantitatively evaluated, and when the test waiting time does not exceed the test time threshold of the target battery to be tested, the measurable battery remaining amount is clarified, which can help the test management personnel to reasonably arrange the test plan and test sequence, thereby improving the test efficiency.

[0076] In a second aspect, the embodiment of the present application further provides a test resource management and control device, including:

[0077] An acquisition module is used to obtain test operation statistics of a target test group to which a target battery to be tested belongs;

[0078] A prediction module, used to predict the test waiting time of the target battery to be tested according to the test operation statistical data of the target test group;

[0079] The control module is used to perform test resource control processing on the target battery to be tested when the test waiting time exceeds the test time threshold of the target battery to be tested.

[0080] In a third aspect, an embodiment of the present application provides a computer device, including a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the method provided in any embodiment of the first aspect when executing the computer program.

[0081] In a fourth aspect, an embodiment of the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of the method provided in any embodiment of the first aspect above.

[0082] In a fifth aspect, an embodiment of the present application further provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of the method provided in any embodiment of the first aspect above.

[0083] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0084] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present application. Moreover, the same reference numerals are used throughout the drawings to represent the same components. In the drawings:

[0085] Figure 1 is an internal structure diagram of a computer device in one embodiment;

[0086] Figure 2 A schematic diagram of a process for testing a resource management and control method in an embodiment;

[0087] Figure 3 A schematic diagram of a flow chart of a test resource management method in another embodiment;

[0088] Figure 4 A schematic diagram of a display interface of a data collection tool in one embodiment;

[0089] Figure 5 A schematic diagram of a flow chart of a test resource management method in another embodiment;

[0090] Figure 6 A schematic diagram of a flow chart of a test resource management method in another embodiment;

[0091] Figure 7 A schematic diagram of a flow chart of a test resource management method in another embodiment;

[0092] Figure 8 A schematic diagram of a flow chart of a test resource management method in another embodiment;

[0093] Fig. 9 A schematic diagram of a flow chart of a test resource management method in another embodiment;

[0094] Fig.10 A schematic diagram of a flow chart of a test resource management method in another embodiment;

[0095] Fig.11 A schematic diagram of a flow chart of a test resource management method in another embodiment;

[0096] Fig.12 A schematic diagram of a flow chart of a test resource management method in another embodiment;

[0097] Fig.13 A schematic diagram of a flow chart of a test resource management method in another embodiment;

[0098] Fig.14 A schematic diagram of a flow chart of a test resource management method in another embodiment;

[0099] Fig.15 A schematic diagram of a flow chart of a test resource management method in another embodiment;

[0100] Fig.16 A schematic diagram of a transmission process of basic test information of a battery to be tested in one embodiment;

[0101] Fig.17 A structural block diagram of a test resource management and control device in an embodiment;

[0102] Fig.18 It is a structural block diagram of a test resource management and control device in another embodiment;

[0103] Fig.19 It is a structural block diagram of a test resource management and control device in another embodiment;

[0104] Fig. 20 It is a structural block diagram of a test resource management and control device in another embodiment;

[0105] Fig.21 It is a structural block diagram of a test resource management and control device in another embodiment;

[0106] Fig. 22 It is a structural block diagram of a test resource management and control device in another embodiment;

[0107] Fig.23 It is a structural block diagram of a test resource management and control device in another embodiment;

[0108] Fig.24 It is a structural block diagram of a test resource management and control device in another embodiment;

[0109] Fig.25 It is a structural block diagram of a test resource management and control device in another embodiment;

[0110] Fig.26 It is a structural block diagram of a test resource management and control device in another embodiment;

[0111] Fig. 27 It is a structural block diagram of a test resource management and control device in another embodiment;

[0112] Fig.28 It is a structural block diagram of a test resource management and control device in another embodiment;

[0113] Fig.29 It is a structural block diagram of a test resource management and control device in another embodiment;

[0114] Fig.30 It is a structural block diagram of a test resource management and control device in another embodiment;

[0115] Fig.31It is a structural block diagram of a test resource management and control device in another embodiment;

[0116] Fig.32 It is a structural block diagram of a test resource management and control device in another embodiment;

[0117] Fig.33 It is a structural block diagram of a test resource management and control device in another embodiment. DETAILED DESCRIPTION

[0118] The following embodiments of the technical solution of the present application are described in detail in conjunction with the accompanying drawings. The following embodiments are only used to more clearly illustrate the technical solution of the present application, and are therefore only used as examples, and cannot be used to limit the scope of protection of the present application.

[0119] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those generally understood by technicians in the technical field of the present application; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit the present application; the term "including" in the specification and claims of the present application and the above-mentioned figure descriptions and any variations thereof are intended to cover non-exclusive inclusions. In the description of the embodiments of the present application, the meaning of "multiple" is more than two, unless otherwise clearly and specifically defined. The reference to "embodiment" in this article means that the specific features, structures or characteristics described in conjunction with the embodiment may be included in at least one embodiment of the present application. The appearance of this phrase in various positions in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments. In the description of the embodiments of the present application, the term "and / or" is only a description of the association relationship of the associated objects, indicating that there can be three relationships, such as A and / or B, which can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.

[0120] Before testing the battery, test resources are pre-configured for the battery, and the battery is tested using the pre-configured test resources. However, when there are too many test tasks, there may be overdue test tasks, resulting in the battery test results not being delivered in time.

[0121] Based on the above considerations, an embodiment of the present application proposes a test resource regulation method, which directly predicts the test waiting time of the target battery to be tested based on the test operation statistical data of the target test group, and performs test resource management and control on the target battery to be tested when the test waiting time exceeds the test time threshold of the target battery to be tested. In this way, when the test waiting time of the target battery to be tested is greater than the test time threshold of the target battery to be tested, resources are timely regulated for the target battery to be tested, thereby reducing the risk of overdue delivery of test results of the target battery to be tested.

[0122] The test resource management method provided in the embodiment of the present application can be applied to a computer device, which can be a computing device including but not limited to a smart terminal, a personal computer, a workbench, a processor, a wearable smart device, a laptop computer, and a server. For example, the computer device can be a server, and its internal structure diagram can be as follows: Figure 1 As shown; the computer device includes a processor, a memory, an input / output interface (Input / Output, referred to as I / O) and a communication interface. Among them, the processor, the memory and the input / output interface are connected through a system bus, and the communication interface is connected to the system bus through the input / output interface. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store test resource management and control data. The input / output interface of the computer device is used to exchange information between the processor and an external device. The communication interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a test resource management and control method is implemented.

[0123] Those skilled in the art will understand that Figure 1 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0124] In an exemplary embodiment, Figure 2 As shown, a test resource management method is provided, which is applied to Figure 1 The computer device in the example is used to illustrate, including the following steps:

[0125] S201, obtaining test operation statistics of a target test group to which a target battery to be tested belongs.

[0126] The target battery to be tested is any battery to be tested in the test task, and the target test group is the test group to which the target battery to be tested belongs. For example, the battery test task may include performance battery test, performance module test, environmental test, mechanical vibration test, safety puncture test, etc., and the test group may include performance battery test group, performance module test group, environmental test group, mechanical vibration test group, safety puncture test group, etc.

[0127] Therefore, if the target battery to be tested is a battery that needs to be subjected to an environmental test, the target test group to which the target battery to be tested belongs is the environmental test group.

[0128] Test operation statistics can be various test indicators and data collected and recorded during the battery testing process. For example, the test operation statistics of the target test group may include the number of completed tests, test pass rate, average test time, test failure rate, test equipment utilization and test cost, etc.

[0129] Among them, the number of completed tests may refer to the total number of battery tests completed within a certain time frame; the test pass rate may refer to the ratio between the number of batteries that passed the test and the total number of battery tests; the average test time may refer to the average time required for each battery test; the test failure rate may refer to the ratio between the number of failures occurring during the test and the total number of battery tests; the test equipment utilization rate may refer to the ratio between the usage time of the test equipment and the total available time; the test cost may refer to the cost of manpower, equipment and materials during the test process, etc.

[0130] Optionally, during the battery test of each test group, the test data in each test group is collected in real time, and based on the test data in each test group, the test operation statistics of each test group are obtained, and the test operation statistics of each test group are stored in the database through the storage module of the computer device.

[0131] Therefore, the method for obtaining the test operation statistics of the target test group to which the target battery to be tested belongs can be, first, determining the target test group to which the target battery to be tested belongs according to the battery identification of the target battery to be tested, and then obtaining the test operation statistics corresponding to the target test group from the storage module in the computer device.

[0132] S202: predicting the test waiting time of the target battery to be tested according to the test operation statistical data of the target test group.

[0133] The test waiting time of the target battery to be tested indicates the waiting time required before the target battery to be tested is tested.

[0134] In one embodiment, the test waiting time of the target battery to be tested is predicted according to a pre-trained prediction model; specifically, the test operation statistics data of the target test group are input into the prediction model, and the test operation statistics data of the target test group are analyzed by the prediction model to obtain the test waiting time of the target battery to be tested output by the prediction model.

[0135] In an optional embodiment, the target battery to be tested can be a battery for a test task to be added to a target test group, or the test waiting time of the target battery to be tested can be obtained directly based on the test operation statistics of the target test group; for example, the test operation statistics of the target test group include the time the target test group still needs to be tested, and the time the target test group still needs to be tested is determined as the test waiting time of the target battery to be tested.

[0136] S203: When the test waiting time exceeds the test time threshold of the target battery to be tested, perform test resource management and control on the target battery to be tested.

[0137] The test duration threshold may indicate the target battery to be tested for the latest allowed test duration. Therefore, when the test waiting duration exceeds the test duration threshold of the target battery to be tested, it indicates that the test waiting duration of the target battery to be tested is long, and there is a risk of delayed delivery of the test result of the target battery to be tested. Therefore, the target battery to be tested is subjected to test resource management and control, and the test waiting duration of the target battery to be tested does not exceed the test duration threshold by means of the test resource management and control of the target battery to be tested.

[0138] The test resource management and control method for the target battery to be tested may be to add test resources to the target test group to which the target battery to be tested belongs, so as to test the target test group with the added test resources.

[0139] The method for performing test resource control on the target battery to be tested can be to generate a test resource control plan for the target test group based on the test waiting time and the test time threshold, and implement test resource control of the target battery to be tested through the test resource control plan; wherein, the test waiting time and the test time threshold of the target battery to be tested can be input into a pre-trained resource control model, and the test waiting time and the test time threshold are analyzed through the resource control model to obtain the test resource control plan.

[0140] Among them, the test resource management and control plan may include adding test equipment, test personnel, etc. to the target test group.

[0141] Optionally, the test time thresholds for different test groups may be different; for example, the test time threshold for the performance battery test group is 168 hours, the test time threshold for the performance module test group is 150 hours, the test time threshold for the environmental test group is 288 hours, the test time threshold for the mechanical vibration test group is 720 hours, and the test time threshold for the safety extrusion test group is 228 hours.

[0142] In the test resource control method provided in the embodiment of the present application, the test operation statistics of the target test group to which the target battery to be tested belongs are obtained, and the test waiting time of the target battery to be tested is predicted according to the test operation statistics of the target test group. When the test waiting time exceeds the test time threshold of the target battery to be tested, the target battery to be tested is subjected to test resource control processing. In this method, since the test operation statistics of the target test group can be data collected and counted in real time by the target test group during the test process, the test waiting time of the target battery to be tested is predicted through the test operation statistics of the target test group, so that the use of the test resources of the target test group can be better determined, so that when the test waiting time of the target battery to be tested exceeds the test time threshold, the test resources of the target battery to be tested can be timely controlled, the test waiting time of the target battery to be tested is reduced, and the test efficiency is improved; and, when the test waiting time of the target battery to be tested is greater than the test time threshold of the target battery to be tested, the test resources are timely adjusted for the target battery to be tested, reducing the risk of overdue delivery of the test results of the target battery to be tested.

[0143] The following describes in detail how to obtain the test operation statistics of the target test group to which the target battery to be tested belongs through an embodiment. In one embodiment, Figure 3 As shown, obtaining the test operation statistics of the target test group to which the target battery to be tested belongs includes the following steps:

[0144] S301, obtaining basic test information of each battery to be tested under different test groups collected in real time.

[0145] The basic test information may be collected through a data collection tool.

[0146] In one embodiment, obtaining the basic test information of each battery to be tested under different test groups collected in real time includes: receiving the basic test information of each battery to be tested sent by a data collection tool.

[0147] When the battery to be tested is being tested, the data acquisition tool can collect the test status of the battery to be tested in real time; for example, the battery identification, action type, acquisition time, test channel identification, etc. of the battery to be tested can be collected through the data acquisition tool; wherein, the action type can be that the test process of the battery to be tested includes multiple test links, and each test link is regarded as an action type, that is, each time the battery to be tested reaches an action type, the data acquisition tool will perform data acquisition once; the test channel can be the station where the battery to be tested performs the corresponding test on the test channel. In addition, each data acquisition tool has a unique data acquisition tool identification.

[0148] Therefore, the basic test information of the battery to be tested may include the data acquisition tool identification, acquisition time, animal type, battery identification, and test channel identification. As shown in Table 1, Table 1 may be the basic test information of each battery to be tested under different test groups collected by the data acquisition tool. It should be noted that the basic test information in Table 1 is only an example.

[0149] Table 1

[0150]

[0151]

[0152] Optionally, in order to improve the test efficiency of the battery to be tested, when sampling the battery to be tested, the test channel of the battery to be tested may not be determined first, and the test channel of the battery to be tested is determined only before the battery to be tested is tested.

[0153] In the test resource management method provided in the embodiment of the present application, the basic test information can be collected by a data acquisition tool, and the basic test information of each battery to be tested sent by the data acquisition tool is received. In this method, the basic test information of the battery to be tested is collected by the data acquisition tool, which improves the efficiency and convenience of collecting the test data of the battery to be tested. In this way, the test operation statistics of the target test battery can have a high real-time performance, thereby improving the accuracy of the test resource management of the target battery to be tested.

[0154] S302: Determine multiple test operation indicator values ​​corresponding to each battery to be tested according to the test basic information.

[0155] Based on the test basic information of each battery to be tested, multiple test operation index values ​​corresponding to each battery to be tested are determined, wherein the test operation index value may be a test operation index value obtained by calculating the test basic information during the test of the battery to be tested; for example, the test operation index value may include the start test time, end test time and test duration of the battery to be tested.

[0156] Multiple test operation index values ​​corresponding to each battery to be tested can be calculated according to a preset calculation model; optionally, the calculation model can include calculation methods for multiple test operation indexes. Therefore, for any battery to be tested, the basic test information of the battery to be tested is input into the calculation model, and the basic test information is calculated through the calculation formulas of the multiple test operation indexes in the calculation model to obtain the multiple test operation index values ​​corresponding to the battery to be tested.

[0157] S303: Determine test operation statistics of each test group based on a plurality of test operation indicator values ​​corresponding to each battery to be tested.

[0158] Among them, the test operation statistics of each test group may include the number of batteries to be tested, the number of tested batteries, the number of test channels, the number of testers, the total test time, etc.; it should be noted that the test operation statistics of each test group can be calculated based on multiple test operation indicator values ​​of the batteries to be tested in the corresponding test group within a certain time period.

[0159] Therefore, the method for obtaining the test operation statistics of each test group can be to first group each battery to be tested, determine the batteries to be tested under each test group, and for any test group, obtain the test operation statistics of the test group based on multiple test operation indicator values ​​corresponding to the batteries to be tested under the test group and a preset calculation formula.

[0160] S304, acquiring test operation statistics of the target test group to which the target battery to be tested belongs from the test operation statistics of each test group.

[0161] The test operation statistical data corresponding to the target test group in each test group is determined as the test operation statistical data of the target test group to which the target battery to be tested belongs.

[0162] For example, each test group includes a performance battery test group, a performance module test group, an environmental test group, a mechanical vibration test group and a safety puncture test group. If the target test group is the environmental test group, the test operation statistical data corresponding to the environmental test group will be determined as the test operation statistical data of the target test group to which the target battery to be tested belongs.

[0163] In the test resource management and control method provided in the embodiment of the present application, the test basic information of each battery to be tested under different test groups collected in real time is obtained, and based on the test basic information, multiple test operation index values ​​corresponding to each battery to be tested are determined, and then the test operation statistics of each test group are determined based on the multiple test operation index values ​​corresponding to each battery to be tested, and finally, the test operation statistics of the target test group to which the target battery to be tested belongs are obtained from the test operation statistics of each test group. In this method, the test operation index value corresponding to each battery to be tested is determined by the test basic information of each battery to be tested collected in real time, so that the current test status of each battery to be tested can be determined more accurately; and the test operation statistics of each test group are determined by each test operation index value, so that the operation status and test resource usage of each test group can be evaluated more objectively, reducing the error caused by subjective judgment, thereby improving the accuracy of test resource management and control of the target battery to be tested.

[0164] The following is a detailed description of how to collect the basic test information of the battery to be tested according to the data acquisition tool through an embodiment. In one embodiment, the display end of the data acquisition tool includes a plurality of collection function controls of action types, and each battery to be tested includes a battery identification; the data acquisition tool collects the basic test information of each battery to be tested, including: for any battery to be tested, the battery identification is collected by the data acquisition tool and the collection function control of the action type currently corresponding to the data acquisition tool is triggered to obtain the basic test information of the battery to be tested.

[0165] Each test channel has a unique test channel identifier, each battery to be tested corresponding to a test task has a unique battery identifier, and the data acquisition tool may be a hardware device.

[0166] Optionally, the battery identification of the battery to be tested may be a QR code, and the test channel identification may also be a QR code. Therefore, collecting the battery identification through the data acquisition tool may be by scanning the QR code attached to the battery to be tested through the data acquisition tool, and collecting the test channel identification corresponding to the battery to be tested through the data acquisition tool may be by scanning the QR code attached to the test channel corresponding to the battery to be tested through the data acquisition tool.

[0167] At the same time, the data acquisition tool has a button function, and the display end of the data acquisition tool includes a plurality of acquisition function controls corresponding to the action types. The method for the data acquisition tool to acquire the action type of the current battery to be tested can be that the tester first scans the battery identification of the battery to be tested through the data acquisition tool, and then clicks the acquisition function control of the action type currently corresponding to the battery to be tested on the data acquisition tool.

[0168] Among them, the action types of the battery to be tested during the test process may include collecting samples, starting bench construction, ending bench construction, starting test, pausing test, continuing test, ending test, starting bench dismantling and ending bench dismantling, etc. Therefore, in addition to the code scanning area, the data acquisition tool also includes controls such as collecting samples, starting bench construction, ending bench construction, starting test, pausing test, continuing test, ending test, starting bench dismantling and ending bench dismantling, such as Figure 4 As shown, Figure 4 Schematic diagram of the display interface of the data collection tool.

[0169] The tester updates the state and test nodes of the battery to be tested by scanning the code first and then clicking the collection function control, that is, collecting and updating the basic test information of the battery to be tested. The data collection tool has the function of reading and writing data and uploading the data to the computer device. Therefore, after the data collection tool collects the basic test information of the battery to be tested, it can be sent to the computer device, and the computer device can store the basic test information of the battery to be tested in the database through the storage module.

[0170] In the test resource management method provided in the embodiment of the present application, for any battery to be tested, the battery identification is collected by the data collection tool and the collection function control of the action type currently corresponding to the data collection tool is triggered to obtain the basic test information of the battery to be tested; wherein, the display end of the data collection tool includes a plurality of collection function controls of action types, and each battery to be tested includes a battery identification. In this method, by setting a battery identification for each battery to be tested, the accuracy and traceability of the basic test information collected for the battery to be tested can be improved; in addition, by setting a plurality of collection function controls of action types on the display end of the data collection tool, the automatic collection of the basic test information of the battery to be tested can be realized, which improves the collection efficiency and thus improves the real-time nature of the basic test information.

[0171] The action types of the battery under test during the test process may include collecting samples, starting bench construction, ending bench construction, starting test, pausing test, continuing test, ending test, starting bench dismantling, and ending bench dismantling. Since each time the battery under test performs an action type, the action type performed by the battery under test and the time of performing the action type are uploaded to the computer device through the data acquisition tool, the basic test information may include the different action types that each battery under test has performed and the collection time of performing each action type; in one embodiment, if Figure 5 As shown, according to the test basic information, determining multiple test operation indicator values ​​corresponding to each battery to be tested includes the following steps:

[0172] S501 : determining at least one test operation indicator corresponding to each battery to be tested according to different action types that have been executed by each battery to be tested.

[0173] Among them, the test operation indicators may include the number of samples collected, the test maintenance time, the maintenance time ratio, the number of tests started, the number of batteries to be tested, the time for test bench construction, the time for test bench dismantling, the total time for test bench dismantling and construction, the test time, etc.

[0174] Please continue to see Figure 4 , the sample collection quantity can represent the number of action type 1, the test maintenance time can be the time for the test equipment to be repaired and maintained during the test of the battery to be tested; the maintenance time ratio can be the proportion of the maintenance time in a certain period of time; the start test quantity can be the number of batteries to be tested that have started testing; the number of batteries to be tested can be the number of batteries that have been sampled but have not started testing; the bench construction time can be the time for installing the battery to be tested to the corresponding test channel before the test starts; the bench dismantling time can be the time for removing the battery to be tested from the test channel after the test is completed; the total bench dismantling time represents the sum of the time to install the battery to be tested to the corresponding test channel and the time to remove the battery to be tested from the test channel; the test time represents the actual testing time of the battery to be tested on the test channel.

[0175] Therefore, at least one test operation indicator corresponding to each battery to be tested may be determined according to different action types that have been executed by each battery to be tested.

[0176] For example, if the action type that the battery to be tested has executed includes sample collection, then it can be determined that the battery to be tested has been sampled, and the sample collection quantity of the corresponding test group can be increased by 1; if the action type that the battery to be tested has executed includes the end of the bench construction time, it means that the bench construction of the battery to be tested has been completed, and therefore, the bench construction time of the battery to be tested can also be determined; if the action type that the battery to be tested has executed includes test continuation, then the test and maintenance time of the battery to be tested can also be determined; if the action type that the battery to be tested has executed includes test completion, then the test time of the battery to be tested can also be determined; if the action type that the test agent has executed includes end of bench dismantling, then the bench dismantling time and the total bench dismantling time of the battery to be tested can also be determined.

[0177] S502 , determining the value of each test operation indicator corresponding to each battery to be tested according to the collection time when each battery to be tested performs each action type, and obtaining multiple test operation indicator values ​​corresponding to each battery to be tested.

[0178] Please continue to see Figure 4 ,The calculation method of each test operation indicator can be shown in Table 2.

[0179] Table 2

[0180]

[0181]

[0182] Therefore, based on the calculation formulas of the test operation indicators in Table 2, the values ​​of the test operation indicators corresponding to each battery to be tested can be determined through the collection time when each battery to be tested performs each action type.

[0183] For any battery to be tested, the basic test information of the battery to be tested can be used as the input of the calculation formula, and the test operation index values ​​of the battery to be tested can be output through calculation of the calculation formula.

[0184] Optionally, after obtaining the value of each test operation indicator corresponding to each battery to be tested, the value of each test operation indicator corresponding to each battery to be tested may be stored in a database through a storage module.

[0185] In the test resource management and control method provided in the embodiment of the present application, at least one test operation indicator corresponding to each battery to be tested is determined according to the different action types that have been performed by each battery to be tested, and the value of each test operation indicator corresponding to each battery to be tested is determined according to the collection time when each battery to be tested performs each action type, so as to obtain multiple test operation indicator values ​​corresponding to each battery to be tested. In this method, since the test operation indicator is obtained based on the basic test information of the battery to be tested, it is possible to determine the test operation indicator corresponding to the battery to be tested according to the different action types that have been performed by each battery to be tested; and, by determining the value of the test operation indicator corresponding to each battery to be tested through the collection time when each battery to be tested performs each action type, the accuracy of the test operation indicator value of the battery to be tested is improved.

[0186] The multiple test operation index values ​​corresponding to each battery to be tested obtained above are classified and summarized by test group and other information. The following is an example of how to classify and summarize by test group. Figure 6 As shown, based on multiple test operation indicator values ​​corresponding to each battery to be tested, determining the test operation statistics of each test group includes the following steps:

[0187] S601, obtaining a data acquisition tool identifier, a tester identifier, and a test channel identifier corresponding to basic test information of each battery to be tested.

[0188] Each tester is equipped with a data collection tool, and each data collection tool has a unique data collection tool identifier, that is, the tester identifier and the data collection tool identifier have a one-to-one correspondence.

[0189] Furthermore, since the basic test information includes the data acquisition tool identifier and test channel identifier corresponding to the battery to be tested, the data acquisition tool identifier, tester identifier and test channel identifier corresponding to the basic test information of each battery to be tested are obtained based on the one-to-one correspondence between the tester identifier and the test channel identifier.

[0190] As shown in Table 3, Table 3 is the correspondence between the tester identification and the data collection tool identification.

[0191] Table 3

[0192] Tester ID Data collection tool identification EE001A DATA001A EE002A DATA002A EE003A DATA003A … …

[0193] Thus, the correspondence between each tester, each battery to be tested, each test channel and the action type of the battery to be tested can be achieved, so as to realize the collection of basic test information.

[0194] S602 , generating test operation statistics of each test group according to the correspondence between the tester identifier and the test group, the correspondence between the test channel identifier and the test group, and a plurality of test operation indicator values ​​corresponding to each battery to be tested.

[0195] Based on the data acquisition tool identification, tester identification and test channel identification corresponding to the basic test information of each battery to be tested, and then according to the correspondence between the tester identification and the test group, and the correspondence between the test channel identification and the test group, each battery to be tested is divided into test groups to obtain the batteries to be tested under each test group.

[0196] Optionally, as shown in Table 4 and Table 5, Table 4 gives a correspondence between a tester identifier and a test group, and Table 5 gives a correspondence between a test channel identifier and a test group.

[0197] Table 4

[0198] Tester ID Test Group EE001A Performance battery test kit EE006A Performance battery test kit EE007A Performance module test group EE002A Environmental Test Group EE003A Mechanical vibration test group EE004A Safety squeeze test set EE005A Safety Acupuncture Test Kit … …

[0199] Table 5

[0200] Test channel identification Test Group CH001 Performance battery test kit CH007 Performance battery test kit CH005 Performance module test group CH006 Performance module test group CH002 Environmental Test Group CH003 Mechanical vibration test group CH004 Safety squeeze test set … …

[0201] Based on a plurality of test operation indicator values ​​corresponding to each battery to be tested in each test group, test operation statistical data of each test group is determined.

[0202] Among them, the test operation statistics may include the number of batteries to be tested, the number of test channel maintenance, the number of tested batteries, the number of test channels, the maintenance time ratio, the total test bench disassembly and assembly time, the number of testers, the average labor efficiency, the average bench disassembly and assembly time, the average test time, etc. Among them, the test operation statistics may be the test operation statistics of each test group within a certain time period; the number of batteries to be tested may be the number of batteries to be tested of the corresponding test group; the number of test channel maintenance may be the number of test channels of the corresponding test group that have been maintained; the number of tested batteries may be the number of batteries that have been tested by the test group within a certain time period; the number of test channels may represent the number of test channels of the corresponding test group; the maintenance time ratio may be the maintenance time ratio of the corresponding test group within a certain time period; the total test disassembly and assembly time may represent the total time for the corresponding test group to disassemble the assembly within a certain time period; the number of testers may represent the number of testers in the corresponding test group; the average labor efficiency may be the average time required for each person in the corresponding test group to disassemble and assemble a battery; the average disassembly and assembly time represents the average time required for disassembly and assembly of a assembly in the corresponding test group; the average test time may be the average time for testing one battery in the corresponding test group.

[0203] Therefore, for any test group, the test operation statistical data of the test group can be determined according to a plurality of test operation indicator values ​​of each battery to be tested in the test group and a calculation method of each test operation statistical data.

[0204] For example, the calculation method of the maintenance time ratio of the test group can be: obtain the sum of the maintenance time of each battery to be tested in the test group within the preset time, and obtain the total maintenance time of the test group within the preset time; since the test group may include multiple test channels, calculate the product of the preset time and the number of test channels in the test group to obtain the total time of the test group; then obtain the ratio of the total maintenance time to the total time of the test group, and determine the ratio of the total maintenance time to the total time of the test group as the maintenance time ratio of the test group.

[0205] The average dismantling time may be calculated by determining the average dismantling time of the test group as the ratio between the total test dismantling time of the test group within a preset time and the number of batteries tested.

[0206] Optionally, as shown in Table 6, Table 6 is the test operation statistics of each test group in March of a certain year.

[0207] Table 6

[0208]

[0209] In the test resource management and control method provided in the embodiment of the present application, the data acquisition tool identifier, tester identifier and test channel identifier corresponding to the test basic information of each battery to be tested are obtained, and the test operation statistics of each test group are generated according to the correspondence between the tester identifier and the test group, the correspondence between the test channel identifier and the test group, and the multiple test operation indicator values ​​corresponding to each battery to be tested. In this method, each battery to be tested is classified by the test group through the correspondence between the tester identifier and the test group, and the correspondence between the test channel identifier and the test group, and the test operation statistics of each test group are obtained. In this way, the test operation statistics of each test group are analyzed in a targeted manner, which can make the test operation status of each test group clearer and improve the accuracy of subsequent test resource management of each test group.

[0210] In one embodiment, the embodiment includes: displaying the test operation statistics of each test group in a visual format to indicate that resource management of each test group is performed based on the test operation statistics of each test group.

[0211] After obtaining the test operation statistics of each test group, the test operation statistics of each test group can be displayed in the form of a visual report.

[0212] Optionally, the test operation statistics of each test group can be stored in a data output module of a computer device, and the test operation statistics of each test group can be displayed in the form of a visual report on an online page of the data output module to indicate resource management of each test group based on the test operation statistics of each test group.

[0213] In addition, it is displayed in the form of a visual report on the online page, allowing testing business personnel to intuitively view the operation status of testing resources.

[0214] In the test resource management method provided in the embodiment of the present application, the test operation statistics of each test group are displayed in a visual format to indicate that the resource management of each test group is performed based on the test operation statistics of each test group. In this method, the test operation statistics of each test group are displayed in a visual format, which enables the test business personnel to obtain the operating efficiency of each test group in a timely manner and the test progress of each test group in real time.

[0215] Based on the test operation statistics of the target test group obtained above, the following describes how to predict the test waiting time of the target battery to be tested based on the test operation statistics of the target test group. Figure 7 As shown, according to the test operation statistics of the target test group, predicting the test waiting time of the target battery to be tested includes the following steps:

[0216] S701, according to the test operation statistical data of the target test group, obtaining the test time required for other batteries to be tested in the target test group to occupy test resources except the target battery to be tested.

[0217] The test time duration that the battery under test needs to occupy the test resources may be the test time duration that the battery under test needs to occupy the test resources when the test corresponding to the target test group needs to be performed.

[0218] The test operation statistics of the target test group may include the rated test time of the test resources required for each battery to be tested. Therefore, the test time of the test resources required for other batteries to be tested in the target test group except the target battery to be tested may be directly obtained from the test operation statistics of the target test group.

[0219] S702: predicting the test waiting time of the target battery to be tested according to the test time of the test resources required by other batteries to be tested.

[0220] The sum of the test time required for the other batteries to be tested to occupy the test resources is determined as the total test time required for the other batteries to be tested in the target test group except the target battery to be tested. Among them, the other batteries to be tested in the target test group except the target battery to be tested may be batteries to be tested before the target test battery is tested.

[0221] Therefore, the total test time required for other batteries to be tested in the target test group to occupy test resources except the target battery to be tested can be determined as the test waiting time of the target battery to be tested.

[0222] In an optional embodiment, the test waiting time of the target battery to be tested can also be determined according to a preset prediction algorithm; for example, the test time required for other batteries to be tested to occupy test resources is used as an input to the prediction algorithm, and the test time of other batteries to be tested is analyzed by the prediction algorithm to obtain the test waiting time of the target battery to be tested.

[0223] In the test resource management method provided in the embodiment of the present application, the test time required for the other batteries to be tested in the target test group to occupy the test resources except the target battery to be tested is obtained according to the test operation statistical data of the target test group, and the test waiting time of the target battery to be tested is predicted according to the test time required for the other batteries to be tested to occupy the test resources. In this method, since the other batteries to be tested are the batteries to be tested in the target test group except the target battery to be tested, and are the batteries to be tested that need to be tested before the target battery to be tested is tested, the test time of the target battery to be tested is predicted by the test time required for the other batteries to be tested in the target test group except the target battery to be tested, the test time of the target battery to be tested is taken into account, and the test time of the other batteries to be tested in the target test group is improved, and the accuracy of the predicted test waiting time of the target battery to be tested is improved.

[0224] In one embodiment, Figure 8 As shown, obtaining the test time required for other batteries to be tested in the target test group to occupy test resources except the target battery to be tested includes the following steps:

[0225] S801, determining the types of actions to be executed of other batteries to be tested in the target test group except the target battery to be tested according to the test operation statistical data of the target test group.

[0226] By analyzing the test operation statistical data of the target test group, the type of action to be executed of the battery to be tested in the target test group can be directly determined; wherein the type of action to be executed of the battery to be tested can reflect the test progress of the battery to be tested.

[0227] For example, the action types of the battery to be tested during the test process may include collecting samples, starting bench construction, ending bench construction, starting test, pausing test, continuing test, ending test, starting bench dismantling and ending bench dismantling. Taking battery A to be tested as an example, if the test operation statistics data of the target test group only include the sampling action type of battery A to be tested, then it can be determined that the action types to be executed for battery A to be tested include starting bench construction, ending bench construction, starting test, pausing test, continuing test, ending test, starting bench dismantling and ending bench dismantling; if the test operation statistics data of the target test group only include the sampling action type of battery A to be tested, starting bench construction and ending bench construction, then it is determined that the action types to be executed for battery A to be tested include starting test, pausing test, continuing test, ending test, starting bench dismantling and ending bench dismantling.

[0228] Therefore, the types of actions to be performed for other batteries to be tested in the target test group except the target battery to be tested may be determined based on the test operation statistical data of the target test group.

[0229] S802: According to the types of actions to be performed of the other batteries to be tested, a plurality of operation indicator values ​​corresponding to the types of actions to be performed of the other batteries to be tested are obtained.

[0230] According to the types of actions to be performed for each other battery to be tested, multiple operating index values ​​corresponding to the types of actions to be performed for each other battery to be tested can be determined. For example, if the types of actions to be performed for battery A to be tested include starting bench construction, ending bench construction, starting test, pausing test, continuing test, ending test, starting bench dismantling, and ending bench dismantling, then it can be determined that the operating index values ​​corresponding to battery A to be tested may include bench construction duration, test cycle, and bench dismantling duration; if the types of actions to be performed for battery A to be tested include starting test, pausing test, continuing test, ending test, starting bench dismantling, and ending bench dismantling, then it can be determined that the operating index values ​​corresponding to battery A to be tested may include test cycle and bench dismantling duration. Among them, the test cycle can be expressed as the test duration required for the battery to be tested to perform the corresponding test.

[0231] Based on this, multiple operation indicator values ​​corresponding to the types of actions to be performed by the other batteries to be tested can be determined according to the types of actions to be performed by the other batteries to be tested.

[0232] S803, determining the test time of the test resources that each other battery to be tested needs to occupy according to the multiple operation indicator values ​​corresponding to the action type to be executed.

[0233] If the multiple operating indicator values ​​corresponding to the action type to be executed include the test cycle and the time for dismantling and setting up the test bench of each other battery to be tested, then in one embodiment, the test time required for each other battery to be tested to occupy the test resources is determined according to the multiple operating indicator values ​​corresponding to the action type to be executed, including: for any one of the other batteries to be tested, the sum of the test cycle and the time for dismantling and setting up the test bench corresponding to the battery to be tested is determined as the test time required for the battery to be tested to occupy the test resources.

[0234] Among them, the time for setting up and dismantling the scaffolding is the sum of the time for setting up the scaffolding and the time for dismantling the scaffolding.

[0235] If the operation indicator value corresponding to the action type to be executed by the battery to be tested includes the test cycle and the time for dismantling and setting up the test bench, the sum of the test cycle and the time for dismantling and setting up the test bench corresponding to the battery to be tested can be determined as the test time required for the battery to be tested to occupy the test resources.

[0236] In the test resource management method provided in the embodiment of the present application, the multiple operation index values ​​corresponding to the action type to be executed include the test cycle and the time for dismantling the test bench of each other battery to be tested. For any of the other batteries to be tested, the sum of the test cycle and the time for dismantling the test bench corresponding to the battery to be tested is determined as the test time required for the battery to be tested to occupy the test resources. In this method, since the test time required for the battery test includes the test cycle and the time for dismantling the test bench during the battery testing process, the sum of the test cycle and the time for dismantling the test bench corresponding to the battery to be tested is determined as the test time required for the battery to be tested to occupy the test resources, so that the determined test time required for the battery to be tested to occupy the test resources is more accurate.

[0237] For any other battery to be tested, if the multiple operating indicator values ​​corresponding to the action type to be executed of the other battery to be tested include the test cycle and the time for dismantling the test bench, the test cycle and the time for dismantling the test bench corresponding to the other battery to be tested shall be determined as the test time required for the other battery to be tested to occupy the test resources.

[0238] If the multiple operation indicator values ​​corresponding to the action types to be executed of other batteries to be tested include the time for dismantling the test bench, the time for dismantling the test bench corresponding to other batteries to be tested is determined as the test time required for the other batteries to be tested to occupy the test resources.

[0239] It should be noted that, for any other battery to be tested, the test cycle of the battery to be tested can be a pre-set test time required to test the battery to be tested, and the test bench setting up time, the test bench dismantling time and the test bench dismantling time can be the average test bench setting up time, the average test bench dismantling time and the average test bench dismantling time obtained from the test operation statistical data in the target test group within a certain time period.

[0240] In the test resource management and control method provided in the embodiment of the present application, the types of actions to be performed of other batteries to be tested in the target test group other than the target battery to be tested are determined based on the test operation statistical data of the target test group, and based on the types of actions to be performed of each other battery to be tested, multiple operation indicator values ​​corresponding to the types of actions to be performed of each other battery to be tested are obtained, and then the test duration required for each other battery to be tested to occupy the test resources is determined based on the multiple operation indicator values ​​corresponding to the types of actions to be performed. In this method, when determining the test duration required for each other battery to be tested to occupy the test resources, the action types that have been executed by other batteries to be tested and the types of actions to be performed are taken into consideration, and the test duration required for other batteries to be tested to occupy the test resources is determined through the multiple operation indicator values ​​corresponding to the types of actions to be performed, so that the calculated test duration required to occupy the test resources is more accurate.

[0241] Based on the test time required for the test resources to be occupied by other batteries to be tested in the target test group except the target battery to be tested obtained in the above embodiment, the following describes how to predict the test waiting time of the battery to be tested through an embodiment. Fig. 9 As shown, predicting the test waiting time of the target battery to be tested according to the test time of the test resources required by other batteries to be tested includes the following steps:

[0242] S901, obtaining the test resource occupation time of the target test group according to the test resource occupation time required by other batteries to be tested.

[0243] The test resource occupation time of the target test group may be the total test time required for all other test batteries in the target test group except the target test battery. Therefore, the sum of the test time required for all other test batteries to occupy the test resources may be determined as the test resource occupation time of the target test group.

[0244] S902, obtaining the number of test channels and maintenance duration ratio of the target test group.

[0245] Among them, the number of test channels of the target test group can be the number of test channels that can test the batteries to be tested in the target test group; the maintenance time ratio can be the ratio of the maintenance time in the target test group within a certain period of time.

[0246] The test operation statistics of the target test group include the number of test channels and the ratio of maintenance time of the target test group; therefore, the number of test channels and the ratio of maintenance time of the target test group can be obtained from the test operation statistics of the target test group.

[0247] S903, determining the test waiting time of the target battery to be tested according to the test resource occupation time, the number of test channels and the maintenance time ratio.

[0248] Since the target test group may include multiple test channels, and the test resources of the target test group may be maintained during the testing of the battery to be tested in the target test group, when predicting the test waiting time of the target battery to be tested, not only the test resource occupancy time of the target test group should be considered, but also the number of test channels of the target test group and the ratio of maintenance time should be considered.

[0249] Therefore, the test waiting time of the target battery to be tested can be calculated according to formula (1).

[0250]

[0251] Among them, T1 represents the test waiting time of the target battery to be tested, T0 represents the test resource occupancy time of the target test group, N represents the number of test channels of the target test group, and Z represents the maintenance time ratio of the target test group.

[0252] Optionally, when the multiple operation indicator values ​​corresponding to the action type to be executed include the test cycle and the time for dismantling and setting up the test bench of other batteries to be tested, the test waiting time of the target battery to be tested can be calculated using formula (2).

[0253]

[0254] Where k represents the number of other batteries to be tested, X i represents the test cycle of the i-th other battery to be tested, Y i represents the disassembly and setup time of the i-th other battery to be tested; it should be noted that the disassembly and setup time of the other batteries to be tested can be the average disassembly and setup time of the target test group.

[0255] In the test resource management method provided in the embodiment of the present application, the test resource occupation time of the target test group is obtained according to the test time required for the test resources to be occupied by other batteries to be tested, and the number of test channels and the maintenance time ratio of the target test group are obtained, and then the test waiting time of the target battery to be tested is determined according to the test resource occupation time, the number of test channels and the maintenance time ratio. In this method, when determining the test waiting time of the target battery to be tested, not only the test time required for the test resources to be occupied by other batteries to be tested in the target test group is considered, but also the current test resource information of the target test group is considered, thereby improving the accuracy of the test waiting time of the target battery to be tested.

[0256] The above embodiments are all about how to obtain the test waiting time of the target battery to be tested. The following is an embodiment of how to perform test resource management and control on the target battery to be tested. Fig.10 As shown, the test resource management and control process for the target battery to be tested includes the following steps:

[0257] S1001, acquiring test resource information required for a target battery to be tested according to test operation statistics of a target test group.

[0258] The test resource information required for the target battery to be tested may include the test cycle of other batteries to be tested in the target test group to which the target battery to be tested belongs, the types of actions to be performed by other batteries to be tested, the time for disassembly and assembly of the test bench, the number of test channels, the number of testers and the test maintenance ratio, etc.

[0259] Therefore, the test resource information required by the target battery to be tested can be directly obtained from the test operation statistics of the target test group.

[0260] S1002, determining a resource control scheme for the target battery to be tested according to the test resource information required by the target battery to be tested and the test duration threshold of the target battery to be tested.

[0261] The resource control scheme of the target battery to be tested may include control information of the test resources of the target test group to which the target battery to be tested belongs; for example, the number of testers, the number of test channels, the number of batteries to be tested, etc. of the target test group to which the target battery to be tested belongs.

[0262] In one embodiment, a resource control scheme for a target battery to be tested can be determined based on a preset control model; specifically, the test resource information required for the target battery to be tested and the test duration threshold of the target battery to be tested are input into the control model, and the test resource information required for the target battery to be tested and the test duration threshold of the target battery to be tested are analyzed through the control model to obtain a resource control scheme for the target battery to be tested.

[0263] In an optional embodiment, the resource control scheme of the target battery to be tested is determined based on the correspondence between preset test resource information and test duration threshold and the resource control scheme; wherein the resource control scheme corresponding to the test resource information required for the target battery to be tested and the test duration threshold in the correspondence is determined as the resource control scheme of the target battery to be tested.

[0264] S1003, performing test resource control processing on the target battery to be tested by executing the resource control plan of the target battery to be tested.

[0265] After obtaining the resource control scheme of the target battery to be tested, the resources of the target test group to which the target battery belongs can be controlled by the resource control scheme of the target battery to be tested, so as to achieve test resource control of the target battery to be tested.

[0266] It should be noted that after executing the resource control scheme of the target battery to be tested, the test waiting time of the target battery to be tested can be less than or equal to the test time threshold, thereby improving the timeliness of the delivery of the test result of the target battery to be tested.

[0267] In the test resource control method provided in the embodiment of the present application, the test resource information required by the target battery to be tested is obtained according to the test operation statistical data of the target test group, and the resource control scheme of the target battery to be tested is determined according to the test resource information required by the target battery to be tested and the test duration threshold of the target battery to be tested, and then the test resource control processing is performed on the target battery to be tested by executing the resource control scheme of the target battery to be tested. In this method, the resource control scheme is determined by the test duration threshold of the target battery to be tested and the test resource information required by the target battery to be tested. The resource control scheme can ensure that the test waiting time of the target battery to be tested does not exceed the test duration threshold, thereby improving the test efficiency of the target battery to be tested and reducing the risk of overdue delivery of the test results of the target battery to be tested.

[0268] When determining the resource control scheme of the target battery to be tested, multiple candidate resource control schemes may be obtained first, and then the resource control scheme of the target battery to be tested may be determined from the multiple candidate resource control schemes. This is described in detail below through an embodiment. Fig.11 As shown, according to the test resource information required by the target battery to be tested and the test time threshold of the target battery to be tested, determining the resource control scheme of the target battery to be tested includes the following steps:

[0269] S1101, acquiring multiple candidate resource regulation schemes according to the test resource information required by the target battery to be tested and the test duration threshold of the target battery to be tested.

[0270] The candidate resource regulation scheme may include adjusting multiple adjustable resource indicator values ​​in the target test group and entrusting a third-party organization to perform testing on excessive test tasks in the target test group.

[0271] Therefore, a plurality of candidate resource control schemes can be determined according to a preset planning algorithm; specifically, the test resource information required for the target battery to be tested and the test duration threshold of the target battery to be tested are used as inputs of the planning algorithm, and the planning algorithm is executed to obtain a plurality of candidate resource control schemes.

[0272] Specifically, the candidate resource control scheme may also include specific control methods. For example, when the candidate resource control scheme is to adjust multiple adjustable resource indicator values ​​in the target test group, the candidate resource control scheme also includes which resources in the target test group are specifically adjusted and the amount of adjustment, etc.; when the candidate resource control scheme is to entrust excessive test tasks in the target test group to a third-party organization for testing, the candidate resource control scheme also includes the number of test tasks entrusted to the third-party organization, etc.

[0273] S1102: Obtain a basic value of execution resource consumption of each candidate resource control scheme.

[0274] The basic value of execution resource consumption may be the cost required to execute the corresponding candidate resource regulation solution.

[0275] The basic value of execution resource consumption of each candidate resource control scheme can be obtained according to the resource consumption model; for example, for any candidate resource control scheme, the candidate resource control scheme is input into the resource consumption model, and the candidate resource control scheme is analyzed through the resource consumption model to obtain the basic value of execution resource consumption of the candidate resource control scheme.

[0276] S1103, determining the candidate resource control scheme with the smallest basic value of resource consumption as the resource control scheme for the target battery to be tested.

[0277] In order to save control costs, the candidate resource control scheme with the smallest basic value of execution resource consumption may be determined as the resource control scheme of the target battery to be tested.

[0278] In the test resource control method provided in the embodiment of the present application, according to the test resource information required by the target battery to be tested and the test duration threshold of the target battery to be tested, a plurality of candidate resource control schemes are obtained, and the basic value of the execution resource consumption of each candidate resource control scheme is obtained, and then the candidate resource control scheme with the smallest basic value of the execution resource consumption is determined as the resource control scheme of the target battery to be tested. In this method, since the plurality of candidate resource control schemes are all determined according to the test resource information required by the target battery to be tested and the test duration threshold of the target battery to be tested, the plurality of candidate resource control schemes can satisfy that the test waiting time of the target battery to be tested does not exceed the test duration threshold, therefore, the candidate resource control scheme with the smallest basic value of the resource consumption is determined as the resource control scheme of the target battery to be tested, which can reduce the cost of test resource control of the target battery to be tested.

[0279] The following describes how to determine multiple candidate resource control schemes when the candidate resource control scheme is to adjust multiple adjustable resource indicator values ​​in the target test group. Fig.12 As shown, obtaining the basic value of execution resource consumption of each candidate resource control scheme includes the following steps:

[0280] S1201, when the candidate resource regulation scheme is to adjust multiple adjustable resource indicator values ​​in the target test group, obtain multiple different adjustable resource adjustment strategies.

[0281] Among them, each adjustable resource adjustment strategy has a different increase in each adjustable resource indicator.

[0282] The more testers there are, the shorter the average time it takes to dismantle and set up the test bench, and the shorter the waiting time; the more test channels there are, the shorter the waiting time; the lower the maintenance time ratio is, the shorter the waiting time is; therefore, it can be determined that the number of testers, the number of test channels, and the maintenance time ratio can be adjustable resource indicators. Therefore, the candidate resource control scheme can be to adjust multiple adjustable resource indicator values ​​in the target test group.

[0283] Optionally, there is a corresponding relationship between the number of testers and the average time for dismantling and setting up the test bench, which can be expressed by formula (3).

[0284]

[0285] Wherein, M represents the number of testers, η represents the average labor efficiency, and Y represents the average time for setting up and dismantling the test bench; wherein, the average labor efficiency can be obtained from the test operation statistics of the target test group.

[0286] In one embodiment, the number of testers, the number of test channels, and the maintenance time ratio can be used as unknown variables to establish a set of simultaneous equations, as shown in formula (4).

[0287]

[0288] Wherein, T2 represents the test time threshold of the target battery to be tested.

[0289] In formula (4), the number of testers M, the number of test channels N, and the maintenance time ratio Z are taken as unknowns, and the test time threshold T2, the test cycle X of each other battery to be tested are taken as i , substitute the average human efficacy η of the target test group into formula (4) and solve formula (4).

[0290] In addition, constraints on the number of testers M, the number of test channels N, and the maintenance time ratio Z can also be pre-set; for example, M is greater than or equal to the current number of testers in the target test group, and M is an integer; N is greater than or equal to the current number of test channels in the target test group, and N is an integer; Z is less than or equal to the current maintenance time ratio in the target test group.

[0291] Formula (4) is solved according to the constraints of the above adjustable resource index values ​​to obtain multiple candidate resource solutions, wherein the multiple candidate resource solutions include the target values ​​to which the adjustable resource index in the target test group needs to be adjusted; therefore, multiple adjustable resource adjustment strategies are determined according to the candidate resource solutions and the current resource index values ​​of the target test group. For example, a candidate resource solution is obtained as {number of testers: 10; number of test channels: 20; maintenance time ratio: 30%}, and the current resource index value of the target test group is {number of testers: 9; number of test channels: 18; maintenance time ratio: 25%}, then an adjustable resource adjustment strategy is determined as {number of testers: +1; number of test channels: +2; maintenance time ratio: -5%}.

[0292] In an optional embodiment, a plurality of candidate resource combinations with different adjustable resource indicator values ​​may be preset, and each candidate resource combination includes the number of testers, the number of test channels, and the ratio of maintenance time.

[0293] Therefore, the average bench dismantling time corresponding to each candidate resource combination can be determined based on the relationship between the number of testers and the average bench dismantling time in formula (3); then for any candidate resource combination, the expected waiting time of the target battery to be tested corresponding to the candidate resource combination can be determined based on the test cycles of other batteries to be tested in the target test group, the average bench dismantling time corresponding to the candidate resource combination, the number of test channels in the candidate resource combination, and the maintenance time ratio. Based on the same method, the expected waiting time of the target battery to be tested corresponding to each candidate resource combination is obtained.

[0294] Then, the candidate resource combination whose expected waiting time does not exceed the test time threshold can be determined as the candidate resource plan, and based on the current number of testers, number of test channels, and maintenance time ratio in the target test group, as well as the number of testers, number of test channels, and maintenance time ratio in the candidate resource plan, multiple adjustable resource adjustment strategies can be determined.

[0295] S1202: Determine a basic value of resource consumption corresponding to each adjustable resource adjustment strategy according to a preset basic value of unit consumption for adjusting each adjustable resource indicator.

[0296] Among them, the basic value of resource consumption corresponding to each adjustable resource adjustment strategy is calculated according to the preset basic value of unit consumption of each adjustable resource indicator and the increase rate of each adjustable resource indicator in each adjustable resource adjustment strategy; wherein, the basic value of unit consumption of adjustable resource indicators corresponding to different test groups may be different, therefore, the basic value of resource consumption corresponding to each adjustable resource adjustment strategy can be determined according to the basic value of unit consumption of each adjustable resource indicator corresponding to the target test group and the increase rate of the adjustable resource indicators in each adjustable resource adjustment strategy.

[0297] For example, the adjustable resource indicators include the number of testers, the number of test channels, and the maintenance time ratio, as shown in Table 7, which gives the basic unit consumption values ​​of the adjustable resource indicators.

[0298] Table 7

[0299] Unit consumption basic value Adjustable resource indicators 100,000 / year Tester (1 person) 50,000 Test channel (1 per performance battery test group) 100,000 Test channel (1 per performance module test group) 150,000 Test channel (1 per environmental test group) 200,000 Test channel (1 per mechanical vibration test group) 100,000 Test channel (1 / safety squeeze test group) 50,000 Maintenance time optimization (-1%) … …

[0300] Therefore, if the multiple adjustable resource adjustment strategies include: {Number of testers: +1; Number of test channels: +2; Maintenance time ratio: -5%}, {Number of testers: +2; Number of test channels: +1; Maintenance time ratio: -5%}, {Number of testers: +1; Number of test channels: +1; Maintenance time ratio: -10%}, {Number of testers: +2; Number of test channels: +2; Maintenance time ratio: 0}. And the target test group is the mechanical vibration test group.

[0301] Therefore, the resource consumption basic value corresponding to each adjustable resource adjustment strategy may be determined according to the unit consumption basic value of each adjustable resource indicator of the mechanical vibration test group and the adjustable resource indicator value in each adjustable resource adjustment strategy.

[0302] For example, the basic value of resource consumption corresponding to {number of testers: +1; number of test channels: +2; maintenance time ratio: -5%} is: 10*1+20*2+5*5=750,000; the basic value of resource consumption corresponding to {number of testers: +2; number of test channels: +1; maintenance time ratio: -5%} is: 10*2+20*1+5*5=650,000; the basic value of resource consumption corresponding to {number of testers: +1; number of test channels: +1; maintenance time ratio: -10%} is: 10*1+20*1+5*10=800,000; the basic value of resource consumption corresponding to {number of testers: +2; number of test channels: +2; maintenance time ratio: 0} is: 10*2+20*2+5*0=600,000.

[0303] In the test resource control method provided in the embodiment of the present application, when the candidate resource control scheme is to adjust multiple adjustable resource indicator values ​​in the target test group, a plurality of different adjustable resource adjustment strategies are obtained; wherein, the increase of each adjustable resource indicator in each adjustable resource adjustment strategy is different; and the basic value of resource consumption corresponding to each adjustable resource adjustment strategy is determined according to the preset basic value of unit consumption for adjusting each adjustable resource indicator. In this method, since each adjustable resource adjustment strategy includes the increase of each adjustable resource indicator, the basic value of resource consumption corresponding to each adjustable resource adjustment strategy can be calculated through the preset basic value of unit consumption for adjusting each adjustable resource indicator, thereby improving the speed of determining the basic value of resource consumption corresponding to each adjustable resource adjustment strategy.

[0304] Optionally, the test resources in the target test group may not be regulated, but the excessive test tasks in the target test group may be delegated to a third party organization. The following describes how to determine a candidate resource regulation scheme when the candidate resource regulation scheme is to delegate the test to a third party organization. Fig.13 As shown, the basic value of execution resource consumption of each candidate resource control scheme is obtained, including:

[0305] S1301, when the candidate resource control scheme is to entrust a third-party organization to perform the test, the number of batteries to be tested in the target test group to be entrusted is obtained.

[0306] The number of batteries to be tested that need to be commissioned in the target test group may be the number of batteries to be tested that exceeds the test task in the target test group.

[0307] Among them, all the batteries to be tested in the target test group have a sampling time. Then, other batteries to be tested in the target test group that have not exceeded the test task can be obtained in sequence according to the sampling time of the batteries to be tested. Then, the difference between the total number of other batteries to be tested in the target test group and the number of other batteries to be tested in the target test group that have not exceeded the test task can be determined as the number of batteries to be tested that need to be commissioned in the target test group.

[0308] Optionally, the method of obtaining the batteries to be tested that do not exceed the test task in the target test group may be:

[0309]

[0310] Wherein, P represents the number of other batteries to be tested in the target test group that do not exceed the test task, P is an integer, X is the average test time of the batteries in the target test group, and Y is the average dismantling and setting up time of the target test group. Solve formula (5) to obtain the value of P; the value of P represents the number of other batteries to be tested in the target test group that do not exceed the test task.

[0311] The total number of other batteries to be tested in the target test group is k, and (kP) is the number of batteries to be tested that need to be commissioned in the target test group.

[0312] S1302, determining a basic value of execution resource consumption for entrusting a third-party organization to perform the test according to the number of batteries to be tested in the target test group and a preset basic value of entrustment resource consumption of the third-party organization.

[0313] Among them, the basic value of entrusted resource consumption of the entrusted third-party agency corresponding to each test group may be different. Therefore, the basic value of entrusted resource consumption of the third-party agency corresponding to the target test group can be obtained, and then the product of the number of batteries to be tested in the target test group and the basic value of entrusted resource consumption of the third-party agency corresponding to the target test group can be determined as the basic value of execution resource consumption for entrusting the third-party agency to conduct the test.

[0314] As shown in Table 8, Table 8 gives the basic values ​​of the entrusted resource consumption of each test group entrusted to a third-party agency.

[0315] Table 8

[0316] Cost (ten thousand) Test Group 10 / H Performance Battery Test Kit 50 / H Performance module test group 10 / 1 battery to be tested Environmental Test Group 15 / 1 battery to be tested Mechanical vibration test group 20 / 1 battery to be tested Safety squeeze test set … …

[0317] For example, if the number of batteries to be tested in the target test group is 5 and the target test group is a mechanical vibration test group, then it can be determined that the basic value of the execution resource consumption of entrusting a third-party organization to perform the test is 15*5=750,000.

[0318] Optionally, the cost of entrusting a third-party organization to conduct testing can also be calculated based on time. According to the number of batteries to be tested that need to be entrusted in the target test group, the test duration that needs to be entrusted in the target test group is determined, and according to the entrusted resource consumption value of the entrusted third-party organization corresponding to the target test group, the basic value of the execution resource consumption of entrusting the third-party organization to conduct testing is determined; specifically, the ratio of the test duration that needs to be entrusted in the target test group to the entrusted resource consumption value of the entrusted third-party organization corresponding to the target test group is determined as the basic value of the execution resource consumption of entrusting the third-party organization to conduct testing.

[0319] For example, please continue to refer to Table 8. If the target test group is a sex battery test group, and the test duration of the sex battery test group to be commissioned is 10 hours, then the basic value of the execution resource consumption for entrusting a third-party organization to conduct the test is determined to be 800,000.

[0320] In the test resource control method provided in the embodiment of the present application, when the candidate resource control scheme is to entrust a third-party organization to conduct the test, the number of batteries to be tested in the target test group that need to be entrusted is obtained, and the basic value of the execution resource consumption of entrusting the third-party organization to conduct the test is determined based on the number of batteries to be entrusted in the target test group and the preset basic value of the entrusted resource consumption of the third-party organization. In this method, the candidate resource control scheme is to entrust a third-party organization to conduct the test, and a resource control scheme other than the method of increasing resources is proposed, which improves the diversity of the test resource control of the target battery to be tested, thereby enriching the control method of the test resources.

[0321] Optionally, in one embodiment, a candidate resource control scheme with the smallest basic value of execution resource consumption is determined as the resource control scheme for the target battery to be tested, including: determining the smallest basic value of execution resource consumption based on the basic values ​​of resource consumption corresponding to the above-mentioned adjustable resource adjustment strategies and the basic value of execution resource consumption commissioned to a third-party organization for testing; and determining the adjustable resource adjustment strategy corresponding to the smallest basic value of execution resource consumption as the resource control scheme for the target battery to be tested.

[0322] For example, the basic resource consumption values ​​corresponding to the adjustable resource adjustment strategies include 750,000, 650,000, 800,000 and 600,000. The basic resource consumption value of the execution entrusted to the third-party agency for testing is 750,000. The adjustable resource adjustment strategy corresponding to 600,000 is determined as the resource control plan for the target battery to be tested.

[0323] For example, the basic resource consumption values ​​corresponding to the adjustable resource adjustment strategies include 750,000, 650,000, 800,000 and 600,000, and the basic execution resource consumption value of entrusting a third-party agency to conduct testing is 500,000. Then the resource control plan for entrusting a third-party agency to conduct testing corresponding to 500,000 is determined as the target battery to be tested.

[0324] For example, if the basic resource consumption values ​​corresponding to the adjustable resource adjustment strategies include 600,000, 650,000, 800,000 and 600,000, and the basic resource consumption value of the execution of the test entrusted to a third-party organization is 750,000, then any adjustable resource adjustment strategy corresponding to 600,000 can be determined as the resource control plan for the target battery to be tested.

[0325] For example, if the basic values ​​of resource consumption corresponding to each adjustable resource adjustment strategy include 750,000, 650,000, 800,000 and 600,000, and the basic value of execution resource consumption for entrusting a third-party organization to conduct testing is 600,000, then the minimum basic value of execution resource consumption includes the adjustable resource adjustment strategy and entrusting a third-party organization to conduct testing. Therefore, it can be determined based on actual needs whether to select the adjustable resource adjustment strategy corresponding to 600,000 or to entrust a third-party organization to conduct testing.

[0326] The test resource management method in the embodiment of the present application may also include an early warning mechanism. When the production capacity of the target test group is insufficient, an early warning message of insufficient existing test resources is issued. This is described in detail below. In one embodiment, the embodiment includes: generating an early warning message when the test waiting time exceeds the test time threshold of the target battery to be tested; the early warning message is used to indicate that the test resources of the target battery to be tested are insufficient.

[0327] When the test waiting time of the target battery to be tested exceeds the test time threshold of the target battery to be tested, it means that the waiting time for the test of the target battery to be tested is too long, that is, there are many test tasks in the target test group to which the target battery to be tested belongs. Therefore, an early warning message can be generated; the early warning message can be used to remind the test management personnel that the test resources of the target test group are insufficient, and the delivery of the test results of the target battery to be tested may be overdue.

[0328] Optionally, when the test waiting time exceeds a test time threshold of the target battery to be tested, a warning message may be directly popped up on the display end of the computer device.

[0329] In the test resource management method provided in the embodiment of the present application, when the test waiting time exceeds the test time threshold of the target battery to be tested, an early warning message is generated; wherein the early warning message is used to indicate that the test resources of the target battery to be tested are insufficient. In this method, when the test waiting time exceeds the test time threshold of the target battery to be tested, an early warning prompt is issued, so that the test management personnel can timely manage the test resources of the target battery to be tested.

[0330] The above embodiments are all descriptions of the case where the test waiting time of the target battery to be tested exceeds the test time threshold of the target battery to be tested. The following is a description of the case where the test waiting time does not exceed the test time threshold through an embodiment. Fig.14 As shown, this embodiment includes the following steps:

[0331] S1401, when the test waiting time does not exceed the test time threshold of the target battery to be tested, obtain a waiting time difference between the test time threshold and the test waiting time.

[0332] When the test waiting time does not exceed the test time threshold of the target battery to be tested, it indicates that the target test group to which the target battery to be tested belongs has sufficient resources. When the target test group to which the target battery to be tested belongs has sufficient resources, the test resources of the target test group can be quantitatively evaluated.

[0333] Therefore, the waiting time difference between the test time threshold and the test waiting time can be obtained, and the test resources can be quantitatively evaluated through the waiting time difference.

[0334] S1402, determining the measurable battery remaining of the target test group according to the waiting time difference, the test operation statistics data of the target test group and the current test resource information of the target test group; the measurable battery remaining is used for test resource management and control of the target test group.

[0335] The test operation statistics of the target test group may include the average test time and the average bench dismantling and installation time and the maintenance time ratio of the target test group; the current test resource information of the target test group may include the current number of test channels of the target test group,

[0336] Therefore, the measurable battery remaining capacity of the target test group can be determined based on the waiting time difference, the average test time of the target test group, the average bench dismantling time and maintenance time ratio, and the number of test channels. Optionally, the measurable battery remaining capacity of the target test group can be calculated based on formula (6).

[0337]

[0338] Among them, Q represents the measurable battery remaining of the target test group, T3 represents the waiting time difference, N represents the number of test channels of the target test group, Z represents the maintenance time ratio of the target test group, X represents the average test time of the battery of the target test group, and Y represents the average disassembly and assembly time of the target test group.

[0339] It should be noted that the measurable remaining battery capacity of the target test group should be an integer, but the calculated Q may be a decimal, so the integer part of Q can be determined as the measurable remaining battery capacity of the target test group.

[0340] In an optional embodiment, the measurable battery remaining capacity of the target test group can also be calculated according to a preset remaining capacity calculation formula; specifically, the waiting time difference, the test operation statistics data of the target test group and the current test resource information of the target test group are used as inputs of the remaining capacity calculation formula, and the measurable battery remaining capacity of the target test group is obtained through calculation of the remaining capacity calculation formula.

[0341] After obtaining the measurable battery remaining of the target test group, the test manager can manage the resources of the target test group according to the measurable battery remaining; for example, add new batteries to be tested that are less than or equal to the measurable battery remaining before the target battery to be tested of the target test group.

[0342] In the test resource management and control method provided in the embodiment of the present application, when the test waiting time does not exceed the test time threshold of the target battery to be tested, the waiting time difference between the test time threshold and the test waiting time is obtained, and the measurable battery remaining amount of the target test group is determined according to the waiting time difference, the test operation statistics data of the target test group and the current test resource information of the target test group; wherein the measurable battery remaining amount is used for test resource management and control of the target test group. In this method, the existing resources are quantitatively evaluated, and when the test waiting time does not exceed the test time threshold of the target battery to be tested, the measurable battery remaining amount is clarified, which can help the test management personnel to reasonably arrange the test plan and test sequence, thereby improving the test efficiency.

[0343] In one embodiment, the present application also provides a test resource management method, which is described with a computer device as the execution subject. The computer device includes a data statistics module, a waiting time calculation algorithm, a test resource early warning mechanism, a data input module, a data output module, and a storage module. Fig.15 As shown, this embodiment includes the following steps:

[0344] S1501, the tester scans the QR code image on the battery to be tested and the QR code image on the test channel through a data acquisition tool, and clicks an action type button on the data acquisition tool to collect basic test information of the battery to be tested.

[0345] Among them, each data acquisition tool has a unique data acquisition tool ID, each tester is equipped with a data acquisition tool, and each tester also has a unique tester ID, thereby realizing the correspondence between each tester, each battery to be tested, each test channel and the action type of each battery to be tested, realizing the collection of basic test information of the battery to be tested, and storing the basic test information in the database through the storage module.

[0346] like Fig.16 As shown, Fig.16 The data transmission process of the basic test information of the battery to be tested; wherein the test task information of the battery to be tested can be input by the test requirement personnel through the data input module, stored in the database through the storage module, and associated with the battery identification of the battery to be tested; wherein the test task information includes information such as the test cycle of the battery to be tested and the test group to which it belongs.

[0347] S1502: Calculate test operation statistics in a data statistics module according to the test basic information of the battery to be tested, and display the test operation statistics in a visual report of a data output module.

[0348] Among them, the definition and calculation formula of the operating indicator value are defined in the data statistics module. The operating indicator values ​​include sample collection quantity, maintenance channel, maintenance time ratio, scaffolding dismantling and erection time, etc. Please see Table 2 for details.

[0349] Specifically, the data statistics module can extract the basic test information of each battery to be tested from the database, and take the basic test information of each battery to be tested as input, calculate and output the test operation index value of each battery to be tested through a calculation formula, and store the test operation index value of each battery to be tested in the database through the storage module; then the data statistics module classifies and summarizes the test operation index value of each battery to be tested according to information such as the test group, obtains test operation statistical data, and displays the test operation statistical data in the form of a report on the online page of the data output module for test management personnel to view the operation status of each test group.

[0350] S1503, for any test group, based on the preset waiting time calculation algorithm, determine the test waiting time of the test group according to the test group's batteries to be tested, the test cycles corresponding to the batteries to be tested, the maintenance time ratio, the average bench dismantling and assembly time, and the number of test channels in the test operation statistical data.

[0351] Among them, the waiting time calculation algorithm collects the basic test information of the newly added batteries to be tested in the database in real time for calculation, and can calculate the test waiting time of each test group. For example, the calculated test waiting time of each test group is: 168 hours for the performance battery test group, 150 hours for the performance module test group, 288 hours for the environmental test group, 720 hours for the mechanical vibration test group, and 228 hours for the safety extrusion test group.

[0352] S1504, input the test duration threshold of each test group through the data input module, and store it in the database through the storage module.

[0353] S1505, for any test group, when the test waiting time is less than or equal to the test time threshold, the test capacity margin of the test group is calculated through the test resource early warning mechanism, and the test capacity margin of the test group is output through the data output module.

[0354] Among them, the measurable battery remaining of the test group is determined according to the waiting time difference between the test time threshold and the test waiting time of the test group, the average dismantling and setting up time of the test group, the number of test channels and the maintenance time ratio, and finally displayed through the data output module. For example, the data output module can display: no test remaining for the performance battery test group; no test remaining for the environmental test group; ...; 4 test remainings for the performance module test group; 7 test remainings for the safety extrusion test group. Test managers can understand the existing test capabilities and operating conditions of the corresponding test group through the measurable battery remaining of each test group.

[0355] S1506, when the test waiting time is greater than the test time threshold, a warning is issued through the test resource warning mechanism, and a resource control plan for the test group is generated, and test resource control processing is performed on the test group through the resource control plan.

[0356] Among them, by increasing the capacity, multiple adjustable resource adjustment strategies can be generated, and the total cost of each adjustable resource adjustment strategy can be calculated, and the adjustable resource adjustment strategy with the minimum total cost can be determined, and the adjustable resource adjustment strategy with the minimum total cost and the corresponding total cost can be output through the data output module, and other adjustable resource adjustment strategies can be automatically folded. If the test manager wants to view other solutions, he can view them by opening the folding information.

[0357] In addition to increasing the test resources of the test group, excessive test tasks can also be delegated to a third-party organization. The test resource early warning mechanism can be used to calculate the maximum number of batteries to be tested while keeping the existing test resources of the test group unchanged, and the number of batteries to be tested that exceed the test group's test capacity can be obtained. The total cost of the test group entrusting the third-party organization to the test group is determined based on the basic test cost of the third-party organization and the number of batteries to be tested that exceed the test group's test capacity. The plan entrusted to the third-party organization is output as an alternative plan through the data output module. The test resource management personnel can compare the adjustable resource adjustment strategy with the test plan entrusted to the third-party organization to determine the resource control plan; they can also determine the resource control plan based on the test requirements.

[0358] In the embodiment of the present application, the test progress of each test group is transmitted in real time through a data acquisition tool, and the test operation index data of each test group and the test basic information of each battery to be tested are respectively integrated into an online visual report, so that the test management personnel can timely obtain the operating efficiency of each test group in each test link. In addition, the sufficiency of existing resources is quantitatively evaluated, and the remaining measurable battery is clearly stated when the resources are sufficient. When the resources are insufficient, an early warning message of insufficient existing test resources is automatically issued, and the corresponding number of resources to be supplemented, the corresponding cost and alternative plans are given, so that the test management personnel can make timely adjustments to the test resource operations, and realize the timely regulation of test resources.

[0359] In addition, through the corresponding cost data (test channels, testers, and unit costs of channel maintenance time optimization), the correlation between test waiting time, operating indicator values, and investment costs can be established, and the final resource control plan can be selected through cost optimization.

[0360] It should be understood that, although the various steps in the flowcharts involved in the above-mentioned embodiments are displayed in sequence according to the indication of the arrows, these steps are not necessarily executed in sequence according to the order indicated by the arrows. Unless there is a clear explanation in this article, the execution of these steps does not have a strict order restriction, and these steps can be executed in other orders. Moreover, at least a part of the steps in the flowcharts involved in the above-mentioned embodiments can include multiple steps or multiple stages, and these steps or stages are not necessarily executed at the same time, but can be executed at different times, and the execution order of these steps or stages is not necessarily to be carried out in sequence, but can be executed in turn or alternately with other steps or at least a part of the steps or stages in other steps.

[0361] Based on the same inventive concept, the embodiment of the present application also provides a test resource control device for implementing the test resource control method involved above. The implementation scheme for solving the problem provided by the device is similar to the implementation scheme recorded in the above method, so the specific limitations in one or more test resource control device embodiments provided below can refer to the limitations of the test resource control method above, and will not be repeated here.

[0362] In an exemplary embodiment, Fig.17 As shown, a test resource management and control device 1700 is provided, including: an acquisition module 1701, a prediction module 1702 and a management and control module 1703, wherein:

[0363] An acquisition module 1701 is used to acquire test operation statistics of a target test group to which a target battery to be tested belongs;

[0364] Prediction module 1702, used to predict the test waiting time of the target battery to be tested according to the test operation statistical data of the target test group;

[0365] The control module 1703 is used to perform test resource control processing on the target battery to be tested when the test waiting time exceeds the test time threshold of the target battery to be tested.

[0366] In one embodiment, Fig.18 As shown, the acquisition module 1701 includes:

[0367] The first acquisition unit 1801 is used to acquire the test basic information of each battery to be tested under different test groups collected in real time;

[0368] A first determining unit 1802 is used to determine a plurality of test operation indicator values ​​corresponding to each battery to be tested according to the test basic information;

[0369] The second determining unit 1803 is used to determine the test operation statistics of each test group based on multiple test operation indicator values ​​corresponding to each battery to be tested;

[0370] The second acquiring unit 1804 is configured to acquire the test operation statistical data of the target test group to which the target battery to be tested belongs from the test operation statistical data of each test group.

[0371] In one embodiment, Fig.19 As shown, the test basic information is collected by a data collection tool, and the first acquisition unit 1801 includes:

[0372] The receiving subunit 1901 is used to receive the basic test information of each battery to be tested sent by the data acquisition tool.

[0373] In one embodiment, the display end of the data acquisition tool includes a plurality of action-type acquisition function controls, and each battery to be tested includes a battery identification; Fig. 20 As shown, the receiving subunit 1901 includes:

[0374] The collection subunit 2001 is used for collecting the battery identification of any battery to be tested through a data collection tool and triggering the collection function control of the currently corresponding action type on the data collection tool to obtain the basic test information of the battery to be tested.

[0375] In one embodiment, the basic test information includes different action types that have been executed by each battery to be tested and the collection time of executing each action type; Fig.21 As shown, the first determining unit 1802 includes:

[0376] The first determining subunit 2101 is used to determine at least one test operation indicator corresponding to each battery to be tested according to different action types that have been performed by each battery to be tested;

[0377] The second determining subunit 2102 is used to determine the value of each test operation indicator corresponding to each battery to be tested according to the collection time when each battery to be tested performs each action type, and obtain multiple test operation indicator values ​​corresponding to each battery to be tested.

[0378] In one embodiment, Fig. 22 As shown, the second determining unit 1803 includes:

[0379] The first acquisition subunit 2201 is used to acquire the data acquisition tool identifier, the tester identifier and the test channel identifier corresponding to the test basic information of each battery to be tested;

[0380] The generating subunit 2202 is used to generate test operation statistics of each test group according to the correspondence between the tester identification and the test group, the correspondence between the test channel identification and the test group, and multiple test operation indicator values ​​corresponding to each battery to be tested.

[0381] In one embodiment, Fig.23 As shown, the device 1700 also includes:

[0382] The display module 2301 is used to display the test operation statistics of each test group in a visual format to indicate that the resource management of each test group is performed based on the test operation statistics of each test group.

[0383] In one embodiment, Fig.24 As shown, the prediction module 1702 includes:

[0384] The second acquisition unit 2401 is used to acquire the test time required to occupy the test resources of other batteries to be tested in the target test group except the target battery to be tested according to the test operation statistical data of the target test group;

[0385] The prediction unit 2402 is used to predict the test waiting time of the target battery to be tested according to the test time of the test resources required to be occupied by other batteries to be tested.

[0386] In one embodiment, Fig.25 As shown, the second acquisition unit 2401 includes:

[0387] The third determining subunit 2501 is used to determine the types of actions to be executed of other batteries to be tested in the target test group except the target battery to be tested according to the test operation statistical data of the target test group;

[0388] The second acquisition subunit 2502 is used to acquire a plurality of operation indicator values ​​corresponding to the types of actions to be performed of the other batteries to be tested according to the types of actions to be performed of the other batteries to be tested;

[0389] The fourth determining subunit 2503 is used to determine the test time duration of the test resources that each other battery to be tested needs to occupy according to multiple operation indicator values ​​corresponding to the type of action to be executed.

[0390] In one embodiment, the multiple operation indicator values ​​corresponding to the action type to be executed include the test cycle and the dismantling and setting up time of each other battery to be tested; Fig.26 As shown, the fourth determining subunit 2503 includes:

[0391] The fifth determining subunit 2601 is used to determine, for any battery to be tested among the other batteries to be tested, the sum of the test cycle and the time for dismantling and setting up the test bench corresponding to the battery to be tested as the test time required for the battery to be tested to occupy the test resources.

[0392] In one embodiment, Fig. 27 As shown, the prediction unit 2402 includes:

[0393] The third acquisition subunit 2701 is used to acquire the test resource occupation time of the target test group according to the test resource occupation time required by other batteries to be tested;

[0394] The fourth acquisition subunit 2702 is used to acquire the number of test channels and the maintenance time ratio of the target test group;

[0395] The sixth determining subunit 2703 is used to determine the test waiting time of the target battery to be tested according to the test resource occupation time, the number of test channels and the maintenance time ratio.

[0396] In one embodiment, Fig.28As shown, the control module 1703 includes:

[0397] The third acquisition unit 2801 is used to acquire the test resource information required by the target battery to be tested according to the test operation statistics data of the target test group;

[0398] The third determining unit 2802 is used to determine the resource control scheme of the target battery to be tested according to the test resource information required by the target battery to be tested and the test time threshold of the target battery to be tested;

[0399] The control unit 2803 is used to perform test resource control processing on the target battery to be tested by executing the resource control scheme of the target battery to be tested.

[0400] In one embodiment, Fig.29 As shown, the third determining unit 2802 includes:

[0401] The fifth acquisition subunit 2901 is used to acquire multiple candidate resource regulation schemes according to the test resource information required by the target battery to be tested and the test time threshold of the target battery to be tested;

[0402] The sixth acquisition subunit 2902 is used to acquire the basic value of execution resource consumption of each candidate resource control scheme;

[0403] The seventh determining subunit 2903 is used to determine the candidate resource control scheme with the smallest basic value of execution resource consumption as the resource control scheme of the target battery to be tested.

[0404] In one embodiment, Fig.30 As shown, the sixth acquisition subunit 2902 includes:

[0405] The seventh acquisition subunit 3001 is used to acquire multiple different adjustable resource adjustment strategies when the candidate resource control scheme is to adjust multiple adjustable resource index values ​​in the target test group; each adjustable resource adjustment strategy has a different increase in each adjustable resource index;

[0406] The eighth determining subunit 3002 is used to determine the basic value of resource consumption corresponding to each adjustable resource adjustment strategy according to a preset basic value of unit consumption for adjusting each adjustable resource indicator.

[0407] In one embodiment, Fig.31 As shown, the sixth acquisition subunit 2902 includes:

[0408] An eighth acquisition subunit 3101 is used to acquire the number of batteries to be tested in the target test group that need to be commissioned when the candidate resource control scheme is to entrust a third-party organization to perform the test;

[0409] The ninth determining subunit 3102 is used to determine a basic value of execution resource consumption for entrusting a third party organization to perform the test according to the number of batteries to be tested in the target test group and a preset basic value of entrustment resource consumption of the third party organization.

[0410] In one embodiment, Fig.32 As shown, the device 1700 also includes:

[0411] The warning module 3201 is used to generate a warning message when the test waiting time exceeds the test time threshold of the target battery to be tested; the warning message is used to indicate that the test resources of the target battery to be tested are insufficient.

[0412] In one embodiment, Fig.33 As shown, the device 1700 also includes:

[0413] The calculation module 3301 is used to obtain the waiting time difference between the test time threshold and the test waiting time when the test waiting time does not exceed the test time threshold of the target battery to be tested;

[0414] Determination module 3302 is used to determine the measurable battery remaining of the target test group based on the waiting time difference, the test operation statistics of the target test group and the current test resource information of the target test group; the measurable battery remaining is used for test resource management and control of the target test group.

[0415] Each module in the above-mentioned test resource control device can be implemented in whole or in part by software, hardware and their combination. Each module can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the processor can call and execute the operations corresponding to each module above.

[0416] In one embodiment, a computer device is further provided, including a memory and a processor, wherein a computer program is stored in the memory, and the processor implements the steps in the above method embodiments when executing the computer program.

[0417] The implementation principles and technical effects of each step implemented by the processor in the embodiment of the present application are similar to the principles of the above-mentioned test resource management and control method, and will not be repeated here.

[0418] In one embodiment, a computer-readable storage medium is provided, on which a computer program is stored. When the computer program is executed by a processor, the steps in the above-mentioned method embodiments are implemented.

[0419] The implementation principles and technical effects of the various steps implemented when the computer program in the embodiment of the present application is executed by the processor are similar to the principles of the above-mentioned test resource management and control method, and will not be repeated here.

[0420] In one embodiment, a computer program product is provided, including a computer program, which implements the steps in the above method embodiments when executed by a processor.

[0421] The implementation principles and technical effects of the various steps implemented when the computer program in the embodiment of the present application is executed by the processor are similar to the principles of the above-mentioned test resource management and control method, and will not be repeated here.

[0422] It should be noted that the data involved in this application (including but not limited to data used for analysis, stored data, displayed data, etc.) are all information and data authorized by the user or fully authorized by all parties, and the collection, use and processing of relevant data must comply with relevant regulations.

[0423] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to the memory, database or other medium used in the embodiments provided in the present application can include at least one of non-volatile and volatile memory. Non-volatile memory can include read-only memory (ROM), magnetic tape, floppy disk, flash memory, optical memory, high-density embedded non-volatile memory, resistive random access memory (ReRAM), magnetoresistive random access memory (MRAM), ferroelectric random access memory (FRAM), phase change memory (PCM), graphene memory, etc. Volatile memory can include random access memory (RAM) or external cache memory, etc. As an illustration and not limitation, RAM can be in various forms, such as static random access memory (SRAM) or dynamic random access memory (DRAM). The database involved in each embodiment provided in this application may include at least one of a relational database and a non-relational database. Non-relational databases may include distributed databases based on blockchains, etc., but are not limited to this. The processor involved in each embodiment provided in this application may be a general-purpose processor, a central processing unit, a graphics processor, a digital signal processor, a programmable logic device, a data processing logic device based on quantum computing, etc., but are not limited to this.

[0424] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0425] The above-described embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A test resource management method, characterized in that: The method comprises: Obtain test operation statistics of the target test group to which the target battery to be tested belongs; Predicting the test waiting time of the target battery to be tested according to the test operation statistical data of the target test group; When the test waiting time exceeds a test time threshold of the target battery to be tested, a test resource control process is performed on the target battery to be tested.

2. The method according to claim 1, characterized in that The step of obtaining test operation statistics of a target test group to which a target battery to be tested belongs includes: Obtain the basic test information of each battery to be tested under different test groups collected in real time; Determine, according to the test basic information, a plurality of test operation index values ​​corresponding to each battery to be tested; Determine test operation statistics of each test group based on the multiple test operation indicator values ​​corresponding to each battery to be tested; The test operation statistical data of the target test group to which the target battery to be tested belongs is obtained from the test operation statistical data of each test group.

3. The method according to claim 2, characterized in that The basic test information is collected by a data collection tool, and the basic test information of each battery to be tested under different test groups collected in real time is obtained, including: Receive the basic test information of each battery to be tested sent by the data acquisition tool.

4. The method according to claim 3, characterized in that The display end of the data acquisition tool includes acquisition function controls of the multiple action types, and each of the batteries to be tested includes a battery identifier; the data acquisition tool collects basic test information of each of the batteries to be tested, including: For any battery to be tested, the battery identification is collected by the data collection tool and a collection function control of a currently corresponding action type on the data collection tool is triggered to obtain basic test information of the battery to be tested.

5. The method according to any one of claims 2 to 4, characterized in that: The test basic information includes different action types that have been executed by each of the batteries to be tested and the collection time of executing each of the action types; and determining multiple test operation indicator values ​​corresponding to each battery to be tested according to the test basic information includes: Determine at least one test operation indicator corresponding to each of the batteries to be tested according to different action types that have been performed by each of the batteries to be tested; According to the collection time when each of the batteries to be tested performs each of the action types, the value of each test operation indicator corresponding to each of the batteries to be tested is determined, and a plurality of test operation indicator values ​​corresponding to each of the batteries to be tested are obtained.

6. The method according to any one of claims 2 to 5, characterized in that: The determining of the test operation statistics of each test group based on the multiple test operation indicator values ​​corresponding to each battery to be tested includes: Obtaining a data acquisition tool identifier, a tester identifier, and a test channel identifier corresponding to the basic test information of each battery to be tested; According to the correspondence between the tester identification and the test group, the correspondence between the test channel identification and the test group, and the multiple test operation indicator values ​​corresponding to each battery to be tested, the test operation statistical data of each test group is generated.

7. The method according to any one of claims 2 to 6, characterized in that: The method further comprises: The test operation statistics of each test group are displayed in a visual format to indicate that resource management of each test group is performed based on the test operation statistics of each test group.

8. The method according to any one of claims 1 to 7, characterized in that: The predicting the test waiting time of the target battery to be tested according to the test operation statistical data of the target test group includes: According to the test operation statistical data of the target test group, obtaining the test time required for other batteries to be tested in the target test group to occupy test resources except the target battery to be tested; The test waiting time of the target battery to be tested is predicted according to the test time of the test resources required by the other batteries to be tested.

9. The method according to claim 8, characterized in that The obtaining of the test time duration of test resources occupied by other batteries to be tested in the target test group except the target battery to be tested includes: Determining, according to the test operation statistical data of the target test group, the types of actions to be performed for other batteries to be tested in the target test group except the target battery to be tested; According to the types of actions to be performed of the other batteries to be tested, obtaining multiple operation indicator values ​​corresponding to the types of actions to be performed of the other batteries to be tested; According to the multiple operation indicator values ​​corresponding to the type of action to be executed, the test time duration of the test resources required to be occupied by each of the other batteries to be tested is determined.

10. The method according to claim 9, characterized in that The multiple operation indicator values ​​corresponding to the type of action to be performed include the test cycle and the duration of dismantling and setting up the test bench of each of the other batteries to be tested; the test duration of the test resources required to be occupied by each of the other batteries to be tested is determined according to the multiple operation indicator values ​​corresponding to the type of action to be performed, including: For any battery to be tested among the other batteries to be tested, the sum of the test cycle and the time for dismantling and setting up the test bench corresponding to the battery to be tested is determined as the test time required for the battery to be tested to occupy the test resources.

11. The method according to any one of claims 8 to 10, characterized in that: The predicting the test waiting time of the target battery to be tested according to the test time of the test resources required to be occupied by the other batteries to be tested includes: According to the test time required for the other batteries to be tested to occupy the test resources, obtain the test resource occupation time of the target test group; Obtain the number of test channels and maintenance time ratio of the target test group; The test waiting time of the target battery to be tested is determined according to the test resource occupation time, the number of test channels and the maintenance time ratio.

12. The method according to any one of claims 1 to 11, characterized in that: The test resource management and control process for the target battery to be tested includes: Acquire test resource information required by the target battery to be tested according to the test operation statistics of the target test group; Determining a resource control scheme for the target battery to be tested according to the test resource information required by the target battery to be tested and the test duration threshold of the target battery to be tested; By executing the resource control scheme of the target battery to be tested, the test resource control processing is performed on the target battery to be tested.

13. The method according to claim 12, characterized in that The determining of the resource control scheme of the target battery to be tested according to the test resource information required by the target battery to be tested and the test duration threshold of the target battery to be tested includes: Acquire multiple candidate resource regulation schemes according to the test resource information required by the target battery to be tested and the test duration threshold of the target battery to be tested; Obtaining a basic value of execution resource consumption of each of the candidate resource control schemes; The candidate resource control scheme with the smallest basic value of resource consumption is determined as the resource control scheme of the target battery to be tested.

14. The method according to claim 13, characterized in that The obtaining of the basic value of the execution resource consumption of each candidate resource control scheme includes: In the case where the candidate resource regulation scheme is to adjust multiple adjustable resource index values ​​in the target test group, a plurality of different adjustable resource adjustment strategies are obtained; each adjustable resource adjustment strategy has a different increase in the value of each adjustable resource index; According to the preset basic value of unit consumption for adjusting each adjustable resource indicator, the basic value of resource consumption corresponding to each adjustable resource adjustment strategy is determined.

15. The method according to claim 13, characterized in that The obtaining of the basic value of the execution resource consumption of each candidate resource control scheme includes: In the case where the candidate resource control scheme is to entrust a third-party organization to conduct the test, obtaining the number of batteries to be tested in the target test group that need to be entrusted; According to the number of batteries to be tested that need to be commissioned in the target test group and the preset basic value of commissioned resource consumption of the third-party organization, the basic value of execution resource consumption of the commissioned third-party organization for testing is determined.

16. The method according to any one of claims 1 to 15, characterized in that: The method further comprises: When the test waiting time exceeds a test time threshold of the target battery to be tested, a warning message is generated; the warning message is used to indicate that the test resources of the target battery to be tested are insufficient.

17. The method according to any one of claims 1 to 16, characterized in that: The method further comprises: When the test waiting time does not exceed the test time threshold of the target battery to be tested, obtaining a waiting time difference between the test time threshold and the test waiting time; The measurable battery remaining of the target test group is determined based on the waiting time difference, the test operation statistics of the target test group and the current test resource information of the target test group; the measurable battery remaining is used for test resource management and control of the target test group.

18. A test resource management and control device, characterized in that: The device comprises: An acquisition module is used to obtain test operation statistics of a target test group to which a target battery to be tested belongs; A prediction module, used for predicting the test waiting time of the target battery to be tested according to the test operation statistical data of the target test group; The control module is used to perform test resource control processing on the target battery to be tested when the test waiting time exceeds the test time threshold of the target battery to be tested.

19. A computer device comprising a memory and a processor, wherein the memory stores a computer program, characterized in that: When the processor executes the computer program, the steps of the method according to any one of claims 1 to 17 are implemented.

20. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 17 are implemented.

21. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 17 are implemented.

Citation Information

Patent Citations

  • Full-link performance test method and device, computing device and storage medium

    CN110262977A

  • Multi-station multi-parameter task scheduling method for power lithium battery module testing

    CN111598465A

  • Test resource analysis method for test task and related equipment

    CN115496466A

  • Accumulator charge-discharge device and charge-discharge method

    CN1330427A

  • Battery test system for predicting battery test results

    US20170108551A1