High-temperature chemical oil removal system for diseased animals
By designing sealing components, stabilizing components and shock absorbing components in the high-temperature oil removal system of diseased animals, the vibration, loose connections and poor sealing effects caused by the first pipeline under high-frequency vibration are solved, and a higher sealing effect, stability and device service life are achieved.
Patent Information
- Application Number
- CN202510371840.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-27
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2045-03-27
AI Technical Summary
In the prior art, the first pipeline of the high-temperature oil removal system of the diseased animal is vibrated under high frequency vibration, resulting in the vacuum pump vibration, the pipeline connection loosening and the sealant not solidifying, affecting the sealing effect.
A high-temperature oil removal system for diseased animals is designed, using sealing components, stabilizing components and shock absorbing components. The sealing assembly pushes the clamping plate close to the pipe by magnetic force, and uses the elastic sealing plate to enhance the sealing effect and absorb shock; the stabilization assembly improves the stability of the pipe through the coordination of the electromagnet and the wedge block; the shock absorption assembly offsets the vibration of the first pipe through the arrangement of the second pipe and the sealing sleeve.
It effectively alleviates the vibration of the first pipe, improves the sealing effect and stability, extends the service life of the vacuum pump, and improves the practicality of the device.
Smart Images

Figure CN119870117A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of chemical manufacturing, and in particular relates to a high-temperature chemical deoiling system for diseased animals. Background Art
[0002] High-temperature chemical degreasing of diseased animals is an important way to harmlessly treat diseased animals. Specifically, it means: treating dead or diseased animals under high temperature and high pressure conditions to completely eliminate the pathogens they carry, and further treating the residues to make them meet environmental protection requirements.
[0003] Chinese patent CN211574145U announces a chemical treatment device for treating dead animals, which relates to a chemical treatment device. The device solves the problem that the vibration effect of the existing chemical treatment device for treating dead animals makes the vibration frequency high and the working noise high. A steam generator is arranged on the right side of the oil-water separator, a feed port top cover is arranged on the upper outer wall of the oil-water separator on the right side of the stirring motor, a supporting foot column is connected to the lower outer wall of the oil-water separator, a discharge port is arranged at the center of the lower outer wall of the oil-water separator, a pressure relief sleeve is sleeved at the lower end of the supporting foot column, a protective collar is sleeved on the outer side of the supporting foot column at the upper end of the pressure relief sleeve, a limiting protrusion is arranged at the lower end of the supporting foot column, a rubber gasket is sleeved on the outer side of the limiting protrusion, a first shock-absorbing spring is connected to the lower outer wall of the limiting protrusion, and a second shock-absorbing spring is connected to the lower outer wall of the limiting protrusion. The utility model is used for treating dead animals.
[0004] At present, the first pipeline is used for an external vacuum pump, but under high-frequency vibration, the first pipeline will cause one end of the external vacuum pump to vibrate synchronously, and long-term vibration will have a certain impact on the vacuum pump; in addition, the biomass boiler is connected with a first pipeline for adjusting pressure and temperature, but during long-term use, under high-frequency vibration, the connection between the first pipeline and the biomass boiler will become loose, affecting the internal sealing of the device; and, although the sealing performance of the connection between the first pipeline and the biomass boiler is repaired, the pipeline is not stable. Under high-frequency vibration, when the sealant has not solidified, the first pipeline is under high-frequency vibration, resulting in a large gap between the sealant and the first pipeline, affecting the sealing effect.
[0005] Therefore, we propose a high temperature chemical deoiling system for diseased animals in order to solve the above-mentioned problems. Summary of the invention
[0006] The first pipeline in the prior art will cause one end of the external vacuum pump to vibrate synchronously, which will have a certain impact on the vacuum pump. In addition, under high-frequency vibration, the connection between the first pipeline and the biomass boiler will become loose. Moreover, when the sealant is not solidified, the first pipeline will vibrate at high frequency, resulting in a large gap between the sealant and the first pipeline. The purpose of the present invention is to provide a high-temperature chemical deoiling system for diseased animals.
[0007] In order to solve the above problems, the technical solution adopted by the present invention is as follows: a high-temperature chemical deoiling system for diseased animals, comprising a bracket, a biomass boiler and a second pipeline, the biomass boiler is fixedly installed on the bracket, a pipeline mounting plate is fixedly connected to the side wall of the biomass boiler, a first pipeline is fixedly connected to the inner wall of the pipeline mounting plate, one end of the first pipeline is fixedly connected to the inside of the biomass boiler, a mixing and stirring mechanism is installed inside the biomass boiler, a cavity is opened on the side wall of the biomass boiler, a sealing component is installed inside the cavity, a stabilizing component is installed on the outer side wall of the biomass boiler, a shock absorbing component is fixedly installed on one end of the second pipeline, and a shock absorbing component is installed on one end of the first pipeline; The shock absorbing assembly includes a sleeve, the first pipe and the second pipe are both hard pipes, one end of the sleeve is fixedly connected to a side wall of one end of the second pipe, one end of the first pipe is located inside the other end of the sleeve, a section of the side wall of the first pipe located inside the sleeve is fixedly connected to a mounting ring, the outer wall of the mounting ring is fixedly connected to a sealing sleeve, and the sealing sleeve is fixedly connected to the inner wall of the sleeve.
[0008] Furthermore, the sealing assembly includes two groups of first springs, the two groups of first springs are respectively fixedly connected to the top wall and the inner bottom wall of the cavity, each group of first springs is commonly fixedly connected to a first clamping plate, the two first clamping plates are symmetrically fixedly connected to a first permanent magnet, the top wall and the inner bottom wall of the cavity are symmetrically fixedly connected to a first electromagnet, and the sealing sleeve is made of a retractable material.
[0009] Furthermore, the two first clamping plates are symmetrically provided with through holes, a first control valve is installed inside each of the through holes, the adjacent surfaces of each of the first clamping plates and the first pipe are arc-shaped surfaces, a plurality of second springs are fixedly connected at equal angles to the side walls of the arc-shaped surfaces of the first clamping plates, a plurality of the second springs are commonly fixedly connected to a sealing plate, the sealing plate is an arc-shaped mechanism, and is in contact with the side walls of the first pipe.
[0010] Furthermore, a sealing cavity is provided on the inner wall of each of the first clamping plates, a connecting cavity is provided on the inner wall of each of the sealing plates, a plurality of discharge holes are symmetrically provided on the side wall of the connecting cavity, and a second control valve is installed inside each of the discharge holes.
[0011] Furthermore, the sealing plate side wall is fixedly connected with a connecting rod, the connecting rod is located inside one of the second springs, one end of the connecting rod passes through the adjacent first clamping plate and extends into the sealing cavity, and the side wall of one end of the connecting rod located inside the sealing cavity is fixedly connected with a piston plate.
[0012] Furthermore, the piston plate is sealingly and slidingly connected to the inner wall of the sealing chamber, and the piston plate is symmetrically and fixedly connected with a discharge pipe. One end of each discharge pipe successively penetrates the inner wall of the adjacent sealing chamber and the sealing plate and is fixedly connected with the connecting chamber, and a one-way discharge valve is installed inside each discharge pipe.
[0013] Furthermore, the stabilizing component includes two support plates, the two support plates are symmetrically fixedly connected to the outer wall of the biomass boiler, the top and bottom ends of the two support plates are commonly fixedly connected to a mounting plate, the side walls of the two support plates are symmetrically fixedly connected to a third spring, and the two third springs are commonly fixedly connected to a second clamping plate.
[0014] Furthermore, the second clamping plate is in contact with the side wall of the first pipe, the second clamping plate is embedded in the side walls of the two support plates and is slidably connected, the top of the second clamping plate is fixedly connected to a second permanent magnet, the bottom end of each mounting plate is fixedly connected to a second electromagnet, and the two support plates are symmetrically fixedly connected to baffles.
[0015] Furthermore, the biomass boiler side wall is symmetrically provided with rectangular holes, the baffle side wall is slidably connected with a wedge block, one end of the wedge block is in contact with the adjacent second clamping plate side wall, and the inclined end of the wedge block is in contact with the adjacent first clamping plate side wall after passing through the adjacent rectangular hole.
[0016] Furthermore, the side walls of the inclined surfaces of the wedge-shaped blocks are symmetrically fixedly connected with connecting plates, each of the connecting plate side walls is fixedly connected with a fourth spring, and each of the fourth springs is fixedly connected to the baffle side walls.
[0017] Compared with the prior art, the present invention has the following beneficial effects: By setting a sealing component, when the first pipeline vibrates at high frequency, the first electromagnet is energized so that the adjacent surfaces of the first electromagnet and the first permanent magnet generate like magnetic poles. Under the action of magnetic repulsion, the first clamping plates on both sides are pushed closer to each other. At this time, the first spring is in a stretched state until the arc-shaped sealing plates of the arc-shaped surfaces of the two first clamping plates are in contact with the side wall of the first pipeline, wherein the sealing plate and the first clamping plate are elastically connected by the second spring. By setting the second spring, on the one hand, the elastic force of the second spring is utilized to enhance the force at the connection between the sealing plate and the first pipeline and the biomass boiler, thereby improving the sealing effect. On the other hand, the second spring has a damping effect and a shock-absorbing effect, which can effectively alleviate the vibration of the first pipeline and improve the sealing effect at the connection between the first pipeline and the biomass boiler. By setting a stabilizing component, the second electromagnet is used before the first electromagnet. When the second electromagnet is energized and the two second clamping plates are in contact with the side wall of the first pipe, the first electromagnet is energized to push the first clamping plates closer to each other, wherein the initial position of the wedge block is that when the second clamping plate is in contact with the side wall of the first pipe, the wedge block is located at the top of the second clamping plate. As the first clamping plate approaches the first pipe, the inclined surface of the wedge block is used to push the wedge block outward. At this time, the fourth spring is in a compressed state until the wedge block is in contact with the side wall of the first clamping plate, thereby limiting the wedge block so that the wedge block is in contact with the adjacent side wall of the second clamping plate for limiting and fixing. The stabilization effect is improved; by setting a shock-absorbing component, setting a second pipe and connecting one end of the second pipe to an external vacuum pump, and fixing a sleeve at the other end of the second pipe, the first pipe and the second pipe are fixedly connected by a sealing sleeve, so that when the vacuum pump is working, the first pipe, the sleeve and the second pipe form a complete pipe body, and the vacuum operation can be carried out normally. Through the elasticity of the sealing sleeve itself, the vibration amplitude generated by the first pipe is offset during the high-frequency vibration of the first pipe. The setting of the shock-absorbing component ensures that during the vibration of the first pipe, the sleeve and the second pipe will not vibrate synchronously, thereby avoiding damage to the vacuum pump, extending the service life of the vacuum pump, and improving the practicality of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a side view of the biomass boiler in the present invention; Figure 3 It is a schematic diagram of the three-dimensional structure of the biomass boiler in the present invention; Figure 4 for Figure 3 A partial enlarged schematic diagram of part A; Figure 5 is a cross-sectional view of the biomass boiler of the present invention; Figure 6 for Figure 5 A partial enlarged schematic diagram of part B; Figure 7 It is a schematic diagram of the three-dimensional structure of the sealing component in the present invention; Figure 8 is a cross-sectional view of the sealing assembly of the present invention; Fig. 9 It is a partial structural schematic diagram of the sealing assembly in the present invention; Fig.10 is a cross-sectional view of a stabilizing component in the present invention; Fig.11 It is a schematic diagram of the structure of the stabilizing component in the present invention; Fig.12 A side view of the stabilizing assembly of the present invention; Fig.13 for Fig.12 A partial enlarged schematic diagram of part C in the middle; Fig.14 It is a schematic diagram of the structure of the shock absorbing assembly in the present invention.
[0019] In the figure: 1, bracket; 2, biomass boiler; 21, pipeline mounting plate; 22, mixing mechanism; 23, cavity; 3, first pipeline; 31, second pipeline; 4, sealing assembly; 41, first spring; 42, first clamping plate; 43, first permanent magnet; 44, first electromagnet; 45, second spring; 46, sealing plate; 47, sealing cavity; 48, through hole; 49, first control valve; 410, connecting rod; 411, piston plate; 412, discharge pipe ; 413, one-way discharge valve; 414, connecting chamber; 417, discharge hole; 418, second control valve; 5, stabilizing assembly; 51, support plate; 52, rectangular hole; 53, mounting plate; 54, third spring; 55, second clamping plate; 56, second permanent magnet; 57, second electromagnet; 58, baffle; 59, wedge block; 510, connecting plate; 511, fourth spring; 6, shock absorbing assembly; 61, sleeve; 62, mounting ring; 63, sealing sleeve. DETAILED DESCRIPTION
[0020] The present invention is further described below in conjunction with specific embodiments.
[0021] To solve the problem that, in general, the first pipe 3 is used to connect to an external vacuum pump, but under high-frequency vibration, the first pipe 3 will cause one end of the external vacuum pump to vibrate synchronously, and long-term vibration will have a certain impact on the vacuum pump, such as Figure 1 - Fig. 9 As shown: A high-temperature chemical deoiling system for diseased animals comprises a bracket 1, a biomass boiler 2, and a second pipe 31. The biomass boiler 2 is fixedly mounted on the bracket 1. A pipe mounting plate 21 is fixedly connected to the side wall of the biomass boiler 2. A first pipe 3 is fixedly connected to the inner wall of the pipe mounting plate 21. One end of the first pipe 3 is fixedly connected to the inside of the biomass boiler 2. A mixing and stirring mechanism 22 is installed inside the biomass boiler 2. The mixing and stirring mechanism 22 is a prior art. It is driven by a motor to drive a rotating shaft and a stirring blade to mix and stir. When the animal carcasses are chemically processed, they need to undergo high-temperature mixing and stirring. The process of combining, and in this process, the vibration frequency of the device is often high due to the vibration effect of the motor. This device can separate the oil without material pressing. While utilizing the three-phase separation of oil, water and slag in the tank, the internal pressure in the chemical tank presses out the liquid material; the energy consumption cost of oil separation is significantly reduced; in addition, since the oil is taken out in advance, there is no oil film layer blocking the surface of the material during the vacuum drying process, which significantly improves the drying efficiency, significantly reduces the drying time and reduces the drying energy consumption cost; and there will be no material thinning and oil removal phenomenon due to oil in the production process, which improves the practicality of the device; A cavity 23 is provided on the side wall of the biomass boiler 2, and a sealing component 4 is installed inside the cavity 23. By setting the sealing component 4, when the first pipeline 3 vibrates at high frequency, the first electromagnet 44 is energized so that the adjacent surfaces of the first electromagnet 44 and the first permanent magnet 43 generate like magnetic poles. Under the action of magnetic repulsion, the first clamping plates 42 on both sides are pushed closer to each other. At this time, the first spring 41 is in a stretched state until the arc-shaped sealing plates 46 of the arc-shaped surfaces of the two first clamping plates 42 are in contact with the side wall of the first pipeline 3, wherein the sealing plate 46 and the first clamping plate 42 are elastically connected by the second spring 45. By setting the second spring 45, on the one hand, the elastic force of the second spring 45 is utilized to enhance the force at the connection between the sealing plate 46 and the first pipeline 3 and the biomass boiler 2, thereby improving the sealing effect. On the other hand, the second spring 45 has a damping effect and a shock absorbing effect, thereby effectively alleviating the vibration of the first pipeline 3 and improving the sealing effect at the connection between the first pipeline 3 and the biomass boiler 2.
[0022] The outer wall of the biomass boiler 2 is provided with a stabilizing component 5. By setting the stabilizing component 5, when the first pipe 3 is vibrated at a high frequency, the second electromagnet 57 is energized, so that the adjacent end faces of the second electromagnet 57 and the second permanent magnet 56 generate the same magnetic poles, thereby pushing the second clamping plates 55 on both sides to approach each other until the arc surface of the second clamping plate 55 contacts the outer wall of the first pipe 3, firmly clamping it, and reducing the amplitude of the first pipe 3. The second electromagnet 57 is used before the first electromagnet 44. When the second electromagnet 57 is energized and the two second clamping plates 55 contact the side wall of the first pipe 3, the first electromagnet 57 is energized. The iron 44 is energized, thereby pushing the first clamping plates 42 closer to each other, wherein the initial position of the wedge block 59 is located inside the rectangular hole 52, and when the second clamping plate 55 contacts the side wall of the first pipe 3, the wedge block 59 is located at the top of the second clamping plate 55, and as the first clamping plate 42 approaches the first pipe 3, the inclined surface of the wedge block 59 is used to push the wedge block 59 to move outward, and at this time the fourth spring 511 is in a compressed state until the wedge block 59 contacts the side wall of the first clamping plate 42, thereby limiting the wedge block 59, so that the wedge block 59 contacts the adjacent side wall of the second clamping plate 55, and is limited and fixed to improve the stabilization effect.
[0023] A shock absorbing component 6 is fixedly installed at one end of the second pipe 31, and one end of the first pipe 3 is installed inside the shock absorbing component 6; by setting the shock absorbing component 6, the second pipe 31 is set and one end of the second pipe 31 is connected to an external vacuum pump, and the other end of the second pipe 31 is fixed with a sleeve 61, and the first pipe 3 and the second pipe 31 are fixedly connected through a sealing sleeve 63, so that when the vacuum pump is working, the first pipe 3, the sleeve 61 and the second pipe 31 form a complete pipe body, and the vacuum operation can be carried out normally. Through the elasticity of the sealing sleeve 63 itself, the vibration amplitude generated by the first pipe 3 is offset during the high-frequency vibration process in the first pipe 3. The setting of the shock absorbing component 6 ensures that the sleeve 61 and the second pipe 31 will not vibrate synchronously during the vibration of the first pipe 3, thereby avoiding damage to the vacuum pump, extending the service life of the vacuum pump, and improving the practicality of the device.
[0024] The shock absorbing assembly 6 includes a sleeve 61. The first pipe 3 and the second pipe 31 are both hard pipes. One end of the sleeve 61 is fixedly connected to the side wall of one end of the second pipe 31. One end of the first pipe 3 is located inside the other end of the sleeve 61. A section of the side wall of the first pipe 3 located inside the sleeve 61 is fixedly connected with a mounting ring 62. The outer wall of the mounting ring 62 is fixedly connected with a sealing sleeve 63. The sealing sleeve 63 is fixedly connected to the inner wall of the sleeve 61. The sealing sleeve 63 is made of a retractable material.
[0025] In this scheme: a second pipe 31 is set and one end of the second pipe 31 is connected to an external vacuum pump, and a sleeve 61 is fixed to the other end of the second pipe 31, wherein the diameter of the sleeve 61 is larger than the first pipe 3, ensuring that the shaking amplitude generated by the first pipe 3 during high-frequency vibration will not contact the inner wall of the sleeve 61, and the first pipe 3 and the second pipe 31 are fixedly connected by a sealing sleeve 63, so that when the vacuum pump is working, the first pipe 3, the sleeve 61 and the second pipe 31 form a complete pipe body, and the vacuum operation can be carried out normally, wherein the sealing sleeve 63 has a certain ductility and elasticity, and its strength is sufficient to withstand the negative pressure generated during vacuuming, and through its elasticity, the vibration amplitude generated by the first pipe 3 during high-frequency vibration in the first pipe 3 is offset, and the setting of the shock absorbing component 6 ensures that the sleeve 61 and the second pipe 31 will not vibrate synchronously during the vibration of the first pipe 3, thereby avoiding damage to the vacuum pump, extending the service life of the vacuum pump, and improving the practicality of the device.
[0026] In order to solve the problem that the first pipe 3 is connected to the biomass boiler 2 for adjusting the pressure and temperature, but during long-term use, under high-frequency vibration, the connection between the first pipe 3 and the biomass boiler 2 may become loose, affecting the sealing of the device. Figure 3 - Figure 4 and Fig.10 - Fig.13 As shown: The sealing assembly 4 includes two groups of first springs 41, which are respectively fixedly connected to the inner top wall and the inner bottom wall of the cavity 23, and each group of first springs 41 is commonly fixedly connected to a first clamping plate 42, and the two first clamping plates 42 are symmetrically fixedly connected to the first permanent magnets 43, and the inner top wall and the inner bottom wall of the cavity 23 are symmetrically fixedly connected to the first electromagnets 44.
[0027] The two first clamping plates 42 are symmetrically provided with through holes 48, and a first control valve 49 is installed inside each through hole 48. The adjacent surfaces of each first clamping plate 42 and the first pipeline 3 are arc-shaped surfaces, and the side walls of the arc-shaped surfaces of the first clamping plates 42 are fixedly connected with multiple second springs 45 at equal angles. The multiple second springs 45 are commonly fixedly connected with a sealing plate 46, and the sealing plate 46 is an arc-shaped mechanism and is in contact with the side walls of the first pipeline 3.
[0028] A sealing cavity 47 is formed on the inner wall of each first clamping plate 42 , a connecting cavity 414 is formed on the inner wall of each sealing plate 46 , a plurality of discharge holes 417 are symmetrically formed on the side wall of the connecting cavity 414 , and a second control valve 418 is installed inside each discharge hole 417 .
[0029] A connecting rod 410 is fixedly connected to the side wall of the sealing plate 46. The connecting rod 410 is located inside one of the second springs 45. One end of the connecting rod 410 passes through the adjacent first clamping plate 42 and extends into the sealing cavity 47. A piston plate 411 is fixedly connected to the side wall of one end of the connecting rod 410 located inside the sealing cavity 47.
[0030] The piston plate 411 is sealingly and slidingly connected to the inner wall of the sealing chamber 47, and the piston plate 411 is symmetrically fixedly connected to the discharge pipe 412. One end of each discharge pipe 412 passes through the inner wall of the adjacent sealing chamber 47 and the sealing plate 46 in sequence and is fixedly connected to the connecting chamber 414. A one-way discharge valve 413 is installed inside each discharge pipe 412.
[0031] In this solution: when the first pipeline 3 vibrates at high frequency, the first electromagnet 44 is energized so that the adjacent surfaces of the first electromagnet 44 and the first permanent magnet 43 generate like magnetic poles. Under the action of magnetic repulsion, the first clamping plates 42 on both sides are pushed closer to each other. At this time, the first spring 41 is in a stretched state until the arc-shaped sealing plates 46 of the arc-shaped surfaces of the two first clamping plates 42 are in contact with the side wall of the first pipeline 3, wherein the sealing plate 46 and the first clamping plate 42 are elastically connected by the second spring 45. By setting the second spring 45, on the one hand, the elastic force of the second spring 45 is utilized to enhance the force at the connection between the sealing plate 46 and the first pipeline 3 and the biomass boiler 2, thereby improving the sealing effect. On the other hand, the second spring 45 has a damping effect and a shock-absorbing effect, which can effectively alleviate the vibration of the first pipeline 3 and improve the sealing effect at the connection between the first pipeline 3 and the biomass boiler 2. As the sealing plate 46 contacts the first pipeline 3, the second spring 45 is in a compressed state. During this process, the one-way discharge valve 413 and the second control valve 418 are opened. As the connecting rod 410 moves upward, the piston plate 411 is pushed to move upward synchronously. The pressure difference generated by the sealing sliding between the piston plate 411 and the sealing chamber 47 is used to make the sealant inside the sealing chamber 47 can only enter the connecting chamber 414 along the discharge pipe 412 and be discharged through the discharge hole 417, wherein the discharge hole 417 is located at the connection between the first pipeline 3 and the biomass boiler 2, so that the discharged sealant re-seals the connection between the first pipeline 3 and the biomass boiler 2. By timely sealing them, gas leakage at the connection between the first pipeline 3 and the biomass boiler 2 due to high-frequency vibration is avoided, which has an impact; When use is completed, the first electromagnet 44 is powered off and the first control valve 49 inside the through hole 48 is opened. Under the elastic action of the first spring 41, the first clamping plate 42 and the sealing plate 46 are pulled to reset, and as the sealing plate 46 leaves the connection between the first pipe 3 and the biomass boiler 2, under the elastic action of the second spring 45, the piston plate 411 and the sealing plate 46 are pushed to move to the original position to facilitate subsequent continued use, thereby improving the practicality of the device, wherein the interior of the cavity 23 is in a vacuum state.
[0032] In order to solve the problem that although the sealing performance of the connection between the first pipeline 3 and the biomass boiler 2 is repaired, the pipeline is not stable. Under high-frequency vibration, when the sealant is not solidified, the first pipeline 3 is under high-frequency vibration, resulting in a large gap between the sealant and the first pipeline 3, affecting the sealing effect, such as Figure 5 - Figure 6 and Fig.14 As shown: The stabilizing assembly 5 includes two support plates 51, which are symmetrically fixedly connected to the outer wall of the biomass boiler 2, and the top and bottom ends of the two support plates 51 are commonly fixedly connected to a mounting plate 53, and the side walls of the two support plates 51 are symmetrically fixedly connected to third springs 54, and the two third springs 54 are commonly fixedly connected to a second clamping plate 55.
[0033] The second clamping plate 55 is in contact with the side wall of the first pipe 3, and is slidably connected to the side walls of the two support plates 51. The second clamping plate 55 is fixedly connected to the top of the second clamping plate 55 with a second permanent magnet 56, and each mounting plate 53 is fixedly connected to the bottom end with a second electromagnet 57. The two support plates 51 are symmetrically fixedly connected with baffles 58.
[0034] The side wall of the biomass boiler 2 is symmetrically provided with rectangular holes 52, and a wedge block 59 is slidably connected to the side wall of the baffle 58. One end of the wedge block 59 abuts against the side wall of the adjacent second clamping plate 55, and the inclined end of the wedge block 59 passes through the adjacent rectangular hole 52 and abuts against the side wall of the adjacent first clamping plate 42.
[0035] The side walls of the inclined surfaces of the wedge-shaped block 59 are symmetrically fixedly connected with connecting plates 510 . The side walls of each connecting plate 510 are fixedly connected with a fourth spring 511 . Each fourth spring 511 is fixedly connected to the side wall of the baffle 58 .
[0036] In this solution: when the first pipe 3 is vibrating at high frequency, the second electromagnet 57 is energized, so that the adjacent end faces of the second electromagnet 57 and the second permanent magnet 56 generate the same magnetic poles, thereby pushing the second clamping plates 55 on both sides to approach each other, until the arc surface of the second clamping plate 55 contacts the outer wall of the first pipe 3, firmly clamping it, and reducing the amplitude of the first pipe 3. The second electromagnet 57 is used before the first electromagnet 44. When the second electromagnet 57 is energized and the two second clamping plates 55 contact the side wall of the first pipe 3, the first electromagnet 44 is energized to push the first clamping plates 42 to approach each other, wherein the wedge block 59 is initially located at its end The fourth spring 511 is in a compressed state until the wedge block 59 contacts the side wall of the first clamping plate 42, thereby limiting the position of the wedge block 59, so that the wedge block 59 contacts the adjacent side wall of the second clamping plate 55, and the second clamping plate 55 is fixed to improve the stability. At this time, the second electromagnet 57 can be powered off; When use is completed, the first electromagnet 44 is powered off, and the first clamping plate 42 moves away from the reset under the elastic action of the first spring 41. Finally, the wedge block 59 loses the limiting effect of the first clamping plate 42, and under the elastic action of the fourth spring 511, the wedge block 59 is pushed to reset, so that the wedge block 59 moves to the inside of the rectangular hole 52, releasing the limiting effect on the second clamping plate 55, and under the elastic action of the third spring 54, the second clamping plate 55 is pulled to reset for subsequent continued use.
[0037] Specifically, the working principle of oil removal is as follows: first, ignite the biomass boiler 2, and when pressure is generated, start crushing and beating; then, by observing how much material is being beaten inside the biomass boiler 2, turn on the external vacuum pump as needed; after the beating is completed, wait until the temperature inside the biomass boiler 2 rises to at least 90 degrees Celsius, then turn on the external vacuum pump for vacuuming, and determine the vacuuming time according to the state of the raw materials. The pressure inside the biomass boiler 2 gradually rises and does not exceed 0.5 atmospheres, and the length of the pressure increase time depends on the pressure of the biomass boiler 2. The time is 30 minutes, during which the pressure of the rotten material does not exceed 2 atmospheres, and the pressure without rotten material cannot be lower than 2.6 atmospheres; and the pressure cannot be lower than 20 minutes, then the operation of the biomass boiler 2 is stopped, and finally the oil discharge operation is carried out; during the oil discharge process, the pressure relief time is 20 minutes. When the pressure in the biomass boiler 2 is equal to the normal atmospheric pressure, vacuuming begins. If the pressure of the biomass boiler 2 reaches more than 5 atmospheres, the biomass boiler 2 can be shut down after working normally for 3.5 hours, and the remaining steam can still be used continuously for 1-1.5 hours.
[0038] The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.
[0039] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A high-temperature deoiling system for diseased animals, comprising a support (1), a biomass boiler (2) and a second pipeline (31), characterized in that: The biomass boiler (2) is fixedly mounted on the bracket (1); a pipe mounting plate (21) is fixedly connected to the side wall of the biomass boiler (2); a first pipe (3) is fixedly connected to the inner wall of the pipe mounting plate (21); one end of the first pipe (3) penetrates and is fixedly connected to the inside of the biomass boiler (2); a mixing and stirring mechanism (22) is installed inside the biomass boiler (2); a cavity (23) is formed on the side wall of the biomass boiler (2); a sealing component (4) is installed inside the cavity (23); a stabilizing component (5) is installed on the outer wall of the biomass boiler (2); a shock absorbing component (6) is fixedly mounted on one end of the second pipe (31); and one end of the first pipe (3) is installed inside the shock absorbing component (6); The shock absorbing assembly (6) comprises a sleeve (61); the first pipe (3) and the second pipe (31) are both hard pipes; one end of the sleeve (61) is fixedly connected to a side wall of one end of the second pipe (31); one end of the first pipe (3) is located inside the other end of the sleeve (61); a section of the side wall of the first pipe (3) located inside the sleeve (61) is fixedly connected to a mounting ring (62); a sealing sleeve (63) is fixedly connected to the outer wall of the mounting ring (62); and the sealing sleeve (63) is fixedly connected to the inner wall of the sleeve (61).
2. A high temperature deoiling system for diseased animals according to claim 1, characterized in that: The sealing assembly (4) comprises two groups of first springs (41), the two groups of first springs (41) are respectively fixedly connected to the inner top wall and the inner bottom wall of the cavity (23), each group of first springs (41) is commonly fixedly connected to a first clamping plate (42), the two first clamping plates (42) are symmetrically fixedly connected to the first permanent magnet (43), the inner top wall and the inner bottom wall of the cavity (23) are symmetrically fixedly connected to the first electromagnet (44), and the sealing sleeve (63) is made of a retractable material.
3. A high temperature deoiling system for diseased animals according to claim 2, characterized in that: The two first clamping plates (42) are symmetrically provided with through holes (48), each of the through holes (48) being provided with a first control valve (49), the adjacent surfaces of each of the first clamping plates (42) and the first pipe (3) being arcuate surfaces, the side walls of the arcuate surfaces of the first clamping plates (42) being fixedly connected with a plurality of second springs (45) at equal angles, the plurality of second springs (45) being fixedly connected with a sealing plate (46) in common, the sealing plate (46) being an arcuate structure and being in contact with the side walls of the first pipe (3).
4. A diseased animal high temperature deoiling system according to claim 3, characterized in that: A sealing cavity (47) is provided on the inner wall of each of the first clamping plates (42), a connecting cavity (414) is provided on the inner wall of each of the sealing plates (46), a plurality of discharge holes (417) are symmetrically provided on the side wall of the connecting cavity (414), and a second control valve (418) is installed inside each of the discharge holes (417).
5. A high temperature deoiling system for diseased animals according to claim 4, characterized in that: A connecting rod (410) is fixedly connected to the side wall of the sealing plate (46), and the connecting rod (410) is located inside one of the second springs (45). One end of the connecting rod (410) passes through the adjacent first clamping plate (42) and extends into the sealing cavity (47). The side wall of one end of the connecting rod (410) located inside the sealing cavity (47) is fixedly connected to a piston plate (411).
6. A high temperature deoiling system for diseased animals according to claim 5, characterized in that: The piston plate (411) is sealingly and slidably connected to the inner wall of the sealing cavity (47); the piston plate (411) is symmetrically and fixedly connected to a discharge pipe (412); one end of each discharge pipe (412) successively passes through the inner wall of the adjacent sealing cavity (47) and the sealing plate (46) and is fixedly connected to the connecting cavity (414); and a one-way discharge valve (413) is installed inside each discharge pipe (412).
7. The high temperature deoiling system for diseased animals according to claim 1, characterized in that: The stabilizing assembly (5) comprises two support plates (51), the two support plates (51) are symmetrically fixedly connected to the outer side wall of the biomass boiler (2), the top and bottom ends of the two support plates (51) are commonly fixedly connected to a mounting plate (53), the side walls of the two support plates (51) are symmetrically fixedly connected to third springs (54), and the two third springs (54) are commonly fixedly connected to a second clamping plate (55).
8. A high temperature deoiling system for diseased animals according to claim 7, characterized in that: The second clamping plate (55) is in contact with the side wall of the first pipe (3), and the second clamping plate (55) is embedded and slidably connected with the side walls of the two support plates (51). The top end of the second clamping plate (55) is fixedly connected to a second permanent magnet (56), the bottom end of each mounting plate (53) is fixedly connected to a second electromagnet (57), and the two support plates (51) are symmetrically fixedly connected to baffles (58).
9. A high temperature deoiling system for diseased animals according to claim 8, characterized in that: The side wall of the biomass boiler (2) is symmetrically provided with rectangular holes (52), and a wedge block (59) is slidably connected to the side wall of the baffle plate (58), one end of the wedge block (59) is in contact with the side wall of the adjacent second clamping plate (55), and the inclined end of the wedge block (59) passes through the adjacent rectangular hole (52) and then is in contact with the side wall of the adjacent first clamping plate (42).
10. A diseased animal high temperature deoiling system according to claim 9, characterized in that: The side walls of the inclined surfaces of the wedge-shaped blocks (59) are symmetrically fixedly connected to connecting plates (510), each side wall of the connecting plates (510) is fixedly connected to a fourth spring (511), and each fourth spring (511) is fixedly connected to a side wall of the baffle plate (58).
Citation Information
Patent Citations
Melting device for treating animals died of illness
CN211574145U
Pipeline damping mounting structure
CN116085587A
High-temperature chemical enzymolysis harmless treatment device and treatment process for dead and culled animals
CN119140576A
Positive and negative pressure flexible connection structure for pipeline damping
CN217463625U