Multi-angle adjusting and moving box girder steel bar binding mould and using method thereof

By designing multi-angle adjustment of the mobile box girder steel bar binding tires, the problems of low working efficiency, high labor investment, large costs and difficult position angle adjustment of traditional tires are solved, and efficient, energy-saving and environmentally friendly steel bar binding operations are achieved, which are suitable for the needs of modern railway construction.

CN119870331APending Publication Date: 2025-04-25中铁十四局集团房桥有限公司
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202510148318.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-11
Publication Date
2025-04-25

AI Technical Summary

Technical Problem

The fixed box girder steel tying tools used in traditional railway prefabricated box girder factories are inefficient in working efficiency, high labor investment, high construction costs, and cannot easily adjust the position and angle, making it difficult to meet the needs of modern railway construction.

Method used

A multi-angle adjustment mobile box girder steel bar binding tire is designed, including a base, a frame, a moving mechanism and a rotary body mechanism. The bottom of the moving mechanism is equipped with a track, and a truss is installed on the top of the frame. The moving mechanism includes a power wheel and a driven wheel, which can move and rotate on the track, realizing multi-angle adjustment.

Benefits of technology

The tire can significantly improve work efficiency, reduce labor investment, reduce construction costs, and is not restricted by location and environment. It can work normally in bad weather, with controllable quality and adjustable location, and is suitable for the needs of modern railway construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119870331A_ABST
    Figure CN119870331A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of box girder construction, and discloses a multi-angle adjusting and moving box girder steel bar binding mould and a using method thereof.The multi-angle adjusting and moving box girder steel bar binding mould comprises a base and a frame body arranged at the top of the base; a moving mechanism is arranged at the bottom of the base, a swivel mechanism is arranged between the moving mechanism and the base, a track is arranged at the bottom of the moving mechanism, a truss is arranged at the top of the frame body, and the moving mechanism comprises a moving frame fixed at the bottom of the base and a plurality of mounting rods arranged in the frame body; the longitudinal rods are arranged on the installation rods, the power wheels and the driven wheels are arranged at the bottoms of the longitudinal rods, the multiple installation rods are arranged at intervals, the longitudinal rods are arranged in the length direction of the frame body in a full-length mode, multiple installation grooves are formed in the longitudinal rods at intervals, and the installation grooves are used for installing the power wheels or the driven wheels. The device is slightly influenced by factors such as space, position, environment and operation mode, and the working efficiency can be obviously improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of box girder construction, and in particular to a multi-angle adjustable movable box girder steel bar binding jig and a use method thereof. Background Art

[0002] At present, the construction of high-speed railways is developing rapidly. The experience exchange and discussion and learning of box girder prefabrication technology among large-scale railway construction units are quite close. The prefabrication technology of large-scale railway box girders has gradually matured. The quality of prefabricated box girders will directly affect the overall quality of the entire bridge project, so the construction technology and process control measures in the box girder prefabrication process are particularly important.

[0003] Traditional railway prefabricated box girder factories use fixed box girder steel bar binding jigs. Affected by factors such as space, location, environment, and operation methods, the fixed box girder steel bar binding jigs have low work efficiency, high labor requirements, and excessive construction costs. They cannot easily complete the conversion of various work processes, and require a large number of steel bars to be transported and hoisted. In addition, the position and angle of the fixed box girder steel bar binding jigs are difficult to adjust. We have developed a new jig technology that is not affected by the environment, has improved efficiency, reduced labor input, saved construction costs, and meets economic applicability by improving the structural characteristics and operation methods of the previous jigs. Summary of the invention

[0004] The present application provides a multi-angle adjustable mobile box girder reinforcement binding jig and a method of using the same, so as to solve the problems of low binding efficiency and inability to adjust the position and angle of existing box girder reinforcement binding jigs.

[0005] To solve the above technical problems, the present application provides a multi-angle adjustable mobile box girder reinforcement binding jig, comprising: a base and a frame arranged on the top of the base; a moving mechanism is arranged at the bottom of the base, a swivel mechanism is arranged between the moving mechanism and the base, a track is arranged at the bottom of the moving mechanism, and a truss is arranged at the top of the frame. The moving mechanism comprises a moving frame fixed to the bottom of the base, a plurality of mounting rods arranged in the frame, a longitudinal rod arranged on the mounting rod, and a power wheel and a driven wheel arranged at the bottom of the longitudinal rod. The plurality of mounting rods are arranged at intervals, the longitudinal rods are arranged along the length direction of the frame, and a plurality of mounting grooves are arranged at intervals between the longitudinal rods, and the mounting grooves are used to install the power wheel or the driven wheel.

[0006] In some embodiments of the present application, the rotating mechanism includes an installation cavity arranged on one side of the base, a rotating motor arranged on the top of the installation cavity, a power gear connected to the output end of the rotating motor, and a transmission gear fixed to the top of the moving mechanism, ribs are arranged at both ends of the installation cavity, the output end of the rotating motor extends to the bottom of the installation cavity and is fixedly connected to the power gear, and the power gear and the transmission gear are meshed.

[0007] In some embodiments of the present application, the track includes a concrete foundation, a track groove opened on the concrete foundation, an I-beam fixed in the track groove, and a track pressure plate hinged to one side of the top of the track groove, the I-beam is arranged along the entire length of the track groove, adjacent I-beams are welded and fixed, and the moving mechanism contacts the top surface of the track pressure plate.

[0008] In some embodiments of the present application, the truss includes a supporting guardrail arranged on the top of the frame, an operating frame arranged on the outside of the supporting guardrail, and an inner support arranged between the supporting guardrail and the frame, a positioning piece is arranged on the opposite side of the supporting guardrail, ladders are arranged at both ends of the operating frame in the length direction, and a steel springboard is arranged on the top of the operating frame.

[0009] In some embodiments of the present application, the length of the moving frame is 32600 mm, and the width of the moving frame is 12880 mm.

[0010] In some embodiments of the present application, the number of the power wheels is 6, the number of the driven wheels is 8, and both the power wheels and the driven wheels are load-bearing wheels.

[0011] In some embodiments of the present application, the rail pressure plates are arranged at intervals of multiple times, and the distance between adjacent rail pressure plates is 60 cm.

[0012] In some embodiments of the present application, the maximum rotation angle of the swivel mechanism is not less than 90°.

[0013] In some embodiments of the present application, a method for using a multi-angle adjustable mobile box girder reinforcement binding jig is provided, and the specific contents of the method are as follows: Step 1, using calculation software to calculate the jig force form, the maximum deformation under load under various working conditions, and obtain the composition form, material type and foundation form of the jig components, and determine the jig structure and the number of power wheels and driven wheels; Step 2: Level the jig making site and level the bottom surface of the steel bar processing and binding workshop; Step 3: Measurement and layout. After the technicians use the total station to lay out the center line of the track, they use the total station to compound again to ensure that the center line of the track is correct. The construction team on the foundation pit excavation site excavates the track foundation pit according to the center line laid out by the technicians. During the excavation, the technicians use the level to control the elevation to ensure that the depth of the foundation pit meets the design and specifications. Before the bottom of the foundation pit is processed, the loose soil at the bottom of the foundation pit is cleaned and compacted, and a 10-centimeter gravel cushion is laid at the bottom of the foundation pit; Step 4: Before steel bar tying, the laboratory shall conduct foundation bearing capacity test to ensure that the foundation bearing capacity meets the design and specification requirements. Track foundation steel bar tying: Track foundation steel bar is tied as shown in the design drawing. Before steel bar tying, the technicians shall perform secondary laying out to determine the track center line. The steel bar tying and lap joints shall meet the specification requirements for steel bar tying and connection. After the steel bar tying is completed, the technicians shall lay out the track center line again. The embedded parts for fixing the track and the steel cage shall be welded according to the track center line. Step 5: Use C30 concrete to pour the track foundation. The concrete pouring should not exceed the top surface of the pre-buried structure. P50 steel rails are used as slideways for track installation, and a track pressure plate is set at intervals of 60 cm. Step six, cutting, assembly and welding of steel components: the jig is made of a box-type steel beam and the trolley is connected in three sections. I-beams are used as crossbars and longitudinal bars to form the overall frame. The sub-plates are made of steel structure and 64 x 40 angle steel. Equipped with six 3.0-kilowatt motors plus carburizing reducers, 6 driving wheels, and 8 driven wheels; a total of 14 sets of load-bearing wheels, and each set of load-bearing wheels is equipped with a separate rotating motor, so that each set of load-bearing wheels can be independently rotated 90 degrees along the Z axis, allowing the trolley to move horizontally or vertically as a whole. Each set of load-bearing wheels uses a steel wheel with a wheel diameter of 400MM and a load of seven tons per wheel, which can meet the binding and transportation work of the jig of 35 tons plus 80 tons of reinforced steel dragons; Step seven, the jig is debugged and operated. The jig is driven by a motor and runs in an unloaded state after the jig is welded as a whole.

[0014] Compared with the prior art, the present invention has the following characteristics and beneficial effects: The present invention can be fully loaded with a weight of 80 tons and move forward at a constant speed of 2 to 3 kilometers per hour. The frame of the mobile tying jig is made of steel sections commonly used in engineering projects, with a stable structure. The power wheels are driven by motors, which is environmentally friendly and energy-saving with low noise. The present invention can be moved to the rebar workshop during the rebar tying period, and the semi-finished products can be hoisted into the jig by the overhead crane in the rebar workshop for rebar tying operations. Compared with the traditional fixed box girder rebar tying jig, the semi-finished rebar products are transported by manpower, which can save a lot of labor. The mobile box girder rebar tying jig is not restricted by position and environment. The box girder rebar cage is processed in the rebar workshop during processing. Under the influence of bad weather, the rebar tying is carried out in the rebar greenhouse. The present invention has the advantages of not being affected by bad weather, controllable quality and adjustable position. At the same time, with the double-track track, more tying jigs can be accommodated in the workshop, the position of the tying jigs can be adjusted at any time, and the construction can be cyclical. Popularization and use can produce better results. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall structure of the embodiment of the present invention; Figure 2 It is a schematic side view of the overall structure of an embodiment of the present invention; Figure 3 It is a schematic diagram of the structure of the moving mechanism of an embodiment of the present invention; Figure 4 is a schematic diagram of the track structure of an embodiment of the present invention; Figure 5 It is a schematic diagram of double-line construction according to an embodiment of the present invention.

[0016] In the figure, 100, base; 200, frame; 300, moving mechanism; 310, moving frame; 320, mounting rod; 330, longitudinal rod; 340, power wheel; 400, rotating mechanism; 410, mounting cavity; 420, rotating motor; 430, power gear; 440, transmission gear; 500, track; 510, concrete foundation; 520, track groove; 530, I-beam; 540, cover plate; 600, truss; 610, support guardrail; 620, operating frame; 630, inner support. DETAILED DESCRIPTION

[0017] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0018] In the description of the present application, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0019] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, unless otherwise specified, "plurality" means two or more.

[0020] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0021] like Figure 1-5 As shown, according to some embodiments of the present application, a multi-angle adjustable mobile box girder reinforcement binding jig includes: a base 100 and a frame 200 arranged on the top of the base 100; a moving mechanism 300 is arranged at the bottom of the base 100, a rotating mechanism 400 is arranged between the moving mechanism 300 and the base 100, a track 500 is arranged at the bottom of the moving mechanism 300, and a truss 600 is arranged at the top of the frame 200. The moving mechanism 300 includes a moving frame 310 fixed to the bottom of the base 100, a plurality of mounting rods 320 arranged in the frame 200, a longitudinal rod 330 arranged on the mounting rod 320, and a power wheel 340 and a driven wheel arranged at the bottom of the longitudinal rod 330, the plurality of mounting rods 320 are arranged at intervals, the longitudinal rod 330 is arranged along the length direction of the frame 200, and a plurality of mounting grooves are arranged at intervals of the longitudinal rod 330, and the mounting grooves are used to install the power wheel 340 or the driven wheel.

[0022] According to some embodiments of the present application, the rotating mechanism 400 includes an installation cavity 410 arranged on one side of the base 100, a rotating motor 420 arranged at the top of the installation cavity 410, a power gear 430 connected to the output end of the rotating motor 420, and a transmission gear 440 fixed to the top of the moving mechanism 300, ribs are arranged at both ends of the installation cavity 410, the output end of the rotating motor 420 extends to the bottom of the installation cavity 410 and is fixedly connected to the power gear 430, and the power gear 430 and the transmission gear 440 are meshed.

[0023] According to some embodiments of the present application, the track 500 includes a concrete foundation 510, a track 500 groove opened on the concrete foundation 510, an I-beam 530 fixed in the track 500 groove, and a track 500 pressure plate hinged to one side of the top of the track 500 groove, the I-beam 530 is arranged along the entire length of the track 500 groove, adjacent I-beams 530 are welded and fixed, and the moving mechanism 300 contacts the top surface of the track 500 pressure plate.

[0024] According to some embodiments of the present application, the truss 600 includes a support guardrail 610 arranged on the top of the frame 200, an operating frame 620 arranged on the outside of the support guardrail 610, and an inner support 630 arranged between the support guardrail 610 and the frame 200, a positioning piece is arranged on the opposite side of the support guardrail 610, ladders are arranged at both ends of the operating frame 620 in the length direction, and a steel springboard is arranged on the top of the operating frame 620.

[0025] According to some embodiments of the present application, the length of the moving frame 310 is 32600 mm, and the width of the moving frame 310 is 12880 mm.

[0026] According to some embodiments of the present application, the number of the power wheels 340 is 6, the number of the driven wheels is 8, and both the power wheels 340 and the driven wheels are load-bearing wheels.

[0027] According to some embodiments of the present application, the track 500 pressure plates are arranged at intervals of multiple, and the distance between adjacent track 500 pressure plates is 60 cm.

[0028] According to some embodiments of the present application, the maximum rotation angle of the swivel mechanism 400 is not less than 90°.

[0029] According to some embodiments of the present application, a method for using a multi-angle adjustment mobile box girder reinforcement binding jig is provided, and the specific contents of the method are as follows: Step 1, using calculation software to calculate the jig force form, the maximum deformation under load under various working conditions, and obtain the composition form, material type and foundation form of the jig components, and determine the jig structure and the number of power wheels 340 and driven wheels; Step 2: Level the jig making site and level the bottom surface of the steel bar processing and binding workshop; Step 3: Measurement and layout. After the technicians use the total station to lay out the center line of the track 500, they use the total station to compound again to ensure that the center line of the track 500 is correct. The construction team on the foundation pit excavation site excavates the track 500 according to the center line laid out by the technicians. During the excavation, the technicians use the level to control the elevation to ensure that the depth of the foundation pit meets the design and specifications. Before the bottom of the foundation pit is processed, the loose soil at the bottom of the foundation pit is cleaned and compacted, and a 10-centimeter gravel cushion is laid at the bottom of the foundation pit; Step 4: Before steel bar tying, the laboratory shall conduct foundation bearing capacity test to ensure that the foundation bearing capacity meets the design and specification requirements. The foundation steel bars of track 500 are tied as shown in the design drawing. Before steel bar tying, the technicians shall perform secondary laying out to determine the center line of track 500. The steel bar tying and lap joints shall meet the specification requirements of steel bar tying and connection. After the steel bar tying is completed, the technicians shall lay out the center line of track 500 again. The operation is to weld the embedded parts used to fix track 500 and the steel cage according to the center line of track 500. Step 5: Use C30 concrete to pour concrete for the track 500 foundation. The concrete pouring should not exceed the top surface of the pre-buried building. P50 steel rails are used as slideways for the installation of track 500. A track 500 pressure plate is set at intervals of 60 cm. Step six, cutting, assembly and welding of steel components: the jig is made of a box-type steel beam and the trolley is connected in three sections. The I-beam 530 is used as the horizontal bar and the longitudinal bar 330 to form the overall frame. The sub-plate is made of steel structure and 64 times 40 angle steel. Equipped with six 3.0-kilowatt motors plus carburizing reducers, 6 driving wheels, and 8 driven wheels; a total of 14 sets of load-bearing wheels, and each set of load-bearing wheels is equipped with a separate rotating motor, so that each set of load-bearing wheels can be independently rotated 90 degrees along the Z axis, allowing the trolley to move horizontally or vertically as a whole. Each set of load-bearing wheels uses a steel wheel with a wheel diameter of 400MM and a load of seven tons per wheel, which can meet the binding and transportation work of the jig of 35 tons plus 80 tons of reinforced steel dragons; Step seven, the jig is debugged and operated. The jig is driven by a motor and runs in an unloaded state after the jig is welded as a whole.

[0030] According to some embodiments of the present application, when the trolley needs to move, the wheel body directly contacts the I-beam 530 and can move forward and backward. When the trolley needs to rotate for longitudinal adjustment or change tracks, the cover plate 540 is buckled on the top of the I-beam 530. When the trolley load-bearing wheels move to the upper end of the cover plate 540, the rotating motor 420 is started, and after the 14 load-bearing groups are rotated 90 degrees, the trolley as a whole can move longitudinally.

[0031] In summary, the present invention relates to the technical field of box girder construction, and discloses a multi-angle adjustable mobile box girder steel bar binding jig and a method of using the same, comprising: a base and a frame arranged on the top of the base; characterized in that a moving mechanism is arranged at the bottom of the base, a swivel mechanism is arranged between the moving mechanism and the base, a track is arranged at the bottom of the moving mechanism, and a truss is arranged at the top of the frame, the moving mechanism comprises a moving frame fixed to the bottom of the base, a plurality of mounting rods arranged in the frame, a longitudinal rod arranged on the mounting rod, and a power wheel and a driven wheel arranged at the bottom of the longitudinal rod, the plurality of mounting rods are arranged at intervals, the longitudinal rods are arranged along the length direction of the frame, a plurality of mounting grooves are arranged at intervals of the longitudinal rods, the mounting grooves are used to install the power wheel or the driven wheel, and the device is less affected by factors such as space, position, environment, and operation mode, and can significantly improve work efficiency.

[0032] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.

Claims

1. A multi-angle adjustable movable box girder reinforcement binding jig, comprising: A base (100) and a frame (200) arranged on the top of the base (100); characterized in that a moving mechanism (300) is arranged at the bottom of the base (100), a rotating mechanism (400) is arranged between the moving mechanism (300) and the base (100), a track (500) is arranged at the bottom of the moving mechanism (300), a truss (600) is arranged on the top of the frame (200), and the moving mechanism (300) includes a moving frame (300) fixed to the bottom of the base (100) and a rotating mechanism (400) arranged between the moving mechanism (300) and the base (100). The frame (200) comprises a plurality of mounting rods (320) arranged in the frame (200), a longitudinal rod (330) arranged on the mounting rods (320), and a power wheel (340) and a driven wheel arranged at the bottom of the longitudinal rod (330), wherein the plurality of mounting rods (320) are arranged at intervals, the longitudinal rod (330) is arranged along the length direction of the frame (200), and a plurality of mounting grooves are arranged at intervals along the length direction of the longitudinal rod (330), and the mounting grooves are used to install the power wheel (340) or the driven wheel.

2. The multi-angle adjustable movable box girder reinforcement binding jig according to claim 1 is characterized in that: The rotating mechanism (400) comprises a mounting cavity (410) arranged on one side of the mounting rod (320), a rotating motor (420) arranged in the mounting cavity (410), a power gear (430) connected to the output end of the rotating motor (420), and a transmission gear (440) fixed to the top of the moving mechanism (300), ribs are arranged at both ends of the mounting cavity (410), the output end of the rotating motor (420) extends to the bottom of the mounting cavity (410) and is fixedly connected to the power gear (430), and the power gear (430) and the transmission gear (440) are meshed.

3. The multi-angle adjustable movable box girder reinforcement binding jig according to claim 2 is characterized in that: The track (500) comprises a concrete foundation (510), a track (500) groove opened on the concrete foundation (510), an I-beam (530) fixed in the track (500) groove, and a cover plate (540) hinged to one side of the top of the track (500) groove, the I-beam (530) is arranged along the entire length of the track (500) groove, adjacent I-beams (530) are welded and fixed, the moving mechanism (300) contacts the top surface of the cover plate (540), and track (500) pressure plates are arranged on both sides of the I-beam (530).

4. The multi-angle adjustable movable box girder reinforcement binding jig according to claim 3 is characterized in that: The truss (600) comprises a support guardrail (610) arranged on the top of the frame (200), an operating frame (620) arranged outside the support guardrail (610), and an inner support (630) arranged between the support guardrail (610) and the frame (200), a positioning piece is arranged on the opposite side of the support guardrail (610), ladders are arranged at both ends of the operating frame (620) in the length direction, and a steel springboard is arranged on the top of the operating frame (620).

5. The multi-angle adjustable movable box girder reinforcement binding jig according to claim 4 is characterized in that: The length of the moving frame (310) is 32600 mm, and the width of the moving frame (310) is 12880 mm.

6. The multi-angle adjustable movable box girder reinforcement binding jig according to claim 5 is characterized in that: The number of the power wheels (340) is 6, and the number of the driven wheels is 8, and both the power wheels (340) and the driven wheels are load-bearing wheels.

7. The multi-angle adjustable movable box girder reinforcement binding jig according to claim 6 is characterized in that: The track (500) pressure plates are arranged at intervals of a plurality, and the distance between adjacent track (500) pressure plates is 60 cm.

8. The multi-angle adjustable movable box girder reinforcement binding jig according to claim 7 is characterized in that: The maximum rotation angle of the rotating mechanism (400) is not less than 90°.

9. A method for using a multi-angle adjustable movable box girder reinforcement binding jig according to any one of claims 1 to 8, characterized in that: The method is specifically described as follows: Step 1, using calculation software to calculate the force form of the mold, the maximum deformation under load under various working conditions, obtain the composition form, material type and basic form of the mold components, determine the mold structure and the number of power wheels (340) and driven wheels; Step 2: Level the jig making site and level the bottom surface of the steel bar processing and binding workshop; Step 3: Measurement and laying out. After the technicians use a total station to lay out the center line of the tire track (500), they use the total station to compound again to ensure that the center line of the track (500) is correct. The construction team on the foundation pit excavation site excavates the track (500) according to the center line laid out by the technicians. During the excavation, the technicians use a level to control the elevation to ensure that the depth of the foundation pit meets the design and specifications. Before the bottom of the foundation pit is processed, the loose soil at the bottom of the foundation pit is cleaned and compacted, and a 10-centimeter gravel cushion is laid at the bottom of the foundation pit; Step 4: Before tying the steel bars, the laboratory conducts a foundation bearing capacity test to ensure that the foundation bearing capacity meets the design and specification requirements. The track (500) foundation steel bars are tied. The track (500) foundation steel bars are tied as shown in the design drawing. Before tying the steel bars, the technicians perform a secondary line laying to determine the center line of the track (500). The steel bar tying and lap joints must meet the specification requirements for steel bar tying and connection. After the steel bar tying is completed, the technicians lay out the center line of the track (500) again. The operation is to weld the embedded parts used to fix the track (500) and the steel cage according to the center line of the track (500); Step 5: Concrete pouring: C30 concrete is used to pour the track (500). The concrete pouring of the track (500) foundation should not exceed the top surface of the pre-buried building. The track (500) is installed using P50 rails as slideways, and a track (500) pressure plate is set at intervals of 60 cm. Step 6, cutting and assembly welding of steel components: The jig is made of a box-type steel beam as a trolley and is connected in three sections. I-beams (530) are used as crossbars and longitudinal bars (330) to form the overall frame. The sub-plate is made of steel structure and 64×40 angle steel. It is equipped with six 3.0 kW motors plus carburizing reducers, 6 driving wheels, and 8 driven wheels; a total of 14 sets of load-bearing wheels, and each set of load-bearing wheels is equipped with a separate rotating motor, so that each set of load-bearing wheels can be rotated 90 degrees along the Z axis independently, allowing the trolley to move horizontally or vertically as a whole. Each set of load-bearing wheels is made of steel wheels with a wheel diameter of 400MM. Each wheel has a load of seven tons, which can meet the binding and transportation work of 35 tons of tires and 80 tons of steel bars. Step seven, the jig is debugged and operated. The jig is driven by a motor and runs in an unloaded state after the jig is welded as a whole.

Citation Information

Cited By

  • Box girder reinforcement cage binding bearing platform and using method thereof

    CN121556368A