Geotechnical engineering side slope anchoring supporting structure

By adding power components, anchor components and reinforcement components to the anchor rod, the poor anchoring performance problem caused by the small contact area between the anchor rod and the soil layer is solved, and higher embedded strength and anchor reliability are achieved.

CN119877528AActive Publication Date: 2025-04-25WUHAN SURVEYING GEOTECHN RES INST OF MCC
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202510205645.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-25
Publication Date
2025-04-25
Estimated Expiration
2045-02-25

AI Technical Summary

Technical Problem

When used, the contact area between the anchor and the soil layer is small, resulting in poor anchoring performance, small pull-out resistance, poor anchoring force and reliability.

Method used

Add an anchor assembly on the anchor rod, including a power assembly and multiple sets of anchor assembly, and the reinforcement assembly is provided with power through the power assembly, so that the anchor assembly and reinforcement assembly extend into the soil layer at the same time, increasing the anchor area and improving the embedded strength.

Benefits of technology

By increasing the anchoring area, the anchoring strength between the anchor rod and the soil body is improved, the anchoring force and reliability are significantly improved, and the pull-out resistance is enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119877528A_ABST
    Figure CN119877528A_ABST
Patent Text Reader

Abstract

The invention provides a geotechnical engineering side slope anchoring supporting structure. The supporting structure comprises an anchor rod and a soil layer, a mounting hole is formed in the surface of the soil layer, the anchor rod is mounted in the mounting hole, a first cavity and a plurality of second cavities are formed in the anchor rod; a power assembly is arranged in the first cavity, an anchoring assembly is arranged in the second cavity, and the power assembly is used for providing power for the anchoring assembly. By arranging the power assembly and the anchoring assembly, after the anchor rod is inserted into a mounting hole reserved in a soil layer, the power assembly works, power can be provided for the anchoring assembly under the action of the power assembly, the anchoring assembly extends into the soil layer, and therefore the anchoring area of the anchor rod can be increased; the anchor rod has higher built-in strength with the surrounding soil body, the anchoring force and reliability of the anchor rod are improved, meanwhile, the anchoring area of the anchor rod can be further increased under the cooperation of the reinforcing assembly, and therefore the anchoring effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of slope anchoring and supporting technology, and in particular to a geotechnical engineering slope anchoring and supporting structure. Background Art

[0002] Slope support refers to the support, reinforcement and protection measures taken on the slope to ensure the safety of the slope and its environment. Common types of support structures include: gravity retaining wall, buttress retaining wall, cantilever support, plate rib or lattice anchor retaining wall support, pile anchor retaining wall support, anchor spraying support, etc. According to the stress transfer method, anchor rods can be divided into tension anchor rods and pressure anchor rods. The anchor rod body of the tension anchor rod is directly bonded to the grouting body, and the anchoring between the anchor rod and the soil is achieved through the bonding force between the anchor rod body and the grouting body; the pressure anchor rod can convert the tension of the anchor rod body into the pressure of the grouting body, making full use of the good compressive resistance of the grouting body, applying compressive stress to the grouting body through the bearing body, so that the grouting body and the surrounding rock and soil body produce friction resistance to provide the bearing capacity required by the anchor rod.

[0003] At present, when using anchor rods, it is necessary to insert the anchor rods into the soil layer, and then pour slurry into the anchor rods, so that the slurry enters the installation hole between the anchor rods and the soil layer along the anchor rod through hole, so that the slurry can wrap the anchor rods, and after the slurry solidifies, the anchor rods can be fully in contact with the soil layer, thereby achieving the purpose of anchoring. Since only the anchor rod body itself and the soil layer are in contact and support between the anchor rods and the soil layer, the contact area is small, the anchoring performance is poor, and the mechanical strength is low, so the pull-out resistance that can be provided is small, resulting in poor anchoring force and reliability of the anchor rods. Therefore, it is necessary to design a geotechnical engineering slope anchoring support structure. Summary of the invention

[0004] In view of the problems existing in the prior art, the present invention provides a geotechnical engineering slope anchoring support structure, which adds an anchoring component to the anchor rod, including increasing the anchoring area of ​​the anchor rod, so that the anchor rod has a higher embedding strength with the surrounding soil, and improves the anchoring force and reliability of the anchor rod, thereby improving the anchoring effect.

[0005] In order to achieve the above-mentioned object, the present invention provides a geotechnical engineering slope anchoring support structure, comprising an anchor rod and a soil layer, wherein a mounting hole is opened on the surface of the soil layer, the anchor rod is mounted inside the mounting hole, a first cavity and a second cavity are arranged inside the anchor rod, the first cavity is arranged at the center of the anchor rod along the length direction of the anchor rod, a plurality of the second cavities are arranged, dispersedly arranged around the first cavity, a power assembly is arranged inside the first cavity, and an anchor assembly is arranged inside each second cavity;

[0006] The power assembly is used to provide power to the anchor assembly, including a rotating shaft rotatably installed in the first cavity, a rotating block is provided at the top of the rotating shaft, the rotating block extends above the top surface of the anchor rod, and a first bevel gear is provided at the height of the rotating shaft corresponding to each second cavity; the anchor assembly includes an anchor rod horizontally placed in the second cavity, a threaded hole is provided at one end of the anchor rod adjacent to the first cavity, and a threaded rod is threadedly connected in the threaded hole, an end of the threaded rod away from the anchor rod extends into the first cavity, and a second bevel gear meshing with the first bevel gear is connected at its end;

[0007] An anchor hole penetrating the corresponding second cavity is opened on the outer wall of the anchor rod at the position corresponding to each anchor rod; the rotation of the rotating shaft is controlled by the rotating block. During the rotation of the rotating shaft, multiple anchor rods are driven by multiple first bevel gears and multiple second bevel gears to move toward the outer wall of the anchor rod along the corresponding second cavity at the same time, and extend out of the corresponding anchor holes and inserted into the soil layer.

[0008] The better technical solution of the present invention is as follows: a reinforcement assembly is provided in each second cavity, the anchor rod is located in the middle of the second cavity, the reinforcement assembly includes two reinforcement rods symmetrically arranged on the upper and lower sides of the anchor rod, the tail end of each reinforcement rod is connected to the anchor rod in the same cavity through a rotating seat, and reinforcement holes connected to the second cavity are respectively provided on the upper and lower sides of the outer wall of the anchor rod corresponding to each anchor hole; when the rotating shaft drives the anchor rod to move, it also drives the two reinforcement rods connected thereto to move toward the outer wall of the anchor rod, extend out of the corresponding reinforcement holes, and insert into the soil layer.

[0009] A preferred technical solution of the present invention: one or more casting channels are provided on the upper end surface of the anchor rod, and a plurality of through holes are provided on the circumferential surface of the anchor rod, the through holes and the casting channels are both connected to the first cavity, and the through holes are arranged at positions that are staggered with the anchor holes and the reinforcement holes.

[0010] A better technical solution of the present invention: the anchor rod has a conical tip at one end facing the anchor hole, and the anchor hole is a circular hole matching the diameter of the anchor rod; the reinforcement rod has a conical tip at one end facing the reinforcement hole, and the reinforcement hole is a vertically arranged strip hole, the width of which matches the diameter of the reinforcement rod.

[0011] A preferred technical solution of the present invention is as follows: a hexagonal groove is provided on the upper end surface of the rotating block; a plurality of the second cavities are provided, which are symmetrically distributed on both sides of the first cavity in a group of two.

[0012] A better technical solution of the present invention is as follows: a fixing plate is fixedly connected to the circumferential surface of the upper end of the anchor rod, and a plurality of fixing plates are provided and distributed in a circular array on the circumference of the top surface of the anchor rod, and a plurality of plug rods are fixedly connected to the lower end of each fixing plate.

[0013] A more preferred technical solution of the present invention is as follows: a limiting groove is provided on the inner wall of each second cavity, a limiting block is slidably connected inside the limiting groove, and the limiting block is fixedly connected to the anchor rod.

[0014] A better technical solution of the present invention: the reinforcement assembly also includes a transmission rod arranged between each reinforcement rod and the anchor rod in the same cavity, and a rotating seat is fixedly installed on the upper and lower sides of the tail of the anchor rod away from the anchor hole, respectively, each reinforcement rod is rotatably connected to the corresponding rotating seat, and two first connecting blocks are fixedly connected to the side of each second cavity away from the first cavity, and the two first connecting blocks are respectively located on the upper and lower sides of the anchor hole, and a second connecting block is provided on the side of the middle part of each reinforcement rod adjacent to the anchor rod, and the second connecting block is fixedly connected to the reinforcement rod, and one end of each transmission rod is rotatably connected to the first connecting block, and the other end is rotatably connected to the second connecting block.

[0015] A better technical solution of the present invention: a lifting assembly is provided between the anchor assembly and the reinforcement rod, the lifting assembly includes a circular groove, a spring, an extension tube and a lifting rod, a circular groove is opened on the circumferential surface of the anchor rod, the circular groove corresponds to the reinforcement rod, an extension tube is fixedly connected to the circumferential surface of the anchor rod, the extension tube is aligned with the circular groove, and a lifting rod is slidably connected inside the extension tube; a spring is fixedly connected inside the circular groove, and the end of the spring away from the bottom of the circular groove is fixedly connected to the lifting rod.

[0016] The present invention has the following beneficial effects:

[0017] (1) The present invention is provided with a power component and a plurality of anchor components. After the anchor rod is inserted into the installation hole reserved in the soil layer, the power component is controlled to work. Under the action of the power component, power can be provided to the plurality of anchor components at the same time, so that the plurality of anchor components can be extended into the soil layer at the same time. In this way, the anchoring area of ​​the anchor rod can be increased, the anchor rod and the surrounding soil have a higher embedding strength, and the anchoring force and reliability of the anchor rod are improved.

[0018] (2) Each group of anchoring components of the present invention is correspondingly provided with two groups of reinforcement components, and the reinforcement components include a rotating seat, a reinforcement rod, a transmission rod, a first connecting block and a second connecting block. When the anchoring rod moves outward, the reinforcing rods on the upper and lower sides of the anchoring rod can be extended and opened at the same time with the cooperation of the rotating seat, the transmission rod, the first connecting block and the second connecting block, so that the reinforcement rods extend into the soil layer, thereby further increasing the anchoring area of ​​the anchoring rod, thereby improving the anchoring effect.

[0019] (3) The present invention also provides a grouting hole on the anchor rod, which leads to the first cavity, and provides a plurality of through holes on the anchor rod wall. After the anchor rod is fixed, grouting can be performed to reinforce it again, thereby ensuring the overall anchoring effect of the anchor rod. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 It is a schematic diagram of the overall structure of the geotechnical engineering slope anchoring support structure of the present invention;

[0021] Figure 2 It is a schematic diagram of the structure after the anchor rod and the soil layer cooperate in the present invention;

[0022] Figure 3 for Figure 2 Enlarged view of part A;

[0023] Figure 4 It is a front cross-sectional structural schematic diagram of the present invention;

[0024] Figure 5 for Figure 4 Enlarged view of part B;

[0025] Figure 6 It is a schematic diagram of the structure of the present invention after the right side section;

[0026] Figure 7 for Figure 6 Enlarged view of part C in the middle;

[0027] Figure 8 It is a schematic diagram of the structure of the present invention after a top view of the cross section;

[0028] Fig. 9 for Figure 8 Enlarged view of part D in the middle;

[0029] Fig.10 It is a schematic diagram of the structure inside the anchoring component;

[0030] Fig.11 for Fig.10 Enlarged view of part E in the middle.

[0031] In the figure: 1. anchor rod; 2. power assembly; 201. rotating shaft; 202. rotating block; 203. hexagonal groove; 204. first bevel gear; 205. second bevel gear; 3. anchor assembly; 301. threaded rod; 302. anchor rod; 4. reinforcement assembly; 401. rotating seat; 402. reinforcement rod; 403. transmission rod; 404. first connecting block; 405. second connecting block; 5. fixing plate; 6. plug rod; 7. pouring channel; 8. through hole; 9. soil layer; 10. mounting hole; 11. reinforcement hole; 12. anchor hole; 13. first cavity; 14. second cavity; 15. limit block; 16. limit groove; 17. lifting assembly; 1701. circular groove; 1702. spring; 1703. extension tube; 1704. lifting rod. DETAILED DESCRIPTION

[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0033] The embodiment provides a geotechnical engineering slope anchoring support structure, such as Figures 1 to 11 As shown, it includes an anchor rod 1 and a soil layer 9, a mounting hole 10 is opened on the surface of the soil layer 9, the anchor rod 1 is installed inside the mounting hole 10, and a first cavity 13 and a second cavity 14 are arranged inside the anchor rod 1. The first cavity 13 is arranged along the length direction of the anchor rod 1, and a plurality of second cavities 14 are arranged, and are symmetrically distributed on both sides of the first cavity 13; a power component 2 is arranged inside the first cavity 13, and an anchor component 3 and a reinforcement component 4 are arranged inside each second cavity 14. Anchor holes 12 for the anchor component 3 to extend out of the anchor rod 1 and reinforcement holes 11 for the reinforcement component 4 to extend out of the anchor rod 1 are correspondingly opened on the surface of the anchor rod 1; the power component 2 is used to provide power to the anchor component 3 and the reinforcement component 4.

[0034] When the anchor rod 1 is installed, the anchor rod 1 is installed inside the installation hole 10, and then the power component 2 starts to work. Under the action of the power component 2, power can be provided to the anchor component 3, so that the anchor component 3 extends out of the anchor hole 12 on the surface of the anchor rod 1 along the second cavity 14, and extends into the soil layer 9. In this way, the anchoring area of ​​the anchor rod 1 can be increased, and the anchor rod 1 and the surrounding soil have a higher embedding strength, thereby improving the anchoring force and reliability of the anchor rod 1; at the same time, the movement of the anchor component 3 also drives the reinforcement component 4 to work, so that the reinforcement component 4 also extends out of the reinforcement hole 11 on the surface of the anchor rod 1 along the second cavity 14, and penetrates into the soil layer 9. At the same time, with the cooperation of the jacking component 17, it is convenient for the reinforcement component 4 to be opened, so that the anchoring area of ​​the anchor rod 1 can be further increased, thereby improving the anchoring effect.

[0035] The embodiment provides a geotechnical engineering slope anchoring support structure, such as Figures 4 to 7As shown, the power assembly 2 includes a rotating shaft 201, a rotating block 202, a first bevel gear 204 and a second bevel gear 205. The rotating shaft 201 is vertically placed inside the first cavity 13, and both upper and lower ends are rotatably connected to the anchor rod 1. The upper end of the rotating shaft 201 is fixedly connected to the rotating block 202, and the rotating block 202 is rotatably connected to the anchor rod 1. The rotating block 202 extends to the top end surface of the anchor rod 1, and a hexagonal groove 203 is provided on the upper end surface of the rotating block 202; a first bevel gear 204 is fixedly connected to the rotating shaft 201 at a position corresponding to each second cavity 14, and a second bevel gear 205 is meshed at a position corresponding to each second cavity 14 on both sides of the first bevel gear 204. The anchor assembly 3 includes a threaded rod 301 and an anchor rod 302. The anchor rod 302 is located in the second cavity 14, with one end facing the anchor hole 12 downward, and the other end having a threaded hole. The length of the threaded hole is 1 / 2 to 2 / 3 of the length of the anchor rod 302, and the end facing the anchor hole 12 is a conical tip. One end of the threaded rod 301 is embedded in the threaded hole of the anchor rod 302 and is threadedly connected with the anchor rod 302. The other end passes through the second cavity 14, extends into the first cavity 13, and is connected with the corresponding second bevel gear 205. Since the cross section of the anchor rod 302 is circular, the anchor hole 12 is a circular hole, and its diameter matches the anchor rod 302. The anchor hole 12 is connected to the second cavity 14 and corresponds to the anchor rod 302. When working, by setting the anchor hole 12, the anchor rod 302 is convenient to extend out of the anchor rod 1 under the action of the anchor hole 12. A limiting groove 16 is provided on the inner wall of the second cavity 14, and a limiting block 15 is slidably connected inside the limiting groove 16. The limiting block 15 is fixedly connected to the anchor rod 302. When working, the movement of the anchor rod 302 can be limited by setting the limiting groove 16 and the limiting block 15, so that the anchor rod 302 can only move horizontally.

[0036] In the embodiment, the working process of the anchoring assembly is: inserting the hexagonal wrench into the hexagonal groove 203 of the rotating block 202, and then rotating the rotating block 202, then the rotating shaft 201 can be driven to rotate, and the rotation of the rotating shaft 201 drives the first bevel gear 204 to rotate, and then the first bevel gear 204 and the second bevel gear 205 cooperate to provide power for the movement of the anchoring assembly 3; with the rotation of the second bevel gear 205, the threaded rod 301 can be driven to rotate, and since the anchoring rod 302 is threadedly connected to the threaded rod 301, when the thread rotates, the anchoring rod 302 is driven to slide inside the second cavity 14, and the anchoring rod 302 can extend along the corresponding anchoring hole 12, move toward the inside of the soil layer 9, and be inserted into the inside of the soil layer 9, thereby increasing the anchoring area of ​​the anchor rod 1, so that the anchor rod 1 has a higher embedding strength with the surrounding soil, thereby improving the anchoring force and reliability of the anchor rod 1.

[0037] In the embodiment, Figure 6 and Figure 7As shown, the reinforcement component 4 includes two reinforcement rods 402 symmetrically arranged on the upper and lower sides of the anchor rod 302 and a transmission rod 403 located between each reinforcement rod 402 and the anchor rod 302, and a rotating seat 401 is fixedly installed on the upper and lower tails of the anchor rod 302 away from the conical tip, each reinforcement rod 402 is rotatably connected to the corresponding rotating seat 401, and one end of each reinforcement rod 402 away from the rotating seat 401 is pointed; two first connecting blocks 404 are fixedly connected to the side of the second cavity 14 away from the first cavity 13, and the two first connecting blocks 404 are respectively located on the upper and lower sides of the anchor hole 12, and a second connecting block 405 is provided on the side of the middle part of each reinforcement rod 402 adjacent to the anchor rod 302, and the second connecting block 405 is fixedly connected to the reinforcement rod 402, one end of each transmission rod 403 is rotatably connected to the first connecting block 404, and the other end is rotatably connected to the second connecting block 405. Each anchor hole 12 is symmetrically provided with two reinforcement holes 11 above and below, and the reinforcement holes 11 are vertical strips, and their width matches the diameter of the reinforcement rod 402. The tip of each reinforcement rod 402 faces the corresponding reinforcement hole 11, and when the anchor rod 302 moves horizontally toward the anchor hole 12, the upper and lower reinforcement rods 402 can extend the anchor rod 1 from the two reinforcement holes 11 respectively.

[0038] During the outward movement of the anchor rod 302, the two reinforcement rods 402 are also driven to move outward. During the movement, with the cooperation of the rotating seat 401, the transmission rod 403, the first connecting block 404 and the second connecting block 405, the reinforcement rod 402 can be extended and opened at the same time, so that the reinforcement rod 402 extends obliquely from the corresponding reinforcement hole 11 and extends into the soil layer 9. This can further increase the anchoring area of ​​the anchor rod 1, thereby improving the anchoring effect.

[0039] In order to make it easier to open the reinforcement rod 402, a lifting assembly 17 is provided between the anchor rod 302 and the reinforcement rod 402. Figure 7 and Fig.11 As shown, the lifting assembly 17 includes a circular groove 1701, a spring 1702, an extension tube 1703 and a lifting rod 1704. The circular groove 1701 is opened on the circumferential surface of the anchor rod 302, and the circular groove 1701 corresponds to the reinforcement rod 402. The circumferential surface of the anchor rod 302 is fixedly connected with the extension tube 1703, and the extension tube 1703 is aligned with the circular groove 1701. The lifting rod 1704 is slidably connected inside the extension tube 1703; the circular groove 1701 is fixedly connected with the spring 1702, and the end of the spring 1702 away from the bottom of the circular groove 1701 is fixedly connected to the lifting rod 1704. When working, as the anchor rod 302 is extended, the reinforcement rod 402 no longer presses the lifting rod 1704, and then the lifting rod 1704 can be driven out under the action of the compression spring 1702, thereby lifting the reinforcement rod 402, which is conducive to the opening of the reinforcement rod 402.

[0040] The embodiment provides a geotechnical engineering slope anchoring support structure, such as Figure 1 and Figure 2 As shown, the upper circumferential surface of the anchor rod 1 is fixedly connected with a fixing plate 5, and there are four fixing plates 5, which are arranged in a circumferential array, and the lower end of the reinforcement rod is fixedly connected with an insertion rod 6; during operation, when the anchor rod 1 is installed inside the installation hole 10, after the insertion rod 6 contacts the soil layer 9, the anchor rod 1 is continued to be pressed, so that the insertion rod 6 can be inserted into the soil layer 9. After the insertion rod 6 is inserted into the soil layer 9, the cooperation of the insertion rod 6 and the fixing plate 5 can not only further increase the anchoring area between the anchor rod 1 and the soil layer 9, but also prevent the anchor rod 1 from rotating, which is conducive to inserting the anchor rod 302 into the soil layer 9. Figure 4 and Figure 8 As shown, two pouring channels 7 are provided on the upper end surface of the anchor rod 1, and a plurality of through holes 8 are provided on the circumferential surface of the anchor rod 1, and the through holes 8 and the pouring channels 7 are both connected to the first cavity 13. During operation, when it is necessary to pour slurry, the slurry is poured into the first cavity 13 through the pouring channels 7, and then enters the mounting hole 10 through the through holes 8, thereby achieving the purpose of pouring slurry. After the slurry solidifies, the anchoring effect between the anchor rod 1 and the soil layer 9 can be further improved.

[0041] The construction process of the present invention is as follows: when installing the anchor rod 1, the anchor rod 1 is installed inside the installation hole 10. After the insertion rod 6 contacts the soil layer 9, the anchor rod 1 is continued to be pressed, so that the insertion rod 6 can be inserted into the soil layer 9. After the insertion rod 6 is inserted into the soil layer 9, the cooperation of the insertion rod 6 and the fixing plate 5 can not only further increase the anchoring area between the anchor rod 1 and the soil layer 9, but also prevent the anchor rod 1 from rotating, which is conducive to inserting the anchor rod 302 into the soil layer 9; then insert the hexagonal wrench into the hexagonal groove 203 of the rotating block 202, control the rotation of the rotating block 202, and rotate the rotating shaft 201, while driving multiple roots. The anchor rod 302 slides inside the corresponding second cavity 14, so that the tip of the anchor rod 302 extends out along the corresponding anchor hole 12 and is inserted into the soil layer 9, thereby increasing the anchoring area of ​​the anchor rod 1, making the anchor rod 1 have a higher embedding strength with the surrounding soil, and improving the anchoring force and reliability of the anchor rod 1; in the process of the anchor rod 302 moving outward, the two reinforcement rods 402 are also driven to move outward, and in the process of movement, the reinforcement rod 402 is extended and opened at the same time, so that the reinforcement rod 402 is obliquely extended out of the corresponding reinforcement hole 11 and inserted into the soil layer 9, thereby further increasing the anchoring area of ​​the anchor rod 1, thereby improving the anchoring effect. After the anchor rod 302 and the reinforcement rod 402 are inserted into the soil layer and fixed, the slurry is poured through the two pouring channels 7 on the end face of the anchor rod 1, and the slurry is poured into the first cavity 13 through the pouring channel 7, and then enters the installation hole 10 through the through hole 8, thereby achieving the purpose of pouring the slurry. After the slurry solidifies, the anchoring effect between the anchor rod 1 and the soil layer 9 can be further improved.

[0042] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A geotechnical engineering slope anchoring support structure, comprising an anchor rod (1) and a soil layer (9), wherein a mounting hole (10) is opened on the surface of the soil layer (9), and the anchor rod (1) is mounted inside the mounting hole (10), characterized in that: The anchor rod (1) is provided with a first cavity (13) and a second cavity (14), the first cavity (13) being arranged at the center of the anchor rod (1) along the length direction of the anchor rod (1), a plurality of second cavities (14) being provided and dispersedly arranged around the first cavity (13), a power assembly (2) being arranged inside the first cavity (13), and an anchor assembly (3) being arranged inside each second cavity (14); The power assembly (2) is used to provide power to the anchor assembly (3), including a rotating shaft (201) rotatably installed in the first cavity (13), a rotating block (202) is provided at the top of the rotating shaft (201), the rotating block (202) extends above the top surface of the anchor rod (1), and a first bevel gear (204) is provided at the height of the rotating shaft (201) corresponding to each second cavity (14); the anchor assembly (3) includes an anchor rod (302) horizontally arranged in the second cavity (14), a threaded hole is provided at one end of the anchor rod (302) adjacent to the first cavity (13), and a threaded rod (301) is threadedly connected in the threaded hole, and one end of the threaded rod (301) away from the anchor rod (302) extends into the first cavity (13), and the end of the threaded rod (301) is connected to a second bevel gear (205) meshing with the first bevel gear (204); An anchor hole (12) penetrating the corresponding second cavity (14) is provided on the outer wall of the anchor rod (1) at a position corresponding to each anchor rod (302); the rotation of the rotating shaft (201) is controlled by the rotating block (202); during the rotation of the rotating shaft (201), the plurality of anchor rods (302) are driven by the plurality of first bevel gears (204) and the plurality of second bevel gears (205) to simultaneously move along the corresponding second cavity (14) toward the outer wall of the anchor rod (1), and extend out of the corresponding anchor hole (12) and insert into the soil layer (9).

2. A geotechnical engineering slope anchoring support structure according to claim 1, characterized in that: A reinforcement assembly (4) is provided in each second cavity (14), the anchor rod (302) being located in the middle of the second cavity (14), the reinforcement assembly (4) comprising two reinforcement rods (402) symmetrically arranged on the upper and lower sides of the anchor rod (302), the tail end of each reinforcement rod (402) being connected to the anchor rod (302) in the same cavity via a rotating seat (401), and reinforcement holes (11) communicating with the second cavity (14) are provided on the outer wall of the anchor rod (1) at positions corresponding to the upper and lower sides of each anchor hole (12); when the rotating shaft (201) drives the anchor rod (302) to move, it also drives the two reinforcement rods (402) connected thereto to move toward the outer wall of the anchor rod (1), extend out of the corresponding reinforcement holes (11), and insert into the soil layer (9).

3. A geotechnical engineering slope anchoring support structure according to claim 1 or 2, characterized in that: The upper end surface of the anchor rod (1) is provided with one or more casting channels (7), and the circumferential surface of the anchor rod (1) is provided with a plurality of through holes (8), the through holes (8) and the casting channels (7) are both connected to the first cavity (13), and the positions of the through holes (8) are arranged in an alternating manner with the anchor holes (12) and the reinforcement holes (11).

4. A geotechnical engineering slope anchoring support structure according to claim 1 or 2, characterized in that: One end of the anchor rod (302) facing the anchor hole (12) has a conical tip, and the anchor hole (12) is a circular hole that matches the diameter of the anchor rod (302); one end of the reinforcement rod (402) facing the reinforcement hole (11) has a conical tip, and the reinforcement hole (11) is a vertically arranged strip hole, the width of which matches the diameter of the reinforcement rod (402).

5. A geotechnical engineering slope anchoring support structure according to claim 1 or 2, characterized in that: The upper end surface of the rotating block (202) is provided with a hexagonal groove (203); a plurality of the second cavities (14) are provided, and two are symmetrically distributed on both sides of the first cavity (13).

6. A geotechnical engineering slope anchoring support structure according to claim 1 or 2, characterized in that: A fixing plate (5) is fixedly connected to the circumferential surface of the upper end of the anchor rod (1), and a plurality of fixing plates (5) are provided and distributed in a circumferential array on the circumference of the top surface of the anchor rod (1), and a plurality of insertion rods (6) are fixedly connected to the lower end of each fixing plate (5).

7. A geotechnical engineering slope anchoring support structure according to claim 1 or 2, characterized in that: A limiting groove (16) is provided on the inner wall of each second cavity (14), a limiting block (15) is slidably connected inside the limiting groove (16), and the limiting block (15) is fixedly connected to the anchor rod (302).

8. A geotechnical engineering slope anchoring support structure according to claim 2, characterized in that: The reinforcement assembly (4) further comprises a transmission rod (403) arranged between each reinforcement rod (402) and the anchor rod (302) in the same cavity; a rotating seat (401) is fixedly installed on the upper and lower sides of the tail of the anchor rod (302) away from the anchor hole (12), respectively; each reinforcement rod (402) is rotatably connected to the corresponding rotating seat (401); two first connecting blocks (404) are fixedly connected to the side of each second cavity (14) away from the first cavity (13); the two first connecting blocks (404) are respectively located on the upper and lower sides of the anchor hole (12); a second connecting block (405) is provided on the side of the middle of each reinforcement rod (402) adjacent to the anchor rod (302); the second connecting block (405) is fixedly connected to the reinforcement rod (402); one end of each transmission rod (403) is rotatably connected to the first connecting block (404), and the other end is rotatably connected to the second connecting block (405).

9. A geotechnical engineering slope anchoring support structure according to claim 2, characterized in that: A lifting assembly (17) is provided between the anchor assembly (302) and the reinforcement rod (402), and the lifting assembly (17) comprises a circular groove (1701), a spring (1702), an extension tube (1703) and a lifting rod (1704). A circular groove (1701) is provided on the circumferential surface of the anchor rod (302), and the circular groove (1701) corresponds to the reinforcement rod (402). An extension tube (1703) is fixedly connected to the circumferential surface of the anchor rod (302), and the extension tube (1703) is aligned with the circular groove (1701). The lifting rod (1704) is slidably connected inside the extension tube (1703); a spring (1702) is fixedly connected inside the circular groove (1701), and one end of the spring (1702) away from the bottom of the circular groove (1701) is fixedly connected to the lifting rod (1704).

Citation Information

Patent Citations

  • Device and method for driving pre-stressed anchor rod in tunnel with water-rich, soft and broken surrounding rock

    CN111561337A

  • Recyclable anchor rod for reinforcing rock slope joint surface

    CN115030153A

  • Reinforcing anchor rod for deep roadway surrounding rock control and reinforcing method of reinforcing anchor rod

    CN118548093A

  • Novel high-stability anchor rod device

    CN212105921U