Prefabricated assembly type sinking foundation of external building elevator

By designing a prefabricated sinking foundation with a storage cavity and automatic replenishment device plus a prefabricated sinking foundation for building elevators, the problem that traditional sinking foundations cannot automatically replenish soil is solved, and the stability and safety of the building are improved.

CN119877589AActive Publication Date: 2025-04-25YANGZHOU MINGCHENG CONSTRUCTION MACHINERY CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510352055.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-25
Publication Date
2025-04-25
Estimated Expiration
2045-03-25

AI Technical Summary

Technical Problem

Traditional prefabricated sinking foundations cannot automatically replenish soil after soil loss, resulting in vacancy around the building and increasing the risk of building tilt or collapse.

Method used

A prefabricated and assembled sinking foundation with an external building elevator is designed, using a prefabricated cement layer and multiple cement frames. A storage cavity is formed between the inner wall of the cement frame and the outer wall of the prefabricated cement layer. The storage cavity is equipped with compressed soil and is equipped with extrusion components, vibration motors and electronic tape measure devices, which can automatically detect soil loss and replenish soil.

Benefits of technology

By automatically replenishing the soil, the vacancy around the building is avoided, the life of the building is extended, the stability and safety of the building are improved, and the tilt or collapse of the building is prevented due to soil loss.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119877589A_ABST
    Figure CN119877589A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of building foundations and discloses an external building elevator prefabricated assembly type sinking foundation which comprises a prefabricated cement layer, a plurality of cement frames are arranged on the outer side of the prefabricated cement layer, the cement frames and the prefabricated cement layer are installed and fixed, and storage cavities are formed between the inner walls of the cement frames and the outer wall of the prefabricated cement layer. Compressed soil is contained in the storage cavity, an extrusion assembly for extruding the soil is arranged in the storage cavity and comprises a balancing weight, the balancing weight is slidably mounted in the storage cavity, a plurality of first discharging openings are formed in the outer wall of the cement frame, and a plurality of transition grooves are formed in the lower side of the prefabricated cement layer. By means of the balancing weight and the multiple storage cavities, soil in the storage cavities can be pushed to the surroundings after the soil around the building is lost while the soil is stored, so that the situation that gaps exist around is avoided, the service life of the building can be prolonged, the safety of the building can be improved, and the situation that the building inclines or collapses due to soil loss is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of building foundations, and more specifically to a prefabricated assembled sinking foundation for an additional building elevator. Background Art

[0002] The prefabricated assembled sunken foundation with building elevator is a new construction method aimed at improving construction efficiency and foundation quality. The sunken foundation refers to a foundation set below the foundation, which is usually used to improve the stability of the building and is suitable for applications such as underground elevators.

[0003] Among them, the sinking part of the elevator will cause soil erosion due to the flow of surrounding water after long-term use, and the soil used to support the precast concrete blocks will be lost, resulting in a hollow shape around the building. After long-term use, the building will tilt or collapse. The traditional prefabricated and assembled sinking foundation cannot automatically replenish soil around the building after soil loss during use, thereby supporting the building and increasing the life and safety of the building. Summary of the invention

[0004] In view of the problems existing in the prior art, the object of the present invention is to provide a prefabricated assembled sinking foundation for an additional building elevator.

[0005] To solve the above problems, the present invention adopts the following technical solutions.

[0006] A prefabricated assembled sinking foundation for an additional building elevator, comprising a prefabricated cement layer, a plurality of cement frames are arranged outside the prefabricated cement layer, the cement frames are fixedly mounted on the prefabricated cement layer, a storage cavity is formed between the inner wall of the cement frame and the outer wall of the prefabricated cement layer, and compressed soil is contained in the storage cavity; The storage cavity is provided with an extrusion assembly for extruding the soil, and the extrusion assembly includes a counterweight block, and the counterweight block is slidably installed in the storage cavity; The outer wall of the cement frame is provided with a plurality of first discharge ports, and the interior of the storage cavity is connected with the exterior of the cement frame through the first discharge ports; the lower side of the prefabricated cement layer is provided with a plurality of transition grooves, and the transition grooves are connected with the interior of the storage cavity; a second discharge port is provided at the lower end of the transition groove, and the transition groove is connected with the lower side of the exterior of the prefabricated cement layer through the second discharge port, and the transition groove is connected with the interior of the storage cavity.

[0007] Furthermore, the extrusion assembly also includes a vibration motor that drives the counterweight block to vibrate, and the vibration motor is fixedly installed on the upper end of the counterweight block.

[0008] Furthermore, a winding wheel is rotatably connected to the upper end of the storage chamber, a servo motor is provided on one side of the winding wheel, the output end of the servo motor is fixedly connected to the central axis of the winding wheel, the servo motor drives the winding wheel to rotate, a pull rope is wound around the outer wall of the winding wheel, and the other end of the pull rope is fixedly connected to the upper end of the counterweight block.

[0009] Furthermore, a plurality of extrusion springs are fixedly mounted on the upper end of the counterweight block, the upper ends of the extrusion springs are pressed against the inner wall of the storage cavity, and one end of the extrusion springs close to the counterweight block presses the counterweight block.

[0010] Furthermore, a plurality of electronic measuring tapes are embedded in the outer wall of the prefabricated cement layer, the number of the electronic measuring tapes is the same as the number of cement frames, and each electronic measuring tape corresponds to one of the cement frames, and one end of the electronic measuring tape is fixedly connected to the upper end of the counterweight block.

[0011] Furthermore, the electronic prefabricated cement layer is rotatably connected to a guide wheel at a position corresponding to the electronic tape measure via a rotating frame, and an outer wall of the guide wheel is in frictional contact with an outer wall of the electronic tape measure.

[0012] Furthermore, a feed port is provided on the inner wall of the prefabricated cement layer at a position relative to the storage cavity, and a one-way valve is installed inside the feed port.

[0013] Furthermore, two switches are fixedly installed on the inner wall of the prefabricated cement layer, one of which controls the forward and reverse rotation of the servo motor, and the other controls the start and stop of the vibration motor.

[0014] Furthermore, a data processing module, a control module and a calculation module are installed on the inner wall of the prefabricated cement layer. An alarm is also installed on the inner wall of the prefabricated cement layer. The electronic tape measure transmits the elongation data to the data processing module. The data processing module analyzes the data collected by the electronic tape measure. When the length data of the electronic tape measure is extended is transmitted to the control module, and a decision tree model is trained by the data of the electronic tape measure, when the length of the electronic tape measure reaches a certain length, the control module controls the alarm to sound. A display screen is installed inside the prefabricated cement layer. The elongation data of the electronic tape measure is transmitted to the display screen and displayed on the display screen.

[0015] Furthermore, the calculation module calculates the volume of soil that needs to be added to the storage cavity according to the volume of soil discharged from the storage cavity by the following formula: ; Where V is the volume of soil to be replenished, N is the area of ​​the lower end of the counterweight, ρ1 is the density of the compacted soil in the storage chamber, ρ0 is the relaxed soil density, and L is the distance the counterweight descends; The calculation module calculates the total amount of soil lost around the prefabricated cement layer according to the following formula: ; Where V 总 is the total amount of soil lost around the precast cement layer, V i The calculation module transmits the calculated total amount of soil that needs to be replenished and the amount of soil that needs to be replenished in each storage cavity to the display screen for display.

[0016] Compared with the prior art, the present invention has the following beneficial effects: The present invention can store soil by means of the counterweight blocks and multiple storage chambers, and can push the soil in the storage chambers to the surrounding areas after the soil around the building is lost, thereby avoiding the situation where there are gaps around the building, thereby increasing the life and safety of the building and avoiding the tilt or collapse of the building due to soil loss. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is a schematic diagram of the internal structure of the cement frame of the present invention; Figure 3 For the present invention Figure 2 A schematic diagram of the structure enlargement in the middle; Figure 4 It is a schematic diagram of the guide wheel part of the present invention; Figure 5 It is a partial structural schematic diagram of the vibration motor of the present invention; Figure 6 It is a schematic diagram of the framework of the electronic measuring tape, data processing module, control module, alarm, calculation module and display screen of the present invention; Figure 7 It is a schematic diagram of the workflow of the present invention.

[0018] Description of the numbers in the figure: 1. Prefabricated cement layer; 101. Transition trough; 102. Second discharge port; 103. Electronic measuring tape; 104. Guide wheel; 105. Feed port; 106. Switch; 107. Data processing module; 108. Control module; 109. Calculation module; 110. Alarm; 111. Display screen; 2. Cement frame; 201. Storage chamber; 202. First discharge port; 203. Winding wheel; 204. Servo motor; 205. Pull rope; 3. Extrusion assembly; 301. Counterweight; 302. Vibration motor; 303. Extrusion spring. DETAILED DESCRIPTION

[0019] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention; it is obvious that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making creative work are within the scope of protection of the present invention.

[0020] See also Figures 1 to 7 , a prefabricated assembled sinking foundation for an additional building elevator, comprising a prefabricated cement layer 1, a plurality of cement frames 2 are arranged outside the prefabricated cement layer 1, the cement frames 2 are fixedly installed on the prefabricated cement layer 1, a storage cavity 201 is formed between the inner wall of the cement frame 2 and the outer wall of the prefabricated cement layer 1, and compressed soil is contained in the storage cavity 201; An extrusion assembly 3 for extruding soil is provided inside the storage cavity 201. The extrusion assembly 3 includes a counterweight block 301. The counterweight block 301 is slidably installed inside the storage cavity 201. The outer wall of the cement frame 2 is provided with a plurality of first discharge ports 202, the interior of the storage cavity 201 is communicated with the exterior of the cement frame 2 through the first discharge ports 202, a plurality of transition grooves 101 are provided inside the lower side of the prefabricated cement layer 1, the transition grooves 101 are communicated with the interior of the storage cavity 201, a second discharge port 102 is provided at the lower end of the transition groove 101, the transition groove 101 is communicated with the exterior lower side of the prefabricated cement layer 1 through the second discharge port 102, and the transition groove 101 is communicated with the interior of the storage cavity 201; The extrusion assembly 3 further includes a vibration motor 302 for driving the counterweight block 301 to vibrate. The vibration motor 302 is fixedly mounted on the upper end of the counterweight block 301 .

[0021] By adopting the above technical solution, after the soil around the precast cement layer 1 is lost, the vibration motor 302 can drive the counterweight block 301 to vibrate continuously after working, thereby surprising the soil inside the storage cavity 201. At this time, the soil in the storage cavity 201 can enter the transition trough 101, and the soil will flow out of the storage cavity 201 and the transition trough 101 through the first discharge port 202 and the second discharge port 102, thereby replenishing the lost soil around.

[0022] The upper end of the storage chamber 201 is rotatably connected to a winding wheel 203, a servo motor 204 is provided on one side of the winding wheel 203, an output end of the servo motor 204 is fixedly connected to the central axis of the winding wheel 203, the servo motor 204 drives the winding wheel 203 to rotate, a pull rope 205 is wound around the outer wall of the winding wheel 203, and the other end of the pull rope 205 is fixedly connected to the upper end of the counterweight block 301; A plurality of extrusion springs 303 are fixedly mounted on the upper end of the counterweight block 301. The upper ends of the extrusion springs 303 are pressed against the inner wall of the storage chamber 201, and one end of the extrusion springs 303 close to the counterweight block 301 presses the counterweight block 301. A feed port 105 is provided at a position of the inner wall of the prefabricated cement layer 1 relative to the storage chamber 201. A one-way valve is installed inside the feed port 105. After opening the one-way valve, the staff can input the prepared soil into the storage chamber 201 through the feed port 105. After the input is completed, the one-way valve is closed. Two switches 106 are fixedly installed on the inner wall of the prefabricated cement layer 1, one of the switches 106 controls the forward and reverse rotation of the servo motor 204, and the other switch 106 controls the start and stop of the vibration motor 302. When the winding wheel needs to work, one of the switches 106 is adjusted to control the servo motor 204 to rotate forward or reverse. When the soil in the storage chamber 201 needs to be squeezed, the other switch 106 is adjusted to control the vibration motor 302 to work, thereby driving the counterweight block 301 to vibrate.

[0023] By adopting the above technical solution, when it is necessary to add soil to the storage chamber 201, the servo motor 204 is controlled to work so that the winding wheel rotates, thereby winding the pull rope 205 through the winding wheel. When it is necessary to compact the soil in the storage chamber 201, the servo motor 204 is first controlled to rotate in the opposite direction so that the pull rope 205 is in a relaxed state, and then the vibration motor 302 is started to drive the counterweight block 301 to vibrate, thereby compacting the soil in the storage chamber 201. The extrusion spring 303 can always squeeze the counterweight block 301 so that the counterweight block 301 is always in close contact with the soil, and when the vibration motor 302 is not working, the soil in the storage chamber 201 is prevented from expanding.

[0024] A plurality of electronic tape measures 103 are embedded in the outer wall of the prefabricated cement layer 1. The number of the electronic tape measures 103 is the same as the number of the cement frames 2, and each electronic tape measure 103 corresponds to one of the cement frames 2. One end of the electronic tape measure 103 is fixedly connected to the upper end of the counterweight block 301. The position of the electronic prefabricated cement layer 1 corresponding to the electronic tape measure 103 is rotatably connected to a guide wheel 104 through a rotating frame, and the outer wall of the guide wheel 104 is in frictional contact with the outer wall of the electronic tape measure 103.

[0025] By adopting the above technical solution, after the counterweight block 301 descends, it can drive the extension end of the electronic tape measure 103 to move, so that the electronic tape measure 103 begins to extend, so that the descending distance of the counterweight block 301 can be recorded by the electronic tape measure 103.

[0026] The inner wall of the prefabricated cement layer 1 is installed with a data processing module 107, a control module 108 and a calculation module 109. The inner wall of the prefabricated cement layer 1 is also installed with an alarm 110. The electronic tape measure 103 transmits the elongation data to the data processing module 107. The data processing module 107 analyzes the data collected by the electronic tape measure 103. When the elongated length data of the electronic tape measure 103 is transmitted to the control module 108, a decision tree model is trained by the data of the electronic tape measure 103. When the elongated length of the electronic tape measure 103 reaches a certain length, the control module 108 controls the alarm 110 to alarm. A display screen 111 is installed inside the prefabricated cement layer 1. The elongation data of the electronic tape measure 103 is transmitted to the display screen 111 and displayed by the display screen 111. The calculation module 109 calculates the volume of soil that needs to be added to the storage chamber 201 according to the volume of soil discharged from the storage chamber 201 by the following formula: ; Wherein, V is the volume of soil to be replenished, N is the area of ​​the lower end of the counterweight block 301, ρ1 is the density of the compacted soil in the storage chamber 201, ρ0 is the relaxed soil density, and L is the distance the counterweight block 301 descends; The calculation module 109 calculates the total amount of soil lost around the prefabricated cement layer 1 according to the following formula: ; Where V 总 is the total amount of soil lost around the prefabricated cement layer 1, V i The calculation module 109 transmits the calculated total amount of soil to be replenished and the amount of soil to be replenished in each storage chamber 201 to the display screen 111 for display on the display screen 111 .

[0027] By adopting the above technical solution, when the counterweight block 301 drops a certain distance, the length of the electronic measuring tape 103 becomes longer. When the amount of soil stored in the storage cavity 201 is insufficient, the control module 108 will control the alarm 110 to sound an alarm, reminding the staff to replenish the soil in time. Among them, the display screen 111 can display the extended length of the electronic measuring tape 103. The staff can replenish the soil in the storage cavity 201 in advance according to work needs. The calculation module 109 can determine the amount of soil that needs to be replenished in each storage cavity 201 according to the distance moved by the counterweight block 301, and can calculate the total amount of soil needed, so that the staff can prepare the appropriate amount of soil.

[0028] The above are only preferred specific implementations of the present invention; however, the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and improved concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A prefabricated and assembled sunken foundation for an additional building elevator, comprising a prefabricated cement layer (1), characterized in that: A plurality of cement frames (2) are provided outside the prefabricated cement layer (1), the cement frames (2) are fixedly mounted on the prefabricated cement layer (1), a storage cavity (201) is formed between the inner wall of the cement frame (2) and the outer wall of the prefabricated cement layer (1), and compressed soil is contained in the storage cavity (201); An extrusion assembly (3) for extruding soil is provided inside the storage cavity (201), and the extrusion assembly (3) comprises a counterweight block (301), and the counterweight block (301) is slidably mounted inside the storage cavity (201); The outer wall of the cement frame (2) is provided with a plurality of first discharge ports (202), the interior of the storage cavity (201) is connected to the exterior of the cement frame (2) via the first discharge ports (202), the interior of the lower side of the prefabricated cement layer (1) is provided with a plurality of transition grooves (101), the transition grooves (101) are connected to the interior of the storage cavity (201), a second discharge port (102) is provided at the lower end of the transition groove (101), the transition groove (101) is connected to the lower side of the exterior of the prefabricated cement layer (1) via the second discharge port (102), and the transition groove (101) is connected to the interior of the storage cavity (201).

2. The prefabricated sunken foundation for an additional building elevator according to claim 1, characterized in that: The extrusion assembly (3) further comprises a vibration motor (302) for driving the counterweight block (301) to vibrate, and the vibration motor (302) is fixedly mounted on the upper end of the counterweight block (301).

3. The prefabricated sunken foundation for an additional building elevator according to claim 2, characterized in that: A winding wheel (203) is rotatably connected to the upper end of the storage chamber (201); a servo motor (204) is provided on one side of the winding wheel (203); an output end of the servo motor (204) is fixedly connected to the central axis of the winding wheel (203); the servo motor (204) drives the winding wheel (203) to rotate; a pull rope (205) is wound around the outer wall of the winding wheel (203); the other end of the pull rope (205) is fixedly connected to the upper end of the counterweight (301).

4. The prefabricated sunken foundation for an additional building elevator according to claim 3 is characterized in that: A plurality of extrusion springs (303) are fixedly mounted on the upper end of the counterweight block (301); the upper ends of the extrusion springs (303) are pressed against the inner wall of the storage cavity (201); and one end of the extrusion springs (303) close to the counterweight block (301) presses the counterweight block (301).

5. The prefabricated and assembled sunken foundation for an additional building elevator according to claim 4 is characterized in that: A plurality of electronic measuring tapes (103) are embedded in the outer wall of the prefabricated cement layer (1), the number of the electronic measuring tapes (103) being the same as the number of the cement frames (2), and each electronic measuring tape (103) corresponding to one of the cement frames (2), and one end of the electronic measuring tape (103) being fixedly connected to the upper end of the counterweight block (301).

6. The prefabricated and assembled sunken foundation for an additional building elevator according to claim 5, characterized in that: Positions of the electronic prefabricated cement layer (1) corresponding to the electronic tape measure (103) are rotatably connected to a guide wheel (104) via a rotating frame, and an outer wall of the guide wheel (104) is in frictional contact with an outer wall of the electronic tape measure (103).

7. The prefabricated sunken foundation for an additional building elevator according to claim 6, characterized in that: A feed port (105) is provided at a position of the inner wall of the prefabricated cement layer (1) relative to the storage cavity (201), and a one-way valve is installed inside the feed port (105).

8. The prefabricated and assembled sunken foundation for an additional building elevator according to claim 7, characterized in that: Two switches (106) are fixedly mounted on the inner wall of the prefabricated cement layer (1), wherein one switch (106) controls the forward and reverse rotation of the servo motor (204), and the other switch (106) controls the start and stop of the vibration motor (302).

9. The prefabricated and assembled sunken foundation for an additional building elevator according to claim 8, characterized in that: The inner wall of the prefabricated cement layer (1) is installed with a data processing module (107), a control module (108) and a calculation module (109); the inner wall of the prefabricated cement layer (1) is also installed with an alarm (110); the electronic tape measure (103) transmits elongation data to the data processing module (107); the data processing module (107) analyzes the data collected by the electronic tape measure (103); when the elongated length data of the electronic tape measure (103) is transmitted to the control module (108), a decision tree model is trained using the data of the electronic tape measure (103); when the elongated length of the electronic tape measure (103) reaches a certain length, the control module (108) controls the alarm (110) to sound an alarm; a display screen (111) is installed inside the prefabricated cement layer (1); the elongation data of the electronic tape measure (103) is transmitted to the display screen (111) and displayed on the display screen (111).

10. The prefabricated sunken foundation for an additional building elevator according to claim 9, characterized in that: The calculation module (109) calculates the volume of soil that needs to be added to the storage chamber (201) according to the volume of soil discharged from the storage chamber (201) using the following formula: ; Wherein, V is the volume of soil to be replenished, N is the area of ​​the lower end of the counterweight (301), ρ1 is the density of the compacted soil in the storage chamber (201), ρ0 is the relaxed soil density, and L is the distance the counterweight (301) descends; The calculation module (109) calculates the total amount of soil lost around the prefabricated cement layer (1) according to the following formula: ; Where V 总 is the total amount of soil lost around the precast cement layer (1), V i The calculation module (109) transmits the calculated total amount of soil that needs to be replenished and the amount of soil that needs to be replenished in each storage cavity (201) to the display screen (111), which displays the calculated amount of soil that needs to be replenished.

Citation Information

Patent Citations

  • Rectification and reinforcement method for oil tank piled raft foundation

    CN106592657A

  • Horizontal and complex direction displacement adjusting and compensating device and mechanism

    CN107237219A

  • Filling-type displacement adjusting and compensating device

    CN107237220A

  • Displacement adjustment compensation device with reserved space and method for reserving space

    CN107503388A

  • Cushion pier structure for bearing extra-heavy load

    CN213143154U