Stepped energy-saving control method for subway wind-water linkage system

By obtaining subway space distribution and personnel flow data, combining external environmental data, determining the target temperature and humidity of the stepped area within the subway, and formulating a Feng Shui linkage control strategy, it solves the problem that the subway system is difficult to deal with environmental changes in real time, and achieves accurate environmental regulation and energy-saving effects.

CN119879338APending Publication Date: 2025-04-25POWERCHINA RAILWAY CONSTR
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411976204.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-30
Publication Date
2025-04-25

AI Technical Summary

Technical Problem

Subway ventilation and air conditioning systems are difficult to deal with complex dynamic environments and personnel distribution changes in real time, resulting in uneven resource allocation and waste of energy consumption. They lack comprehensive consideration of the external environment and internal real-time air quality, and fail to effectively realize intelligent energy-saving control.

Method used

By obtaining the spatial distribution and historical personnel flow data of the subway, combining the external ambient temperature and humidity, as well as the real-time temperature, humidity, air quality and personnel distribution in the subway, the target temperature and humidity of the stepped area are determined, and control strategies are formulated to achieve energy-saving control of feng shui linkage.

Benefits of technology

It has achieved the improvement of precise environmental regulation and response capabilities in the subway area, reduced energy consumption, improved environmental comfort and improved passenger experience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119879338A_ABST
    Figure CN119879338A_ABST
Patent Text Reader

Abstract

The invention provides a stepped energy-saving control method for a subway wind-water linkage system, which belongs to the technical field of energy-saving control and comprises the following steps: acquiring spatial distribution and historical personnel flow data of a subway, and determining a stepped area of the subway; the environment temperature and the environment humidity outside the subway are obtained in real time, and the real-time temperature, the real-time humidity, the real-time air quality and the personnel distribution of the stepped area in the subway are determined in real time; determining a target temperature and a target humidity of the stepped region based on the environment temperature, the environment humidity, the real-time temperature, the real-time humidity, the real-time air quality and the personnel distribution; and determining a control strategy based on the target temperature and the target humidity of the stepped region, and performing wind-water linkage energy-saving control on the subway based on the control strategy. According to the method, the control range can be refined, regional differentiation optimization and an energy-saving strategy can be realized, the accuracy and response capability of regional environment regulation and control are improved, the energy consumption of subway operation is reduced, the environmental comfort of a subway region is improved, and the experience of passengers is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of energy-saving control technology, and in particular to a step-by-step energy-saving control method for a subway feng shui linkage system. Background Art

[0002] Subway ventilation and air conditioning systems usually adopt fixed or simple feedback control modes, which makes it difficult to respond to complex dynamic environments and changes in personnel distribution in real time. This mode usually ignores the differences in the spatial distribution of subways and the characteristics of personnel flow in the area, resulting in uneven resource allocation and energy waste. At the same time, traditional systems lack comprehensive consideration of the external environment and internal real-time air quality, and fail to effectively achieve intelligent energy-saving control. In recent years, some environmental control technologies based on real-time sensor data have gradually emerged, but most of them take a single system (wind or water) as the control target, do not fully integrate the linkage optimization of the wind system and the water system, and have a coarse granularity in regional control, which makes it difficult to meet the needs of subway operations for a balance between energy saving and comfort.

[0003] Therefore, the present invention provides a step-by-step energy-saving control method for a subway Feng Shui linkage system. Summary of the invention

[0004] The present invention provides a stepped energy-saving control method for a subway Feng Shui linkage system. By acquiring the spatial distribution of the subway and historical personnel flow data, the ambient temperature and humidity outside the subway and the real-time temperature, real-time humidity, real-time air quality and personnel distribution of the stepped areas in the subway are acquired, the stepped areas of the subway are determined, and the target temperature and target humidity of the stepped areas are determined to determine the control strategy, so as to realize the Feng Shui linkage energy-saving control of the subway. The control range can be refined, regional differentiated optimization and energy-saving strategies can be realized, the accuracy and responsiveness of regional environmental regulation can be improved, the energy consumption of subway operation can be reduced, the environmental comfort of the subway area can be improved, and the passenger experience can be improved.

[0005] The present invention provides a step-by-step energy-saving control method for a subway Feng Shui linkage system, comprising: 101: Obtain the spatial distribution of the subway and historical personnel flow data to determine the stepped areas of the subway; 102: Obtain the ambient temperature and humidity outside the subway in real time, and determine the real-time temperature, real-time humidity, real-time air quality and personnel distribution of the stepped area in the subway in real time; 103: Determine the target temperature and target humidity of the stepped area based on the ambient temperature, ambient humidity, real-time temperature, real-time humidity, real-time air quality and personnel distribution; 104: Determine the control strategy based on the target temperature and target humidity of the stepped area, and perform Feng Shui linkage energy-saving control on the subway based on the control strategy.

[0006] According to the step-by-step energy-saving control method for the subway Feng Shui linkage system provided by the present invention, the spatial distribution includes the connection relationship between every two functional areas of the subway, the area of ​​all functional areas, and the shape of all functional areas; The historical personnel flow data includes the personnel density, personnel flow, personnel stay time, flow direction and peak time period of each functional area.

[0007] According to the subway Feng Shui linkage system step-by-step energy-saving control method provided by the present invention, determining the step-by-step area of ​​the subway includes: Determine the grid size of each functional area based on the spatial distribution of the subway, divide the corresponding functional area into grids based on the grid size, and determine the grid area of ​​each functional area of ​​the subway, wherein the grid area includes a plurality of sub-areas; Based on historical personnel flow data, determine the personnel density characteristics, personnel flow characteristics, personnel stay time characteristics, flow direction characteristics and peak time characteristics of each sub-area in each grid area, and determine the sub-area feature vector of each sub-area in each grid area; Inputting the sub-region feature vectors of all sub-regions in all grid regions into the region partition model to determine the sub-region level of each sub-region in each grid region; The stepped areas of the subway are determined based on all sub-areas in all grid areas and the sub-area levels of all sub-areas.

[0008] According to the subway Feng Shui linkage system step-by-step energy-saving control method provided by the present invention, the real-time temperature, real-time humidity, real-time air quality and personnel distribution of the stepped area in the subway are determined in real time, including: Determine the temperature sensor group, humidity sensor group, real-time air quality sensor group and camera group of all sub-areas of each grid area in the stepped area based on the grid size of each functional area of ​​the subway; Determine the real-time sub-temperature of each sub-area based on the temperature sensor group of each sub-area, determine the real-time sub-humidity of each sub-area based on the humidity sensor group of each sub-area, determine the sub-real-time air quality of each sub-area based on the real-time air quality sensor group of each sub-area, and determine the sub-personnel distribution of each sub-area based on the camera group of each sub-area; The real-time temperature of the stepped area is determined based on the real-time sub-temperatures of all sub-areas of all grid areas, the real-time humidity of the stepped area is determined based on the real-time sub-humidity of all sub-areas of all grid areas, the real-time air quality of the stepped area is determined based on the sub-real-time air quality of all sub-areas of all grid areas, and at the same time, the personnel distribution of the stepped area is determined based on the sub-personnel distribution of all sub-areas of all grid areas.

[0009] According to the subway Feng Shui linkage system step-by-step energy-saving control method provided by the present invention, the target temperature and target humidity of the step-by-step area are determined based on the ambient temperature, ambient humidity, real-time temperature, real-time humidity, real-time air quality and personnel distribution, including: Determine the sub-region with the highest sub-region level in the stepped region as the reference region, determine the reference temperature of the reference region based on the ambient temperature, and determine the reference temperature and humidity of the reference region based on the ambient humidity; Determine a reference comfort value for the reference area based on the ambient temperature, ambient humidity, reference temperature, and reference humidity; Perform seasonal judgment on the current season and determine the seasonal result, wherein the seasonal result includes air-conditioning season and non-air-conditioning season; Determine a real-time comfort value for each sub-area of ​​each grid area based on the seasonal result, the benchmark comfort value, and the real-time sub-temperature and the real-time sub-humidity of each sub-area of ​​each grid area in the stepped area; Performing regional judgment on each sub-region of each grid region in the stepped region to determine a regional result for each sub-region, wherein the regional result includes an edge sub-region and a non-edge sub-region; Determine adjacent sub-regions of each sub-region that is an edge sub-region; Determine a target sub-temperature and a target sub-humidity for each sub-area of ​​each grid area based on the regional results, the real-time sub-temperature, the real-time sub-humidity, the real-time air quality, and the real-time comfort value of each sub-area of ​​each grid area in the stepped area; The target temperature of the stepped area is determined based on the target sub-temperatures of all sub-areas of all grid areas, and at the same time, the target humidity of the stepped area is determined based on the target sub-humidities of all sub-areas of all grid areas.

[0010] According to the subway Feng Shui linkage system step-by-step energy-saving control method provided by the present invention, the real-time comfort value of each sub-area of ​​each grid area is determined, including: in, represents the real-time comfort value of the bth sub-area of ​​the ath grid area in the stepped area, Indicates the first real-time comfort value when the seasonal result is the air-conditioning season. Indicates the second real-time comfort value when the seasonal result is the non-air-conditioning season. represents the baseline comfort value, , Indicates the real-time sub-temperature and real-time sub-humidity of the b-th sub-area of ​​the a-th grid area in the stepped area. , They represent the reference temperature and reference humidity of the reference area respectively. represents the comfort reduction coefficient based on the reference temperature, They represent the comfort reduction coefficient in the air-conditioning season and the comfort reduction coefficient in the non-air-conditioning season based on the reference humidity, respectively. represents the interaction sensitivity coefficient, Represents the humidity sensitivity coefficient.

[0011] According to the subway Feng Shui linkage system step-by-step energy-saving control method provided by the present invention, the target sub-temperature and target sub-humidity of each sub-area of ​​each grid area are determined, including: determining a target sub-temperature for each sub-area of ​​each grid area based on the regional results, the real-time sub-temperature, the real-time sub-humidity, the real-time air quality, and the real-time comfort value for each sub-area of ​​each grid area in the stepped area; in, represents the target sub-temperature of the b-th sub-region of the a-th grid region in the stepped region, The regional result is The first target sub-temperature at The regional result is The second target sub-temperature at represents the distribution of sub-personnel in the b-th sub-area of ​​the a-th grid area in the stepped area, represents the maximum sub-personnel distribution of all sub-areas of all grid areas in the stepped region, represents the grid size area of ​​the ath grid region in the stepped region, represents the maximum mesh size area of ​​all mesh regions in the stepped region, represents the first target sub-temperature of the adjacent sub-region of the b-th sub-region of the a-th grid region in the stepped region, represents the fitting length of the bth sub-region of the ath grid region in the stepped region, represents the fitting length of the adjacent sub-region of the b-th sub-region of the a-th grid region in the stepped region, represents the first transition adjustment parameter, represents the real-time air quality of the bth sub-area of ​​the ath grid area in the stepped area, Indicates the preset air quality, represents the first air quality influence coefficient based on temperature, represents the second air quality influence coefficient based on temperature; determining a target sub-humidity for each sub-area of ​​each grid area based on the regional results, the real-time sub-temperature, the real-time sub-humidity, the real-time air quality, and the real-time comfort value for each sub-area of ​​each grid area in the stepped area; in, represents the target sub-humidity of the b-th sub-area of ​​the a-th grid area in the stepped area, The regional result is The first target sub-humidity at The regional result is The second target humidity at represents the second transition adjustment parameter, represents the first air quality influence coefficient based on humidity, Represents the second air quality impact coefficient based on humidity.

[0012] According to the step-by-step energy-saving control method for the subway Feng Shui linkage system provided by the present invention, a control strategy is determined based on the target temperature and target humidity of the step-by-step area, and Feng Shui linkage energy-saving control is performed on the subway based on the control strategy, including: The target temperature and target humidity of the stepped area are input into the control model to generate a control strategy, wherein the control strategy includes a wind and water linkage control strategy, an air conditioning water control strategy, and an air conditioning wind control strategy.

[0013] Compared with the prior art, the present invention has the following beneficial effects: By obtaining the spatial distribution of the subway and historical personnel flow data, the ambient temperature and humidity outside the subway and the real-time temperature, real-time humidity, real-time air quality and personnel distribution of the stepped areas in the subway, the stepped areas of the subway are determined, and the target temperature and target humidity of the stepped areas are determined to determine the control strategy, so as to achieve Feng Shui linkage energy-saving control of the subway, refine the control scope, realize regional differentiated optimization and energy-saving strategies, improve the accuracy and responsiveness of regional environmental regulation, reduce the energy consumption of subway operations, improve the environmental comfort of the subway area, and improve the passenger experience. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0015] Figure 1 It is a flow chart of a step-by-step energy-saving control method for a subway Feng Shui linkage system provided by an embodiment of the present invention. DETAILED DESCRIPTION

[0016] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0017] Embodiment 1: The embodiment of the present invention provides a step-by-step energy-saving control method for a subway Feng Shui linkage system, such as Figure 1 As shown, including: 101: Obtain the spatial distribution of the subway and historical personnel flow data to determine the stepped areas of the subway; 102: Obtain the ambient temperature and humidity outside the subway in real time, and determine the real-time temperature, real-time humidity, real-time air quality and personnel distribution of the stepped area in the subway in real time; 103: Determine the target temperature and target humidity of the stepped area based on the ambient temperature, ambient humidity, real-time temperature, real-time humidity, real-time air quality and personnel distribution; 104: Determine the control strategy based on the target temperature and target humidity of the stepped area, and perform Feng Shui linkage energy-saving control on the subway based on the control strategy.

[0018] In this embodiment, the stepped area means dividing the area into hierarchical sub-areas, which are controlled in layers according to the environment and personnel flow characteristics.

[0019] In this embodiment, the target sub-temperature and target sub-humidity are calculated for each sub-area of ​​the stepped area by comprehensively considering the external environmental data (temperature and humidity), the internal real-time environmental data (temperature, humidity, air quality) and the personnel distribution characteristics.

[0020] In this embodiment, the control strategy refers to an operation plan formulated based on the target temperature and humidity, including specific operation modes of ventilation, cooling, heating, humidification and other systems to achieve energy saving and environmental optimization.

[0021] The beneficial effects of the above technical solution are as follows: by obtaining the spatial distribution of the subway and the historical personnel flow data, obtaining the ambient temperature and humidity outside the subway and the real-time temperature, real-time humidity, real-time air quality and personnel distribution of the stepped areas in the subway, determining the stepped areas of the subway, determining the target temperature and target humidity of the stepped areas, so as to determine the control strategy, and realize the Feng Shui linkage energy-saving control of the subway. The control scope can be refined, regional differentiated optimization and energy-saving strategies can be realized, the accuracy and responsiveness of regional environmental regulation can be improved, the energy consumption of subway operations can be reduced, the environmental comfort of the subway area can be improved, and the passenger experience can be improved.

[0022] Embodiment 2: The embodiment of the present invention provides a step-by-step energy-saving control method for a subway Feng Shui linkage system, wherein the control module comprises: The spatial distribution includes the connection relationship between every two functional areas of the subway, the area of ​​all functional areas, and the shape of all functional areas; The historical personnel flow data includes the personnel density, personnel flow, personnel stay time, flow direction and peak time period of each functional area.

[0023] In this embodiment, the functional area may be a passage, a station hall, a platform, a carriage, etc.

[0024] In this embodiment, the connection relationship of the functional areas represents the connection relationship (such as passages, stairs, elevators, entrances, etc.) and flow routes between different functional areas.

[0025] In this embodiment, the functional area area and the functional area shape: the area (square meters) and shape (rectangular, circular, irregular, etc.) of each functional area.

[0026] In this embodiment, the personnel density refers to the personnel density of each functional area, which is usually provided by a crowd sensor or video surveillance data.

[0027] In this embodiment, the personnel flow represents the flow of personnel passing through each area during different time periods (such as peak and non-peak hours).

[0028] In this embodiment, the personnel residence time represents the average residence time of personnel in each area.

[0029] In this embodiment, the flow direction represents the main direction of personnel flow in each area.

[0030] In this embodiment, the peak period data represents the flow rate, residence time, etc. of people during the peak period.

[0031] The beneficial effects of the above technical solution are: obtaining the spatial distribution of the subway and historical personnel flow data can provide a data basis for determining the stepped areas of the subway, so as to improve the accuracy and flexibility of subway space management.

[0032] Embodiment 3: The embodiment of the present invention provides a step-by-step energy-saving control method for a subway feng shui linkage system, which determines the step-by-step areas of a subway, including: Determine the grid size of each functional area based on the spatial distribution of the subway, divide the corresponding functional area into grids based on the grid size, and determine the grid area of ​​each functional area of ​​the subway, wherein the grid area includes a plurality of sub-areas; Based on historical personnel flow data, determine the personnel density characteristics, personnel flow characteristics, personnel stay time characteristics, flow direction characteristics and peak time characteristics of each sub-area in each grid area, and determine the sub-area feature vector of each sub-area in each grid area; Inputting the sub-region feature vectors of all sub-regions in all grid regions into the region partition model to determine the sub-region level of each sub-region in each grid region; The stepped areas of the subway are determined based on all sub-areas in all grid areas and the sub-area levels of all sub-areas.

[0033] In this embodiment, according to the spatial distribution characteristics of the subway, the grid size of each functional area is first determined and divided into multiple grid areas. Each grid area is further divided into multiple sub-areas to form a refined spatial unit structure.

[0034] In this embodiment, based on the historical personnel flow data, the sub-area feature vectors of each sub-area are counted, for example: personnel density characteristics (number of people / area), personnel flow characteristics (number of people entering and leaving per unit time), personnel residence time characteristics (distribution of personnel residence time), flow direction characteristics (main entry and exit directions) and peak period characteristics (periods with dense crowds).

[0035] In this embodiment, the sub-region feature vector is input into the region division model, and the importance of each sub-region is analyzed based on the data classification algorithm or rule, and its level (such as primary, secondary, tertiary, etc.) is output.

[0036] In this embodiment, the overall subway space is divided into stepped areas in combination with the hierarchical distribution of sub-areas in all grid areas.

[0037] In this embodiment, the stepped regions represent areas of different importance and functional levels divided according to sub-region levels.

[0038] The beneficial effects of the above technical solution are as follows: Determining the stepped areas of the subway can improve the accuracy and flexibility of subway space management and lay the foundation for regional differentiated optimization and energy-saving strategies.

[0039] Embodiment 4: The embodiment of the present invention provides a step-by-step energy-saving control method for a subway Feng Shui linkage system, which determines the real-time temperature, real-time humidity, real-time air quality and personnel distribution of a step-by-step area in a subway in real time, including: Determine the temperature sensor group, humidity sensor group, real-time air quality sensor group and camera group of all sub-areas of each grid area in the stepped area based on the grid size of each functional area of ​​the subway; Determine the real-time sub-temperature of each sub-area based on the temperature sensor group of each sub-area, determine the real-time sub-humidity of each sub-area based on the humidity sensor group of each sub-area, determine the sub-real-time air quality of each sub-area based on the real-time air quality sensor group of each sub-area, and determine the sub-personnel distribution of each sub-area based on the camera group of each sub-area; The real-time temperature of the stepped area is determined based on the real-time sub-temperatures of all sub-areas of all grid areas, the real-time humidity of the stepped area is determined based on the real-time sub-humidity of all sub-areas of all grid areas, the real-time air quality of the stepped area is determined based on the sub-real-time air quality of all sub-areas of all grid areas, and at the same time, the personnel distribution of the stepped area is determined based on the sub-personnel distribution of all sub-areas of all grid areas.

[0040] In this embodiment, based on the grid size of each functional area of ​​the subway, the sensor group required for each sub-area in each grid area is determined, including temperature, humidity, air quality sensor group and camera group. These sensors will collect environmental data and personnel flow data in the area.

[0041] In this embodiment, the sensor group of each sub-area monitors and collects environmental data in real time: the temperature sensor group provides real-time temperature, the humidity sensor group provides real-time humidity, the air quality sensor group provides real-time air quality data, and the camera group uses image recognition technology to determine the distribution of people in the sub-area in real time.

[0042] In this embodiment, the real-time environmental parameters of the entire stepped area are comprehensively calculated by collecting data from all sub-areas of the grid area: real-time temperature (based on the temperature data of all sub-areas), real-time humidity (based on the humidity data of all sub-areas), real-time air quality (based on the air quality data of all sub-areas) and personnel distribution (through camera data of each sub-area).

[0043] In this embodiment, the sensor group is a device cluster composed of multiple sensors, which is used to monitor the environment and personnel conditions in real time, including a temperature sensor group, a humidity sensor group, an air quality sensor group, etc.

[0044] The beneficial effects of the above technical solution are: real-time determination of the real-time temperature, real-time humidity, real-time air quality and personnel distribution in the stepped area of ​​the subway, which can realize accurate real-time monitoring of the entire stepped area of ​​the subway.

[0045] Embodiment 5: The embodiment of the present invention provides a step-by-step energy-saving control method for a subway Feng Shui linkage system, which determines the target temperature and target humidity of a step-by-step area based on ambient temperature, ambient humidity, real-time temperature, real-time humidity, real-time air quality, and personnel distribution, including: Determine the sub-region with the highest sub-region level in the stepped region as the reference region, determine the reference temperature of the reference region based on the ambient temperature, and determine the reference temperature and humidity of the reference region based on the ambient humidity; Determine a reference comfort value for the reference area based on the ambient temperature, ambient humidity, reference temperature, and reference humidity; Perform seasonal judgment on the current season and determine the seasonal result, wherein the seasonal result includes air-conditioning season and non-air-conditioning season; Determine a real-time comfort value for each sub-area of ​​each grid area based on the seasonal result, the benchmark comfort value, and the real-time sub-temperature and the real-time sub-humidity of each sub-area of ​​each grid area in the stepped area; Performing regional judgment on each sub-region of each grid region in the stepped region to determine a regional result for each sub-region, wherein the regional result includes an edge sub-region and a non-edge sub-region; Determine adjacent sub-regions of each sub-region that is an edge sub-region; Determine a target sub-temperature and a target sub-humidity for each sub-area of ​​each grid area based on the regional results, the real-time sub-temperature, the real-time sub-humidity, the real-time air quality, and the real-time comfort value of each sub-area of ​​each grid area in the stepped area; The target temperature of the stepped area is determined based on the target sub-temperatures of all sub-areas of all grid areas, and at the same time, the target humidity of the stepped area is determined based on the target sub-humidities of all sub-areas of all grid areas.

[0046] In this embodiment, in the stepped area, the highest level benchmark area is selected according to the level of the sub-area, and the benchmark temperature and benchmark humidity are calculated based on the ambient temperature and humidity of all benchmark areas, and then the benchmark comfort value is determined as a benchmark reference for the overall environmental control of the area.

[0047] In this embodiment, the season is determined according to the current time to distinguish between air-conditioning seasons (such as summer and winter) and non-air-conditioning seasons (such as spring and autumn).

[0048] In this embodiment, the sub-regions are classified into edge sub-regions and non-edge sub-regions, and for the edge sub-regions, the adjacent sub-regions are further identified.

[0049] In this embodiment, the target sub-temperature and humidity of all sub-areas are summarized to determine the target temperature and target humidity of the entire stepped area, providing accurate target values ​​for area-level control.

[0050] The beneficial effects of the above technical solution are as follows: the target temperature and target humidity of the stepped area are determined based on the ambient temperature, ambient humidity, real-time temperature, real-time humidity, real-time air quality and personnel distribution, which can achieve refined environmental control and improve the environmental comfort and energy-saving effect of the subway area.

[0051] Embodiment 6: The embodiment of the present invention provides a step-by-step energy-saving control method for a subway Feng Shui linkage system, which determines the real-time comfort value of each sub-area of ​​each grid area, including: in, represents the real-time comfort value of the bth sub-area of ​​the ath grid area in the stepped area, Indicates the first real-time comfort value when the seasonal result is the air-conditioning season. Indicates the second real-time comfort value when the seasonal result is the non-air-conditioning season. represents the baseline comfort value, , Indicates the real-time sub-temperature and real-time sub-humidity of the b-th sub-area of ​​the a-th grid area in the stepped area. , They represent the reference temperature and reference humidity of the reference area respectively. represents the comfort reduction coefficient based on the reference temperature, They represent the comfort reduction coefficient in the air-conditioning season and the comfort reduction coefficient in the non-air-conditioning season based on the reference humidity, respectively. represents the interaction sensitivity coefficient, Represents the humidity sensitivity coefficient.

[0052] In this embodiment, the interaction sensitivity coefficient represents the sensitivity of the interaction effect between temperature and humidity. For example, if and The larger the difference is, the contribution of the interaction effect will tend to be saturated.

[0053] In this embodiment, the real-time comfort value of each sub-area of ​​each grid area in the stepped area gradually decreases according to changes in the corresponding real-time sub-temperature and real-time sub-humidity.

[0054] In this embodiment, each sub-area of ​​each grid area corresponds to a real-time comfort value.

[0055] The beneficial effects of the above technical solution are as follows: based on seasonal results, benchmark comfort values, and the real-time sub-temperature and real-time sub-humidity of each sub-area of ​​each grid area in the stepped area, the real-time comfort value of each sub-area of ​​each grid area is determined, which can enhance the flexibility and adaptability of environmental control, optimize resource allocation, and improve overall comfort and energy utilization efficiency.

[0056] Embodiment 7: The embodiment of the present invention provides a step-by-step energy-saving control method for a subway Feng Shui linkage system, which determines a target sub-temperature and a target sub-humidity of each sub-area of ​​each grid area, including: determining a target sub-temperature for each sub-area of ​​each grid area based on the regional results, the real-time sub-temperature, the real-time sub-humidity, the real-time air quality, and the real-time comfort value for each sub-area of ​​each grid area in the stepped area; in, represents the target sub-temperature of the b-th sub-region of the a-th grid region in the stepped region, The regional result is The first target sub-temperature at The regional result is The second target sub-temperature at represents the distribution of sub-personnel in the b-th sub-area of ​​the a-th grid area in the stepped area, represents the maximum sub-personnel distribution of all sub-areas of all grid areas in the stepped region, represents the grid size area of ​​the ath grid region in the stepped region, represents the maximum mesh size area of ​​all mesh regions in the stepped region, represents the first target sub-temperature of the adjacent sub-region of the b-th sub-region of the a-th grid region in the stepped region, represents the fitting length of the bth sub-region of the ath grid region in the stepped region, represents the fitting length of the adjacent sub-region of the b-th sub-region of the a-th grid region in the stepped region, represents the first transition adjustment parameter, represents the real-time air quality of the bth sub-area of ​​the ath grid area in the stepped area, Indicates the preset air quality, represents the first air quality influence coefficient based on temperature, represents the second air quality influence coefficient based on temperature; determining a target sub-humidity for each sub-area of ​​each grid area based on the regional results, the real-time sub-temperature, the real-time sub-humidity, the real-time air quality, and the real-time comfort value for each sub-area of ​​each grid area in the stepped area; in, represents the target sub-humidity of the b-th sub-area of ​​the a-th grid area in the stepped area, The regional result is The first target sub-humidity at The regional result is The second target humidity at represents the second transition adjustment parameter, represents the first air quality influence coefficient based on humidity, Represents the second air quality impact coefficient based on humidity.

[0057] In this embodiment, Simulate the nonlinear effect of grid size area on temperature regulation, with different target temperatures in different areas; In this embodiment, It means that the higher the density of personnel distribution, the more difficult it is to achieve the target temperature or target humidity, and the more adjustments are needed.

[0058] In this embodiment, each sub-region of each grid region corresponds to a target sub-temperature, and each sub-region of each grid region corresponds to a target sub-humidity.

[0059] The beneficial effects of the above technical solution are as follows: based on the regional results, real-time sub-temperature, real-time sub-humidity, real-time air quality and real-time comfort value of each sub-area of ​​each grid area in the stepped area, the target sub-temperature and target sub-humidity of each sub-area of ​​each grid area are determined, which can improve the accuracy and responsiveness of regional environmental control while taking into account comfort and energy-saving effects.

[0060] Embodiment 8: The embodiment of the present invention provides a step-by-step energy-saving control method for a subway Feng Shui linkage system, which determines a control strategy based on target temperature and target humidity in a step-by-step area, and performs Feng Shui linkage energy-saving control on the subway based on the control strategy, including: The target temperature and target humidity of the stepped area are input into the control model to generate a control strategy, wherein the control strategy includes a wind and water linkage control strategy, an air conditioning water control strategy, and an air conditioning wind control strategy.

[0061] In this embodiment, in the stepped area, the calculated target temperature and humidity (reflecting the ideal environmental conditions of the entire area) are input into the control model as the core reference indicator for energy-saving control.

[0062] In this embodiment, the control model generates an optimized control strategy by analyzing the input target temperature and humidity combined with real-time environmental parameters (such as current temperature and humidity, air quality) and equipment operation data.

[0063] In this embodiment, the Feng Shui linkage control strategy can be: the air supply volume of the air conditioner adopts feedforward control: the fresh air load is calculated by using the fresh air fan speed and the fresh air temperature as the feedforward control quantity of the air supply volume of the air conditioner, and the air supply volume of the air conditioner is changed by the frequency converter to realize the automatic adjustment of the cooling capacity and the air conditioning dehumidification capacity with the load change. The cold water volume is regulated by the two-way valve using a feedforward plus feedback control mode: on the one hand, the measured temperature of the public area is used as the feedback control quantity to correct the control error so that the temperature of the public area is stable within the set range. On the other hand, the fresh air load is used as a feedforward control quantity to participate in the regulation of the terminal cold water volume, so that the change in load is also reflected in the regulation of the cold water volume. The control of the two-way valve introduces an insensitive link to avoid frequent operation of the two-way valve.

[0064] In this embodiment, the air conditioning water control strategy includes: sequential control and linkage regulation of the air conditioning water system. When the air conditioning water system is started and stopped, it needs to be controlled in sequence, for example: the order of opening the water system equipment is to open the electric butterfly valve of the cooling water and chilled water circuits → after receiving the butterfly valve opening signal, start the cooling tower at the lowest frequency → start the freezing pump → after receiving the freezing pump operation signal, give the chiller start signal → according to the comprehensive energy efficiency optimal linkage regulation of the cooling water pump, cooling tower and chiller itself; the order of closing the water system equipment is to output the chiller shutdown signal → the chiller executes the shutdown, and automatically stops the operation of the cooling water pump and cooling tower → close the electric butterfly valve of the cooling water circuit → after receiving the chiller shutdown signal for 60s, turn off the chilled water pump → close the electric butterfly valve of the chilled water circuit.

[0065] In this embodiment, the air conditioning water control strategy also includes: the energy-saving control system controls the chiller unit by adjusting the number of operating chillers according to the load conditions, which is mainly divided into load host operation quantity control and unload host operation quantity control.

[0066] In this embodiment, the air conditioning water control strategy also includes: chilled water system control, where the chilled water is a primary variable frequency pump system. When multiple pumps are running, each pump must run at the same frequency. In order to avoid the waste of water pump energy caused by large flow and small temperature difference operation, the chilled water pump is frequency-controlled according to the chilled water supply and return water temperature difference (the design temperature difference is 5°C). When the actual temperature difference is greater than the design temperature difference, the frequency is increased; when the actual temperature difference is less than the design temperature difference, the frequency is reduced.

[0067] In this embodiment, the air conditioning wind control strategy includes: real-time frequency control of the small fresh air air conditioning mode. The small fresh air air conditioning mode is an operating condition used under high temperature and high humidity conditions outdoors in summer. Its main feature is to reduce the entry of outdoor fresh air and avoid excessive fresh air load.

[0068] In this embodiment, the air conditioning wind control strategy also includes: real-time frequency control of the fresh air air conditioning mode. The fresh air air conditioning mode is an operating condition used when the outdoor temperature is low during the air-conditioning season. Its main feature is to make full use of the outdoor low-temperature fresh air and reduce the air conditioning load. The air delivered by the fresh air condition is all fresh air, so the fresh air volume can be guaranteed and there is no need to worry about insufficient fresh air.

[0069] In this embodiment, the air conditioning wind control strategy also includes: real-time control of the frequency of the ventilation mode, The ventilation mode is an operating condition used when the outdoor temperature is low during the non-air-conditioning season. Its main feature is to fully utilize the low-temperature outdoor fresh air to cool the station. The air delivered by the ventilation mode is all fresh air, so the fresh air volume can be guaranteed.

[0070] The beneficial effects of the above technical solution are as follows: determining the control strategy based on the target temperature and target humidity of the stepped area, and conducting Feng Shui linkage energy-saving control of the subway based on the control strategy, which can optimize the equipment coordination efficiency and improve the accuracy and energy-saving effect of subway regulation.

[0071] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0072] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0073] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A step-by-step energy-saving control method for a subway Feng Shui linkage system, characterized in that: include: 101: Obtain the spatial distribution of the subway and historical personnel flow data to determine the stepped areas of the subway; 102: Obtain the ambient temperature and humidity outside the subway in real time, and determine the real-time temperature, real-time humidity, real-time air quality and personnel distribution of the stepped area in the subway in real time; 103: Determine the target temperature and target humidity of the stepped area based on the ambient temperature, ambient humidity, real-time temperature, real-time humidity, real-time air quality and personnel distribution; 104: Determine the control strategy based on the target temperature and target humidity of the stepped area, and perform Feng Shui linkage energy-saving control on the subway based on the control strategy.

2. The step-by-step energy-saving control method for the subway feng shui linkage system according to claim 1 is characterized in that: The spatial distribution includes the connection relationship between every two functional areas of the subway, the area of ​​all functional areas, and the shape of all functional areas; The historical personnel flow data includes the personnel density, personnel flow, personnel stay time, flow direction and peak time period of each functional area.

3. The step-by-step energy-saving control method for the subway feng shui linkage system according to claim 2 is characterized in that: Identify the metro's stepped areas, including: Determine the grid size of each functional area based on the spatial distribution of the subway, divide the corresponding functional area into grids based on the grid size, and determine the grid area of ​​each functional area of ​​the subway, wherein the grid area includes a plurality of sub-areas; Based on historical personnel flow data, determine the personnel density characteristics, personnel flow characteristics, personnel stay time characteristics, flow direction characteristics and peak time characteristics of each sub-area in each grid area, and determine the sub-area feature vector of each sub-area in each grid area; Inputting the sub-region feature vectors of all sub-regions in all grid regions into the region partition model to determine the sub-region level of each sub-region in each grid region; The stepped areas of the subway are determined based on all sub-areas in all grid areas and the sub-area levels of all sub-areas.

4. The step-by-step energy-saving control method for the subway feng shui linkage system according to claim 3 is characterized in that: Determine the real-time temperature, real-time humidity, real-time air quality, and personnel distribution of stepped areas within the subway in real time, including: Determine the temperature sensor group, humidity sensor group, real-time air quality sensor group and camera group of all sub-areas of each grid area in the stepped area based on the grid size of each functional area of ​​the subway; Determine the real-time sub-temperature of each sub-area based on the temperature sensor group of each sub-area, determine the real-time sub-humidity of each sub-area based on the humidity sensor group of each sub-area, determine the sub-real-time air quality of each sub-area based on the real-time air quality sensor group of each sub-area, and determine the sub-personnel distribution of each sub-area based on the camera group of each sub-area; The real-time temperature of the stepped area is determined based on the real-time sub-temperatures of all sub-areas of all grid areas, the real-time humidity of the stepped area is determined based on the real-time sub-humidity of all sub-areas of all grid areas, the real-time air quality of the stepped area is determined based on the sub-real-time air quality of all sub-areas of all grid areas, and at the same time, the personnel distribution of the stepped area is determined based on the sub-personnel distribution of all sub-areas of all grid areas.

5. The step-by-step energy-saving control method for the subway feng shui linkage system according to claim 1 is characterized in that: Determine the target temperature and humidity of the stepped area based on the ambient temperature, ambient humidity, real-time temperature, real-time humidity, real-time air quality, and personnel distribution, including: Determine the sub-region with the highest sub-region level in the stepped region as the reference region, determine the reference temperature of the reference region based on the ambient temperature, and determine the reference temperature and humidity of the reference region based on the ambient humidity; Determine a reference comfort value for the reference area based on the ambient temperature, ambient humidity, reference temperature, and reference humidity; Perform seasonal judgment on the current season and determine the seasonal result, wherein the seasonal result includes air-conditioning season and non-air-conditioning season; Determine a real-time comfort value for each sub-area of ​​each grid area based on the seasonal result, the benchmark comfort value, and the real-time sub-temperature and the real-time sub-humidity of each sub-area of ​​each grid area in the stepped area; Performing regional judgment on each sub-region of each grid region in the stepped region to determine a regional result for each sub-region, wherein the regional result includes an edge sub-region and a non-edge sub-region; Determine adjacent sub-regions of each sub-region that is an edge sub-region; Determine a target sub-temperature and a target sub-humidity for each sub-area of ​​each grid area based on the regional results, the real-time sub-temperature, the real-time sub-humidity, the real-time air quality, and the real-time comfort value of each sub-area of ​​each grid area in the stepped area; The target temperature of the stepped area is determined based on the target sub-temperatures of all sub-areas of all grid areas, and at the same time, the target humidity of the stepped area is determined based on the target sub-humidities of all sub-areas of all grid areas.

6. The step-by-step energy-saving control method for the subway Feng Shui linkage system according to claim 5 is characterized in that: Determine the real-time comfort value for each sub-area of ​​each grid area, including: in, represents the real-time comfort value of the bth sub-area of ​​the ath grid area in the stepped area, Indicates the first real-time comfort value when the seasonal result is the air-conditioning season. Indicates the second real-time comfort value when the seasonal result is the non-air-conditioning season. represents the baseline comfort value, , Indicates the real-time sub-temperature and real-time sub-humidity of the b-th sub-area of ​​the a-th grid area in the stepped area. , They represent the reference temperature and reference humidity of the reference area respectively. represents the comfort reduction coefficient based on the reference temperature, They represent the comfort reduction coefficient in the air-conditioning season and the comfort reduction coefficient in the non-air-conditioning season based on the reference humidity, respectively. represents the interaction sensitivity coefficient, Represents the humidity sensitivity coefficient.

7. The step-by-step energy-saving control method for the subway Feng Shui linkage system according to claim 5 is characterized in that: Determine the target sub-temperature and target sub-humidity for each sub-area of ​​each grid area, including: determining a target sub-temperature for each sub-area of ​​each grid area based on the regional results, the real-time sub-temperature, the real-time sub-humidity, the real-time air quality, and the real-time comfort value for each sub-area of ​​each grid area in the stepped area; in, represents the target sub-temperature of the b-th sub-region of the a-th grid region in the stepped region, The regional result is The first target sub-temperature at The regional result is The second target sub-temperature at represents the distribution of sub-personnel in the b-th sub-area of ​​the a-th grid area in the stepped area, represents the maximum sub-personnel distribution of all sub-areas of all grid areas in the stepped area, represents the grid size area of ​​the ath grid region in the stepped region, represents the maximum mesh size area of ​​all mesh regions in the stepped region, represents the first target sub-temperature of the adjacent sub-region of the b-th sub-region of the a-th grid region in the stepped region, represents the fitting length of the bth sub-region of the ath grid region in the stepped region, represents the fitting length of the adjacent sub-region of the b-th sub-region of the a-th grid region in the stepped region, represents the first transition adjustment parameter, represents the real-time air quality of the bth sub-area of ​​the ath grid area in the stepped area, Indicates the preset air quality, represents the first air quality influence coefficient based on temperature, represents the second air quality influence coefficient based on temperature; determining a target sub-humidity for each sub-area of ​​each grid area based on the regional results, the real-time sub-temperature, the real-time sub-humidity, the real-time air quality, and the real-time comfort value for each sub-area of ​​each grid area in the stepped area; in, represents the target sub-humidity of the b-th sub-area of ​​the a-th grid area in the stepped area, The regional result is The first target sub-humidity at The regional result is The second target humidity at represents the second transition adjustment parameter, represents the first air quality influence coefficient based on humidity, Represents the second air quality impact coefficient based on humidity.

8. The step-by-step energy-saving control method for the subway Feng Shui linkage system according to claim 1 is characterized in that: The control strategy is determined based on the target temperature and target humidity of the stepped area, and the Feng Shui linkage energy-saving control of the subway is carried out based on the control strategy, including: The target temperature and target humidity of the stepped area are input into the control model to generate a control strategy, wherein the control strategy includes a wind and water linkage control strategy, an air conditioning water control strategy, and an air conditioning wind control strategy.

Citation Information

Cited By

  • Data analysis method, device and equipment for combustible gas sensor

    CN121329075A