Environmental engineering construction environmental influence automatic studying and judging method based on environmental protection
Through the microcontroller, the construction area and impact factors of environmental engineering are analyzed, and the construction methods are adjusted in real time, which solves the impact of environmental engineering construction on the surrounding environment, and effectively reduces the impact on the environment and protects residents' lives.
Patent Information
- Application Number
- CN202411900154.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-23
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2044-12-23
AI Technical Summary
Environmental engineering may affect the surrounding environment during construction, which in turn affects the daily lives of residents living around them.
The automatic analysis and judgment method based on microcontroller is adopted to adjust the construction method in real time by reading database data, analyzing the environmental engineering construction area, calculating the shortest diffusion distance of construction, evaluating the impact factors and environmental impact results.
It effectively reduces the impact of environmental engineering construction on the surrounding environment and reduces interference to residents' daily lives.
Smart Images

Figure CN119888531A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of environmental protection, and in particular to an automatic assessment method for environmental impact of environmental engineering construction based on environmental protection. Background Art
[0002] Environmental engineering mainly studies the basic knowledge and skills in the protection and rational use of natural resources, the improvement and prevention of environmental pollution, and the improvement of environmental quality, and carries out environmental engineering construction, environmental monitoring, pollution prevention, etc. For example: planning of water treatment projects such as filtration and disinfection of drinking water, monitoring and analysis of air and water pollutants, improvement and prevention of soil pollution and water pollution, etc. Compared with environmental science, it focuses more on engineering design and pollution prevention.
[0003] During the construction of environmental engineering, it may have an impact on the surrounding environment, and then affect the daily life of residents living nearby. Therefore, in order to reduce the impact of environmental engineering construction on the surrounding environment, an automatic assessment method for the environmental impact of environmental engineering construction based on environmental protection is designed. Summary of the invention
[0004] In order to solve the above technical problems, a method for automatic assessment of the environmental impact of environmental engineering construction based on environmental protection is provided. This technical solution solves the problem that the environmental engineering proposed in the above background technology may have an impact on the surrounding environment during construction, and thus affect the daily life of residents living in the surrounding area.
[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:
[0006] An automatic assessment method for environmental impact of environmental engineering construction based on environmental protection, comprising:
[0007] Based on the microcontroller, the database is read to obtain the complete construction area of the environmental engineering;
[0008] Based on the microcontroller, the complete construction area of the environmental engineering is analyzed and processed to obtain the actual shortest diffusion distance of the environmental engineering construction;
[0009] Based on the microcontroller, the actual shortest diffusion distance of environmental engineering construction is analyzed and processed to obtain the influencing factors of environmental engineering construction;
[0010] Based on the microcontroller, the environmental engineering construction influencing factors are analyzed and processed to obtain the environmental impact results of the environmental engineering construction;
[0011] The microcontroller makes real-time adjustments to the specific construction methods of the environmental engineering according to the environmental impact results of the environmental engineering construction.
[0012] Preferably, the microcontroller reads data from the database to obtain the complete construction area of the environmental engineering project, specifically including the following steps:
[0013] Based on the microcontroller, the database is read to obtain the environmental engineering construction project plan;
[0014] Based on the microcontroller, information retrieval is performed on the environmental engineering construction project plan to obtain environmental engineering drawing information;
[0015] Based on the microcontroller, data analysis is performed on the environmental engineering drawing information to obtain the complete construction area of the environmental engineering.
[0016] Preferably, the microcontroller-based analysis and processing of the complete construction area of the environmental engineering project to obtain the shortest diffusion distance of the environmental engineering construction specifically includes the following steps:
[0017] Based on the microcontroller, the drone is controlled to collect images of the environmental engineering construction area, and obtain real-time construction images of the environmental engineering and images of the complete construction area of the environmental engineering;
[0018] Based on the microcontroller, the real-time construction images of environmental engineering are analyzed and processed to obtain the real-time construction area of environmental engineering;
[0019] Based on the microcontroller, the real-time construction area of the environmental engineering and the complete construction area images of the environmental engineering are analyzed and processed to obtain the shortest diffusion distance of the environmental engineering construction.
[0020] Preferably, the microcontroller-based analysis and processing of the real-time construction area of the environmental engineering and the complete construction area image of the environmental engineering to obtain the actual shortest diffusion distance of the environmental engineering construction specifically includes the following steps:
[0021] Based on the microcontroller, the real-time construction area of the environmental engineering and the complete construction area of the environmental engineering are processed for intersection, and the overlapping area of the environmental engineering construction is obtained;
[0022] Based on the microcontroller, the images of the overlapping areas of environmental engineering construction and the complete construction areas of environmental engineering are analyzed and processed to obtain the actual diffusion distances of several groups of environmental engineering construction;
[0023] Based on the microcontroller, several groups of actual diffusion distances of environmental engineering construction are sorted and processed to obtain the actual shortest diffusion distance of environmental engineering construction;
[0024] The specific calculation formula for obtaining the actual shortest diffusion distance of environmental engineering construction is:
[0025]
[0026] Where D minThe shortest diffusion distance for environmental engineering construction; D i is the diffusion distance of environmental engineering construction; n is the specific number of diffusion distances of environmental engineering construction; min() is the minimum function.
[0027] Preferably, the microcontroller-based analysis and processing of the images of the overlapping areas of the environmental engineering construction and the complete environmental engineering construction areas to obtain several groups of actual diffusion distances of the environmental engineering construction specifically includes the following steps:
[0028] The microcontroller draws an image in the complete construction area image of the environmental engineering according to the overlapping area of the environmental engineering construction, and obtains a comprehensive construction image of the environmental engineering;
[0029] Based on the microcontroller, the integrated construction image of the environmental engineering is analyzed and processed to determine the edge contours of the overlapping areas of the environmental engineering construction and the edge contours of the complete construction areas of the environmental engineering;
[0030] The microcontroller draws straight lines on the edge contours of the overlapping areas of the environmental engineering construction and the edge contours of the complete environmental engineering construction areas, and obtains several groups of reduced diffusion distances of the environmental engineering construction;
[0031] Based on the microcontroller, the real-time construction images of environmental engineering are analyzed and processed to obtain the image scaling ratio;
[0032] The microcontroller performs calculations based on the image scaling ratio and the reduced diffusion distances of the several groups of environmental engineering constructions to obtain the actual diffusion distances of the several groups of environmental engineering constructions;
[0033] Among them, obtaining the actual diffusion distances of several groups of environmental engineering construction projects specifically includes the following steps:
[0034]
[0035] Where D i is the actual diffusion distance of several groups of environmental engineering construction; S i Reduce the diffusion distance for several groups of environmental engineering construction; α is the image scaling ratio.
[0036] Preferably, the microcontroller-based analysis and processing of the actual shortest diffusion distance of environmental engineering construction to obtain the environmental engineering construction influencing factors specifically includes the following steps:
[0037] Based on the microcontroller, the database is read to obtain the environmental engineering construction log;
[0038] Based on the microcontroller, information extraction and processing is performed on the environmental engineering construction log to obtain real-time data of environmental engineering construction, wherein the real-time data of environmental engineering construction includes environmental engineering construction method, environmental engineering construction progress and environmental engineering construction duration;
[0039] Based on the microcontroller, the actual shortest diffusion distance of environmental engineering construction and the real-time data of environmental engineering construction are analyzed and processed to obtain the influencing factors of environmental engineering construction.
[0040] Preferably, the microcontroller-based analysis and processing of the actual shortest diffusion distance of environmental engineering construction and real-time data of environmental engineering construction to obtain the influencing factors of environmental engineering construction specifically includes the following steps:
[0041] Based on the microcontroller, the environmental engineering construction progress and construction duration are calculated and processed to obtain the average construction speed of the environmental engineering;
[0042] The microcontroller retrieves information from the environmental engineering construction project plan based on the average construction speed and construction method of the environmental engineering, and obtains the impact distance of the environmental engineering construction;
[0043] Based on the microcontroller, the difference calculation process is performed between the environmental engineering construction impact distance and the actual shortest diffusion distance of the environmental engineering construction to obtain the environmental engineering construction impact factor.
[0044] Preferably, the microcontroller-based analysis and processing of environmental engineering construction influencing factors to obtain environmental engineering construction environmental impact results specifically includes the following steps:
[0045] Based on the microcontroller, information is extracted from the environmental engineering construction project plan to obtain reference standards for the impact of environmental engineering construction;
[0046] Based on the microcontroller, the reference standards for environmental engineering construction impact are analyzed and processed to determine the set thresholds;
[0047] Based on the microcontroller, the environmental engineering construction influencing factors and the set thresholds are compared and judged to obtain the environmental impact results of the environmental engineering construction.
[0048] Preferably, the microcontroller-based comparison and judgment of the environmental engineering construction influencing factors and the set threshold value to obtain the environmental impact results of the environmental engineering construction specifically includes the following steps:
[0049] Based on the microcontroller, the environmental engineering construction influencing factors and set thresholds are judged and processed;
[0050] If the environmental engineering construction impact factor is less than or equal to the set first threshold, the environmental engineering construction has a slight impact on the surrounding environment;
[0051] If the environmental engineering construction impact factor is greater than the set first threshold, and the environmental engineering construction impact factor is less than or equal to the set second threshold, the impact of the environmental engineering construction on the surrounding environment is moderate;
[0052] If the environmental engineering construction impact factor is greater than the set second threshold, the impact of the environmental engineering construction on the surrounding environment is severe.
[0053] Preferably, the microcontroller performs real-time adjustment on the specific construction method of the environmental engineering according to the environmental impact result of the environmental engineering construction, which specifically includes the following steps:
[0054] If the environmental impact result of the environmental engineering construction is that the environmental engineering construction has a slight impact on the surrounding environment;
[0055] The microcontroller sends information to the external display terminal to increase the average construction speed of the environmental engineering or change the construction method of the environmental engineering;
[0056] If the environmental impact result of the environmental engineering construction is that the impact of the environmental engineering construction on the surrounding environment is moderate;
[0057] The microcontroller sends information to the external display terminal without changing the original specific construction method;
[0058] If the environmental impact result of the environmental engineering construction is that the environmental engineering construction has a severe impact on the surrounding environment;
[0059] The microcontroller sends information to the external display terminal to reduce the average construction speed of the environmental engineering or change the construction method of the environmental engineering.
[0060] Compared with the prior art, the present invention provides an automatic assessment method for the environmental impact of environmental engineering construction based on environmental protection, which has the following beneficial effects:
[0061] The present invention firstly collects real-time construction images of environmental engineering and images of complete construction areas of environmental engineering by using unmanned aerial vehicles, then analyzes the real-time construction images of environmental engineering and images of complete construction areas of environmental engineering to determine the shortest diffusion distance of environmental engineering construction, then obtains environmental engineering construction influencing factors by analyzing the shortest diffusion distance of environmental engineering construction, finally, analyzes and judges the environmental engineering construction influencing factors to determine the impact of environmental construction on the surrounding environment, and selects whether it is necessary to adjust the specific construction method of environmental engineering, thereby reducing the impact of environmental engineering construction on the surrounding environment, and also reducing the impact of environmental engineering construction on the daily life of surrounding residents. BRIEF DESCRIPTION OF THE DRAWINGS
[0062] Figure 1 It is a flow chart of steps S100-S500 in a method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection proposed by the present invention;
[0063] Figure 2 This is a flow chart of steps S101-S103 in a method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection proposed by the present invention;
[0064] Figure 3 A flow chart of steps S201-S203 in an automatic assessment method of environmental impact of environmental engineering construction based on environmental protection proposed by the present invention;
[0065] Figure 4 A flow chart of steps S2031-S2033 in an automatic assessment method of environmental impact of environmental engineering construction based on environmental protection proposed by the present invention;
[0066] Figure 5 A flow chart of steps S20321-S20325 in an automatic assessment method of environmental impact of environmental engineering construction based on environmental protection proposed by the present invention;
[0067] Figure 6 It is a flow chart of steps S301-S303 in a method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection proposed by the present invention;
[0068] Figure 7 It is a flow chart of steps S3031-S3033 in the method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection proposed by the present invention;
[0069] Figure 8 It is a flow chart of steps S401-S403 in a method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection proposed by the present invention;
[0070] Fig. 9 A flow chart of steps S4031-S4034 in an automatic assessment method of environmental impact of environmental engineering construction based on environmental protection proposed by the present invention;
[0071] Fig.10 This is a flow chart of steps S501-S506 in a method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection proposed by the present invention. DETAILED DESCRIPTION
[0072] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.
[0073] Reference Figure 1 As shown, a method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection includes:
[0074] S100, based on the microcontroller, reads data from the database to obtain the complete construction area of the environmental engineering;
[0075] S200, based on the microcontroller, analyzes and processes the complete construction area of the environmental engineering project to obtain the actual shortest diffusion distance of the environmental engineering construction;
[0076] S300, based on the microcontroller, analyzes and processes the actual shortest diffusion distance of environmental engineering construction to obtain the influencing factors of environmental engineering construction;
[0077] S400, based on the microcontroller, analyzes and processes the factors affecting the environmental engineering construction to obtain the environmental impact results of the environmental engineering construction;
[0078] S500, the microcontroller adjusts the specific construction method of the environmental engineering in real time according to the environmental impact results of the environmental engineering construction;
[0079] It can be understood by those skilled in the art that environmental engineering construction will have an impact on the surrounding environment, but the impact is related to the construction speed and construction method of the environmental engineering. Therefore, the complete construction area of the environmental engineering is analyzed to determine the specific construction location in the complete construction area of the environmental engineering. Finally, the impact of the environmental engineering construction on the surrounding environment is determined by analyzing the specific construction location, construction speed and construction method in the complete construction area of the environmental engineering.
[0080] Reference Figure 2 As shown, the microcontroller reads data from the database and obtains the complete construction area of the environmental engineering, which specifically includes the following steps:
[0081] S101, based on the microcontroller, read the data from the database to obtain the environmental engineering construction project plan;
[0082] S102, based on the microcontroller, perform information retrieval on the environmental engineering construction project plan to obtain environmental engineering drawing information;
[0083] S103, based on the microcontroller, performing data analysis on the environmental engineering drawing information to obtain a complete construction area of the environmental engineering;
[0084] In this embodiment, in order to make the impact of subsequent environmental engineering construction on the surrounding environment more accurate, it is necessary to obtain the precise construction area of the environmental engineering, and the precise construction area of the environmental engineering is recorded in the environmental engineering construction project plan. Therefore, data is extracted from the database to obtain the environmental engineering construction project plan. By analyzing the environmental engineering construction project book, the complete construction area of the environmental engineering is obtained, thereby improving the accuracy of subsequent analysis.
[0085] Reference Figure 3 As shown, based on the microcontroller, the complete construction area of the environmental engineering is analyzed and processed to obtain the shortest diffusion distance of the environmental engineering construction, which specifically includes the following steps:
[0086] S201, based on the microcontroller, controlling the UAV to collect images of the environmental engineering construction area, and obtaining real-time construction images of the environmental engineering and images of the complete construction area of the environmental engineering;
[0087] S202, analyzing and processing the real-time construction image of the environmental engineering based on the microcontroller to obtain the real-time construction area of the environmental engineering;
[0088] S203, based on the microcontroller, analyzing and processing the images of the real-time construction area of the environmental engineering and the complete construction area of the environmental engineering, and obtaining the shortest diffusion distance of the environmental engineering construction;
[0089] In this embodiment, the construction area of the environmental engineering project is recorded in the environmental engineering construction project plan. In order to accurately obtain the real-time construction position of the environmental engineering, the construction area of the environmental engineering is imaged by a drone. Then, the captured images are analyzed to specifically obtain the real-time construction area of the environmental engineering. By comparing the real-time construction area of the environmental engineering with the complete construction area of the environmental engineering, the shortest diffusion distance of the environmental engineering construction is determined.
[0090] Reference Figure 4 As shown, based on the microcontroller, the real-time construction area of the environmental engineering and the complete construction area of the environmental engineering are analyzed and processed to obtain the actual shortest diffusion distance of the environmental engineering construction, which specifically includes the following steps:
[0091] S2031, based on the microcontroller, performing intersection processing on the images of the real-time construction area of the environmental engineering and the complete construction area of the environmental engineering to obtain the overlapping area of the environmental engineering construction;
[0092] S2032, based on the microcontroller, analyzing and processing the images of the overlapping areas of the environmental engineering construction and the complete construction areas of the environmental engineering, and obtaining several groups of actual diffusion distances of the environmental engineering construction;
[0093] S2033, based on the microcontroller, sorting and processing a plurality of groups of actual diffusion distances of environmental engineering construction to obtain the actual shortest diffusion distance of environmental engineering construction;
[0094] The specific calculation formula for obtaining the actual shortest diffusion distance of environmental engineering construction is:
[0095]
[0096] Where D min The shortest diffusion distance for environmental engineering construction; D i is the diffusion distance of environmental engineering construction; n is the specific number of diffusion distances of environmental engineering construction; min() is the minimum value function;
[0097] In this embodiment, since the environmental engineering construction area is a large area, an area is selected for construction first during construction, and the distance between the edge of the area where construction is first carried out and the edge of the complete environmental engineering construction area is different. In order to make the impact results of the environmental engineering construction more accurate, the actual shortest diffusion distance of the environmental engineering construction is analyzed, because the actual shortest diffusion distance of the environmental engineering construction is the closest distance to the surrounding environment, and it is also the distance where the surrounding environment is first affected.
[0098] Reference Figure 5 As shown, based on a microcontroller, the images of the overlapping area of environmental engineering construction and the complete construction area of environmental engineering are analyzed and processed to obtain several groups of actual diffusion distances of environmental engineering construction, which specifically includes the following steps:
[0099] S20321, the microcontroller draws an image in the complete construction area image of the environmental engineering according to the overlapping area of the environmental engineering construction, and obtains a comprehensive construction image of the environmental engineering;
[0100] S20322, analyzing and processing the comprehensive construction image of the environmental engineering based on the microcontroller to determine the edge contour of the overlapping area of the environmental engineering construction and the edge contour of the complete construction area of the environmental engineering;
[0101] S20323, the microcontroller draws straight lines on the edge contours of the overlapping areas of the environmental engineering construction and the edge contours of the complete environmental engineering construction areas, and obtains several groups of reduced diffusion distances of the environmental engineering construction;
[0102] S20324, based on the microcontroller, analyzing and processing the real-time construction image of the environmental engineering to obtain the image scaling ratio;
[0103] S20325, the microcontroller performs calculations based on the image scaling ratio and the reduced diffusion distances of the several groups of environmental engineering constructions to obtain the actual diffusion distances of the several groups of environmental engineering constructions;
[0104] Among them, obtaining the actual diffusion distances of several groups of environmental engineering construction projects specifically includes the following steps:
[0105]
[0106] Where D i is the actual diffusion distance of several groups of environmental engineering construction; S i Reduce the diffusion distance for several groups of environmental engineering construction; α is the image scaling ratio;
[0107] Those skilled in the art can understand that the overlapping area of environmental engineering construction is an area. Therefore, the outermost area of the overlapping area of environmental engineering construction is the edge contour of the overlapping area of environmental engineering construction. In order to obtain the distance between the edge contour of the overlapping area of environmental engineering construction and the complete construction area of environmental engineering, a straight line is drawn on the comprehensive construction image of environmental engineering. Because the straight line distance between two points is the shortest, a straight line is drawn on the comprehensive construction image of environmental engineering to obtain the reduced diffusion distance of environmental engineering construction. The reduced diffusion distance of environmental engineering construction is then enlarged by the image scaling ratio to obtain the actual diffusion distance of environmental engineering construction. Finally, the actual diffusion distance of environmental engineering construction is analyzed to obtain the impact of environmental engineering construction on the surrounding environment.
[0108] Reference Figure 6 As shown, based on the microcontroller, the actual shortest diffusion distance of environmental engineering construction is analyzed and processed, and the influencing factors of environmental engineering construction are obtained, which specifically include the following steps:
[0109] S301, based on the microcontroller, reading data from the database to obtain the environmental engineering construction log;
[0110] S302, based on the microcontroller, extracting information from the environmental engineering construction log to obtain real-time data on the environmental engineering construction, wherein the real-time data on the environmental engineering construction includes the environmental engineering construction method, the environmental engineering construction progress and the environmental engineering construction duration;
[0111] S303, based on the microcontroller, analyzing and processing the actual shortest diffusion distance of the environmental engineering construction and the real-time data of the environmental engineering construction to obtain the influencing factors of the environmental engineering construction;
[0112] In this embodiment, the impact of environmental engineering on the surrounding environment during construction is related to the construction speed and construction method. For example, if the construction speed is too fast, there will be many vehicles in the construction area, and too many vehicles will cause congestion in the surrounding environment. Therefore, the influencing factors of environmental engineering construction are determined by the construction method and construction speed, and then the influencing factors of environmental engineering construction are analyzed to determine the impact of environmental engineering construction on the surrounding environment.
[0113] Reference Figure 7 As shown, based on the microcontroller, the actual shortest diffusion distance of environmental engineering construction and the real-time data of environmental engineering construction are analyzed and processed to obtain the influencing factors of environmental engineering construction, which specifically includes the following steps:
[0114] S3031. Based on the microcontroller, calculate and process the environmental engineering construction progress and the environmental engineering construction duration to obtain the average construction speed of the environmental engineering;
[0115] S3032, the microcontroller performs information retrieval on the environmental engineering construction project plan based on the average construction speed and construction method of the environmental engineering, and obtains the impact distance of the environmental engineering construction;
[0116] S3033. Based on the microcontroller, the difference calculation process is performed between the environmental engineering construction impact distance and the actual shortest diffusion distance of the environmental engineering construction to obtain the environmental engineering construction impact factor.
[0117] Reference Figure 8 As shown, based on the microcontroller, the environmental engineering construction influencing factors are analyzed and processed to obtain the environmental impact results of the environmental engineering construction, which specifically includes the following steps:
[0118] S401. Based on the microcontroller, extract information from the environmental engineering construction project plan to obtain reference standards for environmental engineering construction impacts;
[0119] S402, based on the microcontroller, analyzing and processing the reference standard of environmental engineering construction impact, and determining the set threshold value;
[0120] S403, based on the microcontroller, compare and judge the environmental engineering construction influencing factors and the set threshold value to obtain the environmental impact results of the environmental engineering construction;
[0121] In this embodiment, the construction speed and construction method will have a certain impact on the surrounding environment. Therefore, the threshold is set by the environmental engineering construction impact reference standard in the environmental engineering construction project plan, and then the set threshold is compared with the environmental engineering construction impact factor. The environmental engineering construction impact factor determined by the construction speed and construction method can reflect the impact of the construction speed and construction method on the surrounding environment.
[0122] Reference Fig. 9 As shown, based on the microcontroller, the environmental engineering construction influencing factors and the set threshold are compared and judged to obtain the environmental impact results of the environmental engineering construction, which specifically includes the following steps:
[0123] S4031, based on the microcontroller, judge and process the environmental engineering construction influencing factors and set thresholds;
[0124] S4032. If the environmental engineering construction impact factor is less than or equal to the set first threshold, the environmental engineering construction has a slight impact on the surrounding environment;
[0125] S4033. If the environmental engineering construction impact factor is greater than the set first threshold, and the environmental engineering construction impact factor is less than or equal to the set second threshold, the environmental engineering construction has a moderate impact on the surrounding environment;
[0126] S4034. If the environmental engineering construction impact factor is greater than the set second threshold, the impact of the environmental engineering construction on the surrounding environment is severe.
[0127] Reference Fig.10 As shown, the microcontroller adjusts the specific construction method of the environmental engineering in real time according to the environmental impact results of the environmental engineering construction, which specifically includes the following steps:
[0128] S501. If the environmental impact result of the environmental engineering construction is that the environmental engineering construction has a slight impact on the surrounding environment;
[0129] S502, the microcontroller sends information to the external display terminal to increase the average construction speed of the environmental engineering or change the construction method of the environmental engineering;
[0130] S503. If the environmental impact result of the environmental engineering construction is that the impact of the environmental engineering construction on the surrounding environment is moderate;
[0131] S504, the microcontroller sends information to the external display terminal without changing the original specific construction method;
[0132] S505. If the environmental impact result of the environmental engineering construction is that the environmental engineering construction has a severe impact on the surrounding environment;
[0133] S506, the microcontroller sends information to the external display terminal to reduce the average construction speed of the environmental engineering or change the construction method of the environmental engineering;
[0134] In this embodiment, when the impact of environmental engineering construction on the surrounding environment is light, the construction speed can be accelerated or the construction method can be changed in order to shorten the construction period. When the impact of environmental engineering construction on the surrounding environment is severe, it means that the environmental engineering construction has a greater impact on the surrounding environment, and it is necessary to make real-time adjustments to the specific construction methods of the environmental engineering to reduce the impact of the environmental engineering construction on the surrounding environment.
[0135] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.
Claims
1. A method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection, characterized in that: include: Based on the microcontroller, the database is read to obtain the complete construction area of the environmental engineering; Based on the microcontroller, the complete construction area of the environmental engineering is analyzed and processed to obtain the actual shortest diffusion distance of the environmental engineering construction; Based on the microcontroller, the actual shortest diffusion distance of environmental engineering construction is analyzed and processed to obtain the influencing factors of environmental engineering construction; Based on the microcontroller, the environmental engineering construction influencing factors are analyzed and processed to obtain the environmental impact results of the environmental engineering construction; The microcontroller makes real-time adjustments to the specific construction methods of the environmental engineering according to the environmental impact results of the environmental engineering construction.
2. According to the method of automatic assessment of environmental impact of environmental engineering construction based on environmental protection in claim 1, it is characterized by: The microcontroller reads data from the database to obtain the complete construction area of the environmental engineering project, which specifically includes the following steps: Based on the microcontroller, the database is read to obtain the environmental engineering construction project plan; Based on the microcontroller, information retrieval is performed on the environmental engineering construction project plan to obtain environmental engineering drawing information; Based on the microcontroller, data analysis is performed on the environmental engineering drawing information to obtain the complete construction area of the environmental engineering.
3. According to the method of automatic assessment of environmental impact of environmental engineering construction based on environmental protection in claim 1, it is characterized by: The microcontroller-based method of analyzing and processing the complete construction area of the environmental engineering project to obtain the shortest diffusion distance of the environmental engineering project specifically includes the following steps: Based on the microcontroller, the drone is controlled to collect images of the environmental engineering construction area, and obtain real-time construction images of the environmental engineering and images of the complete construction area of the environmental engineering; Based on the microcontroller, the real-time construction images of environmental engineering are analyzed and processed to obtain the real-time construction area of environmental engineering; Based on the microcontroller, the real-time construction area of the environmental engineering and the complete construction area images of the environmental engineering are analyzed and processed to obtain the shortest diffusion distance of the environmental engineering construction.
4. The method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection according to claim 3 is characterized in that: The microcontroller-based method of analyzing and processing the images of the real-time construction area of the environmental engineering and the complete construction area of the environmental engineering to obtain the actual shortest diffusion distance of the environmental engineering construction specifically includes the following steps: Based on the microcontroller, the real-time construction area of the environmental engineering and the complete construction area of the environmental engineering are processed for intersection, and the overlapping area of the environmental engineering construction is obtained; Based on the microcontroller, the images of the overlapping areas of environmental engineering construction and the complete construction areas of environmental engineering are analyzed and processed to obtain the actual diffusion distances of several groups of environmental engineering construction; Based on the microcontroller, several groups of actual diffusion distances of environmental engineering construction are sorted and processed to obtain the actual shortest diffusion distance of environmental engineering construction; The specific calculation formula for obtaining the actual shortest diffusion distance of environmental engineering construction is: Where D min The shortest diffusion distance for environmental engineering construction; D i is the diffusion distance of environmental engineering construction; n is the specific number of diffusion distances of environmental engineering construction; min() is the minimum function.
5. The method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection according to claim 4 is characterized in that: The microcontroller-based method of analyzing and processing the images of the overlapping areas of environmental engineering construction and the complete areas of environmental engineering construction to obtain several groups of actual diffusion distances of environmental engineering construction specifically includes the following steps: The microcontroller draws an image in the complete construction area image of the environmental engineering according to the overlapping area of the environmental engineering construction, and obtains a comprehensive construction image of the environmental engineering; Based on the microcontroller, the integrated construction image of the environmental engineering is analyzed and processed to determine the edge contours of the overlapping areas of the environmental engineering construction and the edge contours of the complete construction areas of the environmental engineering; The microcontroller draws straight lines on the edge contours of the overlapping areas of the environmental engineering construction and the edge contours of the complete environmental engineering construction areas, and obtains several groups of reduced diffusion distances of the environmental engineering construction; Based on the microcontroller, the real-time construction images of environmental engineering are analyzed and processed to obtain the image scaling ratio; The microcontroller performs calculations based on the image scaling ratio and the reduced diffusion distances of the several groups of environmental engineering constructions to obtain the actual diffusion distances of the several groups of environmental engineering constructions; Among them, obtaining the actual diffusion distances of several groups of environmental engineering construction projects specifically includes the following steps: Where D i is the actual diffusion distance of several groups of environmental engineering construction; S i Reduce the diffusion distance for several groups of environmental engineering construction; α is the image scaling ratio.
6. The method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection according to claim 1 is characterized in that: The microcontroller-based method of analyzing and processing the actual shortest diffusion distance of environmental engineering construction to obtain the environmental engineering construction influencing factors specifically includes the following steps: Based on the microcontroller, the database is read to obtain the environmental engineering construction log; Based on the microcontroller, information extraction and processing is performed on the environmental engineering construction log to obtain real-time data of environmental engineering construction, wherein the real-time data of environmental engineering construction includes environmental engineering construction method, environmental engineering construction progress and environmental engineering construction duration; Based on the microcontroller, the actual shortest diffusion distance of environmental engineering construction and the real-time data of environmental engineering construction are analyzed and processed to obtain the influencing factors of environmental engineering construction.
7. The method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection according to claim 6 is characterized in that: The microcontroller-based method of analyzing and processing the actual shortest diffusion distance of environmental engineering construction and the real-time data of environmental engineering construction to obtain the influencing factors of environmental engineering construction specifically includes the following steps: Based on the microcontroller, the environmental engineering construction progress and construction duration are calculated and processed to obtain the average construction speed of the environmental engineering; The microcontroller retrieves information from the environmental engineering construction project plan based on the average construction speed and construction method of the environmental engineering, and obtains the impact distance of the environmental engineering construction; Based on the microcontroller, the difference calculation process is performed between the environmental engineering construction impact distance and the actual shortest diffusion distance of the environmental engineering construction to obtain the environmental engineering construction impact factor.
8. The method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection according to claim 1 is characterized in that: The microcontroller-based method of analyzing and processing the environmental engineering construction influencing factors to obtain the environmental engineering construction environmental impact results specifically includes the following steps: Based on the microcontroller, information is extracted from the environmental engineering construction project plan to obtain reference standards for the impact of environmental engineering construction; Based on the microcontroller, the reference standards for environmental engineering construction impact are analyzed and processed to determine the set thresholds; Based on the microcontroller, the environmental engineering construction influencing factors and the set thresholds are compared and judged to obtain the environmental impact results of the environmental engineering construction.
9. The method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection according to claim 8 is characterized in that: The microcontroller-based method of comparing and judging the environmental engineering construction impact factor and the set threshold value to obtain the environmental impact result of the environmental engineering construction specifically includes the following steps: Based on the microcontroller, the environmental engineering construction influencing factors and set thresholds are judged and processed; If the environmental engineering construction impact factor is less than or equal to the set first threshold, the environmental engineering construction has a slight impact on the surrounding environment; If the environmental engineering construction impact factor is greater than the set first threshold, and the environmental engineering construction impact factor is less than or equal to the set second threshold, the impact of the environmental engineering construction on the surrounding environment is moderate; If the environmental engineering construction impact factor is greater than the set second threshold, the impact of the environmental engineering construction on the surrounding environment is severe.
10. The method for automatically evaluating the environmental impact of environmental engineering construction based on environmental protection according to claim 1 is characterized in that: The microcontroller adjusts the specific construction method of the environmental engineering according to the environmental impact result of the environmental engineering construction, and specifically includes the following steps: If the environmental impact result of the environmental engineering construction is that the environmental engineering construction has a slight impact on the surrounding environment; The microcontroller sends information to the external display terminal to increase the average construction speed of the environmental engineering or change the construction method of the environmental engineering; If the environmental impact result of the environmental engineering construction is that the impact of the environmental engineering construction on the surrounding environment is moderate; The microcontroller sends information to the external display terminal without changing the original specific construction method; If the environmental impact result of the environmental engineering construction is that the environmental engineering construction has a severe impact on the surrounding environment; The microcontroller sends information to the external display terminal to reduce the average construction speed of the environmental engineering or change the construction method of the environmental engineering.
Citation Information
Patent Citations
Engineering safety remote online monitoring system based on machine vision and artificial intelligence
CN112903026A
Building engineering quality monitoring system based on BIM technology
CN116823064A
Intelligent design method and system for offshore building construction scheme
CN117495090A
Municipal building engineering construction management system
CN118446530A
Operation planning system and method for high-risk environment
CN118734128A