Pressure pulse test method, system and device and storage medium
By adopting pressure pulse testing methods and systems in the cooling system, and using programmed-controlled relays and solenoid valves, the reliability and durability of the cooling system are detected, which solves the fatigue problem of the cooling system under repeated pressure changes, and improves the accuracy and repeatability of the test.
Patent Information
- Application Number
- CN202510091078.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-21
- Publication Date
- 2025-04-29
AI Technical Summary
How to effectively detect the reliability and durability of cooling systems, especially in the new energy vehicle industry, cooling systems need to withstand repeated pressure changes, resulting in fatigue or damage to components.
A pressure pulse testing method and system is adopted to control the periodic opening and closing of the inlet solenoid valve and return solenoid valve through a programmed controlled cycle delay relay and counting relay to realize the periodic pulse test of the pipeline to be tested.
It ensures accurate execution of pressure holding time, pressure relief time and pulse number during the test, improves the reliability and repeatability of the test, and realizes accurate and repeated pressure pulse testing of the cooling system.
Smart Images

Figure CN119901612A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of pressure testing technology, and in particular to a pressure pulse testing method, system, device and storage medium. Background Art
[0002] In the new energy vehicle industry, the motor and its controller are the core components of the vehicle power system. They generate a lot of heat during operation. In order to ensure the stable operation and long-term reliability of the motor and controller, an effective cooling system, especially a water cooling system, must be used to effectively manage this heat. However, during the operation of new energy vehicles, the cooling system needs to withstand repeated pressure changes. These changes may come from vibrations during vehicle driving, temperature changes, or pressure fluctuations within the system. Long-term pressure changes may cause fatigue or damage to cooling system components. At the same time, in the design and manufacturing process of the cooling system, there may be unreasonable design or manufacturing defects, such as sand holes, seal failures, etc. These defects may not be easy to detect under normal operating conditions.
[0003] Therefore, how to effectively test the reliability and durability of the cooling system is a problem that needs to be solved urgently. Summary of the invention
[0004] The main purpose of this application is to provide a pressure pulse testing method, system, equipment and storage medium, aiming to solve the technical problem of how to effectively detect the reliability and durability of the cooling system.
[0005] To achieve the above-mentioned purpose, the present application proposes a pressure pulse test method, which is applied to a pressure pulse test system. The pressure pulse test system includes a water inlet, a water return port, a pipeline to be tested connected between the water inlet and the water return port, a water inlet solenoid valve arranged on the water inlet, a water return solenoid valve arranged on the water return port, a circulation delay relay respectively connected to the water inlet solenoid valve and the water return solenoid valve, a counting relay respectively connected to the water inlet solenoid valve, the water return solenoid valve and the circulation delay relay, and a main control module respectively connected to the circulation delay relay and the counting relay. The pressure pulse test method includes using the main control module to perform the following steps:
[0006] Obtain the pressure holding time, pressure release time and pulse number of the pressure pulse test task, and configure the first control time of the cycle delay relay based on the pressure holding time, configure the second control time of the cycle delay relay based on the pressure release time, and configure the control number of the counting relay based on the pulse number;
[0007] Control the water inlet solenoid valve to be continuously opened and the water return solenoid valve to be continuously closed for the first control time through the cycle delay relay, so as to inject water and pressurize the pipeline to be tested through the water inlet module connected to the water inlet solenoid valve;
[0008] After reaching the first control time, controlling the water inlet solenoid valve to be continuously closed and the water return solenoid valve to be continuously opened for the second control time by the cycle delay relay to release the pressure applied to the pipeline to be tested, and returning to the step of controlling the water inlet solenoid valve to be continuously opened and the water return solenoid valve to be continuously closed for the first control time by the cycle delay relay;
[0009] The return execution times of the cyclic delay relay are accumulated through the counting relay, and after the return execution times reach the control times, the pressure pulse test task is stopped.
[0010] In one embodiment, the pressure pulse test system further includes a power module, a switch button, an air intake solenoid valve, and an intermediate relay connected to the water return solenoid valve, wherein the power module is used to supply power to the water intake solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay, and after the step of stopping the execution of the pressure pulse test task, the following steps are further included:
[0011] Cut off the power supply from the power module to the water inlet solenoid valve, the cycle delay relay and the counting relay by the switching button;
[0012] The intermediate relay is controlled to keep the water return solenoid valve open, and the air intake solenoid valve is controlled to be continuously open, so as to clean the pipeline to be tested through a preset air source, wherein the preset air source is connected to the air intake solenoid valve.
[0013] In one embodiment, the pressure pulse test system further includes a pressure sensor and an overpressure relief valve, wherein the pressure sensor is used to measure the pressure in the pipeline to be tested, and the pressure pulse test method further includes:
[0014] monitoring the pressure data of the pressure sensor, and controlling the overpressure relief valve to open when the pressure data is greater than a preset pressure threshold;
[0015] When the overpressure relief valve is opened and the pressure data is less than or equal to the preset pressure threshold, the overpressure relief valve is controlled to be closed.
[0016] In one embodiment, the pressure pulse test system further includes an emergency stop button and a power module, wherein the power module is used to supply power to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay, and the pressure pulse test method further includes:
[0017] The emergency stop button is used to cut off the power supply from the power module to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay to stop executing the pressure pulse test task.
[0018] In addition, to achieve the above-mentioned purpose, the present application also proposes a pressure pulse testing system, which is applied to the above-mentioned pressure pulse testing method, and the pressure pulse testing system includes a water inlet, a water return port, a pipeline to be tested connected between the water inlet and the water return port, a water inlet solenoid valve arranged on the water inlet, a water return solenoid valve arranged on the water return port, a circulation delay relay respectively connected to the water inlet solenoid valve and the water return solenoid valve, a counting relay respectively connected to the water inlet solenoid valve, the water return solenoid valve and the circulation delay relay, and a main control module respectively connected to the circulation delay relay and the counting relay;
[0019] The main control module is used to obtain the pressure holding time, pressure release time and pulse number of the pressure pulse test task, and configure the first control time of the cycle delay relay based on the pressure holding time, configure the second control time of the cycle delay relay based on the pressure release time, and configure the control number of the counting relay based on the pulse number;
[0020] The cycle delay relay is used to control the water inlet solenoid valve to be continuously opened and the water return solenoid valve to be continuously closed for the first control time, so as to inject water and pressurize the pipeline to be tested through the water inlet module connected to the water inlet solenoid valve;
[0021] The cycle delay relay is also used to, after reaching the first control time, control the water inlet solenoid valve to be continuously closed and the water return solenoid valve to be continuously opened for the second control time to release the pressure applied to the pipeline to be tested, and return to the step of controlling the water inlet solenoid valve to be continuously opened and the water return solenoid valve to be continuously closed for the first control time;
[0022] The counting relay is used to accumulate the return execution times of the cyclic delay relay, and stop executing the pressure pulse test task after the return execution times reaches the control times.
[0023] Optionally, the pressure pulse test system further comprises a power module, a switching button, an air inlet solenoid valve, and an intermediate relay connected to the water return solenoid valve, wherein the power module is used to supply power to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay;
[0024] The switch button is used to cut off the power supply module to the water inlet solenoid valve, the cycle delay relay and the counting relay;
[0025] The main control module is also used to control the intermediate relay to keep the return water solenoid valve open, and control the intake solenoid valve to be continuously opened, so as to clean the pipeline to be tested through a preset air source, wherein the preset air source is connected to the intake solenoid valve.
[0026] Optionally, the pressure pulse test system further comprises a pressure sensor and an overpressure relief valve, wherein the pressure sensor is used to measure the pressure in the pipeline to be tested;
[0027] The main control module is also used to monitor the pressure data of the pressure sensor, and control the overpressure relief valve to open when the pressure data is greater than a preset pressure threshold; and control the overpressure relief valve to close when the overpressure relief valve is open and the pressure data is less than or equal to the preset pressure threshold.
[0028] Optionally, the pressure pulse test system further comprises an emergency stop button and a power module, wherein the power module is used to supply power to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay;
[0029] The emergency stop button is used to cut off the power supply from the power module to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay, so as to stop executing the pressure pulse test task.
[0030] In addition, to achieve the above-mentioned purpose, the present application also proposes an electronic device, which includes: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program is configured to implement the steps of the pressure pulse testing method as described above.
[0031] In addition, to achieve the above-mentioned purpose, the present application also proposes a storage medium, which is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the pressure pulse testing method described above are implemented.
[0032] In addition, to achieve the above-mentioned purpose, the present application also provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, the steps of the pressure pulse testing method described above are implemented.
[0033] One or more technical solutions proposed in this application have at least the following technical effects:
[0034] The present application first obtains the pressure holding time, pressure release time and pulse number of the pressure pulse test task, and configures the first control time of the cycle delay relay based on the pressure holding time, configures the second control time of the cycle delay relay based on the pressure release time, and configures the control number of the counting relay based on the pulse number, so as to ensure the precise control of the pressure pulse during the test, so that the test process meets the preset pressure holding and pressure release time requirements, and ensures that the test task is completed according to the preset number of pulses; then during the test, the cycle delay relay is used to control the water inlet solenoid valve to be continuously opened and the return water solenoid valve to be continuously closed for the first control time, so as to inject water and pressurize the pipeline to be tested through the water inlet module connected to the water inlet solenoid valve, and perform a pressure test on the reliability and durability of the pipeline to be tested. ; After reaching the first control time, the water inlet solenoid valve is controlled to be continuously closed and the return water solenoid valve is controlled to be continuously opened for the second control time through the circulation delay relay to release the pressure applied to the pipeline to be tested, and return to execute the step of controlling the water inlet solenoid valve to be continuously opened and the return water solenoid valve to be continuously closed for the first control time through the circulation delay relay to avoid the pipeline to be tested from being subjected to excessive pressure for a long time, and at the same time prepare for the next pressure pulse; the number of return executions of the circulation delay relay is accumulated through the counting relay, and the pressure pulse test task is stopped after the return execution number reaches the control number, so as to ensure that the test task is automatically completed according to the preset pulse number, avoid human operation errors, and improve the accuracy and automation of the test.
[0035] In summary, the present application uses programmed-controlled cycle delay relays and counting relays to control the periodic opening and closing of the water inlet solenoid valve and the return water solenoid valve to perform periodic pulse testing on the pipeline to be tested, thereby avoiding the problems of test parameter inconsistency and operating errors caused by manual control, ensuring the precise execution of the pressure holding time, pressure release time and number of pulses during the test, improving the reliability and repeatability of the test, and thus achieving the effect of accurate and repeated pressure pulse testing of the cooling system. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.
[0037] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0038] Figure 1 A schematic diagram of a flow chart provided for the first embodiment of the pressure pulse testing method of the present application;
[0039] Figure 2 A schematic diagram of a flow chart provided for the second embodiment of the pressure pulse testing method of the present application;
[0040] Figure 3 A schematic diagram of the solenoid valve state of the pressure pulse testing method provided in Example 2 of the present application;
[0041] Figure 4 A schematic diagram of the piping and circuits of the pressure pulse test system according to an embodiment of the present application;
[0042] Figure 5 Schematic diagram of the equipment structure of the hardware operating environment involved in the pressure pulse testing method in the embodiment of the present application.
[0043] The purpose, features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0044] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.
[0045] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.
[0046] The main solution of the embodiment of the present application is: obtaining the pressure holding time, pressure release time and pulse number of the pressure pulse test task, and configuring the first control time of the cycle delay relay based on the pressure holding time, configuring the second control time of the cycle delay relay based on the pressure release time, and configuring the control number of the counting relay based on the pulse number; controlling the water inlet solenoid valve to be continuously opened and the return water solenoid valve to be continuously closed for the first control time by the cycle delay relay, so as to inject water and pressurize the pipeline to be tested through the water inlet module connected to the water inlet solenoid valve; after reaching the first control time, controlling the water inlet solenoid valve to be continuously closed and the return water solenoid valve to be continuously opened for the second control time by the cycle delay relay, so as to release the pressure applied to the pipeline to be tested, and returning to execute the step of controlling the water inlet solenoid valve to be continuously opened and the return water solenoid valve to be continuously closed for the first control time by the cycle delay relay; accumulating the return execution times of the cycle delay relay through the counting relay, and stopping the execution of the pressure pulse test task after the return execution times reach the control times.
[0047] During the operation of new energy vehicles, the cooling system needs to withstand repeated pressure changes. These changes may come from vibrations during vehicle driving, temperature changes, or pressure fluctuations within the system. Long-term pressure changes may cause fatigue or damage to cooling system components. At the same time, during the design and manufacturing process of the cooling system, there may be unreasonable designs or manufacturing defects, such as sand holes and seal failures. These defects may not be easy to detect under normal operating conditions. Therefore, how to effectively detect the reliability and durability of the cooling system is a problem that needs to be solved urgently.
[0048] The present application provides a solution, which controls the periodic opening and closing of the water inlet solenoid valve and the water return solenoid valve through the use of a programmed controlled cycle delay relay and a counting relay, so as to perform periodic pulse testing on the pipeline to be tested, thereby avoiding the problems of inconsistency of test parameters and operating errors caused by manual control, ensuring the accurate execution of the pressure holding time, pressure relief time and number of pulses during the test, improving the reliability and repeatability of the test, and thus achieving the effect of accurate and repeated pressure pulse testing of the cooling system.
[0049] It should be noted that the execution subject of this embodiment can be a computing service device with data processing, network communication and program running functions, such as a tablet computer, a personal computer, a mobile phone, etc., or an electronic device that can realize the above functions. The following takes an electronic device as an example to illustrate this embodiment and the following embodiments.
[0050] Based on this, the present application embodiment provides a pressure pulse test method, referring to Figure 1 , Figure 1This is a flow chart of the first embodiment of the pressure pulse testing method of the present application.
[0051] In this embodiment, the pressure pulse test method is applied to a pressure pulse test system, which includes a water inlet, a water return port, a pipeline to be tested connected between the water inlet and the water return port, a water inlet solenoid valve arranged on the water inlet, a water return solenoid valve arranged on the water return port, a circulation delay relay respectively connected to the water inlet solenoid valve and the water return solenoid valve, a counting relay respectively connected to the water inlet solenoid valve, the water return solenoid valve and the circulation delay relay, and a main control module respectively connected to the circulation delay relay and the counting relay. The pressure pulse test method includes using the main control module to perform the following steps S10 to S40:
[0052] Step S10, obtaining the pressure holding time, pressure release time and pulse number of the pressure pulse test task, and configuring the first control time of the cycle delay relay based on the pressure holding time, configuring the second control time of the cycle delay relay based on the pressure release time, and configuring the control number of the counting relay based on the pulse number;
[0053] It should be noted that the pressure holding time refers to the length of time that the pressure is maintained on the pipeline to be tested after the pressure is applied to the pipeline to be tested; the pressure release time refers to the length of time that the pressure applied to the pipeline to be tested is released to the preset minimum threshold after the pressure holding time ends; the number of pulses refers to the number of cycles of applying and releasing pressure to the pipeline to be tested during the entire pressure pulse test process.
[0054] In addition, it should be noted that the first control time length configured by the cyclic delay relay is equal to the pressure holding time length, the second control time length is equal to the pressure release time length, and the control times configured by the counting relay is equal to the pulse times.
[0055] It is understandable that since the pipeline to be tested needs to remain stable under a certain pressure and also needs to get appropriate material rest time, step S10 is performed. By configuring the cycle delay relay based on the pressure holding time and pressure release time of the pressure pulse test task, and configuring the counting relay based on the pulse number of the pressure pulse test task, it is possible to avoid the inability to accurately evaluate the performance of the components to be pressed due to the uncontrollable pressure maintenance time, and the impact damage caused by the uncontrollable pressure release. The problems can be avoided, thereby realizing the durability and reliability of the pipeline to be tested under any pressure, and also realizing the safety detection of the pipeline to be tested in the pressure cycle. In addition, by setting the number of pulses to simulate the repeated pressure changes that the cooling system is subjected to during actual operation, so as to evaluate the long-term durability of the pipeline to be tested, it is possible to avoid the inability to fully evaluate the fatigue life of the pipeline to be tested due to insufficient test times, thereby realizing the performance evaluation of the pipeline to be tested under multiple pressure cycles. In summary, specific test parameters are set according to the test requirements to ensure that the test process meets the expected pressure cycle mode, avoiding problems such as inaccurate test results or uncontrollable test process due to improper parameter settings, and achieving accurate and repeatable pressure pulse testing on the pipeline to be tested, ensuring the reliability and effectiveness of the test results.
[0056] Exemplarily, the main control module first reads the preset pressure holding time, pressure release time and pulse number from the test task parameter library or the user input interface. Then, the main control module adjusts the delay time (including the first control time and the second control time) of the cycle delay relay according to these parameters to ensure that the relay can accurately switch the state of the solenoid valve during the pressure holding and pressure release stages. At the same time, the main control module sets the counting upper limit (i.e., the control number) of the counting relay according to the number of pulses, so as to stop the test after reaching the specified number of times.
[0057] Step S20, controlling the water inlet solenoid valve to be continuously opened and the water return solenoid valve to be continuously closed for the first control time through the cycle delay relay, so as to inject water and pressurize the pipeline to be tested through the water inlet module connected to the water inlet solenoid valve;
[0058] It should be noted that the water inlet module refers to a device used to apply pressure to the pipeline to be tested, which may include components such as a high-pressure water tank and a water pump; the pipeline to be tested includes but is not limited to the pipelines in the cooling system of new energy motors and controllers.
[0059] It can be understood that since it is necessary to simulate the pressure changes that the cooling system is subjected to in actual work in order to detect the pressure resistance performance of the pipeline to be tested, step S20 is performed to avoid problems such as component damage or poor test results caused by improper pressure control, thereby realizing performance testing of the pipeline to be tested under simulated working pressure and ensuring the stability and safety of the pipeline to be tested in actual use.
[0060] For example, when starting the test, the cycle delay relay activates the water inlet solenoid valve to keep it open, while ensuring that the return water solenoid valve is closed, so that the water inlet module can continuously supply water to the pipeline to be tested, thereby applying a certain pressure to the pipeline to be tested. This process will continue for a specified pressure holding time (i.e., the first control time) to ensure that the pipeline to be tested is under sufficient pressure for performance evaluation.
[0061] Step S30, after reaching the first control time, controlling the water inlet solenoid valve to be continuously closed and the water return solenoid valve to be continuously opened for the second control time by the cycle delay relay to release the pressure applied to the pipeline to be tested, and returning to the step of controlling the water inlet solenoid valve to be continuously opened and the water return solenoid valve to be continuously closed for the first control time by the cycle delay relay;
[0062] It is understandable that since it is necessary to allow the pipeline to be tested to have a pressure release process in the continuous pressure pulse test to simulate the pressure cycle in actual work, step S30 is performed to avoid fatigue damage to components caused by continuous high pressure or distortion of test results due to insufficient pressure relief, thereby realizing fatigue life assessment of the pipeline to be tested in the pressure cycle, thereby ensuring the long-term operation reliability of the pipeline to be tested.
[0063] For example, when the first control time for maintaining pressure is reached, the cycle delay relay will close the water inlet solenoid valve and open the water return solenoid valve at the same time, allowing the water in the pipeline to be tested to flow back, thereby quickly reducing the pressure inside the component. This process will continue for the specified pressure relief time (i.e., the second control time) to ensure that the pressure in the pipeline to be tested is completely released and prepare for the next pressure pulse cycle.
[0064] Step S40, accumulating the return execution times of the cyclic delay relay through the counting relay, and stopping the execution of the pressure pulse test task after the return execution times reaches the control times.
[0065] It should be noted that the number of return executions refers to the number of pressure pulse cycles that have been completed during the entire pressure pulse test process.
[0066] It is understandable that since it is necessary to ensure that the test is completed according to the preset number of times to ensure the consistency and completeness of the test, performing step S40 can avoid the problem of insufficient or excessive test times due to counting errors, thereby affecting the accuracy of the test results, thereby achieving accurate cyclic pressure testing of the pipeline to be tested, ensuring the controllability of the test process and the accuracy of the test results.
[0067] For example, each time a pressure pulse cycle is completed, the counting relay will automatically accumulate the number of executions. When the accumulated number of executions reaches the preset number of pulses, i.e., the control number, the counting relay will trigger the stop mechanism of the test system, close the water inlet solenoid valve, open the water return solenoid valve, and end the pressure pulse test task. This ensures that the test is completed accurately according to the predetermined number of times, and does not cause component damage due to excessive testing or affect the evaluation results due to insufficient testing.
[0068] The present embodiment provides a pressure pulse testing method, which uses a programmed controlled cycle delay relay and a counting relay to control the periodic opening and closing of the water inlet solenoid valve and the water return solenoid valve to perform periodic pulse testing on the pipeline to be tested, thereby avoiding the problems of test parameter inconsistency and operating errors caused by manual control, ensuring the accurate execution of the pressure holding time, pressure release time and pulse number during the test, improving the reliability and repeatability of the test, and achieving the effect of accurate and repeatable pressure pulse testing of the cooling system.
[0069] In a feasible implementation manner, the pressure pulse test system further includes a pressure sensor and an overpressure relief valve, wherein the pressure sensor is used to measure the pressure in the pipeline to be tested, and the pressure pulse test method further includes steps S01 to S02:
[0070] Step S01, monitoring the pressure data of the pressure sensor, and controlling the overpressure relief valve to open when the pressure data is greater than a preset pressure threshold;
[0071] It should be noted that pressure data refers to the pressure value in the test water channel where the pipeline to be tested is located, which is detected in real time by a pressure sensor. This data is usually expressed in physical units (such as Pascal, etc.) and is a key parameter for measuring the pressure state of the system.
[0072] It is understandable that since the pressure in the pipeline to be tested may be too high during the pressure pulse test, step S01 is performed. By setting up a pressure sensor and an overpressure relief valve, the overpressure relief valve is used to relieve the pressure in the pipeline to be tested when the pressure is too high. This can avoid safety accidents or equipment damage caused by pressure exceeding the bearing capacity of components or the bearing capacity of the test system. By releasing excess pressure in time, it is ensured that the test process can be carried out within a safe pressure range.
[0073] Exemplarily, the pressure sensor is installed at a key position of the pipeline to be tested, such as the water inlet and outlet of the pipeline to be tested, so as to collect the pressure data in the pipeline to be tested in real time. Then, the output signal of the pressure sensor is continuously read by the main control module, and the output signal is converted into a readable pressure value. When the main control module detects that the pressure value exceeds the preset safety threshold (i.e., the preset pressure threshold), the control circuit is immediately activated and a command is sent to the driving device of the overpressure relief valve, so that the overpressure relief valve is quickly opened, thereby releasing excess pressure and preventing the system from being over-pressurized.
[0074] Step S02: When the overpressure relief valve is open and the pressure data is less than or equal to the preset pressure threshold, control the overpressure relief valve to be closed.
[0075] It is understandable that since the overpressure relief valve being open for a long time will cause the system pressure to be too low or resources to be wasted, performing step S02 can avoid problems such as system performance degradation and component function damage caused by excessive pressure relief, thereby achieving the effect of precise pressure control, ensuring the stable operation of the system, and optimizing the full utilization of energy and resources.
[0076] For example, after the overpressure relief valve is opened and the system pressure is successfully reduced, the main control module continues to monitor the output of the pressure sensor. Once the pressure value is detected to be reduced to or equal to the preset safety threshold (i.e., the preset pressure threshold), the main control module will again send a command through the control circuit to close the drive device of the overpressure relief valve, thereby stopping the pressure relief process. This operation ensures that the system pressure will not be too low, while avoiding the unnecessary long-term opening of the pressure relief valve, ensuring the normal operation of the system and the effective use of energy.
[0077] In this embodiment, by using a pressure sensor to monitor and feedback control the overpressure relief valve, when the monitored pressure data is greater than the preset pressure threshold, the overpressure relief valve is opened in time to release excess pressure and prevent system overpressure; when the pressure data drops to or below the preset threshold, the overpressure relief valve is closed to keep the system within the normal working pressure range, thereby ensuring the stable operation and safety of the system, while avoiding low system pressure or waste of resources due to long-term opening of the pressure relief valve, realizing real-time monitoring and precise control of system pressure, and achieving the purpose of optimizing system performance and protecting equipment.
[0078] In a feasible implementation manner, the pressure pulse test system further includes an emergency stop button and a power module, wherein the power module is used to supply power to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay, and the pressure pulse test method further includes step S100:
[0079] Step S100, cutting off the power supply from the power module to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay through the emergency stop button to stop executing the pressure pulse test task.
[0080] It is understandable that since emergencies or abnormalities may occur during the test, the test needs to be stopped immediately to ensure the safety of personnel or the integrity of equipment, so step S100 is performed. By adopting the emergency stop button as a means of emergency power cut-off, safety accidents or equipment damage caused by failure to stop the test in time are avoided, and the effect of quickly stopping the pressure pulse test task in an emergency is achieved, ensuring the safety of operators and equipment, preventing the occurrence of potential dangerous situations, and also providing guarantees for subsequent safety inspections and troubleshooting.
[0081] Exemplarily, an emergency stop button is provided in the pressure test system, and the button is directly connected to the output end of the power module through an electrical connection. When the operator recognizes an emergency or abnormality during the test, the emergency stop button can be quickly pressed. After pressing the emergency stop button, a mechanical or electronic switch will be triggered, which will immediately cut off the output of the power module, thereby disconnecting the circuit that supplies power to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay, and the counting relay. This operation will cause all these electrical components to lose power instantly, the water inlet solenoid valve and the water return solenoid valve will stop working, and the cycle delay relay and the counting relay will also stop performing their delay and counting functions. The entire pressure pulse test task is therefore stopped immediately, thereby ensuring the safe shutdown of the test system.
[0082] Based on the first embodiment of the present application, in the second embodiment of the present application, the same or similar contents as those in the above-mentioned embodiment 1 can be referred to the above introduction, and will not be repeated in the following. Figure 2 The pressure pulse test system further includes a power module, a switch button, an air intake solenoid valve, and an intermediate relay connected to the water return solenoid valve, wherein the power module is used to supply power to the water intake solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay. After step S40, the pressure pulse test method further includes steps S50 to S60:
[0083] Step S50, cutting off the power supply from the power module to the water inlet solenoid valve, the cycle delay relay and the counting relay through the switching button;
[0084] It can be understood that since it is necessary to safely stop the power supply to the relevant electrical components after the test is completed or when the system maintenance is performed, performing step S50 can avoid safety accidents or equipment damage caused by accidental startup of electrical components, thereby safely controlling the start and stop of the test system and improving the operational safety of the system.
[0085] For example, a switch button is installed in the test system, and the button is connected to the output end of the power module through a circuit. After the pressure pulse test task is completed, the button can be automatically triggered by the main control module, or manually triggered by the operator, thereby closing or disconnecting the circuit, cutting off the power supply from the power module to the water inlet solenoid valve, the cycle delay relay and the counting relay, and switching the power module to supply power to the air inlet solenoid valve. This operation ensures that these electrical components stop working immediately, avoiding any potential electrical hazards.
[0086] Step S60, controlling the intermediate relay to keep the water return solenoid valve open, and controlling the air intake solenoid valve to be continuously open, so as to clean the pipeline to be tested through a preset air source, wherein the preset air source is connected to the air intake solenoid valve.
[0087] It should be noted that the preset gas source refers to compressed air or other gas source that provides cleaning and driving functions for the test system. The gas source is connected to the air inlet solenoid valve through a pipeline and can adjust the pressure and flow as needed.
[0088] It is understandable that after the test task is completed, the liquid (such as coolant, etc.) remaining in the pipeline to be tested will cause certain damage to the hardware of the test system or have a certain impact on the next test task, so step S60 is performed to clear the residues in the test water channel by setting the air intake solenoid valve, thereby avoiding unnecessary impact on the hardware equipment and even the next test task caused by the residues after the test, thereby achieving effective cleaning of the test water channel, ensuring the accuracy and reliability of the next test, and extending the service life of the system components.
[0089] Exemplarily, first, a signal is sent to the intermediate relay based on the control circuit through the main control module, so that the intermediate relay is energized, thereby maintaining the open state of the return water solenoid valve. At the same time, another control signal is sent by the main control module to the air intake solenoid valve, so that the air intake solenoid valve is continuously opened to allow a preset air source (such as compressed air) to enter the pipeline to be tested through the air intake solenoid valve. The preset air source is connected to the air intake solenoid valve through a pipeline. When the air source is activated, high-pressure gas will flow through the pipeline to be tested between the water intake solenoid valve and the return water solenoid valve, thereby purging and cleaning the residue in the pipeline to ensure the cleanliness and smoothness of the pipeline.
[0090] In this embodiment, by adopting electrical control and pneumatic cleaning methods, safety accidents caused by accidental startup of electrical components and inaccurate testing or equipment damage caused by pipeline residues are avoided. The power supply of electrical components can be safely stopped after the test is completed, and the tested pipeline can be effectively cleaned, thereby ensuring the operational safety of the system and the accuracy of the test, while extending the service life of system components, thereby achieving the effect of optimizing system maintenance and ensuring test reliability.
[0091] For example, in order to help understand the actual application effect of the pressure pulse test method of the present application, the water-cooled plate pressure alternation test (i.e., pressure pulse test task) is configured according to the following table:
[0092]
[0093] Table 1
[0094] The pressure holding time shown in Table 1 is 3 to 5 seconds, the pressure release time can be 1 second, and the number of pulses is 200,000 times. In the initial inspection stage of the water-cooled plate pressure alternation test, first open the water inlet solenoid valve and the water outlet solenoid valve, and let the coolant (water and ethylene glycol solution) in the high-pressure water tank circulate in the pressure pulse test system for a period of time to remove the air in the system pipes, and confirm that all components of the system are tightly connected without leakage and are in normal working condition. In the formal testing stage, start the high-pressure water tank, set the pressure pulse time (including pressure holding time, pressure release time, and number of pulses), and start applying periodic pressure fluctuations. You can refer to Figure 4 As shown in the figure, the pressure holding time is 3s, the pressure release time is 1s, and the opening and closing states of the water inlet solenoid valve and the water outlet solenoid valve are opposite. During the formal test, the system main control module or the operator continuously monitors various indicators. If there is an obvious leak or other fault, the emergency stop button is immediately triggered to stop the test. After 200,000 pressure pulses, no obvious leakage was found in the pipeline to be tested (water cooling plate), and the pressure pulse test verification of the pipeline to be tested was determined to be qualified.
[0095] It should be noted that the above examples are only used to understand the present application and do not constitute a limitation on the pressure pulse testing method of the present application. More simple transformations based on this technical concept are all within the scope of protection of the present application.
[0096] This application also provides a pressure pulse test system, please refer to Figure 4, the pressure pulse test system is applied to the pressure pulse test method as described above, the pressure pulse test system includes a water inlet, a water return port, a pipeline to be tested 20 connected between the water inlet and the water return port, a water inlet solenoid valve 10 arranged on the water inlet, a water return solenoid valve 50 arranged on the water return port, a circulation delay relay 80 respectively connected to the water inlet solenoid valve 10 and the water return solenoid valve 50, a counting relay 70 respectively connected to the water inlet solenoid valve 10, the water return solenoid valve 50 and the circulation delay relay 80, and a main control module respectively connected to the circulation delay relay 80 and the counting relay 70;
[0097] The main control module is used to obtain the pressure holding time, pressure release time and pulse number of the pressure pulse test task, and configure the first control time of the cycle delay relay 80 based on the pressure holding time, configure the second control time of the cycle delay relay 80 based on the pressure release time, and configure the control number of the counting relay 70 based on the pulse number;
[0098] The cycle delay relay 80 is used to control the water inlet solenoid valve 10 to be continuously opened and the water return solenoid valve 50 to be continuously closed for the first control time, so as to inject water and pressurize the pipeline 20 to be tested through the water inlet module connected to the water inlet solenoid valve 10;
[0099] The cycle delay relay 80 is also used to control the water inlet solenoid valve 10 to be continuously closed and the water return solenoid valve 50 to be continuously opened for the second control time after the first control time is reached, so as to release the pressure applied to the pipeline 20 to be tested, and return to the step of controlling the water inlet solenoid valve 10 to be continuously opened and the water return solenoid valve 50 to be continuously closed for the first control time;
[0100] The counting relay 70 is used to accumulate the return execution times of the cyclic delay relay 80, and stop executing the pressure pulse test task after the return execution times reaches the control times.
[0101] Optionally, the pressure pulse test system further includes a power module 90, a switch button 110, an air intake solenoid valve 120, and an intermediate relay 60 connected to the water return solenoid valve, wherein the power module 90 is used to supply power to the water intake solenoid valve 10, the water return solenoid valve 50, the cycle delay relay 80 and the counting relay 70;
[0102] It should be noted that, when the switch button 110 is in the first port, the power module 90 supplies power to the water inlet solenoid valve 10, the return water solenoid valve 50, the intermediate relay 60, the cycle delay relay 80 and the counting relay 70; when the switch button 110 is in the second port, the power module 90 supplies power to the return water solenoid valve 50, the intermediate relay 60 and the air intake solenoid valve 120.
[0103] The switch button 110 is used to cut off the power supply module 90 to the water inlet solenoid valve 10, the cycle delay relay 80 and the counting relay 70;
[0104] The main control module is also used to control the intermediate relay 60 to keep the return water solenoid valve 50 open, and control the intake solenoid valve 120 to be continuously open, so as to clean the pipeline 20 to be tested through a preset air source, wherein the preset air source is connected to the intake solenoid valve 120 .
[0105] Optionally, the pressure pulse test system further comprises a pressure sensor 30 and an overpressure relief valve 40, wherein the pressure sensor 30 is used to measure the pressure in the pipeline 20 to be tested;
[0106] The main control module is also used to monitor the pressure data of the pressure sensor 30, and control the overpressure relief valve 40 to open when the pressure data is greater than a preset pressure threshold; and control the overpressure relief valve 40 to close when the overpressure relief valve 40 is open and the pressure data is less than or equal to the preset pressure threshold.
[0107] Optionally, the pressure pulse test system further includes an emergency stop button 100 and a power module 90, wherein the power module 90 is used to supply power to the water inlet solenoid valve 10, the water return solenoid valve 50, the cycle delay relay 80 and the counting relay 70;
[0108] The emergency stop button 100 is used to cut off the power supply from the power module 90 to the water inlet solenoid valve 10, the water return solenoid valve 50, the cycle delay relay 80 and the counting relay 70, so as to stop executing the pressure pulse test task.
[0109] The pressure pulse test system provided by the present application adopts the pressure pulse test method in the above embodiment, which can solve the technical problem of how to effectively detect the reliability and durability of the cooling system. Compared with the prior art, the beneficial effects of the pressure pulse test system provided by the present application are the same as the beneficial effects of the pressure pulse test method provided by the above embodiment, and the other technical features of the pressure pulse test system are the same as the features disclosed in the above embodiment method, which will not be repeated here.
[0110] The present application provides an electronic device, which includes: at least one processor; and a memory that is communicatively connected to the at least one processor; wherein the memory stores instructions that can be executed by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the pressure pulse testing method in the above-mentioned embodiment one.
[0111] Reference below Figure 5 , which shows a schematic diagram of the structure of an electronic device suitable for implementing the embodiments of the present application. The electronic devices in the embodiments of the present application may include but are not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Descriptions), PMPs (Portable Media Players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 5 The electronic device shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.
[0112] like Figure 5 As shown, the electronic device may include a processing device 1001 (e.g., a central processing unit, a graphics processor, etc.), which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM: Read Only Memory) 1002 or a program loaded from a storage device 1003 to a random access memory (RAM: Random Access Memory) 1004. In RAM1004, various programs and data required for the operation of the electronic device are also stored. The processing device 1001, ROM1002, and RAM1004 are connected to each other through a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Generally, the following systems can be connected to the I / O interface 1006: an input device 1007 including, for example, a touch screen, a touch pad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; an output device 1008 including, for example, a liquid crystal display (LCD: Liquid Crystal Display), a speaker, a vibrator, etc.; a storage device 1003 including, for example, a magnetic tape, a hard disk, etc.; and a communication device 1009. The communication device 1009 can allow the electronic device to communicate with other devices wirelessly or by wire to exchange data. Although the figure shows an electronic device with various systems, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems can be implemented or have alternatively.
[0113] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.
[0114] The electronic device provided by the present application adopts the pressure pulse test method in the above embodiment, which can solve the technical problem of how to effectively detect the reliability and durability of the cooling system. Compared with the prior art, the beneficial effects of the electronic device provided by the present application are the same as the beneficial effects of the pressure pulse test method provided by the above embodiment, and the other technical features in the electronic device are the same as the features disclosed in the method of the previous embodiment, which will not be repeated here.
[0115] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.
[0116] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
[0117] The present application provides a computer-readable storage medium having computer-readable program instructions (ie, computer programs) stored thereon, and the computer-readable program instructions are used to execute the pressure pulse testing method in the above-mentioned embodiment.
[0118] The computer-readable storage medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems or devices, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM: Random Access Memory), a read-only memory (ROM: Read Only Memory), an erasable programmable read-only memory (EPROM: Erasable Programmable Read Only Memory or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM: CD-Read Only Memory), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system or device. The program code contained on the computer-readable storage medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency: Radio Frequency), etc., or any suitable combination of the above.
[0119] The computer-readable storage medium may be included in the electronic device, or may exist independently without being installed in the electronic device.
[0120] The computer-readable storage medium carries one or more programs. When the one or more programs are executed by the electronic device, the electronic device: obtains the pressure holding time, pressure relief time and pulse number of the pressure pulse test task, and configures the first control time of the cycle delay relay based on the pressure holding time, configures the second control time of the cycle delay relay based on the pressure relief time, and configures the control number of the counting relay based on the pulse number; controls the water inlet solenoid valve to be continuously opened and the return water solenoid valve to be continuously closed for the first control time by the cycle delay relay, so as to connect the water inlet solenoid valve to the water inlet solenoid valve. The water inlet module injects water into the pipeline to be tested and applies pressure; after reaching the first control time, the water inlet solenoid valve is controlled to be continuously closed and the return water solenoid valve is continuously opened for the second control time through the circulation delay relay to release the pressure applied to the pipeline to be tested, and returns to execute the step of controlling the water inlet solenoid valve to be continuously opened and the return water solenoid valve to be continuously closed for the first control time through the circulation delay relay; the number of return executions of the circulation delay relay is accumulated through the counting relay, and after the number of return executions reaches the control number, the pressure pulse test task is stopped.
[0121] Computer program code for performing the operations of the present application may be written in one or more programming languages or a combination thereof, including object-oriented programming languages such as Java, Smalltalk, C++, and conventional procedural programming languages such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).
[0122] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.
[0123] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.
[0124] The readable storage medium provided in the present application is a computer-readable storage medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned pressure pulse test method, and can solve the technical problem of how to effectively detect the reliability and durability of the cooling system. Compared with the prior art, the beneficial effects of the computer-readable storage medium provided in the present application are the same as the beneficial effects of the pressure pulse test method provided in the above-mentioned embodiment, and will not be repeated here.
[0125] The present application also provides a computer program product, including a computer program, which implements the steps of the pressure pulse testing method as described above when executed by a processor.
[0126] The computer program product provided by the present application can solve the technical problem of how to effectively detect the reliability and durability of the cooling system. Compared with the prior art, the beneficial effects of the computer program product provided by the present application are the same as the beneficial effects of the pressure pulse test method provided by the above embodiment, which will not be repeated here.
[0127] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.
Claims
1. A pressure pulse testing method, characterized in that: Applied to a pressure pulse test system, the pressure pulse test system includes a water inlet, a water return port, a pipeline to be tested connected between the water inlet and the water return port, a water inlet solenoid valve arranged on the water inlet, a water return solenoid valve arranged on the water return port, a circulation delay relay respectively connected to the water inlet solenoid valve and the water return solenoid valve, a counting relay respectively connected to the water inlet solenoid valve, the water return solenoid valve and the circulation delay relay, and a main control module respectively connected to the circulation delay relay and the counting relay. The pressure pulse test method includes using the main control module to perform the following steps: Obtain the pressure holding time, pressure release time and pulse number of the pressure pulse test task, and configure the first control time of the cycle delay relay based on the pressure holding time, configure the second control time of the cycle delay relay based on the pressure release time, and configure the control number of the counting relay based on the pulse number; Control the water inlet solenoid valve to be continuously opened and the water return solenoid valve to be continuously closed for the first control time through the cycle delay relay, so as to inject water and pressurize the pipeline to be tested through the water inlet module connected to the water inlet solenoid valve; After reaching the first control time, controlling the water inlet solenoid valve to be continuously closed and the water return solenoid valve to be continuously opened for the second control time by the cycle delay relay to release the pressure applied to the pipeline to be tested, and returning to the step of controlling the water inlet solenoid valve to be continuously opened and the water return solenoid valve to be continuously closed for the first control time by the cycle delay relay; The return execution times of the cyclic delay relay are accumulated through the counting relay, and after the return execution times reach the control times, the pressure pulse test task is stopped.
2. The pressure pulse testing method according to claim 1, characterized in that: The pressure pulse test system further includes a power module, a switch button, an air intake solenoid valve, and an intermediate relay connected to the water return solenoid valve, wherein the power module is used to supply power to the water intake solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay, and after the step of stopping the execution of the pressure pulse test task, the following steps are further included: Cut off the power supply from the power module to the water inlet solenoid valve, the cycle delay relay and the counting relay by the switching button; The intermediate relay is controlled to keep the water return solenoid valve open, and the air intake solenoid valve is controlled to be continuously open, so as to clean the pipeline to be tested through a preset air source, wherein the preset air source is connected to the air intake solenoid valve.
3. The pressure pulse testing method according to claim 1, characterized in that: The pressure pulse test system further includes a pressure sensor and an overpressure relief valve, wherein the pressure sensor is used to measure the pressure in the pipeline to be tested, and the pressure pulse test method further includes: monitoring the pressure data of the pressure sensor, and controlling the overpressure relief valve to open when the pressure data is greater than a preset pressure threshold; When the overpressure relief valve is opened and the pressure data is less than or equal to the preset pressure threshold, the overpressure relief valve is controlled to be closed.
4. The pressure pulse testing method according to claim 1, characterized in that: The pressure pulse test system further includes an emergency stop button and a power module, wherein the power module is used to supply power to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay, and the pressure pulse test method further includes: The emergency stop button is used to cut off the power supply from the power module to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay to stop executing the pressure pulse test task.
5. A pressure pulse test system, characterized in that: Applied to the pressure pulse test method as described in claims 1 to 4, the pressure pulse test system comprises a water inlet, a water return port, a pipeline to be tested connected between the water inlet and the water return port, a water inlet solenoid valve arranged on the water inlet, a water return solenoid valve arranged on the water return port, a circulation delay relay respectively connected to the water inlet solenoid valve and the water return solenoid valve, a counting relay respectively connected to the water inlet solenoid valve, the water return solenoid valve and the circulation delay relay, and a main control module respectively connected to the circulation delay relay and the counting relay; The main control module is used to obtain the pressure holding time, pressure release time and pulse number of the pressure pulse test task, and configure the first control time of the cycle delay relay based on the pressure holding time, configure the second control time of the cycle delay relay based on the pressure release time, and configure the control number of the counting relay based on the pulse number; The cycle delay relay is used to control the water inlet solenoid valve to be continuously opened and the water return solenoid valve to be continuously closed for the first control time, so as to inject water and pressurize the pipeline to be tested through the water inlet module connected to the water inlet solenoid valve; The cycle delay relay is also used to, after reaching the first control time, control the water inlet solenoid valve to be continuously closed and the water return solenoid valve to be continuously opened for the second control time to release the pressure applied to the pipeline to be tested, and return to execute the step of controlling the water inlet solenoid valve to be continuously opened and the water return solenoid valve to be continuously closed for the first control time; The counting relay is used to accumulate the return execution times of the cyclic delay relay, and stop executing the pressure pulse test task after the return execution times reaches the control times.
6. The pressure pulse testing system according to claim 5, characterized in that: The pressure pulse test system further comprises a power module, a switching button, an air inlet solenoid valve, and an intermediate relay connected to the water return solenoid valve, wherein the power module is used to supply power to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay; The switch button is used to cut off the power supply module to the water inlet solenoid valve, the cycle delay relay and the counting relay; The main control module is also used to control the intermediate relay to keep the return water solenoid valve open, and control the intake solenoid valve to be continuously opened, so as to clean the pipeline to be tested through a preset air source, wherein the preset air source is connected to the intake solenoid valve.
7. The pressure pulse testing system according to claim 5, characterized in that: The pressure pulse test system further comprises a pressure sensor and an overpressure relief valve, wherein the pressure sensor is used to measure the pressure in the pipeline to be tested; The main control module is also used to monitor the pressure data of the pressure sensor, and control the overpressure relief valve to open when the pressure data is greater than a preset pressure threshold; and control the overpressure relief valve to close when the overpressure relief valve is open and the pressure data is less than or equal to the preset pressure threshold.
8. The pressure pulse testing system according to claim 5, characterized in that: The pressure pulse test system further comprises an emergency stop button and a power module, wherein the power module is used to supply power to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay; The emergency stop button is used to cut off the power supply from the power module to the water inlet solenoid valve, the water return solenoid valve, the cycle delay relay and the counting relay, so as to stop executing the pressure pulse test task.
9. An electronic device, characterized in that: The device comprises: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the computer program is configured to implement the steps of the pressure pulse testing method according to any one of claims 1 to 4.
10. A storage medium, characterized in that: The storage medium is a computer-readable storage medium, and a computer program is stored on the storage medium. When the computer program is executed by a processor, the steps of the pressure pulse testing method according to any one of claims 1 to 4 are implemented.
Citation Information
Patent Citations
Hydraulic fatigue test system for pressure-bearing casing made of carbon fiber composite material
CN103424322A
Plastic mold comprehensive detection device and detection method
CN108956045A
Vibration system of automobile cooling pipeline
CN115356066A
Hose impulse testing machine
CN201464307U
Cited By
Simulation device and method for propagation of continuous pulse waves in multiphase medium
CN120354636A