Infrastructure geological construction checking method, device, equipment and medium

Through automated task allocation and real-time data acquisition and analysis, the problems of unclear task allocation and low data management efficiency in construction geological verification are solved, and the digitalization and intelligence of construction geological verification are realized, and the verification efficiency and safety are improved.

CN119904182APending Publication Date: 2025-04-29CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411904136.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-23
Publication Date
2025-04-29

AI Technical Summary

Technical Problem

The existing construction geological verification methods have problems such as unclear task allocation, large workload of data sorting and archiving, and low efficiency of information traceability, resulting in increased construction safety risks and increased management difficulties.

Method used

By obtaining verification project information, automate task allocation according to task allocation rules, collecting construction site data in real time, and generating verification conclusions through data analysis, summarizing completion progress information, realizing the digitalization and intelligence of construction geological verification.

Benefits of technology

It improves the efficiency and accuracy of construction geological verification, realizes refined management of construction geological verification work, and reduces construction safety risks and management difficulties.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119904182A_ABST
    Figure CN119904182A_ABST
Patent Text Reader

Abstract

The invention discloses an infrastructure geological construction checking method, device, equipment and medium, and relates to the field of building engineering construction geological checking, and the method comprises the steps: obtaining checking item information, obtaining checking item distribution information according to the checking item information and a task distribution rule, and sending a synchronization instruction to a target terminal for checking item distribution information, and obtaining construction checking data of the construction site corresponding to the checking item, performing analysis according to the construction checking data to obtain a checking conclusion, and summarizing the checking conclusion to obtain completion progress information corresponding to the checking item. Through automatic task allocation, field data acquisition and verification result analysis and management, digitization and intelligentization of construction geological verification are realized, verification efficiency and accuracy are improved, and accuracy of geological data is ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of geological inspection for construction engineering, and in particular to a method, device, equipment and medium for geological inspection for infrastructure construction. Background Art

[0002] With the increasing number of construction projects, especially large-scale infrastructure projects such as highways, railways, bridges and tunnels, these projects often involve complex geological environments. During the construction process, it is crucial to ensure that the geological conditions are consistent with the design plan, which is not only related to the safety and durability of the project, but also directly affects the construction cost and progress. In order to ensure the quality of the project and the safety of construction, construction geological inspection has become an indispensable part. Construction geological inspection aims to further clarify the engineering geological conditions through various means (such as drilling, excavation, sounding, etc.), and provide a scientific basis for the improvement, monitoring, change or supplementary exploration of engineering measures.

[0003] At present, construction geological verification is mainly based on the relevant provisions of different engineering quality acceptance standards and different engineering categories. It relies on on-site observation by geological personnel, stratum and lithology inspection, test data collection, and photo recording, and compares these data with the design plan to finally draw a verification conclusion.

[0004] Although existing technologies can ensure the smooth progress of construction geological inspections, there are still obvious shortcomings. The construction geological inspection task volume is huge, and the types of projects are diverse. The on-site inspection tasks are mainly assigned manually, which leads to unclear task allocation, making it difficult to fully control the overall situation of the project, prone to omissions or mischecks, and increases construction safety risks. In addition, there are many types of information generated during the construction geological inspection process, including paper records, documents, etc. The workload of organizing and archiving these materials is large and the efficiency is low. In addition, it is difficult to achieve instant information traceability with paper materials, which increases the difficulty of management. Therefore, it is necessary to develop an efficient infrastructure geological construction inspection method to improve the efficiency and accuracy of construction geological inspections and realize the refined management of construction geological inspections. Summary of the invention

[0005] The main purpose of this application is to provide a method, device, equipment and medium for infrastructure geological construction verification, aiming to solve the technical problem of how to achieve refined management of construction geological verification work and improve the accuracy of geological verification.

[0006] To achieve the above objectives, this application proposes a method for verifying infrastructure geological construction, which includes:

[0007] Obtain verification project information;

[0008] According to the verification project information and the task allocation rules, verification project allocation information is obtained;

[0009] Send the verification project allocation information to the target terminal through a synchronization instruction to obtain the construction verification data of the construction site corresponding to the verification project;

[0010] Analyze the construction verification data to obtain a verification conclusion;

[0011] The verification conclusions are summarized to obtain completion progress information corresponding to the verification items.

[0012] In one embodiment, the step of obtaining verification project allocation information according to the verification project information and the task allocation rule includes:

[0013] According to the task allocation rules, the verification project information is used to obtain the number of verification engineering measures;

[0014] Calculation is performed based on the number of engineering measures to be verified to obtain verification task allocation information, which includes task number, work site location, engineering measure category, verification person in charge, estimated verification time and verification standard.

[0015] In one embodiment, before the step of obtaining the verification project allocation information according to the verification project information and the task allocation rule, the step further includes:

[0016] Obtain the imported project work site and engineering category information;

[0017] According to the imported project work site, engineering category information and engineering quality acceptance criteria, the task allocation rule is configured to obtain the task allocation rule;

[0018] After the step of obtaining the task allocation rule, it also includes:

[0019] When the task allocation rule configuration is completed, the step of obtaining the verification project allocation information according to the verification project information according to the engineering category and the task allocation rule is executed.

[0020] In one embodiment, the step of sending a synchronization instruction of the inspection project allocation information to a target terminal to obtain the construction inspection data of the construction site corresponding to the inspection project includes:

[0021] Sending a synchronization instruction to a target terminal so that the target terminal enters the construction data of the construction site and sends a feedback signal after the entry is completed;

[0022] The feedback signal is received and analyzed to obtain construction verification data.

[0023] In one embodiment, the step of analyzing the construction verification data to obtain a verification conclusion includes:

[0024] Obtaining a construction stratum information bar chart and construction site exploration and testing results based on the construction verification data;

[0025] Analyze the construction stratum information histogram and the construction site exploration and testing results to obtain analysis results;

[0026] Based on the analysis results, a verification conclusion is obtained as to whether the requirements are met.

[0027] In one embodiment, the step of analyzing the construction stratum information histogram and the construction site exploration and testing results to obtain the analysis result includes:

[0028] Obtain the design stratigraphic information histogram and design data;

[0029] Comparing the stratigraphic information histogram with the designed stratigraphic information histogram to obtain a first comparison result, wherein the first comparison result is used to determine whether the geological conditions meet the designed geological requirements;

[0030] Comparing the construction site survey and test results with the design data to obtain a second comparison result, wherein the second comparison result is used to determine whether the design indicators revealed by the construction site survey and test results meet the design quality requirements;

[0031] The first comparison result and the second comparison result are combined to obtain an analysis result.

[0032] In one embodiment, the step of summarizing the verification conclusions to obtain completion progress information corresponding to the verification items includes:

[0033] According to the verification conclusion, the task completion status and actual completion time are obtained;

[0034] Calculate according to the task completion status and actual completion time to obtain completion progress information;

[0035] After the step of calculating according to the task completion status and the actual completion time to obtain the completion progress information, the method further includes:

[0036] According to the completion progress information, obtaining the actual completion progress and the expected completion progress;

[0037] When the actual completion progress is less than the expected completion progress, an alarm is issued and displayed.

[0038] In addition, to achieve the above purpose, the present application also proposes an infrastructure geological construction verification device, the infrastructure geological construction verification device comprising:

[0039] An acquisition module is used to obtain verification project information;

[0040] A configuration module, configured to obtain verification project allocation information according to the verification project information and the task allocation rule;

[0041] A calculation module, used for sending a synchronization instruction of the inspection project allocation information to a target terminal to obtain the construction inspection data of the construction site corresponding to the inspection project;

[0042] An analysis module, used to analyze the construction verification data to obtain a verification conclusion;

[0043] The result module is used to summarize the verification conclusions and obtain the completion progress information corresponding to the verification items.

[0044] In addition, to achieve the above-mentioned purpose, the present application also proposes a medium, which is a computer-readable medium, on which a computer program is stored, and when the computer program is executed by a processor, the steps of the infrastructure geological construction verification method described above are implemented.

[0045] In addition, to achieve the above-mentioned purpose, the present application also provides a computer program product, which includes a computer program, and when the computer program is executed by a processor, it implements the steps of the infrastructure geological construction verification method as described above.

[0046] This application obtains verification project information, obtains verification project allocation information according to the verification project information and the task allocation rules, sends the verification project allocation information to the target terminal with a synchronization command, obtains the construction verification data of the construction site corresponding to the verification project, analyzes the construction verification data, obtains the verification conclusion, summarizes the verification conclusion, and obtains the completion progress information corresponding to the verification project. Through automated task allocation, on-site data collection, and verification results analysis and management, the digitalization and intelligence of construction geological verification is realized, and the verification efficiency and accuracy are improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0048] Figure 1 This is a flow chart of the first embodiment of the infrastructure geological construction verification method of this application;

[0049] Figure 2 This is a flow chart of the second embodiment of the infrastructure geological construction verification method of this application;

[0050] Figure 3 This is a flow chart of the third embodiment of the infrastructure geological construction verification method of this application;

[0051] Figure 4 This is a schematic diagram of the module structure of the infrastructure geological construction verification device according to an embodiment of the present application;

[0052] Figure 5 It is a schematic diagram of the equipment structure of the hardware operating environment involved in the infrastructure geological construction verification method in the embodiment of the present application.

[0053] The purpose, features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION

[0054] It should be understood that the specific embodiments described herein are only used to explain the technical solutions of the present application and are not used to limit the present application.

[0055] In order to better understand the technical solution of the present application, a detailed description will be given below in conjunction with the accompanying drawings and specific implementation methods.

[0056] The main solution of the embodiment of the present application is: to obtain verification project information, to obtain verification project allocation information according to the verification project information and task allocation rules, to send a synchronization instruction to the target terminal for the verification project allocation information, to obtain the construction verification data of the construction site corresponding to the verification project, to analyze the construction verification data, to obtain the verification conclusion, to summarize the verification conclusion, and to obtain the completion progress information corresponding to the verification project.

[0057] Based on this, the present application embodiment provides a method for verifying infrastructure geological construction, referring to Figure 1 , Figure 1 This is a flow chart of the first embodiment of the infrastructure geological construction verification method of this application.

[0058] In this embodiment, the infrastructure geological construction verification method includes steps S10 to S50:

[0059] Step S10, obtaining verification item information.

[0060] It should be noted that obtaining verification project information involves collecting geological data required in the construction process of slope engineering, retaining engineering, and pile foundation engineering. Verification project information includes, but is not limited to, key data such as the project's geographical location, geological conditions, design parameters, and construction requirements. By comprehensively analyzing these data, accurate basic information can be provided for subsequent verification task allocation, on-site data collection, and verification results analysis. In actual operations, the acquisition of verification project information involves interfacing with the project management system to automatically extract various types of project-related data, or digitizing data in paper documents through manual input. In addition, the obtained verification project information must also be verified and preprocessed to ensure the accuracy and availability of the data, laying a solid foundation for subsequent verification work.

[0061] Step S20, obtaining verification project allocation information according to the verification project information and the task allocation rule.

[0062] It should be noted that the process of obtaining the verification project allocation information according to the task allocation rules based on the verification project information is to formulate specific verification task allocation rules for each work site based on the input project name, work site name and work site information, combined with the engineering quality acceptance standards, after the new verification project is created. The above-mentioned verification task allocation rules include but are not limited to verification frequency, verification scope, verification focus, etc., to ensure that the verification tasks of each work site can be customized according to its specific engineering measure category and geographical location. Then calculate the number of tasks required for verification at each work site, and intelligently match the most suitable verification person in charge according to pre-set standards, such as the professional background of the verification personnel, previous work performance and other factors. In addition, after the verification task is assigned, the detailed information of all tasks, including task description, person in charge, expected completion time, etc., will be clearly displayed in the verification task management module, which is convenient for managers to view and adjust at any time. In this way, each verification task not only clarifies the specific verification content and requirements, but also clarifies who is responsible for execution, greatly improving the accuracy and efficiency of task allocation.

[0063] Furthermore, the verification project information is subjected to the task allocation rules to obtain the number of engineering measures to be verified. Specifically, after creating a new verification project and entering the project name, work site name and work site information, the number of engineering measures required to be verified at each work site is calculated according to the specific verification task allocation rules. This process takes into account the complexity and importance of the project to ensure that each verification task is targeted and practical. The calculated number of engineering measures will be recorded, including the category of engineering measures, specific quantity and person in charge information for each work site, so that management personnel can view and adjust them at any time. Furthermore, the verification task allocation information is obtained by calculation based on the number of verification engineering measures. The above verification task allocation information includes the task number, work site location, engineering measure category, verification person in charge, estimated verification time and verification standard. Specifically, the task number is used to uniquely identify each verification task to ensure the traceability of the task; the work site location and engineering measure category clarify the specific verification object, and the verification person in charge is intelligently matched based on professional background and experience to ensure the professionalism and reliability of task execution. The estimated verification time helps to reasonably arrange the verification progress and ensure that the task is completed on time. The verification standards are based on relevant specifications and design requirements to ensure the regularization and standardization of the verification work.

[0064] Furthermore, before step S20, the imported project work site and engineering category information are obtained, and the task allocation rules are configured according to the imported project work site, engineering category information and engineering quality acceptance standards to obtain the task allocation rules. Specifically, it is necessary to first import the project work site and engineering category information. The above-mentioned project work site and engineering category information include detailed data such as project name, work site name, engineering category, work site start and end mileage, stratum lithology, and stratum lithology, foundation category, foundation start and end mileage and other design data. These data are the basis for subsequent verification of task allocation. Then, according to the relevant specifications, standard requirements and the imported project work site and engineering category information, the task allocation rules are configured to generate task allocation rules. After obtaining the task allocation rules, step S20 is executed. Specifically, according to the verification project information and the task allocation rules, the verification project allocation information is generated.

[0065] Step S30, sending a synchronization instruction of the verification project allocation information to the target terminal to obtain the construction verification data of the construction site corresponding to the verification project.

[0066] It should be noted that the synchronization command is sent to the target terminal so that the target terminal can enter the construction data of the construction site and send a feedback signal after the entry is completed. Specifically, the verification task containing detailed information such as the task number, the location of the work site, the type of engineering measures, the person in charge of the verification, the estimated verification time and the verification standard is sent to the designated target terminal, such as the mobile device or tablet of the person in charge of the verification. The person in charge of the verification can receive and view the assigned verification tasks in real time through these terminal devices. At the construction site, the person in charge of the verification conducts the verification of the slope engineering, retaining engineering and pile foundation engineering according to the task information. They will record detailed construction geological data on site, including mileage information, design elevation, construction elevation and other data, and generate a bar chart of design and construction stratigraphic information. At the same time, the person in charge of the verification will also take pictures of the excavation pit and pile foundation excavation slag samples on site, record the construction process and on-site testing process, and upload the construction records, on-site test data, etc. as attachments to the system for feedback.

[0067] Furthermore, feedback signals are received and analyzed to obtain construction verification data. Specifically, the data collected on site will be synchronized and transmitted back to the verification system on the computer in real time through the mobile device. The system will automatically receive and store this data to ensure the integrity and timeliness of all verification information. The real-time synchronization of verification data not only improves the efficiency of data management, but also facilitates management personnel to view and monitor the progress of the verification at any time to ensure the smooth progress of the verification work. In addition, the system will also perform preliminary verification on the uploaded data to ensure the accuracy and completeness of the data. Once the data is found to be abnormal or missing, the system will immediately notify the person in charge of the verification to supplement or correct it, thereby ensuring the high quality of the verification data.

[0068] Step S40, analyzing the construction verification data to obtain a verification conclusion.

[0069] It should be noted that after the person in charge of the inspection uploads the data collected at the construction site to the system through a mobile terminal, the system will automatically analyze and process the received data in detail. First, the uploaded construction geological data is preliminarily verified to ensure the integrity and accuracy of the data. Then, the construction geological data is compared with the design geological data, including mileage information, design elevation, construction elevation, stratum information, etc., to generate a bar chart of design and construction stratum information to intuitively display the changes in geological conditions. Automatically identify and mark the places where the geological conditions do not conform to the design, such as differences in stratum thickness, rock and soil properties, etc. Next, the photos and video materials taken on site are reviewed to ensure that these materials can truly reflect the actual situation of the construction site. The inspectors can view photos and videos of the excavation pit and pile foundation excavation slag samples on site through the system to further verify whether the geological conditions are consistent with the design. Then analyze the on-site test data, such as standard penetration test, penetration test and other data, to evaluate the bearing capacity and stability of the stratum to ensure that these data meet the design requirements.

[0070] After completing the above analysis, a detailed verification report is generated, including geological condition comparison results, field test data, photos and video materials, etc., to form the final verification conclusion. The verification conclusion will clearly indicate which work sites and engineering measures have geological conditions that are consistent with the design, where there are differences, and put forward specific improvement suggestions. For example, if it is found that the bearing capacity of the strata in certain areas is insufficient, the system will recommend additional exploration or adjustment of the design plan to ensure the quality of the project and construction safety.

[0071] Step S50, summarizing the verification conclusions to obtain completion progress information corresponding to the verification items.

[0072] It should be noted that after the person in charge of the verification uploads the data collected at the construction site through the mobile terminal, the data is comprehensively analyzed to generate a detailed verification report and conclusions. These verification conclusions include geological condition comparison results, on-site test data, photos and video materials, etc., clearly indicating which work sites and engineering measures have geological conditions that are consistent with the design, where there are differences, and put forward specific improvement suggestions. The conclusions of all verification tasks are summarized to generate a comprehensive verification project ledger. This ledger records the status of each verification task in detail, including task number, work site location, engineering measure category, verification person in charge, estimated verification time and actual completion time. Through this ledger, managers can view the completion progress and detailed information of all verification tasks in real time, and understand which tasks have been completed, which tasks are in progress, and which tasks require special attention.

[0073] This embodiment provides a method for verifying infrastructure geological construction, by obtaining verification project information, obtaining verification project allocation information according to the verification project information and task allocation rules, sending synchronization instructions to the target terminal, obtaining construction verification data of the construction site corresponding to the verification project, analyzing the construction verification data, obtaining verification conclusions, summarizing the verification conclusions, and obtaining completion progress information corresponding to the verification project. Through automated task allocation, on-site data collection, and verification results analysis and management, the digitalization and intelligence of construction geological verification are realized, the verification efficiency and accuracy are improved, and the drilling compliance and the accuracy of geological data are ensured.

[0074] Based on the first embodiment of the present application, in the second embodiment of the present application, the same or similar contents as those in the above-mentioned embodiment 1 can refer to the above introduction, and will not be repeated later. Figure 2 The infrastructure geological construction verification method step S40 also includes steps S401 to S403:

[0075] Step S401, obtaining a construction stratum information bar chart and construction site exploration and testing results based on construction verification data.

[0076] It should be noted that the construction stratigraphic information bar chart is automatically generated based on the construction verification data. This chart shows in detail the stratigraphic distribution of the construction site, including key information such as the type, thickness and physical and mechanical properties of the soil and rock layers. The construction stratigraphic information bar chart is generated by analyzing and processing the data collected at the construction site, which includes but is not limited to geological drilling records, soil sample test reports, etc. The bar chart can not only intuitively reflect the geological conditions of the construction area, but also help engineers evaluate the construction difficulty and provide a scientific basis for the optimization of subsequent construction plans.

[0077] In addition, the physical and mechanical properties of the formation are evaluated based on the verification data, which involves checking various indicators in the construction records, such as the hammer weight, stroke, time, footage, casing mouth elevation, and elevation of each layer in the pile foundation construction records. By comparing the actual construction data with the design standards, quality problems in the construction, such as formation deviation and large changes in rock properties, are automatically identified, and improvement suggestions are given. The evaluation results of the physical and mechanical properties of the construction formation will be integrated and recorded, so that managers can fully understand the current status of the construction, take timely measures to correct it, ensure that the quality of the project meets the standards, and effectively prevent potential safety hazards.

[0078] Step S402, analyzing the construction stratum information histogram and the construction quality to obtain analysis results.

[0079] It should be noted that the stratigraphic information column chart collected on site is compared with the design data to verify whether the geological conditions encountered during the construction process are consistent with expectations. The design stratigraphic information column chart and the exploration and testing results of the construction site are obtained. Through this comparative analysis, the analysis results can identify any deviations from the design parameters, such as deviations in key geological parameters such as stratigraphic depth, soil type, and rock strength. In addition, the analysis of the exploration and testing results of the construction site focuses on the exploration and in-situ test results conducted at the construction site to ensure that the foundation bearing capacity meets the predetermined standards. The analysis results will provide a comprehensive assessment of the construction strata and exploration and testing results, including possible risk points, recommended improvement measures, and necessary design changes.

[0080] Furthermore, the stratigraphic information histogram is compared with the designed stratigraphic information histogram to obtain a first comparison result, which is used to determine whether the geological conditions meet the designed geological requirements. Specifically, through in-depth analysis of the construction stratigraphic information histogram, we can clearly understand the geological structural characteristics of the construction site, such as the type, stratigraphic age, thickness, and state of each layer of soil or rock. These data are crucial for judging the bearing capacity of the foundation and determining appropriate construction technology and material selection. If a layer is found to have poor geological conditions, such as soft soil or broken rock, reinforcement measures need to be taken, such as replacing high-quality soil, setting pile foundations, or using composite foundations to improve the stability and bearing capacity of the foundation. The histogram can also help identify possible geological disaster risks, such as landslides and collapses, and take preventive measures in advance.

[0081] In addition, the exploration and testing results of the construction site are compared with the design data to obtain a second comparison result. The second comparison result is used to determine whether the design indicators revealed by the exploration and testing results of the construction site meet the design quality requirements. Specifically, in terms of the exploration and testing results of the construction site, the analysis results based on the verification data show that most of the geological data have met the expected design standards and quality requirements, but problems of varying degrees have been found in certain specific work sites. For example, the thickness and physical and mechanical properties of some strata vary greatly, and the bearing capacity deviates from the design value. Problems found during the construction process should be recorded in a timely manner and corrected in subsequent construction to ensure the safety and durability of the entire project. Combining the first comparison result and the second comparison result, an analysis result is obtained to generate a verification conclusion.

[0082] Step S403: Based on the analysis results, a verification conclusion is obtained as to whether the requirements are met.

[0083] It should be noted that when the first comparison result and the second comparison result are completed, a detailed verification conclusion is generated. The verification conclusion will clearly indicate whether the construction stratum information bar chart and the construction site exploration and testing results meet the design standards and specifications. Specifically, the construction stratum information bar chart shows whether the type, thickness, state, etc. of each layer of soil or rock are within the design allowable range, whether unfavorable geological conditions such as weak soil layers or broken rock layers are found, whether the groundwater level is within the controllable range, and whether it will have an adverse impact on the construction. Whether the foundation conditions are good and whether they are suitable for subsequent construction. In terms of construction site exploration and testing results, the verification results show whether all key indicators meet the design requirements and whether the foundation bearing capacity and stability meet the expected goals. In addition, the on-site test data, photos, and video materials also verify that every link in the construction process is strictly implemented in accordance with the design drawings and construction specifications, and the construction records are complete and accurate.

[0084] Based on the above analysis, after the comparison of the construction stratigraphic information bar chart and the construction quality is completed, a formal verification conclusion is generated to confirm whether the geological conditions of the project and the construction site exploration and testing results meet the design requirements. If so, subsequent construction can continue. If not, subsequent supplementary investigation, testing and change work will be carried out.

[0085] This embodiment obtains the construction stratum information histogram and the construction site exploration and test results according to the construction verification data, analyzes the construction stratum information histogram and the construction site exploration and test results, obtains the analysis result, and obtains the verification conclusion after the analysis is completed. The construction stratum information histogram and the construction site exploration and test results are generated by the construction verification data, and the verification conclusion is generated, thereby improving the verification efficiency and project quality.

[0086] Based on the first embodiment of the present application, in the third embodiment of the present application, the same or similar contents as those in the first embodiment can be referred to the above description, and will not be described in detail later. Figure 3 The infrastructure geological construction verification method step S50 also includes steps S501 to S502:

[0087] Step S501, according to the verification conclusion, obtain the task completion status and actual completion time.

[0088] It should be noted that the completion status and actual completion time of each verification task are extracted based on the verification conclusion. The completion status includes "completed", "in progress" and "not started", and the actual completion time is the specific date when the task is actually completed. Compare this information with the estimated verification time when the task is assigned to calculate the actual completion progress of each task. For example, if the estimated completion time of a task is 10 days and the actual completion time is 8 days, the completion progress of the task is 100% and it is completed 2 days ahead of schedule. With these data, the overall completion progress of the entire verification project can be calculated, such as the proportion of completed tasks, average completion time, etc.

[0089] Step S502, calculate according to the task completion status and actual completion time to obtain completion progress information.

[0090] It should be noted that after step S502, the actual completion progress and expected completion progress are obtained based on the completion progress information. When the actual completion progress is less than the expected completion progress, an alarm reminder is issued and displayed. Specifically, the actual completion progress and expected completion progress of each verification task are obtained. The actual completion progress is calculated based on the actual completion time and status of the task, while the expected completion progress is calculated based on the estimated completion time and total task volume when the task is assigned. The system will summarize this information into the verification results management module, generate a detailed verification project schedule, display the completion status, actual completion time and expected completion time of each task, and compare the actual completion progress and the expected completion progress regularly or in real time. When it is found that the actual completion progress is less than the expected completion progress, an alarm reminder is automatically triggered. The alarm reminder can be displayed in a variety of ways, such as popping up a warning window on the system interface, sending emails or text messages to notify relevant personnel. The alarm content will detail which tasks' actual progress lags behind the expected progress, as well as the specific lag time and possible reasons, such as insufficient resources, technical difficulties, etc. In addition, it will generate progress comparison charts, such as Gantt charts or bar charts, to intuitively display the gap between the actual completion progress and the expected completion progress, helping managers quickly identify tasks and work points that need to be focused on. Through these alarm reminders and visual displays, managers can take timely measures, such as adjusting resource allocation, optimizing work plans, or strengthening on-site supervision to ensure that verification tasks are completed on schedule, thereby ensuring the smooth progress of the entire project.

[0091] This embodiment obtains the task completion status and actual completion time according to the verification conclusion, and calculates the completion progress information according to the task completion status and actual completion time. The task completion status and actual completion time are obtained according to the verification conclusion, and the completion progress information is calculated to improve the efficiency and transparency of project management.

[0092] This application also provides an infrastructure geological construction verification device, please refer to Figure 4 , the device comprises:

[0093] The acquisition module 10 is used to acquire the verification project information.

[0094] The configuration module 20 is used to obtain the verification project allocation information according to the verification project information and the task allocation rule.

[0095] The calculation module 30 is used to send a synchronization instruction of the inspection project allocation information to the target terminal to obtain the construction inspection data of the construction site corresponding to the inspection project.

[0096] The analysis module 40 is used to analyze the construction verification data to obtain the verification conclusion.

[0097] The result module 50 is used to summarize the verification conclusions and obtain the completion progress information corresponding to the verification items.

[0098] The infrastructure geological construction verification device provided by the present application adopts the infrastructure geological construction verification method in the above embodiment, which can solve the technical problem of how to improve the efficiency of geological verification. Compared with the prior art, the beneficial effects of the infrastructure geological construction verification device provided by the present application are the same as the beneficial effects of the infrastructure geological construction verification method provided by the above embodiment, and the other technical features of the infrastructure geological construction verification device are the same as the features disclosed in the above embodiment method, which will not be repeated here.

[0099] In one embodiment, the configuration module 20 is also used to obtain the number of engineering measures to be verified according to the task allocation rules for the verification project information; and to obtain the verification task allocation information by calculation based on the number of engineering measures to be verified, wherein the verification task allocation information includes the task number, work site location, engineering measure category, verification person in charge, estimated verification time and verification standard.

[0100] In one embodiment, the configuration module 20 is also used to obtain the imported project work site and engineering category information; configure the task allocation rules according to the imported project work site, engineering category information and engineering quality acceptance standards to obtain the task allocation rules; after the step of obtaining the allocation rules, the step of obtaining the project allocation information according to the verification project information and the task allocation rules.

[0101] In one embodiment, the computing module 30 is also used to send a synchronization instruction to the target terminal so that the target terminal enters the construction data of the construction site and sends a feedback signal after the entry is completed; the feedback signal is received and analyzed to obtain construction verification data.

[0102] In one embodiment, the analysis module 40 is also used to obtain the construction stratum information bar chart and the construction site exploration and testing results based on the construction verification data; analyze the construction stratum information bar chart and the construction site exploration and testing results to obtain analysis results and generate verification conclusions.

[0103] In one embodiment, the analysis module 40 is also used to obtain a designed stratigraphic information bar chart and design data; compare the stratigraphic information bar chart with the designed stratigraphic information bar chart to obtain a first comparison result, and the first comparison result is used to determine whether the geological conditions meet the designed geological requirements; compare the construction site exploration and testing results with the design data to obtain a second comparison result, and the second comparison result is used to determine whether the construction quality meets the design quality requirements; combine the first comparison result and the second comparison result to obtain an analysis result.

[0104] In one embodiment, the result module 50 is also used to obtain the task completion status and actual completion time according to the verification conclusion; calculate according to the task completion status and the actual completion time to obtain the completion progress information; after the step of calculating according to the task completion status and the actual completion time to obtain the completion progress information, it also includes: according to the completion progress information, obtaining the actual completion progress and the expected completion progress; when the actual completion progress is less than the expected completion progress, an alarm reminder is issued and displayed.

[0105] The present application provides an infrastructure geological construction verification device, which includes: at least one processor; and a memory communicatively connected to the at least one processor; wherein the memory stores instructions executable by the at least one processor, and the instructions are executed by the at least one processor so that the at least one processor can execute the infrastructure geological construction verification method in the above-mentioned embodiment one.

[0106] Reference below Figure 5 , which shows a schematic diagram of the structure of an infrastructure geological construction verification device suitable for implementing the embodiment of the present application. The infrastructure geological construction verification device in the embodiment of the present application may include but is not limited to mobile terminals such as mobile phones, laptop computers, digital broadcast receivers, PDAs (Personal Digital Assistants), PADs (Portable Application Descriptions), PMPs (Portable Media Players), vehicle-mounted terminals (such as vehicle-mounted navigation terminals), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 5 The infrastructure geological construction verification equipment shown is merely an example and should not bring any limitation to the functions and scope of use of the embodiments of the present application.

[0107] like Figure 5 As shown, the infrastructure geological construction verification equipment may include a processing device 1001 (such as a central processing unit, a graphics processing unit, etc.), which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM: Read Only Memory) 1002 or a program loaded from a storage device 1003 to a random access memory (RAM: Random Access Memory) 1004. In RAM1004, various programs and data required for the operation of the infrastructure geological construction verification equipment are also stored. The processing device 1001, ROM1002 and RAM1004 are connected to each other through a bus 1005. An input / output (I / O) interface 1006 is also connected to the bus. Typically, the following systems can be connected to the I / O interface 1006: input devices 1007 including, for example, a touch screen, a touchpad, a keyboard, a mouse, an image sensor, a microphone, an accelerometer, a gyroscope, etc.; output devices 1008 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 1003 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 1009. The communication device 1009 can allow the infrastructure geological construction verification device to communicate wirelessly or wired with other devices to exchange data. Although the figure shows an infrastructure geological construction verification device with various systems, it should be understood that it is not required to implement or have all the systems shown. More or fewer systems may be implemented or have instead.

[0108] In particular, according to the embodiments disclosed in the present application, the process described above with reference to the flowchart can be implemented as a computer software program. For example, the embodiments disclosed in the present application include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In such an embodiment, the computer program can be downloaded and installed from a network through a communication device, or installed from a storage device 1003, or installed from a ROM 1002. When the computer program is executed by the processing device 1001, the above-mentioned functions defined in the method of the embodiment disclosed in the present application are executed.

[0109] The infrastructure geological construction verification equipment provided by the present application adopts the infrastructure geological construction verification method in the above embodiment, which can solve the technical problem of how to improve the accuracy of geological verification. Compared with the prior art, the beneficial effects of the infrastructure geological construction verification equipment provided by the present application are the same as the beneficial effects of the infrastructure geological construction verification method provided by the above embodiment, and the other technical features in the infrastructure geological construction verification equipment are the same as the features disclosed in the method of the previous embodiment, which will not be repeated here.

[0110] It should be understood that the various parts disclosed in this application can be implemented by hardware, software, firmware or a combination thereof. In the description of the above embodiments, specific features, structures, materials or characteristics can be combined in any one or more embodiments or examples in a suitable manner.

[0111] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.

[0112] The present application provides a computer-readable medium having computer-readable program instructions (ie, computer programs) stored thereon, and the computer-readable program instructions are used to execute the infrastructure geological construction verification method in the above-mentioned embodiment.

[0113] The computer-readable medium provided in the present application may be, for example, a USB flash drive, but is not limited to electrical, magnetic, optical, electromagnetic, infrared, or semiconductor systems, systems or devices, or any combination of the above. More specific examples of computer-readable media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In this embodiment, the computer-readable medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, system or device. The program code contained on the computer-readable medium may be transmitted using any appropriate medium, including but not limited to: wires, optical cables, RF (Radio Frequency), etc., or any suitable combination of the above.

[0114] The computer-readable medium may be included in the infrastructure geological construction verification device; or may exist independently without being assembled into the infrastructure geological construction verification device.

[0115] The computer-readable medium carries one or more programs, and when the one or more programs are executed by the infrastructure geological construction verification device, the infrastructure geological construction verification device can be written in one or more programming languages ​​or a combination thereof to perform computer program codes for the operation of the present application, and the programming languages ​​include object-oriented programming languages, such as Java, Smalltalk, C++, and conventional procedural programming languages, such as "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as an independent software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In the case of a remote computer, the remote computer can be connected to the user's computer through any type of network, including a local area network (LAN) or a wide area network (WAN), or can be connected to an external computer (for example, using an Internet service provider to connect through the Internet).

[0116] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present application. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0117] The modules involved in the embodiments described in this application may be implemented by software or hardware, wherein the name of the module does not constitute a limitation on the unit itself in some cases.

[0118] The readable medium provided in this application is a computer-readable medium, which stores computer-readable program instructions (i.e., computer programs) for executing the above-mentioned infrastructure geological construction verification method, and can solve the technical problem of how to improve the accuracy of geological verification. Compared with the prior art, the beneficial effects of the computer-readable medium provided in this application are the same as the beneficial effects of the infrastructure geological construction verification method provided in the above-mentioned embodiment, and will not be repeated here.

[0119] The present application also provides a computer program product, including a computer program, which implements the steps of the infrastructure geological construction verification method as described above when executed by a processor.

[0120] The computer program product provided in this application can solve the technical problem of how to improve the accuracy of geological verification. Compared with the prior art, the beneficial effects of the computer program product provided in this application are the same as the beneficial effects of the infrastructure geological construction verification method provided in the above embodiment, which will not be repeated here.

[0121] The above descriptions are only some embodiments of the present application, and are not intended to limit the patent scope of the present application. All equivalent structural changes made using the contents of the present application specification and drawings under the technical concept of the present application, or direct / indirect applications in other related technical fields are included in the patent protection scope of the present application.

Claims

1. A method for verifying geological construction of infrastructure, characterized in that: The method comprises: Obtain verification project information; According to the verification project information and the task allocation rules, verification project allocation information is obtained; Send the verification project allocation information to the target terminal through a synchronization instruction to obtain the construction verification data of the construction site corresponding to the verification project; Analyze the construction verification data to obtain a verification conclusion; The verification conclusions are summarized to obtain completion progress information corresponding to the verification items.

2. The method according to claim 1, characterized in that The step of obtaining the verification project allocation information according to the verification project information and the task allocation rule comprises: According to the task allocation rules, the verification project information is used to obtain the number of verification engineering measures; Calculation is performed based on the number of engineering measures to be verified to obtain verification task allocation information, which includes task number, work site location, engineering measure category, verification person in charge, estimated verification time and verification standard.

3. The method according to claim 1, characterized in that Before the step of obtaining the verification project allocation information according to the verification project information and the task allocation rule, the method further includes: Obtain the imported project work site and engineering category information; According to the imported project work site, engineering category information and engineering quality acceptance criteria, the task allocation rule is configured to obtain the task allocation rule; After the step of obtaining the task allocation rule, it also includes: When the task allocation rule configuration is completed, the step of obtaining the verification project allocation information according to the verification project information according to the engineering category and the task allocation rule is executed.

4. The method according to claim 1, characterized in that The step of sending a synchronization instruction of the inspection project allocation information to the target terminal to obtain the construction inspection data of the construction site corresponding to the inspection project includes: Sending a synchronization instruction to a target terminal so that the target terminal enters the construction data of the construction site and sends a feedback signal after the entry is completed; The feedback signal is received and analyzed to obtain construction verification data.

5. The method according to claim 1, characterized in that The step of analyzing the construction verification data to obtain the verification conclusion includes: Obtaining a construction stratum information bar chart and construction site exploration and testing results based on the construction verification data; Analyze the construction stratum information histogram and the construction site exploration and testing results to obtain analysis results; Based on the analysis results, a verification conclusion is obtained as to whether the requirements are met.

6. The method according to claim 5, characterized in that The step of analyzing the construction stratum information histogram and the construction site exploration and testing results to obtain the analysis result includes: Obtain the design stratigraphic information histogram and design data; Comparing the stratigraphic information histogram with the designed stratigraphic information histogram to obtain a first comparison result, wherein the first comparison result is used to determine whether the geological conditions meet the designed geological requirements; Comparing the construction site exploration and test results with the preset design data to obtain a second comparison result, wherein the second comparison result is used to determine whether the design indicators revealed by the construction site exploration and test results meet the design requirements; The first comparison result and the second comparison result are combined to obtain an analysis result.

7. The method according to claim 1, characterized in that The step of summarizing the verification conclusions to obtain completion progress information corresponding to the verification items includes: According to the verification conclusion, the task completion status and actual completion time are obtained; Calculate according to the task completion status and actual completion time to obtain completion progress information; After the step of calculating according to the task completion status and the actual completion time to obtain the completion progress information, the method further includes: According to the completion progress information, obtaining the actual completion progress and the expected completion progress; When the actual completion progress is less than the expected completion progress, an alarm is issued and displayed.

8. A digital geological verification device for infrastructure, characterized in that: The device comprises: An acquisition module is used to obtain verification project information; A configuration module, configured to obtain verification project allocation information according to the verification project information and the task allocation rule; A calculation module, used for sending a synchronization instruction of the inspection project allocation information to a target terminal to obtain the construction inspection data of the construction site corresponding to the inspection project; An analysis module, used to analyze the construction verification data to obtain a verification conclusion; The result module is used to summarize the verification conclusions and obtain the completion progress information corresponding to the verification items.

9. A digital geological verification device for infrastructure, characterized in that: The device comprises: a memory, a processor, and an infrastructure digital geological verification program stored in the memory and executable on the processor, wherein the infrastructure digital geological verification program is configured to implement the steps of the infrastructure digital geological verification method as described in any one of claims 1 to 7.

10. A medium, characterized in that The medium stores an infrastructure digital geological verification program, and when the infrastructure digital geological verification program is executed by the processor, the steps of the infrastructure digital geological verification method according to any one of claims 1 to 7 are implemented.