Leakage-free environment-friendly paint spraying workshop and operation method thereof
By designing a shovel mechanism in the paint spraying workshop, and scraping the paint with a telescopic spring and magnetic drive blade, the problem of paint being adhered to the hanging rod is solved, and the self-cleaning of the paint and the improvement of production efficiency is achieved.
Patent Information
- Application Number
- CN202510413047.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-03
- Publication Date
- 2025-05-02
- Estimated Expiration
- 2045-04-03
AI Technical Summary
In the paint spraying workshop, the paint is prone to stick to the hanging rod. If it is not cleaned for a long time, it will make it difficult to clean, affecting the hanging and placement of subsequent parts.
A leakage-free and environmentally friendly paint spraying workshop was designed, and the guide device was used to drive the parts to move. The paint unit and the drying unit were located at the bottom of the guide device. The shovel mechanism contacted the hanging rod through a telescopic spring and a magnetic drive blade to scrape off the attached paint.
The self-cleaning of the paint is realized, avoiding the difficulty of cleaning caused by the paint being stuck on the hanging rod, and ensuring the smooth hanging and production efficiency of subsequent parts.
Smart Images

Figure CN119909893A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of paint spraying, and in particular to a leak-free and environmentally friendly paint spraying workshop and an operating method thereof. Background Art
[0002] The paint spraying workshop is a professional production space that integrates multiple functions. It has a reasonable layout. The central spraying area is equipped with advanced automatic and manual spraying equipment to meet the spraying needs of different workpieces; the pretreatment area on one side performs surface treatment on the workpiece to enhance the adhesion of the paint; the adjacent drying area can quickly dry and solidify the paint. At the same time, the workshop is also equipped with complete environmental protection facilities. The exhaust gas treatment system can efficiently purify organic waste gas, and the wastewater treatment system can realize the recycling of water resources. In addition, a full range of leak-proof protection measures, such as ground protection, equipment sealing and leakage detection systems, not only ensure the environmental protection of the production process, but also effectively prevent paint leakage, ensuring safe, efficient and green production.
[0003] During the spraying process, the paint will adhere to the hanging rod. After passing through the drying area, the paint will solidify on the hanging rod. If it is not cleaned for a long time, the paint will adhere to the hanging rod and will be difficult to clean, which will affect the subsequent hanging of parts. Summary of the invention
[0004] In view of the deficiencies of the prior art, the technical solution adopted by the present invention to solve the technical problems is as follows: the leak-free and environmentally friendly paint spraying workshop described in the present invention comprises a guide device, the outer surface of the guide device is evenly provided with support columns, the top of the support column is fixedly connected to the outer surface of the guide device, the inner wall of the guide device is slidably connected to a moving block, and the bottom of the moving block is rotatably connected to a placement unit; A coating unit, the coating unit is used to coat the parts, and a dust collecting unit is fixedly connected to the outer surface of the coating unit; A drying unit, which is used to heat and dry the painted parts; The coating unit is located at the bottom of the guide device, and the drying unit is located at the bottom of the guide device; The placement unit comprises a rotating shaft 1, a gear is fixedly connected to the outer surface of the rotating shaft 1, a support rod 1 is fixedly connected to the bottom of the rotating shaft 1, a hanging rod is evenly arranged on the outer surface of the support rod 1, a support plate 1 is fixedly connected to the top of the support rod 1, a telescopic spring 1 is fixedly connected to the bottom of the support plate 1, and a shoveling mechanism is fixedly connected to the bottom of the telescopic spring 1; The shoveling mechanism includes a frame plate, the inner wall of the frame plate is fixedly connected to a sliding rod, the frame plate is fixedly connected to a second telescopic spring near the sliding rod, the bottom of the second telescopic spring is fixedly connected to a sliding block, the outer surface of the sliding block is fixedly connected to a scraper, and impact columns are evenly arranged on the bottom of the frame plate, and the top of the impact column is fixedly connected to the bottom of the frame plate.
[0005] Preferably, the top of the rotating shaft 1 is rotatably connected to the bottom of the moving block, the top of the frame plate is fixedly connected to the bottom of the telescopic spring 1, and the inner wall of the sliding block 1 is slidably connected to the outer surface of the sliding rod.
[0006] Preferably, the paint unit includes a spray bin, a movable groove 1 is provided on the top of the spray bin, bottom blocks are evenly provided on the bottom of the spray bin, the top of the bottom block is fixedly connected to the bottom of the spray bin, a feeding device is fixedly connected to the outer surface of the spray bin, a transmission pipe is fixedly connected to the top of the feeding device, an atomizing spray device is fixedly connected to the end of the transmission pipe away from the feeding device, two magnetic blocks are symmetrically provided at both ends of the spray bin, the two magnetic blocks are located at the front of the spray bin, an inclined surface is provided at the bottom of the spray bin, a shoveling mechanism is fixedly connected to the bottom of the inner wall of the spray bin, an absorption device is fixedly connected to the inner wall of the spray bin, an air pipe is fixedly connected to the outer surface of the absorption device, a support rod 2 is fixedly connected to the top of the spray bin, and a rack is fixedly connected to the top of the support rod 2.
[0007] Preferably, the shoveling mechanism includes a baffle, the inner wall of the spray chamber is fixedly connected to a servo motor 1, the output end of the servo motor 1 is fixedly connected to a screw, the outer surface of the screw is threadedly connected to a movable plate, the outer surface of the movable plate is fixedly connected to a shoveling plate, the outer surface of the shoveling plate is provided with a sliding groove, the outer surface of the sliding groove is slidably connected to a slider 2, the outer surface of the slider 2 is fixedly connected to a scratch plate, and the top of the slider 2 is fixedly connected to a magnetic column.
[0008] Preferably, both ends of the baffle are fixedly connected to the inner wall of the spray chamber, and the outer surface of the scratch plate is in contact with one side of the shovel plate.
[0009] Preferably, the dust suction unit comprises a support frame, a waste pipe is fixedly connected to the outer surface of the support frame, an absorption mechanism is fixedly connected to the inner wall of the waste pipe, and a storage box is fixedly connected to the top of the absorption mechanism.
[0010] Preferably, the absorption mechanism includes a dust suction pipe, the inner wall of the storage box is fixedly connected to a support rod three, the bottom of the support rod three is fixedly connected to a shell, the inner wall of the shell is fixedly connected to a servo motor two, the output end of the servo motor two is fixedly connected to a rotating shaft two, the bottom of the rotating shaft two is fixedly connected to a fan blade, and the outer surface of the rotating shaft two is fixedly connected to a scratch arm.
[0011] Preferably, the outer surface of the support frame is fixedly connected to the outer surface of the spray chamber, the bottom of the dust suction pipe is fixedly connected to the inner wall of the waste pipe, and the outer surface of the waste pipe is fixedly connected to the end of the air pipe away from the absorption device.
[0012] Preferably, the drying unit includes a drying box, the outer surface of the drying box is fixedly connected to the end of the spray chamber away from the magnetic block 2, the top of the drying box is provided with a movable groove 2, the bottom of the drying box is fixedly connected to an oven, the outer surface of the oven is fixedly connected to an air inlet, one end of the drying box is rotatably connected to a curtain, the side of the oven close to the curtain is fixedly connected to an outer box, the bottom of the outer box is fixedly connected to an electromagnetic plate, the outer surface of the electromagnetic plate is fixedly connected to an electric wire, the end of the electric wire away from the electromagnetic plate is fixedly connected to a power supply, and the inner wall of the outer box is fixedly connected to a dirt storage plate.
[0013] A method for operating a leak-free and environmentally friendly paint spraying workshop, comprising the following steps: S1: Hang the parts that need to be painted in the placement unit, and the guide device will drive the parts into the coating unit and drying unit in turn; S2: The atomizing spray device will paint the parts in the spray chamber, and then the drying box will dry and shape the painted parts; S3: After each batch of parts is painted, the shovel mechanism will recycle the materials attached to the bottom of the spray chamber, and the absorption mechanism will also recycle the exhaust gas in the spray chamber; S4: After taking the dried parts, the electromagnetic plate will drive the scraping mechanism to start working and scrape away the materials attached to the hanging rod and the support rod.
[0014] The beneficial effects of the present invention are as follows: 1. The present invention sets a shoveling mechanism. After taking down the dried object, the electromagnet will generate magnetic force and attract the magnetic block 1, so that the telescopic spring 1 is stretched and the whole shoveling mechanism moves downward. In this process, the shovel blade will come into contact with the support rod 1 and the hanging rod, and scrape off the paint attached thereon. The reverse force generated by the scratch in this process will also compress the telescopic spring 2. In the subsequent recovery process, the telescopic spring 2 recovers and drives the shovel blade to collide with the impact column, so that the material that has just scratched the shovel blade is separated, thereby realizing self-cleaning.
[0015] 2. The present invention sets a spraying device. When the guide device drives the parts to move, the gear will come into contact with the rack, so that the gear and the rotating shaft will rotate, and then drive the parts hung on the hanging rod to rotate, so that the material sprayed by the atomizing spraying device can be fully attached to the parts.
[0016] 3. The present invention sets a shoveling mechanism. After a batch of parts are coated, the shovel plate shovels the materials on the inclined surface. As the moving plate moves, the distance between the magnetic column and the magnetic block 2 becomes farther, and the mutual magnetic force will decrease. The gravity of the slider 2 will make the slider 2 slide downward along the sliding groove and scrape the materials on the side of the shovel plate that is attached to the materials to the bottom of the shovel plate, so that they can be recovered from the gap at the bottom later.
[0017] 4. The present invention provides an absorption mechanism. As the rotating shaft 2 rotates, the scraping arm scrapes against the inner wall of the waste pipe, so that the impurity particles on the pipe wall are scraped off into the waste pipe, avoiding the accumulation of particles and clogging of the pipe due to long-term waste gas recovery. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural schematic diagram of the present invention.
[0019] Figure 2 It is a bottom view of the structure of the present invention.
[0020] Figure 3 It is a structural schematic diagram of the placement unit of the present invention.
[0021] Figure 4 It is a structural schematic diagram of the shoveling mechanism of the present invention.
[0022] Figure 5 It is a schematic structural diagram of the coating unit of the present invention.
[0023] Figure 6 It is a structural cross-sectional view of the coating unit of the present invention.
[0024] Figure 7 It is a structural schematic diagram of the shoveling mechanism of the present invention.
[0025] Figure 8 It is a partial structural schematic diagram of the shoveling mechanism of the present invention.
[0026] Fig. 9 It is a structural schematic diagram of the dust collection unit of the present invention.
[0027] Fig.10 It is a structural schematic diagram of the absorption mechanism of the present invention.
[0028] Fig.11 It is a structural schematic diagram of the drying unit of the present invention.
[0029] Fig.12 It is a partial structural schematic diagram of the drying unit of the present invention.
[0030] Fig.13 is a block diagram of the method of operation of the present invention.
[0031] In the figure: 1. guide device; 2. support column; 3. moving block; 4. placement unit; 41. rotating shaft 1; 42. gear; 43. support rod 1; 44. hanging rod; 45. support plate 1; 46. telescopic spring 1; 47. shoveling mechanism; 471. frame plate; 472. magnetic block 1; 473. sliding rod; 474. telescopic spring 2; 475. slider 1; 476. scraper; 477. impact column; 5. dust suction unit; 51. support frame; 52. waste pipe; 53. absorption mechanism; 531. dust suction pipe; 532. support rod 3; 533. housing; 534. servo motor 2; 535. rotating shaft 2; 536. fan blade; 537. scratch arm; 54. storage box; 6. coating unit; 61. Spraying chamber; 62, moving trough 1; 63, bottom block; 64, feeding device; 65, transmission pipe; 66, magnetic block 2; 67, inclined plane; 68, shoveling mechanism; 681, baffle; 682, servo motor 1; 683, screw rod; 684, moving plate; 685, shoveling plate; 686, sliding trough; 687, sliding block 2; 688, scratching plate; 689, magnetic column; 69, atomizing spray device; 610, absorption device; 611, air pipe; 612, supporting rod 2; 613, rack; 7, drying unit; 71, drying box; 72, moving trough 2; 73, oven; 74, air inlet; 75, curtain; 76, outer box; 77, dirt storage plate; 78, electromagnetic plate; 79, electric wire; 710, power supply. DETAILED DESCRIPTION
[0032] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.
[0033] Example 1, using Figure 1-Figure 12 A leak-free and environmentally friendly paint spraying workshop and an operating method thereof according to one embodiment of the present invention are described as follows.
[0034] like Figure 1-Figure 2 As shown, a leak-free and environmentally friendly paint spraying workshop of the present invention comprises a guide device 1, the outer surface of the guide device 1 is evenly provided with support columns 2, the top of the support column 2 is fixedly connected to the outer surface of the guide device 1, the inner wall of the guide device 1 is slidably connected with a moving block 3, and the bottom of the moving block 3 is rotatably connected with a placement unit 4; A coating unit 6, which is used to coat the parts, and a dust collecting unit 5 is fixedly connected to the outer surface of the coating unit 6; A drying unit 7, which is used to heat and dry the painted parts; The coating unit 6 is located at the bottom of the guide device 1, and the drying unit 7 is located at the bottom of the guide device; When the present invention is working, the parts that need to be painted are hung in the placement unit 4, and then the guide device 1 will drive the parts to enter the coating unit 6 and the drying unit 7 in turn. The coating unit 6 will paint the parts, and the drying box 71 will dry and shape the painted parts.
[0035] like Figure 3 As shown, the placement unit 4 includes a rotating shaft 41, a gear 42 is fixedly connected to the outer surface of the rotating shaft 41, a support rod 43 is fixedly connected to the bottom of the rotating shaft 41, a hanging rod 44 is evenly arranged on the outer surface of the support rod 43, a support plate 45 is fixedly connected to the top of the support rod 43, a telescopic spring 46 is fixedly connected to the bottom of the support plate 45, and a shoveling mechanism 47 is fixedly connected to the bottom of the telescopic spring 46; like Figure 4 As shown, the shoveling mechanism 47 includes a frame plate 471, the inner wall of the frame plate 471 is fixedly connected with a sliding rod 473, the frame plate 471 is fixedly connected with a telescopic spring 2 474 near the sliding rod 473, the bottom of the telescopic spring 2 474 is fixedly connected with a slider 1 475, the outer surface of the slider 1 475 is fixedly connected with a scraper 476, and the bottom of the frame plate 471 is evenly provided with impact columns 477, and the top of the impact column 477 is fixedly connected to the bottom of the frame plate 471.
[0036] During the coating process, the sprayed material will also adhere to the support rod 43 and the hanging rod 44, and it will be difficult to remove after cyclic heating, which will affect the placement of subsequent parts. After taking down the dried objects, the electromagnet will generate magnetic force and attract the magnetic block 472, so that the telescopic spring 46 is stretched and the overall scraping mechanism 47 moves downward. In this process, the scraper 476 will come into contact with the support rod 43 and the hanging rod 44 and scrape off the paint adhered thereto. The reverse force generated by the scratches in this process will also compress the telescopic spring 474. In the subsequent recovery process, the telescopic spring 474 recovers and drives the scraper 476 to collide with the impact column 477, so that the material that has just scratched the scraper 476 is detached, thereby achieving self-cleaning.
[0037] The top of the rotating shaft 41 is rotatably connected to the bottom of the moving block 3, the top of the frame plate 471 is fixedly connected to the bottom of the telescopic spring 46, and the inner wall of the sliding block 475 is slidably connected to the outer surface of the sliding rod 473.
[0038] like Figure 11-Figure 12As shown, the drying unit 7 includes a drying box 71, the outer surface of the drying box 71 is fixedly connected to the end of the spray chamber 61 away from the magnetic block 66, a movable groove 72 is provided on the top of the drying box 71, an oven 73 is fixedly connected to the bottom of the drying box 71, an air inlet 74 is fixedly connected to the outer surface of the oven 73, a curtain 75 is rotatably connected to one end of the drying box 71, an outer box 76 is fixedly connected to the side of the oven 73 close to the curtain 75, an electromagnetic plate 78 is fixedly connected to the bottom of the outer box 76, an electric wire 79 is fixedly connected to the outer surface of the electromagnetic plate 78, an end of the electric wire 79 away from the electromagnetic plate 78 is fixedly connected to a power source 710, and a dirt storage plate 77 is fixedly connected to the inner wall of the outer box 76.
[0039] The oven 73 will heat the air and transmit it into the drying box 71 to heat and shape the parts therein. After taking the parts, the power supply 710 will energize the electromagnetic plate 78 through the wire 79, so that the electromagnetic plate generates magnetic force, thereby driving the shoveling mechanism 47 to start working.
[0040] The specific workflow is as follows: During operation, after taking down the dried object, the power supply 710 will energize the electromagnetic plate 78 through the wire 79, so that the electromagnetic plate generates magnetic force, and the electromagnet will generate magnetic force and attract the magnetic block 472, so that the telescopic spring 46 is stretched and the overall shoveling mechanism 47 moves downward. In this process, the scraper 476 will come into contact with the support rod 43 and the hanging rod 44, and scrape off the paint attached thereto. In this process, the reverse force generated by the scratching will also compress the telescopic spring 474. In the subsequent recovery process, the telescopic spring 474 recovers and drives the scraper 476 to collide with the impact column 477, so that the material that has just scratched the scraper 476 is detached.
[0041] Embodiment 2, use Figure 1-Figure 13 A leak-free and environmentally friendly paint spraying workshop and an operating method thereof according to one embodiment of the present invention are described as follows.
[0042] like Figure 5-Figure 6As shown, a leak-free and environmentally friendly paint spraying workshop of the present invention, on the basis of embodiment 1, the paint unit 6 includes a spraying bin 61, a movable groove 62 is arranged on the top of the spraying bin 61, a bottom block 63 is evenly arranged on the bottom of the spraying bin 61, the top of the bottom block 63 is fixedly connected to the bottom of the spraying bin 61, a feeding device 64 is fixedly connected to the outer surface of the spraying bin 61, a transmission pipe 65 is fixedly connected to the top of the feeding device 64, and an end of the transmission pipe 65 away from the feeding device 64 is fixedly connected to an atomizer A spraying device 69, magnetic blocks 66 are symmetrically arranged at both ends of the spraying bin 61, and the magnetic blocks 66 are located at the front of the spraying bin 61. A slope 67 is arranged at the bottom of the spraying bin 61. A shoveling mechanism 68 is fixedly connected to the bottom of the inner wall of the spraying bin 61. An absorption device 610 is fixedly connected to the inner wall of the spraying bin 61. An air pipe 611 is fixedly connected to the outer surface of the absorption device 610. A support rod 612 is fixedly connected to the top of the spraying bin 61, and a rack 613 is fixedly connected to the top of the support rod 612.
[0043] When the guide device 1 drives the parts to move, the gear 42 will come into contact with the rack 613, so that the gear 42 and the rotating shaft 41 rotate, thereby driving the parts hung on the hanging rod 44 to rotate, so that the material sprayed by the atomizing spray device 69 can be fully attached to the parts.
[0044] like Figure 7-Figure 8 As shown, the shoveling mechanism 68 includes a baffle 681, a servo motor 682 is fixedly connected to the inner wall of the spray chamber 61, a screw 683 is fixedly connected to the output end of the servo motor 682, a movable plate 684 is threadedly connected to the outer surface of the screw 683, a shovel plate 685 is fixedly connected to the outer surface of the movable plate 684, a sliding groove 686 is provided on the outer surface of the shovel plate 685, a sliding groove 686 is slidably connected to the outer surface of the sliding groove 686, a slider 687 is slidably connected to the outer surface of the slider 687, a scratch plate 688 is fixedly connected to the outer surface of the slider 687, and a magnetic column 689 is fixedly connected to the top of the slider 687.
[0045] After a batch of parts are painted, the servo motor 1 682 will drive the screw 683 to rotate, thereby moving the movable plate 684 and causing the shovel plate 685 to shovel the material on the inclined surface 67. As the movable plate 684 moves, the distance between the magnetic column 689 and the magnetic block 2 66 becomes farther, and the magnetic force between them will decrease. The gravity of the slider 2 687 will cause the slider 2 687 to slide downward along the sliding groove 686, and scrape the material on the side of the shovel plate 685 that is attached to the material to the bottom of the shovel plate 685, so that it can be recovered from the gap at the bottom later.
[0046] Both ends of the baffle plate 681 are fixedly connected to the inner wall of the spray chamber 61 , and the outer surface of the scraping plate 688 is in contact with one side of the shovel plate 685 .
[0047] like Fig. 9As shown, the dust collection unit 5 includes a support frame 51 , a waste pipe 52 is fixedly connected to the outer surface of the support frame 51 , an absorption mechanism 53 is fixedly connected to the inner wall of the waste pipe 52 , and a storage box 54 is fixedly connected to the top of the absorption mechanism 53 .
[0048] like Fig.10 As shown, the absorption mechanism 53 includes a dust suction tube 531, the inner wall of the storage box 54 is fixedly connected with a support rod 3 532, the bottom of the support rod 3 532 is fixedly connected with a shell 533, the inner wall of the shell 533 is fixedly connected with a servo motor 2 534, the output end of the servo motor 2 534 is fixedly connected with a rotating shaft 2 535, the bottom of the rotating shaft 2 535 is fixedly connected with a fan blade 536, and the outer surface of the rotating shaft 2 535 is fixedly connected with a scratch arm 537.
[0049] After the absorption device 610 absorbs the exhaust gas in the spray chamber 61 into the waste pipe 52, the servo motor 534 will drive the rotating shaft 535 to rotate, so that the fan blades 536 generate suction, so that the exhaust gas further enters the subsequent storage box 54, which is convenient for subsequent purification and reuse. The exhaust gas in the storage box 54 will be pre-treated to remove solid particles, paint mist and other impurities. Common methods include filtering and spraying. Finally, the pre-treated exhaust gas is recycled and treated by adsorption, condensation, catalytic combustion, etc., so as to achieve the recovery or harmless treatment of substances such as volatile organic compounds in the exhaust gas. However, some particulate matter in the exhaust gas will adhere to the wall of the waste pipe 52. As the rotating shaft 535 rotates, the scratch arm 537 will scratch the inner wall of the waste pipe 52, so that the impurity particles on the wall are scraped into the waste pipe 52, so as to avoid the accumulation of particulate matter and blockage of the pipeline due to long-term exhaust gas recovery.
[0050] The outer surface of the support frame 51 is fixedly connected to the outer surface of the spray chamber 61 , the bottom of the dust suction pipe 531 is fixedly connected to the inner wall of the waste pipe 52 , and the outer surface of the waste pipe 52 is fixedly connected to one end of the air pipe 611 away from the absorption device 610 .
[0051] A method for operating a leak-free and environmentally friendly paint spraying workshop, comprising the following steps: S1: Hang the parts that need to be painted in the placement unit 4, and the guide device 1 will drive the parts into the coating unit 6 and the drying unit 7 in sequence; S2: The atomizing spray device 69 will coat the parts in the spray chamber 61, and then the drying box 71 will dry and shape the painted parts; S3: After each batch of parts is painted, the shoveling mechanism 68 will recycle the materials attached to the bottom of the spraying chamber 61, and the absorption mechanism 53 will also recycle the waste gas in the spraying chamber 61; S4: After taking the dried parts, the electromagnetic plate 78 will drive the shoveling mechanism 47 to start working and shovel the materials attached to the hanging rod 44 and the supporting rod 43.
[0052] Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field and related fields without creative work should fall within the scope of protection of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention are implemented according to the conventional means in the field unless otherwise specified and limited.
Claims
1. A leak-free and environmentally friendly paint spraying workshop, comprising a guide device (1), characterized in that: The outer surface of the guide device (1) is evenly provided with support columns (2); the inner wall of the guide device (1) is slidably connected to a moving block (3); the bottom of the moving block (3) is rotatably connected to a placement unit (4); A coating unit (6), the coating unit (6) being used to coat parts, the outer surface of the coating unit (6) being fixedly connected to a dust collection unit (5); A drying unit (7), the drying unit (7) being used to heat and dry the painted parts; The coating unit (6) is located at the bottom of the guide device (1), and the drying unit (7) is located at the bottom of the guide device (1); The placement unit (4) comprises a rotating shaft (41), the outer surface of the rotating shaft (41) is fixedly connected to a gear (42), the bottom of the rotating shaft (41) is fixedly connected to a support rod (43), the outer surface of the support rod (43) is evenly provided with hanging rods (44), the top of the support rod (43) is fixedly connected to a support plate (45), the bottom of the support plate (45) is fixedly connected to a telescopic spring (46), and the bottom of the telescopic spring (46) is fixedly connected to a shoveling mechanism (47); The shoveling mechanism (47) comprises a frame plate (471), the inner wall of the frame plate (471) is fixedly connected to a sliding rod (473), the frame plate (471) is fixedly connected to a second telescopic spring (474) near the sliding rod (473), the bottom of the second telescopic spring (474) is fixedly connected to a first sliding block (475), the outer surface of the first sliding block (475) is fixedly connected to a shovel blade (476), and impact columns (477) are evenly arranged at the bottom of the frame plate (471).
2. A leak-free and environmentally friendly paint spraying workshop according to claim 1, characterized in that: The top of the rotating shaft 1 (41) is rotatably connected to the bottom of the moving block (3), the top of the frame plate (471) is fixedly connected to the bottom of the telescopic spring 1 (46), and the inner wall of the sliding block 1 (475) is slidably connected to the outer surface of the sliding rod (473).
3. A leak-free and environmentally friendly paint spraying workshop according to claim 1, characterized in that: The coating unit (6) comprises a spraying chamber (61), a movable groove (62) is arranged on the top of the spraying chamber (61), bottom blocks (63) are evenly arranged on the bottom of the spraying chamber (61), a feeding device (64) is fixedly connected to the outer surface of the spraying chamber (61), a transmission pipe (65) is fixedly connected to the top of the feeding device (64), an end of the transmission pipe (65) away from the feeding device (64) is fixedly connected to an atomizing spraying device (69), and two magnetic blocks (66) are symmetrically arranged at both ends of the spraying chamber (61). The bottom of the spray chamber (61) is provided with an inclined surface (67), the second magnetic block (66) is located at the front of the spray chamber (61), the bottom of the inner wall of the spray chamber (61) is fixedly connected to a shoveling mechanism (68), the inner wall of the spray chamber (61) is fixedly connected to an absorption device (610), the outer surface of the absorption device (610) is fixedly connected to an air pipe (611), the top of the spray chamber (61) is fixedly connected to a second support rod (612), and the top of the second support rod (612) is fixedly connected to a rack (613).
4. A leak-free and environmentally friendly paint spraying workshop according to claim 3, characterized in that: The shoveling mechanism (68) comprises a baffle (681), the inner wall of the spray chamber (61) is fixedly connected to a servo motor 1 (682), the output end of the servo motor 1 (682) is fixedly connected to a lead screw (683), the outer surface of the lead screw (683) is threadedly connected to a moving plate (684), the outer surface of the moving plate (684) is fixedly connected to a shoveling plate (685), the outer surface of the shoveling plate (685) is provided with a sliding groove (686), the outer surface of the sliding groove (686) is slidably connected to a slider 2 (687), the outer surface of the slider 2 (687) is fixedly connected to a scratch plate (688), and the top of the slider 2 (687) is fixedly connected to a magnetic column (689).
5. A leak-free and environmentally friendly paint spraying workshop according to claim 4, characterized in that: Both ends of the baffle plate (681) are fixedly connected to the inner wall of the spray chamber (61), and the outer surface of the scratch plate (688) is in contact with one side of the shovel plate (685).
6. A leak-free and environmentally friendly paint spraying workshop according to claim 3, characterized in that: The dust collection unit (5) comprises a support frame (51), the outer surface of the support frame (51) is fixedly connected to a waste pipe (52), the inner wall of the waste pipe (52) is fixedly connected to an absorption mechanism (53), and the top of the absorption mechanism (53) is fixedly connected to a storage box (54).
7. A leak-free and environmentally friendly paint spraying workshop according to claim 6, characterized in that: The absorption mechanism (53) comprises a dust suction pipe (531); the inner wall of the storage box (54) is fixedly connected to a support rod three (532); the bottom of the support rod three (532) is fixedly connected to a housing (533); the inner wall of the housing (533) is fixedly connected to a servo motor two (534); the output end of the servo motor two (534) is fixedly connected to a rotating shaft two (535); the bottom of the rotating shaft two (535) is fixedly connected to a fan blade (536); and the outer surface of the rotating shaft two (535) is fixedly connected to a scratch arm (537).
8. A leak-free and environmentally friendly paint spraying workshop according to claim 7, characterized in that: The outer surface of the support frame (51) is fixedly connected to the outer surface of the spray chamber (61), the bottom of the dust suction pipe (531) is fixedly connected to the inner wall of the waste pipe (52), and the outer surface of the waste pipe (52) is fixedly connected to an end of the air pipe (611) away from the absorption device (610).
9. A leak-free and environmentally friendly paint spraying workshop according to claim 3, characterized in that: The drying unit (7) comprises a drying box (71), the outer surface of the drying box (71) is fixedly connected to one end of the spray chamber (61) away from the second magnetic block (66), the top of the drying box (71) is provided with a second movable groove (72), the bottom of the drying box (71) is fixedly connected to an oven (73), the outer surface of the oven (73) is fixedly connected to an air inlet (74), one end of the drying box (71) is rotatably connected to a curtain (75), the side of the oven (73) close to the curtain (75) is fixedly connected to an outer box (76), the bottom of the outer box (76) is fixedly connected to an electromagnetic plate (78), the outer surface of the electromagnetic plate (78) is fixedly connected to an electric wire (79), the end of the electric wire (79) away from the electromagnetic plate (78) is fixedly connected to a power source (710), and the inner wall of the outer box (76) is fixedly connected to a dirt storage plate (77).
10. A method for operating a leak-free and environmentally friendly paint spraying workshop, characterized in that: The following steps are involved: S1: Hang the parts to be coated in the placement unit (4), and the guide device (1) drives the parts into the coating unit (6) and the drying unit (7) in sequence; S2: The atomizing spray device (69) will coat the parts in the spray chamber (61), and then the drying box (71) will dry and shape the painted parts; S3: After each batch of parts is coated, the shoveling mechanism (68) will recover the materials attached to the bottom of the spray chamber (61), and the absorption mechanism (53) will also recover the waste gas in the spray chamber (61); S4: After the dried parts are taken, the electromagnetic plate (78) drives the scraping mechanism (47) to start working and scrape away the materials attached to the hanging rod (44) and the supporting rod 1 (43).
Citation Information
Patent Citations
Workpiece lifting spraying production line
CN109731724A
Land leveller capable of automatically cleaning shovel blade
CN110714496A
Chemical boiler waste gas pipe type dust removal device with pneumatic cleaning structure
CN112354284A
Automatic coating production line device and method
CN113786945A
Saline-alkali land surface soil sampler
CN117782684A