Pipe bending and welding equipment for sports equipment processing

By designing a pipe bending and welding equipment with bending mechanism and welding components, the problem of existing equipment requiring multiple disassembly and fixing of pipes is solved, and continuous bending and welding of pipes is achieved, and working efficiency and welding quality are improved.

CN119910433APending Publication Date: 2025-05-02HEBEI PETROLEUM VOCATIONAL & TECH UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510327657.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-19
Publication Date
2025-05-02

AI Technical Summary

Technical Problem

The existing pipe bending and welding equipment processed by sports equipment requires disassembly and fixing the pipe many times when bending and welding, which is cumbersome.

Method used

A pipe bending and welding equipment including a bending mechanism and welding assembly is designed to fix the pipe through pneumatic jaws and rotating assembly, and a welding assembly in a movable position is provided to reduce multiple disassembly and installation of the pipe.

Benefits of technology

Continuous bending and welding of pipes are achieved, which reduces the cumbersome work. Through the use of risk control mechanisms, impurities on the surface of pipes are cleaned up and welding quality is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119910433A_ABST
    Figure CN119910433A_ABST
Patent Text Reader

Abstract

The invention discloses pipe bending and welding equipment for sports equipment machining, and relates to the technical field of bending and welding. The welding device specifically comprises a workbench, a sliding way is formed in the side face of the workbench, a first sliding block is slidably connected to the interior of the sliding way, and a welding assembly is fixedly connected to the exterior of the first sliding block; the pipe bending and welding equipment for sports equipment machining further comprises a bending mechanism used for fixing and bending a pipe, the bending mechanism is arranged above the workbench, the bending mechanism comprises a telescopic column, a fixing cylinder and a fixing box, a pneumatic clamping jaw is installed outside the telescopic column, and the pneumatic clamping jaw is connected with the fixing cylinder. A rotating assembly is arranged outside the fixed cylinder, and a processing assembly is arranged inside the rotating assembly; and the air control mechanism is used for conducting air suction or air supply treatment on the bending mechanism, the air control mechanism is arranged in the fixing box, and the pipe bending and welding equipment for sports equipment machining achieves the purpose of improving the use efficiency of the equipment.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bending and welding, in particular to a pipe bending and welding device for processing sports equipment. Background Art

[0002] Sports equipment is a general term for various apparatuses, equipment and supplies used in competitive sports and fitness exercises. Sports equipment and sports are interdependent and promote each other. The popularization of sports and the diversification of sports events have led to the development of the types and specifications of sports equipment. In the processing of sports equipment, it is usually necessary to bend and weld the pipes to make basketball stands, football goals, uneven bars and other equipment.

[0003] The current tube bending and welding equipment for sports equipment processing needs to dismantle and fix the tubes many times when bending and welding the tubes, which is cumbersome. Summary of the invention

[0004] In order to solve the above technical problems, the present invention provides a tube bending and welding device for sports equipment processing, which specifically includes:

[0005] A workbench, wherein a slideway is provided on the side of the workbench, a first sliding block is slidably connected inside the slideway, and a welding assembly is fixedly connected outside the first sliding block;

[0006] The tube bending and welding equipment for sports equipment processing also includes:

[0007] A bending mechanism is used to fix and bend the pipe. The bending mechanism is arranged above the workbench and comprises a telescopic column, a fixing cylinder and a fixing box. A pneumatic clamp is installed on the outside of the telescopic column. A rotating assembly is arranged on the outside of the fixing cylinder. A processing assembly is arranged inside the rotating assembly.

[0008] The wind control mechanism is used to suck or supply air to the bending mechanism. The wind control mechanism is arranged inside the fixed box. The wind control mechanism includes a first vertical pipe and a second vertical pipe. The outside of the first vertical pipe is fixedly connected to a first lifting platform, and the outside of the second vertical pipe is fixedly connected to a second lifting platform.

[0009] Preferably, the telescopic column is installed on the outside of the workbench, the fixed cylinder is fixedly connected to the outside of the workbench, the fixed box is installed on the inside of the workbench, the first vertical pipe and the second vertical pipe are both fixedly connected to the inside of the workbench, and the first lifting platform and the second lifting platform are both fixedly connected to the inside of the fixed box.

[0010] Preferably, the top of the workbench is fixedly connected to a fixed frame, the interior of the fixed frame is slidably connected to a second slider, the exterior of the second slider is fixedly connected to a first push rod, the exterior of the first push rod is fixedly connected to a first curved plate, and the first curved plate is used to move with the pipe to protect the pipe.

[0011] Preferably, the rotating assembly includes a first rotating shaft, a connecting frame is installed on the outside of the first rotating shaft, a rotating box is fixedly connected to the outside of the connecting frame, the processing assembly is arranged inside the rotating box, a motor is arranged inside the fixed cylinder, and the first rotating shaft is fixedly connected to the output end of the motor.

[0012] Preferably, the rotating assembly also includes a connecting disk and a center tube, the center tube is installed on the top of the fixed tube, the connecting disk is arranged in a ring shape, the top of the connecting disk is fixedly connected with a lifting rod, the top of the lifting rod is fixedly connected with a second arc plate, the second arc plate is used to place the pipe, and the connecting disk is fixedly connected to the top of the connecting frame.

[0013] Preferably, the processing assembly includes a lifting frame, the outside of the lifting frame is fixedly connected to a second push rod, the outside of the second push rod is fixedly connected to a third arc plate, the third arc plate is used to bend the pipe, and the lifting frame is fixedly connected to the inside of the rotating box.

[0014] Preferably, the processing assembly further comprises a second rotating shaft, the outer portion of the second rotating shaft is sleeved with a reel, a clamping cylinder is installed inside the rotating box, and the second rotating shaft is rotatably connected to the inside of the rotating box.

[0015] Preferably, the outside of the first vertical tube is fixedly connected to a horizontal tube, the inside of the fixing box is fixedly connected to a third push rod, the outside of the third push rod is fixedly connected to a first connecting component, the inside of the fixing box is fixedly connected to a telescopic rod, and a second connecting component is provided on the top of the telescopic rod.

[0016] Preferably, the first connecting assembly includes a movable seat, a first push plate is fixedly connected to the top of the movable seat, a first connecting tube is installed inside the first push plate, a flared tube is installed on the top of the first connecting tube, and the movable seat is fixedly connected to the outside of the third push rod.

[0017] Preferably, the second connecting assembly includes a second push plate, a second connecting tube is installed inside the second push plate, an outer ring is installed outside the second connecting tube, a fourth push rod is fixedly connected to the outside of the outer ring, a protective cover is fixedly connected to the outside of the fourth push rod to reduce dust and impurities entering the second connecting tube, and the second push plate is fixedly connected to the top of the telescopic rod.

[0018] The present invention provides a tube bending and welding device for processing sports equipment. It has the following beneficial effects:

[0019] 1. The tube bending and welding equipment for sports equipment processing can fix and bend the tube by setting a bending mechanism and a welding assembly. When bending and welding the tube, it is necessary to disassemble and fix the tube many times, which is cumbersome. Therefore, a bending mechanism and a welding assembly are set, and a pneumatic clamp is used to fix one end of the tube, and a rotating assembly is used to fix the other end of the tube. A movable welding assembly is set, which can bend and weld the tube without disassembling and installing the tube many times to solve the above problems.

[0020] 2. The tube bending and welding equipment for sports equipment processing is used to bend the tube by setting a rotating component and a processing component. Under the operation of the first arc plate, the pneumatic clamp and the second arc plate, the tube can be fixed and moved, and the tube is moved to the third arc plate. Under the cooperation of the second arc plate and the third arc plate, the tube is bent to avoid rigid fixation of both sides of the tube, which may cause wear at the tube bend. Before and after the bending work, the reel angle can be adjusted to make the reel contact and clean the third arc plate, thereby reducing impurities in the third arc plate.

[0021] 3. The tube bending and welding equipment for sports equipment processing is provided with a wind control mechanism to supply or suck air to the bending mechanism. Before and after using the equipment, by adjusting the first connecting component and the second connecting component, air can be supplied to the outside of the tube or the pneumatic clamp can be sucked, thereby supplying air to remove impurities from the tube or absorbing some impurities in the pneumatic clamp, and air can be supplied to the first curved plate to reduce impurities inside the first curved plate.

[0022] 4. The tube bending and welding equipment for processing sports equipment is provided with a bending mechanism and a wind control mechanism to bend, supply air and suck air to the tube. In the process of bending and welding the tube, impurities may be welded into the tube due to the presence of impurities on the outside of the tube or the outer surface of the tool. Therefore, a bending mechanism and a wind control mechanism are provided to clean the third arc plate, and to process the first arc plate, the tube and the pneumatic clamp to reduce the possibility of the above situation. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0024] Figure 2 It is a side structural schematic diagram of the present invention;

[0025] Figure 3 It is a schematic diagram of the bending mechanism structure of the present invention;

[0026] Figure 4 It is a schematic diagram of the structure of the rotating assembly of the present invention;

[0027] Figure 5 This is a schematic diagram of the structure of the processing component of the present invention;

[0028] Figure 6 For the present invention Figure 5 The structural diagram at A in the middle;

[0029] Figure 7 This is a schematic diagram of the wind control mechanism structure of the present invention;

[0030] Figure 8 This is a schematic diagram of the structure of the first connection component of the present invention;

[0031] Fig. 9 It is a schematic diagram of the structure of the second connection component of the present invention.

[0032] In the figure: 1, workbench; 2, slideway; 3, first slider; 4, welding assembly; 5, bending mechanism; 501, telescopic column; 502, pneumatic clamp; 503, fixed cylinder; 504, rotating assembly; 5041, first rotating shaft; 5042, connecting frame; 5043, rotating box; 5044, connecting plate; 5045, central cylinder; 5046, lifting rod; 5047, second curved plate; 505, processing assembly; 5051, lifting frame; 5052, second push rod; 5053, third curved plate; 5054, second rotating shaft; 5055, reel; 5056, clamping cylinder; 506, fixed box; 50 7. Fixed frame; 508. Second slider; 509. First push rod; 510. First arc plate; 6. Wind control mechanism; 601. Third push rod; 602. First connecting assembly; 6021. Moving seat; 6022. First push plate; 6023. First connecting pipe; 6024. Expanding pipe; 603. First vertical pipe; 604. First lifting platform; 605. Horizontal pipe; 606. Telescopic rod; 607. Second connecting assembly; 6071. Second push plate; 6072. Second connecting pipe; 6073. Outer ring; 6074. Fourth push rod; 6075. Protective cover; 608. Second vertical pipe; 609. Second lifting platform. DETAILED DESCRIPTION

[0033] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific uses.

[0034] like Figure 1-Figure 9 As shown, the present invention provides a technical solution: specifically comprising:

[0035] A workbench 1, a slideway 2 is provided on the side of the workbench 1, a first slider 3 is slidably connected inside the slideway 2, a power system is provided inside the first slider 3, and a welding assembly 4 is fixedly connected outside the first slider 3;

[0036] The tube bending and welding equipment for sports equipment processing also includes:

[0037] The bending mechanism 5 is used to fix and bend the pipe. The bending mechanism 5 is arranged above the workbench 1. The bending mechanism 5 includes a telescopic column 501, a fixed cylinder 503 and a fixed box 506. A pneumatic clamp 502 is installed on the outside of the telescopic column 501, a rotating component 504 is installed on the outside of the fixed cylinder 503, and a processing component 505 is installed inside the rotating component 504. The telescopic column 501 is installed on the outside of the workbench 1, the fixed cylinder 503 is fixedly connected to the outside of the workbench 1, and the fixed box 506 is installed on the inside of the workbench 1;

[0038] The wind control mechanism 6 is used for sucking or supplying air to the bending mechanism 5. The wind control mechanism 6 is arranged inside the fixed box 506. The wind control mechanism 6 includes a first vertical pipe 603 and a second vertical pipe 608. The outside of the first vertical pipe 603 is fixedly connected to the first lifting platform 604, and the outside of the second vertical pipe 608 is fixedly connected to the second lifting platform 609. The first vertical pipe 603 and the second vertical pipe 608 are both fixedly connected to the inside of the workbench 1, and the first lifting platform 604 and the second lifting platform 609 are both fixedly connected to the inside of the fixed box 506.

[0039] Before using the equipment, turn on the power system in the first slider 3, and the first slider 3 drives the welding assembly 4 to move, reserving a working space for fixing the pipe. Turn on the wind control mechanism 6, and perform pretreatment work on the bending mechanism 5 before bending. Then manually place the pipe in the bending mechanism 5, adjust the wind control mechanism 6, perform pretreatment work on the pipe before bending, and turn on the bending mechanism 5 to bend the pipe. Then adjust the power system in the first slider 3, and the first slider 3 drives the welding assembly 4 to move, turn on the welding assembly 4, and weld the pipe.

[0040] The top of the workbench 1 is fixedly connected to a fixed frame 507, the interior of the fixed frame 507 is slidably connected to a second slider 508, the interior of the second slider 508 is provided with a power system, the exterior of the second slider 508 is fixedly connected to a first push rod 509, and the exterior of the first push rod 509 is fixedly connected to a first arc plate 510.

[0041] Before using the device, the pneumatic clamp 502 is repeatedly opened, and the wind control mechanism 6 is opened to perform air suction on the pneumatic clamp 502 to absorb most of the impurities in the pneumatic clamp 502 .

[0042] The pipe is then manually installed and fixed in the pneumatic clamp 502 . The position of the pneumatic clamp 502 and the pipe is controlled by adjusting the stroke of the telescopic column 501 , thereby pushing the pipe to the bending position.

[0043] As the rotating assembly 504 is turned on, the power system in the second slider 508 and the first push rod 509 are turned on. The first push rod 509 drives the first curved plate 510 to move toward the pipe until the first curved plate 510 contacts the pipe. The second slider 508 drives the first push rod 509 and the first curved plate 510 to move. The first curved plate 510 moves with the pipe to protect the pipe.

[0044] The rotating assembly 504 includes a first rotating shaft 5041, a connecting frame 5042 is installed on the outside of the first rotating shaft 5041, a rotating box 5043 is fixedly connected to the outside of the connecting frame 5042, the processing assembly 505 is arranged inside the rotating box 5043, a motor is arranged inside the fixed cylinder 503, and the first rotating shaft 5041 is fixedly connected to the output end of the motor.

[0045] The rotating assembly 504 also includes a connecting disk 5044 and a center tube 5045. The center tube 5045 is installed on the top of the fixed tube 503. A second motor is arranged inside the fixed tube 503. The center tube 5045 is fixedly connected to the output end of the second motor. The connecting disk 5044 is arranged in a ring shape. A lifting rod 5046 is fixedly connected to the top of the connecting disk 5044. A second arc plate 5047 is fixedly connected to the top of the lifting rod 5046. The connecting disk 5044 is fixedly connected to the top of the connecting frame 5042.

[0046] As the pneumatic clamp 502 drives the tube to move, the tube gradually enters the second arc plate 5047, the processing assembly 505 and the motor are turned on, the processing assembly 505 gradually contacts the tube, and the motor drives the first rotating shaft 5041, the connecting frame 5042, the rotating box 5043 and the processing assembly 505 to rotate, thereby bending the tube.

[0047] The processing assembly 505 includes a lifting frame 5051 , the exterior of the lifting frame 5051 is fixedly connected to a second push rod 5052 , the exterior of the second push rod 5052 is fixedly connected to a third arc plate 5053 , and the lifting frame 5051 is fixedly connected to the interior of the rotating box 5043 .

[0048] The processing component 505 also includes a second rotating shaft 5054, the second rotating shaft 5054 is externally sleeved with a reel 5055, the reel 5055 is externally sleeved with a fiber outer layer, a positioning cylinder 5056 is installed inside the rotating box 5043, and the second rotating shaft 5054 is rotatably connected to the inside of the rotating box 5043.

[0049] The lifting frame 5051 is turned on, and the lifting frame 5051 drives the second push rod 5052 and the third curved plate 5053 to move upward, and the third curved plate 5053 gradually reaches the same height as the second curved plate 5047. The second push rod 5052 is turned on, and the second push rod 5052 drives the third curved plate 5053 to move toward the pipe until the third curved plate 5053 contacts the second curved plate 5047, fixing the position of the pipe.

[0050] As the motor is turned on, the motor drives the first rotating shaft 5041, the connecting frame 5042, the rotating box 5043 and the processing assembly 505 to rotate, and then drives the third curved plate 5053, the connecting disk 5044, the lifting rod 5046 and the second curved plate 5047 to rotate, thereby bending the pipe.

[0051] After using the equipment, adjust the lifting frame 5051 to the initial state, then open the second push rod 5052, the second push rod 5052 drives the third curved plate 5053 to move in the direction of the reel 5055, manually rotate the second rotating shaft 5054, the second rotating shaft 5054 drives the reel 5055 to rotate, and the reel 5055 begins to absorb most of the dust and impurities in the third curved plate 5053.

[0052] The first vertical pipe 603 and the second vertical pipe 608 are both configured as stretchable tubes, the first fan and the second fan are disposed inside the workbench 1, the first vertical pipe 603 and the second vertical pipe 608 are respectively connected to the first fan and the second fan, the outside of the first vertical pipe 603 is fixedly connected to the cross pipe 605, the inside of the fixed box 506 is fixedly connected to the third push rod 601, the outside of the third push rod 601 is fixedly connected to the first connecting component 602, the inside of the fixed box 506 is fixedly connected to the telescopic rod 606, and the top of the telescopic rod 606 is provided with a second connecting component 607.

[0053] When the first curved plate 510 needs to be cleaned, the first lifting platform 604 is turned on, and the first lifting platform 604 drives the first vertical pipe 603 to move upward, and then drives the horizontal pipe 605 to move upward, and the first fan is turned on to the air supply mode. The gas moves to the first curved plate 510 through the first vertical pipe 603 and the horizontal pipe 605, driving most of the dust and impurities away from the first curved plate 510.

[0054] The first connecting component 602 includes a moving seat 6021, the top of which is fixedly connected to a first push plate 6022, the interior of the first push plate 6022 is installed with a first connecting tube 6023, the top of the first connecting tube 6023 is installed with a flaring tube 6024, and the moving seat 6021 is fixedly connected to the outside of the third push rod 601.

[0055] When it is necessary to clean the outer surface of the pipe, the third push rod 601 is turned on, and the third push rod 601 drives the moving seat 6021, the first push plate 6022, the first connecting pipe 6023 and the expanding pipe 6024 to move in the direction of the second vertical pipe 608, and the second lifting platform 609 is turned on, and the second lifting platform 609 pulls the second vertical pipe 608 upward until the first connecting pipe 6023 is connected to the second vertical pipe 608, and the second fan is turned on to the air supply mode, and the gas enters the first connecting pipe 6023 and the expanding pipe 6024 through the second vertical pipe 608, thereby supplying air and removing dust for the pipe above. At this time, the telescopic column 501 and the pneumatic clamp 502 drive the pipe to move and rotate.

[0056] The second connecting assembly 607 includes a second push plate 6071, a second connecting tube 6072 is installed inside the second push plate 6071, an outer ring 6073 is installed outside the second connecting tube 6072, a fourth push rod 6074 is fixedly connected to the outside of the outer ring 6073, a protective cover 6075 is fixedly connected to the outside of the fourth push rod 6074, and the second push plate 6071 is fixedly connected to the top of the telescopic rod 606.

[0057] When the pneumatic clamp 502 needs to be cleaned, the second connecting assembly 607 is adjusted. The telescopic rod 606 is opened, and the telescopic rod 606 drives the second push plate 6071 to move toward the second vertical pipe 608. The second lifting platform 609 is opened, and the second lifting platform 609 pulls the second vertical pipe 608 upward until the second connecting pipe 6072 is connected to the second vertical pipe 608. The second fan is turned on in the suction mode, and most of the dust and impurities in the pneumatic clamp move toward the second connecting pipe 6072 and are trapped outside the protective cover 6075.

[0058] Working principle: Before using the equipment, start the power system in the first slider 3, and the first slider 3 drives the welding assembly 4 to move, reserving a working space for fixing the pipe.

[0059] Before using the device, open the telescopic column 501 to move the pneumatic clamp 502 toward the second vertical pipe 608, and repeatedly open the pneumatic clamp 502, open the wind control mechanism 6, and perform air suction on the pneumatic clamp 502 to absorb most of the impurities in the pneumatic clamp 502. When the pneumatic clamp 502 needs to be cleaned, adjust the second connecting assembly 607. Open the telescopic rod 606, and the telescopic rod 606 drives the second push plate 6071 to move toward the second vertical pipe 608. Open the second lifting platform 609, and the second lifting platform 609 pulls the second vertical pipe 608 upward until the second connecting pipe 6072 is connected to the second vertical pipe 608. Open the second fan in the suction mode, and most of the dust and impurities in the pneumatic clamp move toward the second connecting pipe 6072 and are trapped outside the protective cover 6075.

[0060] Then, the pipe is manually installed, fixed in the pneumatic clamp 502, and the wind control mechanism 6 is adjusted to pre-treat the pipe before bending. When the outer surface of the pipe needs to be cleaned, the third push rod 601 is turned on, and the third push rod 601 drives the moving seat 6021, the first push plate 6022, the first connecting pipe 6023 and the flared pipe 6024 to move in the direction of the second vertical pipe 608, and the second lifting platform 609 is turned on, and the second lifting platform 609 pulls the second vertical pipe 608 upward until the first connecting pipe 6023 is connected to the second vertical pipe 608, and the second fan is turned on to the air supply mode, and the gas enters the first connecting pipe 6023 and the flared pipe 6024 through the second vertical pipe 608, thereby supplying air and removing dust for the pipe above, and at this time, the telescopic column 501 and the pneumatic clamp 502 drive the pipe to move and rotate.

[0061] By adjusting the stroke of the telescopic column 501, the position of the pneumatic clamp 502 and the pipe is controlled, and the pipe is pushed to the bending position.

[0062] The bending mechanism 5 is turned on to bend the pipe. As the pneumatic clamp 502 drives the pipe to move, the pipe gradually enters the second arc plate 5047, the processing assembly 505 and the motor are turned on, the processing assembly 505 gradually contacts the pipe, and the motor drives the first rotating shaft 5041, the connecting frame 5042, the rotating box 5043 and the processing assembly 505 to rotate, and the pipe is bent.

[0063] The lifting frame 5051 is turned on, and the lifting frame 5051 drives the second push rod 5052 and the third curved plate 5053 to move upward, and the third curved plate 5053 gradually reaches the same height as the second curved plate 5047. The second push rod 5052 is turned on, and the second push rod 5052 drives the third curved plate 5053 to move toward the pipe until the third curved plate 5053 contacts the second curved plate 5047, fixing the position of the pipe.

[0064] As the motor is turned on, the motor drives the first rotating shaft 5041, the connecting frame 5042, the rotating box 5043 and the processing assembly 505 to rotate, and then drives the third curved plate 5053, the connecting disk 5044, the lifting rod 5046 and the second curved plate 5047 to rotate, thereby bending the pipe.

[0065] As the rotating assembly 504 is turned on, the power system in the second slider 508 and the first push rod 509 are turned on. The first push rod 509 drives the first curved plate 510 to move toward the pipe until the first curved plate 510 contacts the pipe. The second slider 508 drives the first push rod 509 and the first curved plate 510 to move. The first curved plate 510 moves with the pipe to protect the pipe.

[0066] Then, the power system in the first slider 3 is adjusted, the first slider 3 drives the welding assembly 4 to move, the welding assembly 4 is opened, and the pipe is welded.

[0067] Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field and related fields without creative work should fall within the scope of protection of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention are implemented according to the conventional means in the field unless otherwise specified and limited.

Claims

1. A tube bending and welding device for sports equipment processing, specifically comprising: A workbench (1), characterized in that: a slideway (2) is provided on the side of the workbench (1), a first slider (3) is slidably connected inside the slideway (2), and a welding assembly (4) is fixedly connected outside the first slider (3); The tube bending and welding equipment for sports equipment processing also includes: A bending mechanism (5) is used to fix and bend the pipe. The bending mechanism (5) is arranged above the workbench (1). The bending mechanism (5) comprises a telescopic column (501), a fixing cylinder (503) and a fixing box (506). A pneumatic clamp (502) is installed on the outside of the telescopic column (501). A rotating assembly (504) is arranged on the outside of the fixing cylinder (503). A processing assembly (505) is arranged inside the rotating assembly (504). The wind control mechanism (6) is used for performing air suction or air supply processing on the bending mechanism (5), and the wind control mechanism (6) is arranged inside the fixing box (506). The wind control mechanism (6) comprises a first vertical pipe (603) and a second vertical pipe (608). The outside of the first vertical pipe (603) is fixedly connected to a first lifting platform (604), and the outside of the second vertical pipe (608) is fixedly connected to a second lifting platform (609).

2. The tube bending and welding equipment for sports equipment processing according to claim 1 is characterized in that: The telescopic column (501) is installed on the outside of the workbench (1), the fixed cylinder (503) is fixedly connected to the outside of the workbench (1), the fixed box (506) is installed on the inside of the workbench (1), the first vertical pipe (603) and the second vertical pipe (608) are both fixedly connected to the inside of the workbench (1), and the first lifting platform (604) and the second lifting platform (609) are both fixedly connected to the inside of the fixed box (506).

3. The tube bending and welding equipment for sports equipment processing according to claim 1 is characterized in that: The top of the workbench (1) is fixedly connected to a fixed frame (507), the interior of the fixed frame (507) is slidably connected to a second sliding block (508), the exterior of the second sliding block (508) is fixedly connected to a first push rod (509), and the exterior of the first push rod (509) is fixedly connected to a first curved plate (510).

4. The tube bending and welding equipment for sports equipment processing according to claim 1, characterized in that: The rotating assembly (504) comprises a first rotating shaft (5041), a connecting frame (5042) is installed on the outside of the first rotating shaft (5041), a rotating box (5043) is fixedly connected to the outside of the connecting frame (5042), the processing assembly (505) is arranged inside the rotating box (5043), a motor is arranged inside the fixed cylinder (503), and the first rotating shaft (5041) is fixedly connected to the output end of the motor.

5. The tube bending and welding equipment for sports equipment processing according to claim 4 is characterized in that: The rotating assembly (504) further includes a connecting disk (5044) and a center tube (5045), wherein the center tube (5045) is mounted on the top of the fixed tube (503), the connecting disk (5044) is arranged in a ring shape, the top of the connecting disk (5044) is fixedly connected to a lifting rod (5046), the top of the lifting rod (5046) is fixedly connected to a second arc plate (5047), and the connecting disk (5044) is fixedly connected to the top of the connecting frame (5042).

6. The tube bending and welding equipment for sports equipment processing according to claim 4, characterized in that: The processing assembly (505) comprises a lifting frame (5051), the exterior of the lifting frame (5051) is fixedly connected to a second push rod (5052), the exterior of the second push rod (5052) is fixedly connected to a third arc-shaped plate (5053), and the lifting frame (5051) is fixedly connected to the interior of the rotating box (5043).

7. The tube bending and welding equipment for sports equipment processing according to claim 6, characterized in that: The processing assembly (505) further comprises a second rotating shaft (5054), the outer portion of which is sleeved with a reel (5055), the interior of the rotating box (5043) is provided with a clamping cylinder (5056), and the second rotating shaft (5054) is rotatably connected to the interior of the rotating box (5043).

8. The tube bending and welding equipment for sports equipment processing according to claim 1, characterized in that: The outside of the first vertical tube (603) is fixedly connected to a horizontal tube (605), the inside of the fixed box (506) is fixedly connected to a third push rod (601), the outside of the third push rod (601) is fixedly connected to a first connecting component (602), the inside of the fixed box (506) is fixedly connected to a telescopic rod (606), and a second connecting component (607) is arranged on the top of the telescopic rod (606).

9. The tube bending and welding equipment for sports equipment processing according to claim 8, characterized in that: The first connecting component (602) includes a movable seat (6021), the top of which is fixedly connected to a first push plate (6022), the interior of the first push plate (6022) is provided with a first connecting tube (6023), the top of the first connecting tube (6023) is provided with a flaring tube (6024), and the movable seat (6021) is fixedly connected to the outside of the third push rod (601).

10. The tube bending and welding equipment for sports equipment processing according to claim 8, characterized in that: The second connecting component (607) includes a second push plate (6071), a second connecting tube (6072) is installed inside the second push plate (6071), an outer ring (6073) is installed outside the second connecting tube (6072), a fourth push rod (6074) is fixedly connected to the outside of the outer ring (6073), a protective cover (6075) is fixedly connected to the outside of the fourth push rod (6074), and the second push plate (6071) is fixedly connected to the top of the telescopic rod (606).