Grouting positioning device of steel pipe wood core packed column and grouting method of grouting positioning device
By designing a steel pipe wood core filling column grouting positioning device including a base and fixing components, the problems of too small gap between the steel pipe and the wood, inaccurate manual fixation and uneven grouting are solved, and uniform mortar filling columns are achieved, which improves the reliability of the experiment.
Patent Information
- Application Number
- CN202510266126.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-03-07
- Publication Date
- 2025-05-06
- Estimated Expiration
- 2045-03-07
AI Technical Summary
During the production of steel pipe wood core filling columns, when the diameter of the wood is large, the gap between the steel pipe and the wood is too small, making it difficult to fill the mortar and vibrating, resulting in the inability to completely fill the mortar; manual fixation is inaccurate, which may lead to eccentricity of the wood, affecting subsequent experiments; the grouting direction is upward and down, making the mortar difficult to fill evenly, and there may be bubbles.
A grouting positioning device for steel pipe wood core filling columns is designed, including a base and a fixing component. The base is equipped with a grouting channel through its upper and lower bottom surfaces. The fixing component includes a steel pipe fixing mechanism and a wood core fixing mechanism. The positioning of the steel pipe and the wood core is achieved through the telescopic rod and the socket, ensuring that the mortar is grouted from bottom to top and fully filling the gap.
Through the positioning device, the mortar is ensured to be evenly filled, avoid the existence of bubbles, improve the quality of the filling column and the reliability of the experiment, and ensure that the gap between the steel pipe and the wood core is completely filled with the mortar.
Smart Images

Figure CN119933364A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of steel tube grouting, and in particular to a grouting positioning device for a steel tube wood core filling column and a grouting method thereof. Background Art
[0002] The laboratory intends to study steel tube wood core filled columns, that is, filling mortar or concrete between the steel tube and the wood to replace the steel tube concrete column. The specific production steps are: place the wood in the center of the steel tube, manually fix the steel tube and the wood, and then grout from top to bottom, and vibrate during the pouring process to ensure uniform filling. Use wood, a renewable resource, to replace natural aggregates.
[0003] However, the following problems were found during the research:
[0004] 1. If the diameter of the wood is large, the gap between the steel pipe and the wood is very small. On the one hand, it is difficult to pour the mortar into the gap; on the other hand, the gap is too small to put the vibrator into the gap for vibration, and it is impossible to ensure that the mortar can completely fill the gap;
[0005] 2. Artificially fixing the position of the steel pipe and the wood cannot ensure that the wood is always in the center. The wood may have a large eccentricity, which will have a certain impact on the axial compression test to be carried out in the future;
[0006] 3. When grouting from top to bottom, the mortar cannot fill the gap between the steel pipe and the wood very well, and the gap in the lower part of the filling column will not be filled with mortar; or, even if the lower part of the component is completely filled with mortar, it is impossible to determine whether there are large bubbles in the mortar in the gap, which affects the subsequent experiments. Summary of the invention
[0007] The purpose of the present application is to provide a grouting positioning device for a steel tube wood core filled column and a grouting method thereof, so as to solve the problems mentioned in the background technology and obtain a steel tube wood core filled column with gaps uniformly filled with mortar or concrete.
[0008] To achieve the above-mentioned purpose, the present application adopts a grouting positioning device for a steel tube wood core filled column and a grouting method thereof, comprising: a base and a fixing assembly;
[0009] The base is provided with a grouting channel penetrating the upper and lower bottom surfaces thereof, and a fixing boss is provided along the inner peripheral wall of the grouting channel;
[0010] The bottom of the fixing assembly is inserted in the top of the grouting channel, and the fixing assembly is arranged on the top surface of the fixing boss. The fixing assembly includes a peripheral steel pipe fixing mechanism and two wooden core fixing mechanisms. The two wooden core fixing mechanisms are arranged in sequence in the up and down directions. The steel pipe fixing mechanism includes a plurality of telescopic rods arranged at intervals, and the two ends of the telescopic rods are respectively detachably connected to one of the wooden core fixing mechanisms. The wooden core fixing mechanism includes a sleeve portion and a clamping portion, and the sleeve portion is detachably connected to the clamping portion. The sleeve portion includes a plurality of sleeves and a plurality of fixing tubes, and the two ends of the sleeve are respectively slidably connected to one of the fixing tubes The fixing tube is inserted in the top of the grouting channel, and the fixing tube is slidably connected to the top surface of the fixing boss, the telescopic rod is detachably connected to the fixing tube, the clamping part includes a fixing block, a plurality of cross bars and a plurality of limit members, a plurality of the cross bars are spaced at intervals on the outer periphery of the fixing block, one end of the cross bar is slidably connected to the fixing block, the cross bar can slide along the radial direction of the fixing block, and the other end is detachably connected to the fixing tube, a plurality of the limit members are rotatably arranged on the plurality of the cross bars in a one-to-one correspondence, the limit member partly protrudes from the surface of the cross bar, and the limit member can rotate along the axial direction of the cross bar.
[0011] As a preferred technical solution, first slots are provided at both ends of the telescopic rod, and the telescopic rod is connected to the fixed tube via the first slots; a second slot is provided at the other end of the cross bar, and the cross bar is connected to the fixed tube via the second slots.
[0012] As a preferred technical solution, the limiting member is a blocking piece.
[0013] As a preferred technical solution, an observation hole is opened on the fixing block, and the observation hole is located in the middle of the fixing block.
[0014] As a preferred technical solution, it also includes a plurality of locking bolts, and the plurality of locking bolts are respectively used to lock the telescopic rod and the cross bar.
[0015] As a preferred technical solution, the base includes a connecting portion and a supporting portion, the bottom end of the supporting portion is slidably connected to the top end of the connecting portion, and the fixing boss is arranged on the inner peripheral wall of the supporting portion.
[0016] The present application also provides a grouting method for a steel tube wood core filled column, comprising: S1, installing a steel tube and a wood core,
[0017] The wooden core, the first wooden core fixing mechanism, the second wooden core fixing mechanism and the steel pipe fixing mechanism are waxed, the wooden core is placed on the first wooden core fixing mechanism, and the center of the wooden core is aligned with the center of the fixing block on the wooden core fixing mechanism, the cross bar on the wooden core fixing mechanism is slid so that the baffle on the cross bar is aligned with the outer peripheral wall of the wooden core, the baffle is rotated so that the baffle is set upward and fits with the outer peripheral wall of the wooden core, the steel pipe is placed on the wooden core fixing mechanism, the outer peripheral size of the sleeve part on the wooden core fixing mechanism is adjusted so that the outer peripheral wall of the steel pipe fits with the inner peripheral wall of the sleeve part, the end of the cross bar away from the fixing block is detachably connected to the sleeve part, the steel pipe fixing mechanism is installed on the sleeve part at intervals, and the height of the steel pipe fixing mechanism is adjusted so that the top surface of the steel pipe fixing mechanism is aligned with the inner peripheral wall of the steel pipe. The top surface of the tube is flush, and the inner wall of the steel tube fixing mechanism is in contact with the outer peripheral wall of the steel tube. The second wooden core fixing mechanism can be detachably connected to the end of the steel tube fixing mechanism away from the sleeve joint, and the sleeve joint, cross bar and baffle on the second wooden core fixing mechanism are adjusted so that the bottom surface of the second wooden core fixing mechanism is respectively in contact with the top surfaces of the steel tube and the wooden core, and the installed steel tube fixing assembly, the first wooden core fixing mechanism, the second wooden core fixing mechanism, the steel tube and the wooden core are placed on the base, and a grouting channel running through the upper and lower bottom surfaces of the base is provided, and a fixing boss is provided along the inner peripheral wall of the grouting channel, and the bottom of the first wooden core fixing mechanism is inserted into the top of the grouting channel, so that the first wooden core fixing mechanism is located on the top surface of the fixing boss, and the base is connected to the pumping pipe of the grouting machine;
[0018] S2, start the grouting machine to start grouting, and when mortar overflows from the top of the steel pipe, turn off the grouting machine;
[0019] S3. Use a steel sheet to separate the base from the pumping pipe and remove them for maintenance. After maintenance, remove the base, the second wood core fixing mechanism, the steel pipe fixing assembly, the first wood core fixing mechanism, the steel pipe and the wood core in sequence to obtain a steel pipe wood core filling column.
[0020] As a preferred technical solution, the base includes a connecting portion and a supporting portion, the bottom end of the supporting portion is slidably connected to the top end of the connecting portion, and the fixing boss is arranged on the inner peripheral wall of the supporting portion;
[0021] The step of separating the base from the pumping pipe by using a steel sheet specifically includes: using a steel sheet to penetrate a connection between the supporting portion and the connecting portion to separate the two.
[0022] Compared with the prior art, the grouting positioning device and grouting method of a steel tube wood core filled column in the present application have the following beneficial effects:
[0023] 1. Connect the base to the pumping pipe of the grouting machine, and pour the mortar from bottom to top to ensure that the mortar fills the gap between the steel pipe and the wooden core. Due to the effect of gravity, there will be no large bubbles in the mortar in the gap to avoid affecting the later experiments.
[0024] 2. Set up fixed components to position the steel pipe and the wooden core to ensure that the steel pipe and the wooden core do not move during the grouting process and that the gap between the steel pipe and the wooden core remains unchanged during the grouting process, which is conducive to filling the gap with mortar and avoiding affecting the subsequent experiments. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The present application is further described in detail below in conjunction with the accompanying drawings and preferred embodiments, but those skilled in the art will appreciate that these drawings are drawn only for the purpose of explaining the preferred embodiments and therefore should not be used as a limitation on the scope of the present application. In addition, unless otherwise specified, the drawings are intended only to conceptually represent the composition or structure of the described objects and may contain exaggerated displays, and the drawings are not necessarily drawn to scale.
[0026] Figure 1 It is a structural schematic diagram of the present invention;
[0027] Figure 2 It is a schematic diagram of the structure of the fixing assembly of the present invention;
[0028] Figure 3 It is a structural schematic diagram of the base of the present invention;
[0029] Figure 4 It is a structural schematic diagram of the clamping part of the present invention;
[0030] Figure 5 It is a structural schematic diagram of the sleeve connection part of the present invention;
[0031] Wherein: 1. base; 11. connecting part; 12. supporting part; 121. fixing boss; 13. grouting channel; 2. fixing assembly; 21. steel pipe fixing mechanism; 211. telescopic rod; 2110. first slot; 22. wood core fixing mechanism; 221. sleeve part; 2211. sleeve; 2212. fixing tube; 222. clamping part; 2220. fixing block; 2221. cross bar; 2222. limiter; 2223. observation hole; 2224. second slot; 3. locking bolt. DETAILED DESCRIPTION
[0032] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0033] In the description of the present application, it should be understood that the terms "front", "rear", "top", "bottom", "inside", "outside", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, in the description of the present invention, the meaning of "multiple" is two or more, unless otherwise clearly and specifically defined.
[0034] See also Figure 1-5 , a grouting positioning device for a steel tube wood core filled column provided in an embodiment of the present application, comprising: a base 1 and a fixing assembly 2;
[0035] The base 1 is provided with a grouting channel 13 penetrating the upper and lower bottom surfaces thereof, and a fixing boss 121 is provided along the inner peripheral wall of the grouting channel 13;
[0036] The bottom of the fixing component 2 is inserted in cooperation with the top of the grouting channel 13, and the fixing component 2 is arranged on the top surface of the fixing boss 121. The fixing component 2 includes an outer peripheral steel pipe fixing mechanism 21 and two wood core fixing mechanisms 22. The two wood core fixing mechanisms 22 are arranged in sequence in the up and down directions. The steel pipe fixing mechanism 21 includes a plurality of telescopic rods 211 arranged at intervals. The two ends of the telescopic rods 211 are respectively detachably connected to one of the wood core fixing mechanisms 22. The wood core fixing mechanism 22 includes a sleeve portion 221 and a clamping portion 222. The sleeve portion 221 is detachably connected to the clamping portion 222. The sleeve portion 221 includes a plurality of sleeves 2211 and a plurality of fixed cylinders 2212. The two ends of the sleeve 2211 are respectively slidably connected to one of the fixed cylinders 2212. The fixed cylinder 2212 is inserted in cooperation with At the top of the grouting channel 13, the fixed cylinder 2212 is slidably connected to the top surface of the fixed boss 121, the telescopic rod 211 is detachably connected to the fixed cylinder 2212, the clamping portion 222 includes a fixed block 2220, a plurality of cross bars 2221 and a plurality of limit members 2222, a plurality of the cross bars 2221 are spaced apart at the outer periphery of the fixed block 2220, one end of the cross bar 2221 is slidably connected to the fixed block 2220, the cross bar 2221 can slide along the radial direction of the fixed block 2220, and the other end is detachably connected to the fixed cylinder 2212, a plurality of the limit members 2222 are rotatably arranged on the plurality of cross bars 2221 in a one-to-one correspondence, the limit members 2222 partially protrude from the surface of the cross bars 2221, and the limit members 2222 can rotate along the axial direction of the cross bars 2221.
[0037] In this embodiment, the steel pipe and the wood core are positioned by the fixing assembly 2. When fixing, the wood core is first located at the center of the fixing block 2220. The stopper 2222 is adjusted to fit tightly with the outer peripheral wall of the wood core, and the wood core is clamped and positioned. Then, the length of the telescopic rod 211 is adjusted and the circumference of the sleeve 221 is changed, so that the inner peripheral wall of the telescopic rod 211 and the sleeve 221 fit tightly with the outer peripheral wall of the steel pipe, and the steel pipe is clamped and positioned. After the fixing is completed, the bottom of the fixing assembly 2 is inserted into the top of the grouting channel 13, and the fixing assembly 2 is located on the top surface of the fixing boss 121. The base 1 is connected to the pumping pipe, and the grouting machine is started. The mortar enters the base 1 through the pumping pipe and enters the gap between the steel pipe and the wood core until the mortar overflows from the top of the steel pipe, indicating that the mortar has filled the gap between the steel pipe and the wood core, and the grouting machine is closed. Remove the pumping pipe and cure the base 1 and the fixing component 2 filled with mortar. After curing, remove the base 1, fixing component 2, steel pipe and wooden core in turn, and knock off the excess solidified mortar to obtain a steel pipe wooden core filled column that is evenly poured and has no large bubbles inside.
[0038] Furthermore, first slots 2110 are provided at both ends of the telescopic rod 211, and the telescopic rod 211 is connected to the fixed cylinder 2212 through the first slots 2110. A second slot 2224 is provided at the other end of the cross bar 2221, and the cross bar 2221 is connected to the fixed cylinder 2212 through the second slot 2224. The detachable connection between the telescopic rod 211 and the fixed cylinder 2212 and between the cross bar 2221 and the fixed cylinder 2212 is achieved by the snap connection, which is convenient for installation and later disassembly.
[0039] In addition, the present application preferably uses a baffle as a limiting member 2222, and the baffle is rotatably arranged on the cross bar 2221. Before installing the wooden core, the baffle is first rotated to the first position so that the baffle is stored in the side of the cross bar 2221, and then the cross bar 2221 is slid so that the baffle is flush with the outer wall of the wooden core, and then the baffle is rotated to the second position so that the baffle is in contact with the outer wall of the wooden core to position the wooden core.
[0040] Furthermore, an observation hole 2223 is provided on the fixing block 2220, and the observation hole 2223 is located in the middle of the fixing block 2220. During the installation of the wood core, the observation hole 2223 can be used to observe whether the center of the wood core coincides with the center of the fixing block 2220, so as to ensure that the wood core does not deviate during the positioning process, thereby avoiding adverse effects on subsequent tests caused by the deviating wood core.
[0041] Furthermore, it also includes a plurality of locking bolts 3, which are respectively used to lock the telescopic rod 211 and the cross bar 2221. The present application preferably uses bolt fixing to achieve the locking of the telescopic rod 211 and the cross bar 2221, which is simple and easy to adjust, and also convenient for dismantling the device after maintenance.
[0042] Furthermore, the base 1 includes a connecting portion 11 and a supporting portion 12, the bottom end of the supporting portion 12 is slidably connected to the top end of the connecting portion 11, and the fixing boss 121 is arranged on the inner peripheral wall of the supporting portion 12. The base 1 is configured to be composed of the connecting portion 11 and the supporting portion 12, so that it is convenient to separate it from the fixing assembly 2 after grouting, and the connecting portion 11 does not need to be disassembled from the pumping pipe, and the supporting portion 12 can be replaced to produce the next steel tube wood core filling column.
[0043] The present application also provides a grouting method for a steel tube wood core filled column, comprising: S1, installing a steel tube and a wood core,
[0044] The wood core, the first wood core fixing mechanism 22, the second wood core fixing mechanism 22 and the steel pipe fixing mechanism 21 are waxed, the wood core is placed on the first wood core fixing mechanism 22, and the center of the wood core is aligned with the center of the fixing block 2220 on the wood core fixing mechanism 22, the cross bar 2221 on the wood core fixing mechanism 22 is slid, so that the baffle on the cross bar 2221 is aligned with the outer peripheral wall of the wood core, and the baffle is rotated so that the baffle is set upward and aligned with the wood core. The outer peripheral wall fits, the steel pipe is placed on the wood core fixing mechanism 22, the outer peripheral size of the sleeve 221 on the wood core fixing mechanism 22 is adjusted so that the outer peripheral wall of the steel pipe fits the inner peripheral wall of the sleeve 221, the end of the cross bar 2221 away from the fixing block 2220 is detachably connected to the sleeve 221, the steel pipe fixing mechanism 21 is installed on the sleeve 221 at intervals, and the height of the steel pipe fixing mechanism 21 is adjusted so that the top of the steel pipe fixing mechanism 21 The second wooden core fixing mechanism 22 is detachably connected to the end of the steel pipe fixing mechanism 21 away from the sleeve portion 221, and the sleeve portion 221, the cross bar 2221 and the baffle on the second wooden core fixing mechanism 22 are adjusted so that the bottom surface of the second wooden core fixing mechanism 22 is respectively in contact with the top surface of the steel pipe and the wooden core. The installed steel pipe fixing assembly 2 and the first wooden core fixing mechanism 22 are connected to the second wooden core fixing mechanism 22. The core fixing mechanism 22, the second wood core fixing mechanism 22, the steel pipe and the wood core are placed on the base 1. The base 1 is provided with a grouting channel 13 that runs through the upper and lower bottom surfaces thereof. A fixing boss 121 is provided along the inner circumferential wall of the grouting channel 13. The bottom of the first wood core fixing mechanism 22 is inserted into the top of the grouting channel 13, and the first wood core fixing mechanism 22 is located on the top surface of the fixing boss 121. The base 1 is connected to the pumping pipe of the grouting machine.
[0045] S2, start the grouting machine to start grouting, and when mortar overflows from the top of the steel pipe, turn off the grouting machine;
[0046] S3. Use a steel sheet to separate the base 1 from the pumping pipe and remove them for maintenance. After maintenance, remove the base 1, the second wood core fixing mechanism 22, the steel pipe fixing assembly 2, the first wood core fixing mechanism 22, the steel pipe and the wood core in sequence to obtain a steel pipe wood core filling column.
[0047] As a preferred technical solution, the base 1 includes a connecting portion 11 and a supporting portion 12, the bottom end of the supporting portion 12 is slidably connected to the top end of the connecting portion 11, and the fixing boss 121 is provided on the inner peripheral wall of the supporting portion 12;
[0048] The step of separating the base 1 from the pumping pipe by using a steel sheet specifically includes: using a steel sheet to penetrate the connection between the supporting portion 12 and the connecting portion 11 to separate the two.
[0049] In this embodiment, the steel tube wood core filling column obtained by the above-mentioned grouting method has uniform mortar filling inside, is free of bubbles, and has good performance, which is conducive to subsequent performance testing.
[0050] In summary, the grouting positioning device and grouting method of a steel tube wood core filled column provided in this embodiment can accurately position the steel tube and the wood core and obtain a steel tube wood core filled column uniformly filled with mortar. The positioning device has a simple structure and the pouring steps are convenient and easy to operate.
[0051] This specification discloses the present application with reference to the accompanying drawings, and also enables those skilled in the art to implement the present application, including making and using any device or system, using suitable materials, and using any combined method. The scope of the present application is defined by the technical solution for protection, and includes other examples that occur to those skilled in the art. As long as such other examples include structural elements that are not different from the literal language of the technical solution for protection, or such other examples contain equivalent structural elements that are not substantially different from the literal language of the technical solution for protection, such other examples should be considered to be within the scope of protection determined by the technical solution for protection of the present application.
Claims
1. A grouting positioning device for a steel tube wood core filled column, used for positioning a steel tube and a wood core, characterized in that: include: Base and fixing components; The base is provided with a grouting channel penetrating the upper and lower bottom surfaces thereof, and a fixing boss is provided along the inner peripheral wall of the grouting channel; The bottom of the fixing assembly is inserted in the top of the grouting channel, and the fixing assembly is arranged on the top surface of the fixing boss. The fixing assembly includes a peripheral steel pipe fixing mechanism and two wooden core fixing mechanisms. The two wooden core fixing mechanisms are arranged in sequence in the up and down directions. The steel pipe fixing mechanism includes a plurality of telescopic rods arranged at intervals, and the two ends of the telescopic rods are respectively detachably connected to one of the wooden core fixing mechanisms. The wooden core fixing mechanism includes a sleeve portion and a clamping portion, and the sleeve portion is detachably connected to the clamping portion. The sleeve portion includes a plurality of sleeves and a plurality of fixing tubes, and the two ends of the sleeve are respectively slidably connected to one of the fixing tubes The fixing tube is inserted in the top of the grouting channel, and the fixing tube is slidably connected to the top surface of the fixing boss, the telescopic rod is detachably connected to the fixing tube, the clamping part includes a fixing block, a plurality of cross bars and a plurality of limit members, a plurality of the cross bars are spaced at intervals on the outer periphery of the fixing block, one end of the cross bar is slidably connected to the fixing block, the cross bar can slide along the radial direction of the fixing block, and the other end is detachably connected to the fixing tube, a plurality of the limit members are rotatably arranged on the plurality of the cross bars in a one-to-one correspondence, the limit member partly protrudes from the surface of the cross bar, and the limit member can rotate along the axial direction of the cross bar.
2. The grouting positioning device for the steel tube wood core filled column according to claim 1, characterized in that: The two ends of the telescopic rod are provided with a first clamping slot, and the telescopic rod is clamped with the fixed cylinder through the first clamping slot. The other end of the cross bar is provided with a second clamping slot, and the cross bar is clamped with the fixed cylinder through the second clamping slot.
3. The grouting positioning device for the steel tube wood core filled column according to claim 2, characterized in that: The limiting component is a blocking piece.
4. The grouting positioning device for the steel tube wood core filled column according to claim 3, characterized in that: An observation hole is provided on the fixing block, and the observation hole is located in the middle of the fixing block.
5. The grouting positioning device for the steel tube wood core filled column according to claim 4, characterized in that: It also includes a plurality of locking bolts, which are respectively used to lock the telescopic rod and the cross bar.
6. The grouting positioning device for a steel tube wood core filled column according to claim 1, characterized in that: The base comprises a connecting portion and a supporting portion, the bottom end of the supporting portion is slidably connected to the top end of the connecting portion, and the fixing boss is arranged on the inner peripheral wall of the supporting portion.
7. A grouting method for a steel tube wood core filled column, characterized in that: include: S1. Install steel pipe and wooden core. Apply wax to the wood core, the first wood core fixing mechanism, the second wood core fixing mechanism and the steel pipe fixing mechanism, place the wood core on the first wood core fixing mechanism, and align the center of the wood core with the center of the fixing block on the wood core fixing mechanism, slide the cross bar on the wood core fixing mechanism so that the baffle on the cross bar is aligned with the outer peripheral wall of the wood core, rotate the baffle so that the baffle is set upward and fits with the outer peripheral wall of the wood core, place the steel pipe on the wood core fixing mechanism, adjust the outer peripheral size of the sleeve part on the wood core fixing mechanism so that the outer peripheral wall of the steel pipe fits with the inner peripheral wall of the sleeve assembly, detachably connect the end of the cross bar away from the fixing block to the sleeve assembly, install the steel pipe fixing mechanism on the sleeve part at intervals, adjust the height of the steel pipe fixing mechanism so that the top surface of the steel pipe fixing mechanism is aligned with the inner peripheral wall of the sleeve assembly, The top surface of the steel pipe is flush, and the inner wall of the steel pipe fixing mechanism is in contact with the outer peripheral wall of the steel pipe. The second wooden core fixing mechanism is detachably connected to the end of the steel pipe fixing mechanism away from the sleeve joint, and the sleeve joint, the cross bar and the baffle on the second wooden core fixing mechanism are adjusted so that the bottom surface of the second wooden core fixing mechanism is respectively in contact with the top surfaces of the steel pipe and the wooden core. The installed steel pipe fixing assembly, the first wooden core fixing mechanism, the second wooden core fixing mechanism, the steel pipe and the wooden core are placed on the base, and a grouting channel running through the upper and lower bottom surfaces of the base is provided, and a fixing boss is provided along the inner peripheral wall of the grouting channel. The bottom of the first wooden core fixing mechanism is inserted into the top of the grouting channel, and the first wooden core fixing mechanism is located on the top surface of the fixing boss, and the base is connected to the pumping pipe of the grouting machine; S2, start the grouting machine to start grouting, and when mortar overflows from the top of the steel pipe, turn off the grouting machine; S3. Use a steel sheet to separate the base from the pumping pipe and remove them for maintenance. After maintenance, remove the base, the second wood core fixing mechanism, the steel pipe fixing assembly, the first wood core fixing mechanism, the steel pipe and the wood core in sequence to obtain a steel pipe wood core filling column.
8. The grouting method for a steel tube wood core filled column according to claim 7, characterized in that: The base comprises a connecting portion and a supporting portion, the bottom end of the supporting portion is slidably connected to the top end of the connecting portion, and the fixing boss is arranged on the inner peripheral wall of the supporting portion; The step of separating the base from the pumping pipe by using a steel sheet specifically includes: using a steel sheet to penetrate a connection between the supporting portion and the connecting portion to separate the two.
Citation Information
Patent Citations
Lightweight wood-concrete filled combined concrete-filled steel tube column and manufacturing method thereof
CN117988507A
Concrete filled steel tubular column reinforcing device
CN220504625U
Core material inserting implement and method for forming soil column
JP2011012450A
Column-beam joining structure
JP2015071909A