By calculating the number of DC strips of the new energy base and the system inertia margin of the regional power grid, and determining the configuration method of the new energy delivery system, the technical bottlenecks in the access and scheduling of the new energy delivery system are solved, and the efficient delivery of new energy and the stability of the power grid is achieved.
CN119944733APending Publication Date: 2025-05-06이너 몽골리아 일렉트릭 파워 그룹 컴퍼니 리미티드 이너 몽골리아 일렉트릭 파워 리서치 인스티튜트 브랜치
0 Cites 0 Cited by
Patent Information
- Application Number
- CN202510063379.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-15
- Publication Date
- 2025-05-06
Smart Images

Figure CN119944733A_ABST
Abstract
The invention provides a safety regulation and control method for a new energy delivery system, and the method comprises the following steps: S1, obtaining the data information of a new energy base, and calculating the number of direct currents needed by the new energy base for delivering new energy; s2, acquiring a conventional power supply, a grid structure and a load level of a to-be-accessed regional power grid of the new energy base, and calculating a system inertia margin of the to-be-accessed regional power grid of the new energy base; and S3, according to the number of the direct currents and the system inertia margin of the regional power grid, determining the configuration mode of the new energy base sent out through the direct currents.