Method for adding conductivity automatic test to two-in-one machine

By setting up the conductivity test motherboard and needle mold carrier board on the two-in-one machine, the automated conductivity test of the liquid crystal display module is realized, solving the problems of low manual and missed testing in the existing technology, and improving the testing efficiency and quality.

CN119959819APending Publication Date: 2025-05-09GANZHOU TXO TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411991835.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-31
Publication Date
2025-05-09

AI Technical Summary

Technical Problem

In the prior art, the conductivity testing of liquid crystal display modules mainly relies on manual manual, resulting in low testing efficiency and easy missed inspection, resulting in poor conductivity products flowing downstream.

Method used

Set up the conductivity test motherboard and needle mold carrier board on the two-in-one machine, and conduct conductivity tests through the automated test needle mold and display module, and send the test results to the two-in-one machine to realize automated conductivity testing.

Benefits of technology

By adding automatic conductivity tests to the two-in-one machine platform, the testing efficiency is improved, the missed detection of conductivity tests is avoided, and the conductivity quality of the display module is ensured.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention discloses a method for adding a conductivity automatic test on a two-in-one machine, and the method comprises the following steps: 1, providing a two-in-one machine, arranging a conductivity test mainboard and a needle die carrier plate on the two-in-one machine, the number of the conductivity test mainboard and the needle die carrier plate being matched with the number of detection stations of the two-in-one machine, and the needle die carrier plate being used for bearing test needle dies, the test needle die is electrically connected with the test mainboard, and the test mainboard is electrically connected with the two-in-one machine table; and 2, after the two-in-one machine scans the two-dimensional code of the display module, a conductivity test is started to be carried out on the display module, a conductivity test mainboard is electrically connected with the display module through a test needle die, a test result is sent to the two-in-one machine, if the test is qualified, the step 3 is carried out, and if the test is not qualified, material throwing is carried out on the display module. According to the invention, the test efficiency can be improved, and the situation of missed detection of the conductivity test can be avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of display modules, and in particular to a method for adding automatic conductivity testing to a two-in-one machine. Background Art

[0002] Currently, the conductivity test of the main clips and clips of the LCD display module is generally carried out by manual testing. This method requires an increase in manpower in the workshop and may also lead to personnel missing inspections, resulting in products with poor conductivity flowing into downstream clients, causing problems in the electronic equipment after installation.

[0003] Therefore, the prior art has defects and needs to be improved. Summary of the invention

[0004] The purpose of the present invention is to overcome the deficiencies of the prior art and provide a method for adding automatic continuity testing to a two-in-one machine.

[0005] The technical solution of the present invention is as follows: The present invention provides a method for adding automatic conductivity testing to a two-in-one machine, comprising the following steps: Step 1: providing a two-in-one machine, arranging a conductivity test mainboard and a needle mold carrier board matching the number of detection stations of the two-in-one machine on the two-in-one machine, the needle mold carrier board being used to carry a test needle mold, the test needle mold being electrically connected to a test mainboard, and the test mainboard being electrically connected to the two-in-one machine;

[0006] Step 2: After the two-in-one machine scans the QR code of the display module, it starts to perform a continuity test on the display module. The continuity test motherboard is electrically connected to the display module through the test needle mold, and the test result is sent to the two-in-one machine. If the test is qualified, it will proceed to step 3. If the test is unqualified, the display module will be discarded;

[0007] Step 3: Carry out lighting test, TP test and display screen test on the display module in sequence. If each test is qualified, the display module will be lowered normally. If any item fails, the display module will be judged as unqualified and discarded.

[0008] Furthermore, in step 1, the continuity test mainboard is connected to the two-in-one machine through serial communication, and the instructions for starting the test, ending the test, passing the test, and failing the test are set.

[0009] By adopting the above scheme, the beneficial effect of the present invention is that an automatic conductivity test is added to the two-in-one machine, and the display module can be automatically tested for conductivity before performing lighting test, TP test and screen display test, thereby improving the test efficiency and avoiding the occurrence of missed conductivity tests. DETAILED DESCRIPTION

[0010] The present invention is described in detail below in conjunction with specific embodiments.

[0011] In this embodiment, the present invention provides a method for adding automatic conductivity testing to a two-in-one machine, including: Step 1: Provide a two-in-one machine for performing lighting test, TP (touch) test and screen display test, and set a conductivity test mainboard and a pin mold carrier board that match the number of detection stations of the two-in-one machine on the two-in-one machine. For example, if 16 display modules can be detected simultaneously on the two-in-one machine, then the corresponding number of conductivity test mainboards and pin mold carrier boards is 16. The pin mold carrier board is used to carry the test pin mold, the test pin mold is electrically connected to the test mainboard, and the test mainboard is electrically connected to the two-in-one machine. Specifically, the conductivity test mainboard is connected to the two-in-one machine by serial communication, and the instructions for starting the test, ending the test, passing the test, and failing the test are set.

[0012] Step 2: After the two-in-one machine scans the QR code of the display module, it starts to perform a conductivity test on the display module. At this time, the conductivity test mainboard is electrically connected to the display module through the test pin mold. The two-in-one machine controls the conductivity mainboard to perform a conductivity test on the main buckle and negative buckle of the display module. Subsequently, the conductivity test mainboard sends the test results to the two-in-one machine. If the test is qualified, it proceeds to step 3. If the test fails, the display module is discarded.

[0013] Step 3: Carry out lighting test, TP test and display screen test on the display module in sequence. If each test is qualified, the display module will be lowered normally. If any item fails, the display module will be judged as unqualified and discarded.

[0014] In summary, the beneficial effect of this solution is that by adding automatic continuity test to the two-in-one machine, the display module can be automatically tested for continuity before the lighting test, TP test and screen display test, which improves the test efficiency and avoids the leakage of continuity test.

[0015] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for adding automatic continuity testing to a two-in-one machine, characterized in that: The following steps are involved: Step 1: Provide a two-in-one machine, and set a continuity test mainboard and a pin mold carrier board matching the number of detection stations of the two-in-one machine on the two-in-one machine. The pin mold carrier board is used to carry the test pin mold. The test pin mold is electrically connected to the test mainboard, and the test mainboard is electrically connected to the two-in-one machine. Step 2: After the two-in-one machine scans the QR code of the display module, it starts to perform a continuity test on the display module. The continuity test motherboard is electrically connected to the display module through the test needle mold, and the test result is sent to the two-in-one machine. If the test is qualified, it will proceed to step 3. If the test is unqualified, the display module will be discarded; Step 3: Carry out lighting test, TP test and display screen test on the display module in sequence. If each test is qualified, the display module will be lowered normally. If any item fails, the display module will be judged as unqualified and discarded.

2. The method for adding automatic continuity testing to a two-in-one machine according to claim 1, characterized in that: In step 1, the continuity test mainboard is connected to the two-in-one machine through serial communication, and the instructions of starting the test, ending the test, passing the test, and failing the test are set.