New energy power grid modeling area determination method and device for oscillation simulation analysis

Through the GN splitting algorithm and improved relative gain array matrix and small signal perturbation voltage calculation, the modeling area of ​​the new energy grid was determined, which solved the problem of difficult to define reasonable grid modeling areas in the existing technology, and achieved efficient oscillation simulation analysis.

CN119963066APending Publication Date: 2025-05-09CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411852098.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-16
Publication Date
2025-05-09

AI Technical Summary

Technical Problem

In new energy power systems, it is difficult for the existing technology to effectively define reasonable grid modeling areas, resulting in limited simulation model scale and the inability to comprehensively analyze and suppress the number/supersynchronous oscillation problem.

Method used

The new energy power grid is divided by GN splitting algorithm, a static partitioning scheme is generated, and by improving the relative gain array matrix and small signal perturbation voltage calculation, the new energy stations and substations that are weakly coupled to the new energy station to be studied are screened, thereby determining the modeling area for oscillation simulation analysis.

Benefits of technology

Through this method, the new energy grid model can be effectively simplified, taking into account analysis accuracy and simulation efficiency, and improving the analysis and suppression ability of the time/supersynchronous oscillation problem.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119963066A_ABST
    Figure CN119963066A_ABST
Patent Text Reader

Abstract

The invention provides a new energy power grid modeling area determination method and device for oscillation simulation analysis. The method comprises the following steps: dividing a new energy power grid by adopting a GN splitting algorithm to generate a static partitioning scheme; an improved relative gain array matrix is adopted to calculate the dynamic coupling strength between the new energy stations; screening new energy stations which are weakly coupled with the to-be-researched new energy station; calculating the electrical coupling strength between the transformer substation and the new energy station based on the small signal disturbance voltage; the electrical coupling strength between the transformer substation and the new energy station is utilized to screen the transformer substation which is weakly coupled with the new energy station; removing the new energy station which is weakly coupled with the new energy station to be researched and removing the transformer substation which is weakly coupled with the new energy station from the independent partition where the new energy station to be researched is located, so as to obtain a modeling area for oscillation simulation analysis; and establishing an equivalent system by using the modeling area and carrying out oscillation simulation analysis on the new energy field station to be researched.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of new energy power grid simulation modeling, and in particular relates to a method and device for determining a new energy power grid modeling area for oscillation simulation analysis. Background Art

[0002] With the construction of new power systems, the penetration rate of new energy power electronic devices in power systems continues to increase, the dynamic interaction characteristics of the system become more complex, and dynamic stability issues become prominent.

[0003] Usually, during the grid planning stage and before the project is put into operation, an electromagnetic transient simulation model is built for analysis of the planned grid or new energy station before it is put into operation, so as to better analyze and suppress sub- / super-synchronous oscillation problems. Due to the limitations of algorithms and timeliness, the scale of the simulation model cannot be infinite, so it is necessary to clarify the reasonable grid modeling area before modeling.

[0004] Therefore, there is an urgent need to propose a technical solution for demarcating reasonable grid modeling areas for power grids (or new energy grids) in areas where large-scale new energy sources converge. Summary of the invention

[0005] In view of this, the present invention proposes a method and device for determining a new energy power grid modeling area for oscillation simulation analysis, aiming to solve the problem of defining a reasonable power grid modeling area for the new energy power grid.

[0006] In a first aspect, the present invention provides a method for determining a new energy grid modeling area for oscillation simulation analysis, comprising:

[0007] The GN splitting algorithm is used to divide the new energy power grid to generate a static partitioning scheme, wherein the static partitioning scheme includes two or more independent partitions; each independent partition corresponds to a preliminary new energy site set and a preliminary substation set;

[0008] For the independent partitions where the new energy stations to be studied are located, the improved relative gain array matrix is ​​used to calculate the dynamic coupling strength between the new energy stations; the dynamic coupling strength between the new energy stations is used to screen the new energy stations that are weakly coupled with the new energy stations to be studied;

[0009] For the independent partition where the new energy station to be studied is located, the electrical coupling strength between the substation and the new energy station is calculated based on the small signal disturbance voltage; the electrical coupling strength between the substation and the new energy station is used to screen the substation with weak coupling with the new energy station;

[0010] From the independent partition where the new energy station to be studied is located, remove the new energy stations weakly coupled with the new energy station to be studied and the substations weakly coupled with the new energy station to be studied, and obtain a modeling area for oscillation simulation analysis, so as to use the modeling area to establish an equivalent system and perform oscillation simulation analysis on the new energy station to be studied.

[0011] Furthermore, the GN splitting algorithm is used to divide the new energy grid and generate a static partitioning scheme, including:

[0012] The abstract new energy grid is a topological network, which includes a plurality of new energy station nodes, a plurality of substation nodes, and a plurality of line abstract edges;

[0013] Using the GN splitting algorithm, calculating the weighted edge betweenness of the edges between the substation nodes, and removing the edge with the largest weighted edge betweenness from the topological network, so as to divide the new energy grid into at least two independent partitions;

[0014] Calculate the weighted network modularity of the topological network after removing the edges;

[0015] When the weighted network modularity does not meet the preset conditions, the GN splitting algorithm is used to calculate the weighted edge betweenness of the edges between substation nodes for the topological network after removing the edges. The edges with the largest weighted edge betweenness are removed again from the topological network after removing the edges, and the topological network is further divided until the weighted network modularity of the final topological network meets the preset conditions.

[0016] Furthermore, the calculation of the weighted network modularity of the topological network after removing the edges includes:

[0017] The weighted network modularity Q is calculated using the following formula:

[0018]

[0019] Among them, x ab is the line impedance value of the line between nodes a and b in the topological network after removing the edge; is the sum of the line impedance values ​​of all lines connected to node a; is the sum of the line impedance values ​​of all lines connected to node b; Represents the sum of the line impedance values ​​of all lines in the topological network; if node a and node b are divided into the same independent partition, the partition identifier δ(a,b) is determined to be 1; if node a and node b are divided into different independent partitions, the partition identifier δ(a,b) is determined to be 0.

[0020] Furthermore, for the independent partition where the new energy station to be studied is located, the improved relative gain array matrix is ​​used to calculate the dynamic coupling strength between the new energy stations; the dynamic coupling strength between the new energy stations is used to screen the new energy stations that are weakly coupled with the new energy station to be studied, including:

[0021] Establish a system transfer function matrix of an independent partition where the new energy station to be studied is located, and generate a relative gain array matrix using the system transfer function matrix;

[0022] Generate an improved relative gain array matrix according to the relative gain array matrix and the new energy station capacity matrix of the independent partition where the new energy station to be studied is located;

[0023] Determine the dynamic coupling intensity between new energy stations based on the elements of the improved relative gain array matrix;

[0024] Determine the new energy station whose dynamic coupling strength with the new energy station to be studied is less than a preset threshold as a weakly coupled new energy station;

[0025] The new energy stations whose dynamic coupling strength with the new energy stations to be studied is not less than the preset threshold are retained as strongly coupled new energy stations.

[0026] Further, the generating a relative gain array matrix by using the system transfer function matrix includes:

[0027] Using the system transfer function matrix G(s), the relative gain array matrix RGA(G(s)) is calculated according to the following formula:

[0028]

[0029] Among them, the symbol Indicates the multiplication between matrix elements; s = jw = j2πf, w is the angular frequency, f is the frequency, and j represents the imaginary unit;

[0030] The step of generating an improved relative gain array matrix according to the relative gain array matrix and the new energy station capacity matrix of the independent partition where the new energy station to be studied is located comprises:

[0031] Using the relative gain array matrix RGA(G(s)) and the new energy station capacity matrix S of the independent partition where the new energy station to be studied is located, the improved relative gain array matrix SRGA(G(s)) is calculated according to the following formula:

[0032]

[0033] Furthermore, for the independent partition where the new energy station to be studied is located, the electrical coupling strength between the substation and the new energy station is calculated based on the small signal disturbance voltage; the substation with weak coupling with the new energy station is screened by using the electrical coupling strength between the substation and the new energy station, including: determining the system impedance matrix for the independent partition where the new energy station to be studied is located;

[0034] Small signal currents are injected from all the reserved new energy stations in the independent partition where the new energy station to be studied is located. The determined system impedance matrix is ​​used to calculate the small signal disturbance voltage of each substation in the independent partition where the new energy station to be studied is located to characterize the electrical coupling strength between the substation and the new energy station.

[0035] Determine the substation whose electrical coupling strength with the new energy station is less than the voltage disturbance threshold as a weakly coupled substation;

[0036] The substation whose electrical coupling strength with the new energy station is not less than the voltage disturbance threshold is regarded as a strongly coupled substation.

[0037] Furthermore, the voltage disturbance threshold ΔV is determined according to the following formula: m :

[0038]

[0039] Among them, ΔU m is the small signal disturbance voltage generated in substation m by the small signal current injected from all the retained new energy sites, m is an integer greater than 1 and less than n, and n is the number of substation nodes in the independent partition where the new energy site to be studied is located.

[0040] In a second aspect, the present invention provides a device for determining a new energy grid modeling area for oscillation simulation analysis, which is used to execute the method for determining a new energy grid modeling area for oscillation simulation analysis described in the first aspect, comprising:

[0041] A static partitioning scheme calculation unit is used to divide the new energy power grid by using the GN splitting algorithm to generate a static partitioning scheme, wherein the static partitioning scheme includes two or more independent partitions; each independent partition corresponds to a preliminary new energy site set and a preliminary substation set;

[0042] The new energy station screening unit is used to calculate the dynamic coupling strength between new energy stations using the improved relative gain array matrix for the independent partition where the new energy station to be studied is located; and to screen new energy stations that are weakly coupled with the new energy station to be studied using the dynamic coupling strength between the new energy stations;

[0043] The substation screening unit is used to calculate the electrical coupling strength between the substation and the new energy station based on the small signal disturbance voltage for the independent partition where the new energy station to be studied is located; the electrical coupling strength between the substation and the new energy station is used to screen the substation with weak coupling with the new energy station;

[0044] The modeling area determination unit is used to remove new energy stations that are weakly coupled with the new energy stations to be studied and substations that are weakly coupled with the new energy stations from the independent partition where the new energy stations to be studied are located, so as to obtain a modeling area for oscillation simulation analysis, so as to use the modeling area to establish an equivalent system and perform oscillation simulation analysis on the new energy stations to be studied.

[0045] In a third aspect, the present invention provides a terminal, comprising: a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the method described in the first aspect.

[0046] In a fourth aspect, the present invention provides a computer storage medium storing computer controllable instructions, wherein the computer controllable instructions are used to execute the method described in the first aspect.

[0047] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0048] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0049] Figure 1 A schematic diagram of a flow chart of a method for determining a new energy grid modeling area for oscillation simulation analysis according to an embodiment of the present invention;

[0050] Figure 2 A schematic flow chart of a method for determining a new energy grid modeling area for oscillation simulation analysis according to another embodiment of the present invention;

[0051] Figure 3 It is a schematic diagram of the principle of an improved RGA method taking into account the capacity of new energy stations according to an embodiment of the present invention;

[0052] Figure 4 The topology network of the power grid in a large-scale renewable energy gathering area;

[0053] Figure 5 The method for determining the modeling area according to the embodiment of the present invention is applied to Figure 4 Schematic diagram of the modeling area determined by the power grid;

[0054] Fig. 6A To use Figure 5 The equivalent system established and utilized in the determined modeling area Figure 4 Schematic diagram of simulation waveform comparison of the wind farm to be studied for complete system analysis at full startup;

[0055] Figure 6B To use Figure 4 Fully booted complete system and utilization Figure 4 The equivalent system analysis of the exit of the new energy station i shows the simulation waveform comparison diagram of the wind farm to be studied;

[0056] Figure 7 A schematic diagram of the composition of a device for determining a new energy grid modeling area for oscillation simulation analysis according to an embodiment of the present invention;

[0057] Figure 8 A schematic diagram of the composition of a terminal for applying the method for determining a new energy grid modeling area for oscillation simulation analysis according to an embodiment of the present invention. DETAILED DESCRIPTION

[0058] The exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that the embodiments of the present invention and the features in the embodiments can be combined with each other without conflict.

[0059] Referring to the above description, with the construction of new power systems, the penetration rate of new energy power electronic devices in power systems continues to increase. Before the commissioning of new energy sites, it is necessary to establish an electromagnetic transient simulation model to better analyze and suppress sub / supersynchronous oscillation problems. Due to the limitations of algorithms and timeliness, the scale of the simulation model cannot be infinite. Therefore, before modeling, it is necessary to clarify the reasonable grid modeling area and simplify the new energy grid to take into account both analysis accuracy and simulation efficiency.

[0060] From the perspective of graph theory, the essence of the problem of determining the area for modeling a new energy power grid is to select the new energy sites and associated nodes (such as substations) that need to be retained during modeling from the power grid topology.

[0061] The grid partitioning method is a mature grid structure identification method that can be directly applied to determine the grid modeling area. However, when performing grid partitioning, the main consideration is the degree of electrical coupling between nodes, and the impact of dynamic coupling between power electronic equipment (such as new energy stations and substations) in the new energy grid is not considered. This factor cannot be ignored in the sub / super synchronous oscillation analysis of the new energy grid.

[0062] The present invention proposes a technical solution for determining a new energy power grid modeling area suitable for sub / super synchronous oscillation simulation, including a method and device for determining a new energy power grid modeling area for oscillation simulation analysis. According to the degree of electrical coupling between power grid nodes, SRGA analysis and small signal disturbance theory, the dynamic influence or coupling characteristics between new energy sites and the degree of electrical coupling between new energy and substations are determined to determine the power grid modeling area suitable for sub / super synchronous oscillation simulation analysis, and an equivalent system for new energy site analysis is established using the determined power grid modeling area.

[0063] In this way, the simulation model of the new energy grid suitable for sub / super synchronous oscillation simulation can be maintained at an appropriate scale, which is conducive to the application of new energy grid oscillation simulation analysis in engineering practice and better analysis and suppression of sub / super synchronous oscillation problems.

[0064] like Figure 1 As shown, the method for determining the new energy grid modeling area for oscillation simulation analysis in an embodiment of the present invention includes the following steps:

[0065] S100: Divide the new energy power grid using the GN splitting algorithm to generate a static partitioning scheme, wherein the static partitioning scheme includes two or more independent partitions; each independent partition corresponds to a preliminary new energy site set and a preliminary substation set;

[0066] S200: For the independent partition where the new energy station to be studied is located, the improved relative gain array matrix is ​​used to calculate the dynamic coupling strength between the new energy stations; the dynamic coupling strength between the new energy stations is used to screen the new energy stations that are weakly coupled with the new energy station to be studied;

[0067] S300: For the independent partition where the new energy station to be studied is located, the electrical coupling strength between the substation and the new energy station is calculated based on the small signal disturbance voltage; the electrical coupling strength between the substation and the new energy station is used to screen the substation with weak coupling with the new energy station;

[0068] S400: From the independent partition where the new energy station to be studied is located, remove the new energy station that is weakly coupled with the new energy station to be studied and remove the substation that is weakly coupled with the new energy station to be studied, and obtain a modeling area for oscillation simulation analysis, so as to use the modeling area to establish an equivalent system and perform oscillation simulation analysis on the new energy station to be studied.

[0069] In some embodiments, the method of using the GN splitting algorithm to divide the new energy grid and generate a static partitioning scheme includes:

[0070] The abstract new energy grid is a topological network, which includes a plurality of new energy station nodes, a plurality of substation nodes, and a plurality of line abstract edges;

[0071] Using the GN splitting algorithm, calculating the weighted edge betweenness of the edges between the substation nodes, and removing the edge with the largest weighted edge betweenness from the topological network, so as to divide the new energy grid into at least two independent partitions;

[0072] Calculate the weighted network modularity of the topological network after removing the edges;

[0073] When the weighted network modularity does not meet the preset conditions, the GN splitting algorithm is used to calculate the weighted edge betweenness of the edges between substation nodes for the topological network after removing the edges. The edges with the largest weighted edge betweenness are removed again from the topological network after removing the edges, and the topological network is further divided until the weighted network modularity of the final topological network meets the preset conditions.

[0074] In some embodiments, the step of calculating the weighted network modularity of the topological network after removing the edges includes:

[0075] The weighted network modularity Q is calculated using the following formula:

[0076]

[0077] Among them, x ab is the line impedance value of the line between nodes a and b in the topological network after removing the edge; is the sum of the line impedance values ​​of all lines connected to node a; is the sum of the line impedance values ​​of all lines connected to node b; Represents the sum of the line impedance values ​​of all lines in the topological network; if node a and node b are divided into the same independent partition, the partition identifier δ(a,b) is determined to be 1; if node a and node b are divided into different independent partitions, the partition identifier δ(a,b) is determined to be 0.

[0078] In this way, in the partitioning stage based on the GN splitting algorithm, a static partitioning scheme is generated for the power grid topology network in the large-scale new energy gathering area. The static partitioning scheme includes multiple independent partitions, and each independent partition corresponds to a preliminary new energy site set and a preliminary substation set.

[0079] In some embodiments, for the independent partition where the new energy station to be studied is located, the improved relative gain array matrix is ​​used to calculate the dynamic coupling strength between the new energy stations; the dynamic coupling strength between the new energy stations is used to screen the new energy stations that are weakly coupled with the new energy station to be studied, including:

[0080] Establish a system transfer function matrix of an independent partition where the new energy station to be studied is located, and generate a relative gain array matrix using the system transfer function matrix;

[0081] Generate an improved relative gain array matrix according to the relative gain array matrix and the new energy station capacity matrix of the independent partition where the new energy station to be studied is located;

[0082] Determine the dynamic coupling intensity between new energy stations based on the elements of the improved relative gain array matrix;

[0083] Determine the new energy station whose dynamic coupling strength with the new energy station to be studied is less than a preset threshold as a weakly coupled new energy station;

[0084] The new energy stations whose dynamic coupling strength with the new energy stations to be studied is not less than the preset threshold are retained as strongly coupled new energy stations.

[0085] In some embodiments, the generating a relative gain array matrix using the system transfer function matrix comprises:

[0086] Using the system transfer function matrix G(s), the relative gain array matrix RGA(G(s)) is calculated according to the following formula:

[0087]

[0088] Among them, the symbol Indicates the multiplication between matrix elements; s = jw = j2πf, w is the angular frequency, f is the frequency, and j represents the imaginary unit;

[0089] The step of generating an improved relative gain array matrix according to the relative gain array matrix and the new energy station capacity matrix of the independent partition where the new energy station to be studied is located comprises:

[0090] Using the relative gain array matrix RGA(G(s)) and the new energy station capacity matrix S of the independent partition where the new energy station to be studied is located, the improved relative gain array matrix SRGA(G(s)) is calculated according to the following formula:

[0091]

[0092] Thus, in the stage of selecting new energy stations based on SRGA, for the independent partition where the new energy station to be studied is located, the dynamic coupling strength between the new energy stations taking into account the degree of electrical coupling between nodes and the capacity of the new energy stations is calculated, and at least one new energy station that is weakly coupled with the new energy station to be studied is selected, and at least one new energy station that is weakly coupled with the new energy station to be studied is retained to form the final set of new energy stations. The final set of new energy stations records at least one new energy station that is strongly coupled with the new energy station to be studied, that is, all the retained new energy stations.

[0093] In some embodiments, for the independent partition where the new energy station to be studied is located, the electrical coupling strength between the substation and the new energy station is calculated based on the small signal disturbance voltage; and the substation with weak coupling with the new energy station is screened by using the electrical coupling strength between the substation and the new energy station, including:

[0094] Determine the system impedance matrix for the independent partition where the new energy station to be studied is located;

[0095] Small signal currents are injected from all the reserved new energy stations in the independent partition where the new energy station to be studied is located. The determined system impedance matrix is ​​used to calculate the small signal disturbance voltage of each substation in the independent partition where the new energy station to be studied is located to characterize the electrical coupling strength between the substation and the new energy station.

[0096] Determine the substation whose electrical coupling strength with the new energy station is less than the voltage disturbance threshold as a weakly coupled substation;

[0097] The substation whose electrical coupling strength with the new energy station is not less than the voltage disturbance threshold is regarded as a strongly coupled substation.

[0098] In some embodiments, the voltage disturbance threshold ΔV is determined according to the following formula: m :

[0099]

[0100] Among them, ΔU m is the small signal disturbance voltage generated in substation m by the small signal current injected from all the retained new energy sites, m is an integer greater than 1 and less than n, and n is the number of substation nodes in the independent partition where the new energy site to be studied is located.

[0101] In this way, in the stage of screening substations based on small signal voltage, for the independent partition where the new energy station to be studied is located, the small signal disturbance voltage of the substation under the action of the small signal current of all retained new energy stations is calculated, and the substations with a closer electrical distance to the new energy station are screened to form the final substation set.

[0102] The method for determining the modeling area of ​​a new energy grid for oscillation simulation analysis in the embodiment of the present invention, in the system modeling stage in the new energy grid oscillation simulation analysis, sequentially performs static partitioning, new energy station screening and substation screening, and then determines the modeling area of ​​the new energy grid. An improved RGA method is proposed, which can obtain the dynamic coupling strength between new energy stations according to the degree of electrical coupling between nodes and the capacity factor of new energy stations, so that it can be used for new energy station screening and obtaining new energy stations to be retained; it is proposed to screen substations based on small signal disturbance voltage, and use small signal disturbance voltage to characterize the electrical coupling strength between substations and new energy stations when oscillation occurs, so as to obtain substations with a close electrical distance to the reserved stations to form a modeling area, which can take into account both analysis accuracy and simulation efficiency.

[0103] like Figure 2 As shown, the method for determining the new energy grid modeling area for oscillation simulation analysis in an embodiment of the present invention includes the following steps:

[0104] S11: The abstract new energy grid is a network topology diagram. The network topology diagram is as follows: Figure 4 As shown, it includes new energy station nodes, substation nodes, edges, etc.

[0105] S12: Calculate the weighted edge betweenness of all the edges between nodes in the substation node, and remove the edge with the largest value of the weighted edge betweenness (do not remove the nodes connected by the edge); in this way, the network topology graph forms two independent partitions; calculate the weighted network modularity Q after the partition.

[0106] Specifically, in a network topology diagram, the shortest path is the path with the smallest impedance among all paths from a specified starting point to a specified end point; edge betweenness refers to the number of shortest paths passing through an edge among all the shortest paths in the network, which is used to measure the importance of an edge in the network; weighted edge betweenness is the product of edge betweenness and edge weight, where edge weight is the impedance of the edge.

[0107] S13: When the calculated weighted network modularity Q is between 0.5 and 0.6, it is determined that the static partitioning requirement is met; when the calculated weighted network modularity Q is not between 0.5 and 0.6, go to step S12.

[0108] In this way, when the calculated weighted network modularity Q is between 0.5 and 0.6, the static partitioning requirements are met, and the current two or more independent partitions form a static partitioning scheme. The new energy site nodes and substation nodes in each independent partition are obtained, and the new energy site nodes in each independent partition constitute a preliminary new energy site set, and the substation nodes in each independent partition constitute a preliminary substation set.

[0109] Specifically, the weighted network modularity Q is calculated according to the following formula:

[0110]

[0111] In the above formula (1), x ab is the line impedance value of the line between nodes a and b; is the sum of the line impedance values ​​of all lines connected to node a; is the sum of the line impedance values ​​of all lines connected to node b; represents the sum of all line impedance values ​​in the network; assuming that the k of each node is maintained a unchanged, forming a random network, then k a k b / 2K represents the expected value of the line impedance between nodes a and b; if nodes a and b are divided into the same independent partition, the partition identifier δ(a, b) = 1, otherwise δ(a, b) = 0.

[0112] According to the above definition, the value range of weighted network modularity Q is 0 to 1, where the value of weighted network modularity Q of the original network without partitioning is 1. If the value of weighted network modularity Q of the partitioned network is less than 0.5, it means that the cohesion of the partitioned network is insufficient; if the value of weighted network modularity Q of the partitioned network is greater than 0.6, it means that the cohesion of the partitioned network is too large.

[0113] In some embodiments, the GN splitting algorithm may be used multiple times to sequentially remove the edges with the largest weighted edge betweenness in the round, thereby forming more than two independent partitions in the power grid.

[0114] S14: Establishing the system closed-loop transfer function matrix G(s) of the independent partition where the new energy station to be studied is located;

[0115] S15: The dynamic coupling strength between stations is calculated using the improved RGA method to obtain a station set J whose gain factor is not higher than the gain threshold value;

[0116] S16: subtracting set J from the preliminary set of new energy stations to obtain a final set of new energy stations;

[0117] Specifically, Figure 3 As shown in the figure, the single machine current and port voltage of each new energy station in the independent partition are used as the input and output of the improved RGA matrix respectively, and the improved RGA matrix SRGA(G(s)) can be determined according to the following formula:

[0118] SRGA(G(s))=RGA(G(s))·S (2)

[0119] In the above formula (2), S is the capacity matrix of the new energy station, such as the capacity of each new energy station in an independent partition or the number of single machines in each new energy station; RGA (G (s)) is the relative gain array (RGA) matrix.

[0120] Using the closed-loop transfer function matrix G(s) of the independent partition system, the relative gain array matrix RGA(G(s)) is calculated as follows:

[0121]

[0122] In the above formula (3), the symbol It represents the multiplication between matrix elements (such as Hadamard product); s=jw=j2πf, f is the angular frequency, and j represents the imaginary unit.

[0123] According to equations (2) and (3), the elements of the improved relative gain array matrix SRGA(G(s)) can be obtained:

[0124]

[0125] In the above formula (4), S ii is the value of each element on the main diagonal of the new energy station capacity matrix, i = 1, 2, ..., l, that is, i is greater than 1 and less than the number l of new energy stations in the independent partition.

[0126] Furthermore, the elements of the improved relative gain array matrix SRGA(G(s)) are used Determine the gain factor used to characterize the dynamic coupling strength of new energy station j to new energy station i, the gain factor Λ ij Determined according to the following formula:

[0127]

[0128] In formula (5), s=jw=j2πf, and f is the frequency.

[0129] Specifically, the calculation results in the sub-synchronous / super-synchronous frequency band can be approximately replaced by the calculation results under a single frequency; further, the single frequency can be the system frequency f0=50 Hz.

[0130] Specifically, the gain threshold value characterizing the dynamic coupling strength of the new energy station j to the new energy station i is determined to be 0.01. The gain threshold value can be selected by calculation and combined with experience. For example, after comparing the theoretical calculation results and simulation results of multiple examples, the threshold value is set to 0.01, a relatively conservative value.

[0131] When used to characterize the gain factor Λ of the dynamic coupling strength of new energy station j to new energy station i ij When the gain threshold is not higher than the gain threshold, the dynamic impact of the new energy station j on the new energy station i can be ignored. That is, when performing oscillation simulation analysis on the new energy station i, the new energy station j can be modeled without modeling it, and only the gain factor Λ ij The new energy station j corresponding to the value above the gain threshold is included in the modeling scope, so that both the analysis accuracy and simulation efficiency of the oscillation simulation can be taken into account.

[0132] In this way, for the new energy station i to be studied, the gain factor Λ can be formed ij A weakly coupled station set J of new energy station j whose value is not higher than the gain threshold value; by subtracting the weakly coupled station set J from the preliminary new energy station set, the retained final new energy station set can be obtained, and the dynamic coupling strength of each retained new energy station for the new energy station i to be studied is not higher than the gain threshold value.

[0133] In the above, the improved relative gain array matrix is ​​used to quantify the dynamic coupling strength between new energy stations, and then the new energy stations with weak coupling with the new energy stations to be studied can be quantitatively screened, and the new energy stations with strong coupling with the new energy stations to be studied can be retained. The quantitative screening principle is reliable, the conclusion is accurate, and the calculation efficiency is high.

[0134] S17: Establish the system impedance matrix of the independent partition where the new energy station to be studied is located;

[0135] S18: Calculate the substation disturbance voltage under the action of the small signal current of the reserved station, and obtain a substation set M that is not higher than the disturbance voltage threshold value;

[0136] S19: Subtract the weakly coupled substation set M from the preliminary substation set to obtain a final substation set and determine a final modeling area.

[0137] Specifically, for the independent partition where the new energy station to be studied is located, the system impedance matrix Z(jw) is determined; small signal currents are injected from all the retained new energy stations respectively, and the small signal disturbance voltage of each substation is calculated using the determined system impedance matrix Z(jw), and the substation whose small signal disturbance voltage is not higher than the disturbance voltage threshold value is determined.

[0138] Specifically, the small signal current injected from the new energy station i generates a small signal disturbance voltage ΔU in each substation m m,i (jw)(m=1,2,…,n) is calculated according to the following formula, where n is the number of substations in an independent zone or the number of substations in the preliminary substation set:

[0139]

[0140] In the above formula (6), S ii (i=1,2,...,l) is the capacity of the new energy station i; ΔI is the unit small signal current; w is the angular frequency.

[0141] Furthermore, the small signal disturbance voltage generated by the small signal current injected from all the reserved new energy stations i in the substation m is:

[0142]

[0143] In formula (7), w = 2πf; f is the system frequency.

[0144] Specifically, the calculation results in the sub-synchronous / super-synchronous frequency band are approximately replaced by the calculation results under a single frequency, where the system frequency f0=50 Hz.

[0145] Specifically, the substation screening index based on small signal disturbance voltage, that is, the disturbance voltage threshold value ΔV, is calculated according to the following formula: m :

[0146]

[0147] When the small signal current injected from all the reserved new energy stations generates a small signal disturbance voltage ΔU in substation m m Not higher than the disturbance voltage threshold ΔV m When , it means that the small signal current of the new energy station flowing through substation m is very small, and the electrical distance between the substation and each new energy station is far, which is weak coupling. The substation can be ignored in modeling. In this way, the analysis accuracy and simulation efficiency of the oscillation simulation can be taken into account.

[0148] In this way, for the new energy station to be studied, a weakly coupled substation set M whose small signal disturbance voltage is not higher than the disturbance voltage threshold value can be formed. Subtracting the weakly coupled substation set M from the preliminary substation set can obtain the final substation set retained, and the electrical coupling strength of each retained substation for the new energy station to be studied is not higher than the disturbance voltage threshold value.

[0149] In the above, the electrical coupling strength between the substation and the new energy station is quantified by using the small signal disturbance voltage, and then the substations with weak coupling with the new energy station to be studied can be quantitatively screened, and the substations with strong coupling with the new energy station to be studied can be retained. The quantitative screening principle is reliable, the conclusion is accurate, and the calculation efficiency is high.

[0150] In some embodiments, for any independent partition, the final set of new energy stations and the final set of substations are merged as the final modeling area. In the final modeling area, in addition to nodes such as new energy stations and substations, the lines or edges connecting these nodes are also included. In this way, a modeling area suitable for the oscillation simulation scenario is determined.

[0151] As described above, the method for determining the modeling area of ​​a new energy power grid for oscillation simulation analysis in the embodiment of the present invention adopts the GN splitting algorithm to divide the new energy power grid, statically partition the power grid, and generate a static partitioning scheme;

[0152] The improved relative gain array matrix is ​​used to calculate the dynamic coupling strength between the new energy stations taking into account the electrical coupling degree between nodes and the capacity of the new energy stations for the independent partition where the new energy station to be studied is located, and the new energy stations with weak coupling with the new energy stations to be studied are screened; for the independent partition where the new energy station to be studied is located, the electrical coupling strength between the substation and the new energy station is calculated based on the small signal disturbance voltage, and the substation with weak coupling with the new energy station is screened; from the independent partition where the new energy station to be studied is located, the new energy stations with weak coupling with the new energy station to be studied and the substations with weak coupling with the new energy station are removed, and the modeling area for oscillation simulation analysis is obtained, so as to use the modeling area to establish an equivalent system to perform oscillation simulation analysis on the new energy station to be studied. The quantitative screening principle is reliable, the conclusion is accurate, and the calculation efficiency is high. In this way, the analysis accuracy and simulation efficiency of the oscillation simulation can be taken into account by using the modeling area to establish an equivalent system for the new energy station to be studied.

[0153] The following further Figure 4 Taking the power grid in a certain region shown as an example, the method for determining the new energy power grid modeling area suitable for the oscillation simulation scenario of an embodiment of the present invention is described. This area is a typical large-scale wind power access scenario. There are partial loads locally, and there is basically no conventional power supply access. There are 14 wind farms in the north, with a total scale of about 3000MW. Wind power is first sent to the 220kV booster station (14 booster stations are numbered in sequence with lowercase English letters a to n), and then collected to the 220kV substation (10 220kV substations are numbered in sequence with numbers 1 to 10), and finally sent to the 500kV substation (3 500kV substations are numbered in sequence with uppercase English letters A to C; 500kV busbars and lines are displayed in red) to be injected into the power grid. Figure 4 The scale of each wind farm, the booster station of the new energy station, the line length between the 220kV substation and the 500kV substation (in km) are displayed. Figure 4 Before the wind farm d is put into operation, an electromagnetic transient simulation model is established for it to better analyze and suppress sub / super synchronous oscillation problems. To this end, it is necessary to determine the new energy grid modeling area suitable for the wind farm d oscillation simulation scenario to be studied.

[0154] right Figure 4 The regional power grid shown is abstracted and simplified, and the simplified node set includes new energy station nodes a to n, 220kV substation nodes 1 to 10 and 500kV substation nodes A to C, etc.

[0155] The GN splitting algorithm is used to perform static partitioning of the power grid. The calculation results of the first execution of the GN splitting algorithm are shown in Table 1. The edge with the largest weighted edge betweenness is removed, such as the 220kV line 7-B with the highest ranking in this round. The calculation results of the second execution of the GN splitting algorithm are shown in Table 2. After removing the edge with the largest weighted edge betweenness, such as the 220kV line AB with the highest ranking in this round, Figure 5 As shown, the power grid is decomposed into two independent partitions, such as the upper left independent partition and the lower right independent partition separated by the dashed curve. The weighted network modularity Q of the calculated power grid is 0.510, which meets the network cohesion requirement.

[0156] In this way, based on the GN splitting algorithm, the power grid is statically partitioned and the static partitioning scheme is determined. The GN splitting algorithm is executed twice to achieve Figure 4 The static partitioning scheme is stored, such as the preliminary set of new energy sites {a, b, c, d, e, f, g, h, i, j, k, l} and the preliminary set of substations {1, 2, 3, 4, 5, 7, 8, A} corresponding to the upper left independent partition, and the preliminary set of new energy sites {m, n} and the preliminary set of substations {6, 9, 10, B, C} corresponding to the upper right independent partition.

[0157] Table 1. Static partition calculation results after the first execution of the GN splitting algorithm

[0158]

[0159] Table 2 Static partition calculation results after the second execution of the GN splitting algorithm

[0160]

[0161] In this way, based on the GN splitting algorithm, the power grid is statically partitioned and the static partitioning scheme is determined. The GN splitting algorithm is executed twice to achieve Figure 4 The static partitioning scheme is stored, such as the preliminary set of new energy sites {a, b, c, d, e, f, g, h, i, j, k, l} and the preliminary set of substations {1, 2, 3, 4, 5, 7, 8, A} corresponding to the upper left independent partition, and the preliminary set of new energy sites {m, n} and the preliminary set of substations {6, 9, 10, B, C} corresponding to the upper right independent partition.

[0162] Furthermore, the improved RGA method is used to screen new energy sites. Figure 4The upper left independent partition where the wind farm d to be studied is shown in green in the middle is used to establish the closed-loop transfer function matrix of the system, and calculate the dynamic coupling strength of other new energy sites to the wind farm d to be studied, as shown in Table 3. In this way, the gain factors of wind farms k, l and c are lower than the gain threshold value of 0.01, forming a weakly coupled new energy site set J = {c, k, l}. Subtracting set J from the preliminary new energy site set, we get the final set of new energy sites to be modeled or retained {a, b, d, e, f, g, h, i, j}.

[0163] Table 3 Screening results of new energy stations based on the improved RGA method

[0164]

[0165] Table 4 Substation screening results based on small signal disturbance voltage

[0166] Substation name Disturbance voltage Keep 7 0.6836 yes 8 0.6635 yes 4 0.4421 yes 1 0.3223 yes 3 0.2539 yes A 0.1128 yes 5 0.0887 no 2 0.0874 no

[0167] Furthermore, substation screening is performed based on small signal disturbance voltage. Figure 4 The system impedance matrix of the independent partition where the wind farm d to be studied is shown in green in the middle. Based on the set of new energy stations retained in the previous step, the substation disturbance voltage under the small signal current injected by all new energy stations is calculated, and the disturbance voltage threshold value ΔV is set m is 0.1, and the substation screening results are shown in Table 4. Table 4 shows that the substations below the threshold value ΔV m The substations are numbered 2 and 5, forming a weakly coupled substation set M = {2,5}. Subtract the weakly coupled substation set M from the preliminary substation set to obtain the final substation set to be modeled or retained {1,3,4,7,8,A}.

[0168] In this way, for the upper left independent partition, the final modeling area includes the final set of new energy stations to be modeled {a,b,d,e,f,g,h,i,j} and the final set of substations to be modeled {1,3,4,7,8,A}.

[0169] The effectiveness of the partition determination method is verified using an oscillation simulation scenario. Fig. 6A for Figure 4 At 0.5s, the power of the new energy units in the power grid of China Power Grid is stepped from 80% to 100%, and the active power, reactive power and port voltage of the wind farm d to be studied are studied. Sub / super synchronous oscillation phenomenon occurs in both the unsimplified complete system and the simplified equivalent system, and the oscillation waveform has a high consistency, such as the oscillation frequency, amplitude and divergence speed are the same, such as Fig. 6A shown.

[0170] From the final set of new energy stations {a, b, d, e, f, g, h, i, j} in Table 3, remove the new energy station i and perform a simplified equivalent system simulation; compare it with the simulation waveform of the unsimplified complete system. Figure 6B As shown in the figure, the oscillation frequency, amplitude and divergence speed of the unsimplified complete system and the simplified equivalent system are different, indicating that the new energy station i and the wind farm d to be studied are strongly coupled and need to be retained during simulation modeling.

[0171] The above comparison can verify that the modeling area determined by the modeling partition determination method proposed in the present invention is more reasonable. In this way, the effectiveness of the method is verified through simulation.

[0172] like Figure 7 As shown, the present invention provides a device for determining a new energy grid modeling area for oscillation simulation analysis, which is used to execute the method for determining a new energy grid modeling area for oscillation simulation analysis described in the first aspect, comprising:

[0173] The static partitioning scheme calculation unit 10 is used to divide the new energy power grid by using the GN splitting algorithm to generate a static partitioning scheme, wherein the static partitioning scheme includes two or more independent partitions; each independent partition corresponds to a preliminary new energy site set and a preliminary substation set;

[0174] The new energy station screening unit 20 is used to calculate the dynamic coupling strength between the new energy stations using the improved relative gain array matrix for the independent partition where the new energy station to be studied is located; and to screen the new energy stations that are weakly coupled with the new energy station to be studied using the dynamic coupling strength between the new energy stations;

[0175] The substation screening unit 30 is used to calculate the electrical coupling strength between the substation and the new energy station based on the small signal disturbance voltage for the independent partition where the new energy station to be studied is located; and to screen the substation with weak coupling with the new energy station by using the electrical coupling strength between the substation and the new energy station;

[0176] The modeling area determination unit 40 is used to remove the new energy stations that are weakly coupled with the new energy stations to be studied and the substations that are weakly coupled with the new energy stations from the independent partition where the new energy stations to be studied are located, so as to obtain a modeling area for oscillation simulation analysis, so as to use the modeling area to establish an equivalent system and perform oscillation simulation analysis on the new energy stations to be studied.

[0177] The embodiment of the present invention also provides a terminal to execute the method. Figure 8 It shows a schematic diagram of a terminal provided by some embodiments of the present invention. Figure 8As shown, the terminal 8 includes: a processor 800, a memory 801, a bus 802 and a communication interface 803, wherein the processor 800, the communication interface 803 and the memory 801 are connected via the bus 802; the memory 801 stores a computer program that can be run on the processor 800, and the processor 800 executes the method provided by any of the aforementioned embodiments of the present invention when running the computer program.

[0178] The memory 801 may include a high-speed random access memory (RAM), and may also include a non-volatile memory (Non-volatile Memory), such as at least one disk storage. The communication connection between the device network element and at least one other network element is realized through at least one communication interface 803 (which may be wired or wireless), and the Internet, wide area network, local area network, metropolitan area network, etc. may be used.

[0179] The bus 802 may be an ISA bus, a PCI bus, or an EISA bus, etc. The bus may be divided into an address bus, a data bus, a control bus, etc. The memory 801 is used to store programs, and the processor 800 executes the programs after receiving the control instructions. The method disclosed in any implementation of the above embodiments of the present invention may be applied to the processor 800, or implemented by the processor 800.

[0180] The processor 800 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the method can be completed by the hardware integrated logic circuit in the processor 800 or the instruction in the form of software. The processor 800 may be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it may also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present invention can be implemented or executed. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc. The steps of the method disclosed in the embodiments of the present invention may be directly embodied as being executed by a hardware decoding processor, or executed by a combination of hardware and software modules in a decoding processor. The software module may be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 801, and the processor 800 reads the information in the memory 801 and completes the steps of the method in combination with its hardware.

[0181] The terminal and the method are based on the same inventive concept and have the same beneficial effects as the method adopted, operated or implemented by them.

[0182] An embodiment of the present invention also provides a computer-readable storage medium corresponding to the method provided in the aforementioned embodiment. The computer-readable storage medium is a CD on which a computer program (i.e., a program product) is stored. When the computer program is run by a processor, it will execute the method provided in any of the aforementioned embodiments.

[0183] It should be noted that examples of the computer-readable storage medium may also include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other optical or magnetic storage media, which are not listed here one by one.

[0184] The computer-readable storage medium provided by the embodiment of the present invention is based on the same inventive concept as the present method and has the same beneficial effects as the method adopted, run or implemented by the application program stored therein.

[0185] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these adjustments and modifications of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these changes and modifications.

Claims

1. A method for determining a new energy grid modeling area for oscillation simulation analysis, characterized in that: include: The GN splitting algorithm is used to divide the new energy grid to generate a static partitioning scheme, wherein the static partitioning scheme includes two or more independent partitions; Each independent zone corresponds to a preliminary set of new energy stations and a preliminary set of substations; For the independent partitions where the new energy stations to be studied are located, the improved relative gain array matrix is ​​used to calculate the dynamic coupling strength between the new energy stations; Using the dynamic coupling strength between new energy stations, screen new energy stations that are weakly coupled with the new energy stations to be studied; For the independent partition where the new energy station to be studied is located, the electrical coupling strength between the substation and the new energy station is calculated based on the small signal disturbance voltage; the electrical coupling strength between the substation and the new energy station is used to screen the substation with weak coupling with the new energy station; From the independent partition where the new energy station to be studied is located, remove the new energy stations weakly coupled with the new energy station to be studied and the substations weakly coupled with the new energy station to be studied, and obtain a modeling area for oscillation simulation analysis, so as to use the modeling area to establish an equivalent system and perform oscillation simulation analysis on the new energy station to be studied.

2. The method for determining a new energy grid modeling area for oscillation simulation analysis according to claim 1, characterized in that: The GN splitting algorithm is used to divide the new energy grid and generate a static partitioning scheme, including: The abstract new energy grid is a topological network, which includes a plurality of new energy station nodes, a plurality of substation nodes, and a plurality of line abstract edges; Using the GN splitting algorithm, calculating the weighted edge betweenness of the edges between the substation nodes, and removing the edge with the largest weighted edge betweenness from the topological network, so as to divide the new energy grid into at least two independent partitions; Calculate the weighted network modularity of the topological network after removing the edges; When the weighted network modularity does not meet the preset conditions, the GN splitting algorithm is used to calculate the weighted edge betweenness of the edges between substation nodes for the topological network after removing the edges. The edges with the largest weighted edge betweenness are removed again from the topological network after removing the edges, and the topological network is further divided until the weighted network modularity of the final topological network meets the preset conditions.

3. The method for determining a new energy grid modeling area for oscillation simulation analysis according to claim 2, characterized in that: The step of calculating the weighted network modularity of the topological network after removing the edges includes: The weighted network modularity Q is calculated using the following formula: Among them, x ab is the line impedance value of the line between nodes a and b in the topological network after removing the edge; is the sum of the line impedance values ​​of all lines connected to node a; is the sum of the line impedance values ​​of all lines connected to node b; Represents the sum of the line impedance values ​​of all lines in the topological network; if node a and node b are divided into the same independent partition, the partition identifier δ(a,b) is determined to be 1; if node a and node b are divided into different independent partitions, the partition identifier δ(a,b) is determined to be 0.

4. The method for determining a new energy grid modeling area for oscillation simulation analysis according to claim 3, characterized in that: The improved relative gain array matrix is ​​used to calculate the dynamic coupling strength between the new energy stations for the independent partition where the new energy stations to be studied are located; Using the dynamic coupling strength between new energy stations, screen new energy stations that are weakly coupled with the new energy stations to be studied, including: Establish a system transfer function matrix of an independent partition where the new energy station to be studied is located, and generate a relative gain array matrix using the system transfer function matrix; Generate an improved relative gain array matrix according to the relative gain array matrix and the new energy station capacity matrix of the independent partition where the new energy station to be studied is located; Determine the dynamic coupling intensity between new energy stations based on the elements of the improved relative gain array matrix; Determine the new energy station whose dynamic coupling strength with the new energy station to be studied is less than a preset threshold as a weakly coupled new energy station; The new energy stations whose dynamic coupling strength with the new energy stations to be studied is not less than the preset threshold are retained as strongly coupled new energy stations.

5. The method for determining a new energy grid modeling area for oscillation simulation analysis according to claim 4, characterized in that: The method of using the system transfer function matrix to generate a relative gain array matrix comprises: Using the system transfer function matrix G(s), the relative gain array matrix RGA(G(s)) is calculated according to the following formula: Among them, the symbol Indicates the multiplication between matrix elements; s = jw = j2πf, w is the angular frequency, f is the frequency, and j represents the imaginary unit; The step of generating an improved relative gain array matrix according to the relative gain array matrix and the new energy station capacity matrix of the independent partition where the new energy station to be studied is located comprises: Using the relative gain array matrix RGA(G(s)) and the new energy station capacity matrix S of the independent partition where the new energy station to be studied is located, the improved relative gain array matrix SRGA(G(s)) is calculated according to the following formula:

6. The method for determining a new energy grid modeling area for oscillation simulation analysis according to claim 5, characterized in that: The electrical coupling strength between the substation and the new energy station is calculated based on the small signal disturbance voltage for the independent partition where the new energy station to be studied is located; Using the electrical coupling strength between the substation and the new energy station, screen the substations with weak coupling with the new energy station, including: determining the system impedance matrix for the independent partition where the new energy station to be studied is located; Small signal currents are injected from all the reserved new energy stations in the independent partition where the new energy station to be studied is located. The determined system impedance matrix is ​​used to calculate the small signal disturbance voltage of each substation in the independent partition where the new energy station to be studied is located to characterize the electrical coupling strength between the substation and the new energy station. Determine the substation whose electrical coupling strength with the new energy station is less than the voltage disturbance threshold as a weakly coupled substation; The substation whose electrical coupling strength with the new energy station is not less than the voltage disturbance threshold is regarded as a strongly coupled substation.

7. The method for determining a new energy grid modeling area for oscillation simulation analysis according to claim 6, characterized in that: Determine the voltage disturbance threshold ΔV according to the following formula m : Among them, ΔU m is the small signal disturbance voltage generated in substation m by the small signal current injected from all the retained new energy sites, m is an integer greater than 1 and less than n, and n is the number of substation nodes in the independent partition where the new energy site to be studied is located.

8. A device for determining a new energy grid modeling area for oscillation simulation analysis, characterized in that: The method for determining a new energy grid modeling area for oscillation simulation analysis according to claim 1 comprises: A static partitioning scheme calculation unit is used to divide the new energy power grid by using the GN splitting algorithm to generate a static partitioning scheme, wherein the static partitioning scheme includes two or more independent partitions; each independent partition corresponds to a preliminary new energy site set and a preliminary substation set; The new energy station screening unit is used to calculate the dynamic coupling strength between new energy stations using the improved relative gain array matrix for the independent partition where the new energy station to be studied is located; and to screen new energy stations that are weakly coupled with the new energy station to be studied using the dynamic coupling strength between the new energy stations; The substation screening unit is used to calculate the electrical coupling strength between the substation and the new energy station based on the small signal disturbance voltage for the independent partition where the new energy station to be studied is located; the electrical coupling strength between the substation and the new energy station is used to screen the substation with weak coupling with the new energy station; The modeling area determination unit is used to remove new energy stations that are weakly coupled with the new energy stations to be studied and substations that are weakly coupled with the new energy stations from the independent partition where the new energy stations to be studied are located, so as to obtain a modeling area for oscillation simulation analysis, so as to use the modeling area to establish an equivalent system and perform oscillation simulation analysis on the new energy stations to be studied.

9. A terminal, comprising: A memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the computer program to implement the method described in any one of claims 1 to 7.

10. A computer storage medium, characterized in that: Computer controllable instructions are stored, and the computer controllable instructions are used to execute the method according to any one of claims 1 to 7.